Anda di halaman 1dari 125

INPUT DATA : fc' = 22 Mpa H1 = 4.

15 m
fy = 325 Mpa H2 = 3.75 m
L1 = 6 m
L2 = 5.5 m
L3 = 5 m
L4 = 4.5 m
Kedalaman tanah keras = 16 m
Tujuan bangunan = sekolah
Beban hidup yang bekerja = 250 kg/m2
GAMBAR RENCANA
B
5.00 m
4.50 m

A A
5.00 m

B
6.00 m 5.50 m 6.00 m

DENAH LANTAI 1 DAN 2


3.8 m
4.15 m

6.00 m 6.00 m 6.00 m

POTONGAN A - A
3.8 m
4.15 m

5.00 m 5.00 m 5.00 m

POTONGAN B - B

B3 B1 B3
5.00 m

B2 B2 B2 B2

B3 B1 B3
4.50 m

B4 B4 B4 B4

A B3 B1 B3 A
5.00 m

B2 B2 B2 B2

B3 B1 B3

6.00 m 5.50 m 6.00 m


DENAH BALOK
ATAP
3.75 m

LANTAI 2
4.15 m

LANTAI 1

6.00 m 5.50 m 6.00 m

POTONGAN A - A
STRUKTUR BETON II Bab I hal. 7

I. PERENCANAAN AWAL (PRELIMINARY DESIGN)

I.1. DIMENSI BALOK

Untuk perhitungan, tebal pelindung/selimut beton menurut SNI 2002 Pasal 9.7.1
untuk balok dan kolom = 40 mm = 4 cm

Sedangkan untuk perencanaan tinggi balok (hmin) yang fy-nya selain dari 400 Mpa nilainya
harus dikalikan dengan (0,4 + fy/700), SNI 2002 Pasal 11.5.1.Tabel 8. Contoh fy =240, maka :
faktor penggandanya = (0,4 + 240/700) = 0,9071.

a. Untuk Balok B1

Diketahui L = 5500 mm Asumsi dua ujungnya menerus. (SNI 2002 Pasal 11.5.3(b) Tabel 8 )

L 5500 325
hmin = = . 0.4 + = 226.361 mm = 22.636 cm
21 21 700

dmin hmin
2
b = 3 x hmin = 15.0907 d' Ts

Jadi ukuran baloknya adalah b x h = 15.091 x 22.636 cm2

b. Untuk Balok B2

Diketahui L = 5000 mm Asumsi satu ujungnya menerus. (SNI 2002 Pasal 11.5.3(b) Tabel 8 )

L 5000 325
hmin = = . 0.4 + = 233.591 mm = 23.359 cm
18.5 18.5 700
2
b = x hmin =
3 15.5727

Jadi ukuran baloknya adalah b x h = 15.573 x 23.359 cm2


c. Untuk Balok B3

Diketahui L = 6000 mm (Asumsi satu ujung menerus (SNI 2002 pasal 11.5.3 (b) tabel 8)

L 6000 325
hmin = = . 0.4 + = 280.309 mm = 28.031 cm
18.5 18.5 700

2
b = x hmin = 18.6873
3

Jadi ukuran baloknya adalah b x h = 18.687 x 28.031 cm2

d. Untuk Balok B4

Diketahui L = 4500 mm Asumsi dua ujungnya menerus. (SNI 2002 Pasal 11.5.3(b) Tabel 8 )

L 4500 325
hmin = = . 0.4 + = 185.204 mm = 18.520 cm
21 21 700
STRUKTUR BETON II Bab I hal. 8

2
b = x hmin = 12.3469 cm
3

Jadi ukuran baloknya adalah b x h = 12.347 x 18.520 cm2

Untuk wilayah gempa disyaratkan lebar balok minimum 250 mm


( SNI 2002 tentang komponen struktur lentur pada SRPMK hal 208)
Tabel Rekapitulasi Ukuran Balok
syarat
BALOK UKURAN BALOK (cm2)
b min (cm)
B1 15.0907 x 22.6361 25
B2 15.5727 x 23.3591 25
B3 18.6873 x 28.0309 25
B4 12.3469 x 18.5204 25

Dalam perencanaan konstruksi, biasanya diambil ukuran balok yang seragam.


Ketentuan pengambilan ukuran balok yang sama yaitu sekurang-kurangnya diambil
sama dengan ukuran balok yang terbesar : 18.6873 x 28.0309 .
Tapi dengan mempertimbangkan syarat untuk wilayah gempa, maka digunakan ukuran balok
sebesar (b x h) :

- Untuk lantai atap = ( 25 x 40 ) cm2


- Untuk lantai dua = ( 25 x 40 ) cm2
I.2. TEBAL PLAT

Menurut SNI 2002 Pasal 11.5.3.3


" tebal dari plat dengan balok yang menghubungkan tumpuan pada semua sisinya harus memenuhi :
STRUKTUR BETON II Bab I hal. 9

Untuk am lebih besar dari 0,2 tapi tidak lebih dari 2,0 tebal plat minimum harus memenuhi :
fy
ln 0.8 +
1500
hmin =
36 + 5b am - 0.2

Untuk a m lebih besar dari 2,0 tebal plat minimum harus memenuhi :

fy
ln 0.8 -
1500
hmin =
36 - 9b

Dalam segala hal tebal minimum plat tidak boleh kurang dari harga berikut :

Untuk 0,2 < a m < 2,0 ...................120 mm


Untuk am ³ 2,0 ...................90 mm

B3 B1

Panel 3 Panel 4 LL = Bentang panjang


4.50 m LS = Bentang pendek
B4 B4 B4

B3 B1

Panel 1 Panel 2
B2 B2 B2 5.00 m

B3 B1

6.00 m 5.50 m

y
Plat - plat diwakili oleh panel seperti gambar diatas.
tinjauan balok tepi dan balok tengah :
x Memanjang : arah x
Melintang : arah y
Menurut SNI 2002 Pasal 15.2.4, dimana pada konstruksi monolit atau komposit
penuh, suatu balok mencakup bagian dari plat pada tiap sisi balok sebesar proyeksi balok yang
berada diatas atau di bawah plat, diambil yang terbesar, tetapi tidak boleh lebih besar dari 4 X
tebal plat, seperti pada gambar sbb:
bE bE

t t

h h
(h-t) < 4t (h-t) < 4t (h-t) < 4t

bW bW
STRUKTUR BETON II Bab I hal. 10

Sebenarnya bagian - bagian kecil dari plat (flans balok) yang telah diperhitungkan dalam balok
tidak bolah diperhitungkan untuk Is, tapi ACI mengizinkan penggunaan lebar total portal Eqivalen
dalam perhitungan Is, sehingga :

Ecb . Ib
a =
Ecs . Is

Lebar efektif balok pinggir diambil nilai terkecil :

(h-t) £ 4 t

Lebar efektif balok tengah / dalam (Balok T) harus diambil nilai terkecil :

2(h-t) £ 8 t

Momen Inersia dari penampang balok dengan flans terhadap sumbu pusat ialah :

bw . h3
Ib = K .
12

Dimana :

bE t t  t  bE


2
  t 3 
1  b  1    h    4  6  h   4  h    b  1    h  
K 
 w        w   
 Eb  t
1   1    
 wb  h
h = tinggi total balok
be = lebar total plat
bf = lebar efektif flans
bw = lebar badan balok
bE t
k = suatu tetapan tanpa dimensi sebagai fungsi dari ( - 1 ) dan
bw h

Momen Inersia plat :

1
Ib = . L . t3
12

Rasio kekakuan lentur balok ( Ecb . Ib ) terhadap kekakuanlentur plat ( Ecs . Is ) dengan lebar
yang dibatasi dalam arah lateral oleh suatu sumbu dari panel yang berbatasan ( bila ada ) pada tiap
sisi balok, yaitu :

Ecb . Ib Ecb = Modulus elastisitas balok beton


a =
Ecs . Is Ecs = Modulus elastisitas plat beton

A. Perhitungan a balok pada plat / panel

a. Balok tepi melintang (untuk balok B2 dan B4)


Ditaksir tebal plat t = 12 cm
Lebar efektif bE = bw + (h - t)
= 25 + ( 40 - 12 ) = 53 cm (terkecil)
Atau bE = bw + 4t
= 25 + 4 . 12 = 73 cm
STRUKTUR BETON II Bab I hal. 11

53 cm

12 cm

40 cm

25 cm 575 cm 25 cm 525 cm
600 cm 550 cm

bE t t t


2
bE   t 3
1  b  1    h    4  6  h   4  h    b  1   h  
K 
 w        w   
bE  t
1   1    
 wb  h

53 12 12 12 2 53 12###
1 + - 1 . . 4 - 6 . + 4 . + - 1 .
25 40 40 40 25 40
K =
53 12
1 + - 1 .
25 40

1 + 0.336 . 2.59024
K =
1.336

= 1.399941

bW . h3 25 . 40 3
Ib = K . = 1.39994 . = 186659 cm4
12 12

L 600 3
2 . t3 2 . 12
Is = = = 43200 cm4
12 12

Ecb .Ib Ecb = Ecs


a1 = Ecs .Is = 186658.74651
43200 = 4.32080432

b. Balok tepi memanjang (untuk balok B1 dan B3)


Ditaksir tebal plat t = 12 cm
Lebar efektif bE = bw + (h - t)
= 25 + ( 40 - 12 ) = 53 cm (terkecil)
Atau bE = bw + 4t
= 25 + 4 . 12 = 73 cm
53 cm

40 cm

25 cm 475 cm 25 cm 425 cm
500 cm 450 cm
STRUKTUR BETON II Bab I hal. 12

bE  t  2
bE  t 3
 1       4  6    4     1     
t t
1  
K 
bw  h  h h bw  h 
bE  t
1   1    
bw  h

53 12 12 12 2 53 12###
1 + - 1 . . 4 - 6 . + 4 . + - 1 .
25 40 40 40 25 40
K =
53 12
1 + - 1 .
25 40

1 + 0.336 . 2.59024
K =
1.336

= 1.3999

bW . h3 25 . 40 3
Ib = K . = 1.39994 . = 186659 cm4
12 12

L 500 3
. t3 . 12
2 2
Is = = = 36000 cm4
12 12

Ecb .Ib 186658.74651 Ecb = Ecs


a2 = = = 5.18496518
Ecs .Is 36000

c. Balok tengah melintang (untuk balok B2 dan B4)


Ditaksir tebal plat t = 12 cm
Lebar efektif bE = bw + 2 . (h - t)
= 25 + 2 . (40 - 12 ) = 81 cm (terkecil)
Atau bE = bw + 8t
= 25 + 8 . 12 = 121 cm

81 cm

40 cm

25 cm 575 cm 25 cm 525 cm
600 cm 550 cm

575

bE  t  2
bE  t 3
 1       4  6    4     1     
t t
1  
K 
bw  h  h h bw  h 
bE  t
1   1    
 w b  h
STRUKTUR BETON II Bab I hal. 13

81 12 12 12 2 81 12###
1 + - 1 . . 4 - 6 . + 4 . + - 1 .
25 40 40 40 25 40
K =
81 12
1 + - 1 .
25 40

1 + 0.672 . 2.62048
K =
1.672

= 1.651293

bW . h3 25 . 40 3
Ib = K . = 1.65129 . = 220172.45295 cm4
12 12

L . t3 575 . 12 3
Is = = = 82800 cm4
12 12

Ecb .Ib 220172.45295 Ecb = Ecs


a3 = = = 2.6590876
Ecs .Is 82800

d. Balok tengah memanjang (untuk balok B1 dan B3)


Ditaksir tebal plat t = 12 cm
Lebar efektif bE = bw + 2 . (h - t)
= 25 + 2 . (40 - 12 ) = 81 cm (terkecil)
Atau bE = bw + 8t
= 25 + 8 . 12 = 121 cm

81 cm

40 cm

25 cm 475 cm 25 cm 425 cm
500 cm 450 cm

475

bE t t t


2
bE   t 3
1  b  1    h    4  6  h   4  h    b  1   h  
K 
 w        w   
 Eb  t
1   1    
 b w  h

81 12 12 12 2 81 12###
1 + - 1 . . 4 - 6 . + 4 . + - 1 .
25 40 40 40 25 40
K =
81 12
1 + - 1 .
25 40
STRUKTUR BETON II Bab I hal. 14

1 + 0.672 . 2.62048
K =
1.672

= 1.651293

bW . h3 25 . 40 3
Ib = K . = 1.65129 . = 220172 cm4
12 12

L . t3 475 . 12 3
Is = 12 = 12 = 68400 cm4

Ecb .Ib 220172.45295 Ecb = Ecs


a4 = = = 3.21889551
Ecs .Is 68400

B. Perhitungan kontrol tebal plat

a1 = 4.3208
a4 a4 a2 = 5.18497
a3 4.50 m a3 = 2.65909
a1 Panel 3 a3 Panel 4
a4 = 3.2189

a4 a4

a1 Panel 1 a3 Panel 2 a3 5.00 m

a2 a2

6.00 m 5.50 m

a. Panel 1

Sa a1 + a2 + a3 + a4
am = =
n 4
4.3208043173 + 5.1849652 + 2.65909 + 3.2189
= = 3.8459
4

L1 585
b = Ls = = 1.2061856
485

fy
Ln1 0.8 +
1500
hmin =
36 + 5 b am - 0.2

325
585 0.8 + 1500
hmin =
36 + 5 . 1.2062 3.84594 - 0.2
STRUKTUR BETON II Bab I hal. 15

594.750
hmin = = 10.2564 cm
36 + 21.988389881

b. Panel 2

Sa a2 + a3 + a3 + a4
am = =
n 4
5.1849651807 + 2.6590876 + 2.65909 + 3.2189
= 4 = 3.43051

L1 535
b = Ls = = 1.1030928
485

fy
Ln1 0.8 + 1500
hmin =
36 + 5 b am - 0.2

325
535 0.8 +
1500
hmin =
36 + 5 . 1.1 3.43051 - 0.2

543.917
hmin = = 10.1066 cm
36 + 17.817755664

c. Panel 3

Sa a1 + a3 + a4 + a4
am = =
n 4
4.3208043173 + 2.6590876 + 3.2189 + 3.2189
= = 3.35442
4

L1 585
b = Ls = = 1.3448276
435

fy
Ln1 0.8 +
1500
hmin =
36 + 5 b am - 0.2

325
585 0.8 +
1500
hmin =
36 + 5 . 1.3 3.35442 - 0.2

594.750
hmin = = 10.3958 cm
36 + 21.210760107
STRUKTUR BETON II Bab I hal. 16

d. Panel 4

Sa a3 + a3 + a4 + a4
am = =
n 4
2.659087596 + 2.6590876 + 3.2189 + 3.2189
= = 2.93899
4

L1 435
b = Ls = = 0.8130841
535

fy
Ln1 0.8 +
1500
hmin =
36 + 5 b am - 0.2

325
435 0.8 +
1500
hmin =
36 + 5 . 0.8 2.93899 - 0.2

442.250
hmin = = 9.38259 cm
36 + 11.135152577

Tabel Rekapitulasi Tebal Plat


TEBAL MINIMUM (hmin)
PANEL PLAT (cm) Syarat
SNI 2002 Pasal 11.5.3.3
1 10.2564 ³ 12
2 10.1066 ³ 12
3 10.3958 ³ 12
4 9.3826 ³ 12

Dalam perhitungan tabel plat diperoleh penggunaan tebal plat minimum yang terbesar 10.3958 cm
Jadi tebal plat yang digunakan 12.00 cm
- Untuk atap digunakan plat setebal = 12 cm
- Untuk lantai 1 digunakan plat setebal = 12 cm
STRUKTUR BETON II Bab I hal. 17

I.3. DIMENSI KOLOM

Untuk menaksir ukuran penampang kolom, ditinjau kolom tengah yang dianggap memikul
beban terbesar.
3m 2.75 m

4.5 m

2.25 m

2.5 m

5m

6m 5.5 m

Beban yang dipikul menurut PBI untuk gedung 1983 hal. 11, 12 dan 17 :
- Berat volume beton bertulang = 2400 kg/m3
- Panjang kolom = 4.15 + 3.75 m = 7.9 m
- Berat beban hidup untuk gedung sekolah = 250 kg/m2
- Beban hidup untuk plat atap = 100 kg/m2
- Beban Dinding 1/2 Bata = 250 kg/m2
- Berat volume air = 1000 kg/m3
- Berat plafond + ducting = 20 kg/m2
- Finishing plat atap (3 cm) = 63 kg/m2
- Finishing plat lantai (2 cm) = 42 kg/m2
- Total berat konsol (konstruksi kayu + atap genteng) sekeliling = 2700 kg

Pembebanan yang bekerja hanya pembebanan gravitasi saja, tanpa beban gempa yang terjadi
yang terdiri dari :

1. Beban mati (DL)


2. Beban hidup (LL)

A. Kolom pada lantai 02 (Direncanakan dimensi 40 x 40 cm2)

Beban hidup (LL) :


- Beban hidup plat atap : 5.75 . 4.75 . 100 = ###
- Beban air pada lantai atap (5 cm) : 5.75 . 4.75 . 0.05 . 1000 = ###
= ###

Beban mati (DL) :


- Beban kolom lantai 02 + konsol : 0.4 . 0.4 . 3.8 . 2400 + 2700.0 = 4140 kg
- Beban plat atap : 0.12 . 5.75 . 4.75 . 2400 = 7866 kg
- Berat balok atap :
- arah x (memanjang) : ( 0.25 . 0.4 . 5.75 - 0.25 2400 ) = 1320 kg
- arah y (melintang) : ( 0.25 . 0.4 . 4.75 . 2400 ) = 1140 kg
- Berat finishing atap : 5.75 . 4.75 . 63 = ###
- Berat plafond + ducting atap : 5.75 . 4.75 . 20 = 546.25 kg
= ###
STRUKTUR BETON II Bab I hal. 18

Menurut SNI 2002 Pasal 11.2.1, kuat perlu (U) yang menahan beban mati (D) dan beban hidup (L)
paling tidak harus sama dengan :

U = 1.2 D + 1.6 L sehingga :


= 1.2 . 16732.9375 + 1.6 . 4096.88 = ###

Pu = U . 9.81 = 26634.525 . 9.81 = 261285 N

Menurut SNI 2002 Pasal 12.3.5.2, kuat tekan rancang komponen struktur non-prategang :

fPnmax = 0.8 . f . 0.85 . fc' . Ag - Ast + fy . Ast

dimana :
f = Faktor reduksi f = 0,65 untuk aksial tekan dengan aksial lentur komponen struktur
dengan tulangan sengkang biasa, SNI 2002 Pasal 11.3.2.2.b
fc' = Kuat tekan beton yang disyaratkan = 22 MPa
fy = Tegangan leleh baja yang disyaratkan = 325 MPa
Ag = Luas bruto penampang = 400 . 400 = 160000 mm2
r t = Rasio penulangan kolom (0,01 - 0,03), diambil rt = 0,02
Ast = Luas tulangan total = rt . Ag = 0.02 . 160000 = 3200 mm2

Sehingga :
fPnmax = 0.8 . 0.65 . 0.85 . 22 . 160000 - 3200 + 325 . 3200
= 2065523.2 N

Syarat :
fPnmax > Pu
2065523.2 > 261284.69 Aman !!

B. Kolom pada lantai 01 (Direncanakan dimensi 40 x 40 cm2)

Beban hidup (LL) :


- Beban hidup Lantai 02 : = ###
- Beban hidup plat lantai 01 : ( 5.75 . 4.75 . 250 ) = ###
= 10925 kg

Beban mati (DL) :


- Beban mati lantai 02 : = ###
- Beban kolom lantai 01 : 0.4 . 0.4 . 4.15 . 2400 = 1593.6 kg
- Beban plat lantai 01 : 0.12 . 5.75 . 4.75 . 2400 = 7866 kg
- Berat balok (lantai 01) :
- arah x (memanjang) : ( 0.25 . 0.4 . 4.75 - 0.25 . 2400 ) = 1080 kg
- arah y (melintang) : ( 0.25 . 0.4 . 4.75 . 2400 ) = 1140 kg
- Berat plafond + ducting (lt 01) : 5.75 . 4.75 . 20 = 546.25 kg
- Berat dinding lt 01 : 3.8 - 0.4 5.75 - 0.4 250 = ###
3.8 - 0.4 4.75 - 0.4 250 = ###
= ###
STRUKTUR BETON II Bab I hal. 19

Menurut SNI 2002 Pasal 11.2.1, kuat perlu (U) yang menahan beban mati (D) dan beban hidup (L)
paling tidak harus sama dengan :

U = 1.2 D + 1.6 L sehingga :


= 1.2 . 37082.5375 + 1.6 . 10925 = ###

Pu = U . 9.81 = 61979.045 . 9.81 = 608014 N

Menurut SNI 2002 Pasal 12.3.5.2, kuat tekan rancang komponen struktur non-prategang :

fPnmax = 0.8 . f . 0.85 . fc' . Ag - Ast + fy . Ast

dimana :
f = Faktor reduksi f = 0,65 untuk aksial tekan dengan aksial lentur komponen struktur
dengan tulangan sengkang biasa, SNI 2002 Pasal 11.3.2.2.b
fc' = Kuat tekan beton yang disyaratkan = 22 MPa
fy = Tegangan leleh baja yang disyaratkan = 325 MPa
Ag = Luas bruto penampang = 400 . 400 = 160000 mm2
rt = Rasio penulangan kolom (0,01 - 0,03), diambil rt = 0,02
Ast = Luas tulangan total = rt . Ag = 0.02 . 160000 = 3200 mm2

Sehingga :
fPnmax = 0.8 . 0.65 . 0.85 . 22 . 160000 - 3200 + 325 . 3200
= 2065523.2 N

Syarat :
fPnmax > Pu
2065523.2 > 608014.43 Aman !!

Kesimpulan : Ukuran kolom yang direncanakan adalah 40 x 40 cm2


II. PERENCANAAN PENULANGAN PLAT
DENGAN METODE MARKUS

GAMBAR PENOMORAN PELAT

5 m
A C A

B D B 4.5 m

A C A 5 m

6 m 5.5 m 6 m

II.1 Tebal Plat Lantai


Tebal plat lantai diperoleh dari perhitungan sebelumnya yaitu h = 12 cm

II.2. Kontrol persyaratan untuk metode Markus


a. Perbandingan bentang panjang dengan bentang pendek
Ly Ly 550
< 2 = = 1.1 < 2 (PLAT DUA ARAH !!!....)
Lx Lx 500

II.3. Perhitungan Baban


Beban-beban Terhadap Pelat Atap ( berdasarkan Peraturan muatan Indonesia 1970)
Berat Sendiri Pelat Atap = 0.12 . 2400 = 288 kg/m2
Berat Finising Atap = 63 = 63 kg/m2
Berat plafond + ducting atap = 20 = 20 kg/m2
Beban Air Hujan (5cm) = 0.05 . 1000 = 50 kg/m2
Beban Hidup Atap = 100 = 100 kg/m2

WU = 1.2 . (WDL) + 1.6 . (WLL)


= 1.2 .( 288 + 63 + 20 ) + 1.6 .( 50 + 100 )
= 685.2 kg/m2

Beban-beban Terhadap Pelat Lantai 02


Berat Sendiri Pelat lantai = 0.12 . 2400 = 288 kg/m2
Berat Finising lantai = 42 = 42 kg/m2
Berat plafond + ducting atap = 20 = 20 kg/m3
Beban Hidup Atap = 250 = 250 kg/m2

WU = 1.2 . (WDL) + 1.6 . (WLL)


= 1.2 .( 288 + 42 + 20 ) + 1.6 .( 250 )
= 820 kg/m 2

Beban yang diambil adalah yang terbesar dari kedua asumsi beban diatas.
WU untuk 1 meter lebar pelat = 820 kg/m2
Karena pelat menerus, maka digunakan tabel marcus menerus
PERHITUNGAN LUAS TULANGAN (AS)

Diambil lindungan beton (beton dekking) sebagai berikut :


Asumsi : Æ Tulangan arah y = 10 mm = 1.0 cm
Æ Tulangan arah x = 10 mm = 1.0 cm
Tebal selimut (Ts) = 20 mm = 2.0 cm (menurut SK SNI 2002 hal 41)

dx
dy h

Tinggi efektif d dalam arah y adalah : Tinggi efektif d dalam arah x adalah :
dy = h - Ts - 1/2 *Æy dx = h - Ts - Æy - 1/2 *Æx
= 12 - 2 - 0.5 = 12 - 2 - 1 - 0.5
= 9.5 cm = 8.5 cm
Digunakan beton dengan fc' = 22 MPa dan besi fy = 325 MPa dengan menggunakan
SNI 03-2847-2002, maka tulangan dapat dihitung sebagai berikut :

a. Pelat A

Dari tabel markus


untuk Ly/Lx = 1.200 diperoleh :
Cmlx = 38
5 m A Cmly = 28
Cmtx = 85
Cmty = 74

6 m

Mlx = 0.001 . q . lx2 . Cmlx = 0.001 . 820 . 5.00 2 . 38 = 779 kg m


Mly = 0.001 . q . lx2 . Cmly = 0.001 . 820 . 5.00 2 . 28 = 574 kg m
Mtx = -0.001 . q . lx2 . Cmtx = -0.001 . 820 . 5.00 2 . 85 = -1742.5 kg m
Mty = -0.001 . q . lx2 . Cmty = -0.001 . 820 . 5.00 2 . 74 = -1517 kg m

MOMEN LAPANGAN ARAH X, Mlx = 77900 kg cm , dx = 8.50 cm

fy 2
Mu
AS2 - fy . d. AS. + = 0
1,7 . fc' .b f

3250 2 77900
AS2 - 3250 . 8.50 . AS. + = 0
1.7 220 100 0.8

282.41979 AS2 - 27625 AS. + 97375 = 0

Dengan rumus ABC diperoleh : AS. = 3.662 cm2


Dipilih tulangan arah L1 = f 10 - 200 = 3.93 cm2

Kontrol

1.4 1.4
r min = = = 0.00431
fy 325

0.85 . f'c 600 0.85 . 22 600


rmaks = 0.75 . b1 . = 0.75 0.85
fy 600 + fy 325 600 + 325

= 0.02379

rmin < rada < rmaks

As. 3.93
rada = = = 0.00462 (OKE !!!)
b. d 100 . 8.5

MOMEN LAPANGAN ARAH Y, Mly = 57400 kg cm , dy = 9.50 cm

fy2 Mu
AS2 - fy . d. AS. + = 0
1,7 . fc' .b f

3250 2 57400
AS2 - 3250 . 9.50 . AS. + = 0
1.7 220 100 0.8

282.41979 AS2 - 30875 AS. + 71750 = 0

Dengan rumus ABC diperoleh : AS. = 2.376 cm2


Dipilih tulangan arah L1 = f 10 - 190 = 4.13 cm2
Kontrol
1.4 1.4
rmin = = = 0.00431
fy 325

0.85 . f'c 600 0.85 . 22 600


rmaks = 0.75 . b1 . = 0.75 0.85
fy 600 + fy 325 600 + 325

= 0.02379

rmin < rada < rmaks

As. 4.13
rada = = = 0.00435 (OKE !!!)
b. d 100 . 9.50

MOMEN TUMPUAN ARAH X, Mtx = 174250 kg cm , dx = 8.50 cm

fy2 Mu
AS2 - fy . d. AS. + = 0
1,7 . fc' .b f

3250 2 174250
AS2 - 3250 . 8.50 . AS. + = 0
1.7 220 100 0.8

282.41979 AS2 - 27625 AS. + 217812.5 = 0

Dengan rumus ABC diperoleh : AS. = 8.649 cm2

Dipilih tulangan arah L1 = f 10 - 90 = 8.73 cm2

Kontrol

1.4 1.4
rmin = = = 0.00431
fy 325

0.85 . f'c 600 0.85 . 22 600


rmaks = 0.75 . b1 . = 0.75 0.85
fy 600 + fy 325 600 + 325

= 0.02379

rmin < rada < rmaks

As. 8.73
rada = = = 0.01027 (OKE !!!)
b. d 100 . 8.50

MOMEN TUMPUAN ARAH Y, Mty = 151700 kg cm , dy = 9.50 cm

fy2 Mu
AS2 - fy . d. AS. + = 0
1,7 . fc' .b f

3250 2 151700
AS2 - 3250 . 9.50 . AS. + = 0
1.7 220 100 0.8

282.41979 AS2 - 30875 AS. + 189625 = 0

Dengan rumus ABC diperoleh : AS. = 6.532 cm2


Dipilih tulangan arah L1 = f 10 - 120 = 6.54 cm2

Kontrol

1.4 1.4
rmin = = = 0.00431
fy 325

0.85 . f'c 600 0.85 . 22 600


rmaks = 0.75 . b1 . = 0.75 0.85
fy 600 + fy 325 600 + 325

= 0.02379

rmin < rada < rmaks

As. 6.54
rada = = = 0.00689 (OKE !!!)
b. d 100 . 9.50
b. Pelat B

Dari tabel markus


untuk Ly/Lx = 1.33 Diperoleh
Cmlx = 35
4.5 m B Cmly = 18
Cmtx = 74
Cmty = 57

6 m

Mlx = 0.001 . q . lx2 . Cmlx = 0.001 . 820 . 4.5 2 . 35 = 581.175 kg m


Mly = 0.001 . q . lx2 . Cmly = 0.001 . 820 . 4.5 2 . 18 = 298.89 kg m
Mtx = -0.001 . q . lx2 . Cmtx = -0.001 . 820 . 4.5 2 . 74 = -1228.77 kg m
Mty = -0.001 . q . lx2 . Cmty = -0.001 . 820 . 4.5 2 . 57 = -946.485 kg m

MOMEN LAPANGAN ARAH X, Mlx = 58117.5 kg cm , dx = 8.50 cm

fy2 Mu
AS2 - fy . d. AS. + = 0
1,7 . fc' .b f

3250 2 58117.5
AS2 - 3250 . 8.50 . AS. + = 0
1.7 220 100 0.8

282.41979 AS2 - 27625 AS. + 72646.875 = 0

Dengan rumus ABC diperoleh : AS. = 2.705 cm2

Dipilih tulangan arah L1 = f 10 - 200 = 3.93 cm2

Kontrol

1.4 1.4
rmin = = = 0.00431
fy 325

0.85 . f'c 600 0.85 . 22 600


rmaks = 0.75 . b1 . = 0.75 0.85
fy 600 + fy 325 600 + 325

= 0.02379

rmin < rada < rmaks

As. 3.93
rada = = = 0.00462 (OKE !!!)
b. d 100 . 8.5

MOMEN LAPANGAN ARAH Y, Mly = 29889 kg cm , dy = 9.50 cm

fy2 Mu
AS2 - fy . d. AS. + = 0
1,7 . fc' .b f

3250 2 29889
AS2 - 3250 . 9.50 . AS. + = 0
1.7 220 100 0.8

282.41979 AS2 - 30875 AS. + 37361.25 = 0

Dengan rumus ABC diperoleh : AS. = 1.224 cm2


Dipilih tulangan arah L1 = f 10 - 190 = 4.13 cm2

Kontrol

1.4 1.4
rmin = = = 0.00431
fy 325

0.85 . f'c 600 0.85 . 22 600


rmaks = 0.75 . b1 . = 0.75 0.85
fy 600 + fy 325 600 + 325

= 0.02379

rmin < rada < rmaks

As. 4.13
rada = = = 0.00435 (OKE !!!)
b. d 100 . 9.50
MOMEN TUMPUAN ARAH X, Mtx = 122877 kg cm , dx = 8.50 cm

fy2 Mu
AS2 - fy . d. AS. + = 0
1,7 . fc' .b f

3250 2 122877
AS2 - 3250 . 8.50 . AS. + = 0
1.7 220 100 0.8

282.41979 AS2 - 27625 AS. + 153596.25 = 0

Dengan rumus ABC diperoleh : AS. = 5.918 cm2


Dipilih tulangan arah L1 = f 10 - 130 = 6.04 cm2

Kontrol

1.4 1.4
rmin = = = 0.00431
fy 325

0.85 . f'c 600 0.85 . 22 600


rmaks = 0.75 . b1 . = 0.75 0.85
fy 600 + fy 325 600 + 325

= 0.02379

rmin < rada < rmaks

As. 6.04
rada = = = 0.00711 (OKE !!!)
b. d 100 . 8.50

MOMEN TUMPUAN ARAH Y, Mty = 94648.5 kg cm , dy = 9.50 cm

fy2 Mu
AS2 - fy . d. AS. + = 0
1,7 . fc' .b f

3250 2 94648.5
AS2 - 3250 . 9.50 . AS. + = 0
1.7 220 100 0.8

282.41979 AS2 - 30875 AS. + 118310.625 = 0

Dengan rumus ABC diperoleh : AS. = 3.977 cm2

Dipilih tulangan arah L1 = f 10 - 190 = 4.13 cm2

Kontrol

1.4 1.4
rmin = = = 0.00431
fy 325

0.85 . f'c 600 0.85 . 22 600


rmaks = 0.75 . b1 . = 0.75 0.85
fy 600 + fy 325 600 + 325

= 0.02379

rmin < rada < rmaks

As. 4.13
rada = = = 0.00435 (OKE !!!)
b. d 100 . 9.50

c. Pelat C

Dari tabel markus


untuk Ly/Lx = 1.1
Cmlx = 26
5 m C Cmly = 27
Cmtx = 65
Cmty = 65

5.5 m

Mlx = 0.001 . q . lx2 . Cmlx = 0.001 . 820 . 5.0 2 . 26 = 533 kg m


Mly = 0.001 . q . lx2 . Cmly = 0.001 . 820 . 5.0 2 . 27 = 553.5 kg m
Mtx = -0.001 . q . lx2 . Cmtx = -0.001 . 820 . 5.0 2 . 65 = -1332.5 kg m
Mty = -0.001 . q . lx2 . Cmty = -0.001 . 820 . 5.0 2 . 65 = -1332.5 kg m
MOMEN LAPANGAN ARAH X, Mlx = 53300 kg cm , dx = 8.50 cm

fy2 Mu
AS2 - fy . d. AS. + = 0
1,7 . fc' .b f

3250 2 53300
AS2 - 3250 . 8.50 . AS. + = 0
1.7 220 100 0.8

282.41979 AS2 - 27625 AS. + 66625 = 0

Dengan rumus ABC diperoleh : AS. = 2.474 cm2


Dipilih tulangan arah L1 = f 10 - 200 = 3.93 cm2

Kontrol

1.4 1.4
rmin = = = 0.00431
fy 325

0.85 . f'c 600 0.85 . 22 600


rmaks = 0.75 . b1 . = 0.75 0.85
fy 600 + fy 325 600 + 325

= 0.02379

rmin < rada < rmaks

As. 3.93
rada = = = 0.00462 (OKE !!!)
b. d 100 . 8.5

MOMEN LAPANGAN ARAH Y, Mly = 55350 kg cm , dy = 9.50 cm

fy2 Mu
AS2 - fy . d. AS. + = 0
1,7 . fc' .b f

3250 2 55350
AS2 - 3250 . 9.50 . AS. + = 0
1.7 220 100 0.8

282.41979 AS2 - 30875 AS. + 69187.5 = 0

Dengan rumus ABC diperoleh : AS. = 2.289 cm2


Dipilih tulangan arah L1 = f 10 - 190 = 4.13 cm2

Kontrol

1.4 1.4
rmin = = = 0.00431
fy 325

0.85 . f'c 600 0.85 . 22 600


rmaks = 0.75 . b1 . = 0.75 0.85
fy 600 + fy 325 600 + 325

= 0.02379

rmin < rada < rmaks

As. 4.13
rada = = = 0.00435 (OKE !!!)
b. d 100 . 9.50

MOMEN TUMPUAN ARAH X, Mtx = 133250 kg cm , dx = 8.50 cm

fy2 Mu
AS2 - fy . d. AS. + = 0
1,7 . fc' .b f

3250 2 133250
AS2 - 3250 . 8.50 . AS. + = 0
1.7 220 100 0.8

282.41979 AS2 - 27625 AS. + 166562.5 = 0

Dengan rumus ABC diperoleh : AS. = 6.455 cm2


Dipilih tulangan arah L1 = f 10 - 120 = 6.54 cm2

Kontrol

1.4 1.4
rmin = = = 0.00431
fy 325

0.85 . f'c 600 0.85 . 22 600


rmaks = 0.75 . b1 . = 0.75 0.85
fy 600 + fy 325 600 + 325

= 0.02379

rmin < rada < rmaks

As. 6.54
rada = = = 0.0077 (OKE !!!)
rada = = = 0.0077 (OKE !!!)
b. d 100 . 8.50
MOMEN TUMPUAN ARAH Y, Mty = 133250 kg cm , dy = 9.50 cm

fy2 Mu
AS2 - fy . d. AS. + = 0
1,7 . fc' .b f

3250 2 133250
AS2 - 3250 . 9.50 . AS. + = 0
1.7 220 100 0.8

282.41979 AS2 - 30875 AS. + 166562.5 = 0

Dengan rumus ABC diperoleh : AS. = 5.691 cm2


Dipilih tulangan arah L1 = f 10 - 135 = 5.82 cm2

Kontrol

1.4 1.4
rmin = = = 0.00431
fy 325

0.85 . f'c 600 0.85 . 22 600


rmaks = 0.75 . b1 . = 0.75 0.85
fy 600 + fy 325 600 + 325

= 0.02379

rmin < rada < rmaks

As. 5.82
rada = = = 0.00612 (OKE !!!)
b. d 100 . 9.50

d. Pelat D

Dari tabel markus


untuk Ly/Lx = 1.22 diperoleh:
Cmlx = 28
4.5 m D Cmly = 20
Cmtx = 64
Cmty = 56

5.5 m

Mlx = 0.001 . q . lx2 . Cmlx = 0.001 . 820 . 5.5 2 . 28 = 694.54 kg m


Mly = 0.001 . q . lx2 . Cmly = 0.001 . 820 . 5.5 2 . 20 = 496.1 kg m
Mtx = -0.001 . q . lx2 . Cmtx = -0.001 . 820 . 5.5 2 . 64 = -1587.52 kg m
Mty = -0.001 . q . lx2 . Cmty = -0.001 . 820 . 5.5 2 . 56 = -1389.08 kg m

MOMEN LAPANGAN ARAH X, Mlx = 69454 kg cm , dx = 8.50 cm

fy2 Mu
AS2 - fy . d. AS. + = 0
1,7 . fc' .b f

3250 2 69454
AS2 - 3250 . 8.50 . AS. + = 0
1.7 220 100 0.8

282.41979 AS2 - 27625 AS. + 86817.5 = 0

Dengan rumus ABC diperoleh : AS. = 3.251 cm2


Dipilih tulangan arah L1 = f 10 - 200 = 3.93 cm2
Kontrol

1.4 1.4
rmin = = = 0.00431
fy 325

0.85 . f'c 600 0.85 . 22 600


rmaks = 0.75 . b1 . = 0.75 0.85
fy 600 + fy 325 600 + 325

= 0.02379

rmin < rada < rmaks

As. 3.93
rada = = = 0.00462 (OKE !!!)
b. d 100 . 8.5

MOMEN LAPANGAN ARAH Y, Mly = 49610 kg cm , dy = 9.50 cm

fy2 Mu
AS2 - fy . d. AS. + = 0
1,7 . fc' .b f

3250 2 49610
AS2 - 3250 . 9.50 . AS. + = 0
1.7 220 100 0.8

282.41979 AS2 - 30875 AS. + 62012.5 = 0

Dengan rumus ABC diperoleh : AS. = 2.047 cm2


Dipilih tulangan arah L1 = f 10 - 190 = 4.13 cm2

Kontrol

1.4 1.4
rmin = = = 0.00431
fy 325

0.85 . f'c 600 0.85 . 22 600


rmaks = 0.75 . b1 . = 0.75 0.85
fy 600 + fy 325 600 + 325

= 0.02379

rmin < rada < rmaks

As. 4.13
rada = = = 0.00435 (OKE !!!)
b. d 100 . 9.50

MOMEN TUMPUAN ARAH X, Mtx = 158752 kg cm , dx = 8.50 cm

fy2 Mu
AS2 - fy . d. AS. + = 0
1,7 . fc' .b f

3250 2 158752
AS2 - 3250 . 8.50 . AS. + = 0
1.7 220 100 0.8

282.41979 AS2 - 27625 AS. + 198440 = 0

Dengan rumus ABC diperoleh : AS. = 7.806 cm2


Dipilih tulangan arah L1 = f 10 - 95 = 8.27 cm2

Kontrol

1.4 1.4
rmin = = = 0.00431
fy 325

0.85 . f'c 600 0.85 . 22 600


rmaks = 0.75 . b1 . = 0.75 0.85
fy 600 + fy 325 600 + 325

= 0.02379

rmin < rada < rmaks

As. 8.27
rada = = = 0.00973 (OKE !!!)
b. d 100 . 8.50
MOMEN TUMPUAN ARAH Y, Mty = 138908 kg cm , dy = 9.50 cm

fy2 Mu
AS2 - fy . d. AS. + = 0
1,7 . fc' .b f

3250 2 138908
AS2 - 3250 . 9.50 . AS. + = 0
1.7 220 100 0.8

282.41979 AS2 - 30875 AS. + 173635 = 0

Dengan rumus ABC diperoleh : AS. = 5.947 cm2


Dipilih tulangan arah L1 = f 10 - 130 = 6.04 cm2

Kontrol

1.4 1.4
rmin = = = 0.00431
fy 325

0.85 . f'c 600 0.85 . 22 600


rmaks = 0.75 . b1 . = 0.75 0.85
fy 600 + fy 325 600 + 325

= 0.02379

rmin < rada < rmaks

As. 6.04
rada = = = 0.00636 (OKE !!!)
b. d 100 . 9.50

REKAPITULASI HASIL PERHITUNGAN TULANGAN

LOKASI PANEL A PANEL B PANEL C PANEL D


Tulangan Plat
Tulangan Arah X
Tulangan Lapangan f 10 - 200 f 10 - 200 f 10 - 200 f 10 - 200
Tulangan Tumpuan f 10 - 90 f 10 - 130 f 10 - 120 f 10 - 95
Tulangan Arah Y
Tulangan Lapangan f 10 - 190 f 10 - 190 f 10 - 190 f 10 - 190
Tulangan Tumpuan f 10 - 120 f 10 - 190 f 10 - 135 f 10 - 130
SKETSA PENULANGAN PLAT

Panel A

f 10 - 90

f 10 - 120

125 cm

f 10 - 90 f 10 - 200 f 10 - 90

500 cm
250 cm

f 10 - 120 f 10 - 190 f 10 - 120

125 cm

f 10 - 120

f 10 - 90

125 cm 350 cm 125 cm

600 cm

Panel B

f 10 - 130

f 10 - 190

112.5 cm

f 10 - 130 f 10 - 200 f 10 - 130

450 cm
225 cm

f 10 - 190 f 10 - 190 f 10 - 190

112.5 cm

f 10 - 190

f 10 - 130

113 cm 375 cm 113 cm

600 cm
Panel C

f 10 - 120

f 10 - 135

125 cm

f 10 - 120 f 10 - 200 f 10 - 120

500 cm
250 cm

f 10 - 135 f 10 - 190 f 10 - 135

125 cm

f 10 - 135

f 10 - 120

125 cm 300 cm 125 cm

550 cm

Panel D

f 10 - 95

f 10 - 130

112.5 cm

f 10 - 95 f 10 - 200 f 10 - 95

450 cm
225 cm

f 10 - 130 f 10 - 190 f 10 - 130

112.5 cm

f 10 - 130

f 10 - 95

112.5 cm 325 cm 112.5 cm

550 cm
REKAYASA GEMPA
ANALISA BEBAN GEMPA BANGUNAN PBT

Analisa pembebanan portal dilakukan terhadap kombinasi pembebanan berikut :

1. Beban Gravitasi (Beban mati + Beban hidup)


Beban - beban merata pada plat diterima oleh balok arah longitudinal dan arah transversal
(arah x dan y), seperti denah berikut. Disamping itu portal juga menerima beban garis berupa
berat sendiri balok dan berat dinding.

6m 5.5 m 6m

2.5 m
5.00

2.5 m

2.25 m
4.5

1m

A A
2.25 m
Portal Portal Portal
Eqivalen 1 Eqivalen 2 Eqivalen 1
2.5 m
###

2.5 m

2.5 m 2.5 m 2.5 m 2.5 m 2.5 m 2.5 m


1m

1m

2. Beban Gravitasi + Beban Gempa


Semua beban yang bekerja selebar portal dianggap dipikul sepenuhnya oleh portal yang
bersangkutan. Lebar portal yang dimaksud adalah jarak dari tengah bentang sebelah kiri
(jika ada) ke tengah bentang sebelah kanan. Hal ini didasarkan pada anggapan bahwa pada
saat percepatan gempa sejajar dengan sumbu x, maka semua beban - beban tersebut dipikul
oleh portal arah x. Demikian pula untuk arah y.

Luas pembebanan ditinjau dari denah berikut :


M N O P

I K L
J

E F G H

A B C D

A. Perhitungan beban akibat Gaya Gravitasi Potongan A - A

W1 W3

W2
6m 5.5 m 6m
1 2 3

Beban yang bekerja pada portal A - A berbentuk sebagai berikut :

Page 33
REKAYASA GEMPA
1. Beban 1
W
W .L 2
Mmax = = 1.13 W
32

7 W .L 4
fmax = = 2.3625 m W / EI
6m 3840 EI

W . L
Dmax = = 1.5 W
L = 6m 4

2. Beban 2
W
W 2 2
Mmax = 3 L - 4 a
24

2.5 m 2.5 m = 3.46 W


1m

W .L 4 a 2 a 4
fmax = 25 - + 16
L = 6m 1920 EI L 2 L 4
a = 2.5 m
= 17.08 W / EI

W ( L - a )
Dmax =
4

= 0.88 W

3. Beban 3
W
W .L 2
Mmax = = 0.95 W
32

7 W .L 4
fmax = = ### W / EI
5.5 m 3840 EI

W . L
Dmax = = 1.38 W
L = 5.5 m 4

Pengaruh beban segi empat (Weq) untuk setiap bentang :


1. Bentang 1 dan Bentang 3

Weq1

Weq . L 2
Mmax = = 1.50 Weq
24
6m
5 Weq . L 4
fmax = = 16.88 Weq / EI
384 EI
L = 6m
Weq . L
Dmax = = 3.00 Weq
2

2. Bentang 2

Weq2

Weq . L 2
Mmax = = 1.26 Weq
24
5.5 m
5 Weq . L 4
fmax = = 11.91 Weq / EI
384 EI
L = 5.5 m
Weq . L
Dmax = = 2.75 Weq
2

Page 34
REKAYASA GEMPA
ANALISA BEBAN GEMPA PADA BANGUNAN PBT
DATA:
ukuran kolom : 50 x 50

balok : 40 x 40
balok anak : 20 x 40
arah x = 16 m
arah y = 15 m
tebal pelat = 0.12 m
tinggi (h) = 5 m

analisa pembebanan portal dilakukan terhadap beban gempa

beban Plafond + ducting = 20 kg/m2


beban finishing atap =

1. Berat bangunan total


a. Beban plat atap (W4)

Beban mati (DL)


- Beban plat 16 . 15 . 0.12 . 2400 = 69120
- Beban balok
arah x (memanjang) 0.4 . 0.4 . 16 . 3 . 2400 = 18432
arah y (melintang) 0.4 . 0.4 . 15 . 3 . 2400 = 17280
- Beban balok anak
arah y 0.2 . 0.4 . 15 . 2 . 2400 = 5760
- Beban kolom
kolom tepi 6 . 0.5 . 0.5 . 5 . 2400 = 18000
- Beban Finishing atap 0.05 . 1000 . 0.5 = 25
= 18025

Jadi beban rencana (qu1)


qu1 = 1.2 DL + 1.6 LL
= 1.2 . 5760 + 1.6 . 18025 = 35752

2. Beban Gravitasi pada balok 2

Beban mati (DL)


- Beban plat 16 . 0 . 0.12 = 0
- Beban plafond + ducling 0 . 0 = 0
- Beban finishing lantai 02 0 . 0 = 0
= 0

Beban hidup (LL)


- Beban hidup lantai 02 6 . 0 = 0
- Beban air hujan (5 cm) 0.05 . 1000 . 0 = 0
= 0

Jadi beban rencana (qu1)


qu2 = 1.2 DL + 1.6 LL
= 1.2 . 0 + 1.6 . 0 = 0

Perhitungan Beban Gravitasi Balok lantai 02


1. Beban Gravitasi pada balok 1 dan 3

Beban mati (DL)


- Beban plat 16 . 15 . 0.12 = 28.8
- Beban plafond + ducling 0 . 15 = 0
- Beban finishing lantai 02 42 . 15 = 630
- Beban dinding ( 6 - 0.4 ) . 250 = 1400
= 2058.8

Beban hidup (LL)


- Beban hidup lantai 02 250 . 15 = 3750

Jadi beban rencana (qu1)


qu2 = 1.2 DL + 1.6 LL

Page 35
REKAYASA GEMPA
= 1.2 . 2058.8 + 1.6 . 3750 = 8470.56

Page 36
REKAYASA GEMPA

ANALISA BEBAN GEMPA PADA BANGUNAN PBT


DATA:
ukuran kolom : 50 x 50
balok : 40 x 40
balok anak : 20 x 40
arah x = 16 m
arah y = 15 m
tebal pelat = 0.12 m
tinggi (h) = 5 m

analisa pembebanan portal dilakukan terhadap beban gempa

beban Plafond + ducting = 20 kg/m2


beban finishing atap = 63 kg/m2
beban finishing lantai = 42 kg/m2
1. Berat bangunan total
a. Berat atap (W4)

Beban mati (DL)


- Beban plat 16 . 15 . 0.12 . 2400 = 69120
- Beban balok
- arah x (memanjang) : 0.4 . 0.4 . 16 . 3 . 2400 = 18432
- arah y (melintang) : 0.4 . 0.4 . 15 . 3 . 2400 = 17280
- Beban balok anak
arah y (melintang) : 0.2 . 0.4 . 15 . 2 . 2400 = 5760
- Beban kolom
Kolom 6 . 0.5 . 0.5 . 2 . 2400 = 7200
- Beban finishing atap 63 . 16 . 15 = 15120
- Beban plafond + ducling 20 . 16 . 15 = 4800
= 137712

Beban hidup (LL)


- Beban hidup plat atap 100 . 16 . 15 = 24000
- Beban air ( 5 cm ) 0.05 . 1000 . 16 . 15 = 12000
= 36000

Beban total W4 =
W4 = 1.2 DL + 1.6 LL
= 1.2 . 137712 + 1.6 . 36000 = 222854.4

b. Berat lantai 04 (W3)

Beban mati (DL)


- Beban plat 16 . 15 . 0 . 2400 = 69120
- Beban balok
- arah x (memanjang) : 0.4 . 0.4 . 16 . 3 . 2400 = 18432
- arah y (melintang) : 0.4 . 0.4 . 15 . 3 . 2400 = 17280
- Beban kolom
Kolom 6 . 0.5 . 0.5 . 2 . 2400 = 7200
- Beban finishing lantai 04 42 . 16 . 15 = 10080
- Beban plafond + ducling 20 . 16 . 15 = 4800
= 126912

Page 37
REKAYASA GEMPA
Beban hidup (LL)
- Beban hidup lantai 04 250 . 16 . 15 = 60000

Beban total W3 =
W3 = 1 DL + 2 LL
= 1 . 1E+05 + 2 . 60000 = 248294.4
c. Berat lantai 03 (W2)

Beban mati (DL)


- Beban plat 16 . 15 . 0.12 . 2400 = 69120
- Beban balok

- arah x (memanjang) : 0.4 . 0.4 . 16 . 3 . 2400 = 18432


- arah y (melintang) : 0.4 . 0.4 . 15 . 3 . 2400 = 17280
- Beban kolom
Kolom 6 . 1 . 1 . 2 . 2400 = 7200

- Beban finishing lantai 03 42 . 16 . 15 = 10080


- Beban plafond + ducling 20 . 16 . 15 = 4800
= 126912

Beban hidup (LL)


- Beban hidup lantai 03 250 . 16 . 15 = 60000

Beban total W2 =
W2 = 1 DL + 2 LL

= 1 . 126912 + 2 . 60000 = 272294.4

d. Berat lantai 02 (W1)

Beban mati (DL)


- Beban plat 16 . 15 . 0.12 . 2400 = 69120
- Beban balok
- arah x (memanjang) : 0.4 . 0.4 . 16 . 3 . 2400 = 18432
- arah y (melintang) : 0.4 . 0.4 . 15 . 3 . 2400 = 17280
- Beban kolom
Kolom 6 . 1 . 1 . 2 . 2400 = 7200
- Beban finishing lantai 02 42 . 16 . 15 = 10080
- Beban plafond + ducling 20 . 16 . 15 = 4800
= 126912

Beban hidup (LL)


- Beban hidup lantai 03 250 . 16 . 15 = 60000

Beban total W1 =
W1 = 1 DL + 2 LL
= 1 . 126912 + 2 . 60000 = 272294.4
Jadi berat total (Wt) = W4+W3+W2+W1 = 1015737.6 kg

2. Waktu getar bangunan (T)


Dengan rumus empiris :
Tx = Ty = z.n (SNI Gempa 2002 halaman 27 tabel 8)

Jadi :
Tx = Ty = 0.18 . 4.00 = 0.72 detik

Page 38
REKAYASA GEMPA
Asumsi tanah yang akan dibangun adalah
0.20 Tanah Lunak
C=
T
tanah sedang untuk wilayah gempa 3 dengan
nilai Tc (waktu getar alami) 0,72 detik.
Respons Spektrum, C
0.08 Tanah Sedang
0.90
C= Dari tabel 6 Spektrum respons gempa
0.83 T
0.08 Tanah Keras rencana (SNI 03 - 1726 - 2002 ) diperoleh :
C=
0.70 T Am = 0.75
Ar = 0.54

0.36
Untuk T £Tc maka :
0.32
0.28 C = Am = 2,5 A0
= 0.75

0 0.2 0.5
0.6
1.0 2.0 3.0

0.72 detik
Perioda, T

4. Faktor keutamaan I
Berdasarkan desain struktur rangka beton di daerah rawan gempa ( SNI 03 - 1726 - 2002
pasal 4.12) tabel 1 diperoleh faktor keutamaan I = 1,0 untuk gedung umum seperti untuk
penghunian, perniagaan dan perkantoran.

5. Daktalitas Struktur, R
Berdasarkan taraf kinerja struktur di daerah rawan gempa ( SNI 03 - 1726 - 2002
pasal 4.12) tabel 2 dengan asumsi struktur adalah daktail penuh, untuk m = 5,3 maka diperoleh
nilai R = 8.5

5. Gaya geser horizontal total akibat gempa


Rumus :
Vtotal = Vx = Vy = (C . I . Wt) / R
= ( 0.75 . 1 . 1015737.6 ) / 8.5
= 89623.905882 kg
= 89.623905882 ton

6. Distribusi gaya geser horizontal total


a. Arah x
H 5 wi . hi
= = 0.3125 < 3 Fix = . Vx
B 16 S wi . hi

a. Arah y
H 5 wi . hi
= = 0.3333333 < 3 Fiy = . Vy
B 15 S wi . hi

Dimana : Fix = Gaya horizontal akibat gempa pada lantai ke-i arah x
Fiy = Gaya horizontal akibat gempa pada lantai ke-i arah y
hi = Tinggi lantai ke-i terhadap lantai dasar
Wi = Berat lantai ke-i
Vx = Gaya geser horizontal total akibat gempa arah x
Vy = Gaya geser horizontal total akibat gempa arah y
B = Panjang sisi bangunan dalam arah yang ditinjau

V Total hi Wi
Tingkat Wi . hi Fix,Fiy Total 1/3 Fix
(t) (m) (t)
1 89.623905882 5 272294.4 1361472 51796.985746 17265.662
2 89.623905882 5 272294.4 1361472 51796.985746 17265.662
3 89.623905882 5 248.2944 1241.472 47.231604828 15.743868
Atap 89.623905882 5 222.8544 1114.272 42.392301055 14.130767
S 2355.744 89.623905882 29.874635

Page 39
REKAYASA GEMPA
q = 5.76 t/m q = 0 t/m q = 5.76 t/m

3 4 4' 3'

3.75
q = 2.0588 t/m q = 0 t/m q = 2.0588 t/m

2 5 5' 2'

4.15

6 m 5.5 m 6 m

SKETSA PEMBEBANAN AKIBAT BEBAN MATI

q = 18.025 t/m q = 0 t/m q = 18.025 t/m

3 4 4' 3'

3.75
q = 3.75 t/m q = 0 t/m q = 3.75 t/m

2 5 5' 2'

4.15

A B C D

6 m 5.5 m 6 m

SKETSA PEMBEBANAN AKIBAT BEBAN HIDUP

14.1308 t/m
M N O P

3.75

15.7439 t/m
I J K L

4.15

A B C D

6 m 5.5 m 6 m

SKETSA PEMBEBANAN AKIBAT BEBAN GEMPA

Page 40
REKAYASA GEMPA
7. Kombinasi Pembebanan

COMB 1 1,4 DL
COMB 2 1,2 DL + 1,6 LL
COMB 3 1,2 DL + 1,0 LL + 1,0 E
COMB 4 1,2 DL + 1,0 LL - 1,0 E

B4 B5 B6
I J K L

5
K5 K6 K7 K8

B1 B2 B3
E F G H

K1 K2 K3 K4 5

A B C D

6 m 5.5 m 6 m

Page 41
TABLE: Element Forces - Frames
Frame Station OutputCase CaseType P V2 V3 T M2 M3
Text m Text Text Ton Ton Ton Ton-m Ton-m Ton-m
B1 0 COMB1 Combination 0.67472529895 -9.2941833593 0 0 0 -7.257298766
B1 0.5 COMB1 Combination 0.67472529895 -7.5637833593 0 0 0 -3.0428070864
B1 1 COMB1 Combination 0.67472529895 -5.8333833593 0 0 0 0.30648459326
B1 1.5 COMB1 Combination 0.67472529895 -4.1029833593 0 0 0 2.79057627289
B1 2 COMB1 Combination 0.67472529895 -2.3725833593 0 0 0 4.40946795252
B1 2.5 COMB1 Combination 0.67472529895 -0.6421833593 0 0 0 5.16315963216
B1 3 COMB1 Combination 0.67472529895 1.08821664073 0 0 0 5.05165131179
B1 3.5 COMB1 Combination 0.67472529895 2.81861664073 0 0 0 4.07494299142
B1 4 COMB1 Combination 0.67472529895 4.54901664073 0 0 0 2.23303467106
B1 4.5 COMB1 Combination 0.67472529895 6.27941664073 0 0 0 -0.4740736493
B1 5 COMB1 Combination 0.67472529895 8.00981664073 0 0 0 -4.0463819697
B1 0 COMB2 Combination 0.83037623991 -11.101958419 0 0 0 -8.5338646919
B1 0.5 COMB2 Combination 0.83037623991 -9.0267584192 0 0 0 -3.5016854823
B1 1 COMB2 Combination 0.83037623991 -6.9515584192 0 0 0 0.49289372728
B1 1.5 COMB2 Combination 0.83037623991 -4.8763584192 0 0 0 3.44987293688
B1 2 COMB2 Combination 0.83037623991 -2.8011584192 0 0 0 5.36925214649
B1 2.5 COMB2 Combination 0.83037623991 -0.7259584192 0 0 0 6.25103135609
B1 3 COMB2 Combination 0.83037623991 1.3492415808 0 0 0 6.09521056569
B1 3.5 COMB2 Combination 0.83037623991 3.4244415808 0 0 0 4.90178977529
B1 4 COMB2 Combination 0.83037623991 5.4996415808 0 0 0 2.67076898489
B1 4.5 COMB2 Combination 0.83037623991 7.5748415808 0 0 0 -0.5978518055
B1 5 COMB2 Combination 0.83037623991 9.6500415808 0 0 0 -4.9040725959
B1 0 COMB3 Combination -4.9517780393 -13.724867017 0 0 0 -15.947333934
B1 0.5 COMB3 Combination -4.9517780393 -11.871667017 0 0 0 -9.5482004251
B1 1 COMB3 Combination -4.9517780393 -10.018467017 0 0 0 -4.0756669163
B1 1.5 COMB3 Combination -4.9517780393 -8.1652670174 0 0 0 0.47026659238
B1 2 COMB3 Combination -4.9517780393 -6.3120670174 0 0 0 4.08960010109
B1 2.5 COMB3 Combination -4.9517780393 -4.4588670174 0 0 0 6.78233360981
B1 3 COMB3 Combination -4.9517780393 -2.6056670174 0 0 0 8.54846711853
B1 3.5 COMB3 Combination -4.9517780393 -0.7524670174 0 0 0 9.38800062724
B1 4 COMB3 Combination -4.9517780393 1.10073298257 0 0 0 9.30093413596
B1 4.5 COMB3 Combination -4.9517780393 2.95393298257 0 0 0 8.28726764467
B1 5 COMB3 Combination -4.9517780393 4.80713298257 0 0 0 6.34700115339
B1 0 COMB4 Combination 6.42350031706 -6.1274131661 0 0 0 0.61459671929
B1 0.5 COMB4 Combination 6.42350031706 -4.2742131661 0 0 0 3.21500330234
B1 1 COMB4 Combination 6.42350031706 -2.4210131661 0 0 0 4.88880988539
B1 1.5 COMB4 Combination 6.42350031706 -0.5678131661 0 0 0 5.63601646844
B1 2 COMB4 Combination 6.42350031706 1.2853868339 0 0 0 5.45662305149
B1 2.5 COMB4 Combination 6.42350031706 3.1385868339 0 0 0 4.35062963454
B1 3 COMB4 Combination 6.42350031706 4.9917868339 0 0 0 2.31803621759
B1 3.5 COMB4 Combination 6.42350031706 6.8449868339 0 0 0 -0.6411571994
B1 4 COMB4 Combination 6.42350031706 8.6981868339 0 0 0 -4.5269506163
B1 4.5 COMB4 Combination 6.42350031706 10.5513868339 0 0 0 -9.3393440333
B1 5 COMB4 Combination 6.42350031706 12.4045868339 0 0 0 -15.07833745
B2 0 COMB1 Combination 0.33842124714 -5.8023 0 0 0 -5.4172783576
B2 0.5 COMB1 Combination 0.33842124714 -4.5129 0 0 0 -2.8384783576
B2 1 COMB1 Combination 0.33842124714 -3.2235 0 0 0 -0.9043783576
B2 1.5 COMB1 Combination 0.33842124714 -1.9341 0 0 0 0.38502164245
B2 2 COMB1 Combination 0.33842124714 -0.6447 0 0 0 1.02972164245
B2 2.5 COMB1 Combination 0.33842124714 0.6447 0 0 0 1.02972164245
B2 3 COMB1 Combination 0.33842124714 1.9341 0 0 0 0.38502164245
B2 3.5 COMB1 Combination 0.33842124714 3.2235 0 0 0 -0.9043783576
B2 4 COMB1 Combination 0.33842124714 4.5129 0 0 0 -2.8384783576
B2 4.5 COMB1 Combination 0.33842124714 5.8023 0 0 0 -5.4172783576
B2 0 COMB2 Combination 0.40134930756 -6.3414 0 0 0 -6.1455142025
B2 0.5 COMB2 Combination 0.40134930756 -4.9322 0 0 0 -3.3271142025
B2 1 COMB2 Combination 0.40134930756 -3.523 0 0 0 -1.2133142025
B2 1.5 COMB2 Combination 0.40134930756 -2.1138 0 0 0 0.19588579752
B2 2 COMB2 Combination 0.40134930756 -0.7046 0 0 0 0.90048579752
B2 2.5 COMB2 Combination 0.40134930756 0.7046 0 0 0 0.90048579752
B2 3 COMB2 Combination 0.40134930756 2.1138 0 0 0 0.19588579752
B2 3.5 COMB2 Combination 0.40134930756 3.523 0 0 0 -1.2133142025
B2 4 COMB2 Combination 0.40134930756 4.9322 0 0 0 -3.3271142025
B2 4.5 COMB2 Combination 0.40134930756 6.3414 0 0 0 -6.1455142025
B2 0 COMB3 Combination -3.6068749084 -8.8014787705 0 0 0 -12.271093861
B2 0.5 COMB3 Combination -3.6068749084 -7.5062787705 0 0 0 -8.1941544757
B2 1 COMB3 Combination -3.6068749084 -6.2110787705 0 0 0 -4.7648150905
B2 1.5 COMB3 Combination -3.6068749084 -4.9158787705 0 0 0 -1.9830757052
B2 2 COMB3 Combination -3.6068749084 -3.6206787705 0 0 0 0.15106368008
B2 2.5 COMB3 Combination -3.6068749084 -2.3254787705 0 0 0 1.63760306535
B2 3 COMB3 Combination -3.6068749084 -1.0302787705 0 0 0 2.47654245063
B2 3.5 COMB3 Combination -3.6068749084 0.26492122945 0 0 0 2.6678818359
B2 4 COMB3 Combination -3.6068749084 1.56012122945 0 0 0 2.21162122117
B2 4.5 COMB3 Combination -3.6068749084 2.85532122945 0 0 0 1.10776060645
B2 0 COMB4 Combination 4.32611805885 -2.8553212295 0 0 0 1.10666502092
B2 0.5 COMB4 Combination 4.32611805885 -1.5601212295 0 0 0 2.21052563564
B2 1 COMB4 Combination 4.32611805885 -0.2649212295 0 0 0 2.66678625037
B2 1.5 COMB4 Combination 4.32611805885 1.03027877055 0 0 0 2.4754468651
B2 2 COMB4 Combination 4.32611805885 2.32547877055 0 0 0 1.63650747982
B2 2.5 COMB4 Combination 4.32611805885 3.62067877055 0 0 0 0.14996809455
B2 3 COMB4 Combination 4.32611805885 4.91587877055 0 0 0 -1.9841712907
B2 3.5 COMB4 Combination 4.32611805885 6.21107877055 0 0 0 -4.765910676
B2 4 COMB4 Combination 4.32611805885 7.50627877055 0 0 0 -8.1952500613
B2 4.5 COMB4 Combination 4.32611805885 8.80147877055 0 0 0 -12.272189447
B3 0 COMB1 Combination 0.67472529895 -8.0098166407 0 0 0 -4.0463819697
B3 0.5 COMB1 Combination 0.67472529895 -6.2794166407 0 0 0 -0.4740736493
B3 1 COMB1 Combination 0.67472529895 -4.5490166407 0 0 0 2.23303467106
B3 1.5 COMB1 Combination 0.67472529895 -2.8186166407 0 0 0 4.07494299142
B3 2 COMB1 Combination 0.67472529895 -1.0882166407 0 0 0 5.05165131179
B3 2.5 COMB1 Combination 0.67472529895 0.64218335927 0 0 0 5.16315963216
B3 3 COMB1 Combination 0.67472529895 2.37258335927 0 0 0 4.40946795252
B3 3.5 COMB1 Combination 0.67472529895 4.10298335927 0 0 0 2.79057627289
B3 4 COMB1 Combination 0.67472529895 5.83338335927 0 0 0 0.30648459326
B3 4.5 COMB1 Combination 0.67472529895 7.56378335927 0 0 0 -3.0428070864
B3 5 COMB1 Combination 0.67472529895 9.29418335927 0 0 0 -7.257298766
B3 0 COMB2 Combination 0.83037623991 -9.6500415808 0 0 0 -4.9040725959
B3 0.5 COMB2 Combination 0.83037623991 -7.5748415808 0 0 0 -0.5978518055
B3 1 COMB2 Combination 0.83037623991 -5.4996415808 0 0 0 2.67076898489
B3 1.5 COMB2 Combination 0.83037623991 -3.4244415808 0 0 0 4.90178977529
B3 2 COMB2 Combination 0.83037623991 -1.3492415808 0 0 0 6.09521056569
B3 2.5 COMB2 Combination 0.83037623991 0.7259584192 0 0 0 6.25103135609
B3 3 COMB2 Combination 0.83037623991 2.8011584192 0 0 0 5.36925214649
B3 3.5 COMB2 Combination 0.83037623991 4.8763584192 0 0 0 3.44987293688
B3 4 COMB2 Combination 0.83037623991 6.9515584192 0 0 0 0.49289372728
B3 4.5 COMB2 Combination 0.83037623991 9.0267584192 0 0 0 -3.5016854823
B3 5 COMB2 Combination 0.83037623991 11.1019584192 0 0 0 -8.5338646919
B3 0 COMB3 Combination -1.5151230688 -12.389191438 0 0 0 -15.027613917
B3 0.5 COMB3 Combination -1.5151230688 -10.535991438 0 0 0 -9.2963181982
B3 1 COMB3 Combination -1.5151230688 -8.6827914376 0 0 0 -4.4916224794
B3 1.5 COMB3 Combination -1.5151230688 -6.8295914376 0 0 0 -0.6135267606
B3 2 COMB3 Combination -1.5151230688 -4.9763914376 0 0 0 2.33796895816
B3 2.5 COMB3 Combination -1.5151230688 -3.1231914376 0 0 0 4.36286467695
B3 3 COMB3 Combination -1.5151230688 -1.2699914376 0 0 0 5.46116039575
B3 3.5 COMB3 Combination -1.5151230688 0.58320856241 0 0 0 5.63285611455
B3 4 COMB3 Combination -1.5151230688 2.43640856241 0 0 0 4.87795183334
B3 4.5 COMB3 Combination -1.5151230688 4.28960856241 0 0 0 3.19644755214
B3 5 COMB3 Combination -1.5151230688 6.14280856241 0 0 0 0.58834327094
B3 0 COMB4 Combination 2.98684534658 -4.8225283789 0 0 0 6.29627762021
B3 0.5 COMB4 Combination 2.98684534658 -2.9693283789 0 0 0 8.24424180964
B3 1 COMB4 Combination 2.98684534658 -1.1161283789 0 0 0 9.26560599908
B3 1.5 COMB4 Combination 2.98684534658 0.73707162112 0 0 0 9.36037018852
B3 2 COMB4 Combination 2.98684534658 2.59027162112 0 0 0 8.52853437796
B3 2.5 COMB4 Combination 2.98684534658 4.44347162112 0 0 0 6.7700985674
B3 3 COMB4 Combination 2.98684534658 6.29667162112 0 0 0 4.08506275684
B3 3.5 COMB4 Combination 2.98684534658 8.14987162112 0 0 0 0.47342694627
B3 4 COMB4 Combination 2.98684534658 10.0030716211 0 0 0 -4.0648088643
B3 4.5 COMB4 Combination 2.98684534658 11.8562716211 0 0 0 -9.5296446748
B3 5 COMB4 Combination 2.98684534658 13.7094716211 0 0 0 -15.921080485
B4 0 COMB1 Combination -1.2844846317 -4.3755804195 0 0 0 -2.0783098796
B4 0.5 COMB1 Combination -1.2844846317 -3.4361804195 0 0 0 -0.1253696698
B4 1 COMB1 Combination -1.2844846317 -2.4967804195 0 0 0 1.35787053994
B4 1.5 COMB1 Combination -1.2844846317 -1.5573804195 0 0 0 2.37141074971
B4 2 COMB1 Combination -1.2844846317 -0.6179804195 0 0 0 2.91525095949
B4 2.5 COMB1 Combination -1.2844846317 0.32141958046 0 0 0 2.98939116926
B4 3 COMB1 Combination -1.2844846317 1.26081958046 0 0 0 2.59383137903
B4 3.5 COMB1 Combination -1.2844846317 2.20021958046 0 0 0 1.7285715888
B4 4 COMB1 Combination -1.2844846317 3.13961958046 0 0 0 0.39361179857
B4 4.5 COMB1 Combination -1.2844846317 4.07901958046 0 0 0 -1.4110479917
B4 5 COMB1 Combination -1.2844846317 5.01841958046 0 0 0 -3.6854077819
B4 0 COMB2 Combination -1.5666716337 -5.3913259686 0 0 0 -2.546295815
B4 0.5 COMB2 Combination -1.5666716337 -4.2341259686 0 0 0 -0.1399328307
B4 1 COMB2 Combination -1.5666716337 -3.0769259686 0 0 0 1.68783015354
B4 1.5 COMB2 Combination -1.5666716337 -1.9197259686 0 0 0 2.93699313782
B4 2 COMB2 Combination -1.5666716337 -0.7625259686 0 0 0 3.6075561221
B4 2.5 COMB2 Combination -1.5666716337 0.39467403143 0 0 0 3.69951910638
B4 3 COMB2 Combination -1.5666716337 1.55187403143 0 0 0 3.21288209067
B4 3.5 COMB2 Combination -1.5666716337 2.70907403143 0 0 0 2.14764507495
B4 4 COMB2 Combination -1.5666716337 3.86627403143 0 0 0 0.50380805923
B4 4.5 COMB2 Combination -1.5666716337 5.02347403143 0 0 0 -1.7186289565
B4 5 COMB2 Combination -1.5666716337 6.18067403143 0 0 0 -4.5196659722
B4 0 COMB3 Combination -9.9045709376 -3.3072198884 0 0 0 1.87694273475
B4 0.5 COMB3 Combination -9.9045709376 -2.2820198884 0 0 0 3.27425267896
B4 1 COMB3 Combination -9.9045709376 -1.2568198884 0 0 0 4.15896262317
B4 1.5 COMB3 Combination -9.9045709376 -0.2316198884 0 0 0 4.53107256738
B4 2 COMB3 Combination -9.9045709376 0.79358011159 0 0 0 4.39058251158
B4 2.5 COMB3 Combination -9.9045709376 1.81878011159 0 0 0 3.73749245579
B4 3 COMB3 Combination -9.9045709376 2.84398011159 0 0 0 2.5718024
B4 3.5 COMB3 Combination -9.9045709376 3.86918011159 0 0 0 0.89351234421
B4 4 COMB3 Combination -9.9045709376 4.89438011159 0 0 0 -1.2973777116
B4 4.5 COMB3 Combination -9.9045709376 5.91958011159 0 0 0 -4.0008677674
B4 5 COMB3 Combination -9.9045709376 6.94478011159 0 0 0 -7.2169578232
B4 0 COMB4 Combination 7.12049127515 -6.2448106991 0 0 0 -6.3958688547
B4 0.5 COMB4 Combination 7.12049127515 -5.2196106991 0 0 0 -3.5297635051
B4 1 COMB4 Combination 7.12049127515 -4.1944106991 0 0 0 -1.1762581556
B4 1.5 COMB4 Combination 7.12049127515 -3.1692106991 0 0 0 0.664647194
B4 2 COMB4 Combination 7.12049127515 -2.1440106991 0 0 0 1.99295254357
B4 2.5 COMB4 Combination 7.12049127515 -1.1188106991 0 0 0 2.80865789314
B4 3 COMB4 Combination 7.12049127515 -9.36E-02 0 0 0 3.11176324271
B4 3.5 COMB4 Combination 7.12049127515 0.93158930086 0 0 0 2.90226859228
B4 4 COMB4 Combination 7.12049127515 1.95678930086 0 0 0 2.18017394185
B4 4.5 COMB4 Combination 7.12049127515 2.98198930086 0 0 0 0.94547929142
B4 5 COMB4 Combination 7.12049127515 4.00718930086 0 0 0 -0.801815359
B5 0 COMB1 Combination -0.6786174452 -2.5578 0 0 0 -2.6837412082
B5 0.5 COMB1 Combination -0.6786174452 -1.9894 0 0 0 -1.5469412082
B5 1 COMB1 Combination -0.6786174452 -1.421 0 0 0 -0.6943412082
B5 1.5 COMB1 Combination -0.6786174452 -0.8526 0 0 0 -0.1259412082
B5 2 COMB1 Combination -0.6786174452 -0.2842 0 0 0 0.15825879182
B5 2.5 COMB1 Combination -0.6786174452 0.2842 0 0 0 0.15825879182
B5 3 COMB1 Combination -0.6786174452 0.8526 0 0 0 -0.1259412082
B5 3.5 COMB1 Combination -0.6786174452 1.421 0 0 0 -0.6943412082
B5 4 COMB1 Combination -0.6786174452 1.9894 0 0 0 -1.5469412082
B5 4.5 COMB1 Combination -0.6786174452 2.5578 0 0 0 -2.6837412082
B5 0 COMB2 Combination -0.7860871048 -3.0204 0 0 0 -3.2354970554
B5 0.5 COMB2 Combination -0.7860871048 -2.3492 0 0 0 -1.8930970554
B5 1 COMB2 Combination -0.7860871048 -1.678 0 0 0 -0.8862970554
B5 1.5 COMB2 Combination -0.7860871048 -1.0068 0 0 0 -0.2150970554
B5 2 COMB2 Combination -0.7860871048 -0.3356 0 0 0 0.12050294459
B5 2.5 COMB2 Combination -0.7860871048 0.3356 0 0 0 0.12050294459
B5 3 COMB2 Combination -0.7860871048 1.0068 0 0 0 -0.2150970554
B5 3.5 COMB2 Combination -0.7860871048 1.678 0 0 0 -0.8862970554
B5 4 COMB2 Combination -0.7860871048 2.3492 0 0 0 -1.8930970554
B5 4.5 COMB2 Combination -0.7860871048 3.0204 0 0 0 -3.2354970554
B5 0 COMB3 Combination -5.9749890018 -1.4936656232 0 0 0 -0.1478566958
B5 0.5 COMB3 Combination -5.9749890018 -0.8914656232 0 0 0 0.44842611576
B5 1 COMB3 Combination -5.9749890018 -0.2892656232 0 0 0 0.74360892734
B5 1.5 COMB3 Combination -5.9749890018 0.31293437684 0 0 0 0.73769173892
B5 2 COMB3 Combination -5.9749890018 0.91513437684 0 0 0 0.4306745505
B5 2.5 COMB3 Combination -5.9749890018 1.51733437684 0 0 0 -0.1774426379
B5 3 COMB3 Combination -5.9749890018 2.11953437684 0 0 0 -1.0866598263
B5 3.5 COMB3 Combination -5.9749890018 2.72173437684 0 0 0 -2.2969770148
B5 4 COMB3 Combination -5.9749890018 3.32393437684 0 0 0 -3.8083942032
B5 4.5 COMB3 Combination -5.9749890018 3.92613437684 0 0 0 -5.6209113916
B5 0 COMB4 Combination 4.55612604894 -3.9261343768 0 0 0 -5.6217768287
B5 0.5 COMB4 Combination 4.55612604894 -3.3239343768 0 0 0 -3.8092596403
B5 1 COMB4 Combination 4.55612604894 -2.7217343768 0 0 0 -2.2978424519
B5 1.5 COMB4 Combination 4.55612604894 -2.1195343768 0 0 0 -1.0875252634
B5 2 COMB4 Combination 4.55612604894 -1.5173343768 0 0 0 -0.178308075
B5 2.5 COMB4 Combination 4.55612604894 -0.9151343768 0 0 0 0.4298091134
B5 3 COMB4 Combination 4.55612604894 -0.3129343768 0 0 0 0.73682630182
B5 3.5 COMB4 Combination 4.55612604894 0.28926562316 0 0 0 0.74274349024
B5 4 COMB4 Combination 4.55612604894 0.89146562316 0 0 0 0.44756067866
B5 4.5 COMB4 Combination 4.55612604894 1.49366562316 0 0 0 -0.1487221329
B6 0 COMB1 Combination -1.2844846317 -5.0184195805 0 0 0 -3.6854077819
B6 0.5 COMB1 Combination -1.2844846317 -4.0790195805 0 0 0 -1.4110479917
B6 1 COMB1 Combination -1.2844846317 -3.1396195805 0 0 0 0.39361179857
B6 1.5 COMB1 Combination -1.2844846317 -2.2002195805 0 0 0 1.7285715888
B6 2 COMB1 Combination -1.2844846317 -1.2608195805 0 0 0 2.59383137903
B6 2.5 COMB1 Combination -1.2844846317 -0.3214195805 0 0 0 2.98939116926
B6 3 COMB1 Combination -1.2844846317 0.61798041954 0 0 0 2.91525095949
B6 3.5 COMB1 Combination -1.2844846317 1.55738041954 0 0 0 2.37141074971
B6 4 COMB1 Combination -1.2844846317 2.49678041954 0 0 0 1.35787053994
B6 4.5 COMB1 Combination -1.2844846317 3.43618041954 0 0 0 -0.1253696698
B6 5 COMB1 Combination -1.2844846317 4.37558041954 0 0 0 -2.0783098796
B6 0 COMB2 Combination -1.5666716337 -6.1806740314 0 0 0 -4.5196659722
B6 0.5 COMB2 Combination -1.5666716337 -5.0234740314 0 0 0 -1.7186289565
B6 1 COMB2 Combination -1.5666716337 -3.8662740314 0 0 0 0.50380805923
B6 1.5 COMB2 Combination -1.5666716337 -2.7090740314 0 0 0 2.14764507495
B6 2 COMB2 Combination -1.5666716337 -1.5518740314 0 0 0 3.21288209067
B6 2.5 COMB2 Combination -1.5666716337 -0.3946740314 0 0 0 3.69951910638
B6 3 COMB2 Combination -1.5666716337 0.76252596857 0 0 0 3.6075561221
B6 3.5 COMB2 Combination -1.5666716337 1.91972596857 0 0 0 2.93699313782
B6 4 COMB2 Combination -1.5666716337 3.07692596857 0 0 0 1.68783015354
B6 4.5 COMB2 Combination -1.5666716337 4.23412596857 0 0 0 -0.1399328307
B6 5 COMB2 Combination -1.5666716337 5.39132596857 0 0 0 -2.546295815
B6 0 COMB3 Combination -3.4149758515 -4.0109741711 0 0 0 -0.8086109869
B6 0.5 COMB3 Combination -3.4149758515 -2.9857741711 0 0 0 0.94057609865
B6 1 COMB3 Combination -3.4149758515 -1.9605741711 0 0 0 2.1771631842
B6 1.5 COMB3 Combination -3.4149758515 -0.9353741711 0 0 0 2.90115026976
B6 2 COMB3 Combination -3.4149758515 8.98E-02 0 0 0 3.11253735531
B6 2.5 COMB3 Combination -3.4149758515 1.11502582889 0 0 0 2.81132444086
B6 3 COMB3 Combination -3.4149758515 2.14022582889 0 0 0 1.99751152642
B6 3.5 COMB3 Combination -3.4149758515 3.16542582889 0 0 0 0.67109861197
B6 4 COMB3 Combination -3.4149758515 4.19062582889 0 0 0 -1.1679143025
B6 4.5 COMB3 Combination -3.4149758515 5.21582582889 0 0 0 -3.5195272169
B6 5 COMB3 Combination -3.4149758515 6.24102582889 0 0 0 -6.3837401314
B6 0 COMB4 Combination 0.63089618901 -6.9409952413 0 0 0 -7.2101621953
B6 0.5 COMB4 Combination 0.63089618901 -5.9157952413 0 0 0 -3.9959645746
B6 1 COMB4 Combination 0.63089618901 -4.8905952413 0 0 0 -1.2943669539
B6 1.5 COMB4 Combination 0.63089618901 -3.8653952413 0 0 0 0.89463066673
B6 2 COMB4 Combination 0.63089618901 -2.8401952413 0 0 0 2.5710282874
B6 2.5 COMB4 Combination 0.63089618901 -1.8149952413 0 0 0 3.73482590807
B6 3 COMB4 Combination 0.63089618901 -0.7897952413 0 0 0 4.38602352873
B6 3.5 COMB4 Combination 0.63089618901 0.23540475866 0 0 0 4.5246211494
B6 4 COMB4 Combination 0.63089618901 1.26060475866 0 0 0 4.15061877007
B6 4.5 COMB4 Combination 0.63089618901 2.28580475866 0 0 0 3.26401639074
B6 5 COMB4 Combination 0.63089618901 3.31100475866 0 0 0 1.86481401141
K1 0 COMB1 Combination -13.96039706 -0.6097593327 0 0 0 -0.8100416925
K1 2 COMB1 Combination -13.54039706 -0.6097593327 0 0 0 0.40947697296
K1 4 COMB1 Combination -13.12039706 -0.6097593327 0 0 0 1.62899563841
K1 0 COMB2 Combination -16.391367549 -0.7362953938 0 0 0 -0.978163882
K1 2 COMB2 Combination -16.031367549 -0.7362953938 0 0 0 0.49442690554
K1 4 COMB2 Combination -15.671367549 -0.7362953938 0 0 0 1.96701769307
K1 0 COMB3 Combination -9.464352871 3.64365102312 0 0 0 8.57466192268
K1 2 COMB3 Combination -9.104352871 3.64365102312 0 0 0 1.28735987645
K1 4 COMB3 Combination -8.744352871 3.64365102312 0 0 0 -5.9999421698
K1 0 COMB4 Combination -19.999397533 -4.9560084078 0 0 0 -10.318107863
K1 2 COMB4 Combination -19.639397533 -4.9560084078 0 0 0 -0.4060910476
K1 4 COMB4 Combination -19.279397533 -4.9560084078 0 0 0 9.50592576796
K2 0 COMB1 Combination -23.40770294 -0.2695631347 0 0 0 -0.7211518293
K2 2 COMB1 Combination -23.82770294 -0.2695631347 0 0 0 -0.1820255599
K2 4 COMB1 Combination -24.24770294 -0.2695631347 0 0 0 0.35710070953
K2 0 COMB2 Combination -27.274432451 -0.3515575966 0 0 0 -0.940473555
K2 2 COMB2 Combination -27.634432451 -0.3515575966 0 0 0 -0.2373583618
K2 4 COMB2 Combination -27.994432451 -0.3515575966 0 0 0 0.4657568313
K2 0 COMB3 Combination -25.648633982 -5.2744850667 0 0 0 -10.370658892
K2 2 COMB3 Combination -26.008633982 -5.2744850667 0 0 0 0.17831124137
K2 4 COMB3 Combination -26.368633982 -5.2744850667 0 0 0 10.7272813748
K2 0 COMB4 Combination -23.492215614 4.66174748441 0 0 0 8.73146934379
K2 2 COMB4 Combination -23.852215614 4.66174748441 0 0 0 -0.592025625
K2 4 COMB4 Combination -24.212215614 4.66174748441 0 0 0 -9.9155205939
K3 0 COMB1 Combination -23.40770294 0.26956313471 0 0 0 0.72115182932
K3 2 COMB1 Combination -23.82770294 0.26956313471 0 0 0 0.1820255599
K3 4 COMB1 Combination -24.24770294 0.26956313471 0 0 0 -0.3571007095
K3 0 COMB2 Combination -27.274432451 0.35155759657 0 0 0 0.940473555
K3 2 COMB2 Combination -27.634432451 0.35155759657 0 0 0 0.23735836185
K3 4 COMB2 Combination -27.994432451 0.35155759657 0 0 0 -0.4657568313
K3 0 COMB3 Combination -23.511395881 -4.6517649899 0 0 0 -8.7116915106
K3 2 COMB3 Combination -23.871395881 -4.6517649899 0 0 0 0.59183846916
K3 4 COMB3 Combination -24.231395881 -4.6517649899 0 0 0 9.89536844894
K3 0 COMB4 Combination -25.629453715 5.26450257221 0 0 0 10.3508810589
K3 2 COMB4 Combination -25.989453715 5.26450257221 0 0 0 -0.1781240855
K3 4 COMB4 Combination -26.349453715 5.26450257221 0 0 0 -10.70712923
K4 0 COMB1 Combination -13.12039706 -0.6097593327 0 0 0 -1.6289956384
K4 2 COMB1 Combination -13.54039706 -0.6097593327 0 0 0 -0.409476973
K4 4 COMB1 Combination -13.96039706 -0.6097593327 0 0 0 0.81004169248
K4 0 COMB2 Combination -15.671367549 -0.7362953938 0 0 0 -1.9670176931
K4 2 COMB2 Combination -16.031367549 -0.7362953938 0 0 0 -0.4944269055
K4 4 COMB2 Combination -16.391367549 -0.7362953938 0 0 0 0.978163882
K4 0 COMB3 Combination -19.260217266 -4.9300989203 0 0 0 -9.4589385682
K4 2 COMB3 Combination -19.620217266 -4.9300989203 0 0 0 0.40125927227
K4 4 COMB3 Combination -19.980217266 -4.9300989203 0 0 0 10.2614571128
K4 0 COMB4 Combination -8.7635331375 3.61774153559 0 0 0 5.95295497008
K4 2 COMB4 Combination -9.1235331375 3.61774153559 0 0 0 -1.2825281011
K4 4 COMB4 Combination -9.4835331375 3.61774153559 0 0 0 -8.5180111723
K5 0 COMB1 Combination -5.1105804195 -1.2844846317 0 0 0 -2.4173863313
K5 1.75 COMB1 Combination -4.7430804195 -1.2844846317 0 0 0 -0.1695382258
K5 3.5 COMB1 Combination -4.3755804195 -1.2844846317 0 0 0 2.0783098796
K5 0 COMB2 Combination -6.0213259686 -1.5666716337 0 0 0 -2.9370549028
K5 1.75 COMB2 Combination -5.7063259686 -1.5666716337 0 0 0 -0.1953795439
K5 3.5 COMB2 Combination -5.3913259686 -1.5666716337 0 0 0 2.54629581503
K5 0 COMB3 Combination -3.9372198884 0.63542906239 0 0 0 0.3470589836
K5 1.75 COMB3 Combination -3.6222198884 0.63542906239 0 0 0 -0.7649418756
K5 3.5 COMB3 Combination -3.3072198884 0.63542906239 0 0 0 -1.8769427348
K5 0 COMB4 Combination -6.8748106991 -3.4195087248 0 0 0 -5.5724116823
K5 1.75 COMB4 Combination -6.5598106991 -3.4195087248 0 0 0 0.41172858623
K5 3.5 COMB4 Combination -6.2448106991 -3.4195087248 0 0 0 6.39586885471
K6 0 COMB1 Combination -7.5762195805 -0.6058671865 0 0 0 -1.0016665737
K6 1.75 COMB1 Combination -7.9437195805 -0.6058671865 0 0 0 5.86E-02
K6 3.5 COMB1 Combination -8.3112195805 -0.6058671865 0 0 0 1.11886857914
K6 0 COMB2 Combination -9.2010740314 -0.7805845289 0 0 0 -1.2841689168
K6 1.75 COMB2 Combination -9.5160740314 -0.7805845289 0 0 0 8.19E-02
K6 3.5 COMB2 Combination -9.8310740314 -0.7805845289 0 0 0 1.44787693444
K6 0 COMB3 Combination -8.4384457347 -3.9295819358 0 0 0 -7.0691011274
K6 1.75 COMB3 Combination -8.7534457347 -3.9295819358 0 0 0 -0.1923327396
K6 3.5 COMB3 Combination -9.0684457347 -3.9295819358 0 0 0 6.68443564811
K6 0 COMB4 Combination -7.9333236777 2.56436522621 0 0 0 4.81996146969
K6 1.75 COMB4 Combination -8.2483236777 2.56436522621 0 0 0 0.33232232382
K6 3.5 COMB4 Combination -8.5633236777 2.56436522621 0 0 0 -4.155316822
K7 0 COMB1 Combination -7.5762195805 0.60586718653 0 0 0 1.00166657371
K7 1.75 COMB1 Combination -7.9437195805 0.60586718653 0 0 0 -5.86E-02
K7 3.5 COMB1 Combination -8.3112195805 0.60586718653 0 0 0 -1.1188685791
K7 0 COMB2 Combination -9.2010740314 0.78058452892 0 0 0 1.28416891679
K7 1.75 COMB2 Combination -9.5160740314 0.78058452892 0 0 0 -8.19E-02
K7 3.5 COMB2 Combination -9.8310740314 0.78058452892 0 0 0 -1.4478769344
K7 0 COMB3 Combination -7.9371085479 -2.5600131503 0 0 0 -4.8123004047
K7 1.75 COMB3 Combination -8.2521085479 -2.5600131503 0 0 0 -0.3322773917
K7 3.5 COMB3 Combination -8.5671085479 -2.5600131503 0 0 0 4.14774562134
K7 0 COMB4 Combination -8.4346608645 3.92522985993 0 0 0 7.06144006235
K7 1.75 COMB4 Combination -8.7496608645 3.92522985993 0 0 0 0.19228780747
K7 3.5 COMB4 Combination -9.0646608645 3.92522985993 0 0 0 -6.6768644474
K8 0 COMB1 Combination -4.3755804195 -1.2844846317 0 0 0 -2.0783098796
K8 1.75 COMB1 Combination -4.7430804195 -1.2844846317 0 0 0 0.16953822583
K8 3.5 COMB1 Combination -5.1105804195 -1.2844846317 0 0 0 2.41738633127
K8 0 COMB2 Combination -5.3913259686 -1.5666716337 0 0 0 -2.546295815
K8 1.75 COMB2 Combination -5.7063259686 -1.5666716337 0 0 0 0.19537954391
K8 3.5 COMB2 Combination -6.0213259686 -1.5666716337 0 0 0 2.93705490284
K8 0 COMB3 Combination -6.2410258289 -3.4149758515 0 0 0 -6.3837401314
K8 1.75 COMB3 Combination -6.5560258289 -3.4149758515 0 0 0 -0.4075323913
K8 3.5 COMB3 Combination -6.8710258289 -3.4149758515 0 0 0 5.56867534878
K8 0 COMB4 Combination -3.3110047587 0.63089618901 0 0 0 1.86481401141
K8 1.75 COMB4 Combination -3.6260047587 0.63089618901 0 0 0 0.76074568064
K8 3.5 COMB4 Combination -3.9410047587 0.63089618901 0 0 0 -0.3433226501
TABLE: Joint Reactions
Joint OutputCase CaseType U1 U2 U3 R1 R2 R3
Text Text Text Ton Ton Ton Ton-m Ton-m Ton-m
A COMB1 Combination 0.60975933272 0 13.96039706 0 0.81004169248 0
A COMB2 Combination 0.73629539377 0 16.391367549 0 0.978163882 0
A COMB3 Combination -3.6436510231 0 9.464352871 0 -8.5746619227 0
A COMB4 Combination 4.95600840779 0 19.999397533 0 10.3181078632 0
B COMB1 Combination -0.2695631347 0 24.24770294 0 -0.3571007095 0
B COMB2 Combination -0.3515575966 0 27.994432451 0 -0.4657568313 0
B COMB3 Combination -5.2744850667 0 26.368633982 0 -10.727281375 0
B COMB4 Combination 4.66174748441 0 24.212215614 0 9.91552059386 0
C COMB1 Combination 0.26956313471 0 24.24770294 0 0.35710070953 0
C COMB2 Combination 0.35155759657 0 27.994432451 0 0.4657568313 0
C COMB3 Combination -4.6517649899 0 24.231395881 0 -9.8953684489 0
C COMB4 Combination 5.26450257221 0 26.349453715 0 10.7071292299 0
D COMB1 Combination -0.6097593327 0 13.96039706 0 -0.8100416925 0
D COMB2 Combination -0.7362953938 0 16.391367549 0 -0.978163882 0
D COMB3 Combination -4.9300989203 0 19.980217266 0 -10.261457113 0
D COMB4 Combination 3.61774153559 0 9.4835331375 0 8.51801117227 0
STRUKTUR BETON II BAB IV50

IV. PERENCANAAN PENULANGAN BALOK DAN KOLOM


A. PENULANGAN BALOK
1. Penulangan balok atap
a. Tulangan tumpuan

M (-) = 7.21695782 tm = 72169578.232 Nmm

810

120
d
400
f 8
d'
f 12
250

d = h - 1/2 f tul. Utama - f Sengkang - d'


= 400.000 - 0.5 . 12 - 8 - 40
= 346.000 mm 0.63

1.4 1.4
r min = = = 0.00431
fy 325

Mu 72169578.2317
Mnperlu = = = 90211972.79 Nmm
f 0.8

t
Mnada = 0.85 . fc' . Be . t . d -
2

120
= 0.85 . 22 . 810 . 120 . 346 -
2

= 519845040

Syarat : Mn perlu > Mn ada Dianalisa dengan rumus sifat balok T murni
Mn perlu < Mn ada Dianalisa dengan rumus seperti balok biasa

2 . Mu
a aktual = d + d 2 -
0.85 . fc' . f . Be

2 . 72169578.2317068
= 346 + 346 2 -
0.85 . 22 . 0.8 . 810

= 17.6641

0,85 . Fc' . Be . a aktual 0.85 . 22 . 810 . 17.6641


r = =
Bw . d . fy 250 . 346 . 325

= 0.00952
STRUKTUR BETON II BAB IV51

Syarat :
r > rmin Ok !!!
STRUKTUR BETON II BAB IV52

Hitung luas tulangan :


As = r . Bw . d.
= 0.00952 . 250 . 346.0
= 823.255 mm2

Digunakan Tulangan : 3 f 22 = 1140.857 mm2

b. Tulangan lapangan

M (+) = 4.53107257 tm = 45310725.674 Nmm

810

120
d
400
f 8
d'
f 12
250

d = h - 1/2 f tul. Utama - f Sengkang - d'


= 400.000 - 0.5 . 12 - 8 - 40
= 346.000 mm

1.4 1.4
rmin = = = 0.00431
fy 325

Mu 45310725.6738
Mnperlu = = = 56638407.092 Nmm
f 0.8

t
Mnada = 0.85 . fc' . Be . t . d -
2

120
= 0.85 . 22 . 810 . 120 . 346 -
2

= 519845040

Syarat : Mn perlu > Mn ada Dianalisa dengan rumus sifat balok T murni
Mn perlu < Mn ada Dianalisa dengan rumus seperti balok biasa

2 . Mu
a aktual = d + d 2 -
0.85 . fc' . f . Be

2 . 45310725.6737699
= 346 + 346 2 -
0.85 . 22 . 0.8 . 810

= 10.9813

0,85 . Fc' . Be . a aktual 0.85 . 22 . 810 . 10.9813


r = =
STRUKTUR BETON II BAB IV53

r = =
Bw . d . fy 250 . 346 . 325

= 0.00592
STRUKTUR BETON II BAB IV54

Syarat :
r > rmin Ok !!!

Hitung luas tulangan :


As = r . Bw . d.
= 0.00592 . 250 . 346.0
= 511.798 mm 2

Digunakan Tulangan : 3 f 17 = 681.214 mm2

2. Penulangan balok lantai 02


a. Tulangan tumpuan

M (-) = 15.9473339 tm = 159473339.34 Nmm

810

120
d
400
f 8
d'
f 12
250

d = h - 1/2 f tul. Utama - f Sengkang - d'


= 400.000 - 0.5 . 12 - 8 - 40
= 346.000 mm

1.4 1.4
rmin = = = 0.00431
fy 325

Mu 159473339.338
Mnperlu = = = 199341674.17 Nmm
f 0.8

t
Mnada = 0.85 . fc' . Be . t . d -
2

120
= 0.85 . 22 . 810 . 120 . 346 -
2

= 519845040

Syarat : Mn perlu > Mn ada Dianalisa dengan rumus sifat balok T murni
Mn perlu < Mn ada Dianalisa dengan rumus seperti balok biasa

2 . Mu
a aktual = d + d 2 -
0.85 . fc' . f . Be

2 . 159473339.337684
= 346 + 346 2 -
0.85 . 22 . 0.8 . 810
STRUKTUR BETON II BAB IV55

= 40.394
STRUKTUR BETON II BAB IV56

0,85 . Fc' . Be . a aktual 0.85 . 22 . 810 . 40.394


r = =
Bw . d . fy 250 . 346 . 325

= 0.02176
Syarat :
r > rmin Ok !!!

Hitung luas tulangan :


As = r . Bw . d.
= 0.02176 . 250 . 346.0
= 1882.61 mm 2

Digunakan Tulangan : 3 f 32 = 2413.714 mm2

b. Tulangan Lapangan

M (+) = 9.38800 tm = 93880006.272 Nmm

810

120
d
400
f 8
d'
f 12
250

d = h - 1/2 f tul. Utama - f Sengkang - d'


= 400.000 - 0.5 . 12 - 8 - 40
= 346.000 mm

1.4 1.4
rmin = = = 0.00431
fy 325

Mu 93880006.2724
Mnperlu = = = 117350007.84 Nmm
f 0.8

t
Mnada = 0.85 . fc' . Be . t . d -
2

120
= 0.85 . 22 . 810 . 120 . 346 -
2

= 519845040

Syarat : Mn perlu > Mn ada Dianalisa dengan rumus sifat balok T murni
Mn perlu < Mn ada Dianalisa dengan rumus seperti balok biasa

2 . Mu
a aktual = d + d 2 -
STRUKTUR BETON II BAB IV57

a aktual = d + d 2 -
0.85 . fc' . f . Be
STRUKTUR BETON II BAB IV58

2 . 93880006.2724238
= 346 + 346 2 -
0.85 . 22 . 0.8 . 810

= 23.1669

0,85 . Fc' . Be . a aktual 0.85 . 22 . 810 . 23.1669


r = =
Bw . d . fy 250 . 346 . 325

= 0.01248
Syarat :
r > rmin Ok !!!

Hitung luas tulangan :


As = r . Bw . d.
= 0.01248 . 250 . 346.0
= 1079.72 mm 2

Digunakan Tulangan : 3 f 24 = 1357.714 mm2

B. PENULANGAN KOLOM
1. Penulangan Kolom Lantai 2
1.1 Kolom tepi
~ Mengecek pengaruh kelangsingan kolom
Untuk komponen struktur tekan yang tidak ditahan terhadap goyangan ke samping, pengaruh
kelangsingan dapat diabaikan jika memenuhi :

k . Lu
< 22 SNI 2002 Pasal 12.12.2)
r
dimana :
k = faktor tekuk = 1
lu = panjang kolom = 3.75
I 1/ 12 . 40 . 40 3
r = radius girasi = = = 11.547
A 40 . 40
atau r = 0,3 . h. = 0.3 . 40 = 12

Jadi :
k . Lu 1. 3.75
= = 31.25 > 22
r 0.12

Berarti faktor kelangsingan tak dapat diabaikan

~ Faktor pembesar momen (d)

Cm
d = > 1
Pu
1 -
f . Pc

Dimana : Cm = 1 (konservatif)
Pu = 6.87 ton
p2 . EI
Pc =
(k . Lu)2
Ec . Ig
EI =
2,5 . (1 + b d)
STRUKTUR BETON II BAB IV59

Ec = 4700 . fc' = 4700 22 = 22044.954 Mpa = 2204495.4 t/m2


Ig = 1/12 . b. h3 =
STRUKTUR BETON II BAB IV60

1
Ig = . 0.40 . 0.40 3 = 0.0021333 m4
12
1,2 . qdl 1.2 . 8366.47
bd = = = 0.75389
1,2 . qdl + 1,6 . qll 1.2 . 8366.47 + 1.6 . 2048.44
diperoleh :
2204495.4 . 0.0021333
EI = = 1072.5692546
2.5 . ( 1 + 0.75389 )

p2 . 1072.5693
Pc = = 752.007
1. 3.75 2

1
d = = 1.01 > 1 Ok !!!
6.87
1 -
0.65 . 752.007

Penulangan untuk kolom tepi


Mu = 6.38374013 tm
Mc = d . Mu
= 1.01427 . 6.38374013 = 6.47481 tm

Hitung :
Pu 6.8748107
Pn perlu = = = 10.5766 ton
f 0.65

Mc 6.4748
Mn perlu = = = 9.96124 tm
f 0.65

Eksentrisitas :
Mn perlu 9.9612388251
e = = = 0.94182 = 941.816
Pn perlu 10.576631845

emin = 15 + 0,03 . h. = 15 + 0.03 . 400 = 27

Syarat : emin < e Ok !!!

Hitung nilai r
~ Sumbu vertikal
Pu 68748.1069914102
= = 0.03535
f . Ag . 0,85 . fc' 0.65 . 400 . 400 . 0.85 . 22

~ Sumbu horizontal
Pu e 941.816
. = 0.03535 . = 0.08323
f . Ag . 0,85 . Fc' h 400

Dari diagram interaksi kolom, diperoleh : (gunakan grafik tulangan empat sisi, "Pu > Mu" )
dengan d'/h » 0,20 dan fy = 400 Mpa
b = 1
r = 0.06

Maka, r = b . r = 1 . 0.06 = 0.06


Hitung luas tulangan :
Ast = r . Ag
= 0.06 . 400 . 400
STRUKTUR BETON II BAB IV61

= 9600 mm2
STRUKTUR BETON II BAB IV62

As = As' = 1/4 . Ast = 0.25 . 9600 = 2400 mm2

Digunakan Tulangan : 2 f 25 = 982.14 mm2

1.2 Kolom tengah


~ Mengecek pengaruh kelangsingan kolom
Untuk komponen struktur tekan yang tidak ditahan terhadap goyangan ke samping, pengaruh
kelangsingan dapat diabaikan jika memenuhi :

k . Lu
< 22 SNI 2002 Pasal 12.12.2)
r
dimana :
k = faktor tekuk = 1
lu = panjang kolom = 3.75
I 1/ 12 . 40 . 40 3
r = radius girasi = = = 11.547
A 40 . 40
atau r = 0,3 . h. = 0.3 . 40 = 12

Jadi :
k . Lu 1. 3.75
= = 31.25 > 22
r 0.12

Berarti faktor kelangsingan tak dapat diabaikan

~ Faktor pembesar momen (d)

Cm
d = > 1
Pu
1 -
f . Pc

Dimana : Cm = 1 (konservatif)
Pu = 9.83 ton
p2 . EI
Pc =
(k . Lu)2
Ec . Ig
EI =
2,5 . (1 + bd)
Ec = 4700 . fc' = 4700 22 = 22044.954 Mpa = 2204495.4 t/m2
Ig = 1/12 . b. h3 =
1
Ig = . 0.40 . 0.40 3 = 0.0021333 m4
12
1,2 . qdl 1.2 . 16733
bd = = = 0.75389
1,2 . qdl + 1,6 . qll 1.2 . 16733 + 1.6 . 4096.88
diperoleh :
2204495.4 . 0.0021333
EI = = 1072.5692546
2.5 . ( 1 + 0.75389 )

p2 . 1072.5693
Pc = = 752.007
1. 3.75 2

1
d = = 1.02053 > 1 Ok !!!
9.831074031435
1 -
STRUKTUR BETON II BAB IV63

1 -
0.65 . 752.007
STRUKTUR BETON II BAB IV64

Penulangan untuk kolom tengah


Mu = 7.06910113 tm
Mc = d . Mu
= 1.02053 . 7.06910113 = 7.21419647 tm

Hitung :
Pu 9.831074
Pn perlu = = = 15.1247 ton
f 0.65

Mc 7.2142
Mn perlu = = = 11.0988 tm
f 0.65

Eksentrisitas :
Mn perlu 11.098763799
e = = = 0.73382 = 733.816
Pn perlu 15.124729279

emin = 15 + 0,03 . h. = 15 + 0.03 . 400 = 27

Syarat : emin < e Ok !!!

Hitung nilai r
~ Sumbu vertikal
Pu 98310.7403143496
= = 0.05055
f . Ag . 0,85 . fc' 0.65 . 400 . 400 . 0.85 . 22

~ Sumbu horizontal
Pu e 733.816
. = 0.05055 . = 0.09274
f . Ag . 0,85 . Fc' h 400

Dari diagram interaksi kolom, diperoleh : (gunakan grafik tulangan empat sisi, "Pu > Mu" )
dengan d'/h » 0,20 dan fy = 400 Mpa
b = 1
r = 0.06

Maka, r = b . r = 1 . 0.06 = 0.06


Hitung luas tulangan :
Ast = r . Ag
= 0.06 . 400 . 400

= 9600 mm2

As = As' = 1/4 . Ast = 0.25 . 9600 = 2400 mm2

Digunakan Tulangan : 2 f 25 = 982.1 mm2


Dengan cara yang sama diperoleh penulangan kolom untuk lantai 01 seperti pada tabel.

2. Penulangan kolom Lantai 1


2.1 Kolom tepi
~ Mengecek pengaruh kelangsingan kolom
Untuk komponen struktur tekan yang tidak ditahan terhadap goyangan ke samping, pengaruh
kelangsingan dapat diabaikan jika memenuhi :

k . Lu
£ 22 SNI 2002 Pasal 12.12.2)
STRUKTUR BETON II BAB IV65

£ 22 SNI 2002 Pasal 12.12.2)


r
STRUKTUR BETON II BAB IV66

dimana :
k = faktor tekuk = 1
lu = panjang kolom = 4.15 m
I 1/ 12 . 40 . 40 3
r = radius girasi = = = 11.547
A 40 . 40
atau r = 0,3 . h. = 0.3 . 40 = 12

Jadi :
k . Lu 1. 4.15
= = 34.5833 > 22
r 0.12

Berarti faktor kelangsingan tak dapat diabaikan

~ Faktor pembesar momen (d)

Cm
d = > 1
Pu
1 -
f . Pc

Dimana : Cm = 1 (konservatif)
Pu = 19.999 ton
p . EI
2

Pc =
(k . Lu)2
Ec . Ig
EI =
2,5 . (1 + bd)
Ec = 4700 . fc' = 4700 22 = 22044.954 Mpa = 2204495.4 t/m2
Ig = 1/12 . b. h 3
=
1
Ig = . 0.40 . 0.40 3 = 0.0021333 m4
12
1,2 . qdl 1.2 . 18541
Bd = = = 0.71797
1,2 . qdl + 1,6 . qll 1.2 . 18541 + 1.6 . 5462.5
diperoleh :
2204495.4 . 0.0021333
EI = = 1094.9960106
2.5 . ( 1 + 0.71797 )

p2 . 1094.996
Pc = = 626.867
1. 4.15 2

1
d = = 1.052 > 1 Ok !!!
19.99939753304
1 -
0.65 . 626.867

Penulangan untuk kolom tepi


Mu = 10.3181079 tm
Mc = d . Mu
= 1.05162 . 10.3181079 = 10.8506883

Hitung :
Pu 19.999398
Pn perlu = = = 30.7683 ton
f 0.65
STRUKTUR BETON II BAB IV67

Mc 10.8507
Mn perlu = = = 16.6934 tm
f 0.65
STRUKTUR BETON II BAB IV68

Eksentrisitas :
Mn perlu 16.693366606
e = = = 0.54255 = 542.551
Pn perlu 30.768303897

emin = 15 + 0,03 . h. = 15 + 0.03 . 400 = 27

Syarat : emin < e Ok !!!

Hitung nilai r
~ Sumbu vertikal
Pu 199993.975330425
= = 0.10284
f . Ag . 0,85 . fc' 0.65 . 400 . 400 . 0.85 . 22

~ Sumbu horizontal
Pu e 542.551
. = 0.10284 . = 0.13948
f . Ag . 0,85 . Fc' h 400

Dari diagram interaksi kolom, diperoleh : (gunakan grafik tulangan empat sisi, "Pu > Mu" )
dengan d'/h » 0,20 dan fy = 400 Mpa
b = 1
r = 0.06

Maka, r = b . r = 1 . 0.06 = 0.06

Hitung luas tulangan :


Ast = r . Ag
= 0.06 . 400 . 400
= 9600 mm 2

As = As' = 1/4 . Ast = 0.25 . 9600 = 2400 mm2

Digunakan Tulangan : 2 f 25 = 982.14 mm2

2.2 Penulangan untuk kolom tengah


~ Mengecek pengaruh kelangsingan kolom
Untuk komponen struktur tekan yang tidak ditahan terhadap goyangan ke samping, pengaruh
kelangsingan dapat diabaikan jika memenuhi :

k . Lu
< 22 SNI 2002 Pasal 12.12.2)
r
dimana :
k = faktor tekuk = 1
lu = panjang kolom = 4.15
I 1/ 12 . 40 . 40 3
r = radius girasi = = = 11.547
A 40 . 40
atau r = 0,3 . h. = 0.3 . 40 = 12

Jadi :
k . Lu 1. 4.15
= = 34.5833 > 22
r 0.12
STRUKTUR BETON II BAB IV69

Berarti faktor kelangsingan tak dapat diabaikan


STRUKTUR BETON II BAB IV70

~ Faktor pembesar momen (d)

Cm
d = > 1
Pu
1 -
f . Pc

Dimana : Cm = 1 (konservatif)
Pu = 27.9944 ton
p2 . EI
Pc =
(k . Lu)2
Ec . Ig
EI =
2,5 . (1 + bd)
Ec = 4700 . fc' = 4700 22 = 22044.954 Mpa = 2204495.4 t/m2
Ig = 1/12 . b. h3 =
1
Ig = . 0.40 . 0.40 3 = 0.0021333 m4
12
1,2 . qdl 1.2 . 37083
Bd = = = 0.71797
1,2 . qdl + 1,6 . qll 1.2 . 37083 + 1.6 . 10925
diperoleh :
2204495.4 . 0.0021333
EI = = 1094.9960106
2.5 . ( 1 + 0.71797 )

p2 . 1094.996
Pc = = 626.867
1. 4.15 2

1
d = = 1.07377 > 1 Ok !!!
27.99443245064
1 -
0.65 . 626.867

Penulangan untuk kolom tengah


Mu = 10.7071292 tm
Mc = d . Mu
= 1.07377 . 10.7071292 = 11.4970218 tm

Hitung :
Pu 27.994432
Pn perlu = = = 43.0684 ton
f 0.65

Mc 11.4970
Mn perlu = = = 17.6877 tm
f 0.65

Eksentrisitas :
Mn perlu 17.687725837
e = = = 0.41069 = 410.69
Pn perlu 43.068357616

emin = 15 + 0,03 . h. = 15 + 0.03 . 400 = 27

Syarat : emin < e Ok !!!

Hitung nilai r
~ Sumbu vertikal
STRUKTUR BETON II BAB IV71

Pu 279944.324506366
= = 0.14395
f . Ag . 0,85 . fc' 0.65 . 400 . 400 . 0.85 . 22
STRUKTUR BETON II BAB IV72

~ Sumbu horizontal
Pu e 410.69
. = 0.14395 . = 0.14779
f . Ag . 0,85 . Fc' h 400

Dari diagram interaksi kolom, diperoleh : (gunakan grafik tulangan empat sisi, "Pu > Mu" )
dengan d'/h » 0,20 dan fy = 400 Mpa
b = 1
r = 0.06

Maka, r = b . r = 1 . 0.06 = 0.06

Hitung luas tulangan :


Ast = r . Ag
= 0.06 . 400 . 400
= 9600 mm 2

As = As' = 1/4 . Ast = 0.25 . 9600 = 2400 mm2

Digunakan Tulangan : 2 f 25 = 982.14 mm2

C. PENULANGAN GESER PADA BALOK


1. Balok atap

69447.8011 N
61438.15 N

346

6000 mm -69409.952 N

~ Gaya geser rencana diambil gaya geser maksimum yaitu Vu = 69447.8011 N

~ Penampang kritis pertama pada jarak d :

3000 - 346
Vud = . 69447.8011 = 61438 N
3000

~ Kapasitas geser balok :

Vc = 1/6 . f'c . b . d
Vc = 1/6 . 22 . 250 . 346
Vc = 67620.16 N

Vc yang dapat dipergunakan = 1/2 . Vc = 33810.08 N


Vud 61438.15
Vs = == 102397 > Vc = 33810.08 Pakai tul. Geser
f 0.6
Jadi jarak antar sengkang harus memenuhi : S < d/4 S < 87 atau S < 100 mm
Vs - Vc s S = 80 mm
Av =
fy . d

102396.924534148 - 33810.0802687272
Av = . 80
STRUKTUR BETON II BAB IV73

Av = . 80
325 . 346
STRUKTUR BETON II BAB IV74

Av = 48.795 mm2 ( Av = 2 . A 1 Æ Beugel )


A1 = 24.397 mm2

Jadi digunakan sengkang f ### - 80 = 78.5398 mm2

~ Untuk daerah diluar jarak d

Vud = 61438.2 N
Vc = 67620.16 N

Vud 61438.2
Vs = - Vc = - 67620.16 = 34776.76 N
f 0.6

Av . fy . d 48.795 . 400 . 346 d


s = = = 194.1862 mm >
Vs 34776.76 2

Jadi digunakan sengkang f ### - 170

2. Balok Lantai

137094.716 N
121419 N

346

6000 mm -137248.67 N

~ Gaya geser rencana diambil gaya geser maksimum yaitu Vu = 137248.6702 N

~ Penampang kritis pertama pada jarak d :

3000 - 346
Vud = . 137248.6702 = 121419 N
3000

~ Kapasitas geser balok :

Vc = 1/6 . f'c . b . d
Vc = 1/6 . 22 . 250 . 346
Vc = 67620.16 N

Vc yang dapat dipergunakan = 1/2 . Vc = 33810.08 N

Vud 121419
Vs = = = 202366 > Vc = 33810.08 Pakai tul. Geser
f 0.6
Jadi jarak antar sengkang harus memenuhi : S < d/4 S < 87 atau S < 100 mm
Vs - Vc s S = 80 mm
Av =
fy . d

202365.53924591 - 33810.0802687272
Av = . 80
325 . 346
STRUKTUR BETON II BAB IV75

Av = 119.915 mm2 ( Av = 2 . A 1 Æ Beugel )


A1 = 59.957 mm2

Jadi digunakan sengkang f ### - 80 = 78.5398 mm2

~ Untuk daerah diluar jarak d

Vud = 121419.3 N
Vc = 67620.16 N

Vud 121419
Vs = - Vc = - 67620.16 = 134745 N
f 0.6

Av . fy . d 119.915 . 400 . 346 d


s = = = 123.1673 mm <
Vs 134745.38 2

Jadi digunakan sengkang f ### - 130

TABEL REKAPITULASI PENULANGAN BALOK DAN KOLOM


Nama Pu (ton) Mu (tm) Jumlah & Diameter tulangan
1. Balok
Tumpuan - 7.21695782 3 f 22
Atap
Lapangan - 4.53107257 3 f 17
Tumpuan - 15.95 3 f 32
Lantai 2
Lapangan - 9.39 3 f 24
2. Kolom
~ Kolom Lantai 2
Kolom Tepi 6.8748107 6.38374013 2 f 25
Kolom Tengah 9.831074 7.06910113 2 f 25
~ Kolom Lantai 1
Kolom Tepi 19.999398 10.3181079 2 f 25
Kolom Tengah 27.994432 10.7071292 2 f 25
STRUKTUR BETON II BAB IV76

Sketsa Hasil Desain Tulangan

1. Balok
~ Balok Atap
Tumpuan Luar Lapangan Tumpuan Dalam

3 f 22 3 f 22
400 mm 400 mm 400 mm
f 10 3 f 17 f 10 - 80

40 mm 40 mm 40 mm

250 mm 250 mm 250 mm

~ Balok Lantai 2
Tumpuan Luar Lapangan Tumpuan Dalam

3 f 32 3 f 32
400 mm 400 mm 400 mm
f 10 3 f 24 f 10 - 80

40 mm 40 mm 40 mm
250 mm 250 mm 250 mm

2. Kolom
~ Kolom Lantai 2
Kolom Tepi Kolom Tengah

400 mm 400 mm

40 mm 40 mm
400 mm 400 mm

2 f 25 2 f 25

~ Kolom Lantai 1
Kolom Tepi Kolom Tengah

400 mm 400 mm

40 mm 40 mm
400 mm 400 mm

2 f 25 2 f 25
STRUKTUR BETON II BAB V HAL. 77

V. DIMENSI DAN PENULANGAN PONDASI


V.1 DIMENSI DAN PENULANGAN PONDASI TELAPAK

A B

Dari hasil perhitungan, diperoleh :


RA = 19.9994 = 199994 N
RB = 27.9944 = 279944 N
Data - data :
~ Dimensi kolom, hc = 40.00 cm = 400 mm
~ Dimensi kolom, bc = 40.00 cm = 400 mm
~ Kuat rencana beton, fc' = 22 Mpa
~ Kuat leleh baja tulangan, fy = 325 Mpa
~ Daya dukung tanah, st = 0.15 Mpa
~ Dalam pondasi, Htot = 1.8 m = 1800 mm
~ Berat volume tanah urug, gt = 18000 N/m 3

1.8 m

d
d'

bc B

hc

L
STRUKTUR BETON II BAB V HAL. 78

1. PONDASI A
Data :
P = 199993.98
Htot = H + h
h = 30 cm = 300 mm (ditaksir)
jadi : H = 1500 mm = 1.5 m
1.1 Perencanaan Dimensi Pondasi

q 1 = H . gt = 1.5 . 18000 = 27000 N/m2 = 0.027 N/mm2


Taksir tebal slab = 30 cm

q 2 = h . gt = 0.3 . 24000 = 7200 N/m2 = 0.0072 N/mm2


snetto = st - q1 - q2 = 0.15 - 0.027 - 0.0072 = 0.1158 N/mm2
L = 1 s/d 2B diambil L = 1,5
Sehingga :
P 199994
B . L = snetto B . 1,5 . B =
0.1158

1,5 . B2 = 1727063.6902

B = 1073 mm = 1100 mm
L = 1.5 . B = 1609.53 mm
= 1650 mm
1.2 Kontrol Daya Dukung Tanah

qs = st = 0.15 Mpa

Pu + Af . ( q1 + q2 ) 199994 + 1100 . 1650 . 0.027 + 0.0072


qsunetto = =
Af 1100 . 1650

= 0.1444 Mpa
Syarat :
qsunetto < qs Ok !!!

1.3 Tebal slab yang ditinjau dari geser dua arah

Syarat : f Vc > Vu

Dimana : Vc = ((hc + d) + (bc + d)) . 2 . d 1/3 fc'


Vu = Af - (hc + d) . (bc + d) qsunetto
f = 0,60

B
bc + d
bc

hc

hc + d
STRUKTUR BETON II BAB V HAL. 79

L
STRUKTUR BETON II BAB V HAL. 80

Vc = ((hc + d) + (bc + d)) . 2 . d 1/3 fc'0.5


1
Vc = 400 + d + 400 + d . 2 . d .
3 22
1
= 1600 . d + 4 . d 2 . . 22
3

= 2501.56 d + 6.25 d2

Vu = Af - (hc + d) . (bc + d) qsunetto

Vu = 1100 . 1650 + 400 + d . 400 + d . 0.14439

= 1815000 - 160000 + 800 d + d2 0.14439

= 238965 - 115.512 d - 0.14439 d2

Syarat : f Vc ³ Vu
0.6 . 2501.56 d + 6.25 d2 ³ 238965 - 115.512 d - 0.14439 d2
1500.93 d + 3.75233 ³ 238965 - 115.512 d - 0.14439 d2
3.89672 d2 + 1616.44 d - 238965 ³ 0
Diambil 3.89672 d2 + 1616.44 d - 238965 = 0

Diperoleh : d = 115.612 mm = 150 mm

1.4 Tebal slab yang ditinjau dari geser satu arah

L hc
af = - - d
2 2
Bidang geser

1
= . 1650 - 400 - d
bc

hc 2
= 625 - d

d
af

1
Vc = . fc' . B . d
6
1
= . 22 . 1073 . d
6
= 838.82 d

Vu = B . Af . Qsunetto
= 1100 . ( 625 - d ) . 0.14439
= 99268 - 158.828 d

Syarat : f Vc > Vu
0.6 . ( 838.82 d ³ 99268 - 158.828 d
503.292 d ³ 99268 - 158.828 d
Diambil : 503.292 d = 99268 - 158.828 d
662.12 d = 99268
d = 149.924 mm = 150 mm
STRUKTUR BETON II BAB V HAL. 81

Dengan demikian, tebal slab pondasi (h) = d + d' = 150 + 75 + 12


= 237 mm Ok !!!
STRUKTUR BETON II BAB V HAL. 82

Kesimpulan hasil perhitungan :


~ Panjang slab pondasi L = 1650 mm
~ Lebar slab pondasi B = 1100 mm
~ Tebal slab pondasi h = 237 mm
~ Tinggi efektif d = 150 mm
~ Beton dekking d' = 87 mm

1.5 Perhitungan luas tulangan


~ Tulangan arah panjang L

Syarat : f Mn ³ Mu
As. Fy
Mn = As. . fy . d -
1,7 . Fc' . B
As. 325
= As. . 325 . 150 -
1.7 . 22 . 1000

= 48750 As. - 2.8242 As2

1 dimana : Ly = 1/2 . ( L - hc )
Mu = qsu netto . B . Ly2
2 1
= . 1650 - 400
1 2
= 0.1443895 . 1000 . 625 2
2 = 625 mm

= 28201077.752 Nmm

Syarat : f Mn ³ Mu
0.8 . 48750 As. - 2.8242 As2 ³ 28201077.752
2.8242 As 2
- 48750 As. + 35251347.19 ³ 0
Diambil : 2.8242 As 2
- 48750 As. + 35251347.19 ³ 0
Diperoleh :
As. =
695.113 mm
Digunakan Tulangan : f 12 - 150 = 753.98 mm2

~ Tulangan arah pendek B

As. Fy d0 = d - 1/2 . ( dtul 1 + d tul. 2)


Mn = As. . fy . d0 -
1,7 . Fc' . B = 150 - 0.5 12 + 16
As. 325 = 136 mm
= As. . 325 . 136 -
1.7 . 22 . 1000

= 44200 As. - 2.8242 As2

1 dimana : Lx = 1/2 . ( B - bc )
Mu = qsu netto . L . Lx2
2 1
= . 1100 - 400
1 2
= 0.1443895 . 1000 . 350 2
2 = 350 mm

= 8843857.9829 Nmm

Syarat : f Mn ³ Mu
0.8 . 44200 As. - 2.8242 As2 ³ 8843857.9829
2.8242 As2 - 44200 As. + 11054822.479 ³ 0
STRUKTUR BETON II BAB V HAL. 83

Diambil : 2.8242 As2 - 44200 As. + 11054822.479 = 0


STRUKTUR BETON II BAB V HAL. 84

Diperoleh :
As. =
246.235 mm
Digunakan Tulangan : f 10 - 150 = 523.60 mm2

Kontrol :
As min = r min . b .d

1.4
As min Arah B = . 1000 . 136 = 585.846 mm2
325

1.4
As min Arah L = . 1000 . 150 = 646.154 mm2
325

Dari hasil perhitungan luas tulangan, ternyata As yang diperoleh lebih kecil dari Asmin,
sehingga digunakan Asmin untuk mencari tulangan yang digunakan.

Untuk arah B
Digunakan Tulangan : f 12 - 125 = 904.78 mm2

Untuk arah L
Digunakan Tulangan : f 12 - 125 = 904.78 mm2

~ Kontrol Panjang Penyaluran

0.02 . Ab . Fy 0.02 . p /4 . 12 2 . 325


Ld perlu = = = 156.731 mm
fc' 22

Ld min = 0.06 . db . fy
= 0.06 . 12 . 325
= 234 mm

1
Ld ada = . B - bc - Ts
2
1
= . 1100 - 400 - 87
2

= 306.5 mm

Ld ada > Ld perlu Ok !!!

~ Tulangan Dowel / Pasak

P 199993.97533
- fc' tekan pada kaki kolom = = = 1.24996 Mpa
hc . bc 400 . 400

- Kuat dukung = f . ( 0,85 . fc' . A2/A1)


800 . 800
= 0.65 . ( 0.85 . 22 .
400 . 400

= 24.31 < f'c tekan kolom Ok !!!

Sehingga perlu tulangan Dowel 0,5 % . 400 . 400 = 800 mm2


STRUKTUR BETON II BAB V HAL. 85

Digunakan Tulangan : 4 f 12 = 452.571 mm2


STRUKTUR BETON II BAB V HAL. 86

~ Penyebaran tulangan
2 . Asb 2 . 12
Tulangan Arah B = = = 9.6 Batang
L 1650
+ 1 + 1
B 1100
Sisanya : 12 batang -### batang = 2 batang (sebar rata)

~ Kontrol tahanan kaki kolom


P = 199994 N

Daya dukung kaki kolom = f . 0,85 . fc' . bc . hc


= 0.65 . 0.85 . 22 . 400 . 400
= 2E+06 N > P Ok !!!

Daya dukung beton slab tertekan = 0,85 . fc' . Bc . Hc . (A2 / A1)0.5

800 . 800
= 0.85 . 22 . 400 . 400
400 . 400
= 5984000 N > P Ok !!!

SKETSA TULANGAN PONDASI A

146.3 cm

10 cm

23.7 cm

165 cm

110 cm

165 cm
STRUKTUR BETON II BAB V HAL. 87

2. PONDASI B
Data - data :
~ Dimensi kolom, hc = 40.00 cm = 400 mm
~ Dimensi kolom, bc = 40.00 cm = 400 mm
~ Kuat rencana beton, fc' = 22 Mpa
~ Kuat leleh baja tulangan, fy = 325 Mpa
~ Daya dukung tanah, st = 0.15 Mpa
~ Dalam pondasi, Htot = 1.8 m = 1800 mm
~ Berat volume tanah urug, gt = 18000 N/m 3

1.8 m

d
d'

bc B

hc

Data :
P = 279944.32
Htot = H + h
h = 30 cm = 300 mm (ditaksir)
jadi : H = 1500 mm = 1.5 m
2.1 Perencanaan Dimensi Pondasi
q 1 = H . gt = 1.5 . 18000 = 27000 N/m2 = 0.027 N/mm2
Taksir tebal slab = 30 cm
q 2 = h . gt = 0.3 . 24000 = 7200 N/m2 = 0.0072 N/mm2
snetto = st - q1 - q2 = 0.15 - 0.027 - 0.0072 = 0.1158 N/mm2

L = 1 s/d 2B diambil L = 1,5


Sehingga :
P 279944
B . L = snetto B . 1,5 . B =
0.1158
1,5 . B2 = 2417481.2134
B = 1269.51 mm = 1300 mm
L = 1.5 . B = 1904.26 mm
= 1950 mm
STRUKTUR BETON II BAB V HAL. 88

1.2 Kontrol Daya Dukung Tanah

qs = st = 0.15 Mpa

Pu + Af . ( q1 + q2 ) 279944 + 1300 . 1950 . 0.027 + 0.0072


qsunetto = =
Af 1300 . 1950

= 0.1446 Mpa
Syarat :
qsunetto < qs Ok !!!

1.3 Tebal slab yang ditinjau dari geser dua arah

Syarat : f Vc > Vu

Dimana : Vc = ((hc + d) + (bc + d)) . 2 . d 1/3 fc'


Vu = Af - (hc + d) . (bc + d) qsunetto
f = 0,60

B
bc + d
bc

hc

hc + d

Vc = ((hc + d) + (bc + d)) . 2 . d 1/3 fc'


1
Vc = 400 + d + 400 + d . 2 . d .
3 22
1
= 1600 . d + 4 . d 2 . . 22
3

= 2501.56 d + 6.25 d2

Vu = Af - (hc + d) . (bc + d) qsunetto

Vu = 1300 . 1950 + 400 + d . 400 + d . 0.14463

= 2535000 - 160000 + 800 d + d2 0.14463

= 343500 - 115.705 d - 0.14463 d2

Syarat : f Vc > Vu
0.6 . 2501.56 d + 6.25 d2 ³ 343500 - 115.705 d - 0.14463 d2
1500.93 d + 3.75233 ³ 343500 - 115.705 d - 0.14463 d2
3.89696 d2 + 1616.64 d - 343500 ³ 0
Diambil 3.89696 d2 + 1616.64 d - 343500 = 0
STRUKTUR BETON II BAB V HAL. 89

Diperoleh : d = 154.751 mm = 200 mm


STRUKTUR BETON II BAB V HAL. 90

1.4 Tebal slab yang ditinjau dari geser satu arah

L hc
af = - - d
2 2

Bidang geser
1
= . 1904.26 - 400 - d

bc
hc 2
= 752.132 - d

d
af

1
Vc = . fc' . B . d
6
1
= . 22 . 1300 . d
6
= 1016.26 d

Vu = B . af . Qsunetto
= 1300 . ( 752.132 - d ) . 0.14463
= 141417 - 188.021 d

Syarat : f Vc > Vu
0.6 . ( 1016.26 d ³ 141417 - 188.021 d
609.754 d ³ 141417 - 188.021 d
Diambil : 609.754 d = 141417 - 188.021 d
797.775 d = 141417
d = 177.264 mm = 200 mm

Dengan demikian, tebal slab pondasi (h) = d + d' = 200 + 75 + 12


= 287 mm Ok !!!

Kesimpulan hasil perhitungan :


~ Panjang slab pondasi L = 1950 mm
~ Lebar slab pondasi B = 1300 mm
~ Tebal slab pondasi h = 287 mm
~ Tinggi efektif d = 200 mm
~ Beton dekking d' = 75 mm

1.5 Perhitungan luas tulangan


~ Tulangan arah panjang L

Syarat : f Mn >= Mu
As. Fy
Mn = As. . fy . d -
1,7 . Fc' . B
As. 325
= As. . 325 . 200 -
1.7 . 22 . 1000
= 65000 As. - 2.8242 As2

1 dimana : Ly = 1/2 . ( L - hc )
Mu = qsu netto . B . Ly2
2 1
= . 1950 - 400
1 2
= 0.1446317 . 1000 . 775 2
2 = 775 mm
STRUKTUR BETON II BAB V HAL. 91

= 43434703.261 Nmm
STRUKTUR BETON II BAB V HAL. 92

Syarat : f Mn ³ Mu
0.8 . 65000 As. - 2.8242 As2 ³ 43434703.261
2.8242 As2 - 65000 As. + 54293379.076 ³ 0
Diambil : 2.8242 As2 - 65000 As. + 54293379.076 = 0
Diperoleh :
As. =
806.987 mm
Digunakan Tulangan : f 12 - 100 = 1130.97 mm2

~ Tulangan arah pendek B

As. Fy d0 = d - 1/2 . ( dtul 1 + d tul. 2)


Mn = As. . fy . d0 -
1,7 . Fc' . B = 200 - 0.5 12 + 12
As. 325 = 188 mm
= As. . 325 . 188 -
1.7 . 22 . 1000

= 61100 As. - 2.8242 As2

1 dimana : Lx = 1/2 . ( B - bc )
Mu = qsu netto . B . Lx2
2 1
= . 1300 - 400
1 2
= 0.1446317 . 1000 . 450 2
2 = 450 mm

= 14643958.227 Nmm

Syarat : f Mn ³ Mu
0.8 . 61100 As. - 2.8242 As2 ³ 14643958.227
2.8242 As2 - 61100 As. + 18304947.784 ³ 0
Diambil : 2.8242 As 2
- 61100 As. + 18304947.784 = 0
Diperoleh :
As. = 295.552 mm
Digunakan Tulangan : f 12 - 150 = 753.98 mm2

Kontrol :
As min = rmin . b .d

1.4
As min Arah B = . 1000 . 188 = 809.846 mm2
325

1.4
As min Arah L = . 1000 . 200 = 861.538 mm2
325

Dari hasil perhitungan luas tulangan arah B, ternyata As yang diperoleh lebih kecil dari Asmin,
sehingga digunakan Asmin untuk mencari tulangan yang digunakan.

Untuk arah B
Digunakan Tulangan : f 12 - 125 = 904.78 mm2

Untuk arah L
Digunakan Tulangan : f 12 - 100 = 1130.97 mm2

~ Kontrol Panjang Penyaluran

0.02 . Ab . Fy 0.02 . p/4 . 12 2 . 325


Ld perlu = = = 156.731 mm
fc' 22

Ld min = 0.06 . db . fy
STRUKTUR BETON II BAB V HAL. 93

= 0.06 . 12 . 325
= 234 mm
STRUKTUR BETON II BAB V HAL. 94

1
Ld ada = . B - bc - Ts
2
1
= . 1300 - 400 - 75
2

= 412.5 mm

Ld ada > Ld perlu Ok !!!

~ Tulangan Dowel / Pasak

P 279944.32451
- fc' tekan pada kaki kolom = = = 1.74965 Mpa
hc . bc 400 . 400

- Kuat dukung = f . ( 0,85 . fc' . A2/A1)


800 . 800
= 0.65 . ( 0.85 . 22 .
400 . 400

= 24.31 > fc' tekan kolom Ok !!!

Sehingga perlu tulangan Dowel 0,5 % . 400 . 400 = 800 mm2


Digunakan Tulangan : 4 f 12 = 452.571 mm2

~ Penyebaran tulangan
2 . nb 2 . 12
Tulangan Arah B = = = 9.6 Batang
L 1950
+ 1 + 1
B 1300
Sisanya : 12 batang -### batang = 2 batang (sebar rata)

~ Kontrol tahanan kaki kolom


P = 279944 N

Daya dukung kaki kolom = f . 0,85 . fc' . bc . hc


= 0.65 . 0.85 . 22 . 400 . 400
= 1944800 N > P Ok !!!

Daya dukung beton slab tertekan = 0,85 . Fc' . Bc . Hc . (A2 / A1)0.5

800 . 800
= 0.85 . 22 . 400 . 400
400 . 400
= 5984000 N > P Ok !!!
STRUKTUR BETON II BAB V HAL. 95

SKETSA TULANGAN PONDASI B

141.3 cm

10 cm

28.7 cm

195 cm

130 cm

195 cm
STRUKTUR BETON II BAB VI. HAL96

VI. PERENCANAAN TANGGA


Syarat perencanaan tangga
1 antride + 2 optride = ( 57 - 63 ) cm

Diambil tinggi anak tangga = optride = 16 cm, sehingga lebar anak tangga = antride :
1 antride + 2 (16) = ( 57 - 63 ) cm

208
Jumlah optride = = 12.9688
16
162

Jumlah antride = 12.9688 - 1 = 11.9688


338.00
Panjang antride = = 28.2 cm
11.96875
338 Lebar bordes = 162 cm
Kontrol :
1 antride + 2 (16) = ( 57 - 63 ) cm
28 + 2 x 16 = 60 cm ( Oke !!! )
120 cm 10 120 cm

± 415 cm

207.5 cm

± 207.5 cm
B

207.5 cm

± 0.00 cm
A
338 cm 162 cm
STRUKTUR BETON II BAB VI. HAL97

tebal rata - rata


###

16
tg a = = 0.57
16 cm 28.2
a= 29.5345 0

a
10 cm

### p
sin a =
28.2
P = 28.2 sin 29.5345
p
= 13.9 cm
16 cm

a Jadi tebal rata - rata plat tangga = 0.5 . 13.9 + 10


= 16.96

Menghitung beban - beban yang bekerja :


Tangga
~ Beban mati ( qD)
Berat plat + anak tangga = 0.1696 . 1.2 . 2400 = 488.462 kg/m
Finishing lantai = 48 . 1.2 = 57.6 kg/m
Hand riil = = 20 kg/m
= 566.062 kg/m

~ Beban hidup ( qL)


Beban hidup = 300 . 1.2 = 360 kg/m

Jadi beban rencana q1 = 1.2 . 566.062 + 1.6 . 360 = 1255.27 kg/m

Bordes
~ Beban mati ( qD)
Berat plat bordes 0.12 . 1.25 . 2400 = 360 kg/m
Finishing lantai = 48 . 1.25 = 60 kg/m
= 420 kg/m

~ Beban hidup ( qL)


Beban hidup = 300 . 1.25 = 375 kg/m

Jadi beban rencana q1 = 1.2 . 420 + 1.6 . 375 = 1104 kg/m


STRUKTUR BETON II BAB VI. HAL98

1104 kg/m 1255.27 kg/m

C
B

###

162 cm 338 cm

Momen Primer :
1 1
MCB = - . q l 2 = - . 1104 . 1.62 2 = - 241.445 kgm
12 12

MBC = 241.445 kgm

1 1
MBA = - . q l 2 = - . 1255.27 . 3.38 2 = - 1195.06 kgm
12 12

MAB = 1195.06 kgm

Faktor kekakuan
4 EI 4 EI
KBC = KCB = = = 2.46914
L 1.62

4 EI 4 EI
KAB = KBA = = = 1.18343
L 3.38

Tabel Momen Distribusi


Titik C B A
Batang CB BA BC AB.
K 2.469 2.469 1.183 1.183
DF 1.000 0.676 0.324 0.000
FEM -241.4448 241.4448 -1195.0626 1195.062604
Bal 241.4448 644.645635 308.9721684 0
Co 322.32282 120.72240 0.00000 154.48608
Bal -322.32282 -81.60834 -39.11406 0.00000
Co -40.80417 -161.16141 0.00000 -19.55703
Bal 40.80417 108.94511 52.21630 0.00000
Co 54.47256 20.40209 0.00000 26.10815
Bal -54.47256 -13.79181 -6.61028 0.00000
Co -6.89590 -27.23628 0.00000 -3.30514
Bal 6.89590 18.41172 8.82455 0.00000
Co 9.20586 3.44795 0.00000 4.41228
Bal -9.20586 -2.33082 -1.11714 0.00000
Co -1.16541 -4.60293 0.00000 -0.55857
Bal 1.16541 3.11158 1.49135 0.00000
STRUKTUR BETON II BAB VI. HAL99

Co 1.55579 0.58270 0.00000 0.74567


Bal -1.55579 -0.39391 -0.18880 0.00000
STRUKTUR BETON II BAB VI. HAL100

Co -0.19695 -0.77790 0.00000 -0.09440


Bal 0.19695 0.52586 0.25204 0.00000
Co 0.26293 0.09848 0.00000 0.12602
Bal -0.26293 -0.06657 -0.03191 0.00000
Co -0.03329 -0.13146 0.00000 -0.01595
Bal 0.03329 0.08887 0.04259 0.00000
Co 0.04443 0.01664 0.00000 0.02130
Bal -0.04443 -0.01125 -0.00539 0.00000
Co -0.00563 -0.02222 0.00000 -0.00270
Bal 0.00563 0.01502 0.00720 0.00000
Co 0.00751 0.00281 0.00000 0.00360
Bal -0.00751 -0.00190 -0.00091 0.00000
Co -0.00095 -0.00375 0.00000 -0.00046
Bal 0.00095 0.00254 0.00122 0.00000
Co 0.00127 0.00048 0.00000 0.00061
Bal -0.00127 -0.00032 -0.00015 0.00000
Co -0.00016 -0.00063 0.00000 -0.00008
Bal 0.00016 0.00043 0.00021 0.00000

Total 0 870.323612 -870.323612 1357.431997

FREE BODY STRUKTUR

1104 kg/m 1255.27 kg/m

870.324 kgm
870.324 kgm

###

1357.43

1.62 m 3.38 m

Gaya Dalam

Bentang AB.
1104 kg/m
C S MB = 0
VC . 1.62 - 1.62 . 1104 . 0.81 + 870.324 = 0
870.324 VC = 357.003 kg
RC

Mx = 357 x - 1/2 . 1104 x2


Mx = 357 x - 552 x2
Dx = 357 - 1104 x

Untuk x = 0 Mx = 0 Dx = 357.003 kg
x = 1,5 Mx = -870.32 kgm Dx = -1431.48 kg
STRUKTUR BETON II BAB VI. HAL101

Dx = 0 x = 0.32 m
Mmaks = 57.7225 kgm
STRUKTUR BETON II BAB VI. HAL102

Bentang BC
1255.27 kg/m
B
HC SMA = 0
870.324 kgm VB . ( 3.38 ) + HA ( 2.075 ) - ( 870.324 )
- ( 4242.83 . 1.69 ) + 1357.43
1431
HC = 5552.6067 kg
2.075

SMB = 0
HA . ### - 1357.43 - 7170.38 + 870.324
A HA + VA . 3.38 =0
1357.43 kgm
VA = 5674.3 kg
VC
SV = 0
VA + VC = 1255.3 x 3.38 m
4242.8 = 4242.83 Ok !!

Mx = VC . x - HA . y - 1/2 . q . x2 - 1357.43
= 5674.3 x - 5552.61 . 0.614 x - 627.637 x2 - 1357.43
= -627.64 x2 + 2265.5 x - 1357.43

Dx = -1255.3 x + 2265.5

Untuk x = 0 Mx = kgm
-1357.43 Dx = 2265.5 kg
x= 3.38 Mx = -870.3 kgm Dx = -1977.3 kg

Dx = 0 x = 1.8 m
Mmaks = 686.989 kgm

Perencanaan Penulangan Balok


Balok AB.
~ Tulangan tumpuan

~ M (-) =1357.43 kgm = 13574320 Nmm

d = tebal rata - rata plat tangga - d' - 1/2 f


= 169.60 - 25 - 6
= 138.60 mm

Hitung :
1.4 1.4
rmin = = = 0.00431
fy 325

0.85 . f'c 600 0.85 . 22 600


rmaks = 0.75 . b1 . = 0.75 0.85
fy 600 + fy 325 600 + 325
STRUKTUR BETON II BAB VI. HAL103

= 0.02379
STRUKTUR BETON II BAB VI. HAL104

600 600
amaks = 0.75 . b1 . .d = 0.75 0.85 138.60
600 + fy 600 + 325

= 57.3149
amaks
Mnada = 0.85 . fc' . b . amaks . d -
2

57.3
= 0.85 . 22 . 1200 . 57.3 . 138.60 -
2

= 141408323.83 Nmm

Mu 13574319.968
Mnperlu = = = 16967899.96 Nmm
f 0.8
Mn ada > Mn perlu Tulangan tunggal
fy 325
m = = = 17.3797
0.85 . fc' 0.85 . 22

Mu 13574319.9682547
Rn = = = 0.7360
f . b .d 2
0.80 . 1200 . 138.60 2
,
1 2 . m . Rn
r = . 1 - 1 -
m fy

1 2. 17.3797 . 0.7360
r = . 1 - 1 -
17.3797 325

r = 0.00231

Periksa :
r < rmin ( Digunakan Rasio Tulangan Minimum )
r < rmaks ( OK )

Hitung Luas Tulangan :


As = r . b . d
As = 0.0043 . 1200 . 138.60
As = 716.48 mm2 / 1,2 m lebar tangga
As = 597.066 mm2/m

Digunakan tulangan f 12 - 150 = 753.98 mm2

Tulangan bagi

d = tebal plat - d' - f - 1/2 fb


= 169.60 - 25 - 12 - 5
= 127.60 mm

As = r . b . d
untuk tulangan bagi r = 0,002

3380
As = 0.002 . . 127.605 = 991.436 mm2 / 3.88 m
cos a
As = 255.209 mm /m
2
STRUKTUR BETON II BAB VI. HAL105

Digunakan tulangan f 10 - 250 = 314.16 mm2


STRUKTUR BETON II BAB VI. HAL106

~ Tulangan lapangan

~ M (+) =686.989 kgm = 6869888.4 Nmm


d = tebal rata - rata plat tangga - d' - 1/2 f
= 169.60 - 25 - 6
= 138.60 mm
Hitung :
1.4 1.4
rmin = = = 0.00431
fy 325

0.85 . f'c 600 0.85 . 22 600


rmaks = 0.75 . b1 . = 0.75 0.85
fy 600 + fy 325 600 + 325

= 0.02379

600 600
amaks = 0.75 . b1 . .d = 0.75 0.85 138.60
600 + fy 600 + 325
= 57.3149
amaks
Mnada = 0.85 . fc' . b . amaks . d -
2

57.3
= 0.85 . 22 . 1200 . 57.3 . 138.60 -
2
= 141408323.83 Nmm

Mu 6869888.4001
Mnperlu = = = 8587360.5001 Nmm
f 0.8

Mn ada > Mn perlu Tulangan tunggal

fy 325
m = = = 17.3797
0.85 . fc' 0.85 . 22

Mu 6869888.40010418
Rn = = = 0.3725
f . b . d2 0.80 . 1200 . 138.60 2
,
1 2 . m . Rn
r = . 1 - 1 -
m fy

1 2. 17.3797 . 0.3725
r = . 1 - 1 -
17.3797 325

r = 0.00116

Periksa :
r < rmin ( Digunakan Rasio Tulangan Minimum )
r < rmaks ( OK )

Hitung Luas Tulangan :


As = r . b . d
As = 0.0043 . 1200 . 138.60
As = 716.48 mm / 1,2 m lebar tangga
2

As = 597.066 mm2/m
STRUKTUR BETON II BAB VI. HAL107

Digunakan tulangan f 12 - 150 = 753.98 mm2


STRUKTUR BETON II BAB VI. HAL108

Tulangan bagi
As = r . b . d
untuk tulangan bagi r = 0,002

3380
As = 0.002 . . 127.60 = 862.608 mm2 / 3.38 m
cos a
As = 255.209 mm2/m

Digunakan tulangan f 10 - 250 = 314.16 mm2

Penulangan Bordes
~ Tulangan tumpuan
~ M (-) =870.324 kgm = 8703236.1 Nmm

d = tebal plat - d' - 1/2 f


= 120.00 - 25 - 6
= 89.00 mm

Hitung :
1.4 1.4
rmin = = = 0.00431
fy 325

0.85 . f'c 600 0.85 . 22 600


rmaks = 0.75 . b1 . = 0.75 0.85
fy 600 + fy 325 600 + 325
= 0.02379

600 600
amaks = 0.75 . b1 . .d = 0.75 0.85 89.00
600 + fy 600 + 325

= 36.8027

amaks
Mnada = 0.85 . fc' . b . amaks . d -
2

36.8
= 0.85 . 22 . 1250 . 36.8 . 89 -
2

= 60733417.685 Nmm

Mu 8703236.1207
Mnperlu = = = 10879045.151 Nmm
f 0.8

Mn ada > Mn perlu Tulangan tunggal

fy 325
m = = = 17.3797
0.85 . fc' 0.85 . 22

Mu 8703236.12071067
Rn = = = 1.0988
f . b . d2 0.80 . 1250 . 89 2

1 2 . m . Rn
r = . 1 - 1 -
m fy

1 2. 17.3797 . 1.0988
r = . 1 - 1 -
17.3797 325
STRUKTUR BETON II BAB VI. HAL109

r = 0.00349
STRUKTUR BETON II BAB VI. HAL110

Periksa :
r < rmin ( Digunakan Rasio Tulangan Minimum )
r < rmaks ( OK )

Hitung Luas Tulangan :


As = r . b . d
As = 0.0043 . 1250 . 89.00
As = 479.231 mm2 / 1.25 m
As = 383.385 mm2/m

Digunakan tulangan f 12 - 250 = 452.39 mm2

Tulangan bagi
d = tebal plat - d' - f - 1/2 fb
= 120.00 - 25 - 12 - 5
= 78.00 mm

As = r . b . d
= 0.0020 . 1620 . 78.00
As = 252.72 mm2 / 1.62 m
As = 156 cm2/m

Digunakan tulangan f 10 - 300 = 261.80 mm2

~ Tulangan lapangan

~ M (+) =57.7225 kgm = 577225.03 Nmm

d = tebal plat - d' - 1/2 f


= 120.00 - 25 - 6
= 89.00 mm

Hitung :
1.4 1.4
rmin = = = 0.00431
fy 325

0.85 . f'c 600 0.85 . 22 600


rmaks = 0.75 . b1 . = 0.75 0.85
fy 600 + fy 325 600 + 325

= 0.02379

600 600
amaks = 0.75 . b1 . .d = 0.75 0.85 89.00
600 + fy 600 + 325

= 36.8027

amaks
Mnada = 0.85 . fc' . b . amaks . d -
2

36.8
= 0.85 . 22 . 1250 . 36.8 . 89 -
2
STRUKTUR BETON II BAB VI. HAL111

= 60733417.685 Nmm

Mu 577225.02963
Mnperlu = = = 721531.28704 Nmm
f 0.8

Mn ada > Mn perlu Tulangan tunggal

fy 325
m = = = 17.3797
0.85 . fc' 0.85 . 22

Mu 577225.029628154
Rn = = = 0.0729
f . b . d2 0.80 . 1250 . 89 2
,
1 2 . m . Rn
r = . 1 - 1 -
m fy

1 2. 17.3797 . 0.0729
r = . 1 - 1 -
17.3797 325

r = 0.00022

Periksa :
r < rmin ( Digunakan Rasio Tulangan Minimum )
r < rmaks ( OK )

Hitung Luas Tulangan :


As = r . b . d
As = 0.0043 . 1250 . 89.00
As = 479.231 mm2 / 1.25 m
As = 383.385 mm2/m

Digunakan tulangan f 12 - 250 = 452.39 mm2

Tulangan bagi
As = r . b . d
= 0.0020 . 1620 . 78.00
As = 252.72 mm2 / 1.62 m
As = 156 mm2/m

Digunakan tulangan f 10 - 300 = 261.80 mm2


STRUKTUR BETON II BAB V Hal.

V.1 DIMENSI DAN PENULANGAN PONDASI TIANG PANCANG

A B

Dari hasil perhitungan, diperoleh :


RA = 19.9994 ton
RB = 27.9944 ton

~ Daya dukung keseimbangan/batas tiang pancang adalah :


Qult = qc . A + f . O dimana : qc = nilai kronis
f = jumlah hambatan pelekat
A = luas penampang ujung tiang
O = keliling tiang

~ Daya dukung ijin dari tiang pancang :


qc . A = daya dukung dari ujung
qc . A f .O f .O = daya dukung dari ujung dengan pelekatan tiang dng tanah
Qa = (F.K) + (F.K)
1 2
diambil (FK)1 = 3 (FK)2 = 5

Dari grafik hasil penyondiran diperoleh nilai qc dan f untuk kedalaman 14.2 m dari muka tanah :

qc = 150 kg/cm2
f = 650 kg/cm

1. Tiang Pancang Untuk Titik A

A = 25 . 25 cm2 = 625 cm2


O = 4 . 25 cm = 100 cm

Sehingga daya dukung tiang pancang adalah :

150 . 625 650 . 100


Qa = +
3 5
= 44250 kg

Andi Burhanuddin / D 111 98 107 Rahman Judriah / D 111 98 055


STRUKTUR BETON II BAB V Hal.

= 44.25 ton

Kontrol : Qa > RA ( OK )

Andi Burhanuddin / D 111 98 107 Rahman Judriah / D 111 98 055


STRUKTUR BETON II BAB V Hal.

2. Tiang Pancang Untuk Titik B

A = 25 . 25 cm2 = 625 cm2


O = 4 . 25 cm = 100 cm

Sehingga daya dukung tiang pancang adalah :

150 . 625 650 . 100


Qa = +
3 5
= 44250 kg
= 44.25 ton

Kontrol : Qa > RB ( OK )

Dari hasil perhitungan daya dukung tiang, 1 tiang pancang sudah dapat memikul beban yang ada
Namun karena kondisi lapangan, jika digunakan 1 tiang saja dapat menyebabkan perubahan posisi
tiang dari rencana semula, maka terjadinya beban eksentrisitas tidak dapat dihindari. Oleh karena
itu digunakan 2 tiang pancang.

Perhitungan penulangan

Kondisi saat pengangkatan


~ Kondisi I
ql2
Mmaks =
32
q

1/4 L 1 1/2 L 1/4 L

~ Kondisi II

ql2
Mmaks =
8

Andi Burhanuddin / D 111 98 107 Rahman Judriah / D 111 98 055


STRUKTUR BETON II BAB V Hal.

Andi Burhanuddin / D 111 98 107 Rahman Judriah / D 111 98 055


STRUKTUR BETON II BAB V Hal.

Dimana :
q = berat sendiri tiang beton (tiang pancang)
= 0.25 . 0.25 . 2400
= 150 kg/m
L = panjang tiang pancang
= 14.2 m

ql2 150 . 14.2 2


Mmaks1 = = = 945.188 kgm
32 32

ql2 150 . 14.2 2


Mmaks2 = = = 3780.75 kgm
8 8

Momen desain yang digunakan adalah : 3780.75 kgm = 37807500 Nmm

Perhitungan penulangan utama :

ddmin f 10
hhmin h
min minf 12
min

d'

dmin = hmin - 1/2 f tul. Utama - f Sengkang - Ts


= 250.000 - 0.5 . 12 - 10 - 50
= 184.00 mm
Hitung :
1.4 1.4
rmin = = = 0.00431
fy 325

0.85 . f'c 600 0.85 . 22 600


rmaks = 0.75 . b1 . = 0.75 0.85
fy 600 + fy 325 600 + 325

= 0.02379

600 600
amaks = 0.75 . b1 . .d = 0.75 0.85 184.0
600 + fy 600 + 325

= 76.0865
amaks
Mnada = 0.85 . fc' . b . amaks . d -
2

76.1
= 0.85 . 22 . 250 . 76.1 . 184.0 -
2

= 51917449.543 Nmm

Mu 37807500
Mnperlu = = = 47259375 Nmm
f 0.8

Andi Burhanuddin / D 111 98 107 Rahman Judriah / D 111 98 055


STRUKTUR BETON II BAB V Hal.

Mn ada > Mn perlu Tulangan tunggal

Andi Burhanuddin / D 111 98 107 Rahman Judriah / D 111 98 055


STRUKTUR BETON II BAB V Hal.

fy 325
m = = = 17.3797
0.85 . fc' 0.85 . 22

Mu 37807500
Rn = = = 5.5836
f . b .d 2
0.80 . 250 . 184 2
,
1 2 . m . Rn
r = . 1 - 1 -
m fy
1 2. 17.3797 . 5.5836
r = . 1 - 1 -
17.3797 325

r = 0.02102

Periksa :
r > rmin ( OK )
r < rmaks ( OK )

Hitung Luas Tulangan :


As = r . b . d
As = 0.0210 . 250 . 184.00
As = 966.902 mm2

Digunakan Tulangan : 3 f 21 = 1039.500 mm2

Perhitungan penulangan sengkang/geser :

q= 150 kg/m

14.2 m

Diagram geser

Vud
Vu = 1065 kg
d

~ Penampang kritis pertama pada jarak d :

7100 - 184.00
Vud = . 1065 = 10374 N

Andi Burhanuddin / D 111 98 107 Rahman Judriah / D 111 98 055


STRUKTUR BETON II BAB V Hal.

Vud = . 1065 = 10374 N


7100

Andi Burhanuddin / D 111 98 107 Rahman Judriah / D 111 98 055


STRUKTUR BETON II BAB V Hal.

Vc = 1/6 . f'c . b . d
Vc = 1/6 . 22 . 250 . . 184
Vc = 35959.85 N

Vud 10374
Vn = = = 17290 N
f 0.6

Vud > f . Vc
10374.00 N < 21575.91 N ( Digunakan Tulangan Geser Minimum )

Luas tulangan :
b.S 250 . 90 dimana S £ d/2 = 92
Av = = = 23.0769
3 .fy 3 . 325 ambil S = 90 mm

Digunakan Tulangan sengkang f 10 - 90 = 157.08 mm2

SNI 03 - 2847 - 2002 memberikan syarat agar menggunakan tulangan geser ( sengkang )
f 10 mm sebagai diameter tulangan minimum untuk penulangan geser kolom.

Andi Burhanuddin / D 111 98 107 Rahman Judriah / D 111 98 055


f 10 - 50 mm f 10 - 90 mm f 10
I II III

plat begel f 8 mm
I II III

3d = 552 mm 13648 mm 3d = 552 mm

5f 21 3f 21 5

25 cm

25 cm 25 cm 25 cm

POT. I - I POT. II - II POT. III - III

SKETSA PENULANGAN TIANG PANCANG 121


f ### - ### mm f ### - ### mm f ###
I II III

plat begel f 8 mm
I II III

3d = ### mm #REF! mm 3d = ### mm

### f ### ### f ###

### cm

### cm ### cm ### cm

POT. I - I POT. II - II POT. III - III

SKETSA PENULANGAN TIANG PANCANG 122


10 - 50 mm

f 21

SKETSA PENULANGAN TIANG PANCANG 123


- ### mm

### f ###

SKETSA PENULANGAN TIANG PANCANG 124


STRUKTUR BETON II Sket. Tul. Tangga

2 f ###

f ### - ###

± #REF! f ### - ###

###

f ### - ###

f ### - ###

f ### - ###
f ###

#REF! f ### - ###

###
f ### - ###

SKETSA PENULANGAN TANGGA

f ### - ###

f ### - ###

Anda mungkin juga menyukai