RINCIAN VOLUME
VOLUME HARGA
NO JENIS BIAYA KEGIATAN JUMLAH
KEGIATAN SATUAN
ORG JMLH HR
I BIAYA PERSONIL
I TENAGA KERJA
1.1 Team Leader 1 14 14 350,000 4,900,000.00
1.2 Ahli Geoteknik 1 14 14 250,000 3,500,000.00
1.3 Laboran 2 14 28 225,000 6,300,000.00
1.4 Teknisi 2 14 28 200,000 5,600,000.00
1.5 Tenaga Pembantu 15 14 210 175,000 36,750,000.00
1.6 Sopir 1 14 14 150,000 2,100,000.00