REALISASI PENERIMAAN
PT LOTUS TUJUH SEJAHTERA
Periode 1 Jan 2018 s.d. 31 Des 2018
Bulan No Tgl URAIAN PENERIMAAN PPN PPH NET
Januari 1 1/5/2018 PT. Bumi Arta / Swarna Group KONSULTANSI TAHAP 1 (DP) Rp9,900,000.00 Rp900,000.00 Rp180,000.00 Rp8,820,000.00
2 1/12/2018 PT POWERBLOCK INDONESIA KONSULTANSI TAHAP AKHIR (3) Rp9,900,000.00 Rp900,000.00 Rp180,000.00 Rp8,820,000.00
3 1/12/2018 SMKN PURWAKARTA KONSULTANSI TAHAP KEDUA (2) Rp13,750,000.00 Rp1,250,000.00 Rp250,000.00 Rp12,250,000.00
4 1/15/2018 PT. AJINOMOTO INDONESIA KONSULTANSI TAHAP 1 (DP) Rp9,405,000.00 Rp855,000.00 Rp171,000.00 Rp8,379,000.00
5 1/17/2018 PT. HUTAMA KARYA (PUJT) KONSULTANSI TAHAP AKHIR (3) Rp22,000,000.00 Rp2,000,000.00 Rp200,000.00 Rp19,800,000.00
6 1/23/2018 PT. PERTAMINA GAS (PERTAGAS) KONSULTANSI TAHAP AKHIR (3) Rp52,800,000.00 Rp4,800,000.00 Rp960,000.00 Rp 47,040,000.00
7 1/26/2018 PT. MITRASATRYA INHOUSETRAINING INTERNAL AUDIT 9K Rp16,500,000.00 Rp1,500,000.00 Rp300,000.00 Rp14,700,000.00
Februari 1
Februari 4
5
6
7
8
9
Penerimaan, Pengeluaran dan Saldo per 31 Desember 2018 Rp119,809,000.00 Rp31,950,000.00 Rp97,050,000.00 -Rp9,191,000.00