REKAPITULASI BIAYA

PEKERJAAN ………………………………..
LOKASI : …………….., - HALSEL

NO JENIS PEKERJAAN JUMLAH HARGA (RP)

A PEKERJAAN PERSIAPAN / PEMBERSIHAN 0.00

B PEKERJAAN TANAH / PASIR 0.00

C PEKERJAAN PONDASI 0.00

D PEKERJAAN BETON 0.00

E PEKERJAAN SANITASI 0.00

F PEKERJAAN DINDING 0.00

G PEKERJAAN PLESTERAN 0.00

H PEKRJAAN PENGECATAN 0.00

I PEKERJAAN KAYU 0.00

J PEKERJAAN KUNCI DAN KACA 0.00

K PEKERJAAN BESI DAN ALUMINIUM 0.00

L PEKERJAAN ATAP 0.00

M PEKERJAAN LANTAI 0.00

N PEKERJAAN LISTRIK 0.00

JUMLAH 0.00
PPN 10 % 0.00
JUMLAH TERMASUK PPN 10 % 0.00
DIBULATKAN 0.00

TERBILANG :

SERATUS DELAPAN PULUH SATU EMPAT RATUS SEMBILAN PULUH EMPAT RIBU RUPIAH.
ANALISA HARGA BAHAN DAN TENAGA
BIAYA KONSTRUKSI
BANGUNAN GEDUNG DAN PERUMAHAN

BIAYA (Rp.)
NO URAIAN JENIS PEKERJAAN KET
BAHAN TENAGA TOTAL

A PEKERJAAN PERSIAPAN

1 Pembersihan Awal 5,000.00 5,000.00


2 Pemasangan bowplank 22,470.00 7,505.00 29,975.00
3 Pembuatan Direksi keet dan Gudang Ls Ls
4 Papan nama Proyek Ls Ls
5 Dokumentasi dan Pelaporan Ls Ls
6 Pembersihan akhir Ls Ls
7 Bongkaran Dinding 184,827.50 184,827.50
8 Bongkaran Beton 198,327.50 198,327.50
9 Bongkaran Kuda-Kuda,kusen,gording,rangka atap kayu,Plafond dan Listplank -
10 Pembersihan material bongkaran Ls Ls
11 Pembuatan bak adukan Uk. 40 x 50 x 20 cm 58,580.00 12,367.50 70,947.50

B PEKERJAAN TANAH / PASIR

1 Galian Tanah 12,800.00 12,800.00


2 Urugan Kembali 6,135.00 6,135.00
3 Urugan Tanah Bawah Lantai 96,000.00 8,000.00 104,000.00
4 Urugan Pasir Bawah Pondasi 180,000.00 8,700.00 188,700.00
5 Urugan Pasir Bawah Lantai 180,000.00 8,700.00 188,700.00
6 Urugan Tanah Biasa 96,000.00 8,000.00 104,000.00
7 Urugan Sirtu 180,000.00 8,000.00 188,000.00
8 Pemadatan Tanah 16,000.00 16,000.00

C PEKERJAAN PONDASI

1 Pasangan Pondasi Batu Kali 1:1 649,580.00 71,805.00 721,385.00


2 Pasangan Pondasi Batu Kali 1:2 531,290.00 71,805.00 603,095.00
3 Pasangan Pondasi Batu Kali 1:25 488,150.00 71,805.00 559,955.00
4 Pasangan Pondasi Batu Kali 1:3 469,650.00 71,805.00 541,455.00
5 Pasangan Pondasi Batu Kali 1:4 448,300.00 71,805.00 520,105.00
6 Pasangan Pondasi Batu Kali 1:5 407,080.00 71,805.00 478,885.00
7 Pasangan Pondasi Batu Kali 1:6 389,070.00 71,805.00 460,875.00
8 Pasangan Pondasi Batu Kosong 225,000.00 40,872.00 265,872.00
9 Pasangan Pondasi Telapak Uk ……………cm 200 Kg 3,116,450.00 225,250.00 3,341,700.00 dimensi
10 Pasangan Pondasi Siklop 40 % Batu Kali 1,221,470.00 127,755.00 1,349,225.00
11 Pasangan Pondasi Sumuran Diameter 100 cm 596,150.00 82,640.00 678,790.00
12 Pembuatan Tiang Pancang 35 x 35 cm 529,665.00 46,450.00 576,115.00
13 Pembuatan Tiang Pancang 40 x 40 cm 676,562.00 60,101.00 736,663.00

D PEKERJAAN BETON

1 Beton Tumbuk 1 : 3 : 5 513,450.00 60,300.00 573,750.00 Tebal


2 Beton Tumbuk 1 : 3 : 6 494,000.00 60,300.00 554,300.00 Tebal
3 Beton Bertulang 1 : 2 : 3 574,300.00 60,300.00 634,600.00
4 Slof Beton Bertulang Uk 20 x 30 ( 200 Kg + Bekesting ) 3,217,300.00 290,968.00 3,508,268.00 Kg Besi
5 Kolom Beton Bertulang Uk 30 x 30 (150 Kg + Bekisting ) 3,771,450.00 445,200.00 4,216,650.00 Kg Besi
6 Kolom Beton Bertulang Uk 40 x 40 (200 Kg + Bekisting ) 4,402,050.00 456,800.00 4,858,850.00 Kg Besi
7 Kolom Praktis Beton Bertulang Uk 12 x 12 ( 100 Kg + Bekisting ) - Kg Besi
8 Kolom Beton Bertulang Dia. 30 ( 180 Kg + Bekisting ) 4,149,810.00 452,160.00 4,601,970.00 Kg Besi
9 Balok Induk Beton Bertulang Uk 30 x 60 ( 250 Kg + Bekisting ) 5,532,440.00 400,665.00 5,933,105.00 Kg Besi
10 Balok Anak Beton Bertulang Uk 25 x 40 ( 250 Kg + Bekisting ) 5,532,440.00 400,665.00 5,933,105.00 Kg Besi
11 Ring Balk Beton Bertulang Uk 20 x 30 ( ….Kg + Bekesting ) - Kg Besi
12 Plat Beton Bertulang T = 12 ( ……Kg + Bekisting ) - Kg Besi
13 Tangga Beton Bertulang Uk. 20 x 30 ( ….Kg + Bekesting ) - Kg Besi

E PEKERJAAN SANITASI

1 Kloset Duduk INA 2,117,456.00 143,093.00 2,260,549.00


2 Kloset Duduk TOTO 1,925,066.00 143,093.00 2,068,159.00
3 Kloset Jongkok INA 227,200.00 160,700.00 387,900.00
4 Kloset Jongkok TOTO 218,600.00 106,850.00 325,450.00
5 Urinoir 1,582,340.00 77,300.00 1,659,640.00
6 Westavel INA/TOTO 1,283,624.00 97,900.00 1,381,524.00
7 Bak Mandi Batu Bata Volume ……………… 410,280.00 97,900.00 508,180.00 Volume
8 Pipa Galvanis Dia. 1/2" 34,668.00 6,777.00 41,445.00
9 Pipa Galvanis Dia. 3/4" 40,176.00 6,777.00 46,953.00
10 Pipa Galvanis Dia. 1" 57,996.00 6,777.00 64,773.00
11 Pipa Galvanis Dia. 2 1/2" 40,500.00 11,367.00 51,867.00
12 Pipa PVC tipe AW Dia. 1/2" 12,312.00 3,789.00 16,101.00
13 Pipa PVC tipe AW Dia. 3/4" 13,284.00 3,789.00 17,073.00
14 Pipa PVC tipe AW Dia. 1" 14,256.00 3,789.00 18,045.00
15 Pipa PVC tipe AW Dia. 1 1/2" 29,970.00 3,789.00 33,759.00
16 Pipa PVC tipe AW Dia. 2" 35,802.00 5,683.50 41,485.50
17 Pipa PVC tipe AW Dia. 2 1/2" 35,802.00 5,770.50 41,572.50
18 Pipa PVC tipe AW Dia. 3" 92,826.00 8,527.50 101,353.50
19 Bak cuci piring Stainles steel 510,000.00 14,482.50 524,482.50
20 Kran Dia. 3/4" atau 1/2" 31,087.50 5,030.00 36,117.50
21 Floor drain 9,200.00 5,030.00 14,230.00
22 Septic tank dan peresapan - Ls
F PEKERJAAN DINDING

1 Pasangan 1 batu bata Transram 1 : 1 163,263.00 28,285.00 191,548.00


2 Pasangan 1 batu bata Transram 1 : 2 144,250.00 28,285.00 172,535.00
3 Pasangan 1 batu bata Transram 1 : 3 134,515.00 28,285.00 162,800.00
4 Pasangan 1 batu bata 1 : 4 127,815.00 28,285.00 156,100.00
5 Pasangan 1 batu bata 1 : 5 124,560.00 28,285.00 152,845.00
6 Pasangan 1 batu bata 1 : 6 124,560.00 28,285.00 152,845.00
7 Pasangan 1/2 batu bata Transram 1 : 1 76,740.00 14,005.00 90,745.00
8 Pasangan 1/2 batu bata Transram 1 : 2 68,705.00 14,005.00 82,710.00
9 Pasangan 1/2 batu bata Transram 1 : 3 64,007.00 14,005.00 78,012.00
10 Pasangan 1/2 batu bata 1 : 4 61,360.00 14,005.00 75,365.00
11 Pasangan 1/2 batu bata 1 : 5 59,500.00 14,005.00 73,505.00

G PEKERJAAN PLESTERAN

1 Pasangan Plesteran Transram 1 : 1 ( T. 15 ) 16,422.00 12,745.00 29,167.00


2 Pasangan Plesteran Transram 1 : 2 ( T. 15 ) 12,262.00 12,745.00 25,007.00
3 Pasangan Plesteran Transram 1 : 3 ( T. 15 ) 10,358.00 12,745.00 23,103.00
4 Pasangan Plesteran 1 : 4 ( T. 15 ) 9,120.00 12,745.00 21,865.00
5 Pasangan Plesteran 1 : 5 ( T. 15 ) 8,492.00 12,745.00 21,237.00
6 Pasangan Plesteran 1 : 6 ( T. 15 ) 7,958.00 12,745.00 20,703.00
7 Pasangan Plesteran Beton 1 : 2 ( T. 15 ) 13,290.00 7,464.00 20,754.00
8 Pasangan Plesteran Beton 1 : 3 ( T. 15 ) 11,398.00 7,464.00 18,862.00

H PEKRJAAN PENGECATAN

1 Mendempul dan menggosok kayu 1,906.00 3,024.50 4,930.50


2 Pengecatan kayu lama 11,060.00 5,435.00 16,495.00
3 Pengecatan kayu baru = ( 1 x Plamir ) 1 cat dasar, 2 lapis cat 19,731.00 2,664.50 22,395.50
4 Pengecatan kayu baru = ( 1 x Plamir ) 1 cat dasar, 3 lapis cat 22,422.00 6,514.50 28,936.50
5 Pengecatan tembok baru = ( 1 x Plamir ) 1 cat dasar, 2 lapis cat 5,744.00 3,516.40 9,260.40
6 Pengecatan tembok lama = ( 1 x Plamir ) 1 cat dasar, 2 lapis cat 4,290.00 2,785.10 7,075.10
7 Pengecatan Plafon = ( 1 x Plamir ) 1 cat dasra, 2 lapis cat 5,744.00 3,516.40 9,260.40
8 Pengecatan Listplank ( 1 x Plamir ) 1 cat dasar, 2 lapis cat 17,938.00 2,664.50 20,602.50
9 Pengecatan meni Atap 3,070.00 10,060.00 13,130.00

I PEKERJAAN KAYU

1 Pas. Kusen Pintu dan Jendela Kls I 1,760,000.00 603,400.00 2,363,400.00


2 Pas. Pintu Panel Kls I 66,000.00 143,000.00 209,000.00
3 Pas. Pintu dan jendela kaca Kls I 57,750.00 114,400.00 172,150.00
4 Pas. Jendela Kls I 105,600.00 176,900.00 282,500.00
5 Pas. Pintu dan jendela jalusi Kls I 105,600.00 185,900.00 291,500.00
6 Pas. Pintu Plywood Double Kls I 89,295.00 108,450.00 197,745.00
7 Pas. Jalusi Mati Kusen Kls II 74,025.00 105,475.00 179,500.00
8 Pas. Pintu teakwood double Kls I 96,250.00 108,450.00 204,700.00
9 Pas. Pintu teakwood & formika Kls I (vernis) 94,200.00 137,050.00 231,250.00
10 Pas. Kuda-kuda Kls I 1,935,800.00 1,314,000.00 3,249,800.00
11 Pas. Gording Kls II 1,319,000.00 15,650.00 1,334,650.00
12 Pas. Kaso + Reng Genteng Metal Roof Kls I 24,425.00 15,650.00 40,075.00
13 Pas. Plafon Triplek 29,520.00 14,875.00 44,395.00
14 Pas. Rangka plafon 5/7 15,150.00 32,075.00 47,225.00
15 Pas. Rangka Plafon (100x100) Kls II 15,150.00 32,075.00 47,225.00
16 Pas. Rangka Plafon (30x60) Kls I 38,825.00 39,900.00 78,725.00
17 Pas. Rangka plafon (30x30) Kls I 45,900.00 47,725.00 93,625.00
18 Pas. Lisplang (3x20) Kls I 12,555.00 12,250.00 24,805.00
19 Pas. Lisplang (2x20) Kls I 18,825.00 13,216.00 32,041.00
20 Pas. Lisplang (3x20) Kls II 13,875.00 13,216.00 27,091.00
21 Pas. Lisplang 2 x (3x20) Kls II 18,210.00 18,825.00 37,035.00
22 Pas. Lisplang 2 x (2x20) Kls II 11,130.00 9,530.00 20,660.00
23 Pas. List plafon profil 7,140.00 1,569.50 8,709.50

J PEKERJAAN KUNCI DAN KACA

1 Pas. Kunci tanam besar 134,500.00 28,965.00 163,465.00


2 Pas. Kunci tanam biasa 67,300.00 28,965.00 96,265.00
3 Pas. Kunci tanam biasa KM/WC 67,300.00 20,965.00 88,265.00
4 Pas. Engsel pintu 29,800.00 7,241.25 37,041.25
5 Pas. Engsel jendela 21,300.00 4,827.50 26,127.50
6 Pas. Engsel angin 21,300.00 9,655.00 30,955.00
7 Pas. kait angin 2,600.00 7,241.25 9,841.25
8 Pas. Kunci selot 5,500.00 9,655.00 15,155.00
9 Pas. Pegangan pintu/door holder 250,000.00 20,965.00 270,965.00
10 Pas. Kaca T. 3 mm 224,070.00 7,241.25 231,311.25
11 Pas. Kaca T. 5 mm 224,070.00 7,241.25 231,311.25

K PEKERJAAN BESI DAN ALUMINIUM

1 Pas. Rangka atap baja 33,742.00 2,167.50 35,909.50


2 Pas. Pintu besi baja 220,500.00 48,760.00 269,260.00
3 Pas. Jendela nako dan terali 33,930.00 14,605.00 48,535.00
4 Pas. Talang datar ( BJLS 2.8 ) 59,647.50 21,656.25 81,303.75
5 Pas. Talang miring ( BJLS 2.8 ) 72,422.50 18,631.25 91,053.75
6 Pas. Talang 1/2 ling. D-10 ( BJLS 2.8 ) 63,370.00 15,506.25 78,876.25
7 Pas. Talang 1/2 ling. D-10 ( BJLS 2.4 ) 58,660.00 15,506.25 74,166.25

L PEKERJAAN ATAP

1 Pas. Atap seng BJLS 0.25 64,644.80 12,995.00 77,639.80


2 Pas. Atap seng BJLS 0.30 72,386.80 12,995.00 85,381.80
3 Pas. Atap multi roof 186,560.00 12,995.00 199,555.00
4 Pas. Bubungan/Nok bulat Metal Roof 54,200.00 15,032.50 69,232.50
5 Pas. Bubungan seng plat BJLS 0.30 48,764.64 8,387.50 57,152.14

M PEKERJAAN LANTAI

1 Pas. Lantai keramik 40x40 135,608.00 34,255.00 169,863.00


2 Pas. Lantai keramik 30x30 122,308.00 34,255.00 156,563.00
3 Pas. Lantai keramik 20x25 108,408.00 34,255.00 142,663.00
4 Pas. Lantai keramik 20x20 95,108.00 34,255.00 129,363.00

N PEKERJAAN LISTRIK

1 Pasang Panel Box Pembagi Lengkap 48,600.00 48,600.00


2 Box MCB 25 Ampere 22,000.00 22,000.00
3 Box MCB 10 Ampere 10,500.00 10,500.00
4 Box MCB 6 Ampere 10,500.00 10,500.00
5 Box MCB 4 Ampere 10,500.00 10,500.00
6 Instalasi Listrik - Tanya
7 Stop Kontak 66,700.00 66,700.00
8 Saklar Tunggal 34,100.00 34,100.00
9 Saklar Ganda 67,900.00 67,900.00
10 Lampu Jari - Jari 25 Watt 82,700.00 82,700.00
11 Lampu Jari - Jari 18 Watt 82,100.00 82,100.00
12 Lampu Jari - Jari 14 Watt 80,900.00 80,900.00
13 Pasang Arde - Tanya
14 Penangkal Petir 2,250,000.00 2,250,000.00 Tanya
15 Biaya Penyambungan PLN -
RINCIAN ANGGARAN BIAYA ( RAB )
PEKERJAAN ………………………………..
LOKASI : …………….., - HALSEL

HARGA SAT JML.HARGA


NO URAIAN JENIS PEKERJAAN SATUAN VOLUME
(Rp) (Rp)

A PEKERJAAN PERSIAPAN / PEMBERSIHAN

1 Pembersihan Awal M2 5,000.00 0.00


2 Pemasangan bowplank M1 29,975.00 0.00
3 Pembuatan Direksi keet dan Gudang Ls 0.00
4 Papan nama Proyek Ls 0.00
5 Dokumentasi dan Pelaporan Ls 0.00
6 Pembersihan akhir Ls 0.00
7 Bongkaran Dinding M2 184,827.50 0.00
8 Bongkaran Beton M2 198,327.50 0.00
9 Bongkaran Kuda-Kuda,kusen,gording,rangka atap kayu,Plafond dan Listplank M2 0.00
10 Pembersihan material bongkaran Ls 0.00
11 Pembuatan bak adukan Uk. 40 x 50 x 20 cm M2 70,947.50 0.00
Jumlah ( A ) 0.00

B PEKERJAAN TANAH / PASIR

1 Galian Tanah M3 12,800.00 0.00


2 Urugan Kembali M3 6,135.00 0.00
3 Urugan Tanah Bawah Lantai M3 104,000.00 0.00
4 Urugan Pasir Bawah Pondasi M3 188,700.00 0.00
5 Urugan Pasir Bawah Lantai M3 188,700.00 0.00
6 Urugan Tanah Biasa M3 104,000.00 0.00
7 Urugan Sirtu M3 188,000.00 0.00
8 Pemadatan Tanah M3 16,000.00 0.00
Jumlah ( B ) 0.00

C PEKERJAAN PONDASI

1 Pasangan Pondasi Batu Kali 1:1 M3 721,385.00 0.00


2 Pasangan Pondasi Batu Kali 1:2 M3 603,095.00 0.00
3 Pasangan Pondasi Batu Kali 1:25 M3 559,955.00 0.00
4 Pasangan Pondasi Batu Kali 1:3 M3 541,455.00 0.00
5 Pasangan Pondasi Batu Kali 1:4 M3 520,105.00 0.00
6 Pasangan Pondasi Batu Kali 1:5 M3 478,885.00 0.00
7 Pasangan Pondasi Batu Kali 1:6 M3 460,875.00 0.00
8 Pasangan Pondasi Batu Kosong M3 265,872.00 0.00
9 Pasangan Pondasi Telapak Uk ……………cm 200 Kg M3 3,341,700.00 0.00
10 Pasangan Pondasi Siklop 40 % Batu Kali M3 1,349,225.00 0.00
11 Pasangan Pondasi Sumuran Diameter 100 cm M3 678,790.00 0.00
12 Pembuatan Tiang Pancang 35 x 35 cm M1 576,115.00 0.00
13 Pembuatan Tiang Pancang 40 x 40 cm M1 736,663.00 0.00
Jumlah ( C ) 0.00

D PEKERJAAN BETON

1 Beton Tumbuk 1 : 3 : 5 M2 573,750.00 0.00


2 Beton Tumbuk 1 : 3 : 6 M2 554,300.00 0.00
3 Beton Bertulang 1 : 2 : 3 M2 634,600.00 0.00
4 Slof Beton Bertulang Uk 20 x 30 ( 200 Kg + Bekesting ) M3 3,508,268.00 0.00
5 Kolom Beton Bertulang Uk 30 x 30 ( …Kg + Bekisting ) M3 4,216,650.00 0.00
6 Kolom Praktis Beton Bertulang Uk 12 x 12 ( 100 Kg + Bekisting ) M3 0.00 0.00
7 Kolom Beton Bertulang Dia. 30 ( …Kg + Bekisting ) M3 4,601,970.00 0.00
8 Balok Induk Beton Bertulang Uk ……….( …Kg + Bekisting ) M3 5,933,105.00 0.00
9 Balok Anak Beton Bertulang Uk ……….( …Kg + Bekisting ) M3 5,933,105.00 0.00
10 Ring Balk Beton Bertulang Uk……..( ….Kg + Bekesting ) M3 0.00 0.00
11 Plat Beton Bertulang T = 12 ( ……Kg + Bekisting ) M3 0.00 0.00
12 Tangga Beton Bertulang Uk. 20 x 30 ( ….Kg + Bekesting ) M3 0.00 0.00
Jumlah ( D ) 0.00

E PEKERJAAN SANITASI

1 Kloset Duduk INA Buah 2,260,549.00 0.00


2 Kloset Duduk TOTO Buah 2,068,159.00
3 Kloset Jongkok INA Buah 387,900.00 0.00
4 Kloset Jongkok TOTO Buah 325,450.00 0.00
5 Urinoir Buah 1,659,640.00 0.00
6 Westavel INA/TOTO Buah 1,381,524.00 0.00
7 Bak Mandi Batu Bata Volume ……………… Buah 508,180.00 0.00
8 Pipa Galvanis Dia. 1/2" Buah 41,445.00 0.00
9 Pipa Galvanis Dia. 3/4" M1 46,953.00 0.00
10 Pipa Galvanis Dia. 1" M1 64,773.00 0.00
11 Pipa Galvanis Dia. 2 1/2" M1 51,867.00 0.00
12 Pipa PVC tipe AW Dia. 1/2" M1 16,101.00 0.00
13 Pipa PVC tipe AW Dia. 3/4" M1 17,073.00 0.00
14 Pipa PVC tipe AW Dia. 1" M1 18,045.00 0.00
15 Pipa PVC tipe AW Dia. 1 1/2" M1 33,759.00 0.00
16 Pipa PVC tipe AW Dia. 2" M1 41,485.50 0.00
17 Pipa PVC tipe AW Dia. 2 1/2" M1 41,572.50 0.00
18 Pipa PVC tipe AW Dia. 3" Buah 101,353.50 0.00
19 Bak cuci piring Stainles steel Buah 524,482.50 0.00
20 Kran Dia. 3/4" atau 1/2" M1 36,117.50 0.00
21 Floor drain Buah 14,230.00 0.00
22 Septic tank dan peresapan Ls 0.00 0.00
Jumlah ( E ) 0.00

F PEKERJAAN DINDING

1 Pasangan 1 batu bata Transram 1 : 1 M2 191,548.00 0.00


2 Pasangan 1 batu bata Transram 1 : 2 M2 172,535.00 0.00
3 Pasangan 1 batu bata Transram 1 : 3 M2 162,800.00 0.00
4 Pasangan 1 batu bata 1 : 4 M2 156,100.00 0.00
5 Pasangan 1 batu bata 1 : 5 M2 152,845.00 0.00
6 Pasangan 1 batu bata 1 : 6 M2 152,845.00 0.00
7 Pasangan 1/2 batu bata Transram 1 : 1 M2 90,745.00 0.00
8 Pasangan 1/2 batu bata Transram 1 : 2 M2 82,710.00 0.00
9 Pasangan 1/2 batu bata Transram 1 : 3 M2 78,012.00 0.00
10 Pasangan 1/2 batu bata 1:4 M2 75,365.00 0.00
11 Pasangan 1/2 batu bata 1:5 M2 73,505.00 0.00
Jumlah ( F ) 0.00

G PEKERJAAN PLESTERAN

1 Pasangan Plesteran Transram 1 : 1 ( T. 15 ) M2 29,167.00 0.00


2 Pasangan Plesteran Transram 1 : 2 ( T. 15 ) M2 25,007.00 0.00
3 Pasangan Plesteran Transram 1 : 3 ( T. 15 ) M2 23,103.00 0.00
4 Pasangan Plesteran 1 : 4 ( T. 15 ) M2 21,865.00 0.00
5 Pasangan Plesteran 1 : 5 ( T. 15 ) M2 21,237.00 0.00
6 Pasangan Plesteran 1 : 6 ( T. 15 ) M2 20,703.00 0.00
7 Pasangan Plesteran Beton 1 : 2 ( T. 15 ) M2 20,754.00 0.00
8 Pasangan Plesteran Beton 1 : 3 ( T. 15 ) M2 18,862.00 0.00
Jumlah ( G ) 0.00

H PEKRJAAN PENGECATAN

1 Mendempul dan menggosok kayu M2 4,930.50 0.00


2 Pengecatan kayu lama M2 16,495.00 0.00
3 Pengecatan kayu baru = ( 1 x Plamir ) 1 cat dasar, 2 lapis cat M2 22,395.50 0.00
4 Pengecatan kayu baru = ( 1 x Plamir ) 1 cat dasar, 3 lapis cat M2 28,936.50 0.00
5 Pengecatan tembok baru = ( 1 x Plamir ) 1 cat dasar, 2 lapis cat M2 9,260.40 0.00
6 Pengecatan tembok lama = ( 1 x Plamir ) 1 cat dasar, 2 lapis cat M2 7,075.10 0.00
7 Pengecatan Plafon = ( 1 x Plamir ) 1 cat dasra, 2 lapis cat M2 9,260.40 0.00
8 Pengecatan Listplank ( 1 x Plamir ) 1 cat dasar, 2 lapis cat M2 20,602.50 0.00
9 Pengecatan meni Atap M2 13,130.00 0.00
Jumlah ( H ) 0.00

I PEKERJAAN KAYU

1 Pas. Kusen Pintu dan Jendela Kls I M3 2,363,400.00 0.00


2 Pas. Pintu Panel Kls I M2 209,000.00 0.00
3 Pas. Pintu dan jendela kaca Kls I M2 172,150.00 0.00
4 Pas. Jendela Kls I M2 282,500.00 0.00
5 Pas. Pintu dan jendela jalusi Kls I M2 291,500.00 0.00
6 Pas. Pintu Plywood Double Kls I M2 197,745.00 0.00
7 Pas. Jalusi Mati Kusen Kls I M2 179,500.00 0.00
8 Pas. Pintu teakwood double Kls I M2 204,700.00 0.00
9 Pas. Pintu teakwood & formika Kls I (vernis) M2 231,250.00 0.00
10 Pas. Kuda-kuda 6/12 Kls I M2 3,249,800.00 0.00
11 Pas. Gording 6/10 Kls II M3 1,334,650.00 0.00
12 Pas. Kaso 5/7 + Reng Genteng Metal Roof Kls I M3 40,075.00 0.00
13 Pas. Plafon Triplek M3 44,395.00 0.00
14 Pas. Rangka plafon 5/7 M2 47,225.00 0.00
15 Pas. Rangka Plafon (1.00x1.00) Kls II M2 47,225.00 0.00
16 Pas. Rangka Plafon (30x60) Kls I M2 78,725.00 0.00
17 Pas. Rangka plafon (30x30) Kls I M2 93,625.00 0.00
18 Pas. Lisplang (3x20) Kls I M2 24,805.00 0.00
19 Pas. Lisplang (2x20) Kls I M2 32,041.00 0.00
20 Pas. Lisplang (3x20) Kls II M2 27,091.00 0.00
21 Pas. Lisplang 2 x (3x20) Kls II M2 37,035.00 0.00
22 Pas. Lisplang 2 x (2x20) Kls II M2 20,660.00 0.00
23 Pas. List plafon profil M2 8,709.50 0.00
Jumlah ( I ) 0.00
Jumlah ( I )

J PEKERJAAN KUNCI DAN KACA

1 Pas. Kunci tanam besar Buah 163,465.00 0.00


2 Pas. Kunci tanam biasa Buah 96,265.00 0.00
3 Pas. Kunci tanam biasa KM/WC Buah 88,265.00 0.00
4 Pas. Engsel pintu Buah 37,041.25 0.00
5 Pas. Engsel jendela Buah 26,127.50 0.00
6 Pas. Engsel angin Buah 30,955.00 0.00
7 Pas. kait angin Buah 9,841.25 0.00
8 Pas. Kunci selot Buah 15,155.00 0.00
9 Pas. Pegangan pintu/door holder Buah 270,965.00 0.00
10 Pas. Kaca T. 3 mm M2 231,311.25 0.00
11 Pas. Kaca T. 5 mm M2 231,311.25 0.00
Jumlah ( J ) 0.00

K PEKERJAAN BESI DAN ALUMINIUM

1 Pas. Rangka atap baja M2 35,909.50 0.00


2 Pas. Pintu besi baja M2 269,260.00 0.00
3 Pas. Jendela nako dan terali M2 48,535.00 0.00
4 Pas. Talang datar ( BJLS 2.8 ) M2 81,303.75 0.00
5 Pas. Talang miring ( BJLS 2.8 ) M2 91,053.75 0.00
6 Pas. Talang 1/2 ling. D-10 ( BJLS 2.8 ) M2 78,876.25 0.00
7 Pas. Talang 1/2 ling. D-10 ( BJLS 2.4 ) M2 74,166.25 0.00
Jumlah ( K ) 0.00

L PEKERJAAN ATAP

1 Pas. Atap seng BJLS 0.25 M2 77,639.80 0.00


2 Pas. Atap seng BJLS 0.30 M2 85,381.80 0.00
3 Pas. Atap Metal Roof M2 199,555.00 0.00
4 Pas. Bubungan/Nok bulat Metal Roof M2 69,232.50 0.00
5 Pas. Bubungan seng plat BJLS 0.30 M1 57,152.14 0.00
Jumlah ( L ) 0.00

M PEKERJAAN LANTAI

1 Pas. Lantai keramik 40x40 M2 169,863.00 0.00


2 Pas. Lantai keramik 30x30 M2 156,563.00 0.00
3 Pas. Lantai keramik 20x25 M2 142,663.00 0.00
4 Pas. Lantai keramik 20x20 M2 129,363.00 0.00
Jumlah ( M ) 0.00

N PEKERJAAN LISTRIK

1 Pasang Panel Box Pembagi Lengkap buah 48,600.00 0.00


2 Box MCB 25 Ampere buah 22,000.00 0.00
3 Box MCB 10 Ampere buah 10,500.00 0.00
4 Box MCB 6 Ampere buah 10,500.00 0.00
5 Box MCB 4 Ampere buah 10,500.00 0.00
6 Instalasi Listrik m1 0.00 0.00
7 Stop Kontak buah 66,700.00 0.00
8 Saklar Tunggal buah 34,100.00 0.00
9 Saklar Ganda buah 67,900.00 0.00
10 Lampu Jari - Jari 25 Watt buah 82,700.00 0.00
11 Lampu Jari - Jari 18 Watt 82,100.00
12 Lampu Jari - Jari 14 Watt buah 80,900.00 0.00
13 Pasang Arde Unit 0.00 0.00
14 Penangkal Petir Unit 2,250,000.00
15 Biaya Penyambungan PLN Unit 0.00 0.00
Jumlah ( N ) 0.00
PEKERJAAN PERSIAPAN

1. 1 m' Pagar Sementara dari kayu tinggi 2 meter

a. Bahan

- Dolken Kayu Ø 8-10/400 cm 1.250 Btg x Rp. 26,500.00 = Rp. 33,125.00


- Semen Portland 2.500 Kg x Rp. 1,100.00 = Rp. 2,750.00
- Pasir Beton 0.005 M3 x Rp. 200,000.00 = Rp. 1,000.00
- Koral Beton 0.009 M3 x Rp. 195,000.00 = Rp. 1,755.00
- Kayu 5/7 0.072 M3 x Rp. 1,150,000.00 = Rp. 82,800.00
- Paku Biasa 2" - 5" 0.060 Kg x Rp. 13,500.00 = Rp. 810.00
- Residu 0.400 Lt x Rp. 18,400.00 = Rp. 7,360.00
JUMLAH = Rp. 129,600.00

b. Tenaga

- Tukang Kayu 0.200 Oh x Rp. 41,000.00 = Rp. 8,200.00


- Pekerja 0.400 Oh x Rp. 27,500.00 = Rp. 11,000.00
- Kepala Tukang 0.020 Oh x Rp. 43,000.00 = Rp. 860.00
- Mandor 0.020 Oh x Rp. 45,000.00 = Rp. 900.00
JUMLAH = Rp. 20,960.00

JUMLAH (a) + (b) = Rp. 150,560.00

2. 1 m' Pagar Sementara dari Dari Seng Gelombang tinggi 2 meter

a. Bahan

- Dolken Kayu Ø 8-10/400 cm 1.250 Btg x Rp. 26,500.00 = Rp. 33,125.00


- Semen Portland 2.500 Kg x Rp. 1,100.00 = Rp. 2,750.00
- Seng Gelombang 3" - 5" 1.200 Lbr x Rp. 73,100.00 = Rp. 87,720.00
- Pasir Beton 0.005 M3 x Rp. 200,000.00 = Rp. 1,000.00
- Koral Beton 0.009 M3 x Rp. 195,000.00 = Rp. 1,755.00
- Kayu 5/7 0.072 M3 x Rp. 1,150,000.00 = Rp. 82,800.00
- Paku Biasa 2" - 5" 0.060 Kg x Rp. 13,500.00 = Rp. 810.00
- Meni Besi 0.450 Kg x Rp. 29,900.00 = Rp. 13,455.00
JUMLAH = Rp. 209,960.00
b. Tenaga

- Tukang Kayu 0.200 Oh x Rp. 41,000.00 = Rp. 8,200.00


- Pekerja 0.400 Oh x Rp. 27,500.00 = Rp. 11,000.00
- Kepala Tukang 0.020 Oh x Rp. 43,000.00 = Rp. 860.00
- Mandor 0.020 Oh x Rp. 45,000.00 = Rp. 900.00
JUMLAH = Rp. 20,960.00

JUMLAH (a) + (b) = Rp. 230,920.00

3. 1 m' Pagar Sementara dari Kawat Duri tinggi 1,8 meter

a. Bahan

- Dolken Kayu Ø 8-10/400 cm 1.000 Btg x Rp. 26,500.00 = Rp. 26,500.00


- Semen Portland 2.000 Kg x Rp. 1,100.00 = Rp. 2,200.00
- Kawat Duri 25.000 Kg x Rp. 201,700.00 = Rp. 5,042,500.00
- Pasir Beton 0.005 M3 x Rp. 200,000.00 = Rp. 1,000.00
- Koral Beton 0.009 M3 x Rp. 195,000.00 = Rp. 1,755.00
- Paku Biasa 2" - 5" 0.060 Kg x Rp. 13,500.00 = Rp. 810.00
JUMLAH = Rp. 5,074,765.00
b. Tenaga

- Tukang Kayu 0.200 Oh x Rp. 41,000.00 = Rp. 8,200.00


- Pekerja 0.300 Oh x Rp. 27,500.00 = Rp. 8,250.00
- Kepala Tukang 0.020 Oh x Rp. 43,000.00 = Rp. 860.00
- Mandor 0.020 Oh x Rp. 45,000.00 = Rp. 900.00
JUMLAH = Rp. 18,210.00
JUMLAH (a) + (b) = Rp. 5,092,975.00

4. 1 m' Pengukuran dan Pemasangan Bouwplank

a. Bahan

- Kayu 5/7 0.012 Btg x Rp. 1,150,000.00 = Rp. 13,800.00


- Paku Biasa 2" - 5" 0.020 Kg x Rp. 13,500.00 = Rp. 270.00
- Kayu Papan 3/20 0.007 Kg x Rp. 1,200,000.00 = Rp. 8,400.00
JUMLAH = Rp. 22,470.00
b. Tenaga

- Tukang Kayu 0.100 Oh x Rp. 41,000.00 = Rp. 4,100.00


- Pekerja 0.100 Oh x Rp. 27,500.00 = Rp. 2,750.00
- Kepala Tukang 0.010 Oh x Rp. 43,000.00 = Rp. 430.00
- Mandor 0.005 Oh x Rp. 45,000.00 = Rp. 225.00
JUMLAH = Rp. 7,505.00

JUMLAH (a) + (b) = Rp. 29,975.00

5. 1 m2 Pembuatan Kantor Sementara, dengan Lantai Plesteran

a. Bahan
- Dolken Kayu Ø 8-10/400 cm 1.250 Btg x Rp. 26,500.00 = Rp. 33,125.00
- Kayu 0.180 M3 x Rp. 1,600,000.00 = Rp. 288,000.00
- kayu Biasa 0.850 Kg x Rp. 1,150,000.00 = Rp. 977,500.00
- Besi Strip 1.100 Kg x Rp. 11,000.00 = Rp. 12,100.00
- Semen Portland 35.000 Kg x Rp. 1,100.00 = Rp. 38,500.00
- Pasir Pasang 0.150 M3 x Rp. 170,000.00 = Rp. 25,500.00
- Pasir Beton 0.100 M3 x Rp. 200,000.00 = Rp. 20,000.00
- Koral Beton 0.150 M3 x Rp. 195,000.00 = Rp. 29,250.00
- Bata Merah 30.000 Bh x Rp. 1,800.00 = Rp. 54,000.00
- Seng Plat 1.500 Lbr x Rp. 80,900.00 = Rp. 121,350.00
- Jendela Nako 2.000 Bh x Rp. 30,400.00 = Rp. 60,800.00
- Kaca Polos 0.080 M2 x Rp. 203,700.00 = Rp. 16,296.00
- Kunci Tanam 0.150 Bh x Rp. 67,300.00 = Rp. 10,095.00
- Plywood 4 mm 0.060 Lbr x Rp. 71,300.00 = Rp. 4,278.00
JUMLAH = Rp. 1,690,794.00

b. Tenaga

- Tukang Kayu 2.000 Oh x Rp. 41,000.00 = Rp. 82,000.00


- Tukang Bata 1.000 Oh x Rp. 41,000.00 = Rp. 41,000.00
- Pekerja 2.000 Oh x Rp. 27,500.00 = Rp. 55,000.00
- Kepala Tukang 0.300 Oh x Rp. 43,000.00 = Rp. 12,900.00
- Mandor 0.050 Oh x Rp. 45,000.00 = Rp. 2,250.00
JUMLAH = Rp. 193,150.00

JUMLAH (a) + (b) = Rp. 1,883,944.00


6. 1 m2 Pembuatan Gudang Semen dan Alat - alat

a. Bahan

- Dolken Kayu Ø 8-10/400 cm 1.700 Btg x Rp. 26,500.00 = Rp. 45,050.00


- Kayu 0.210 M3 x Rp. 1,150,000.00 = Rp. 241,500.00
- Paku Biasa 0.300 Kg x Rp. 13,500.00 = Rp. 4,050.00
- Semen Portland 10.500 Kg x Rp. 1,100.00 = Rp. 11,550.00
- Pasir beton 0.030 M3 x Rp. 200,000.00 = Rp. 6,000.00
- Koral Beton 0.050 M3 x Rp. 195,000.00 = Rp. 9,750.00
- Seng Gelombang BLJS 30 1.500 Lbr x Rp. 47,200.00 = Rp. 70,800.00
JUMLAH = Rp. 388,700.00

b. Tenaga

- Tukang Kayu 2.000 Oh x Rp. 41,000.00 = Rp. 82,000.00


- Pekerja 1.000 Oh x Rp. 27,500.00 = Rp. 27,500.00
- Kepala Tukang 0.200 Oh x Rp. 43,000.00 = Rp. 8,600.00
- Mandor 0.050 Oh x Rp. 45,000.00 = Rp. 2,250.00
JUMLAH = Rp. 120,350.00
JUMLAH (a) + (b) = Rp. 509,050.00

7. 1 m2 Membersihkan Lapangan dan Perataan

a. Tenaga

- Pekerja 0.100 Oh x Rp. 27,500.00 = Rp. 2,750.00


- Mandor 0.050 Oh x Rp. 45,000.00 = Rp. 2,250.00
JUMLAH = Rp. 5,000.00
JUMLAH (a) = Rp. 5,000.00

8. 1 m2 Pembuatan Bak adukan Ukuran (40 x 50 x 20) cm

a. Bahan

- Kayu Terentang 0.036 M3 x Rp. 1,150,000.00 = Rp. 41,400.00


- Paku Biasa 0.080 Kg x Rp. 13,500.00 = Rp. 1,080.00
- Kaso 5/7 1.000 Btg x Rp. 16,100.00 = Rp. 16,100.00
JUMLAH = Rp. 58,580.00

b. Tenaga

- Tukang Kayu 0.300 Oh x Rp. 41,000.00 = Rp. 12,300.00


- Mandor 0.0015 Oh x Rp. 45,000.00 = Rp. 67.50
JUMLAH = Rp. 12,367.50

JUMLAH (a) + (b) = Rp. 70,947.50

9. 1 m2 Pembuatan Jalan Sementara

a. Bahan

- Batu Belah 15/20 0.150 M3 x Rp. 125,000.00 = Rp. 18,750.00


- Batu Pecah 5/7 0.090 M3 x Rp. 200,000.00 = Rp. 18,000.00
- Pasing Pasang 0.010 M3 x Rp. 170,000.00 = Rp. 1,700.00
JUMLAH = Rp. 38,450.00

b. Tenaga

- Pekerja 1.000 Oh x Rp. 27,500.00 = Rp. 27,500.00


- Mandor 0.050 Oh x Rp. 45,000.00 = Rp. 2,250.00
JUMLAH = Rp. 29,750.00
JUMLAH (a) + (b) = Rp. 68,200.00
10. 1 m3 Bongkaran Beton Bertulang

a. Tenaga

- Pekerja 6.667 Oh x Rp. 27,500.00 = Rp. 183,342.50


- Mandor 0.333 Oh x Rp. 45,000.00 = Rp. 14,985.00
JUMLAH = Rp. 198,327.50
JUMLAH (a) = Rp. 198,327.50

11. 1 m3 Bongkaran Dinding Tembok Bata Merah

a. Tenaga
- Pekerja 6.667 Oh x Rp. 27,500.00 = Rp. 183,342.50
- Mandor 0.033 Oh x Rp. 45,000.00 = Rp. 1,485.00
JUMLAH = Rp. 184,827.50
JUMLAH (a) = Rp. 184,827.50

12. 1 m2 Bongkaran Atap seng

a. Tenaga

- Pekerja 0.100 Oh x Rp. 27,500.00 = Rp. 2,750.00


- Mandor 0.050 Oh x Rp. 45,000.00 = Rp. 2,250.00
JUMLAH = Rp. 5,000.00

JUMLAH (a) = Rp. 5,000.00

13. 1 m2 Bongkaran Rangka atap kayu ( gording )

a. Tenaga

- Pekerja 0.100 Oh x Rp. 27,500.00 = Rp. 2,750.00


- Mandor 0.005 Oh x Rp. 45,000.00 = Rp. 225.00
JUMLAH = Rp. 2,975.00

JUMLAH (a) = Rp. 2,975.00

14. 1 m2 Bongkaran Listplank papan, daun pintu, daun jendela dan jalusi kayu

a. Tenaga

- Pekerja 0.060 Oh x Rp. 27,500.00 = Rp. 1,650.00


- Mandor 0.006 Oh x Rp. 45,000.00 = Rp. 270.00
JUMLAH = Rp. 1,920.00

JUMLAH (a) = Rp. 1,920.00

15. 1 m2 Bongkaran Plafon tripleks

a. Tenaga

- Pekerja 0.100 Oh x Rp. 27,500.00 = Rp. 2,750.00


- Mandor 0.010 Oh x Rp. 45,000.00 = Rp. 450.00
JUMLAH = Rp. 3,200.00

JUMLAH (a) = Rp. 3,200.00

16. 1 m3 Bongkaran Kuda-kuda / Kusen kayu

a. Tenaga

- Pekerja 4.000 Oh x Rp. 27,500.00 = Rp. 110,000.00


- Mandor 0.200 Oh x Rp. 45,000.00 = Rp. 9,000.00
- Tukang Kayu 2.000 Oh x Rp. 41,000.00 = Rp. 82,000.00
- Kepala Tukang 0.200 Oh x Rp. 43,000.00 = Rp. 8,600.00
JUMLAH = Rp. 209,600.00

JUMLAH (a) = Rp. 209,600.00


PEKERJAAN TANAH

1. 1 m3 Galian Tanah Biasa Sedalam 1 Meter

b. Tenaga

- Pekerja 0.400 Oh x Rp. 27,500.00 = Rp. 11,000.00


- Mandor 0.040 Oh x Rp. 45,000.00 = Rp. 1,800.00
JUMLAH = Rp. 12,800.00

2 1 m3 Galian Tanah Biasa Sedalam 2 Meter

b. Tenaga

Pekerja 0.526 Oh x Rp. 27,500.00 = Rp. 14,465.00


Mandor 0.052 Oh x Rp. 45,000.00 = Rp. 2,340.00
JUMLAH = Rp. 16,805.00

3 1 m3 Galian Tanah Biasa Sedalam 3 Meter

b. Tenaga

Pekerja 0.735 Oh x Rp. 27,500.00 = Rp. 20,212.50


Mandor 0.073 Oh x Rp. 45,000.00 = Rp. 3,285.00
JUMLAH = Rp. 23,497.50

4 1 m3 Galian Tanah Keras Sedalam 1 Meter

b. Tenaga

Pekerja 0.625 Oh x Rp. 27,500.00 = Rp. 17,187.50


Mandor 0.063 Oh x Rp. 45,000.00 = Rp. 2,812.50
JUMLAH = Rp. 20,000.00

5 1 m3 Galian Tanah Cadas Sedalam 1 Meter

b. Tenaga

Pekerja 1.250 Oh x Rp. 27,500.00 = Rp. 34,375.00


Mandor 0.125 Oh x Rp. 45,000.00 = Rp. 5,625.00
JUMLAH = Rp. 40,000.00

6 1 m3 Galian Tanah Lumpur Sedalam 1 Meter

b. Tenaga

Pekerja 0.825 Oh x Rp. 27,500.00 = Rp. 22,687.50


Mandor 0.083 Oh x Rp. 45,000.00 = Rp. 3,712.50
JUMLAH = Rp. 26,400.00

7 1 m3 Galian Pekerjaan Striping (Pembuangan Humus) Setinggi 1 Meter

b. Tenaga
Pekerja 0.050 Oh x Rp. 27,500.00 = Rp. 1,375.00
Mandor 0.005 Oh x Rp. 45,000.00 = Rp. 225.00
JUMLAH = Rp. 1,600.00

8 1 m3 Pembuangan Tanah Sejauh 150 Meter

b. Tenaga

Pekerja 0.516 Oh x Rp. 27,500.00 = Rp. 14,190.00


Mandor 0.050 Oh x Rp. 45,000.00 = Rp. 2,250.00
JUMLAH = Rp. 16,440.00
9 1 m3 Urugan Kembali

b. Tenaga

Pekerja 0.192 Oh x Rp. 27,500.00 = Rp. 5,280.00


Mandor 0.019 Oh x Rp. 45,000.00 = Rp. 855.00
JUMLAH = Rp. 6,135.00

10 1 m3 Pemadatan Tanah

b. Tenaga

Pekerja 0.500 Oh x Rp. 27,500.00 = Rp. 13,750.00


Mandor 0.050 Oh x Rp. 45,000.00 = Rp. 2,250.00
JUMLAH = Rp. 16,000.00

11 1 m3 Urugan Pasir

a. Bahan

Pasir Urug 1.200 M3 x Rp. 150,000.00 = Rp. 180,000.00


JUMLAH = Rp. 180,000.00

b. Tenaga

Pekerja 0.300 Oh x Rp. 27,500.00 = Rp. 8,250.00


Mandor 0.010 Oh x Rp. 45,000.00 = Rp. 450.00
JUMLAH = Rp. 8,700.00
JUMLAH (a) + (b) = Rp. 188,700.00

12 1 m3 Pemasangan Lapisan Ijuk

a. Bahan
Ijuk 1.200 M3 x Rp. 5,000.00 = Rp. 6,000.00
JUMLAH = Rp. 6,000.00

b. Tenaga

Pekerja 0.150 Oh x Rp. 27,500.00 = Rp. 4,125.00


Mandor 0.015 Oh x Rp. 45,000.00 = Rp. 675.00
JUMLAH = Rp. 4,800.00

JUMLAH (a) + (b) = Rp. 10,800.00

13 1 m3 Urugan Sirtu

a. Bahan
Sirtu 1.200 M3 x Rp. 150,000.00 = Rp. 180,000.00
JUMLAH = Rp. 180,000.00

b. Tenaga
Pekerja 0.250 Oh x Rp. 27,500.00 = Rp. 6,875.00
Mandor 0.025 Oh x Rp. 45,000.00 = Rp. 1,125.00
JUMLAH = Rp. 8,000.00
JUMLAH (a) + (b) = Rp. 188,000.00
14 1 m3 Urugan Tanah Biasa

a. Bahan

Tanah Urug / Timbunan 1.200 M3 x Rp. 80,000.00 = Rp. 96,000.00


JUMLAH = Rp. 96,000.00

b. Tenaga

Pekerja 0.250 Oh x Rp. 27,500.00 = Rp. 6,875.00


Mandor 0.025 Oh x Rp. 45,000.00 = Rp. 1,125.00
JUMLAH = Rp. 8,000.00

JUMLAH (a) + (b) = Rp. 104,000.00


15 1 m2 Pembuatan Jalan Sementara, Tebal 25 cm

a. Bahan

Batu Belah 0.275 M3 x Rp. 125,000.00 = Rp. 34,375.00


Kerikil 0.030 M3 x Rp. 195,000.00 = Rp. 5,850.00
Pasir 0.050 M3 x Rp. 170,000.00 = Rp. 8,500.00
JUMLAH = Rp. 48,725.00

b. Tenaga

Pekerja 1.000 Oh x Rp. 27,500.00 = Rp. 27,500.00


Mandor 0.100 Oh x Rp. 45,000.00 = Rp. 4,500.00
JUMLAH = Rp. 32,000.00

JUMLAH (a) + (b) = Rp. 80,725.00


PEKERJAAN PONDASI

1. 1 m3 Pasang Pondasi Batu Kali 1 Pc : 1 Ps

a. Bahan

- Batu Kali 1.100 M3 x Rp. 150,000.00 = Rp. 165,000.00


- Semen Portland 392.000 Kg x Rp. 1,100.00 = Rp. 431,200.00
- Pasir pasang 0.314 M3 x Rp. 170,000.00 = Rp. 53,380.00
JUMLAH = Rp. 649,580.00

b. Tenaga

- Pekerja 1.500 Oh x Rp. 27,500.00 = Rp. 41,250.00


- Tukang Batu 0.600 Oh x Rp. 41,000.00 = Rp. 24,600.00
- Kepala Tukang 0.060 Oh x Rp. 43,000.00 = Rp. 2,580.00
- Mandor 0.075 Oh x Rp. 45,000.00 = Rp. 3,375.00
JUMLAH = Rp. 71,805.00

JUMLAH (a) + (b) = Rp. 721,385.00

2 1 m3 Pasang Pondasi Batu Kali 1 Pc : 2 Ps

a. Bahan

- Batu Kali 1.100 M3 x Rp. 150,000.00 = Rp. 165,000.00


- Semen Portland 267.000 Kg x Rp. 1,100.00 = Rp. 293,700.00
- Pasir pasang 0.427 M3 x Rp. 170,000.00 = Rp. 72,590.00
JUMLAH = Rp. 531,290.00

b. Tenaga

- Pekerja 1.500 Oh x Rp. 27,500.00 = Rp. 41,250.00


- Tukang Batu 0.600 Oh x Rp. 41,000.00 = Rp. 24,600.00
- Kepala Tukang 0.060 Oh x Rp. 43,000.00 = Rp. 2,580.00
- Mandor 0.075 Oh x Rp. 45,000.00 = Rp. 3,375.00
JUMLAH = Rp. 71,805.00

JUMLAH (a) + (b) = Rp. 603,095.00

3 1 m3 Pasang Pondasi Batu Kali 1 Pc : 2,5 Ps

a. Bahan

- Batu Kali 1.100 M3 x Rp. 150,000.00 = Rp. 165,000.00


- Semen Portland 225.000 Kg x Rp. 1,100.00 = Rp. 247,500.00
- Pasir pasang 0.445 M3 x Rp. 170,000.00 = Rp. 75,650.00
JUMLAH = Rp. 488,150.00

b. Tenaga

- Pekerja 1.500 Oh x Rp. 27,500.00 = Rp. 41,250.00


- Tukang Batu 0.600 Oh x Rp. 41,000.00 = Rp. 24,600.00
- Kepala Tukang 0.060 Oh x Rp. 43,000.00 = Rp. 2,580.00
- Mandor 0.075 Oh x Rp. 45,000.00 = Rp. 3,375.00
JUMLAH = Rp. 71,805.00

JUMLAH (a) + (b) = Rp. 559,955.00

4 1 m3 Pasang Pondasi Batu Kali 1 Pc : 3 Ps

a. Bahan

- Batu Kali 1.100 M3 x Rp. 150,000.00 = Rp. 165,000.00


- Semen Portland 202.000 Kg x Rp. 1,100.00 = Rp. 222,200.00
- Pasir pasang 0.485 M3 x Rp. 170,000.00 = Rp. 82,450.00
JUMLAH = Rp. 469,650.00
b. Tenaga

- Pekerja 1.500 Oh x Rp. 27,500.00 = Rp. 41,250.00


- Tukang Batu 0.600 Oh x Rp. 41,000.00 = Rp. 24,600.00
- Kepala Tukang 0.060 Oh x Rp. 43,000.00 = Rp. 2,580.00
- Mandor 0.075 Oh x Rp. 45,000.00 = Rp. 3,375.00
JUMLAH = Rp. 71,805.00

JUMLAH (a) + (b) = Rp. 541,455.00

5 1 m3 Pasang Pondasi Batu Kali 1 Pc : 4 Ps

a. Bahan

- Batu Kali 1.100 M3 x Rp. 150,000.00 = Rp. 165,000.00


- Semen Portland 163.000 Kg x Rp. 1,100.00 = Rp. 179,300.00
- Pasir pasang 0.520 M3 x Rp. 200,000.00 = Rp. 104,000.00
JUMLAH = Rp. 448,300.00

b. Tenaga

- Pekerja 1.500 Oh x Rp. 27,500.00 = Rp. 41,250.00


- Tukang Batu 0.600 Oh x Rp. 41,000.00 = Rp. 24,600.00
- Kepala Tukang 0.060 Oh x Rp. 43,000.00 = Rp. 2,580.00
- Mandor 0.075 Oh x Rp. 45,000.00 = Rp. 3,375.00
JUMLAH = Rp. 71,805.00

JUMLAH (a) + (b) = Rp. 520,105.00

6 1 m3 Pasang Pondasi Batu Kali 1 Pc : 5 Ps

a. Bahan

- Batu Kali 1.100 M3 x Rp. 150,000.00 = Rp. 165,000.00


- Semen Portland 136.000 Kg x Rp. 1,100.00 = Rp. 149,600.00
- Pasir pasang 0.544 M3 x Rp. 170,000.00 = Rp. 92,480.00
JUMLAH = Rp. 407,080.00

b. Tenaga

- Pekerja 1.500 Oh x Rp. 27,500.00 = Rp. 41,250.00


- Tukang Batu 0.600 Oh x Rp. 41,000.00 = Rp. 24,600.00
- Kepala Tukang 0.060 Oh x Rp. 43,000.00 = Rp. 2,580.00
- Mandor 0.075 Oh x Rp. 45,000.00 = Rp. 3,375.00
JUMLAH = Rp. 71,805.00

JUMLAH (a) + (b) = Rp. 478,885.00

7 1 m3 Pasang Pondasi Batu Kali 1 Pc : 6 Ps

a. Bahan

- Batu Kali 1.100 M3 x Rp. 150,000.00 = Rp. 165,000.00


- Semen Portland 117.000 Kg x Rp. 1,100.00 = Rp. 128,700.00
- Pasir pasang 0.561 M3 x Rp. 170,000.00 = Rp. 95,370.00
JUMLAH = Rp. 389,070.00

b. Tenaga

- Pekerja 1.500 Oh x Rp. 27,500.00 = Rp. 41,250.00


- Tukang Batu 0.600 Oh x Rp. 41,000.00 = Rp. 24,600.00
- Kepala Tukang 0.060 Oh x Rp. 43,000.00 = Rp. 2,580.00
- Mandor 0.075 Oh x Rp. 45,000.00 = Rp. 3,375.00
JUMLAH = Rp. 71,805.00

JUMLAH (a) + (b) = Rp. 460,875.00


8 1 m3 Pasang Pondasi Kosong

a. Bahan

- Batu Belah 15 / 20 cm 1.200 M3 x Rp. 150,000.00 = Rp. 180,000.00


- Pasir Urug 0.300 M3 x Rp. 150,000.00 = Rp. 45,000.00
JUMLAH = Rp. 225,000.00

b. Tenaga

- Pekerja 0.780 Oh x Rp. 27,500.00 = Rp. 21,450.00


- Tukang Batu 0.390 Oh x Rp. 41,000.00 = Rp. 15,990.00
- Kepala Tukang 0.039 Oh x Rp. 43,000.00 = Rp. 1,677.00
- Mandor 0.039 Oh x Rp. 45,000.00 = Rp. 1,755.00
JUMLAH = Rp. 40,872.00

JUMLAH (a) + (b) = Rp. 265,872.00

9 1 m2 Pasang Pondasi Siklop 40 % Batu Kali

a. Bahan

- Besi Beton 75.000 Kg x Rp. 11,000.00 = Rp. 825,000.00


- Semen Portland 202.000 Kg x Rp. 1,100.00 = Rp. 222,200.00
- Pasir Beton 0.320 M3 x Rp. 200,000.00 = Rp. 64,000.00
- Koral Beton 0.490 M3 x Rp. 195,000.00 = Rp. 95,550.00
- Kawat Beton 0.800 Kg x Rp. 18,400.00 = Rp. 14,720.00
JUMLAH = Rp. 1,221,470.00

b. Tenaga

- Pekerja 3.000 Oh x Rp. 27,500.00 = Rp. 82,500.00


- Tukang Batu 0.850 Oh x Rp. 41,000.00 = Rp. 34,850.00
- Kepala Tukang 0.085 Oh x Rp. 43,000.00 = Rp. 3,655.00
- Mandor 0.150 Oh x Rp. 45,000.00 = Rp. 6,750.00
JUMLAH = Rp. 127,755.00

JUMLAH (a) + (b) = Rp. 1,349,225.00

10 1 M3 Pasang Pondasi Sumuran Diameter 100 cm

a. Bahan

- Batu Belah 15/20 cm 0.450 M3 x Rp. 150,000.00 = Rp. 67,500.00


- Semen Portland 280.000 Kg x Rp. 1,100.00 = Rp. 308,000.00
- Pasir Beton 0.450 M3 x Rp. 200,000.00 = Rp. 90,000.00
- Koral Beton 0.670 M3 x Rp. 195,000.00 = Rp. 130,650.00
JUMLAH = Rp. 596,150.00

b. Tenaga

- Pekerja 2.380 Oh x Rp. 27,500.00 = Rp. 65,450.00


- Tukang Batu 0.300 Oh x Rp. 41,000.00 = Rp. 12,300.00
- Kepala Tukang 0.030 Oh x Rp. 43,000.00 = Rp. 1,290.00
- Mandor 0.080 Oh x Rp. 45,000.00 = Rp. 3,600.00
JUMLAH = Rp. 82,640.00

JUMLAH (a) + (b) = Rp. 678,790.00


11 1 m' Pembuatan Tiang Pancang 40 x 40 cm ; Beton Bertulang

a. Bahan

- Pasir Urug darat 0.019 M3 x Rp. 150,000.00 = Rp. 2,850.00


- Pasir Beton 0.094 M3 x Rp. 200,000.00 = Rp. 18,800.00
- Koral Beton 0.150 M3 x Rp. 195,000.00 = Rp. 29,250.00
- Semen Portland 60.500 Kg x Rp. 1,100.00 = Rp. 66,550.00
- Besi Beton 45.000 Kg x Rp. 11,000.00 = Rp. 495,000.00
- Kawat Beton 0.900 Kg x Rp. 18,400.00 = Rp. 16,560.00
- Kayu Kaso 5/7 0.032 M3 x Rp. 1,150,000.00 = Rp. 36,800.00
- Paku 0.120 Kg x Rp. 13,500.00 = Rp. 1,620.00
- Minyak Bekisting / Pelumas 0.090 Ltr x Rp. 22,000.00 = Rp. 1,980.00
- Plamur Tembok 0.240 Kg x Rp. 29,800.00 = Rp. 7,152.00
JUMLAH = Rp. 676,562.00

b. Tenaga

- Pekerja 1.000 Oh x Rp. 27,500.00 = Rp. 27,500.00


- Tukang 0.670 Oh x Rp. 41,000.00 = Rp. 27,470.00
- Kepala Tukang 0.067 Oh x Rp. 43,000.00 = Rp. 2,881.00
- Mandor 0.050 Oh x Rp. 45,000.00 = Rp. 2,250.00
JUMLAH = Rp. 60,101.00

JUMLAH (a) + (b) = Rp. 736,663.00

12 1 m' Pembuatan Tiang Pancang 35 x 35 cm ; Beton Bertulang

a. Bahan

- Pasir Urug darat 0.016 M3 x Rp. 150,000.00 = Rp. 2,400.00


- Pasir Beton 0.080 M3 x Rp. 200,000.00 = Rp. 16,000.00
- Koral Beton 0.125 M3 x Rp. 195,000.00 = Rp. 24,375.00
- Semen Portland 49.000 Kg x Rp. 1,100.00 = Rp. 53,900.00
- Besi Beton 34.500 Kg x Rp. 11,000.00 = Rp. 379,500.00
- Kawat Beton 0.700 Kg x Rp. 18,400.00 = Rp. 12,880.00
- Kayu Kaso 5/7 0.027 M3 x Rp. 1,150,000.00 = Rp. 31,050.00
- Paku 0.120 Kg x Rp. 13,500.00 = Rp. 1,620.00
- Minyak Bekisting 0.090 Ltr x Rp. 22,000.00 = Rp. 1,980.00
- Plamur Tembok 0.200 Kg x Rp. 29,800.00 = Rp. 5,960.00
JUMLAH = Rp. 529,665.00

b. Tenaga

- Pekerja 0.800 Oh x Rp. 27,500.00 = Rp. 22,000.00


- Tukang Batu 0.500 Oh x Rp. 41,000.00 = Rp. 20,500.00
- Kepala Tukang 0.050 Oh x Rp. 43,000.00 = Rp. 2,150.00
- Mandor 0.040 Oh x Rp. 45,000.00 = Rp. 1,800.00
JUMLAH = Rp. 46,450.00

JUMLAH (a) + (b) = Rp. 576,115.00

13 1 m2 Pemasangan Geotekstil

a. Bahan
- Geotekstil 1.000 M2 x Rp. 35,000.00 = Rp. 35,000.00
JUMLAH = Rp. 35,000.00

b. Tenaga

- Pekerja 0.250 Oh x Rp. 27,500.00 = Rp. 6,875.00


- Tukang Batu 0.150 Oh x Rp. 41,000.00 = Rp. 6,150.00
- Kepala Tukang 0.015 Oh x Rp. 43,000.00 = Rp. 645.00
- Mandor 0.010 Oh x Rp. 45,000.00 = Rp. 450.00
JUMLAH = Rp. 14,120.00

JUMLAH (a) + (b) = Rp. 49,120.00


PEKERJAAN DINDING

1. 1 m2 pasangan bata bata tebal 1 bata, 1 Pc : 1 Ps

a. Bahan

- Bata Merah 46.000 Bh x Rp. 1,800.00 = Rp. 82,800.00


- Semen Portland 64.030 Kg x Rp. 1,100.00 = Rp. 70,433.00
- Pasir pasang 0.059 M3 x Rp. 170,000.00 = Rp. 10,030.00
JUMLAH = Rp. 163,263.00

b. Tenaga

- Pekerja 0.650 Oh x Rp. 27,500.00 = Rp. 17,875.00


- Tukang Batu 0.200 Oh x Rp. 41,000.00 = Rp. 8,200.00
- Kepala Tukang 0.020 Oh x Rp. 43,000.00 = Rp. 860.00
- Mandor 0.030 Oh x Rp. 45,000.00 = Rp. 1,350.00
JUMLAH = Rp. 28,285.00

JUMLAH (a) + (b) = Rp. 191,548.00

2 1 m2 pasangan bata bata tebal 1 bata, 1 Pc : 2 Ps

a. Bahan

- Bata Merah 46.000 Bh x Rp. 1,800.00 = Rp. 82,800.00


- Semen Portland 43.500 Kg x Rp. 1,100.00 = Rp. 47,850.00
- Pasir pasang 0.080 M3 x Rp. 170,000.00 = Rp. 13,600.00
JUMLAH = Rp. 144,250.00

b. Tenaga

- Pekerja 0.650 Oh x Rp. 27,500.00 = Rp. 17,875.00


- Tukang Batu 0.200 Oh x Rp. 41,000.00 = Rp. 8,200.00
- Kepala Tukang 0.020 Oh x Rp. 43,000.00 = Rp. 860.00
- Mandor 0.030 Oh x Rp. 45,000.00 = Rp. 1,350.00
JUMLAH = Rp. 28,285.00

JUMLAH (a) + (b) = Rp. 172,535.00

3 1 m2 pasang bata bata tebal 1 bata, 1 Pc : 3 Ps

a. Bahan

- Bata Merah 46.000 Bh x Rp. 1,800.00 = Rp. 82,800.00


- Semen Portland 32.950 Kg x Rp. 1,100.00 = Rp. 36,245.00
- Pasir pasang 0.091 M3 x Rp. 170,000.00 = Rp. 15,470.00
JUMLAH = Rp. 134,515.00

b. Tenaga

- Pekerja 0.650 Oh x Rp. 27,500.00 = Rp. 17,875.00


- Tukang Batu 0.200 Oh x Rp. 41,000.00 = Rp. 8,200.00
- Kepala Tukang 0.020 Oh x Rp. 43,000.00 = Rp. 860.00
- Mandor 0.030 Oh x Rp. 45,000.00 = Rp. 1,350.00
JUMLAH = Rp. 28,285.00

JUMLAH (a) + (b) = Rp. 162,800.00

4 1 m2 pasang bata bata tebal 1 bata, 1 Pc : 4 Ps

a. Bahan

- Bata Merah 46.000 Bh x Rp. 1,800.00 = Rp. 82,800.00


- Semen Portland 26.550 Kg x Rp. 1,100.00 = Rp. 29,205.00
- Pasir pasang 0.093 M3 x Rp. 170,000.00 = Rp. 15,810.00
JUMLAH = Rp. 127,815.00
b. Tenaga

- Pekerja 0.650 Oh x Rp. 27,500.00 = Rp. 17,875.00


- Tukang Batu 0.200 Oh x Rp. 41,000.00 = Rp. 8,200.00
- Kepala Tukang 0.020 Oh x Rp. 43,000.00 = Rp. 860.00
- Mandor 0.030 Oh x Rp. 45,000.00 = Rp. 1,350.00
JUMLAH = Rp. 28,285.00

JUMLAH (a) + (b) = Rp. 156,100.00

5 1 m2 pasang bata bata tebal 1 bata, 1 Pc : 5 Ps

a. Bahan

- Bata Merah 46.000 Bh x Rp. 1,800.00 = Rp. 82,800.00


- Semen Portland 22.200 Kg x Rp. 1,100.00 = Rp. 24,420.00
- Pasir pasang 0.102 M3 x Rp. 170,000.00 = Rp. 17,340.00
JUMLAH = Rp. 124,560.00

b. Tenaga

- Pekerja 0.650 Oh x Rp. 27,500.00 = Rp. 17,875.00


- Tukang Batu 0.200 Oh x Rp. 41,000.00 = Rp. 8,200.00
- Kepala Tukang 0.020 Oh x Rp. 43,000.00 = Rp. 860.00
- Mandor 0.030 Oh x Rp. 45,000.00 = Rp. 1,350.00
JUMLAH = Rp. 28,285.00

JUMLAH (a) + (b) = Rp. 152,845.00

6 1 m2 pasang bata bata tebal 1 bata, 1 Pc : 6 Ps

a. Bahan

- Bata Merah 46.000 Bh x Rp. 1,800.00 = Rp. 82,800.00


- Semen Portland 22.200 Kg x Rp. 1,100.00 = Rp. 24,420.00
- Pasir pasang 0.102 M3 x Rp. 170,000.00 = Rp. 17,340.00
JUMLAH = Rp. 124,560.00

b. Tenaga

- Pekerja 0.650 Oh x Rp. 27,500.00 = Rp. 17,875.00


- Tukang Batu 0.200 Oh x Rp. 41,000.00 = Rp. 8,200.00
- Kepala Tukang 0.020 Oh x Rp. 43,000.00 = Rp. 860.00
- Mandor 0.030 Oh x Rp. 45,000.00 = Rp. 1,350.00
JUMLAH = Rp. 28,285.00

JUMLAH (a) + (b) = Rp. 152,845.00

7 1 m2 pasang bata bata tebal 1/2 bata, 1 Pc : 1 Ps

a. Bahan

- Bata Merah 23.000 Bh x Rp. 1,800.00 = Rp. 41,400.00


- Semen Portland 27.800 Kg x Rp. 1,100.00 = Rp. 30,580.00
- Pasir pasang 0.028 M3 x Rp. 170,000.00 = Rp. 4,760.00
JUMLAH = Rp. 76,740.00

b. Tenaga

- Pekerja 0.320 Oh x Rp. 27,500.00 = Rp. 8,800.00


- Tukang Batu 0.100 Oh x Rp. 41,000.00 = Rp. 4,100.00
- Kepala Tukang 0.010 Oh x Rp. 43,000.00 = Rp. 430.00
- Mandor 0.015 Oh x Rp. 45,000.00 = Rp. 675.00
JUMLAH = Rp. 14,005.00

JUMLAH (a) + (b) = Rp. 90,745.00


8 1 m2 pasang bata bata tebal 1/2 bata, 1 Pc : 2 Ps

a. Bahan

- Bata Merah 23.000 Bh x Rp. 1,800.00 = Rp. 41,400.00


- Semen Portland 18.950 Kg x Rp. 1,100.00 = Rp. 20,845.00
- Pasir pasang 0.038 M3 x Rp. 170,000.00 = Rp. 6,460.00
JUMLAH = Rp. 68,705.00

b. Tenaga

- Pekerja 0.320 Oh x Rp. 27,500.00 = Rp. 8,800.00


- Tukang Batu 0.100 Oh x Rp. 41,000.00 = Rp. 4,100.00
- Kepala Tukang 0.010 Oh x Rp. 43,000.00 = Rp. 430.00
- Mandor 0.015 Oh x Rp. 45,000.00 = Rp. 675.00
JUMLAH = Rp. 14,005.00

JUMLAH (a) + (b) = Rp. 82,710.00

9 1 M2 Pasang Bata bata Tebal 1/2 Bata, 1 Pc : 3 Ps

a. Bahan

- Bata Merah 23.000 Bh x Rp. 1,800.00 = Rp. 41,400.00


- Semen Portland 14.370 Kg x Rp. 1,100.00 = Rp. 15,807.00
- Pasir pasang 0.040 M3 x Rp. 170,000.00 = Rp. 6,800.00
JUMLAH = Rp. 64,007.00

b. Tenaga

- Pekerja 0.320 Oh x Rp. 27,500.00 = Rp. 8,800.00


- Tukang Batu 0.100 Oh x Rp. 41,000.00 = Rp. 4,100.00
- Kepala Tukang 0.010 Oh x Rp. 43,000.00 = Rp. 430.00
- Mandor 0.015 Oh x Rp. 45,000.00 = Rp. 675.00
JUMLAH = Rp. 14,005.00

JUMLAH (a) + (b) = Rp. 78,012.00

10 1 m2 pasang bata bata tebal 1/2 bata, 1 Pc : 4 Ps

a. Bahan

- Bata Merah 23.000 Bh x Rp. 1,800.00 = Rp. 41,400.00


- Semen Portland 11.500 Kg x Rp. 1,100.00 = Rp. 12,650.00
- Pasir pasang 0.043 M3 x Rp. 170,000.00 = Rp. 7,310.00
JUMLAH = Rp. 61,360.00

b. Tenaga

- Pekerja 0.320 Oh x Rp. 27,500.00 = Rp. 8,800.00


- Tukang Batu 0.100 Oh x Rp. 41,000.00 = Rp. 4,100.00
- Kepala Tukang 0.010 Oh x Rp. 43,000.00 = Rp. 430.00
- Mandor 0.015 Oh x Rp. 45,000.00 = Rp. 675.00
JUMLAH = Rp. 14,005.00

JUMLAH (a) + (b) = Rp. 75,365.00

11 1 m2 pasang bata bata tebal 1/2 bata, 1 Pc : 5 Ps

a. Bahan

- Bata Merah 23.000 Bh x Rp. 1,800.00 = Rp. 41,400.00


- Semen Portland 9.500 Kg x Rp. 1,100.00 = Rp. 10,450.00
- Pasir pasang 0.045 M3 x Rp. 170,000.00 = Rp. 7,650.00
JUMLAH = Rp. 59,500.00

b. Tenaga

- Pekerja 0.320 Oh x Rp. 27,500.00 = Rp. 8,800.00


- Tukang Batu 0.100 Oh x Rp. 41,000.00 = Rp. 4,100.00
- Kepala Tukang 0.010 Oh x Rp. 43,000.00 = Rp. 430.00
- Mandor 0.015 Oh x Rp. 45,000.00 = Rp. 675.00
JUMLAH = Rp. 14,005.00

JUMLAH (a) + (b) = Rp. 73,505.00


PEKERJAAN PLESTERAN

1. 1 m2 Plesteran 1 Pc : 1 Ps, tebal 15 mm.

a. Bahan

- Semen Portland 12.920 Kg x Rp. 1,100.00 = Rp. 14,212.00


- Pasir pasang 0.013 M3 x Rp. 170,000.00 = Rp. 2,210.00
JUMLAH = Rp. 16,422.00

b. Tenaga

- Pekerja 0.200 Oh x Rp. 27,500.00 = Rp. 5,500.00


- Tukang Batu 0.150 Oh x Rp. 41,000.00 = Rp. 6,150.00
- Kepala Tukang 0.015 Oh x Rp. 43,000.00 = Rp. 645.00
- Mandor 0.010 Oh x Rp. 45,000.00 = Rp. 450.00
JUMLAH = Rp. 12,745.00

JUMLAH (a) + (b) = Rp. 29,167.00

2 1 m2 Plesteran 1 Pc : 2 Ps, tebal 15 mm.

a. Bahan

- Semen Portland 8.520 Kg x Rp. 1,100.00 = Rp. 9,372.00


- Pasir pasang 0.017 M3 x Rp. 170,000.00 = Rp. 2,890.00
JUMLAH = Rp. 12,262.00

b. Tenaga

- Pekerja 0.200 Oh x Rp. 27,500.00 = Rp. 5,500.00


- Tukang Batu 0.150 Oh x Rp. 41,000.00 = Rp. 6,150.00
- Kepala Tukang 0.015 Oh x Rp. 43,000.00 = Rp. 645.00
- Mandor 0.010 Oh x Rp. 45,000.00 = Rp. 450.00
JUMLAH = Rp. 12,745.00

JUMLAH (a) + (b) = Rp. 25,007.00

3 1 m2 Plesteran 1 Pc : 3 Ps, tebal 15 mm.

a. Bahan

- Semen Portland 6.480 Kg x Rp. 1,100.00 = Rp. 7,128.00


- Pasir pasang 0.019 M3 x Rp. 170,000.00 = Rp. 3,230.00
JUMLAH = Rp. 10,358.00

b. Tenaga

- Pekerja 0.200 Oh x Rp. 27,500.00 = Rp. 5,500.00


- Tukang Batu 0.150 Oh x Rp. 41,000.00 = Rp. 6,150.00
- Kepala Tukang 0.015 Oh x Rp. 43,000.00 = Rp. 645.00
- Mandor 0.010 Oh x Rp. 45,000.00 = Rp. 450.00
JUMLAH = Rp. 12,745.00

JUMLAH (a) + (b) = Rp. 23,103.00


4 1 m2 Plesteran 1 Pc : 4 Ps, tebal 15 mm.

a. Bahan

- Semen Portland 5.200 Bh x Rp. 1,100.00 = Rp. 5,720.00


- Pasir pasang 0.020 Kg x Rp. 170,000.00 = Rp. 3,400.00
JUMLAH = Rp. 9,120.00
b. Tenaga

- Pekerja 0.200 Oh x Rp. 27,500.00 = Rp. 5,500.00


- Tukang Batu 0.150 Oh x Rp. 41,000.00 = Rp. 6,150.00
- Kepala Tukang 0.015 Oh x Rp. 43,000.00 = Rp. 645.00
- Mandor 0.010 Oh x Rp. 45,000.00 = Rp. 450.00
JUMLAH = Rp. 12,745.00

JUMLAH (a) + (b) = Rp. 21,865.00

5 1 m2 Plesteran 1 Pc : 5 Ps, tebal 15 mm.

a. Bahan

- Semen Portland 4.320 Kg x Rp. 1,100.00 = Rp. 4,752.00


- Pasir pasang 0.022 M3 x Rp. 170,000.00 = Rp. 3,740.00
JUMLAH = Rp. 8,492.00

b. Tenaga

- Pekerja 0.200 Oh x Rp. 27,500.00 = Rp. 5,500.00


- Tukang Batu 0.150 Oh x Rp. 41,000.00 = Rp. 6,150.00
- Kepala Tukang 0.015 Oh x Rp. 43,000.00 = Rp. 645.00
- Mandor 0.010 Oh x Rp. 45,000.00 = Rp. 450.00
JUMLAH = Rp. 12,745.00

JUMLAH (a) + (b) = Rp. 21,237.00

6 1 m2 Plesteran 1 Pc : 6 Ps, tebal 15 mm.

a. Bahan

- Semen Portland 3.680 Kg x Rp. 1,100.00 = Rp. 4,048.00


- Pasir pasang 0.023 M3 x Rp. 170,000.00 = Rp. 3,910.00
JUMLAH = Rp. 7,958.00

b. Tenaga

- Pekerja 0.200 Oh x Rp. 27,500.00 = Rp. 5,500.00


- Tukang Batu 0.150 Oh x Rp. 41,000.00 = Rp. 6,150.00
- Kepala Tukang 0.015 Oh x Rp. 43,000.00 = Rp. 645.00
- Mandor 0.010 Oh x Rp. 45,000.00 = Rp. 450.00
JUMLAH = Rp. 12,745.00

JUMLAH (a) + (b) = Rp. 20,703.00

7 1 m2 Plesteran 1 Pc : 8 Ps, tebal 15 mm.

a. Bahan

- Semen Portland 2.880 Kg x Rp. 1,100.00 = Rp. 3,168.00


- Pasir pasang 0.024 M3 x Rp. 170,000.00 = Rp. 4,080.00
JUMLAH = Rp. 7,248.00

b. Tenaga
- Pekerja 0.200 Oh x Rp. 27,500.00 = Rp. 5,500.00
- Tukang Batu 0.150 Oh x Rp. 41,000.00 = Rp. 6,150.00
- Kepala Tukang 0.015 Oh x Rp. 43,000.00 = Rp. 645.00
- Mandor 0.010 Oh x Rp. 45,000.00 = Rp. 450.00
JUMLAH = Rp. 12,745.00

JUMLAH (a) + (b) = Rp. 19,993.00


8 1 m2 Plesteran 1 Pc : 2 Ps, tebal 20 mm.

a. Bahan

- Semen Portland 14.280 Kg x Rp. 1,000.00 = Rp. 14,280.00


- Pasir pasang 0.023 M3 x Rp. 1,000.00 = Rp. 23.00
JUMLAH = Rp. 14,303.00

b. Tenaga

- Pekerja 0.250 Oh x Rp. 27,500.00 = Rp. 6,875.00


- Tukang Batu 0.200 Oh x Rp. 41,000.00 = Rp. 8,200.00
- Kepala Tukang 0.020 Oh x Rp. 43,000.00 = Rp. 860.00
- Mandor 0.0125 Oh x Rp. 45,000.00 = Rp. 562.50
JUMLAH = Rp. 16,497.50

JUMLAH (a) + (b) = Rp. 30,800.50

9 1 m2 Plesteran 1 Pc : 3 Ps, tebal 20. mm.

a. Bahan

- Semen Portland 10.800 Kg x Rp. 1,100.00 = Rp. 11,880.00


- Pasir pasang 0.026 M3 x Rp. 170,000.00 = Rp. 4,420.00
JUMLAH = Rp. 16,300.00

b. Tenaga

- Pekerja 0.250 Oh x Rp. 27,500.00 = Rp. 5,500.00


- Tukang Batu 0.200 Oh x Rp. 41,000.00 = Rp. 820.00
- Kepala Tukang 0.020 Oh x Rp. 43,000.00 = Rp. 537.50
- Mandor 0.0125 Oh x Rp. 45,000.00 = Rp. 562.50
JUMLAH = Rp. 7,420.00

JUMLAH (a) + (b) = Rp. 23,720.00

10 1 m2 Plesteran 1 Pc : 4 Ps, tebal 20. mm.

a. Bahan

- Semen Portland 8.680 Kg x Rp. 1,100.00 = Rp. 9,548.00


- Pasir pasang 0.028 M3 x Rp. 170,000.00 = Rp. 4,760.00
JUMLAH = Rp. 14,308.00

b. Tenaga

- Pekerja 0.250 Oh x Rp. 27,500.00 = Rp. 5,500.00


- Tukang Batu 0.200 Oh x Rp. 41,000.00 = Rp. 820.00
- Kepala Tukang 0.020 Oh x Rp. 43,000.00 = Rp. 537.50
- Mandor 0.0125 Oh x Rp. 45,000.00 = Rp. 562.50
JUMLAH = Rp. 6,857.50

JUMLAH (a) + (b) = Rp. 21,165.50

11 1 m2 Plesteran 1 Pc : 5 Ps, tebal 20. mm.


a. Bahan

- Semen Portland 7.290 Kg x Rp. 1,100.00 = Rp. 8,019.00


- Pasir pasang 0.028 M3 x Rp. 170,000.00 = Rp. 4,760.00
JUMLAH = Rp. 12,779.00
b. Tenaga

- Pekerja 0.250 Oh x Rp. 27,500.00 = Rp. 5,500.00


- Tukang Batu 0.200 Oh x Rp. 41,000.00 = Rp. 820.00
- Kepala Tukang 0.020 Oh x Rp. 43,000.00 = Rp. 537.50
- Mandor 0.0125 Oh x Rp. 45,000.00 = Rp. 562.50
JUMLAH = Rp. 7,420.00

JUMLAH (a) + (b) = Rp. 20,199.00

12 1 m2 Plesteran 1 Pc : 6 Ps, tebal 20. mm.

a. Bahan

- Semen Portland 6.240 Kg x Rp. 1,100.00 = Rp. 6,864.00


- Pasir pasang 0.030 M3 x Rp. 170,000.00 = Rp. 5,100.00
JUMLAH = Rp. 11,964.00

b. Tenaga

- Pekerja 0.250 Oh x Rp. 27,500.00 = Rp. 5,500.00


- Tukang Batu 0.200 Oh x Rp. 41,000.00 = Rp. 820.00
- Kepala Tukang 0.020 Oh x Rp. 43,000.00 = Rp. 537.50
- Mandor 0.0125 Oh x Rp. 45,000.00 = Rp. 562.50
JUMLAH = Rp. 7,420.00

JUMLAH (a) + (b) = Rp. 19,384.00

13 1 m2 Plesteran 1 Pc : 2 Ps, tebal 25. mm.

a. Bahan

- Semen Portland 15.500 Kg x Rp. 1,100.00 = Rp. 17,050.00


- Pasir pasang 0.013 M3 x Rp. 170,000.00 = Rp. 2,210.00
JUMLAH = Rp. 19,260.00

b. Tenaga

- Pekerja 0.300 Oh x Rp. 27,500.00 = Rp. 5,500.00


- Tukang Batu 0.200 Oh x Rp. 41,000.00 = Rp. 820.00
- Kepala Tukang 0.020 Oh x Rp. 43,000.00 = Rp. 559.00
- Mandor 0.013 Oh x Rp. 45,000.00 = Rp. 585.00
JUMLAH = Rp. 7,464.00

JUMLAH (a) + (b) = Rp. 26,724.00

14 1 m2 Plesteran 1 Pc : 3 Ps, tebal 25. mm.

a. Bahan

- Semen Portland 11.750 Kg x Rp. 1,100.00 = Rp. 12,925.00


- Pasir pasang 0.035 M3 x Rp. 170,000.00 = Rp. 6,018.00
JUMLAH = Rp. 18,943.00

b. Tenaga
- Pekerja 0.300 Oh x Rp. 27,500.00 = Rp. 5,500.00
- Tukang Batu 0.200 Oh x Rp. 41,000.00 = Rp. 820.00
- Kepala Tukang 0.020 Oh x Rp. 43,000.00 = Rp. 559.00
- Mandor 0.013 Oh x Rp. 45,000.00 = Rp. 585.00
JUMLAH = Rp. 7,464.00

JUMLAH (a) + (b) = Rp. 26,407.00


15 1 m2 Plesteran 1 Pc : 4 Ps, tebal 25. mm.

a. Bahan

- Semen Portland 9.480 Kg x Rp. 1,100.00 = Rp. 10,428.00


- Pasir pasang 0.038 M3 x Rp. 170,000.00 = Rp. 6,460.00
JUMLAH = Rp. 16,888.00

b. Tenaga

- Pekerja 0.300 Oh x Rp. 27,500.00 = Rp. 5,500.00


- Tukang Batu 0.200 Oh x Rp. 41,000.00 = Rp. 820.00
- Kepala Tukang 0.020 Oh x Rp. 43,000.00 = Rp. 559.00
- Mandor 0.013 Oh x Rp. 45,000.00 = Rp. 585.00
JUMLAH = Rp. 7,464.00

JUMLAH (a) + (b) = Rp. 24,352.00

16 1 m2 Plesteran 1 Pc : 5 Ps, tebal 25. mm.

a. Bahan

- Semen Portland 7.940 Kg x Rp. 1,100.00 = Rp. 8,734.00


- Pasir pasang 0.039 M3 x Rp. 170,000.00 = Rp. 6,630.00
JUMLAH = Rp. 15,364.00

b. Tenaga

- Pekerja 0.300 Oh x Rp. 27,500.00 = Rp. 5,500.00


- Tukang Batu 0.200 Oh x Rp. 41,000.00 = Rp. 820.00
- Kepala Tukang 0.020 Oh x Rp. 43,000.00 = Rp. 559.00
- Mandor 0.013 Oh x Rp. 45,000.00 = Rp. 585.00
JUMLAH = Rp. 7,464.00

JUMLAH (a) + (b) = Rp. 22,828.00

17 1 m2 Plesteran Beton 1 Pc : 2 Ps, tebal 15. mm.

a. Bahan

- Semen Portland 9.300 Kg x Rp. 1,100.00 = Rp. 10,230.00


- Pasir pasang 0.018 M3 x Rp. 170,000.00 = Rp. 3,060.00
JUMLAH = Rp. 13,290.00

b. Tenaga

- Pekerja 0.260 Oh x Rp. 27,500.00 = Rp. 5,500.00


- Tukang Batu 0.200 Oh x Rp. 41,000.00 = Rp. 820.00
- Kepala Tukang 0.020 Oh x Rp. 43,000.00 = Rp. 559.00
- Mandor 0.013 Oh x Rp. 45,000.00 = Rp. 585.00
JUMLAH = Rp. 7,464.00

JUMLAH (a) + (b) = Rp. 20,754.00

18 1 m2 Plesteran Beton 1 Pc : 3 Ps, tebal 15. mm.


a. Bahan

- Semen Portland 7.070 Kg x Rp. 1,100.00 = Rp. 7,777.00


- Pasir pasang 0.021 M3 x Rp. 170,000.00 = Rp. 3,621.00
JUMLAH = Rp. 11,398.00
b. Tenaga

- Pekerja 0.260 Oh x Rp. 27,500.00 = Rp. 5,500.00


- Tukang Batu 0.200 Oh x Rp. 41,000.00 = Rp. 820.00
- Kepala Tukang 0.020 Oh x Rp. 43,000.00 = Rp. 559.00
- Mandor 0.013 Oh x Rp. 45,000.00 = Rp. 585.00
JUMLAH = Rp. 7,464.00

JUMLAH (a) + (b) = Rp. 18,862.00


PEKERJAAN KAYU

1 1 m3 pasang kusen pintu dan jendela kayu klas I

a. Bahan

- kayu klas I, balok 1.100 m3 x Rp. 1,600,000.00 = Rp. 1,760,000.00


JUMLAH = Rp. 1,760,000.00

b. Tenaga

- Pekerja 6.000 Oh x Rp. 27,500.00 = Rp. 495,000.00


- Tukang kayu 18.000 Oh x Rp. 41,000.00 = Rp. 82,000.00
- Kepala Tukang 2.000 Oh x Rp. 43,000.00 = Rp. 12,900.00
- Mandor 0.300 Oh x Rp. 45,000.00 = Rp. 13,500.00
JUMLAH = Rp. 603,400.00

JUMLAH (a) + (b) = Rp. 2,363,400.00

2 1 m2 pasang pintu panel kayu klas I

a. Bahan

- kayu kls I, papan 0.040 m3 x Rp. 1,650,000.00 = Rp. 66,000.00


JUMLAH = Rp. 66,000.00

b. Tenaga

- Pekerja 1.000 Oh x Rp. 27,500.00 = Rp. 27,500.00


- Tukang kayu 2.500 Oh x Rp. 41,000.00 = Rp. 102,500.00
- Kepala Tukang 0.250 Oh x Rp. 43,000.00 = Rp. 10,750.00
- Mandor 0.050 Oh x Rp. 45,000.00 = Rp. 2,250.00
JUMLAH = Rp. 143,000.00

JUMLAH (a) + (b) = Rp. 209,000.00

3 1 m2 pasang pintu dan jendela kaca kayu klas I

a. Bahan

- kayu klas I, papan 0.035 m3 x Rp. 1,650,000.00 = Rp. 57,750.00


JUMLAH = Rp. 57,750.00

b. Tenaga
- Pekerja 0.800 Oh x Rp. 27,500.00 = Rp. 22,000.00
- Tukang kayu 2.000 Oh x Rp. 41,000.00 = Rp. 82,000.00
- Kepala Tukang 0.200 Oh x Rp. 43,000.00 = Rp. 8,600.00
- Mandor 0.040 Oh x Rp. 45,000.00 = Rp. 1,800.00
JUMLAH = Rp. 114,400.00
JUMLAH (a) + (b) = Rp. 172,150.00

4 1 m2 pasang jendela kayu klas I

a. Bahan

- kayu klas I, papan 0.064 m3 x Rp. 1,650,000.00 = Rp. 105,600.00


JUMLAH = Rp. 105,600.00

b. Tenaga

- Pekerja 1.000 Oh x Rp. 27,500.00 = Rp. 27,500.00


- Tukang kayu 3.000 Oh x Rp. 41,000.00 = Rp. 123,000.00
- Kepala Tukang 0.300 Oh x Rp. 43,000.00 = Rp. 12,900.00
- Mandor 0.300 Oh x Rp. 45,000.00 = Rp. 13,500.00
JUMLAH = Rp. 176,900.00
JUMLAH (a) + (b) = Rp. 282,500.00
5 1 m2 pasang pintu dan jendela jalusi kayu klas I

a. Bahan

- kayu klas I, papan 0.064 m3 x Rp. 1,650,000.00 = Rp. 105,600.00


JUMLAH = Rp. 105,600.00

b. Tenaga

- Pekerja 1.000 Oh x Rp. 27,500.00 = Rp. 27,500.00


- Tukang kayu 3.000 Oh x Rp. 41,000.00 = Rp. 123,000.00
- Kepala Tukang 0.300 Oh x Rp. 43,000.00 = Rp. 12,900.00
- Mandor 0.500 Oh x Rp. 45,000.00 = Rp. 22,500.00
JUMLAH = Rp. 185,900.00

JUMLAH (a) + (b) = Rp. 291,500.00

6 1 m2 pasang pintu plywood rangkap, rangka kayu klas I

a. Bahan

- kayu klas I, papan 0.020 m3 x Rp. 1,650,000.00 = Rp. 32,340.00


- paku biasa 1/2 " -1 " 0.030 kg x Rp. 13,500.00 = Rp. 405.00
- lem kayu 0.300 Lt x Rp. 12,500.00 = Rp. 3,750.00
- play wood 4 x 3 x 3 mm 1.000 Lbr x Rp. 52,800.00 = Rp. 52,800.00
JUMLAH = Rp. 89,295.00

b. Tenaga

- Pekerja 0.600 Oh x Rp. 27,500.00 = Rp. 16,500.00


- Tukang kayu 2.000 Oh x Rp. 41,000.00 = Rp. 82,000.00
- Kepala Tukang 0.200 Oh x Rp. 43,000.00 = Rp. 8,600.00
- Mandor 0.030 Oh x Rp. 45,000.00 = Rp. 1,350.00
JUMLAH = Rp. 108,450.00

JUMLAH (a) + (b) = Rp. 197,745.00

7 1 m2 pasang jalusi mati kusen kayu klas II

a. Bahan
- kayu klas II, papan 0.06 m3 x Rp. 1,200,000.00 = Rp. 72,000.00
- paku biasa 1/2 " -1 " 0.15 kg x Rp. 13,500.00 = Rp. 2,025.00
JUMLAH = Rp. 74,025.00

b. Tenaga
- pekerja 0.500 Oh x Rp. 27,500.00 = Rp. 13,750.00
- Tukang kayu 2.000 Oh x Rp. 41,000.00 = Rp. 82,000.00
- Kepala Tukang 0.200 Oh x Rp. 43,000.00 = Rp. 8,600.00
- Mandor 0.025 Oh x Rp. 45,000.00 = Rp. 1,125.00
JUMLAH = Rp. 105,475.00

JUMLAH (a) + (b) = Rp. 179,500.00

8 1 m2 pasang pintu teakwood rangkap, rangka kayu klas I


a. Bahan

- kayu kls I, papan 0.0196 m3 x Rp. 1,200,000.00 = Rp. 23,520.00


- paku biasa 1/2 " -1 " 0.3 kg x Rp. 13,500.00 = Rp. 4,050.00
- lem kayu 0.3 Lt x Rp. 12,500.00 = Rp. 3,750.00
- teakwood 4 x 8 x 4 mm 1 Lbr x Rp. 92,500.00 = Rp. 92,500.00
JUMLAH = Rp. 96,250.00
b. Tenaga

- pekerja 0.600 Oh x Rp. 27,500.00 = Rp. 16,500.00


- Tukang kayu 2.000 Oh x Rp. 41,000.00 = Rp. 82,000.00
- Kepala Tukang 0.200 Oh x Rp. 43,000.00 = Rp. 8,600.00
- Mandor 0.030 Oh x Rp. 45,000.00 = Rp. 1,350.00
JUMLAH = Rp. 108,450.00

JUMLAH (a) + (b) = Rp. 204,700.00

9 1 m2 pasang pintu teakwood & formika rangka kayu klas I ( divernis )

a. Bahan

- kayu klas I, papan 0.0196 m3 x Rp. 1,650,000.00 = Rp. 32,340.00


- paku biasa 1/2 " -1 " 0.3 kg x Rp. 13,500.00 = Rp. 4,050.00
- lem kayu 0.8 Lt x Rp. 12,500.00 = Rp. 10,000.00
- teakwood 4 x 8 x 4 mm 0.5 Lbr x Rp. 92,500.00 = Rp. 46,250.00
- vernis 0.5 Ltr x Rp. 15,000.00 = Rp. 7,500.00
- formika 4 x 8 0.5 Lbr x Rp. 52,800.00 = Rp. 26,400.00
JUMLAH = Rp. 94,200.00

b. Tenaga

- pekerja 0.800 Oh x Rp. 27,500.00 = Rp. 22,000.00


- Tukang kayu 2.500 Oh x Rp. 41,000.00 = Rp. 102,500.00
- Kepala Tukang 0.250 Oh x Rp. 43,000.00 = Rp. 10,750.00
- Mandor 0.040 Oh x Rp. 45,000.00 = Rp. 1,800.00
JUMLAH = Rp. 137,050.00

JUMLAH (a) + (b) = Rp. 231,250.00

10 1 m3 pasang konstruksi kuda - kuda kayu klas I

a. Bahan

- kayu klas I, balok 1.1 m3 x Rp. 1,600,000.00 = Rp. 1,760,000.00


- besi strip 15 kg x Rp. 11,000.00 = Rp. 165,000.00
- paku biasa 2" - 5" 0.8 kg x Rp. 13,500.00 = Rp. 10,800.00
JUMLAH = Rp. 1,935,800.00

b. Tenaga

- pekerja 4.000 Oh x Rp. 27,500.00 = Rp. 110,000.00


- Tukang kayu 12.000 Oh x Rp. 41,000.00 = Rp. 492,000.00
- Kepala Tukang 1.200 Oh x Rp. 43,000.00 = Rp. 172,000.00
- Mandor 0.200 Oh x Rp. 45,000.00 = Rp. 540,000.00
JUMLAH = Rp. 1,314,000.00

JUMLAH (a) + (b) = Rp. 3,249,800.00

11 1 m3 pasang gording kayu klas II

a. Bahan

- kayu klas II, balok 1.1 m3 x Rp. 1,150,000.00 = Rp. 1,265,000.00


- paku campur 4.000 kg x Rp. 13,500.00 = Rp. 54,000.00
JUMLAH = Rp. 1,319,000.00

b. Tenaga

- pekerja 0.100 Oh x Rp. 27,500.00 = Rp. 2,750.00


- Tukang kayu 0.100 Oh x Rp. 41,000.00 = Rp. 4,100.00
- Kepala Tukang 0.010 Oh x Rp. 43,000.00 = Rp. 4,300.00
- Mandor 0.005 Oh x Rp. 45,000.00 = Rp. 4,500.00
JUMLAH = Rp. 15,650.00

JUMLAH (a) + (b) = Rp. 1,334,650.00


12 1 m3 pasang kaso + reng genteng kodok kayu klas I

a. Bahan

- kayu klas I, balok 0.012 m3 x Rp. 1,600,000.00 = Rp. 19,200.00


- paku biasa 2" - 5" 0.150 kg x Rp. 13,500.00 = Rp. 2,025.00
JUMLAH = Rp. 21,225.00

b. Tenaga

- pekerja 0.100 Oh x Rp. 27,500.00 = Rp. 2,750.00


- Tukang kayu 0.100 Oh x Rp. 41,000.00 = Rp. 4,100.00
- Kepala Tukang 0.010 Oh x Rp. 43,000.00 = Rp. 4,300.00
- Mandor 0.005 Oh x Rp. 45,000.00 = Rp. 4,500.00
JUMLAH = Rp. 15,650.00

JUMLAH (a) + (b) = Rp. 36,875.00

13 1 m3 pasang kaso + reng genteng metal roof kayu klas I

a. Bahan

- kayu klas I, balok 0.014 m3 x Rp. 1,600,000.00 = Rp. 22,400.00


- paku biasa 2" - 5" 0.150 kg x Rp. 13,500.00 = Rp. 2,025.00
JUMLAH = Rp. 24,425.00

b. Tenaga

- pekerja 0.100 Oh x Rp. 27,500.00 = Rp. 2,750.00


- Tukang kayu 0.100 Oh x Rp. 41,000.00 = Rp. 4,100.00
- Kepala Tukang 0.010 Oh x Rp. 43,000.00 = Rp. 4,300.00
- Mandor 0.005 Oh x Rp. 45,000.00 = Rp. 4,500.00
JUMLAH = Rp. 15,650.00

JUMLAH (a) + (b) = Rp. 40,075.00

14 1 m2 pasang kaso + reng genteng monier kayu klas I

a. Bahan

- kayu klas I, balok 0.014 m3 x Rp. 1,600,000.00 = Rp. 22,400.00


- paku biasa 2" - 5" 0.150 kg x Rp. 13,500.00 = Rp. 2,025.00
JUMLAH = Rp. 24,425.00

b. Tenaga

- pekerja 0.100 Oh x Rp. 27,500.00 = Rp. 2,750.00


- Tukang kayu 0.100 Oh x Rp. 41,000.00 = Rp. 4,100.00
- Kepala Tukang 0.010 Oh x Rp. 43,000.00 = Rp. 4,300.00
- Mandor 0.005 Oh x Rp. 45,000.00 = Rp. 4,500.00
JUMLAH = Rp. 15,650.00

JUMLAH (a) + (b) = Rp. 40,075.00


15 1 m2 pasang kaso + reng genteng beton kayu klas I

a. Bahan

- kayu klas I, balok 0.014 m3 x Rp. 1,600,000.00 = Rp. 22,400.00


- paku biasa 2" - 5" 0.150 kg x Rp. 13,500.00 = Rp. 2,025.00
JUMLAH = Rp. 24,425.00
b. Tenaga

- pekerja 0.100 Oh x Rp. 27,500.00 = Rp. 2,750.00


- Tukang kayu 0.100 Oh x Rp. 41,000.00 = Rp. 4,100.00
- Kepala Tukang 0.010 Oh x Rp. 43,000.00 = Rp. 4,300.00
- Mandor 0.005 Oh x Rp. 45,000.00 = Rp. 4,500.00
JUMLAH = Rp. 15,650.00

JUMLAH (a) + (b) = Rp. 40,075.00

16 1 m2 pasang langit - langit Triplek

a. Bahan

- triplek 0.5 Lbr x Rp. 52,800.00 = Rp. 26,400.00


- paku triplek 0.150 kg x Rp. 20,800.00 = Rp. 3,120.00
JUMLAH = Rp. 29,520.00

b. Tenaga

- pekerja 0.500 Oh x Rp. 27,500.00 = Rp. 13,750.00


- Mandor 0.025 Oh x Rp. 45,000.00 = Rp. 1,125.00
JUMLAH = Rp. 14,875.00

JUMLAH (a) + (b) = Rp. 44,395.00

17 1 m2 pasang rangka plafon 5/7

a. Bahan

- kayu klas II, balok 0.012 m3 x Rp. 1,150,000.00 = Rp. 13,800.00


- paku campuran 0.100 kg x Rp. 13,500.00 = Rp. 1,350.00
JUMLAH = Rp. 15,150.00

b. Tenaga

- pekerja 0.150 Oh x Rp. 27,500.00 = Rp. 4,125.00


- Tukang kayu 0.250 Oh x Rp. 41,000.00 = Rp. 10,250.00
- Kepala Tukang 0.025 Oh x Rp. 43,000.00 = Rp. 6,450.00
- Mandor 0.075 Oh x Rp. 45,000.00 = Rp. 11,250.00
JUMLAH = Rp. 32,075.00

JUMLAH (a) + (b) = Rp. 47,225.00

18 1 m2 pasang rangka langit - langit (1.00 x 1.00) m, kayu II

a. Bahan

- kayu Kls II, balok 0.012 m3 x Rp. 1,150,000.00 = Rp. 13,800.00


- paku biasa 2" - 5" 0.100 kg x Rp. 13,500.00 = Rp. 1,350.00
JUMLAH = Rp. 15,150.00

b. Tenaga

- pekerja 0.150 Oh x Rp. 27,500.00 = Rp. 4,125.00


- Tukang kayu 0.250 Oh x Rp. 41,000.00 = Rp. 10,250.00
- Kepala Tukang 0.025 Oh x Rp. 43,000.00 = Rp. 6,450.00
- Mandor 0.075 Oh x Rp. 45,000.00 = Rp. 11,250.00
JUMLAH = Rp. 32,075.00

JUMLAH (a) + (b) = Rp. 47,225.00


19 1 m2 pasang rangka langit - langit (30 x 60) cm, kayu Kls I

a. Bahan

- kayu Kls I, balok 0.023 m3 x Rp. 1,600,000.00 = Rp. 36,800.00


- paku biasa 2" - 5" 0.150 kg x Rp. 13,500.00 = Rp. 2,025.00
JUMLAH = Rp. 38,825.00

b. Tenaga

- pekerja 0.200 Oh x Rp. 27,500.00 = Rp. 5,500.00


- Tukang kayu 0.300 Oh x Rp. 41,000.00 = Rp. 12,300.00
- Kepala Tukang 0.030 Oh x Rp. 43,000.00 = Rp. 8,600.00
- Mandor 0.010 Oh x Rp. 45,000.00 = Rp. 13,500.00
JUMLAH = Rp. 39,900.00

JUMLAH (a) + (b) = Rp. 78,725.00

20 1 m2 pasang rangka langit - langit (30 x 30) cm, kayu Kls I

a. Bahan

- kayu Kls I, balok 0.027 m3 x Rp. 1,600,000.00 = Rp. 43,200.00


- paku biasa 2" - 5" 0.200 kg x Rp. 13,500.00 = Rp. 2,700.00
JUMLAH = Rp. 45,900.00

b. Tenaga

- pekerja 0.250 Oh x Rp. 27,500.00 = Rp. 6,875.00


- Tukang kayu 0.350 Oh x Rp. 41,000.00 = Rp. 14,350.00
- Kepala Tukang 0.036 Oh x Rp. 43,000.00 = Rp. 10,750.00
- Mandor 0.013 Oh x Rp. 45,000.00 = Rp. 15,750.00
JUMLAH = Rp. 47,725.00

JUMLAH (a) + (b) = Rp. 93,625.00

21 1 m2 pasang lisplang ukuran (3 x 20) cm, kayu Kls I

a. Bahan

- kayu Kls I, papan 0.0072 m3 x Rp. 1,650,000.00 = Rp. 11,880.00


- paku biasa 2" - 5" 0.050 kg x Rp. 13,500.00 = Rp. 675.00
JUMLAH = Rp. 12,555.00

b. Tenaga

- pekerja 0.100 Oh x Rp. 27,500.00 = Rp. 2,750.00


- Tukang kayu 0.200 Oh x Rp. 41,000.00 = Rp. 8,200.00
- Kepala Tukang 0.025 Oh x Rp. 43,000.00 = Rp. 1,075.00
- Mandor 0.005 Oh x Rp. 45,000.00 = Rp. 225.00
JUMLAH = Rp. 12,250.00

JUMLAH (a) + (b) = Rp. 24,805.00


22 1 m2 pasang lisplang ukuran (2 x 20) cm, kayu Kls I

a. Bahan

- kayu Kls I, papan 0.011 m3 x Rp. 1,650,000.00 = Rp. 18,150.00


- paku biasa 2" - 5" 0.050 kg x Rp. 13,500.00 = Rp. 675.00
JUMLAH = Rp. 18,825.00
b. Tenaga

- pekerja 0.110 Oh x Rp. 27,500.00 = Rp. 3,025.00


- Tukang kayu 0.220 Oh x Rp. 41,000.00 = Rp. 9,020.00
- Kepala Tukang 0.022 Oh x Rp. 43,000.00 = Rp. 946.00
- Mandor 0.005 Oh x Rp. 45,000.00 = Rp. 225.00
JUMLAH = Rp. 13,216.00

JUMLAH (a) + (b) = Rp. 32,041.00

23 1 m2 pasang lisplang ukuran (3 x 20) cm, kayu klas II

a. Bahan

- kayu klas II, papan 0.011 m3 x Rp. 1,200,000.00 = Rp. 13,200.00


- paku biasa 2" - 5" 0.050 kg x Rp. 13,500.00 = Rp. 675.00
JUMLAH = Rp. 13,875.00

b. Tenaga

- pekerja 0.110 Oh x Rp. 27,500.00 = Rp. 3,025.00


- Tukang kayu 0.220 Oh x Rp. 41,000.00 = Rp. 9,020.00
- Kepala Tukang 0.022 Oh x Rp. 43,000.00 = Rp. 946.00
- Mandor 0.005 Oh x Rp. 45,000.00 = Rp. 225.00
JUMLAH = Rp. 13,216.00

JUMLAH (a) + (b) = Rp. 27,091.00

24 1 m2 pasang lisplang ukuran 2 x (3 x 20) cm, kayu klas II

a. Bahan

- kayu klas II, papan 0.0145 m3 x Rp. 1,200,000.00 = Rp. 17,400.00


- paku biasa 2" - 5" 0.060 kg x Rp. 13,500.00 = Rp. 810.00
JUMLAH = Rp. 18,210.00

b. Tenaga

- pekerja 0.150 Oh x Rp. 27,500.00 = Rp. 4,125.00


- Tukang kayu 0.250 Oh x Rp. 41,000.00 = Rp. 10,250.00
- Kepala Tukang 0.025 Oh x Rp. 43,000.00 = Rp. 1,075.00
- Mandor 0.075 Oh x Rp. 45,000.00 = Rp. 3,375.00
JUMLAH = Rp. 18,825.00

JUMLAH (a) + (b) = Rp. 37,035.00

25 1 m2 pasang lisplang ukuran 2 x (2 x 20) cm, kayu klas II

a. Bahan

- kayu klas II, papan 0.0086 m3 x Rp. 1,200,000.00 = Rp. 10,320.00


- paku biasa 2" - 5" 0.060 kg x Rp. 13,500.00 = Rp. 810.00
JUMLAH = Rp. 11,130.00

b. Tenaga
- pekerja 0.100 Oh x Rp. 27,500.00 = Rp. 2,750.00
- Tukang kayu 0.100 Oh x Rp. 41,000.00 = Rp. 4,100.00
- Kepala Tukang 0.010 Oh x Rp. 43,000.00 = Rp. 430.00
- Mandor 0.050 Oh x Rp. 45,000.00 = Rp. 2,250.00
JUMLAH = Rp. 9,530.00

JUMLAH (a) + (b) = Rp. 20,660.00


26 1 m2 pasang rangka dinding pemisah kayu II

a. Bahan

- kayu Kls II, balok 0.0195 m3 x Rp. 1,150,000.00 = Rp. 22,425.00


- kayu Kls II, papan 0.007 m3 x Rp. 1,200,000.00 = Rp. 8,400.00
- paku biasa 2" - 5" 0.100 kg x Rp. 13,500.00 = Rp. 1,350.00
JUMLAH = Rp. 32,175.00

b. Tenaga

- pekerja 0.150 Oh x Rp. 27,500.00 = Rp. 4,125.00


- Tukang kayu 0.450 Oh x Rp. 41,000.00 = Rp. 18,450.00
- Kepala Tukang 0.045 Oh x Rp. 43,000.00 = Rp. 1,935.00
- Mandor 0.075 Oh x Rp. 45,000.00 = Rp. 3,375.00
JUMLAH = Rp. 27,885.00

JUMLAH (a) + (b) = Rp. 60,060.00

27 1 m2 pasang rangka dinding pemisah kayu klas II

a. Bahan

- kayu klas II, balok 0.0195 m3 x Rp. 1,150,000.00 = Rp. 22,425.00


- kayu Kls II, papan 0.007 m3 x Rp. 1,200,000.00 = Rp. 8,400.00
- paku biasa 2" - 5" 0.100 kg x Rp. 13,500.00 = Rp. 1,350.00
JUMLAH = Rp. 32,175.00

b. Tenaga

- pekerja 0.150 Oh x Rp. 27,500.00 = Rp. 4,125.00


- Tukang kayu 0.450 Oh x Rp. 41,000.00 = Rp. 18,450.00
- Kepala Tukang 0.045 Oh x Rp. 43,000.00 = Rp. 1,935.00
- Mandor 0.075 Oh x Rp. 45,000.00 = Rp. 3,375.00
JUMLAH = Rp. 27,885.00

JUMLAH (a) + (b) = Rp. 60,060.00

28 1 m2 pasang rangka dinding pemisah teakwood rangkap, rangka kayu klas II

a. Bahan

- kayu klas II, balok 0.0195 m3 x Rp. 1,150,000.00 = Rp. 22,425.00


- kayu Kls II, papan 0.007 m3 x Rp. 1,200,000.00 = Rp. 8,400.00
- paku biasa 2" - 5" 0.100 kg x Rp. 13,500.00 = Rp. 1,350.00
JUMLAH = Rp. 32,175.00

b. Tenaga

- pekerja 0.150 Oh x Rp. 27,500.00 = Rp. 4,125.00


- Tukang kayu 0.450 Oh x Rp. 41,000.00 = Rp. 18,450.00
- Kepala Tukang 0.045 Oh x Rp. 43,000.00 = Rp. 1,935.00
- Mandor 0.075 Oh x Rp. 45,000.00 = Rp. 3,375.00
JUMLAH = Rp. 27,885.00
JUMLAH (a) + (b) = Rp. 60,060.00
29 1 m2 pasang rangka dinding pemisah plywood rangkap, rangka kayu klas II

a. Bahan

- kayu klas II, balok 0.0195 m3 x Rp. 1,150,000.00 = Rp. 22,425.00


- kayu Kls II, papan 0.007 m3 x Rp. 1,200,000.00 = Rp. 8,400.00
- paku biasa 2" - 5" 0.100 kg x Rp. 13,500.00 = Rp. 1,350.00
- lem kayu 0.560 Lt x Rp. 12,500.00 = Rp. 7,000.00
- plywood 4 x 8 x 4 mm 1.000 Lb x Rp. 52,800.00 = Rp. 52,800.00
JUMLAH = Rp. 91,975.00

b. Tenaga

- pekerja 0.200 Oh x Rp. 27,500.00 = Rp. 5,500.00


- Tukang kayu 0.600 Oh x Rp. 41,000.00 = Rp. 24,600.00
- Kepala Tukang 0.060 Oh x Rp. 43,000.00 = Rp. 2,580.00
- Mandor 0.010 Oh x Rp. 45,000.00 = Rp. 450.00
JUMLAH = Rp. 33,130.00

JUMLAH (a) + (b) = Rp. 125,105.00

30 1 m2 pasang dinding lambrizring dari papan klas I

a. Bahan

- kayu klas I, balok 0.007 m3 x Rp. 1,600,000.00 = Rp. 11,200.00


- paku biasa 2" - 5" 0.100 m3 x Rp. 13,500.00 = Rp. 1,350.00
- paku skrup 3" - 5" 0.150 kg x Rp. 13,500.00 = Rp. 2,025.00
JUMLAH = Rp. 14,575.00

b. Tenaga

- pekerja 0.600 Oh x Rp. 27,500.00 = Rp. 16,500.00


- Tukang kayu 1.800 Oh x Rp. 41,000.00 = Rp. 73,800.00
- Kepala Tukang 0.180 Oh x Rp. 43,000.00 = Rp. 7,740.00
- Mandor 0.030 Oh x Rp. 45,000.00 = Rp. 1,350.00
JUMLAH = Rp. 99,390.00

JUMLAH (a) + (b) = Rp. 113,965.00

31 1 m2 pasang plywood tebal 4 mm, untuk dinding

a. Bahan

- plywood 4" x 8" x 4" mm 0.4 Lbr x Rp. 52,800.00 = Rp. 21,120.00
- paku biasa 1/2" - 1" 0.050 kg x Rp. 13,500.00 = Rp. 675.00
JUMLAH = Rp. 21,795.00

b. Tenaga

- pekerja 0.025 Oh x Rp. 27,500.00 = Rp. 687.50


- Tukang kayu 0.075 Oh x Rp. 41,000.00 = Rp. 3,075.00
- Kepala Tukang 0.008 Oh x Rp. 43,000.00 = Rp. 322.50
- Mandor 0.001 Oh x Rp. 45,000.00 = Rp. 58.50
JUMLAH = Rp. 4,143.50
JUMLAH (a) + (b) = Rp. 25,938.50
32 1 m1 pasang list plafon kayu profil

a. Bahan

- kayu profil 1.05 Lbr x Rp. 6,800.00 = Rp. 7,140.00


JUMLAH = Rp. 7,140.00

b. Tenaga

- pekerja 0.021 Oh x Rp. 27,500.00 = Rp. 577.50


- Tukang kayu 0.021 Oh x Rp. 41,000.00 = Rp. 861.00
- Kepala Tukang 0.002 Oh x Rp. 43,000.00 = Rp. 86.00
- Mandor 0.001 Oh x Rp. 45,000.00 = Rp. 45.00
JUMLAH = Rp. 1,569.50

JUMLAH (a) + (b) = Rp. 8,709.50


PEKERJAAN BETON

1. 1 m3 Membuat Beton Tumbuk, 1 Pc : 3 Ps : 5 Kr

a. Bahan

- Semen Portland 218.000 Kg x Rp. 1,100.00 = Rp. 239,800.00


- Pasir Beton 0.520 M3 x Rp. 200,000.00 = Rp. 104,000.00
- Koral Beton 0.870 M3 x Rp. 195,000.00 = Rp. 169,650.00
JUMLAH = Rp. 513,450.00

b. Tenaga

- Pekerja 1.650 Oh x Rp. 27,500.00 = Rp. 45,375.00


- Tukang Batu 0.250 Oh x Rp. 41,000.00 = Rp. 10,250.00
- Kepala Tukang 0.025 Oh x Rp. 43,000.00 = Rp. 1,075.00
- Mandor 0.080 Oh x Rp. 45,000.00 = Rp. 3,600.00
JUMLAH = Rp. 60,300.00

JUMLAH (a) + (b) = Rp. 573,750.00

2 1 m3 Membuat Beton Tumbuk, 1 Pc : 3 Ps : 6 Kr

a. Bahan

- Semen Portland 197.000 Kg x Rp. 1,100.00 = Rp. 216,700.00


- Pasir Beton 0.470 M3 x Rp. 200,000.00 = Rp. 94,000.00
- Koral Beton 0.940 M3 x Rp. 195,000.00 = Rp. 183,300.00
JUMLAH = Rp. 494,000.00

b. Tenaga

- Pekerja 1.650 Oh x Rp. 27,500.00 = Rp. 45,375.00


- Tukang Batu 0.250 Oh x Rp. 41,000.00 = Rp. 10,250.00
- Kepala Tukang 0.025 Oh x Rp. 43,000.00 = Rp. 1,075.00
- Mandor 0.080 Oh x Rp. 45,000.00 = Rp. 3,600.00
JUMLAH = Rp. 60,300.00

JUMLAH (a) + (b) = Rp. 554,300.00

3 1 m2 Membuat Lantai Kerja Beton Tumbuk, 1 Pc : 3 Ps : 5 Kr, T. 5 cm

a. Bahan

- Semen Portland 10.000 Kg x Rp. 1,100.00 = Rp. 11,000.00


- Pasir Beton 0.026 M3 x Rp. 200,000.00 = Rp. 5,200.00
- Koral Beton 0.044 M3 x Rp. 195,000.00 = Rp. 8,580.00
JUMLAH = Rp. 24,780.00

b. Tenaga

- Pekerja 1.150 Oh x Rp. 27,500.00 = Rp. 31,625.00


- Tukang Batu 0.020 Oh x Rp. 41,000.00 = Rp. 820.00
- Kepala Tukang 0.002 Oh x Rp. 43,000.00 = Rp. 86.00
- Mandor 0.006 Oh x Rp. 45,000.00 = Rp. 270.00
JUMLAH = Rp. 32,801.00

JUMLAH (a) + (b) = Rp. 57,581.00


4 1 m3 membuat Beton Bertulang 1 Pc : 2 Ps : 3 Kr

a. Bahan

- Semen Portland 282.000 Kg x Rp. 1,100.00 = Rp. 310,200.00


- Pasir Beton 0.560 M3 x Rp. 200,000.00 = Rp. 112,000.00
- Koral Beton 0.780 M3 x Rp. 195,000.00 = Rp. 152,100.00
JUMLAH = Rp. 574,300.00

b. Tenaga

- Pekerja 1.650 Oh x Rp. 27,500.00 = Rp. 45,375.00


- Tukang Batu 0.250 Oh x Rp. 41,000.00 = Rp. 10,250.00
- Kepala Tukang 0.025 Oh x Rp. 43,000.00 = Rp. 1,075.00
- Mandor 0.080 Oh x Rp. 45,000.00 = Rp. 3,600.00
JUMLAH = Rp. 60,300.00

JUMLAH (a) + (b) = Rp. 634,600.00

5 1 m3 membuat Beton Bertulang 1 Pc : 2 Ps : 2.5 Kr

a. Bahan

- Semen Portland 352.000 Kg x Rp. 1,100.00 = Rp. 387,200.00


- Pasir Beton 0.560 M3 x Rp. 200,000.00 = Rp. 112,000.00
- Koral Beton 0.700 M3 x Rp. 195,000.00 = Rp. 136,500.00
JUMLAH = Rp. 635,700.00

b. Tenaga

- Pekerja 1.650 Oh x Rp. 27,500.00 = Rp. 45,375.00


- Tukang Batu 0.250 Oh x Rp. 41,000.00 = Rp. 10,250.00
- Kepala Tukang 0.025 Oh x Rp. 43,000.00 = Rp. 1,075.00
- Mandor 0.080 Oh x Rp. 45,000.00 = Rp. 3,600.00
JUMLAH = Rp. 60,300.00

JUMLAH (a) + (b) = Rp. 696,000.00

6 1 m3 membuat Beton Bertulang 1 Pc : 1.5 Ps : 2.5 Kr

a. Bahan

- Semen Portland 386.000 Kg x Rp. 1,100.00 = Rp. 424,600.00


- Pasir Beton 0.470 M3 x Rp. 200,000.00 = Rp. 94,000.00
- Koral Beton 0.780 M3 x Rp. 195,000.00 = Rp. 152,100.00
JUMLAH = Rp. 670,700.00

b. Tenaga

- Pekerja 1.650 Oh x Rp. 27,500.00 = Rp. 45,375.00


- Tukang Batu 0.250 Oh x Rp. 41,000.00 = Rp. 10,250.00
- Kepala Tukang 0.025 Oh x Rp. 43,000.00 = Rp. 1,075.00
- Mandor 0.080 Oh x Rp. 45,000.00 = Rp. 3,600.00
JUMLAH = Rp. 60,300.00
JUMLAH (a) + (b) = Rp. 731,000.00

7 1 m3 membuat tiang pancang prestressed beton

a. Bahan

- Semen Portland 440.000 Bh x Rp. 1,100.00 = Rp. 484,000.00


- Pasir Beton 0.500 Kg x Rp. 200,000.00 = Rp. 100,000.00
- Koral Beton 0.800 M3 x Rp. 195,000.00 = Rp. 156,000.00
- Rapidrant 2.460 Gin x Rp. - = Rp. -
JUMLAH = Rp. 740,000.00
b. Tenaga

- Pekerja 1.650 Oh x Rp. 27,500.00 = Rp. 45,375.00


- Tukang Batu 0.250 Oh x Rp. 41,000.00 = Rp. 10,250.00
- Kepala Tukang 0.025 Oh x Rp. 43,000.00 = Rp. 1,075.00
- Mandor 0.800 Oh x Rp. 45,000.00 = Rp. 36,000.00
JUMLAH = Rp. 92,700.00

JUMLAH (a) + (b) = Rp. 832,700.00

8 1 Kg Pembesian dengan besi polos atau besi ulir

a. Bahan

- Besi Beton (Polos/Ulir) 1.050 Kg x Rp. 11,000.00 = Rp. 11,550.00


- Kawat Beton 0.015 Kg x Rp. 18,400.00 = Rp. 276.00
JUMLAH = Rp. 11,826.00

b. Tenaga

- Pekerja 0.007 Oh x Rp. 27,500.00 = Rp. 192.50


- Tukang Besi 0.007 Oh x Rp. 41,000.00 = Rp. 287.00
- Kepala Tukang 0.0007 Oh x Rp. 43,000.00 = Rp. 30.10
- Mandor 0.0003 Oh x Rp. 45,000.00 = Rp. 13.50
JUMLAH = Rp. 523.10

JUMLAH (a) + (b) = Rp. 12,349.10

9 1 Kg Jaring Kawat Baja

a. Bahan

- Besi Jaring Kawat Baja 1.020 Kg x Rp. 605,200.00 = Rp. 617,304.00


- Kawat Beton 0.805 Kg x Rp. 18,400.00 = Rp. 14,812.00
JUMLAH = Rp. 632,116.00

b. Tenaga

- Pekerja 0.025 Oh x Rp. 27,500.00 = Rp. 687.50


- Tukang Besi 0.025 Oh x Rp. 41,000.00 = Rp. 1,025.00
- Kepala Tukang 0.0025 Oh x Rp. 43,000.00 = Rp. 107.50
- Mandor 0.0015 Oh x Rp. 45,000.00 = Rp. 67.50
JUMLAH = Rp. 1,887.50

JUMLAH (a) + (b) = Rp. 634,003.50

10 1 m2 pasang bekisting untuk pondasi

a. Bahan

- Kayu terentang 0.040 M3 x Rp. 1,150,000.00 = Rp. 46,000.00


- Paku biasa 2 - 5 " 0.300 Kg x Rp. 13,500.00 = Rp. 4,050.00
- Minyak Bekisting 0.100 Ltr x Rp. 22,000.00 = Rp. 2,200.00
JUMLAH = Rp. 52,250.00
b. Tenaga

- Pekerja 0.300 Oh x Rp. 27,500.00 = Rp. 8,250.00


- Tukang Batu 0.260 Oh x Rp. 41,000.00 = Rp. 10,660.00
- Kepala Tukang 0.026 Oh x Rp. 43,000.00 = Rp. 1,118.00
- Mandor 0.005 Oh x Rp. 45,000.00 = Rp. 225.00
JUMLAH = Rp. 20,253.00

JUMLAH (a) + (b) = Rp. 72,503.00


11 1 m2 pasang bekisting untuk Sloof

a. Bahan

- Kayu terentang 0.045 M3 x Rp. 1,150,000.00 = Rp. 51,750.00


- Paku biasa 2 - 5 " 0.300 Kg x Rp. 13,500.00 = Rp. 4,050.00
- Minyak Bekisting 0.100 Ltr x Rp. 22,000.00 = Rp. 2,200.00
JUMLAH = Rp. 58,000.00

b. Tenaga

- Pekerja 0.300 Oh x Rp. 27,500.00 = Rp. 8,250.00


- Tukang Batu 0.260 Oh x Rp. 41,000.00 = Rp. 10,660.00
- Kepala Tukang 0.026 Oh x Rp. 43,000.00 = Rp. 1,118.00
- Mandor 0.005 Oh x Rp. 45,000.00 = Rp. 225.00
JUMLAH = Rp. 20,253.00

JUMLAH (a) + (b) = Rp. 78,253.00

12 1 m2 pasang bekisting untuk Kolom

a. Bahan

- Kayu terentang 0.040 M3 x Rp. 1,150,000.00 = Rp. 46,000.00


- Paku biasa 2 - 5 " 0.400 Kg x Rp. 13,500.00 = Rp. 5,400.00
- Minyak Bekisting 0.200 Lt x Rp. 22,000.00 = Rp. 4,400.00
- Balok Kayu 0.015 M3 x Rp. 1,150,000.00 = Rp. 17,250.00
- Plywood tebal 9 mm 0.350 Lbr x Rp. 236,500.00 = Rp. 82,775.00
- Dolken kayu galam Ø 8-10 2.000 Btg x Rp. 26,500.00 = Rp. 53,000.00
JUMLAH = Rp. 208,825.00

b. Tenaga

- Pekerja 0.300 Oh x Rp. 27,500.00 = Rp. 8,250.00


- Tukang Batu 0.330 Oh x Rp. 41,000.00 = Rp. 13,530.00
- Kepala Tukang 0.033 Oh x Rp. 43,000.00 = Rp. 1,419.00
- Mandor 0.006 Oh x Rp. 45,000.00 = Rp. 270.00
JUMLAH = Rp. 23,469.00

JUMLAH (a) + (b) = Rp. 232,294.00

13 1 m2 pasang bekisting untuk Balok

a. Bahan

- Kayu terentang 0.040 M3 x Rp. 1,150,000.00 = Rp. 46,000.00


- Paku biasa 2 - 5 " 0.400 Kg x Rp. 13,500.00 = Rp. 5,400.00
- Minyak Bekisting 0.200 Lt x Rp. 22,000.00 = Rp. 4,400.00
- Balok Kayu 0.018 M3 x Rp. 1,150,000.00 = Rp. 20,700.00
- Plywood tebal 9 mm 0.350 Lbr x Rp. 236,500.00 = Rp. 82,775.00
- Dolken kayu galam Ø 8-10 2.000 Btg x Rp. 26,500.00 = Rp. 53,000.00
JUMLAH = Rp. 212,275.00

b. Tenaga
- Pekerja 0.320 Oh x Rp. 27,500.00 = Rp. 8,800.00
- Tukang Batu 0.330 Oh x Rp. 41,000.00 = Rp. 13,530.00
- Kepala Tukang 0.033 Oh x Rp. 43,000.00 = Rp. 1,419.00
- Mandor 0.006 Oh x Rp. 45,000.00 = Rp. 270.00
JUMLAH = Rp. 24,019.00

JUMLAH (a) + (b) = Rp. 236,294.00


14 1 m2 pasang bekisting untuk Lantai

a. Bahan

- Kayu terentang 0.040 M3 x Rp. 1,150,000.00 = Rp. 46,000.00


- Paku biasa 2 - 5 " 0.400 Kg x Rp. 13,500.00 = Rp. 5,400.00
- Minyak Bekisting 0.200 Lt x Rp. 22,000.00 = Rp. 4,400.00
- Balok Kayu 0.015 M3 x Rp. 1,150,000.00 = Rp. 17,250.00
- Plywood tebal 9 mm 0.350 Lbr x Rp. 236,500.00 = Rp. 82,775.00
- Dolken kayu galam Ø 8-10 6.000 Btg x Rp. 26,500.00 = Rp. 159,000.00
JUMLAH = Rp. 314,825.00

b. Tenaga

- Pekerja 0.320 Oh x Rp. 27,500.00 = Rp. 8,800.00


- Tukang Batu 0.330 Oh x Rp. 41,000.00 = Rp. 13,530.00
- Kepala Tukang 0.033 Oh x Rp. 43,000.00 = Rp. 1,419.00
- Mandor 0.006 Oh x Rp. 45,000.00 = Rp. 270.00
JUMLAH = Rp. 24,019.00

JUMLAH (a) + (b) = Rp. 338,844.00

15 1 m2 pasang bekisting untuk Dinding

a. Bahan

- Kayu terentang 0.030 M3 x Rp. 1,150,000.00 = Rp. 34,500.00


- Paku biasa 2 - 5 " 0.400 Kg x Rp. 13,500.00 = Rp. 5,400.00
- Minyak Bekisting 0.200 Lt x Rp. 22,000.00 = Rp. 4,400.00
- Balok Kayu 0.020 M3 x Rp. 1,150,000.00 = Rp. 23,000.00
- Plywood tebal 9 mm 0.350 Lbr x Rp. 236,500.00 = Rp. 82,775.00
- Dolken kayu galam Ø 8-10 3.000 Btg x Rp. 26,500.00 = Rp. 79,500.00
- Spacer/Jarak Bekisting 4.000 Btg x Rp. 26,500.00 = Rp. 106,000.00
JUMLAH = Rp. 335,575.00

b. Tenaga

- Pekerja 0.320 Oh x Rp. 27,500.00 = Rp. 8,800.00


- Tukang Batu 0.330 Oh x Rp. 41,000.00 = Rp. 13,530.00
- Kepala Tukang 0.033 Oh x Rp. 43,000.00 = Rp. 1,419.00
- Mandor 0.006 Oh x Rp. 45,000.00 = Rp. 270.00
JUMLAH = Rp. 24,019.00

JUMLAH (a) + (b) = Rp. 359,594.00

16 1 m2 pasang bekisting untuk Tangga

a. Bahan

- Kayu terentang 0.030 M3 x Rp. 1,150,000.00 = Rp. 34,500.00


- Paku biasa 2 - 5 " 0.400 Kg x Rp. 13,500.00 = Rp. 5,400.00
- Minyak Bekisting 0.150 Lt x Rp. 22,000.00 = Rp. 3,300.00
- Balok Kayu 0.015 M3 x Rp. 1,150,000.00 = Rp. 17,250.00
- Plywood tebal 9 mm 0.350 Lbr x Rp. 236,500.00 = Rp. 82,775.00
- Dolken kayu galam Ø 8-10 2.000 Btg x Rp. 26,500.00 = Rp. 53,000.00
JUMLAH = Rp. 196,225.00

b. Tenaga

- Pekerja 0.320 Oh x Rp. 27,500.00 = Rp. 8,800.00


- Tukang Batu 0.330 Oh x Rp. 41,000.00 = Rp. 13,530.00
- Kepala Tukang 0.033 Oh x Rp. 43,000.00 = Rp. 1,419.00
- Mandor 0.006 Oh x Rp. 45,000.00 = Rp. 270.00
JUMLAH = Rp. 24,019.00

JUMLAH (a) + (b) = Rp. 220,244.00


17 1 m3 Membuat beton dengan mutu K 225

a. Bahan

- Semen Portland 388.000 Kg x Rp. 1,100.00 = Rp. 426,800.00


- Pasir Beton 0.650 M3 x Rp. 200,000.00 = Rp. 130,000.00
- Koral Beton 0.650 M3 x Rp. 195,000.00 = Rp. 126,750.00
JUMLAH = Rp. 683,550.00

b. Tenaga

- Pekerja 6.000 Oh x Rp. 27,500.00 = Rp. 165,000.00


- Tukang Batu 1.000 Oh x Rp. 41,000.00 = Rp. 41,000.00
- Kepala Tukang 0.100 Oh x Rp. 43,000.00 = Rp. 4,300.00
- Mandor 0.300 Oh x Rp. 45,000.00 = Rp. 13,500.00
JUMLAH = Rp. 223,800.00

JUMLAH (a) + (b) = Rp. 907,350.00

18 1 m3 Membuat beton dengan mutu K 275

a. Bahan

- Semen Portland 400.000 Kg x Rp. 1,100.00 = Rp. 440,000.00


- Pasir Beton 0.400 M3 x Rp. 200,000.00 = Rp. 80,000.00
- Koral Beton 0.820 M3 x Rp. 195,000.00 = Rp. 159,900.00
JUMLAH = Rp. 679,900.00

b. Tenaga

- Pekerja 6.000 Oh x Rp. 27,500.00 = Rp. 165,000.00


- Tukang Batu 1.000 Oh x Rp. 41,000.00 = Rp. 41,000.00
- Kepala Tukang 0.100 Oh x Rp. 43,000.00 = Rp. 4,300.00
- Mandor 0.300 Oh x Rp. 45,000.00 = Rp. 13,500.00
JUMLAH = Rp. 223,800.00

JUMLAH (a) + (b) = Rp. 903,700.00


19 1 m3 Membuat pondasi beton bertulang ( 150 kg besi + bekisting )

a. Bahan

- Kayu Terentang 0.200 M3 x Rp. 1,150,000.00 = Rp. 230,000.00


- Paku biasa 2" - 5" 1.500 Kg x Rp. 13,500.00 = Rp. 20,250.00
- Minyak bekisting 0.400 Lt x Rp. 22,000.00 = Rp. 8,800.00
- Besi Beton Polos 150.000 Kg x Rp. 11,000.00 = Rp. 1,650,000.00
- Kawat Beton 2.250 Kg x Rp. 18,400.00 = Rp. 41,400.00
- Semen Portland 323.000 Kg x Rp. 1,100.00 = Rp. 355,300.00
- Pasir Beton 0.520 M3 x Rp. 200,000.00 = Rp. 104,000.00
- Koral Beton 0.780 M3 x Rp. 195,000.00 = Rp. 152,100.00
JUMLAH = Rp. 2,561,850.00

b. Tenaga

- Pekerja 3.900 Oh x Rp. 27,500.00 = Rp. 107,250.00


- Tukang Batu 0.350 Oh x Rp. 41,000.00 = Rp. 14,350.00
- Tukang kayu 1.040 Oh x Rp. 41,000.00 = Rp. 42,640.00
- Tukang besi 1.050 Oh x Rp. 41,000.00 = Rp. 43,050.00
- Kepala Tukang 0.245 Oh x Rp. 43,000.00 = Rp. 10,535.00
- Mandor 0.165 Oh x Rp. 45,000.00 = Rp. 7,425.00
JUMLAH = Rp. 225,250.00

JUMLAH (a) + (b) = Rp. 2,787,100.00


20 1 m3 Membuat pondasi beton bertulang ( 200 kg besi + bekisting )

a. Bahan

- Kayu Terentang 0.200 M3 x Rp. 1,150,000.00 = Rp. 230,000.00


- Paku biasa 2" - 5" 1.500 Kg x Rp. 13,500.00 = Rp. 20,250.00
- Minyak bekisting 0.400 Lt x Rp. 22,000.00 = Rp. 8,800.00
- Besi Beton Polos 200.000 Kg x Rp. 11,000.00 = Rp. 2,200,000.00
- Kawat Beton 2.500 Kg x Rp. 18,400.00 = Rp. 46,000.00
- Semen Portland 323.000 Kg x Rp. 1,100.00 = Rp. 355,300.00
- Pasir Beton 0.520 M3 x Rp. 200,000.00 = Rp. 104,000.00
- Koral Beton 0.780 M3 x Rp. 195,000.00 = Rp. 152,100.00
JUMLAH = Rp. 3,116,450.00

b. Tenaga

- Pekerja 3.900 Oh x Rp. 27,500.00 = Rp. 107,250.00


- Tukang Batu 0.350 Oh x Rp. 41,000.00 = Rp. 14,350.00
- Tukang kayu 1.040 Oh x Rp. 41,000.00 = Rp. 42,640.00
- Tukang besi 1.050 Oh x Rp. 41,000.00 = Rp. 43,050.00
- Kepala Tukang 0.245 Oh x Rp. 43,000.00 = Rp. 10,535.00
- Mandor 0.165 Oh x Rp. 45,000.00 = Rp. 7,425.00
JUMLAH = Rp. 225,250.00

JUMLAH (a) + (b) = Rp. 3,341,700.00

21 1 m3 Membuat pondasi beton bertulang ( 250 kg besi + bekisting )

a. Bahan

- Kayu Terentang 0.200 M3 x Rp. 1,150,000.00 = Rp. 230,000.00


- Paku biasa 2" - 5" 1.500 Kg x Rp. 13,500.00 = Rp. 20,250.00
- Minyak bekisting 0.400 Lt x Rp. 22,000.00 = Rp. 8,800.00
- Besi Beton Polos 250.000 Kg x Rp. 11,000.00 = Rp. 2,750,000.00
- Kawat Beton 3.000 Kg x Rp. 18,400.00 = Rp. 55,200.00
- Semen Portland 323.000 Kg x Rp. 1,100.00 = Rp. 355,300.00
- Pasir Beton 0.520 M3 x Rp. 200,000.00 = Rp. 104,000.00
- Koral Beton 0.780 M3 x Rp. 195,000.00 = Rp. 152,100.00
JUMLAH = Rp. 3,675,650.00

b. Tenaga

- Pekerja 3.900 Oh x Rp. 27,500.00 = Rp. 107,250.00


- Tukang Batu 0.350 Oh x Rp. 41,000.00 = Rp. 14,350.00
- Tukang kayu 1.040 Oh x Rp. 41,000.00 = Rp. 42,640.00
- Tukang besi 1.050 Oh x Rp. 41,000.00 = Rp. 43,050.00
- Kepala Tukang 0.245 Oh x Rp. 43,000.00 = Rp. 10,535.00
- Mandor 0.165 Oh x Rp. 45,000.00 = Rp. 7,425.00
JUMLAH = Rp. 225,250.00

JUMLAH (a) + (b) = Rp. 3,900,900.00


22 1 m3 Membuat Sloof beton bertulang ( 200 kg besi + bekisting )

a. Bahan

- Kayu Terentang 0.270 M3 x Rp. 1,150,000.00 = Rp. 310,500.00


- Paku biasa 2" - 5" 2.000 Kg x Rp. 13,500.00 = Rp. 27,000.00
- Minyak bekisting 0.600 Lt x Rp. 22,000.00 = Rp. 13,200.00
- Besi Beton Polos 200.000 Kg x Rp. 11,000.00 = Rp. 2,200,000.00
- Kawat Beton 3.000 Kg x Rp. 18,400.00 = Rp. 55,200.00
- Semen Portland 323.000 Kg x Rp. 1,100.00 = Rp. 355,300.00
- Pasir Beton 0.520 M3 x Rp. 200,000.00 = Rp. 104,000.00
- Koral Beton 0.780 M3 x Rp. 195,000.00 = Rp. 152,100.00
JUMLAH = Rp. 3,217,300.00

b. Tenaga

- Pekerja 4.850 Oh x Rp. 27,500.00 = Rp. 133,375.00


- Tukang Batu 0.350 Oh x Rp. 41,000.00 = Rp. 14,350.00
- Tukang kayu 1.560 Oh x Rp. 41,000.00 = Rp. 63,960.00
- Tukang besi 1.400 Oh x Rp. 41,000.00 = Rp. 57,400.00
- Kepala Tukang 0.331 Oh x Rp. 43,000.00 = Rp. 14,233.00
- Mandor 0.170 Oh x Rp. 45,000.00 = Rp. 7,650.00
JUMLAH = Rp. 290,968.00

JUMLAH (a) + (b) = Rp. 3,508,268.00

23 1 m3 Membuat Sloof beton bertulang ( 250 kg besi + bekisting )

a. Bahan

- Kayu Terentang 0.270 M3 x Rp. 1,150,000.00 = Rp. 310,500.00


- Paku biasa 2" - 5" 2.000 Kg x Rp. 13,500.00 = Rp. 27,000.00
- Minyak bekisting 0.600 Lt x Rp. 22,000.00 = Rp. 13,200.00
- Besi Beton Polos 250.000 Kg x Rp. 11,000.00 = Rp. 2,750,000.00
- Kawat Beton 3.250 Kg x Rp. 18,400.00 = Rp. 59,800.00
- Semen Portland 323.000 Kg x Rp. 1,100.00 = Rp. 355,300.00
- Pasir Beton 0.520 M3 x Rp. 200,000.00 = Rp. 104,000.00
- Koral Beton 0.780 M3 x Rp. 195,000.00 = Rp. 152,100.00
JUMLAH = Rp. 3,771,900.00

b. Tenaga

- Pekerja 4.850 Oh x Rp. 27,500.00 = Rp. 133,375.00


- Tukang Batu 0.350 Oh x Rp. 41,000.00 = Rp. 14,350.00
- Tukang kayu 1.560 Oh x Rp. 41,000.00 = Rp. 63,960.00
- Tukang besi 1.400 Oh x Rp. 41,000.00 = Rp. 57,400.00
- Kepala Tukang 0.331 Oh x Rp. 43,000.00 = Rp. 14,233.00
- Mandor 0.170 Oh x Rp. 45,000.00 = Rp. 7,650.00
JUMLAH = Rp. 290,968.00

JUMLAH (a) + (b) = Rp. 4,062,868.00


24 1 m3 Membuat Kolom beton bertulang ( 300 kg besi + bekisting )

a. Bahan

- Kayu Terentang 0.400 M3 x Rp. 1,150,000.00 = Rp. 460,000.00


- Paku biasa 2" - 5" 4.000 Kg x Rp. 13,500.00 = Rp. 54,000.00
- Minyak bekisting 2.000 Lt x Rp. 22,000.00 = Rp. 44,000.00
- Besi Beton Polos 300.000 Kg x Rp. 11,000.00 = Rp. 3,300,000.00
- Kawat Beton 4.500 Kg x Rp. 18,400.00 = Rp. 82,800.00
- Semen Portland 323.000 Kg x Rp. 1,100.00 = Rp. 355,300.00
- Pasir Beton 0.520 M3 x Rp. 200,000.00 = Rp. 104,000.00
- Koral Beton 0.780 M3 x Rp. 195,000.00 = Rp. 152,100.00
- Kayu Balok 0.150 M3 x Rp. 1,150,000.00 = Rp. 172,500.00
- Plywood 9 mm 3.500 Lbr x Rp. 71,300.00 = Rp. 249,550.00
- Dolken kayu galam Ø 8-10 26.000 Btg x Rp. 26,500.00 = Rp. 689,000.00
JUMLAH = Rp. 5,663,250.00

b. Tenaga

- Pekerja 7.300 Oh x Rp. 27,500.00 = Rp. 200,750.00


- Tukang Batu 0.350 Oh x Rp. 41,000.00 = Rp. 14,350.00
- Tukang kayu 3.300 Oh x Rp. 41,000.00 = Rp. 135,300.00
- Tukang besi 2.100 Oh x Rp. 41,000.00 = Rp. 86,100.00
- Kepala Tukang 0.750 Oh x Rp. 43,000.00 = Rp. 32,250.00
- Mandor 0.250 Oh x Rp. 45,000.00 = Rp. 11,250.00
JUMLAH = Rp. 480,000.00

JUMLAH (a) + (b) = Rp. 6,143,250.00

25 1 m3 Membuat Kolom beton bertulang ( 250 kg besi + bekisting )

a. Bahan

- Kayu Terentang 0.400 M3 x Rp. 1,150,000.00 = Rp. 460,000.00


- Paku biasa 2" - 5" 4.000 Kg x Rp. 13,500.00 = Rp. 54,000.00
- Minyak bekisting 2.000 Lt x Rp. 22,000.00 = Rp. 44,000.00
- Besi Beton Polos 250.000 Kg x Rp. 11,000.00 = Rp. 2,750,000.00
- Kawat Beton 4.250 Kg x Rp. 18,400.00 = Rp. 78,200.00
- Semen Portland 323.000 Kg x Rp. 1,100.00 = Rp. 355,300.00
- Pasir Beton 0.520 M3 x Rp. 200,000.00 = Rp. 104,000.00
- Koral Beton 0.780 M3 x Rp. 195,000.00 = Rp. 152,100.00
- Kayu Balok 0.130 M3 x Rp. 1,150,000.00 = Rp. 149,500.00
- Plywood 9 mm 3.500 Lbr x Rp. 71,300.00 = Rp. 249,550.00
- Dolken kayu galam Ø 8-10 24.000 Btg x Rp. 26,500.00 = Rp. 636,000.00
JUMLAH = Rp. 5,032,650.00

b. Tenaga

- Pekerja 7.200 Oh x Rp. 27,500.00 = Rp. 198,000.00


- Tukang Batu 0.350 Oh x Rp. 41,000.00 = Rp. 14,350.00
- Tukang kayu 3.300 Oh x Rp. 41,000.00 = Rp. 135,300.00
- Tukang besi 2.000 Oh x Rp. 41,000.00 = Rp. 82,000.00
- Kepala Tukang 0.650 Oh x Rp. 43,000.00 = Rp. 27,950.00
- Mandor 0.240 Oh x Rp. 45,000.00 = Rp. 10,800.00
JUMLAH = Rp. 468,400.00

JUMLAH (a) + (b) = Rp. 5,501,050.00


26 1 m3 Membuat Kolom beton bertulang ( 200 kg besi + bekisting )

a. Bahan

- Kayu Terentang 0.400 M3 x Rp. 1,150,000.00 = Rp. 460,000.00


- Paku biasa 2" - 5" 4.000 Kg x Rp. 13,500.00 = Rp. 54,000.00
- Minyak bekisting 2.000 Lt x Rp. 22,000.00 = Rp. 44,000.00
- Besi Beton Polos 200.000 Kg x Rp. 11,000.00 = Rp. 2,200,000.00
- Kawat Beton 4.000 Kg x Rp. 18,400.00 = Rp. 73,600.00
- Semen Portland 323.000 Kg x Rp. 1,100.00 = Rp. 355,300.00
- Pasir Beton 0.520 M3 x Rp. 200,000.00 = Rp. 104,000.00
- Koral Beton 0.780 M3 x Rp. 195,000.00 = Rp. 152,100.00
- Kayu Balok 0.110 M3 x Rp. 1,150,000.00 = Rp. 126,500.00
- Plywood 9 mm 3.500 Lbr x Rp. 71,300.00 = Rp. 249,550.00
- Dolken kayu galam Ø 8-10 22.000 Btg x Rp. 26,500.00 = Rp. 583,000.00
JUMLAH = Rp. 4,402,050.00

b. Tenaga

- Pekerja 7.100 Oh x Rp. 27,500.00 = Rp. 195,250.00


- Tukang Batu 0.350 Oh x Rp. 41,000.00 = Rp. 14,350.00
- Tukang kayu 3.300 Oh x Rp. 41,000.00 = Rp. 135,300.00
- Tukang besi 1.900 Oh x Rp. 41,000.00 = Rp. 77,900.00
- Kepala Tukang 0.550 Oh x Rp. 43,000.00 = Rp. 23,650.00
- Mandor 0.230 Oh x Rp. 45,000.00 = Rp. 10,350.00
JUMLAH = Rp. 456,800.00

JUMLAH (a) + (b) = Rp. 4,858,850.00

27 1 m3 Membuat Kolom beton bertulang ( 180 kg besi + bekisting )

a. Bahan

- Kayu Terentang 0.400 M3 x Rp. 1,150,000.00 = Rp. 460,000.00


- Paku biasa 2" - 5" 4.000 Kg x Rp. 13,500.00 = Rp. 54,000.00
- Minyak bekisting 2.000 Lt x Rp. 22,000.00 = Rp. 44,000.00
- Besi Beton Polos 180.000 Kg x Rp. 11,000.00 = Rp. 1,980,000.00
- Kawat Beton 3.900 Kg x Rp. 18,400.00 = Rp. 71,760.00
- Semen Portland 323.000 Kg x Rp. 1,100.00 = Rp. 355,300.00
- Pasir Beton 0.520 M3 x Rp. 200,000.00 = Rp. 104,000.00
- Koral Beton 0.780 M3 x Rp. 195,000.00 = Rp. 152,100.00
- Kayu Balok 0.102 M3 x Rp. 1,150,000.00 = Rp. 117,300.00
- Plywood 9 mm 3.500 Lbr x Rp. 71,300.00 = Rp. 249,550.00
- Dolken kayu galam Ø 8-10 21.200 Btg x Rp. 26,500.00 = Rp. 561,800.00
JUMLAH = Rp. 4,149,810.00

b. Tenaga

- Pekerja 7.060 Oh x Rp. 27,500.00 = Rp. 194,150.00


- Tukang Batu 0.350 Oh x Rp. 41,000.00 = Rp. 14,350.00
- Tukang kayu 3.300 Oh x Rp. 41,000.00 = Rp. 135,300.00
- Tukang besi 1.860 Oh x Rp. 41,000.00 = Rp. 76,260.00
- Kepala Tukang 0.510 Oh x Rp. 43,000.00 = Rp. 21,930.00
- Mandor 0.226 Oh x Rp. 45,000.00 = Rp. 10,170.00
JUMLAH = Rp. 452,160.00
JUMLAH (a) + (b) = Rp. 4,601,970.00
28 1 m3 Membuat Kolom beton bertulang ( 160 kg besi + bekisting )

a. Bahan

- Kayu Terentang 0.400 M3 x Rp. 1,150,000.00 = Rp. 460,000.00


- Paku biasa 2" - 5" 4.000 Kg x Rp. 13,500.00 = Rp. 54,000.00
- Minyak bekisting 2.000 Lt x Rp. 22,000.00 = Rp. 44,000.00
- Besi Beton Polos 160.000 Kg x Rp. 11,000.00 = Rp. 1,760,000.00
- Kawat Beton 3.800 Kg x Rp. 18,400.00 = Rp. 69,920.00
- Semen Portland 323.000 Kg x Rp. 1,100.00 = Rp. 355,300.00
- Pasir Beton 0.520 M3 x Rp. 200,000.00 = Rp. 104,000.00
- Koral Beton 0.780 M3 x Rp. 195,000.00 = Rp. 152,100.00
- Kayu Balok 0.094 M3 x Rp. 1,150,000.00 = Rp. 108,100.00
- Plywood 9 mm 3.500 Lbr x Rp. 71,300.00 = Rp. 249,550.00
- Dolken kayu galam Ø 8-10 20.400 Btg x Rp. 26,500.00 = Rp. 540,600.00
JUMLAH = Rp. 3,897,570.00

b. Tenaga

- Pekerja 7.020 Oh x Rp. 27,500.00 = Rp. 193,050.00


- Tukang Batu 0.350 Oh x Rp. 41,000.00 = Rp. 14,350.00
- Tukang kayu 3.300 Oh x Rp. 41,000.00 = Rp. 135,300.00
- Tukang besi 1.820 Oh x Rp. 41,000.00 = Rp. 74,620.00
- Kepala Tukang 0.470 Oh x Rp. 43,000.00 = Rp. 20,210.00
- Mandor 0.222 Oh x Rp. 45,000.00 = Rp. 9,990.00
JUMLAH = Rp. 447,520.00

JUMLAH (a) + (b) = Rp. 4,345,090.00

29 1 m3 Membuat Kolom beton bertulang ( 150 kg besi + bekisting )

a. Bahan

- Kayu Terentang 0.400 M3 x Rp. 1,150,000.00 = Rp. 460,000.00


- Paku biasa 2" - 5" 4.000 Kg x Rp. 13,500.00 = Rp. 54,000.00
- Minyak bekisting 2.000 Lt x Rp. 22,000.00 = Rp. 44,000.00
- Besi Beton Polos 150.000 Kg x Rp. 11,000.00 = Rp. 1,650,000.00
- Kawat Beton 3.750 Kg x Rp. 18,400.00 = Rp. 69,000.00
- Semen Portland 323.000 Kg x Rp. 1,100.00 = Rp. 355,300.00
- Pasir Beton 0.520 M3 x Rp. 200,000.00 = Rp. 104,000.00
- Koral Beton 0.780 M3 x Rp. 195,000.00 = Rp. 152,100.00
- Kayu Balok 0.090 M3 x Rp. 1,150,000.00 = Rp. 103,500.00
- Plywood 9 mm 3.500 Lbr x Rp. 71,300.00 = Rp. 249,550.00
- Dolken kayu galam Ø 8-10 20.000 Btg x Rp. 26,500.00 = Rp. 530,000.00
JUMLAH = Rp. 3,771,450.00

b. Tenaga

- Pekerja 7.000 Oh x Rp. 27,500.00 = Rp. 192,500.00


- Tukang Batu 0.350 Oh x Rp. 41,000.00 = Rp. 14,350.00
- Tukang kayu 3.300 Oh x Rp. 41,000.00 = Rp. 135,300.00
- Tukang besi 1.800 Oh x Rp. 41,000.00 = Rp. 73,800.00
- Kepala Tukang 0.450 Oh x Rp. 43,000.00 = Rp. 19,350.00
- Mandor 0.220 Oh x Rp. 45,000.00 = Rp. 9,900.00
JUMLAH = Rp. 445,200.00
JUMLAH (a) + (b) = Rp. 4,216,650.00
30 1 m3 Membuat Balok beton bertulang ( 300 kg besi + bekisting )

a. Bahan

- Kayu Terentang 0.320 M3 x Rp. 1,150,000.00 = Rp. 368,000.00


- Paku biasa 2" - 5" 3.200 Kg x Rp. 13,500.00 = Rp. 43,200.00
- Minyak bekisting 1.600 Lt x Rp. 22,000.00 = Rp. 35,200.00
- Besi Beton Polos 300.000 Kg x Rp. 11,000.00 = Rp. 3,300,000.00
- Kawat Beton 4.500 Kg x Rp. 18,400.00 = Rp. 82,800.00
- Semen Portland 323.000 Kg x Rp. 1,100.00 = Rp. 355,300.00
- Pasir Beton 0.520 M3 x Rp. 200,000.00 = Rp. 104,000.00
- Koral Beton 0.780 M3 x Rp. 195,000.00 = Rp. 152,100.00
- Kayu Balok 0.180 M3 x Rp. 1,150,000.00 = Rp. 207,000.00
- Plywood 9 mm 2.800 Lbr x Rp. 71,300.00 = Rp. 199,640.00
- Dolken kayu galam Ø 8-10 64.000 Btg x Rp. 26,500.00 = Rp. 1,696,000.00
JUMLAH = Rp. 6,543,240.00

b. Tenaga

- Pekerja 6.280 Oh x Rp. 27,500.00 = Rp. 172,700.00


- Tukang Batu 0.350 Oh x Rp. 41,000.00 = Rp. 14,350.00
- Tukang kayu 2.800 Oh x Rp. 41,000.00 = Rp. 114,800.00
- Tukang besi 2.100 Oh x Rp. 41,000.00 = Rp. 86,100.00
- Kepala Tukang 0.525 Oh x Rp. 43,000.00 = Rp. 22,575.00
- Mandor 0.254 Oh x Rp. 45,000.00 = Rp. 11,430.00
JUMLAH = Rp. 421,955.00

JUMLAH (a) + (b) = Rp. 6,965,195.00

31 1 m3 Membuat Balok beton bertulang ( 250 kg besi + bekisting )

a. Bahan

- Kayu Terentang 0.320 M3 x Rp. 1,150,000.00 = Rp. 368,000.00


- Paku biasa 2" - 5" 3.200 Kg x Rp. 13,500.00 = Rp. 43,200.00
- Minyak bekisting 1.600 Lt x Rp. 22,000.00 = Rp. 35,200.00
- Besi Beton Polos 250.000 Kg x Rp. 11,000.00 = Rp. 2,750,000.00
- Kawat Beton 3.750 Kg x Rp. 18,400.00 = Rp. 69,000.00
- Semen Portland 323.000 Kg x Rp. 1,100.00 = Rp. 355,300.00
- Pasir Beton 0.520 M3 x Rp. 200,000.00 = Rp. 104,000.00
- Koral Beton 0.780 M3 x Rp. 195,000.00 = Rp. 152,100.00
- Kayu Balok 0.160 M3 x Rp. 1,150,000.00 = Rp. 184,000.00
- Plywood 9 mm 2.800 Lbr x Rp. 71,300.00 = Rp. 199,640.00
- Dolken kayu galam Ø 8-10 48.000 Btg x Rp. 26,500.00 = Rp. 1,272,000.00
JUMLAH = Rp. 5,532,440.00

b. Tenaga

- Pekerja 6.120 Oh x Rp. 27,500.00 = Rp. 168,300.00


- Tukang Batu 0.350 Oh x Rp. 41,000.00 = Rp. 14,350.00
- Tukang kayu 2.800 Oh x Rp. 41,000.00 = Rp. 114,800.00
- Tukang besi 1.750 Oh x Rp. 41,000.00 = Rp. 71,750.00
- Kepala Tukang 0.490 Oh x Rp. 43,000.00 = Rp. 21,070.00
- Mandor 0.231 Oh x Rp. 45,000.00 = Rp. 10,395.00
JUMLAH = Rp. 400,665.00

JUMLAH (a) + (b) = Rp. 5,933,105.00


32 1 m3 Membuat Balok beton bertulang ( 200 kg besi + bekisting )

a. Bahan

- Kayu Terentang 0.320 M3 x Rp. 1,150,000.00 = Rp. 368,000.00


- Paku biasa 2" - 5" 3.200 Kg x Rp. 13,500.00 = Rp. 43,200.00
- Minyak bekisting 1.600 Lt x Rp. 22,000.00 = Rp. 35,200.00
- Besi Beton Polos 200.000 Kg x Rp. 11,000.00 = Rp. 2,200,000.00
- Kawat Beton 3.000 Kg x Rp. 18,400.00 = Rp. 55,200.00
- Semen Portland 323.000 Kg x Rp. 1,100.00 = Rp. 355,300.00
- Pasir Beton 0.520 M3 x Rp. 200,000.00 = Rp. 104,000.00
- Koral Beton 0.780 M3 x Rp. 195,000.00 = Rp. 152,100.00
- Kayu Balok 0.140 M3 x Rp. 1,150,000.00 = Rp. 161,000.00
- Plywood 9 mm 2.800 Lbr x Rp. 71,300.00 = Rp. 199,640.00
- Dolken kayu galam Ø 8-10 32.000 Btg x Rp. 26,500.00 = Rp. 848,000.00
JUMLAH = Rp. 4,521,640.00

b. Tenaga

- Pekerja 5.960 Oh x Rp. 27,500.00 = Rp. 163,900.00


- Tukang Batu 0.350 Oh x Rp. 41,000.00 = Rp. 14,350.00
- Tukang kayu 2.800 Oh x Rp. 41,000.00 = Rp. 114,800.00
- Tukang besi 1.400 Oh x Rp. 41,000.00 = Rp. 57,400.00
- Kepala Tukang 0.455 Oh x Rp. 43,000.00 = Rp. 19,565.00
- Mandor 0.208 Oh x Rp. 45,000.00 = Rp. 9,360.00
JUMLAH = Rp. 379,375.00

JUMLAH (a) + (b) = Rp. 4,901,015.00

33 1 m3 Membuat Balok beton bertulang ( 180 kg besi + bekisting )

a. Bahan

- Kayu Terentang 0.320 M3 x Rp. 1,150,000.00 = Rp. 368,000.00


- Paku biasa 2" - 5" 3.200 Kg x Rp. 13,500.00 = Rp. 43,200.00
- Minyak bekisting 1.600 Lt x Rp. 22,000.00 = Rp. 35,200.00
- Besi Beton Polos 180.000 Kg x Rp. 11,000.00 = Rp. 1,980,000.00
- Kawat Beton 2.700 Kg x Rp. 18,400.00 = Rp. 49,680.00
- Semen Portland 323.000 Kg x Rp. 1,100.00 = Rp. 355,300.00
- Pasir Beton 0.520 M3 x Rp. 200,000.00 = Rp. 104,000.00
- Koral Beton 0.780 M3 x Rp. 195,000.00 = Rp. 152,100.00
- Kayu Balok 0.132 M3 x Rp. 1,150,000.00 = Rp. 151,800.00
- Plywood 9 mm 2.800 Lbr x Rp. 71,300.00 = Rp. 199,640.00
- Dolken kayu galam Ø 8-10 25.600 Btg x Rp. 26,500.00 = Rp. 678,400.00
JUMLAH = Rp. 4,117,320.00

b. Tenaga

- Pekerja 5.896 Oh x Rp. 27,500.00 = Rp. 162,140.00


- Tukang Batu 0.350 Oh x Rp. 41,000.00 = Rp. 14,350.00
- Tukang kayu 2.800 Oh x Rp. 41,000.00 = Rp. 114,800.00
- Tukang besi 1.260 Oh x Rp. 41,000.00 = Rp. 51,660.00
- Kepala Tukang 0.441 Oh x Rp. 43,000.00 = Rp. 18,963.00
- Mandor 0.199 Oh x Rp. 45,000.00 = Rp. 8,955.00
JUMLAH = Rp. 370,868.00
JUMLAH (a) + (b) = Rp. 4,488,188.00
34 1 m3 Membuat Balok beton bertulang ( 150 kg besi + bekisting )

a. Bahan

- Kayu Terentang 0.320 M3 x Rp. 1,150,000.00 = Rp. 368,000.00


- Paku biasa 2" - 5" 3.200 Kg x Rp. 13,500.00 = Rp. 43,200.00
- Minyak bekisting 1.600 Lt x Rp. 22,000.00 = Rp. 35,200.00
- Besi Beton Polos 150.000 Kg x Rp. 11,000.00 = Rp. 1,650,000.00
- Kawat Beton 2.250 Kg x Rp. 18,400.00 = Rp. 41,400.00
- Semen Portland 323.000 Kg x Rp. 1,100.00 = Rp. 355,300.00
- Pasir Beton 0.520 M3 x Rp. 200,000.00 = Rp. 104,000.00
- Koral Beton 0.780 M3 x Rp. 195,000.00 = Rp. 152,100.00
- Kayu Balok 0.120 M3 x Rp. 1,150,000.00 = Rp. 138,000.00
- Plywood 9 mm 2.800 Lbr x Rp. 71,300.00 = Rp. 199,640.00
- Dolken kayu galam Ø 8-10 16.000 Btg x Rp. 26,500.00 = Rp. 424,000.00
JUMLAH = Rp. 3,510,840.00

b. Tenaga

- Pekerja 5.800 Oh x Rp. 27,500.00 = Rp. 159,500.00


- Tukang Batu 0.350 Oh x Rp. 41,000.00 = Rp. 14,350.00
- Tukang kayu 2.800 Oh x Rp. 41,000.00 = Rp. 114,800.00
- Tukang besi 1.050 Oh x Rp. 41,000.00 = Rp. 43,050.00
- Kepala Tukang 0.420 Oh x Rp. 43,000.00 = Rp. 18,060.00
- Mandor 0.185 Oh x Rp. 45,000.00 = Rp. 8,325.00
JUMLAH = Rp. 358,085.00

JUMLAH (a) + (b) = Rp. 3,868,925.00

35 1 m3 Membuat Dinding beton bertulang ( 150 kg besi + bekisting )

a. Bahan

- Kayu Terentang 0.240 M3 x Rp. 1,150,000.00 = Rp. 276,000.00


- Paku biasa 2" - 5" 3.200 Kg x Rp. 13,500.00 = Rp. 43,200.00
- Minyak bekisting 1.600 Lt x Rp. 22,000.00 = Rp. 35,200.00
- Besi Beton Polos 150.000 Kg x Rp. 11,000.00 = Rp. 1,650,000.00
- Kawat Beton 2.250 Kg x Rp. 18,400.00 = Rp. 41,400.00
- Semen Portland 323.000 Kg x Rp. 1,100.00 = Rp. 355,300.00
- Pasir Beton 0.520 M3 x Rp. 200,000.00 = Rp. 104,000.00
- Koral Beton 0.780 M3 x Rp. 195,000.00 = Rp. 152,100.00
- Kayu Balok 0.160 M3 x Rp. 1,150,000.00 = Rp. 184,000.00
- Plywood 9 mm 2.800 Lbr x Rp. 71,300.00 = Rp. 199,640.00
- Dolken kayu galam Ø 8-10 24.000 Btg x Rp. 26,500.00 = Rp. 636,000.00
JUMLAH = Rp. 3,676,840.00

b. Tenaga

- Pekerja 5.600 Oh x Rp. 27,500.00 = Rp. 154,000.00


- Tukang Batu 0.350 Oh x Rp. 41,000.00 = Rp. 14,350.00
- Tukang kayu 2.640 Oh x Rp. 41,000.00 = Rp. 108,240.00
- Tukang besi 1.050 Oh x Rp. 41,000.00 = Rp. 43,050.00
- Kepala Tukang 0.400 Oh x Rp. 43,000.00 = Rp. 17,200.00
- Mandor 0.193 Oh x Rp. 45,000.00 = Rp. 8,685.00
JUMLAH = Rp. 345,525.00
JUMLAH (a) + (b) = Rp. 4,022,365.00
36 1 m3 Membuat Plat beton bertulang ( 120 kg besi + bekisting )

a. Bahan

- Kayu Terentang 0.240 M3 x Rp. 1,150,000.00 = Rp. 276,000.00


- Paku biasa 2" - 5" 3.200 Kg x Rp. 13,500.00 = Rp. 43,200.00
- Minyak bekisting 1.600 Lt x Rp. 22,000.00 = Rp. 35,200.00
- Besi Beton Polos 120.000 Kg x Rp. 11,000.00 = Rp. 1,320,000.00
- Kawat Beton 2.250 Kg x Rp. 18,400.00 = Rp. 41,400.00
- Semen Portland 323.000 Kg x Rp. 1,100.00 = Rp. 355,300.00
- Pasir Beton 0.520 M3 x Rp. 200,000.00 = Rp. 104,000.00
- Koral Beton 0.780 M3 x Rp. 195,000.00 = Rp. 152,100.00
- Kayu Balok 0.160 M3 x Rp. 1,150,000.00 = Rp. 184,000.00
- Plywood 9 mm 2.800 Lbr x Rp. 71,300.00 = Rp. 199,640.00
- Dolken kayu galam Ø 8-10 20.000 Btg x Rp. 26,500.00 = Rp. 530,000.00
JUMLAH = Rp. 3,240,840.00

b. Tenaga

- Pekerja 5.600 Oh x Rp. 27,500.00 = Rp. 154,000.00


- Tukang Batu 0.350 Oh x Rp. 41,000.00 = Rp. 14,350.00
- Tukang kayu 2.640 Oh x Rp. 41,000.00 = Rp. 108,240.00
- Tukang besi 1.050 Oh x Rp. 41,000.00 = Rp. 43,050.00
- Kepala Tukang 0.400 Oh x Rp. 43,000.00 = Rp. 17,200.00
- Mandor 0.193 Oh x Rp. 45,000.00 = Rp. 8,685.00
JUMLAH = Rp. 345,525.00

JUMLAH (a) + (b) = Rp. 3,586,365.00

37 1 m3 Membuat Plat beton bertulang ( 150 kg besi + bekisting )

a. Bahan

- Kayu Terentang 0.240 M3 x Rp. 1,150,000.00 = Rp. 276,000.00


- Paku biasa 2" - 5" 3.200 Kg x Rp. 13,500.00 = Rp. 43,200.00
- Minyak bekisting 1.600 Lt x Rp. 22,000.00 = Rp. 35,200.00
- Besi Beton Polos 150.000 Kg x Rp. 11,000.00 = Rp. 1,650,000.00
- Kawat Beton 2.250 Kg x Rp. 18,400.00 = Rp. 41,400.00
- Semen Portland 323.000 Kg x Rp. 1,100.00 = Rp. 355,300.00
- Pasir Beton 0.520 M3 x Rp. 200,000.00 = Rp. 104,000.00
- Koral Beton 0.780 M3 x Rp. 195,000.00 = Rp. 152,100.00
- Kayu Balok 0.160 M3 x Rp. 1,150,000.00 = Rp. 184,000.00
- Plywood 9 mm 2.800 Lbr x Rp. 71,300.00 = Rp. 199,640.00
- Dolken kayu galam Ø 8-10 24.000 Btg x Rp. 26,500.00 = Rp. 636,000.00
JUMLAH = Rp. 3,676,840.00

b. Tenaga

- Pekerja 5.600 Oh x Rp. 27,500.00 = Rp. 154,000.00


- Tukang Batu 0.350 Oh x Rp. 41,000.00 = Rp. 14,350.00
- Tukang kayu 2.640 Oh x Rp. 41,000.00 = Rp. 108,240.00
- Tukang besi 1.050 Oh x Rp. 41,000.00 = Rp. 43,050.00
- Kepala Tukang 0.400 Oh x Rp. 43,000.00 = Rp. 17,200.00
- Mandor 0.193 Oh x Rp. 45,000.00 = Rp. 8,685.00
JUMLAH = Rp. 345,525.00
JUMLAH (a) + (b) = Rp. 4,022,365.00
38 1 m3 Membuat Tangga beton bertulang ( 200 kg besi + bekisting )

a. Bahan

- Kayu Terentang 0.250 M3 x Rp. 1,150,000.00 = Rp. 287,500.00


- Paku biasa 2" - 5" 3.000 Kg x Rp. 13,500.00 = Rp. 40,500.00
- Minyak bekisting 1.200 Lt x Rp. 22,000.00 = Rp. 26,400.00
- Besi Beton Polos 200.000 Kg x Rp. 11,000.00 = Rp. 2,200,000.00
- Kawat Beton 3.000 Kg x Rp. 18,400.00 = Rp. 55,200.00
- Semen Portland 323.000 Kg x Rp. 1,100.00 = Rp. 355,300.00
- Pasir Beton 0.520 M3 x Rp. 200,000.00 = Rp. 104,000.00
- Koral Beton 0.780 M3 x Rp. 195,000.00 = Rp. 152,100.00
- Kayu Balok 0.105 M3 x Rp. 1,150,000.00 = Rp. 120,750.00
- Plywood 9 mm 2.500 Lbr x Rp. 71,300.00 = Rp. 178,250.00
- Dolken kayu Ø 8-10/4 m 14.000 Btg x Rp. 26,500.00 = Rp. 371,000.00
JUMLAH = Rp. 3,891,000.00

b. Tenaga

- Pekerja 5.600 Oh x Rp. 27,500.00 = Rp. 154,000.00


- Tukang Batu 0.350 Oh x Rp. 41,000.00 = Rp. 14,350.00
- Tukang kayu 2.300 Oh x Rp. 41,000.00 = Rp. 94,300.00
- Tukang besi 1.400 Oh x Rp. 41,000.00 = Rp. 57,400.00
- Kepala Tukang 0.405 Oh x Rp. 43,000.00 = Rp. 17,415.00
- Mandor 0.202 Oh x Rp. 45,000.00 = Rp. 9,090.00
JUMLAH = Rp. 346,555.00

JUMLAH (a) + (b) = Rp. 4,237,555.00


39 1 m3 Membuat Tangga beton bertulang ( 150 kg besi + bekisting )

a. Bahan

- Kayu Terentang 0.250 M3 x Rp. 1,150,000.00 = Rp. 287,500.00


- Paku biasa 2" - 5" 3.000 Kg x Rp. 13,500.00 = Rp. 40,500.00
- Minyak bekisting 1.200 Lt x Rp. 22,000.00 = Rp. 26,400.00
- Besi Beton Polos 150.000 Kg x Rp. 11,000.00 = Rp. 1,650,000.00
- Kawat Beton 3.000 Kg x Rp. 18,400.00 = Rp. 55,200.00
- Semen Portland 323.000 Kg x Rp. 1,100.00 = Rp. 355,300.00
- Pasir Beton 0.520 M3 x Rp. 200,000.00 = Rp. 104,000.00
- Koral Beton 0.780 M3 x Rp. 195,000.00 = Rp. 152,100.00
- Kayu Balok 0.105 M3 x Rp. 1,150,000.00 = Rp. 120,750.00
- Plywood 9 mm 2.500 Lbr x Rp. 71,300.00 = Rp. 178,250.00
- Dolken kayu Ø 8-10/4 m 10.000 Btg x Rp. 26,500.00 = Rp. 265,000.00
JUMLAH = Rp. 3,235,000.00

b. Tenaga

- Pekerja 5.600 Oh x Rp. 27,500.00 = Rp. 154,000.00


- Tukang Batu 0.350 Oh x Rp. 41,000.00 = Rp. 14,350.00
- Tukang kayu 2.300 Oh x Rp. 41,000.00 = Rp. 94,300.00
- Tukang besi 1.400 Oh x Rp. 41,000.00 = Rp. 57,400.00
- Kepala Tukang 0.405 Oh x Rp. 43,000.00 = Rp. 17,415.00
- Mandor 0.202 Oh x Rp. 45,000.00 = Rp. 9,090.00
JUMLAH = Rp. 346,555.00
JUMLAH (a) + (b) = Rp. 3,581,555.00
40 1 bh Pemotongan dan pengupasan tiang Pancang beton

a. Bahan

- Oxigen 0.500 Btl x Rp. 110,000.00 = Rp. 55,000.00


- Elpiji 3.000 Kg x Rp. 9,250.00 = Rp. 27,750.00
- Alat Bantu Khusus 1.000 Set x Rp. 100,000.00 = Rp. 100,000.00

JUMLAH = Rp. 182,750.00

b. Tenaga

- Pekerja 1.000 Oh x Rp. 27,500.00 = Rp. 27,500.00


- Tukang Batu 0.500 Oh x Rp. 41,000.00 = Rp. 20,500.00
- Kepala Tukang 0.050 Oh x Rp. 43,000.00 = Rp. 2,150.00
- Mandor 0.550 Oh x Rp. 45,000.00 = Rp. 24,750.00
JUMLAH = Rp. 74,900.00

JUMLAH (a) + (b) = Rp. 257,650.00


PEKERJAAN PENECATAN

1 1 m2 Mendempul dan menggosok kayu

a. Bahan

- Dempul Jadi 0.080 Kg x Rp. 19,600.00 = Rp. 1,568.00


- Minyak Cat 0.020 Kg x Rp. 15,400.00 = Rp. 308.00
- Batu Apung 0.010 Kg x Rp. 3,000.00 = Rp. 30.00
JUMLAH = Rp. 1,906.00

b. Tenaga

- Pekerja 0.040 Oh x Rp. 27,500.00 = Rp. 1,100.00


- Tukang Cat 0.040 Oh x Rp. 41,000.00 = Rp. 1,640.00
- Kepala Tukang 0.004 Oh x Rp. 43,000.00 = Rp. 172.00
- Mandor 0.0025 Oh x Rp. 45,000.00 = Rp. 112.50
JUMLAH = Rp. 3,024.50

JUMLAH (a) + (b) = Rp. 4,930.50

2 1 m2 Pengecatan Bidang Kayu Lama

a. Bahan

- Plamir 0.150 Kg x Rp. 5,960.00 = Rp. 894.00


- Cat dasar 0.170 Kg x Rp. 29,900.00 = Rp. 5,083.00
- Cat penutup 0.170 Kg x Rp. 29,900.00 = Rp. 5,083.00
JUMLAH = Rp. 11,060.00

b. Tenaga

- Pekerja 0.070 Oh x Rp. 27,500.00 = Rp. 1,925.00


- Tukang Cat 0.075 Oh x Rp. 41,000.00 = Rp. 3,075.00
- Kepala Tukang 0.0075 Oh x Rp. 43,000.00 = Rp. 322.50
- Mandor 0.0025 Oh x Rp. 45,000.00 = Rp. 112.50
JUMLAH = Rp. 5,435.00

JUMLAH (a) + (b) = Rp. 16,495.00

3 1 m2 Pengecatan Bidang Kayu Baru ( 1 lapis plamir ), 1 lapis cat dasar, 2 lapis cat
penutup
a. Bahan

- Cat Meni 0.200 Kg x Rp. 29,900.00 = Rp. 5,980.00


- Plamir 0.150 Kg x Rp. 5,960.00 = Rp. 894.00
- Cat dasar 0.170 Kg x Rp. 29,900.00 = Rp. 5,083.00
- Cat penutup 2 kali 0.260 Kg x Rp. 29,900.00 = Rp. 7,774.00
JUMLAH = Rp. 19,731.00

b. Tenaga

- Pekerja 0.070 Oh x Rp. 27,500.00 = Rp. 1,925.00


- Tukang Cat 0.009 Oh x Rp. 41,000.00 = Rp. 369.00
- Kepala Tukang 0.006 Oh x Rp. 43,000.00 = Rp. 258.00
- Mandor 0.0025 Oh x Rp. 45,000.00 = Rp. 112.50
JUMLAH = Rp. 2,664.50

JUMLAH (a) + (b) = Rp. 22,395.50

4 1' Pengecatan Listplank ( 1 lapis plamir ), 1 lapis cat dasar, 2 lapis cat penutup
a. Bahan

- Cat Meni 0.150 Kg x Rp. 29,900.00 = Rp. 4,485.00


- Plamir 0.100 Kg x Rp. 5,960.00 = Rp. 596.00
- Cat dasar 0.170 Kg x Rp. 29,900.00 = Rp. 5,083.00
- Cat penutup 2 kali 0.260 Kg x Rp. 29,900.00 = Rp. 7,774.00
JUMLAH = Rp. 17,938.00

b. Tenaga

- Pekerja 0.070 Oh x Rp. 27,500.00 = Rp. 1,925.00


- Tukang Cat 0.009 Oh x Rp. 41,000.00 = Rp. 369.00
- Kepala Tukang 0.006 Oh x Rp. 43,000.00 = Rp. 258.00
- Mandor 0.0025 Oh x Rp. 45,000.00 = Rp. 112.50
JUMLAH = Rp. 2,664.50

JUMLAH (a) + (b) = Rp. 20,602.50

4 1 m2 Pengecatan Bidang Kayu Baru ( 1 lapis plamir ), 1 lapis cat dasar, 3 lapis cat
penutup
a. Bahan

- Cat Meni 0.200 Kg x Rp. 29,900.00 = Rp. 5,980.00


- Plamir 0.150 Kg x Rp. 5,960.00 = Rp. 894.00
- Cat dasar 0.170 Kg x Rp. 29,900.00 = Rp. 5,083.00
- Cat penutup 2 kali 0.350 Kg x Rp. 29,900.00 = Rp. 10,465.00
JUMLAH = Rp. 22,422.00
b. Tenaga

- Pekerja 0.070 Oh x Rp. 27,500.00 = Rp. 1,925.00


- Tukang Cat 0.105 Oh x Rp. 41,000.00 = Rp. 4,305.00
- Kepala Tukang 0.004 Oh x Rp. 43,000.00 = Rp. 172.00
- Mandor 0.0025 Oh x Rp. 45,000.00 = Rp. 112.50
JUMLAH = Rp. 6,514.50

JUMLAH (a) + (b) = Rp. 28,936.50

5 1 m2 Pengecatan Tembok Baru ( 1 lapis plamir ), 1 lapis cat dasar, 2 lapis cat
penutup
a. Bahan

- Plamir 0.100 Kg x Rp. 5,960.00 = Rp. 596.00


- Cat dasar 0.100 Kg x Rp. 14,300.00 = Rp. 1,430.00
- Cat penutup 2 kali 0.260 Kg x Rp. 14,300.00 = Rp. 3,718.00
JUMLAH = Rp. 5,744.00

b. Tenaga

- Pekerja 0.020 Oh x Rp. 27,500.00 = Rp. 550.00


- Tukang Cat 0.063 Oh x Rp. 41,000.00 = Rp. 2,583.00
- Kepala Tukang 0.0063 Oh x Rp. 43,000.00 = Rp. 270.90
- Mandor 0.0025 Oh x Rp. 45,000.00 = Rp. 112.50
JUMLAH = Rp. 3,516.40

JUMLAH (a) + (b) = Rp. 9,260.40

6 1 m2 Pengecatan Plafon ( 1 lapis plamir ), 1 lapis cat dasar, 2 lapis cat


penutup
a. Bahan

- Plamir 0.100 Kg x Rp. 5,960.00 = Rp. 596.00


- Cat dasar 0.100 Kg x Rp. 14,300.00 = Rp. 1,430.00
- Cat penutup 2 kali 0.260 Kg x Rp. 14,300.00 = Rp. 3,718.00
JUMLAH = Rp. 5,744.00

b. Tenaga

- Pekerja 0.020 Oh x Rp. 27,500.00 = Rp. 550.00


- Tukang Cat 0.063 Oh x Rp. 41,000.00 = Rp. 2,583.00
- Kepala Tukang 0.0063 Oh x Rp. 43,000.00 = Rp. 270.90
- Mandor 0.0025 Oh x Rp. 45,000.00 = Rp. 112.50
JUMLAH = Rp. 3,516.40

JUMLAH (a) + (b) = Rp. 9,260.40


7 1 m2 Pengecatan Tembok Lama ( 1 lapis plamir ), 1 lapis cat dasar, 2 lapis cat
penutup
a. Bahan

- Cat dasar 0.120 Kg x Rp. 14,300.00 = Rp. 1,716.00


- Cat penutup 2 kali 0.180 Kg x Rp. 14,300.00 = Rp. 2,574.00
JUMLAH = Rp. 4,290.00

b. Tenaga

- Pekerja 0.028 Oh x Rp. 27,500.00 = Rp. 770.00


- Tukang Cat 0.042 Oh x Rp. 41,000.00 = Rp. 1,722.00
- Kepala Tukang 0.0042 Oh x Rp. 43,000.00 = Rp. 180.60
- Mandor 0.0025 Oh x Rp. 45,000.00 = Rp. 112.50
JUMLAH = Rp. 2,785.10

JUMLAH (a) + (b) = Rp. 7,075.10

8 1 m2 Pelaburan bidang kayu dengan vernis

a. Bahan

- Vernis 0.150 ltr x Rp. 1,000.00 = Rp. 150.00


- Dempul 0.050 kg x Rp. 1,000.00 = Rp. 50.00
- Ampelas 0.100 lbr x Rp. 1,000.00 = Rp. 100.00
- Kuas 0.010 bh x Rp. 1,000.00 = Rp. 10.00
JUMLAH = Rp. 310.00
b. Tenaga

- Pekerja 0.160 Oh x Rp. 27,500.00 = Rp. 4,400.00


- Tukang Cat 0.160 Oh x Rp. 41,000.00 = Rp. 6,560.00
- Kepala Tukang 0.016 Oh x Rp. 43,000.00 = Rp. 688.00
- Mandor 0.0025 Oh x Rp. 45,000.00 = Rp. 112.50
JUMLAH = Rp. 11,760.50

JUMLAH (a) + (b) = Rp. 12,070.50

9 1 m2 Pelaburan bidang kayu dengan cat residu dan ter

a. Bahan

- Residu atau ter 0.350 ltr x Rp. 5,000.00 = Rp. 1,750.00


JUMLAH = Rp. 1,750.00

b. Tenaga

- Pekerja 0.100 Oh x Rp. 27,500.00 = Rp. 2,750.00


- Mandor 0.006 Oh x Rp. 45,000.00 = Rp. 270.00
JUMLAH = Rp. 3,020.00

JUMLAH (a) + (b) = Rp. 4,770.00

10 1 m2 Pengecatan permukaan baja / Seng dengan meni besi

a. Bahan

- Meni besi 0.100 Kg x Rp. 29,900.00 = Rp. 2,990.00


- Kuas 0.010 Bh x Rp. 8,000.00 = Rp. 80.00
JUMLAH = Rp. 3,070.00

b. Tenaga

- Pekerja 0.020 Oh x Rp. 27,500.00 = Rp. 550.00


- Tukang Cat 0.200 Oh x Rp. 41,000.00 = Rp. 8,200.00
- Kepala Tukang 0.0200 Oh x Rp. 43,000.00 = Rp. 860.00
- Mandor 0.0100 Oh x Rp. 45,000.00 = Rp. 450.00
JUMLAH = Rp. 10,060.00

JUMLAH (a) + (b) = Rp. 13,130.00

11 1 m2 Pengecatan permukaan baja dengan meni besi dan perancah

a. Bahan

- Meni besi 0.100 Kg x Rp. 29,900.00 = Rp. 2,990.00


- Kuas 0.010 Bh x Rp. 8,000.00 = Rp. 80.00
- Perancah 0.002 M3 x Rp. 1,150,000.00 = Rp. 2,300.00
JUMLAH = Rp. 5,370.00

b. Tenaga

- Pekerja 0.250 Oh x Rp. 27,500.00 = Rp. 6,875.00


- Tukang Cat 0.225 Oh x Rp. 41,000.00 = Rp. 9,225.00
- Kepala Tukang 0.0225 Oh x Rp. 43,000.00 = Rp. 967.50
- Mandor 0.0075 Oh x Rp. 45,000.00 = Rp. 337.50
JUMLAH = Rp. 17,405.00

JUMLAH (a) + (b) = Rp. 22,775.00


PEKERJAAN SANITASI

1 Memasang 1 buah kloset duduk INA

a. Bahan

- Kloset duduk/monoblok 1.000 Bh x Rp. 1,997,600.00 = Rp. 1,997,600.00


- Perlengkapan 0.060 - x Rp. 1,997,600.00 = Rp. 119,856.00
JUMLAH = Rp. 2,117,456.00

b. Tenaga

- Pekerja 3.300 Oh x Rp. 27,500.00 = Rp. 90,750.00


- Tukang batu 1.100 Oh x Rp. 41,000.00 = Rp. 45,100.00
- Kepala Tukang 0.001 Oh x Rp. 43,000.00 = Rp. 43.00
- Mandor 0.160 Oh x Rp. 45,000.00 = Rp. 7,200.00
JUMLAH = Rp. 143,093.00

JUMLAH (a) + (b) = Rp. 2,260,549.00

1 Memasang 1 buah kloset duduk TOTO

a. Bahan

- Kloset duduk/monoblok 1.000 Bh x Rp. 1,816,100.00 = Rp. 1,816,100.00


- Perlengkapan 0.060 - x Rp. 1,816,100.00 = Rp. 108,966.00
JUMLAH = Rp. 1,925,066.00

b. Tenaga

- Pekerja 3.300 Oh x Rp. 27,500.00 = Rp. 90,750.00


- Tukang batu 1.100 Oh x Rp. 41,000.00 = Rp. 45,100.00
- Kepala Tukang 0.001 Oh x Rp. 43,000.00 = Rp. 43.00
- Mandor 0.160 Oh x Rp. 45,000.00 = Rp. 7,200.00
JUMLAH = Rp. 143,093.00

JUMLAH (a) + (b) = Rp. 2,068,159.00

2 Memasang 1 buah kloset jongkok INA

a. Bahan

- Kloset Jongkok Porselen 1.000 Bh x Rp. 218,900.00 = Rp. 218,900.00


- Semen Portland 6.000 Kg x Rp. 1,100.00 = Rp. 6,600.00
- Pasir Pasang 0.010 Kg x Rp. 170,000.00 = Rp. 1,700.00
JUMLAH = Rp. 227,200.00

b. Tenaga

- Pekerja 1.000 Oh x Rp. 27,500.00 = Rp. 27,500.00


- Tukang batu 1.500 Oh x Rp. 41,000.00 = Rp. 61,500.00
- Kepala Tukang 1.500 Oh x Rp. 43,000.00 = Rp. 64,500.00
- Mandor 0.160 Oh x Rp. 45,000.00 = Rp. 7,200.00
JUMLAH = Rp. 160,700.00

JUMLAH (a) + (b) = Rp. 387,900.00

3 Memasang 1 buah kloset jongkok TOTO

a. Bahan

- Kloset Jongkok teraso 1.000 Bh x Rp. 197,700.00 = Rp. 197,700.00


- Bata Merah 5x11x22 cm 7.000 Bh x Rp. 1,800.00 = Rp. 12,600.00
- Semen Portland 6.000 Kg x Rp. 1,100.00 = Rp. 6,600.00
- Pasir Pasang 0.010 Kg x Rp. 170,000.00 = Rp. 1,700.00
JUMLAH = Rp. 218,600.00

b. Tenaga

- Pekerja 1.000 Oh x Rp. 27,500.00 = Rp. 27,500.00


- Tukang batu 1.500 Oh x Rp. 41,000.00 = Rp. 61,500.00
- Kepala Tukang 0.300 Oh x Rp. 43,000.00 = Rp. 12,900.00
- Mandor 0.110 Oh x Rp. 45,000.00 = Rp. 4,950.00
JUMLAH = Rp. 106,850.00

JUMLAH (a) + (b) = Rp. 325,450.00

4 Memasang 1 buah urinoir

a. Bahan

- Urinoir 1.000 Bh x Rp. 1,210,800.00 = Rp. 1,210,800.00


- Perlengkapan 0.300 Bh x Rp. 1,210,800.00 = Rp. 363,240.00
- Semen Portland 6.000 Kg x Rp. 1,100.00 = Rp. 6,600.00
- Pasir Pasang 0.010 Kg x Rp. 170,000.00 = Rp. 1,700.00
JUMLAH = Rp. 1,582,340.00

b. Tenaga

- Pekerja 1.000 Oh x Rp. 27,500.00 = Rp. 27,500.00


- Tukang batu 1.000 Oh x Rp. 41,000.00 = Rp. 41,000.00
- Kepala Tukang 0.100 Oh x Rp. 43,000.00 = Rp. 4,300.00
- Mandor 0.100 Oh x Rp. 45,000.00 = Rp. 4,500.00
JUMLAH = Rp. 77,300.00

JUMLAH (a) + (b) = Rp. 1,659,640.00

5 Memasang 1 buah westafel

a. Bahan

- Wastafel 1.000 Bh x Rp. 1,210,800.00 = Rp. 1,210,800.00


- Perlengkapan 0.030 Bh x Rp. 1,210,800.00 = Rp. 36,324.00
- Semen abu-abu 6.000 Kg x Rp. 5,800.00 = Rp. 34,800.00
- Pasir Pasang 0.010 Kg x Rp. 170,000.00 = Rp. 1,700.00
JUMLAH = Rp. 1,283,624.00

b. Tenaga

- Pekerja 1.000 Oh x Rp. 27,500.00 = Rp. 27,500.00


- Tukang batu 1.450 Oh x Rp. 41,000.00 = Rp. 59,450.00
- Kepala Tukang 0.150 Oh x Rp. 43,000.00 = Rp. 6,450.00
- Mandor 0.100 Oh x Rp. 45,000.00 = Rp. 4,500.00
JUMLAH = Rp. 97,900.00

JUMLAH (a) + (b) = Rp. 1,381,524.00

6 Memasang 1 buah bak mandi batu bata volume 0.30 m3

a. Bahan

- Batu bata 0.400 m3 x Rp. 1,800.00 = Rp. 720.00


- Semen Portland 120.000 kg x Rp. 1,100.00 = Rp. 132,000.00
- Pasir Pasang 0.300 m3 x Rp. 170,000.00 = Rp. 51,000.00
- Porselen ( 11x11 ) cm 3.600 m2 x Rp. 61,100.00 = Rp. 219,960.00
- Semen nat 6.000 Kg x Rp. 1,100.00 = Rp. 6,600.00
JUMLAH = Rp. 410,280.00

b. Tenaga

- Pekerja 1.000 Oh x Rp. 27,500.00 = Rp. 27,500.00


- Tukang batu 1.450 Oh x Rp. 41,000.00 = Rp. 59,450.00
- Kepala Tukang 0.150 Oh x Rp. 43,000.00 = Rp. 6,450.00
- Mandor 0.100 Oh x Rp. 45,000.00 = Rp. 4,500.00
JUMLAH = Rp. 97,900.00

JUMLAH (a) + (b) = Rp. 508,180.00

8 Memasang 1 m' pipa galvanis diameter 1/2 "

a. Bahan

- Pipa galvanis 1.200 m' x Rp. 21,400.00 = Rp. 25,680.00


- Perlengkapan 0.350 - x Rp. 25,680.00 = Rp. 8,988.00
JUMLAH = Rp. 34,668.00

b. Tenaga

- Pekerja 0.054 Oh x Rp. 27,500.00 = Rp. 1,485.00


- Tukang besi 0.090 Oh x Rp. 41,000.00 = Rp. 3,690.00
- Kepala Tukang 0.009 Oh x Rp. 43,000.00 = Rp. 387.00
- Mandor 0.027 Oh x Rp. 45,000.00 = Rp. 1,215.00
JUMLAH = Rp. 6,777.00

JUMLAH (a) + (b) = Rp. 41,445.00

9 Memasang 1 m' pipa galvanis diameter 3/4 "

a. Bahan

- Pipa galvanis 1.200 m' x Rp. 24,800.00 = Rp. 29,760.00


- Perlengkapan 0.350 - x Rp. 29,760.00 = Rp. 10,416.00
JUMLAH = Rp. 40,176.00

b. Tenaga

- Pekerja 0.054 Oh x Rp. 27,500.00 = Rp. 1,485.00


- Tukang besi 0.090 Oh x Rp. 41,000.00 = Rp. 3,690.00
- Kepala Tukang 0.009 Oh x Rp. 43,000.00 = Rp. 387.00
- Mandor 0.027 Oh x Rp. 45,000.00 = Rp. 1,215.00
JUMLAH = Rp. 6,777.00

JUMLAH (a) + (b) = Rp. 46,953.00

10 Memasang 1 m' pipa galvanis diameter 1 "

a. Bahan

- Pipa galvanis 1.200 m' x Rp. 35,800.00 = Rp. 42,960.00


- Perlengkapan 0.350 - x Rp. 42,960.00 = Rp. 15,036.00
JUMLAH = Rp. 57,996.00

b. Tenaga

- Pekerja 0.054 Oh x Rp. 27,500.00 = Rp. 1,485.00


- Tukang besi 0.090 Oh x Rp. 41,000.00 = Rp. 3,690.00
- Kepala Tukang 0.009 Oh x Rp. 43,000.00 = Rp. 387.00
- Mandor 0.027 Oh x Rp. 45,000.00 = Rp. 1,215.00
JUMLAH = Rp. 6,777.00

JUMLAH (a) + (b) = Rp. 64,773.00

11 Memasang 1 m' pipa galvanis diameter 2 1/2 "

a. Bahan

- Pipa galvanis 1.200 m' x Rp. 25,000.00 = Rp. 30,000.00


- Perlengkapan 0.350 - x Rp. 30,000.00 = Rp. 10,500.00
JUMLAH = Rp. 40,500.00

b. Tenaga

- Pekerja 0.108 Oh x Rp. 27,500.00 = Rp. 2,970.00


- Tukang besi 0.180 Oh x Rp. 41,000.00 = Rp. 7,380.00
- Kepala Tukang 0.018 Oh x Rp. 43,000.00 = Rp. 774.00
- Mandor 0.0054 Oh x Rp. 45,000.00 = Rp. 243.00
JUMLAH = Rp. 11,367.00

JUMLAH (a) + (b) = Rp. 51,867.00

12 Memasang 1 m' pipa PVC tipe AW diameter 1/2 "

a. Bahan

- Pipa PVC 1.200 m' x Rp. 7,600.00 = Rp. 9,120.00


- Perlengkapan 0.350 - x Rp. 9,120.00 = Rp. 3,192.00
JUMLAH = Rp. 12,312.00

b. Tenaga

- Pekerja 0.036 Oh x Rp. 27,500.00 = Rp. 990.00


- Tukang pipa 0.060 Oh x Rp. 41,000.00 = Rp. 2,460.00
- Kepala Tukang 0.006 Oh x Rp. 43,000.00 = Rp. 258.00
- Mandor 0.0018 Oh x Rp. 45,000.00 = Rp. 81.00
JUMLAH = Rp. 3,789.00

JUMLAH (a) + (b) = Rp. 16,101.00

13 Memasang 1 m' pipa PVC tipe AW diameter 3/4 "

a. Bahan

- Pipa PVC 1.200 m' x Rp. 8,200.00 = Rp. 9,840.00


- Perlengkapan 0.350 - x Rp. 9,840.00 = Rp. 3,444.00
JUMLAH = Rp. 13,284.00

b. Tenaga

- Pekerja 0.036 Oh x Rp. 27,500.00 = Rp. 990.00


- Tukang pipa 0.060 Oh x Rp. 41,000.00 = Rp. 2,460.00
- Kepala Tukang 0.006 Oh x Rp. 43,000.00 = Rp. 258.00
- Mandor 0.0018 Oh x Rp. 45,000.00 = Rp. 81.00
JUMLAH = Rp. 3,789.00

JUMLAH (a) + (b) = Rp. 17,073.00

14 Memasang 1 m' pipa PVC tipe AW diameter 1 "

a. Bahan

- Pipa PVC 1.200 m' x Rp. 8,800.00 = Rp. 10,560.00


- Perlengkapan 0.350 - x Rp. 10,560.00 = Rp. 3,696.00
JUMLAH = Rp. 14,256.00

b. Tenaga

- Pekerja 0.036 Oh x Rp. 27,500.00 = Rp. 990.00


- Tukang pipa 0.060 Oh x Rp. 41,000.00 = Rp. 2,460.00
- Kepala Tukang 0.006 Oh x Rp. 43,000.00 = Rp. 258.00
- Mandor 0.0018 Oh x Rp. 45,000.00 = Rp. 81.00
JUMLAH = Rp. 3,789.00

JUMLAH (a) + (b) = Rp. 18,045.00

15 Memasang 1 m' pipa PVC tipe AW diameter 1 1/2 "

a. Bahan

- Pipa PVC 1.200 m' x Rp. 18,500.00 = Rp. 22,200.00


- Perlengkapan 0.350 - x Rp. 22,200.00 = Rp. 7,770.00
JUMLAH = Rp. 29,970.00

b. Tenaga

- Pekerja 0.036 Oh x Rp. 27,500.00 = Rp. 990.00


- Tukang pipa 0.060 Oh x Rp. 41,000.00 = Rp. 2,460.00
- Kepala Tukang 0.006 Oh x Rp. 43,000.00 = Rp. 258.00
- Mandor 0.0018 Oh x Rp. 45,000.00 = Rp. 81.00
JUMLAH = Rp. 3,789.00

JUMLAH (a) + (b) = Rp. 33,759.00

16 Memasang 1 m' pipa PVC tipe AW diameter 2 "

a. Bahan

- Pipa PVC 1.200 m' x Rp. 22,100.00 = Rp. 26,520.00


- Perlengkapan 0.350 - x Rp. 26,520.00 = Rp. 9,282.00
JUMLAH = Rp. 35,802.00

b. Tenaga

- Pekerja 0.054 Oh x Rp. 27,500.00 = Rp. 1,485.00


- Tukang pipa 0.090 Oh x Rp. 41,000.00 = Rp. 3,690.00
- Kepala Tukang 0.009 Oh x Rp. 43,000.00 = Rp. 387.00
- Mandor 0.0027 Oh x Rp. 45,000.00 = Rp. 121.50
JUMLAH = Rp. 5,683.50

JUMLAH (a) + (b) = Rp. 41,485.50

17 Memasang 1 m' pipa PVC tipe AW diameter 2 1/2 "

a. Bahan

- Pipa PVC 1.200 m' x Rp. 22,100.00 = Rp. 26,520.00


- Perlengkapan 0.350 - x Rp. 26,520.00 = Rp. 9,282.00
JUMLAH = Rp. 35,802.00

b. Tenaga

- Pekerja 0.057 Oh x Rp. 27,500.00 = Rp. 1,567.50


- Tukang pipa 0.090 Oh x Rp. 41,000.00 = Rp. 3,690.00
- Kepala Tukang 0.009 Oh x Rp. 43,000.00 = Rp. 387.00
- Mandor 0.0028 Oh x Rp. 45,000.00 = Rp. 126.00
JUMLAH = Rp. 5,770.50

JUMLAH (a) + (b) = Rp. 41,572.50

18 Memasang 1 m' pipa PVC tipe AW diameter 3 "


a. Bahan

- Pipa PVC 1.200 m' x Rp. 57,300.00 = Rp. 68,760.00


- Perlengkapan 0.350 - x Rp. 68,760.00 = Rp. 24,066.00
JUMLAH = Rp. 92,826.00

b. Tenaga

- Pekerja 0.081 Oh x Rp. 27,500.00 = Rp. 2,227.50


- Tukang pipa 0.135 Oh x Rp. 41,000.00 = Rp. 5,535.00
- Kepala Tukang 0.0135 Oh x Rp. 43,000.00 = Rp. 580.50
- Mandor 0.0041 Oh x Rp. 45,000.00 = Rp. 184.50
JUMLAH = Rp. 8,527.50

JUMLAH (a) + (b) = Rp. 101,353.50

20 Memasang 1 buah bak cuci piring stainles steel

a. Bahan

- Bak cuci stainles steel 1.000 Bh x Rp. 360,000.00 = Rp. 360,000.00


- Water drain + asesories 1.000 set x Rp. 150,000.00 = Rp. 150,000.00
JUMLAH = Rp. 510,000.00

b. Tenaga

- Pekerja 0.030 Oh x Rp. 27,500.00 = Rp. 825.00


- Tukang batu 0.300 Oh x Rp. 41,000.00 = Rp. 12,300.00
- Kepala Tukang 0.030 Oh x Rp. 43,000.00 = Rp. 1,290.00
- Mandor 0.0015 Oh x Rp. 45,000.00 = Rp. 67.50
JUMLAH = Rp. 14,482.50

JUMLAH (a) + (b) = Rp. 524,482.50

21 Memasang 1 buah kran diameter 3/4" atau 1/2"

a. Bahan

- Kran air 1.000 Bh x Rp. 31,000.00 = Rp. 31,000.00


- Seal tape 0.025 Bh x Rp. 3,500.00 = Rp. 87.50
JUMLAH = Rp. 31,087.50

b. Tenaga

- Pekerja 0.010 Oh x Rp. 27,500.00 = Rp. 275.00


- Tukang batu 0.100 Oh x Rp. 41,000.00 = Rp. 4,100.00
- Kepala Tukang 0.010 Oh x Rp. 43,000.00 = Rp. 430.00
- Mandor 0.005 Oh x Rp. 45,000.00 = Rp. 225.00
JUMLAH = Rp. 5,030.00

JUMLAH (a) + (b) = Rp. 36,117.50

22 Memasang 1 buah floor drain


a. Bahan

- Floor drain 1.000 Bh x Rp. 9,200.00 = Rp. 9,200.00


JUMLAH = Rp. 9,200.00
b. Tenaga

- Pekerja 0.010 Oh x Rp. 27,500.00 = Rp. 275.00


- Tukang batu 0.100 Oh x Rp. 41,000.00 = Rp. 4,100.00
- Kepala Tukang 0.010 Oh x Rp. 43,000.00 = Rp. 430.00
- Mandor 0.005 Oh x Rp. 45,000.00 = Rp. 225.00
JUMLAH = Rp. 5,030.00
JUMLAH (a) + (b) = Rp. 14,230.00
PEKERJAAN KUNCI DAN KACA

1. 1 buah pasang kunci tanam antik

a. Bahan

- kunci tanam antik 1.000 Bh x Rp. 134,500.00 = Rp. 134,500.00


JUMLAH = Rp. 134,500.00

b. Tenaga

- Pekerja 0.060 Oh x Rp. 27,500.00 = Rp. 1,650.00


- Tukang Kayu 0.600 Oh x Rp. 41,000.00 = Rp. 24,600.00
- Kepala Tukang 0.060 Oh x Rp. 43,000.00 = Rp. 2,580.00
- Mandor 0.003 Oh x Rp. 45,000.00 = Rp. 135.00
JUMLAH = Rp. 28,965.00

JUMLAH (a) + (b) = Rp. 163,465.00

2 1 buah pasang kunci tanam biasa

a. Bahan

- kunci tanam biasa 1.000 Bh x Rp. 67,300.00 = Rp. 67,300.00


JUMLAH = Rp. 67,300.00

b. Tenaga

- Pekerja 0.060 Oh x Rp. 27,500.00 = Rp. 1,650.00


- Tukang Kayu 0.600 Oh x Rp. 41,000.00 = Rp. 24,600.00
- Kepala Tukang 0.060 Oh x Rp. 43,000.00 = Rp. 2,580.00
- Mandor 0.003 Oh x Rp. 45,000.00 = Rp. 135.00
JUMLAH = Rp. 28,965.00

JUMLAH (a) + (b) = Rp. 96,265.00

3. 1 buah pasang kunci tanam kamar mandi

a. Bahan

- kunci tanam kamar mandi 1.000 Bh x Rp. 67,300.00 = Rp. 67,300.00


JUMLAH = Rp. 67,300.00

b. Tenaga

- Pekerja 0.005 Oh x Rp. 27,500.00 = Rp. 137.50


- Tukang Kayu 0.500 Oh x Rp. 41,000.00 = Rp. 20,500.00
- Kepala Tukang 0.005 Oh x Rp. 43,000.00 = Rp. 215.00
- Mandor 0.0025 Oh x Rp. 45,000.00 = Rp. 112.50
JUMLAH = Rp. 20,965.00

JUMLAH (a) + (b) = Rp. 88,265.00


4. 1 buah pasang engsel pintu

a. Bahan

- Engsel pintu 1.000 Bh x Rp. 29,800.00 = Rp. 29,800.00


JUMLAH = Rp. 29,800.00

b. Tenaga

- Pekerja 0.015 Oh x Rp. 27,500.00 = Rp. 412.50


- Tukang Kayu 0.150 Oh x Rp. 41,000.00 = Rp. 6,150.00
- Kepala Tukang 0.015 Oh x Rp. 43,000.00 = Rp. 645.00
- Mandor 0.00075 Oh x Rp. 45,000.00 = Rp. 33.75
JUMLAH = Rp. 7,241.25

JUMLAH (a) + (b) = Rp. 37,041.25

5. 1 buah pasang engsel jendela

a. Bahan

- Engsel jendela 1.000 Bh x Rp. 21,300.00 = Rp. 21,300.00


JUMLAH = Rp. 21,300.00

b. Tenaga

- Pekerja 0.010 Oh x Rp. 27,500.00 = Rp. 275.00


- Tukang Kayu 0.100 Oh x Rp. 41,000.00 = Rp. 4,100.00
- Kepala Tukang 0.010 Oh x Rp. 43,000.00 = Rp. 430.00
- Mandor 0.0005 Oh x Rp. 45,000.00 = Rp. 22.50
JUMLAH = Rp. 4,827.50

JUMLAH (a) + (b) = Rp. 26,127.50

6. 1 buah pasang engsel angin

a. Bahan

- Engsel angin 1.000 Bh x Rp. 21,300.00 = Rp. 21,300.00


JUMLAH = Rp. 21,300.00

b. Tenaga

- Pekerja 0.020 Oh x Rp. 27,500.00 = Rp. 550.00


- Tukang Kayu 0.200 Oh x Rp. 41,000.00 = Rp. 8,200.00
- Kepala Tukang 0.020 Oh x Rp. 43,000.00 = Rp. 860.00
- Mandor 0.001 Oh x Rp. 45,000.00 = Rp. 45.00
JUMLAH = Rp. 9,655.00

JUMLAH (a) + (b) = Rp. 30,955.00


7. 1 buah pasang kait angin

a. Bahan

- Kait angin 1.000 Bh x Rp. 2,600.00 = Rp. 2,600.00


JUMLAH = Rp. 2,600.00

b. Tenaga

- Pekerja 0.015 Oh x Rp. 27,500.00 = Rp. 412.50


- Tukang Kayu 0.150 Oh x Rp. 41,000.00 = Rp. 6,150.00
- Kepala Tukang 0.015 Oh x Rp. 43,000.00 = Rp. 645.00
- Mandor 0.00075 Oh x Rp. 45,000.00 = Rp. 33.75
JUMLAH = Rp. 7,241.25

JUMLAH (a) + (b) = Rp. 9,841.25

8. 1 buah pasang kunci selot

a. Bahan

- Kunci selot 1.000 Bh x Rp. 5,500.00 = Rp. 5,500.00


JUMLAH = Rp. 5,500.00

b. Tenaga

- Pekerja 0.020 Oh x Rp. 27,500.00 = Rp. 550.00


- Tukang Kayu 0.200 Oh x Rp. 41,000.00 = Rp. 8,200.00
- Kepala Tukang 0.020 Oh x Rp. 43,000.00 = Rp. 860.00
- Mandor 0.001 Oh x Rp. 45,000.00 = Rp. 45.00
JUMLAH = Rp. 9,655.00

JUMLAH (a) + (b) = Rp. 15,155.00

9. 1 buah pasang pegangan pintu / door holder

a. Bahan

- Door holder 1.000 Bh x Rp. 250,000.00 = Rp. 250,000.00


JUMLAH = Rp. 250,000.00

b. Tenaga

- Pekerja 0.005 Oh x Rp. 27,500.00 = Rp. 137.50


- Tukang Kayu 0.500 Oh x Rp. 41,000.00 = Rp. 20,500.00
- Kepala Tukang 0.005 Oh x Rp. 43,000.00 = Rp. 215.00
- Mandor 0.0025 Oh x Rp. 45,000.00 = Rp. 112.50
JUMLAH = Rp. 20,965.00

JUMLAH (a) + (b) = Rp. 270,965.00


10. 1 m2 pasang kaca, tebal 3 mm

a. Bahan

- Kaca 1.100 m2 x Rp. 203,700.00 = Rp. 224,070.00


JUMLAH = Rp. 224,070.00

b. Tenaga

- Pekerja 0.015 Oh x Rp. 27,500.00 = Rp. 412.50


- Tukang Kayu 0.150 Oh x Rp. 41,000.00 = Rp. 6,150.00
- Kepala Tukang 0.015 Oh x Rp. 43,000.00 = Rp. 645.00
- Mandor 0.00075 Oh x Rp. 45,000.00 = Rp. 33.75
JUMLAH = Rp. 7,241.25

JUMLAH (a) + (b) = Rp. 231,311.25

11. 1 m2 pasang kaca, tebal 5 mm

a. Bahan

- Kaca 1.100 m2 x Rp. 203,700.00 = Rp. 224,070.00


JUMLAH = Rp. 224,070.00

b. Tenaga

- Pekerja 0.015 Oh x Rp. 27,500.00 = Rp. 412.50


- Tukang Kayu 0.150 Oh x Rp. 41,000.00 = Rp. 6,150.00
- Kepala Tukang 0.015 Oh x Rp. 43,000.00 = Rp. 645.00
- Mandor 0.00075 Oh x Rp. 45,000.00 = Rp. 33.75
JUMLAH = Rp. 7,241.25

JUMLAH (a) + (b) = Rp. 231,311.25

12. 1 m2 pasang kaca, tebal 8 mm

a. Bahan

- Kaca 1.100 m2 x Rp. 203,700.00 = Rp. 224,070.00


JUMLAH = Rp. 224,070.00

b. Tenaga

- Pekerja 0.0165 Oh x Rp. 27,500.00 = Rp. 453.75


- Tukang Kayu 0.165 Oh x Rp. 41,000.00 = Rp. 6,765.00
- Kepala Tukang 0.0165 Oh x Rp. 43,000.00 = Rp. 709.50
- Mandor 0.0008 Oh x Rp. 45,000.00 = Rp. 36.00
JUMLAH = Rp. 7,964.25

JUMLAH (a) + (b) = Rp. 232,034.25


13. 1 m2 pasang kaca buram tebal 12 mm

a. Bahan

- Kaca buram 1.100 m2 x Rp. 458,625.00 = Rp. 504,487.50


- Sealent 0.050 kg x Rp. 12,500.00 = Rp. 625.00
JUMLAH = Rp. 505,112.50

b. Tenaga

- Pekerja 0.025 Oh x Rp. 27,500.00 = Rp. 687.50


- Tukang Kayu 0.250 Oh x Rp. 41,000.00 = Rp. 10,250.00
- Kepala Tukang 0.025 Oh x Rp. 43,000.00 = Rp. 1,075.00
- Mandor 0.00125 Oh x Rp. 45,000.00 = Rp. 56.25
JUMLAH = Rp. 12,068.75

JUMLAH (a) + (b) = Rp. 517,181.25

14. 1 m2 pasang kaca patri, tebal 12 mm

a. Bahan

- Kaca patri 1.100 m2 x Rp. 170,500.00 = Rp. 187,550.00


JUMLAH = Rp. 187,550.00

b. Tenaga

- Pekerja 0.015 Oh x Rp. 27,500.00 = Rp. 412.50


- Tukang Kayu 0.150 Oh x Rp. 41,000.00 = Rp. 6,150.00
- Kepala Tukang 0.015 Oh x Rp. 43,000.00 = Rp. 645.00
- Mandor 0.00075 Oh x Rp. 45,000.00 = Rp. 33.75
JUMLAH = Rp. 7,241.25

JUMLAH (a) + (b) = Rp. 194,791.25


PEKERJAAN BESI

1. 1 Kg pasang rangka atap baja

a. Bahan

- Besi Profil WF 1.100 Kg x Rp. 28,500.00 = Rp. 31,350.00


- Meni Besi 0.080 Kg x Rp. 29,900.00 = Rp. 2,392.00
JUMLAH = Rp. 33,742.00

b. Tenaga

- Tukang Besi Konstruksi 0.006 Oh x Rp. 41,000.00 = Rp. 246.00


- Pekerja 0.060 Oh x Rp. 27,500.00 = Rp. 1,650.00
- Kepala Tukang 0.006 Oh x Rp. 43,000.00 = Rp. 258.00
- Mandor 0.000 Oh x Rp. 45,000.00 = Rp. 13.50
JUMLAH = Rp. 2,167.50

JUMLAH (a) + (b) = Rp. 35,909.50

2 1 m2 pasang pintu besi baja

a. Bahan

- Pintu Besi Baja 1.000 m2 x Rp. 220,500.00 = Rp. 220,500.00


JUMLAH = Rp. 220,500.00

b. Tenaga

- Tukang Besi Konstruksi 0.650 Oh x Rp. 41,000.00 = Rp. 26,650.00


- Pekerja 0.650 Oh x Rp. 27,500.00 = Rp. 17,875.00
- Kepala Tukang 0.065 Oh x Rp. 43,000.00 = Rp. 2,795.00
- Mandor 0.032 Oh x Rp. 45,000.00 = Rp. 1,440.00
JUMLAH = Rp. 48,760.00

JUMLAH (a) + (b) = Rp. 269,260.00

3 1 m2 pasang jendela besi

a. Bahan

- jendela besi 1.000 m2 x Rp. 220,500.00 = Rp. 220,500.00


JUMLAH = Rp. 220,500.00

b. Tenaga

- Tukang Besi Konstruksi 1.050 Oh x Rp. 41,000.00 = Rp. 43,050.00


- Pekerja 1.050 Oh x Rp. 27,500.00 = Rp. 28,875.00
- Kepala Tukang 0.105 Oh x Rp. 43,000.00 = Rp. 4,515.00
- Mandor 0.005 Oh x Rp. 45,000.00 = Rp. 236.25
JUMLAH = Rp. 76,676.25

JUMLAH (a) + (b) = Rp. 297,176.25


4 1 m2 pasang rolling door

a. Bahan

- Rolling Door 1.000 m2 x Rp. 330,500.00 = Rp. 330,500.00


JUMLAH = Rp. 330,500.00

b. Tenaga

- Tukang Besi Konstruksi 1.500 Oh x Rp. 41,000.00 = Rp. 61,500.00


- Pekerja 1.050 Oh x Rp. 27,500.00 = Rp. 28,875.00
- Kepala Tukang 0.150 Oh x Rp. 43,000.00 = Rp. 6,450.00
- Mandor 0.005 Oh x Rp. 45,000.00 = Rp. 234.00
JUMLAH = Rp. 97,059.00

JUMLAH (a) + (b) = Rp. 427,559.00

5 1 m2 pasang pintu alluminium

a. Bahan

- pintu alluminium 1.000 m2 x Rp. 275,000.00 = Rp. 275,000.00


JUMLAH = Rp. 275,000.00

b. Tenaga

- Tukang Besi Konstruksi 1.050 Oh x Rp. 41,000.00 = Rp. 43,050.00


- Pekerja 1.050 Oh x Rp. 27,500.00 = Rp. 28,875.00
- Kepala Tukang 0.105 Oh x Rp. 43,000.00 = Rp. 4,515.00
- Mandor 0.005 Oh x Rp. 45,000.00 = Rp. 234.00
JUMLAH = Rp. 76,674.00

JUMLAH (a) + (b) = Rp. 351,674.00

6 1 m2 pasang terali besi

a. Bahan

- Besi Strip 2 x 3 1.150 m2 x Rp. 8,800.00 = Rp. 10,120.00


JUMLAH = Rp. 10,120.00

b. Tenaga

- Tukang Las 1.200 Oh x Rp. 41,000.00 = Rp. 49,200.00


- Pekerja 1.200 Oh x Rp. 27,500.00 = Rp. 33,000.00
- Kepala Tukang 0.012 Oh x Rp. 43,000.00 = Rp. 516.00
- Mandor 0.001 Oh x Rp. 45,000.00 = Rp. 27.00
JUMLAH = Rp. 82,743.00

JUMLAH (a) + (b) = Rp. 92,863.00


7 1 m2 pasang jendela nako & dan tralis

a. Bahan

- jendela nako 1.100 m2 x Rp. 30,400.00 = Rp. 33,440.00


- paku biasa 1/2" - 1" 0.020 Kg x Rp. 13,500.00 = Rp. 270.00
- besi strip 0.025 m3 x Rp. 8,800.00 = Rp. 220.00
JUMLAH = Rp. 33,930.00

b. Tenaga
- Pekerja 0.200 Oh x Rp. 27,500.00 = Rp. 5,500.00
- Tukang Kayu 0.200 Oh x Rp. 41,000.00 = Rp. 8,200.00
- Kepala Tukang 0.020 Oh x Rp. 43,000.00 = Rp. 860.00
- Mandor 0.001 Oh x Rp. 45,000.00 = Rp. 45.00
JUMLAH = Rp. 14,605.00

JUMLAH (a) + (b) = Rp. 48,535.00

8 1 m2 pasang talang datar, seng BJLS 2.8 mm

a. Bahan
- seng plat 3 x 6 bjls 28 0.500 Lbr x Rp. 80,900.00 = Rp. 40,450.00
- paku biasa 1/2" - 1" 0.015 Kg x Rp. 13,500.00 = Rp. 202.50
- kayu borneo, papan 0.010 m3 x Rp. 1,200,000.00 = Rp. 11,520.00
- flincote / meni besi 0.250 Kg x Rp. 29,900.00 = Rp. 7,475.00
JUMLAH = Rp. 59,647.50

b. Tenaga
- Pekerja 0.150 Oh x Rp. 27,500.00 = Rp. 4,125.00
- Tukang Kayu 0.400 Oh x Rp. 41,000.00 = Rp. 16,400.00
- Kepala Tukang 0.025 Oh x Rp. 43,000.00 = Rp. 1,075.00
- Mandor 0.001 Oh x Rp. 45,000.00 = Rp. 56.25
JUMLAH = Rp. 21,656.25

JUMLAH (a) + (b) = Rp. 81,303.75

9 1 m2 pasang talang miring, seng BJLS 2.8 mm

a. Bahan
- seng plat 3 x 6 bjls 28 0.500 Lbr x Rp. 80,900.00 = Rp. 40,450.00
- paku biasa 1/2" - 1" 0.015 Kg x Rp. 13,500.00 = Rp. 202.50
- kayu borneo, papan 0.019 m3 x Rp. 1,200,000.00 = Rp. 22,800.00
- flincote / meni besi 0.300 Kg x Rp. 29,900.00 = Rp. 8,970.00
JUMLAH = Rp. 72,422.50

b. Tenaga
- Pekerja 0.040 Oh x Rp. 27,500.00 = Rp. 1,100.00
- Tukang Kayu 0.400 Oh x Rp. 41,000.00 = Rp. 16,400.00
- Kepala Tukang 0.025 Oh x Rp. 43,000.00 = Rp. 1,075.00
- Mandor 0.001 Oh x Rp. 45,000.00 = Rp. 56.25
JUMLAH = Rp. 18,631.25

JUMLAH (a) + (b) = Rp. 91,053.75


10 1 m2 pasang talang 1/2 lingkaran D-10 cm, seng BJLS 2.8 mm

a. Bahan
- seng plat 3 x 6 bjls 28 0.300 Lbr x Rp. 80,900.00 = Rp. 24,270.00
- paku biasa 1/2" - 1" 0.100 Kg x Rp. 13,500.00 = Rp. 1,350.00
- kayu borneo, papan 0.019 m3 x Rp. 1,200,000.00 = Rp. 22,800.00
- flincote / meni besi 0.500 Kg x Rp. 29,900.00 = Rp. 14,950.00
JUMLAH = Rp. 63,370.00

b. Tenaga
- Pekerja 0.150 Oh x Rp. 27,500.00 = Rp. 4,125.00
- Tukang Kayu 0.250 Oh x Rp. 41,000.00 = Rp. 10,250.00
- Kepala Tukang 0.025 Oh x Rp. 43,000.00 = Rp. 1,075.00
- Mandor 0.001 Oh x Rp. 45,000.00 = Rp. 56.25
JUMLAH = Rp. 15,506.25

JUMLAH (a) + (b) = Rp. 78,876.25

11 1 m2 pasang talang 1/2 lingkaran D-10 cm, seng BJLS 2.4 mm

a. Bahan
- seng plat 3 x 6 bjls 24 0.300 Lbr x Rp. 65,200.00 = Rp. 19,560.00
- paku biasa 1/2" - 1" 0.100 Kg x Rp. 13,500.00 = Rp. 1,350.00
- kayu borneo, papan 0.019 m3 x Rp. 1,200,000.00 = Rp. 22,800.00
- flincote / meni besi 0.500 Kg x Rp. 29,900.00 = Rp. 14,950.00
JUMLAH = Rp. 58,660.00

b. Tenaga

- Pekerja 0.150 Oh x Rp. 27,500.00 = Rp. 4,125.00


- Tukang Kayu 0.250 Oh x Rp. 41,000.00 = Rp. 10,250.00
- Kepala Tukang 0.025 Oh x Rp. 43,000.00 = Rp. 1,075.00
- Mandor 0.001 Oh x Rp. 45,000.00 = Rp. 56.25
JUMLAH = Rp. 15,506.25
JUMLAH (a) + (b) = Rp. 74,166.25
PEKERJAAN LANTAI

1 1 m2 pasang lantai keramik ukuran 30x30 cm

a. Bahan

- Keramik warna 30x30 cm 11.000 bh x Rp. 9,181.82 = Rp. 101,000.00


- Semen Portland 11.38 Kg x Rp. 1,100.00 = Rp. 12,518.00
- Pasir Pasang 0.042 m3 x Rp. 170,000.00 = Rp. 7,140.00
- Semen Portland Isian 1.5 Kg x Rp. 1,100.00 = Rp. 1,650.00
JUMLAH = Rp. 122,308.00

b. Tenaga

- Pekerja 0.620 Oh x Rp. 27,500.00 = Rp. 17,050.00


- Tukang kayu 0.350 Oh x Rp. 41,000.00 = Rp. 14,350.00
- Kepala Tukang 0.035 Oh x Rp. 43,000.00 = Rp. 1,505.00
- Mandor 0.030 Oh x Rp. 45,000.00 = Rp. 1,350.00
JUMLAH = Rp. 34,255.00

JUMLAH (a) + (b) = Rp. 156,563.00

2 1 m2 pasang lantai keramik ukuran 20x25 cm

a. Bahan

- Keramik 25x20 cm 20.000 bh x Rp. 4,355.00 = Rp. 87,100.00


- Semen Portland 11.38 Kg x Rp. 1,100.00 = Rp. 12,518.00
- Pasir Pasang 0.042 m3 x Rp. 170,000.00 = Rp. 7,140.00
- Semen Portland Isian 1.5 Kg x Rp. 1,100.00 = Rp. 1,650.00
JUMLAH = Rp. 108,408.00

b. Tenaga

- Pekerja 0.620 Oh x Rp. 27,500.00 = Rp. 17,050.00


- Tukang kayu 0.350 Oh x Rp. 41,000.00 = Rp. 14,350.00
- Kepala Tukang 0.035 Oh x Rp. 43,000.00 = Rp. 1,505.00
- Mandor 0.030 Oh x Rp. 45,000.00 = Rp. 1,350.00
JUMLAH = Rp. 34,255.00

JUMLAH (a) + (b) = Rp. 142,663.00

2 1 m2 pasang lantai keramik ukuran 20x20 cm

a. Bahan

- Keramik 20x20 cm 25.000 bh x Rp. 2,952.00 = Rp. 73,800.00


- Semen Portland 11.38 Kg x Rp. 1,100.00 = Rp. 12,518.00
- Pasir Pasang 0.042 m3 x Rp. 170,000.00 = Rp. 7,140.00
- Semen Portland Isian 1.5 Kg x Rp. 1,100.00 = Rp. 1,650.00
JUMLAH = Rp. 95,108.00

b. Tenaga

- Pekerja 0.620 Oh x Rp. 27,500.00 = Rp. 17,050.00


- Tukang kayu 0.350 Oh x Rp. 41,000.00 = Rp. 14,350.00
- Kepala Tukang 0.035 Oh x Rp. 43,000.00 = Rp. 1,505.00
- Mandor 0.030 Oh x Rp. 45,000.00 = Rp. 1,350.00
JUMLAH = Rp. 34,255.00

JUMLAH (a) + (b) = Rp. 129,363.00

3 1 m2 pasang lantai keramik ukuran 40x40 cm

a. Bahan

- Keramik warna 40x40 cm 6.000 bh x Rp. 19,050.00 = Rp. 114,300.00


- Semen Portland 11.38 Kg x Rp. 1,100.00 = Rp. 12,518.00
- Pasir Pasang 0.042 m3 x Rp. 170,000.00 = Rp. 7,140.00
- Semen Portland Isian 1.5 Kg x Rp. 1,100.00 = Rp. 1,650.00
JUMLAH = Rp. 135,608.00
b. Tenaga

- Pekerja 0.620 Oh x Rp. 27,500.00 = Rp. 17,050.00


- Tukang kayu 0.350 Oh x Rp. 41,000.00 = Rp. 14,350.00
- Kepala Tukang 0.035 Oh x Rp. 43,000.00 = Rp. 1,505.00
- Mandor 0.030 Oh x Rp. 45,000.00 = Rp. 1,350.00
JUMLAH = Rp. 34,255.00

JUMLAH (a) + (b) = Rp. 169,863.00

4 1 m2 pasang lantai keramik artistik ukuran 10x20 cm

a. Bahan

- Keramik artistik 10x20 cm 50.000 bh x Rp. 1,222.00 = Rp. 61,100.00


- Semen Portland 11.38 Kg x Rp. 1,100.00 = Rp. 12,518.00
- Pasir Pasang 0.042 m3 x Rp. 170,000.00 = Rp. 7,140.00
- Semen Warna 1.5 Kg x Rp. 5,800.00 = Rp. 8,700.00
JUMLAH = Rp. 89,458.00

b. Tenaga

- Pekerja 0.620 Oh x Rp. 27,500.00 = Rp. 17,050.00


- Tukang kayu 0.350 Oh x Rp. 41,000.00 = Rp. 14,350.00
- Kepala Tukang 0.035 Oh x Rp. 43,000.00 = Rp. 1,505.00
- Mandor 0.030 Oh x Rp. 45,000.00 = Rp. 1,350.00
JUMLAH = Rp. 34,255.00

JUMLAH (a) + (b) = Rp. 123,713.00

5 1 m2 pasang lantai keramik artistik ukuran 10x10 cm

a. Bahan

- Keramik artistik 10x10 cm 100.000 bh x Rp. 611.00 = Rp. 61,100.00


- Semen Portland 11.38 Kg x Rp. 1,100.00 = Rp. 12,518.00
- Pasir Pasang 0.042 m3 x Rp. 170,000.00 = Rp. 7,140.00
- Semen Warna 2.00 Kg x Rp. 5,800.00 = Rp. 11,600.00
JUMLAH = Rp. 92,358.00

b. Tenaga

- Pekerja 0.620 Oh x Rp. 27,500.00 = Rp. 17,050.00


- Tukang kayu 0.350 Oh x Rp. 41,000.00 = Rp. 14,350.00
- Kepala Tukang 0.035 Oh x Rp. 43,000.00 = Rp. 1,505.00
- Mandor 0.030 Oh x Rp. 45,000.00 = Rp. 1,350.00
JUMLAH = Rp. 34,255.00

JUMLAH (a) + (b) = Rp. 126,613.00


6 1 m2 pasang dinding keramik ukuran 10x20 cm

a. Bahan

- Keramik 10x20 cm 50.000 bh x Rp. 1,222.00 = Rp. 61,100.00


- Semen Portland 9.30 Kg x Rp. 1,100.00 = Rp. 10,230.00
- Pasir Pasang 0.018 m3 x Rp. 170,000.00 = Rp. 3,060.00
- Semen Warna 1.50 Kg x Rp. 5,800.00 = Rp. 8,700.00
JUMLAH = Rp. 83,090.00

b. Tenaga

- Pekerja 0.620 Oh x Rp. 27,500.00 = Rp. 17,050.00


- Tukang kayu 0.350 Oh x Rp. 41,000.00 = Rp. 14,350.00
- Kepala Tukang 0.035 Oh x Rp. 43,000.00 = Rp. 1,505.00
- Mandor 0.030 Oh x Rp. 45,000.00 = Rp. 1,350.00
JUMLAH = Rp. 34,255.00

JUMLAH (a) + (b) = Rp. 117,345.00

7 1 m2 pasang dinding keramik artistik ukuran 20x20 cm

a. Bahan

- Keramik artistik 20x20 cm 25.000 bh x Rp. 2,952.00 = Rp. 73,800.00


- Semen Portland 9.30 Kg x Rp. 1,100.00 = Rp. 10,230.00
- Pasir Pasang 0.018 m3 x Rp. 170,000.00 = Rp. 3,060.00
- Semen Warna 1.50 Kg x Rp. 1,100.00 = Rp. 1,650.00
JUMLAH = Rp. 88,740.00

b. Tenaga

- Pekerja 0.620 Oh x Rp. 27,500.00 = Rp. 17,050.00


- Tukang kayu 0.350 Oh x Rp. 41,000.00 = Rp. 14,350.00
- Kepala Tukang 0.035 Oh x Rp. 43,000.00 = Rp. 1,505.00
- Mandor 0.030 Oh x Rp. 45,000.00 = Rp. 1,350.00
JUMLAH = Rp. 34,255.00

JUMLAH (a) + (b) = Rp. 122,995.00


PEKERJAAN ATAP

1 1 m2 pasang atap genteng metal roof

a. Bahan

- genteng metal roof 2 Lbr x Rp. 91,200.00 = Rp. 182,400.00


- paku seng 0.2 Kg x Rp. 20,800.00 = Rp. 4,160.00
JUMLAH = Rp. 186,560.00

b. Tenaga

- Pekerja 0.200 Oh x Rp. 27,500.00 = Rp. 5,500.00


- Tukang kayu 0.020 Oh x Rp. 41,000.00 = Rp. 820.00
- Kepala Tukang 0.150 Oh x Rp. 43,000.00 = Rp. 6,450.00
- Mandor 0.005 Oh x Rp. 45,000.00 = Rp. 225.00
JUMLAH = Rp. 12,995.00

JUMLAH (a) + (b) = Rp. 199,555.00

2 1 m2 pasang atap sirap

a. Bahan

- genteng sirap 60 Lbr x Rp. 1,000.00 = Rp. 60,000.00


- paku biasa 1/2 - 1" 0.2 Kg x Rp. 1,000.00 = Rp. 200.00
JUMLAH = Rp. 60,200.00

b. Tenaga

- Pekerja 0.166 Oh x Rp. 27,500.00 = Rp. 4,565.00


- Tukang kayu 0.250 Oh x Rp. 41,000.00 = Rp. 10,250.00
- Kepala Tukang 0.025 Oh x Rp. 43,000.00 = Rp. 1,075.00
- Mandor 0.008 Oh x Rp. 45,000.00 = Rp. 360.00
JUMLAH = Rp. 16,250.00

JUMLAH (a) + (b) = Rp. 76,450.00

3 1 m2 pasang nok genteng beton

a. Bahan

- nok genteng beton 0.5 Bh x Rp. 15,000.00 = Rp. 7,500.00


- paku biasa 2" x 5" 0.05 Kg x Rp. 13,500.00 = Rp. 675.00
- semen abu-abu 10.8 Kg x Rp. 5,800.00 = Rp. 62,640.00
- pasir pasang 0.032 m3 x Rp. 170,000.00 = Rp. 5,440.00
- semen warna 1 Kg x Rp. 5,800.00 = Rp. 5,800.00
JUMLAH = Rp. 82,055.00

b. Tenaga

- Pekerja 0.400 Oh x Rp. 27,500.00 = Rp. 11,000.00


- Tukang kayu 0.200 Oh x Rp. 41,000.00 = Rp. 8,200.00
- Kepala Tukang 0.020 Oh x Rp. 43,000.00 = Rp. 860.00
- Mandor 0.020 Oh x Rp. 45,000.00 = Rp. 900.00
JUMLAH = Rp. 20,960.00

JUMLAH (a) + (b) = Rp. 103,015.00

4 1 m2 pasang nok genteng aspal

a. Bahan

- genteng aspal 2 Bh x Rp. 1,000.00 = Rp. 2,000.00


- paku biasa 1/2" - 1" 0.05 Kg x Rp. 1,000.00 = Rp. 50.00
- kayu borneo, balok 0.0035 m3 x Rp. 1,000.00 = Rp. 3.50
JUMLAH = Rp. 2,053.50

b. Tenaga

- Pekerja 0.125 Oh x Rp. 27,500.00 = Rp. 3,437.50


- Tukang kayu 0.250 Oh x Rp. 41,000.00 = Rp. 10,250.00
- Kepala Tukang 0.025 Oh x Rp. 43,000.00 = Rp. 1,075.00
- Mandor 0.006 Oh x Rp. 45,000.00 = Rp. 270.00
JUMLAH = Rp. 15,032.50

JUMLAH (a) + (b) = Rp. 17,086.00


5 1 m1 pasang nok genteng metal roof

a. Bahan

- nok genteng metal roof 2.2 Bh x Rp. 22,500.00 = Rp. 49,500.00


- paku biasa 1/2" - 1" 0.05 Kg x Rp. 13,500.00 = Rp. 675.00
- kayu borneo, balok 0.0035 m3 x Rp. 1,150,000.00 = Rp. 4,025.00
JUMLAH = Rp. 54,200.00

b. Tenaga

- Pekerja 0.125 Oh x Rp. 27,500.00 = Rp. 3,437.50


- Tukang kayu 0.250 Oh x Rp. 41,000.00 = Rp. 10,250.00
- Kepala Tukang 0.025 Oh x Rp. 43,000.00 = Rp. 1,075.00
- Mandor 0.006 Oh x Rp. 45,000.00 = Rp. 270.00
JUMLAH = Rp. 15,032.50

JUMLAH (a) + (b) = Rp. 69,232.50

6 1 m2 Pemasangan Atap Seng Gelombang BJLS 0.20 mm

a. Bahan

- Seng Gelombang 0.98 Lbr x Rp. 47,200.00 = Rp. 46,256.00


- Paku Seng 0.036 Kg x Rp. 20,800.00 = Rp. 748.80
JUMLAH = Rp. 47,004.80

b. Tenaga

- Pekerja 0.200 Oh x Rp. 27,500.00 = Rp. 5,500.00


- Tukang kayu 0.020 Oh x Rp. 41,000.00 = Rp. 820.00
- Kepala Tukang 0.150 Oh x Rp. 43,000.00 = Rp. 6,450.00
- Mandor 0.005 Oh x Rp. 45,000.00 = Rp. 225.00
JUMLAH = Rp. 12,995.00

JUMLAH (a) + (b) = Rp. 59,999.80

7 1 m2 Pemasangan Atap Seng Gelombang BJLS 0.25 mm

a. Bahan

- Seng Gelombang 0.98 Lbr x Rp. 65,200.00 = Rp. 63,896.00


- Paku Seng 0.036 Kg x Rp. 20,800.00 = Rp. 748.80
JUMLAH = Rp. 64,644.80

b. Tenaga

- Pekerja 0.200 Oh x Rp. 27,500.00 = Rp. 5,500.00


- Tukang kayu 0.020 Oh x Rp. 41,000.00 = Rp. 820.00
- Kepala Tukang 0.150 Oh x Rp. 43,000.00 = Rp. 6,450.00
- Mandor 0.005 Oh x Rp. 45,000.00 = Rp. 225.00
JUMLAH = Rp. 12,995.00

JUMLAH (a) + (b) = Rp. 77,639.80

7 1 m2 Pemasangan Atap Seng Gelombang BJLS 0.30 mm

a. Bahan

- Seng Gelombang 0.98 Lbr x Rp. 73,100.00 = Rp. 71,638.00


- Paku Seng 0.036 Kg x Rp. 20,800.00 = Rp. 748.80
JUMLAH = Rp. 72,386.80
b. Tenaga

- Pekerja 0.200 Oh x Rp. 27,500.00 = Rp. 5,500.00


- Tukang kayu 0.020 Oh x Rp. 41,000.00 = Rp. 820.00
- Kepala Tukang 0.150 Oh x Rp. 43,000.00 = Rp. 6,450.00
- Mandor 0.005 Oh x Rp. 45,000.00 = Rp. 225.00
JUMLAH = Rp. 12,995.00

JUMLAH (a) + (b) = Rp. 85,381.80

9 1 m Pemasangan Bubungan Seng Plat BJLS 0.30 mm

a. Bahan

- Seng Plat 0.60 Lbr x Rp. 80,900.00 = Rp. 48,540.00


- Paku Seng 0.0108 Kg x Rp. 20,800.00 = Rp. 224.64
JUMLAH = Rp. 48,764.64

b. Tenaga

- Pekerja 0.025 Oh x Rp. 27,500.00 = Rp. 687.50


- Tukang kayu 0.025 Oh x Rp. 41,000.00 = Rp. 1,025.00
- Kepala Tukang 0.150 Oh x Rp. 43,000.00 = Rp. 6,450.00
- Mandor 0.005 Oh x Rp. 45,000.00 = Rp. 225.00
JUMLAH = Rp. 8,387.50

JUMLAH (a) + (b) = Rp. 57,152.14


BAHAN MATERIAL ALAMI
LOKASI : HALMAHERA SELATAN

NO JENIS BAHAN SATUAN HARGA (Rp.) KETERANGAN

1 Batu Kali / Batu Gunung M3 150,000.00


3 Batu Belah 10 - 15 cm M3 125,000.00
4 Batu Belah 7 - 10 cm M3 145,000.00
5 Batu Belah 5 - 7 cm M3 200,000.00
6 Batu Belah 3 - 5 cm M3 215,000.00
7 Batu Belah 2 - 3 cm M3 225,000.00
8 Batu Belah 1 - 2 cm M3 250,000.00
9 Batu Belah 0.5 - 1 cm M3 195,000.00
10 Kerikil Beton / Koral M3 195,000.00

11 Sirtu M3 150,000.00
12 Timbunan Pilihan / Pasir Urug M3 150,000.00
13 Timbunan Biasa / Tanah Urug M3 80,000.00
14 Pasir Kasar / Pasir Beton M3 200,000.00
15 Pasir Halus / Pasir Pasangan M3 170,000.00

16 Balok Kayu Klas I M3 1,600,000.00


17 Balok kayu Klas II M3 1,150,000.00
18 Papan Klas I M3 1,650,000.00
19 Papan Klas II M3 1,200,000.00
20 Dolken Kayu Galam Ø 8-10 / 4 meter Btg 26,500.00
UPAH KERJA

NO TENAGA KERJA UPAH (Rp./Hari) KODE IDEM KETERANGAN

1 Mandor Lapangan 45,000 MAN Mandor


2 Mekanik 35,000 MEK
3 Pembantu Mekanik 33,000 PMEK
4 Kepala Tukang 43,000 KTUK
5 Tukang 41,000 TUK Tukang Kayu, Batu dan Besi
6 Operator Terlatih 43,000
7 Operator Kurang Terlatih 37,000
8 Pembantu Operator 34,000
9 Supir Truck (Material) 36,500 SUP
10 Supir Personil 31,000 SUP2
11 Pembantu Supir (Kernet) 33,000 PSUP
12 Buruh Lapangan Terlatih 27,500 PKR Pekerja Terlatih
13 Buruh Lapangan Agak Terlatih 25,000
14 Buruh Lapangan Tidak Terlatih 22,500 PKR2 Pekerja Tidak Terlatih
BAHAN PABRIKASI

NO JENIS BAHAN SPESIFIKASI SATUAN HARGA (Rp.) KETERANGAN

1 Semen (PC) Zak 50 kg 52,000.00


Kg 1,100.00
2 Semen warna Kg 5,800.00
3 Kawat Beton Kg 18,400.00
4 Kawat Bronjong Kg 605,200.00
5 Kawat Duri Kg 201,700.00
6 Besi Beton Kg 11,000.00
7 Besi Beton Dia. 6 mm Staf 26,400.00
8 Besi Beton Dia. 8 mm Staf 46,800.00
9 Besi Beton Dia. 10 mm Staf 73,100.00
10 Besi Beton Dia. 12 mm Staf 104,400.00
11 Besi Beton Dia. 14 mm Staf 141,800.00
12 Besi Beton Dia. 16 mm Staf 229,700.00
13 Besi Beton Dia. 19 mm Staf 260,600.00
14 Besi Beton Dia. 22 mm Staf 349,300.00
15 Paku Campuran Kg 13,500.00
16 Paku Tripleks Kg 20,800.00
17 Paku Seng Kg 20,800.00
18 Paku Beton Kg 20,800.00
19 Kapur Padam M3 225,000.00
20 Teakwood 3 mm Uk. 122 x 244 cm Lbr 92,500.00
21 Tripleks 3 mm Uk. 122 x 244 cm Lbr 52,800.00
22 Tripleks 5 mm Uk. 122 x 244 cm Lbr 71,300.00
23 Tripleks 8 mm Uk. 122 x 244 cm Lbr 201,400.00
24 Tripleks 10 mm Uk. 122 x 244 cm Lbr 236,500.00
25 Tripleks 20 mm Uk. 122 x 244 cm Lbr 266,700.00
26 Pipa Galvanis Medium B Uk. 1/2 " Staf 128,400.00
27 Pipa Galvanis Medium B Uk. 3/4 " Staf 148,800.00
28 Pipa Galvanis Medium B Uk. 1 " Staf 214,800.00
29 Pipa GIP Medium A Uk. 1/2 " Staf 373,200.00
30 Pipa GIP Medium A Uk. 3/4 " Staf 449,400.00
31 Pipa PVC Uk. 1/2 " M' 7,600.00
32 Pipa PVC Uk. 3/4 " M' 8,200.00
33 Pipa PVC Uk. 1 " M' 8,800.00
34 Pipa PVC Uk. 11/2 " M' 18,500.00
35 Pipa PVC Uk. 2 " M' 22,100.00
36 Pipa PVC Uk. 3 " M' 57,300.00
37 Knee PVC Uk. 1/2 " Bh 1,400.00
38 Knee PVC Uk. 3/4 " Bh 1,700.00
39 Knee PVC Uk. 1 " Bh 2,000.00
40 Knee PVC Uk. 11/4 " Bh 2,600.00
41 Knee PVC Uk. 11/2 " Bh 2,900.00
42 Knee PVC Uk. 2 " Bh 30,400.00
43 Knee PVC Uk. 3 " Bh 9,200.00
44 Knee PVC Uk. 4 " Bh 12,300.00
45 Batu Bata Bh 1,800.00
46 Paving Stone Bh 6,500.00
47 Seng Gelombang BJLS 0.20 mm Lbr 47,200.00
48 Seng Gelombang BJLS 0.25 mm Lbr 65,200.00
49 Seng Gelombang BJLS 0.30 mm Lbr 73,100.00
50 Seng Pelat Bubungan BJLS 0.30 mm Lbr 80,900.00
51 Atap Asbes Gelombang Lbr 95,500.00
52 Genteng Metal Roof Lbr 91,200.00
53 Tegel Porselin 10 x 20 cm M2 62,300.00
54 Tegel Porselin 10 x 10 cm M2 61,100.00
55 Tegel Keramik 10 x 20 cm M2 61,100.00
56 Tegel Keramik 20 x 20 cm M2 73,800.00
57 Tegel Keramik 20 x 25 cm M2 87,100.00
58 Tegel Keramik 30 x 30 cm M2 101,000.00
59 Tegel Keramik 40 x 40 cm M2 114,300.00
60 Cat Kayu / Besi Glotex Kg 29,900.00
61 Cat Kayu / Besi Platone Kg 29,900.00
62 Cat Tembok Matex 1 Kg 14,300.00
63 Cat Tembok Matex 5 Kg 17,600.00
64 Cat Meni Kayu Altex 1 Kg 29,900.00
65 Cat Meni Besi Altex 1 Kg 29,900.00
66 Minyak Cat Thinner Liter 15,400.00
67 Minyak Cat Afduner Liter 12,300.00
68 Pelumas / Olie Liter 22,000.00
69 Dempul Kayu Altex Kg 19,600.00
70 Plamir Tembok 5 Kg Kaleng 29,800.00
71 Plamir Tembok 1 Kg Kaleng 5,960.00
72 Kuas Cat Bh 8,000.00
73 Residu Ltr 18,400.00
74 Lem Kayu 1 Ltr 12,500.00
75 Vernis 1 Ltr 15,000.00
76 Batu Apung 1 Kg 3,000.00
77 Kaca Rayban 3 mm M2 203,700.00
78 Kaca Rayban 5 mm M2 237,600.00
79 Kaca Bening 2 mm M2 137,200.00
80 Kaca Bening 3 mm M2 170,500.00
81 Kaca Bening 5 mm M2 203,700.00
82 Dudukan Nako Bh 30,400.00
83 Kran (Kualitas Baik) Bh 31,000.00
84 Avour / Saringan Air Kotor Bh 20,100.00
85 Floor Drain Bh 9,200.00
86 Kloset Jongkok INA Bh 218,900.00
87 Kloset Jongkok TOTO Bh 197,700.00
88 Kloset Duduk / Lengkap INA Bh 1,997,600.00
89 Kloset Duduk / Lengkap TOTO Bh 1,816,100.00
90 Wastafel INA / TOTO Bh 1,210,800.00
91 IJUK Kg 5,000.00
92 Kunci Pintu 1 Slaag Cap Kuda Terbang Bh 67,300.00
93 Kunci Pintu 2 Slaag Cap SES Bh 134,500.00
94 Grendel Jendela Bh 2,600.00
95 Kait Angin Bh 2,600.00
96 Engsel Jendela Kuningan Bh 21,300.00
97 Engsel Pintu Kuningan Bh 29,800.00
98 Lis Profil 5 cm M' 6,800.00
99 Profil Baja ( Pabrikan ) Kg 28,500.00
100 Plat Eiser M2 220,500.00
101 Besi Strip Kg 7,500.00
102 Pintu Rooling Door 1 M2 330,500.00
103 Pintu Alumanium 1 M2 275,000.00
104 Fibreglass M2 67,500.00
105 Geotekstil 1 M2 35,000.00
106 Oxigen 1 Btl 110,000.00
107 Elpiji 1 Kg 9,250.00
108 Asbes Gelombang (2.5x0.92 ) 5 mm M2 55,000.00
109 Asbes Gelombang (2.25x0.92 ) 5 mm M2 48,500.00
110 Asbes Gelombang (2.0x0.92 ) 5 mm M2 44,500.00
111 Atap Steel Gelombang / Spandec M2 87,500.00
112 Nok Steel 0.92 Bh 27,500.00
113 Nok Steel 1.05 Bh 32,500.00
114 Kertas Ampelas Lbr 4,400.00
115 Mur / Baut / Beugel / Angker Kg 24,400.00
116 Box Sekring 1 Group Bh 181,700.00
117 Box Sekring 2 Group Bh 363,200.00
118 Panel Box Bh 48,600.00
119 MCB 2 Ampere Bh 10,500.00
120 MCB 4 Ampere Bh 10,500.00
121 MCB 6 Ampere Bh 10,500.00
122 MCB 10 Ampere Bh 10,500.00
123 MCB 25 Ampere Bh 22,000.00
124 Saklar Tunggal Tanam Bh 34,100.00
125 Saklar Ganda Tanam Bh 67,900.00
126 Saklar Tunggal Timbul Bh 28,000.00
127 Saklar Ganda Timbul Bh 55,800.00
128 Stop Kontak Tanam Bh 66,700.00
129 Stop Kontak Timbul Bh 36,500.00
130 Titik Lampu Bh 12,300.00
131 Lampu Pijar 5 Watt Bh 3,200.00
132 Lampu Pijar 10 Watt Bh 5,000.00
133 Lampu Pijar 25 Watt Bh 5,600.00
134 Lampu Pijar 40 Watt Bh 6,500.00
135 Lampu Pijar 60 Watt Bh 6,500.00
136 Lampu Pijar 75 Watt Bh 8,000.00
137 Lampu Pijar 100 Watt Bh 34,100.00
138 Lampu Jari-jari 14 Watt Philips Bh 80,900.00
139 Lampu Jari-jari 18 Watt Philips Bh 82,100.00
140 Lampu Jari-jari 25 Watt Philips Bh 82,700.00
141 Alat Bantu Khusus 1 Set 100,000.00
142 Penangkal Petir 1 Unit 2,250,000.00
HARGA SATUAN BAHAN PABRIKASI

LOKASI : HALMAHERA SELATAN

SPESIFIKASI ONGKOS ANGKUT


NO JENIS BAHAN MERK / MOFDEL SATUAN HPS KE LOKASI
UKURAN PROYEK
1 2 3 4 5 6
1 Semen (PC) 50 kg Zak 45,405.00 45,405.00 1,950.00
Kg 908.10 998.91 50.00
2 Semen warna Kg 5,100.00 5,100.00 250.00
3 Kawat Beton Kg 15,000.00 16,500.00 250.00
4 Kawat Bronjong Rool 500,000.00 550,000.00 250.00
5 Kawat Duri Rool 166,500.00 183,150.00 250.00
6 Besi Beton Dia. 6 mm Staf 21,200.00 23,320.00 750.00
7 Besi Beton Dia. 8 mm Staf 38,000.00 41,800.00 750.00
8 Besi Beton Dia. 10 mm Staf 59,800.00 65,780.00 750.00
9 Besi Beton Dia. 12 mm Staf 85,600.00 94,160.00 750.00
10 Besi Beton Dia. 14 mm Staf 116,300.00 127,930.00 1,000.00
11 Besi Beton Dia. 16 mm Staf 189,000.00 207,900.00 1,000.00
12 Besi Beton Dia. 19 mm Staf 214,500.00 235,950.00 1,000.00
13 Besi Beton Dia. 22 mm Staf 287,500.00 316,250.00 1,300.00
14 Paku Campuran Kg 11,000.00 12,100.00 250.00
15 Paku Tripleks Kg 17,000.00 18,700.00 250.00
16 Paku Seng Kg 17,000.00 18,700.00 250.00
17 Paku Beton Kg 17,000.00 18,700.00 250.00
18 Teakwood 3 mm Uk. 122 x 244 cm Lbr 76,000.00 83,600.00 500.00
19 Tripleks 3 mm Uk. 122 x 244 cm Lbr 47,500.00 47,500.00 500.00
20 Tripleks 5 mm Uk. 122 x 244 cm Lbr 58,500.00 64,350.00 500.00
21 Tripleks 8 mm Uk. 122 x 244 cm Lbr 166,000.00 182,600.00 500.00
22 Tripleks 10 mm Uk. 122 x 244 cm Lbr 195,000.00 214,500.00 500.00
23 Tripleks 20 mm Uk. 122 x 244 cm Lbr 220,000.00 242,000.00 500.00
24 Pipa Galvanis Medium B Uk. 1/2 " M1 17,400.00 19,140.00 375.00
25 Pipa Galvanis Medium B Uk. 3/4 " M1 20,200.00 22,220.00 375.00
26 Pipa Galvanis Medium B Uk. 1 " M1 29,300.00 32,230.00 375.00
27 Pipa GIP Medium A Uk. 1/2 " M1 51,100.00 56,210.00 400.00
28 Pipa GIP Medium A Uk. 3/4 " M1 61,600.00 67,760.00 400.00
29 Pipa PVC Uk. 1/2 " M' 6,000.00 6,600.00 375.00
30 Pipa PVC Uk. 3/4 " M' 6,500.00 7,150.00 375.00
31 Pipa PVC Uk. 1 " M' 7,000.00 7,700.00 375.00
32 Pipa PVC Uk. 11/2 " M' 15,000.00 16,500.00 375.00
33 Pipa PVC Uk. 2 " M' 18,000.00 19,800.00 375.00
34 Pipa PVC Uk. 3 " M' 47,000.00 51,700.00 475.00
35 Knee PVC Uk. 1/2 " Bh 1,000.00 1,100.00 200.00
36 Knee PVC Uk. 3/4 " Bh 1,250.00 1,375.00 200.00
37 Knee PVC Uk. 1 " Bh 1,500.00 1,650.00 200.00
38 Knee PVC Uk. 11/4 " Bh 2,000.00 2,200.00 200.00
39 Knee PVC Uk. 11/2 " Bh 2,250.00 2,475.00 200.00
40 Knee PVC Uk. 2 " Bh 25,000.00 27,500.00 200.00
41 Knee PVC Uk. 3 " Bh 7,500.00 8,250.00 200.00
42 Knee PVC Uk. 4 " Bh 10,000.00 11,000.00 200.00
43 Batu Bata Kls I Bh 1,500.00 1,500.00 200.00
44 Batu Bata Kls II Bh 1,200.00 1,200.00 200.00
45 Batu Merah Bh 900.00 900.00 200.00
46 Paving Stone Bh 5,200.00 5,720.00 200.00
47 Seng Gelombang BJLS 0.20 mm Lbr 42,500.00 42,500.00 475.00
48 Seng Gelombang BJLS 0.25 mm Lbr 53,500.00 58,850.00 475.00
49 Seng Gelombang BJLS 0.30 mm Lbr 60,000.00 66,000.00 475.00
50 Seng Pelat Bubungan BJLS 0.30 mm Lbr 66,500.00 73,150.00 475.00
51 Atap Multi Roff 0.30 mm Lbr 75,000.00 82,500.00 475.00
52 Atap Asbes Gelombang Lbr 78,500.00 86,350.00 475.00
53 Tegel Semen 30 x 30 cm M2 36,300.00 39,930.00 550.00
54 Tegel Semen 20 x 20 cm M2 82,500.00 90,750.00 550.00
55 Tegel Porselin 10 x 20 cm M2 51,000.00 56,100.00 550.00
56 Tegel Porselin 10 x 10 cm M2 50,000.00 55,000.00 550.00
57 Tegel Keramik 10 x 20 cm M2 50,000.00 55,000.00 550.00
58 Tegel Keramik 20 x 20 cm M2 60,500.00 66,550.00 550.00
59 Tegel Keramik 20 x 25 cm M2 71,500.00 78,650.00 550.00
60 Tegel Keramik 30 x 30 cm M2 83,000.00 91,300.00 550.00
61 Tegel Keramik 40 x 40 cm M2 94,000.00 103,400.00 550.00
62 Cat Kayu / Besi Glotex Kg 24,500.00 26,950.00 250.00
63 Cat Kayu / Besi Platone Kg 24,500.00 26,950.00 250.00
64 Cat Tembok Matex 1 Kg 11,600.00 12,760.00 250.00
65 Cat Tembok Metrolait 1 Kg 14,400.00 15,840.00 250.00
66 Cat Meni Kayu Altex Kg 24,500.00 26,950.00 250.00
67 Cat Meni Besi Altex Kg 24,500.00 26,950.00 250.00
68 Minyak Cat Thinner Liter 12,500.00 13,750.00 250.00
69 Minyak Cat Afduner Liter 10,000.00 11,000.00 250.00
70 Pelumas / Olie Liter 18,000.00 19,800.00 250.00
71 Dempul Kayu Altex Kg 16,000.00 17,600.00 250.00
72 Plamir Tembok Kaleng 5 Kg 23,500.00 25,850.00 1,250.00
73 Kuas Cat Bh 6,500.00 7,150.00 200.00
74 Residu/Ter Liter 15,000.00 16,500.00 250.00
75 Kaca Rayban 3 mm M2 165,000.00 181,500.00 3,750.00
76 Kaca Rayban 5 mm M2 193,000.00 212,300.00 3,750.00
77 Kaca Bening 2 mm M2 110,000.00 121,000.00 3,750.00
78 Kaca Bening 3 mm M2 137,500.00 151,250.00 3,750.00
79 Kaca Bening 5 mm M2 165,000.00 181,500.00 3,750.00
80 Dudukan Nako Bh 25,000.00 27,500.00 200.00
81 Kran (Kualitas Baik) Bh 25,500.00 28,050.00 200.00
82 Avour / Saringan Air Kotor Bh 16,500.00 18,150.00 200.00
83 Floor Drain Bh 7,500.00 8,250.00 200.00
84 Kloset Jongkok INA Bh 180,500.00 198,550.00 500.00
85 Kloset Jongkok TOTO Bh 163,000.00 179,300.00 500.00
86 Kloset Duduk / Lengkap INA Bh 1,650,000.00 1,815,000.00 1,000.00
87 Kloset Duduk / Lengkap TOTO Bh 1,500,000.00 1,650,000.00 1,000.00
88 Wastafel INA / TOTO Bh 1,000,000.00 1,100,000.00 750.00
89 IJUK Ikat 10,000.00 11,000.00 200.00
90 Kunci Pintu 1 Slaag Cap Kuda Terbang Bh 55,500.00 61,050.00 200.00
91 Kunci Pintu 2 Slaag Cap SES Bh 111,000.00 122,100.00 200.00
92 Grendel Jendela Bh 2,000.00 2,200.00 200.00
93 Kait Angin Bh 2,000.00 2,200.00 200.00
94 Engsel Jendela Kuningan Bh 17,500.00 19,250.00 200.00
95 Engsel Pintu Kuningan Bh 24,500.00 26,950.00 200.00
96 Lis Profil 5 cm M' 5,500.00 6,050.00 200.00
97 Kertas Ampelas Lbr 3,500.00 3,850.00 200.00
98 Mur / Baut / Beugel / Angker Kg 20,000.00 22,000.00 200.00
99 Box Sekring Bh 150,000.00 165,000.00 200.00
100 Box 2 Sekring Bh 300,000.00 330,000.00 200.00
101 MCB 25 Ampere Bh 18,000.00 19,800.00 200.00
102 Panel Box Bh 40,000.00 44,000.00 200.00
103 MCB 2 Ampere Bh 8,500.00 9,350.00 200.00
104 MCB 4 Ampere Bh 8,500.00 9,350.00 200.00
105 MCB 6 Ampere Bh 8,500.00 9,350.00 200.00
106 MCB 10 Ampere Bh 8,500.00 9,350.00 200.00
107 MCB 25 Ampere Bh 18,000.00 19,800.00 200.00
108 MCB 16 Ampere Bh 16,000.00 17,600.00 200.00
109 Saklar Tunggal Tanam Bh 28,000.00 30,800.00 200.00
110 Saklar Ganda Tanam Bh 56,000.00 61,600.00 200.00
111 Saklar Tunggal Timbul Bh 23,000.00 25,300.00 200.00
112 Saklar Ganda Timbul Bh 46,000.00 50,600.00 200.00
113 Stop Kontak Double Tanam Bh 55,000.00 60,500.00 200.00
114 Stop Kontak Timbul Bh 30,000.00 33,000.00 200.00
115 Titik Lampu Bh 10,000.00 11,000.00 200.00
116 Lampu Pijar 5 Watt Bh 2,500.00 2,750.00 200.00
117 Lampu Pijar 10 Watt Bh 4,000.00 4,400.00 200.00
118 Lampu Pijar 25 Watt Bh 4,500.00 4,950.00 200.00
119 Lampu Pijar 40 Watt Bh 5,200.00 5,720.00 200.00
120 Lampu Pijar 60 Watt Bh 5,200.00 5,720.00 200.00
121 Lampu Pijar 75 Watt Bh 6,500.00 7,150.00 200.00
122 Lampu Pijar 100 Watt Bh 28,000.00 30,800.00 200.00
123 Lampu Jari-jari 14 Watt Bh 66,000.00 72,600.00 1,000.00
124 Lampu Jari-jari 18 Watt Bh 67,000.00 73,700.00 1,000.00
125 Lampu Jari-jari 25 Watt Bh 67,500.00 74,250.00 1,000.00
PABRIKASI

PROFIT PPN JAMSOSTEK HARGA SATUAN


10% 10% 0.50% DILOKASI PROYEK PEMBULATAN
(Rp) (Rp) (Rp) (Rp) (Rp)
7=10% *(5+6) 8 9=0.5%*(5+6+7) 10 11
4,735.50 260.45 52,090.50 52,000.00
104.89 5.77 1,153.80 1,100.00
535.00 29.43 5,885.00 5,800.00
1,675.00 92.13 18,425.00 18,400.00
55,025.00 3,026.38 605,275.00 605,200.00
18,340.00 1,008.70 201,740.00 201,700.00
2,407.00 132.39 26,477.00 26,400.00
4,255.00 234.03 46,805.00 46,800.00
6,653.00 365.92 73,183.00 73,100.00
9,491.00 522.01 104,401.00 104,400.00
12,893.00 709.12 141,823.00 141,800.00
20,890.00 1,148.95 229,790.00 229,700.00
23,695.00 1,303.23 260,645.00 260,600.00
31,755.00 1,746.53 349,305.00 349,300.00
1,235.00 67.93 13,585.00 13,500.00
1,895.00 104.23 20,845.00 20,800.00
1,895.00 104.23 20,845.00 20,800.00
1,895.00 104.23 20,845.00 20,800.00
8,410.00 462.55 92,510.00 92,500.00
4,800.00 264.00 52,800.00 52,800.00
6,485.00 356.68 71,335.00 71,300.00
18,310.00 1,007.05 201,410.00 201,400.00
21,500.00 1,182.50 236,500.00 236,500.00
24,250.00 1,333.75 266,750.00 266,700.00
1,951.50 107.33 21,466.50 21,400.00
2,259.50 124.27 24,854.50 24,800.00
3,260.50 179.33 35,865.50 35,800.00
5,661.00 311.36 62,271.00 62,200.00
6,816.00 374.88 74,976.00 74,900.00
697.50 38.36 7,672.50 7,600.00
752.50 41.39 8,277.50 8,200.00
807.50 44.41 8,882.50 8,800.00
1,687.50 92.81 18,562.50 18,500.00
2,017.50 110.96 22,192.50 22,100.00
5,217.50 286.96 57,392.50 57,300.00
130.00 7.15 1,430.00 1,400.00
157.50 8.66 1,732.50 1,700.00
185.00 10.18 2,035.00 2,000.00
240.00 13.20 2,640.00 2,600.00
267.50 14.71 2,942.50 2,900.00
2,770.00 152.35 30,470.00 30,400.00
845.00 46.48 9,295.00 9,200.00
1,120.00 61.60 12,320.00 12,300.00
170.00 9.35 1,870.00 1,800.00
140.00 7.70 1,540.00 1,500.00
110.00 6.05 1,210.00 1,200.00
592.00 32.56 6,512.00 6,500.00
4,297.50 236.36 47,272.50 47,200.00
5,932.50 326.29 65,257.50 65,200.00
6,647.50 365.61 73,122.50 73,100.00
7,362.50 404.94 80,987.50 80,900.00
8,297.50 456.36 91,272.50 91,200.00
8,682.50 477.54 95,507.50 95,500.00
4,048.00 222.64 44,528.00 44,500.00
9,130.00 502.15 100,430.00 100,400.00
5,665.00 311.58 62,315.00 62,300.00
5,555.00 305.53 61,105.00 61,100.00
5,555.00 305.53 61,105.00 61,100.00
6,710.00 369.05 73,810.00 73,800.00
7,920.00 435.60 87,120.00 87,100.00
9,185.00 505.18 101,035.00 101,000.00
10,395.00 571.73 114,345.00 114,300.00
2,720.00 149.60 29,920.00 29,900.00
2,720.00 149.60 29,920.00 29,900.00
1,301.00 71.56 14,311.00 14,300.00
1,609.00 88.50 17,699.00 17,600.00
2,720.00 149.60 29,920.00 29,900.00
2,720.00 149.60 29,920.00 29,900.00
1,400.00 77.00 15,400.00 15,400.00
1,125.00 61.88 12,375.00 12,300.00
2,005.00 110.28 22,055.00 22,000.00
1,785.00 98.18 19,635.00 19,600.00
2,710.00 149.05 29,810.00 29,800.00
735.00 40.43 8,085.00 8,000.00
1,675.00 92.13 18,425.00 18,400.00
18,525.00 1,018.88 203,775.00 203,700.00
21,605.00 1,188.28 237,655.00 237,600.00
12,475.00 686.13 137,225.00 137,200.00
15,500.00 852.50 170,500.00 170,500.00
18,525.00 1,018.88 203,775.00 203,700.00
2,770.00 152.35 30,470.00 30,400.00
2,825.00 155.38 31,075.00 31,000.00
1,835.00 100.93 20,185.00 20,100.00
845.00 46.48 9,295.00 9,200.00
19,905.00 1,094.78 218,955.00 218,900.00
17,980.00 988.90 197,780.00 197,700.00
181,600.00 9,988.00 1,997,600.00 1,997,600.00
165,100.00 9,080.50 1,816,100.00 1,816,100.00
110,075.00 6,054.13 1,210,825.00 1,210,800.00
1,120.00 61.60 12,320.00 12,300.00
6,125.00 336.88 67,375.00 67,300.00
12,230.00 672.65 134,530.00 134,500.00
240.00 13.20 2,640.00 2,600.00
240.00 13.20 2,640.00 2,600.00
1,945.00 106.98 21,395.00 21,300.00
2,715.00 149.33 29,865.00 29,800.00
625.00 34.38 6,875.00 6,800.00
405.00 22.28 4,455.00 4,400.00
2,220.00 122.10 24,420.00 24,400.00
16,520.00 908.60 181,720.00 181,700.00
33,020.00 1,816.10 363,220.00 363,200.00
2,000.00 110.00 22,000.00 22,000.00
4,420.00 243.10 48,620.00 48,600.00
955.00 52.53 10,505.00 10,500.00
955.00 52.53 10,505.00 10,500.00
955.00 52.53 10,505.00 10,500.00
955.00 52.53 10,505.00 10,500.00
2,000.00 110.00 22,000.00 22,000.00
1,780.00 97.90 19,580.00 19,500.00
3,100.00 170.50 34,100.00 34,100.00
6,180.00 339.90 67,980.00 67,900.00
2,550.00 140.25 28,050.00 28,000.00
5,080.00 279.40 55,880.00 55,800.00
6,070.00 333.85 66,770.00 66,700.00
3,320.00 182.60 36,520.00 36,500.00
1,120.00 61.60 12,320.00 12,300.00
295.00 16.23 3,245.00 3,200.00
460.00 25.30 5,060.00 5,000.00
515.00 28.33 5,665.00 5,600.00
592.00 32.56 6,512.00 6,500.00
592.00 32.56 6,512.00 6,500.00
735.00 40.43 8,085.00 8,000.00
3,100.00 170.50 34,100.00 34,100.00
7,360.00 404.80 80,960.00 80,900.00
7,470.00 410.85 82,170.00 82,100.00
7,525.00 413.88 82,775.00 82,700.00