A
B B
A
TAMPAK SAMPING
TAMPAK SAMPING PONDASI
GIRDER
0.10
0.60
0.13
0.32
1.28
0.35
0.25
2.10
40.00
1.50
0.20
0.29
0.20
1.35
0.50
Abutment 1 0.50
0.74
0.50
0.60
9.30
1.46
0.80
12.00
0.80
4.50
Abutment 2
Potongan A-A
AC - WC, t = 4 cm
Tack Coat
AC - BC, t = 6 cm
Tack Coat
CL
e% e%