I TENAGA KERJA
1 civil engeneering orang/hari 1.00 300,000.00
2 Mandor galian orang/hari 1.10 79,500.00
3 Mandor pasangan orang/hari 16.76 79,500.00
4 Mandor siaran orang/hari 3.29 79,500.00
5 Mandor plesteran orang/hari 0.95 79,500.00
6 Mandor beton orang/hari 0.01 79,500.00
7 Mandor pengisi orang/hari 0.84 79,500.00
8 Mandor kayu orang/hari 0.00 79,500.00
9 Mandor penganyam orang/hari 0.91 79,500.00
10 Kepala tukang pasangan orang/hari 11.17 63,600.00
11 Kepala tukang siaran orang/hari 2.33 63,600.00
12 Kepala tukang plesteran orang/hari 0.95 63,600.00
13 Kepala tukang beton orang/hari 0.00 63,600.00
14 Kepala tukang kayu orang/hari 0.00 63,600.00
15 Tukang batu pasangan orang/hari 111.72 53,100.00
16 Tukang batu siaran orang/hari 22.28 53,100.00
17 Tukang batu plesteran orang/hari 9.48 53,100.00
18 Tukang beton orang/hari 0.01 53,100.00
19 Tukang besi orang/hari 0.28 53,100.00
20 Tukang kayu orang/hari 0.02 53,100.00
21 Tukang pintu orang/hari 0.30 11,775,245.98
22 Tukang penganyam orang/hari 24.64 53,100.00
23 tukang batu nomenklatur orang/hari 0.20 250,000.00
24 Pekerja galian orang/hari 32.92 41,000.00
25 Pekerja pasangan orang/hari 335.17 41,000.00
26 Pekerja siaran orang/hari 67.04 41,000.00
27 Pekerja plesteran orang/hari 19.16 41,000.00
28 Pekerja beton orang/hari 0.15 41,000.00
29 Pekerja pengisi orang/hari 48.37 41,000.00
30 Pekerja penganyam orang/hari 20.16 49,300.00
31 pekerja pipa orang/hari 0.60 115,850.00
jumlah
II JENIS BAHAN
1 Batu kali pasangan 1:4 m3 139.66 167,800.00
2 Batu kali bronjong m3 35.00 167,800.00
3 Batu koral beton m3 0.03 262,400.00
4 Besi beton kg 3.52 20,835.68
5 Paku m3 0.01 28,800.00
Page 9
6 Kayu bekesting m3 0.00 3,313,500.00
7 Kawat beton kg 0.06 23,650.00
8 Kawat Galvanis d = 3 mm kg 385.00 16,500.00
9 Pasir cor/beton m3 0.02 137,350.00
10 Pasir pasang 1:4 m3 60.75 134,800.00
11 Pasir pasang 1:2 m3 1.55 134,800.00
12 Pasir pasang 1:3 m3 0.95 134,800.00
13 Portland cement (50 kg) 1:4 zak 379.05 75,750.00
14 Portland cement (50 kg) 1:2 zak 20.35 75,750.00
15 Portland cement (50 kg) 1:3 zak 8.13 75,750.00
16 Portland cement (50 kg) beton bertul zak 0.160 75,750.00
17 pintu air type C3 (B=400 mm) bh 0.70 11775245.98
18 nomenklatur bh 0.80 250000
19 pipa Lj 2.40 115850
Page 9
Jumlah
(Rp)
300,000.00
87,233.76
1,332,318.24
261,880.16
75,358.85
610.56
66,780.00
25.44
72,345.00
710,569.73
147,885.26
60,287.08
81.41
97.69
5,932,586.88
1,183,256.51
503,340.21
679.68
14,681.09
815.62
3,532,573.79
1,308,384.00
50,000.00
1,349,654.40
13,742,150.40
2,748,821.22
785,468.16
6,297.60
1,983,170.00
993,888.00
69,510.00
37,320,750.72
23,434,276.80
5,873,000.00
8,396.80
73,341.59
368.64
Page 9
4,241.28
1,513.60
6,352,500.00
2,197.60
8,189,148.53
208,961.57
127,778.27
28,713,011.75
1,541,198.14
616,004.30
12,120.00
8,242,672.19
200,000.00
278,040.00
24815
136.128
46863
304631.40004
30371.5098
25805.20338
5.01568
97198.9074
33792.9915
502382.63475
41486.79326
16167.8523
12.444288
7997.5
4876259.7367
1605.728
124.3968
56.5056
10.528
332.8
89,888,827.12
127,209,577.84
Page 9
PERHITUNGAN SUMBER DAYA MATERIAL DAN PERALATAN
NO URAIAN PEKERJAAN SATUAN VOLUME Vul x Koeff Satuan upah Harga upah
I PEKERJAAN PENDAHULUAN
1. Pekerjaan Uitzet ls 1.00
civil engineering - - -
II PEKERJAAN TANAH
1. Galian tanah biasa untk timbunan /dibuang m3 45.72
Keranjang 2.286 20,500.00 46863
IV PEKERJAAN BETON
1. Beton bertulang K .125 untuk plat pelayanan dan tit m3 0.03
Batu koral beton 0.03 262,400.00 8,396.80
Pasir cor/beton 0.02 137,350.00 2,197.60
Portland cement (50 kg) beton bertulang 0.16 75,750.00 12,120.00
molen beton 0.01 250,895.00 1,605.73
ember beton bertulang 0.00 15,674.00 5.02
vibrator 0.01 52,000.00 332.80
kotak adukan beton bertulang 0.00 32,407.00 12.44
Kayu bekesting 0.00 3,313,500.00 4,241.28
Paku 0.01 28,800.00 368.64
Palu / bodem beton bertulang 0.00 70,900.00 136.13
Gergaji 0.00 88,350.00 124.40
Besi beton 3.52 20,835.68 73,341.59
Kawat beton 0.06 23,650.00 1,513.60
Gunting pemotong baja 0.00 88,290.00 56.51
Kunci pembengkok tulangan 0.00 32,900.00 10.53
V PEKERJAAN PINTU
1. Pintu air type C3 (B=400, H=800, H'=2.000 mm) bh 1.00
pintu air type C3 (B=400 mm) 0.70 11,775,245.98 8,242,672.19
VI PEKERJAAN BRONJONG
1. Bronjong kawat galvanis d = 3 mm ( 0,50 x 1,00 x 2,0 m3 35.00
Batu kali bronjong 35.00 167,800.00 5,873,000.00
Kawat Galvanis d = 3 mm 385.00 16,500.00 6,352,500.00
Tang pemotong kawat 0.35 22,850.00 7,997.50
Palu / bodem bronjong 0.35 70,900.00 24,815.00
Page 2
pipa 2.40 115,850.00 278,040.00
Page 2
jumlah 89,888,827.12
Page 2
Page 2
PERHITUNGAN SUMBER DAYA TENAGA KERJA
NO URAIAN PEKERJAAN SATUAN VOLUME Vol x Koeff Satuan upah Harga upah
I PEKERJAAN PENDAHULUAN
Pekerjaan Uitzet ls 1.00
civil engeneering 1.00 300,000.00 300,000.00
II PEKERJAAN TANAH
Galian tanah biasa untk timbunan /dibuang m3 45.72
Mandor galian 1.09728 79,500.00 87233.76
Pekerja galian 32.9184 41,000.00 1349654.4
IV PEKERJAAN BETON
1 Beton bertulang K .125 untuk plat pelayanan dan t m3 0.03
Mandor beton 0.01 79,500.00 610.56
Mandor kayu 0.00 79,500.00 25.44
mandor besi tulangan 0.09 79,500.00 7,326.72
Kepala tukang beton 0.00 63,600.00 81.41
Kepala tukang kayu 0.00 63,600.00 97.69
Tukang beton 0.01 53,100.00 679.68
Tukang kayu 0.02 53,100.00 815.62
Tukang besi 0.28 53,100.00 14,681.09
Pekerja beton 0.15 41,000.00 6,297.60
pekerja besi tulangan 0.28 41,000.00 11,335.68
pekerja bekisting 0.02 41,000.00 755.71
V PEKERJAAN PINTU
1 Pintu air type C3 (B=400, H=800, H'=2.000 mm) bh 1.00
Tukang pintu 0.30 11,775,245.98 3,532,573.79
VI PEKERJAAN BRONJONG
1 Bronjong kawat galvanis d = 3 mm ( 0,50 x 1,00 x 2 m3 35.00
Mandor pengisi 0.84 79,500.00 66780
Tukang penganyam 24.64 53,100.00 1308384
Mandor penganyam 0.91 79500.00 72345
Pekerja pengisi 48.37 41,000.00 1983170
Pekerja penganyam 20.16 49,300.00 993888
Page 2
jumlah 37,340,168.83
Page 2
Page 2
URUTAN KEGIATAN
DURASI
NO URAIAN PEKERJAAN BIAYA PREDDECESSOR (Pekerjaan yg mendahului)
(hari)
1 2 3 4 5
I PEKERJAAN PENDAHULUAN
1 Pekerjaan Uitzet 300,000.00 6 -
II PEKERJAAN TANAH
2 Galian tanah biasa untk timbunan /dibuang 1,483,751.16 14 1 Pekerjaan Uitzet
IV PEKERJAAN BETON
6 Beton bertulang K .125 untuk plat pelayanan dan ti 185,092.71 6 3 Pasangan batu kali spesi 1Pc :4 Ps
V PEKERJAAN PINTU
7 Pintu air type C3 (B=400, H=800, H'=2.000 mm) 11,775,245.98 6 6 Beton bertulang K .125 untuk plat pelayanan dan
VI PEKERJAAN BRONJONG
8 Bronjong kawat galvanis d = 3 mm ( 0,50 x 1,00 x 2, 16,682,879.50 12 6 Beton bertulang K .125 untuk plat pelayanan dan
Page 2
URUTAN KEGIATAN
FS
FS(-6)
FS(-12)
FS(-6)
FS
FS
FS
FS
FS(-2)
Page 2
RENCANA ANGGARAN BIAYA (RAB)
PROGRAM : PENYEDIAAN DAN PENGELOLAAN AIR BAKU
KEGIATAN : PEMBANGUNAN PRASARANA PENGAMBILAN DAN SALURAN PEMBAWA
PEKERJAAN : PENINGKATAN DAM DAN SALURAN
LOKASI :
TAHUN ANGGARAN :
NO URAIAN PEKERJAAN SATUAN VOLUME HARGA SATUAN JUMLAH HARGA
I PEKERJAAN PENDAHULUAN
1 Pekerjaan Uitzet ls 1.00 Rp 300,000.00 Rp 300,000.00
II PEKERJAAN TANAH
1 Galian tanah biasa untk timbunan /dibuang m3 45.72 Rp 32,453.00 Rp 1,483,751.16
IV PEKERJAAN BETON
1 Beton bertulang K .125 untuk plat pelayanan dan titian m3 0.03 Rp 5,784,147.32 Rp 185,092.71
Jumlah Harga Pekerjaan Rp 185,092.71
V PEKERJAAN PINTU
1 Pintu air type C3 (B=400, H=800, H'=2.000 mm) bh 1.00 Rp 11,775,245.98 Rp 11,775,245.98
VI PEKERJAAN BRONJONG
1 Bronjong kawat galvanis d = 3 mm ( 0,50 x 1,00 x 2,00 ) m3 35.00 476,653.70 Rp 16,682,879.50
Page 2
HARGA SATUAN PEKERJAAN
DINAS PENGAIRAN KABUPATEN MALANG
PENINGKATAN DAM DAN SALURAN
0.00
TAHUN ANGGARAN 2016
2. PEKERJAAN PASANGAN
2.2.1. Pasangan batu kali spesi 1Pc : 4Psr M3 Rp. 749,926.45
2.2.2. Siaran spesi 1Pc : 2Psr M2 Rp. 34,690.39
2.2.3. Plesteran Tebal 1,5 cm dg spesi 1Pc : 3Psr M 2
Rp. 44,979.01
3 PEKERJAAN BETON
3.3.1. Beton K.125 M3 Rp. 1,010,613.62
3.3.2. Beton K. 175 M 3
Rp. 1,070,848.12
3.3.3. Bekesting kayu termasuk pembongkaran Kg Rp. 198,604.30
3.3.4. Perancah kayu bekesting termasuk pembongkaran M3 Rp. 4,152,686.90
3.3.5. Besi tulangan untuk beton struktur M 3
Rp. 33,833.04
3.3.6. Beton bertulang K.125 / plat titian dan pelayanan M3 Rp. 5,784,147.32
4. PEKERJAAN PINTU
Pintu air type C3 (B=400, H=800, H'=2.000 mm) Bh Rp. 11,775,245.98
Page 3
BIDANG PEMBANGUNAN
Page 4
BIDANG PEMBANGUNAN
Page 5
BIDANG PEMBANGUNAN
3.3.4. Perancah kayu bekesting termasuk pembongkaran
HARGA SATUAN TOTAL
NO URAIAN PEKERJAAN SATUAN KOEFISIEN
(Rp) (Rp)
I BAHAN
Kayu bekesting m3 1.100 3,313,500.00 3,644,850.00
TOTAL 3,644,850.00
II TENAGA
Mandor Org/hr 0.240 79,500.00 19,080.00
Kepala tukang Org/hr 0.480 63,600.00 30,528.00
Tukang kayu Org/hr 4.800 53,100.00 254,880.00
Pekerja Org/hr 4.800 41,000.00 196,800.00
TOTAL 501,288.00
III ALAT
Palu / bodem bh 0.050 70,900.00 3,545.00
Gergaji bh 0.034 88,350.00 3,003.90
TOTAL 6,548.90
Page 7
BIDANG PEMBANGUNAN
Page 8
DAFTAR UPAH KERJA DAN HARGA BAHAN
DINAS PENGAIRAN KABUPATEN MALANG
HARGA
NO JENIS UPAH KERJA / BAHAN SATUAN
(Rp)
I UPAH KERJA :
1 Mandor Orang/hari 79,500.00
2 Kepala Tukang Orang/hari 63,600.00
3 Tukang batu Orang/hari 53,100.00
4 Tukang Besi Orang/hari 53,100.00
5 Tukang kayu Orang/hari 53,100.00
6 Pekerja Orang/hari 41,000.00
7 civil engineering 1,500,000.00
II JENIS BAHAN
1 Batu kali M3 167,800.00
2 Besi Beton Polos Kg 20,835.68
3 Kayu/ Papan bekisting M3 3,313,500.00
4 Kawat bendrat Kg 23,650.00
5 Kawat Bronjong d 3 mm Kg 16,500.00
6 Pasir beton M3 137,350.00
7 Pasir pasang M3 134,800.00
8 Paku reng Kg 28,800.00
9 Tanah urug m3 83,700.00
10 Semen PC/ 50 Kg Zak 75,750.00
11 Semen PC/ 40 Kg Zak 60,600.00
12 Batu koral beton (Batu pecah 2-3 Cm) m3 262,400.00
13 Pintu Air type C2 ( B = 1000 mm ) Bh 22,748,386.46
( H = 1000 mm, H' = 3240 mm )
14 Pintu Air type C3 ( B = 400 mm ) Bh 11,775,245.98
( H = 800 mm, H' = 2000 mm )
15 Pintu Air type C5 ( B = 200 mm ) Bh 2,034,426.24
( H = 500 mm, H' = 500 mm )
16 Pipa PVC 2" Lj 115,850.00
Page 9
11 Kuas Bh 15,525.00
12 Kasut kayu Bh 67,735.00
13 Kotak adukan Bh 32,407.00
14 Tang pemotong kawat Bh 22,850.00
15 Molen Unit/hari 250,895.00
16 Gergaji Bh 88,350.00
17 Gunting pemotong baja Bh 88,290.00
18 Kunci pembengkok tulangan Bh 32,900.00
19 Vibrator Unit/hari 52,000.00
Page 9