I PEKERJAAN PERSIAPAN
1 Pembersihan dan persiapan M2 300.00
2 Uitzet M2 300.00
3 Pasang Papan Bowlank M' 59.88
II PEKERJAAN PONDASI
1 Pek. Galian pondasi setempat M3 41.34
2 Pek. Galian pondasi menerus M3 64.46
3 Pasir urug M3 4.20
4 Pas. Batu kosong M3 9.66
5 Pas. Batu kali M3 30.62
6 Urugan tanah kembali M3 35.27
IX PEKERJAAN LANTAI
1 Pas. Lantai granit 60x60 M2 175.95
2 Pas. Lantai keramik KM M2 20.09
3 Pas. Dinding keramik KM M2
4
PEKERJAAN PENGECATAN DAN POLITUR
X Pek. Cat tembok M2 1,330.64
1 Finishing tembok fine texture M2
2 Cat plafond M2 202.28
3 Pek. Cat list plafon M2 29.38
4 Politur kusen dengan ultran M' 22.27
5 Politur daun pintu KM / WC Bh 8.00
6 Politur daun jendela kaca Bh 8.00
7
HARGA SATUAN JUMLAH
Rp 7,500.00 Rp 2,250,000.00
Rp 8,400.00 Rp 2,520,000.00
Rp 47,160.00 Rp 2,823,940.80
Rp 7,593,940.80
Rp 35,650.00 Rp 1,473,771.00
Rp 35,650.00 Rp 2,297,999.00
Rp 132,200.00 Rp 555,768.80
Rp 295,670.00 Rp 2,856,172.20
Rp 469,035.00 Rp 14,361,851.70
Rp 12,550.00 Rp 442,596.67
Rp 21,988,159.37
Rp 132,500.00 Rp 3,373,450.00
Rp 134,500.00 Rp 855,420.00
Rp 4,228,870.00
Rp 785,920.00 Rp 773,345.28
Rp 4,100,223.00 Rp 18,697,016.88
Rp 4,865,400.00 Rp 5,254,632.00
Rp 4,286,304.00 Rp 28,503,921.60
Rp 3,223,844.00 Rp 4,223,235.64
Rp 4,874,006.00 Rp 14,232,097.52
Rp 4,193,061.00 Rp 42,693,747.10
Rp 1,132,733.00 Rp 16,288,700.54
Rp 2,593,778.00 Rp 2,394,057.09
Rp 3,123,844.00 Rp 2,342,883.00
Rp 3,588,298.00 Rp 12,738,457.90
Rp 75,130.00 Rp 9,564,800.30
Rp 1,095,991.00 Rp 4,449,723.46
Rp 2,116,393.00 Rp 16,486,701.47
Rp 178,643,319.79
Rp 211,616.00 Rp 139,423,201.60
Rp 29,493.00 Rp 39,244,565.52
Rp 17,360.00 Rp 23,099,910.40
Rp 201,767,677.52
Rp 275,000.00 Rp 26,915,625.00
Rp 94,150.00 Rp 5,323,241.00
Rp 125,000.00 Rp 2,835,000.00
Rp 35,073,866.00
Rp 113,975.00 Rp 23,054,863.00
Rp 39,776.00 Rp 16,695,180.48
Rp 39,750,043.48
Rp 109,810.00 Rp 16,524,208.80
Rp 1,250,000.00 Rp 15,000,000.00
Rp 875,000.00 Rp 7,000,000.00
Rp 402,632.00 Rp 3,221,056.00
Rp 41,745,264.80
Rp 165,000.00 Rp 29,031,750.00
Rp 125,000.00 Rp 2,511,250.00
Rp 135,600.00 Rp -
Rp 31,543,000.00
Rp 14,575.00 Rp 19,394,078.00
Rp 55,000.00 Rp -
Rp 20,898.00 Rp 4,227,247.44
Rp 17,979.00 Rp 528,223.02
Rp 35,969.00 Rp 801,029.63
Rp 54,155.00 Rp 433,240.00
Rp 107,572.00 Rp 860,576.00
Rp 26,244,394.09
Jumlah
Dibulatkan Rp 588,578,535.84
Daftar Analisa
No. Uraian Pekerjaan Harga Harga Harga Jumlah
Satuan Upah Bahan Harga
A B C D E F
I PEKERJAAN PERSIAPAN
1 1 M2 PEMBERSIHAN LAPANGAN
0.005 oh Mandor 70,000.00 350.00 350.00
0.100 Pekerjaan 66,500.00 6,650.00 6,650.00
7,000.00 0.00 7,000.00
2 1M2 UITZET / PENGUKURAN
0.050 ho Mandor 75,000.00 3,750.00 0.00 3,750.00
0.010 ho Kepaka Tukang Kayu 65,000.00 650.00 0.00 650.00
0.100 ho Pekerja 35,000.00 3,500.00 0.00 3,500.00
7,900.00 0.00 7,900.00
3 1 M2 PEMASANGAN BOWPLANK
0.012 m3 Kayu usuk 5/7 1,800,000.00 21,600.00 21,600.00
0.020 kg Paku Biasa 2" - 5" 18,000.00 360.00 360.00
0.007 m3 Kayu papan 3/20 2,000,000.00 14,000.00 14,000.00
0.100 ho Pekerja 35,000.00 3,500.00 3,500.00
0.100 oh Tukang Kayu 60,000.00 6,000.00 6,000.00
0.010 oh Kepala Tukang Kayu 65,000.00 650.00 650.00
0.005 oh Mandor 70,000.00 350.00 350.00
10,500.00 35,960.00 46,460.00
II PEKERJAAN PONDASI
1 1 M3 GALIAN TANAH BIASA
0.900 oh Pekerja 35,000.00 31,500.00 31,500.00
0.045 oh Mandor 70,000.00 3,150.00 3,150.00
34,650.00 34,650.00
2 1 M3 PASIR URUG
1.200 m3 Pasir Urug 100,000.00 120,000.00 120,000.00
0.300 oh Pekerja 35,000.00 10,500.00 10,500.00
0.010 oh Mandor 70,000.00 700.00 700.00
11,200.00 120,000.00 131,200.00
3 1 M3 PASANGAN BATU KOSONG
1.200 m3 Batu Belah 15/30 160,000.00 192,000.00 192,000.00
0.432 m3 Pasir Pasang 100,000.00 43,200.00 43,200.00
0.780 ho Pekerja 35,000.00 27,300.00 27,300.00
0.390 ho Tukang Batu 55,000.00 21,450.00 21,450.00
0.039 ho Kepala Tukang Batu 65,000.00 2,535.00 2,535.00
0.039 ho Mandor 70,000.00 2,730.00 2,730.00
54,015.00 235,200.00 289,215.00
4 1 M3 PASANGAN BATU KARANG 1:5
1.200 m3 Batu Karang 125,000.00 150,000.00 150,000.00
136.000 kg Semen Portland 1,080.00 146,880.00 146,880.00
0.544 m3 Pasir Pasang 120,000.00 65,280.00 65,280.00
1.500 ho Pekerja 35,000.00 52,500.00 52,500.00
0.750 ho Tukang Batu 55,000.00 41,250.00 41,250.00
0.075 ho Kepala Tukang Batu 65,000.00 4,875.00 4,875.00
0.075 ho Mandor 70,000.00 5,250.00 5,250.00
103,875.00 362,160.00 466,035.00
5 1 M3 URUGAN TANAH KEMBALI
0.300 ho Pekerja 35,000.00 10,500.00 10,500.00
0.015 ho Mandor 70,000.00 1,050.00 1,050.00
11,550.00 11,550.00
VI PEKERJAAN ATAP
1 1 M2 PEK. ATAP GENTENG EX. KODOK GEBANG
25.000 bj Genteng Kodok Gebang 2,750.00 68,750.00 68,750.00
0.100 ho Tukang Kayu 60,000.00 6,000.00 6,000.00
0.010 ho Kepala Tukang Kayu 65,000.00 650.00 650.00
0.200 ho Pekerja 40,000.00 8,000.00 8,000.00
0.010 ho Mandor 75,000.00 750.00 750.00
15,400.00 68,750.00 84,150.00
IX PEKERJAAN LANTAI
1 1 M2 PEK. LANTAI GERANIT
1.200 m2 Granit 60x60 37,000.00 44,400.00 44,400.00
0.600 kg Semen Portland 1,080.00 648.00 648.00
0.045 m2 Pasir Pasang 120,000.00 5,400.00 5,400.00
1.500 kg Semen Warna 12,000.00 18,000.00 18,000.00
0.350 ho Tukang Batu 55,000.00 19,250.00 19,250.00
0.035 ho Kepala Tukang 65,000.00 2,275.00 2,275.00
0.700 ho Pekerja 35,000.00 24,500.00 24,500.00
0.035 ho Mandor 70,000.00 2,450.00 2,450.00
48,475.00 68,448.00 116,923.00
2 1 M' PEK. PLIN GERANIT
0.120 m2 Granit 60x60 350,000.00 42,000.00 42,000.00
0.600 kg Semen Portland 1,080.00 648.00 648.00
0.002 m2 Pasir Pasang 120,000.00 240.00 240.00
0.060 kg Semen Warna 12,000.00 720.00 720.00
0.350 ho Tukang Batu 55,000.00 19,250.00 19,250.00
0.035 ho Kepala Tukang 65,000.00 2,275.00 2,275.00
0.700 ho Pekerja 35,000.00 24,500.00 24,500.00
0.035 ho Mandor 70,000.00 2,450.00 2,450.00
48,475.00 43,608.00 92,083.00
3 1 M' PEK. PAS. LANTAI KERAMIK 20X20
1.200 m2 Keramik 20x20 40,000.00 48,000.00 48,000.00
0.012 kg Semen Portland 1,080.00 12.96 12.96
0.010 m2 Pasir Pasang 120,000.00 1,200.00 1,200.00
0.060 kg Semen Warna 12,000.00 720.00 720.00
0.350 ho Tukang Batu 55,000.00 19,250.00 19,250.00
0.035 ho Kepala Tukang 65,000.00 2,275.00 2,275.00
0.700 ho Pekerja 35,000.00 24,500.00 24,500.00
0.035 ho Mandor 70,000.00 2,450.00 2,450.00
48,475.00 49,932.96 98,407.96
4 1 M' PEK. PAS. DINDING KERAMIK 20X25
1.200 m2 Keramik 20x25 45,000.00 54,000.00 54,000.00
0.600 kg Semen Portland 1,080.00 648.00 648.00
0.045 m2 Pasir Pasang 120,000.00 5,400.00 5,400.00
1.620 kg Semen Warna 12,000.00 19,440.00 19,440.00
0.350 ho Tukang Batu 55,000.00 19,250.00 19,250.00
0.035 ho Kepala Tukang 65,000.00 2,275.00 2,275.00
0.700 ho Pekerja 35,000.00 24,500.00 24,500.00
0.035 ho Mandor 70,000.00 2,450.00 2,450.00
48,475.00 79,488.00 127,963.00
1 M3 BETON COR 1 : 2 : 3
6.600 zak Semen 52,500.00 346,500.00 346,500.00
0.312 m3 Pasir Cor 150,000.00 46,800.00 46,800.00
0.468 m3 Koral 150,000.00 70,200.00 70,200.00
0.800 ho Tukang Batu 45,000.00 36,000.00 36,000.00
0.080 ho Kepala Tukang Batu 60,000.00 4,800.00 4,800.00
5.300 ho Pekerja 35,000.00 185,500.00 185,500.00
0.119 ho Mandor 75,000.00 8,925.00 8,925.00
235,225.00 463,500.00 698,725.00
II PEKERJAAN PONDASI
1 1 M3 GALIAN TANAH BIASA
0.900 oh Pekerja 35,000.00 31,500.00 31,500.00
0.045 oh Mandor 70,000.00 3,150.00 3,150.00
34,650.00 34,650.00
2 1 M3 PASIR URUG
1.200 m3 Pasir Urug 100,000.00 120,000.00 120,000.00
0.300 oh Pekerja 35,000.00 10,500.00 10,500.00
0.010 oh Mandor 70,000.00 700.00 700.00
11,200.00 120,000.00 131,200.00
3 1 M3 PASANGAN BATU KOSONG
1.200 m3 Batu Belah 15/30 160,000.00 192,000.00 192,000.00
0.432 m3 Pasir Pasang 100,000.00 43,200.00 43,200.00
0.780 ho Pekerja 35,000.00 27,300.00 27,300.00
0.390 ho Tukang Batu 55,000.00 21,450.00 21,450.00
0.039 ho Kepala Tukang Batu 65,000.00 2,535.00 2,535.00
0.039 ho Mandor 70,000.00 2,730.00 2,730.00
54,015.00 235,200.00 289,215.00
4 1 M3 PASANGAN BATU KARANG 1:5
1.200 m3 Batu Karang 125,000.00 150,000.00 150,000.00
136.000 kg Semen Portland 1,080.00 146,880.00 146,880.00
0.544 m3 Pasir Pasang 120,000.00 65,280.00 65,280.00
1.500 ho Pekerja 35,000.00 52,500.00 52,500.00
0.750 ho Tukang Batu 55,000.00 41,250.00 41,250.00
0.075 ho Kepala Tukang Batu 65,000.00 4,875.00 4,875.00
0.075 ho Mandor 70,000.00 5,250.00 5,250.00
103,875.00 362,160.00 466,035.00
5 1 M3 URUGAN TANAH KEMBALI
0.300 ho Pekerja 35,000.00 10,500.00 10,500.00
0.015 ho Mandor 70,000.00 1,050.00 1,050.00
11,550.00 11,550.00
VI PEKERJAAN ATAP
1 1 M2 PEK. ATAP GENTENG EX. KODOK GEBANG
25.000 bj Genteng Kodok Gebang 2,750.00 68,750.00 68,750.00
0.100 ho Tukang Kayu 60,000.00 6,000.00 6,000.00
0.010 ho Kepala Tukang Kayu 65,000.00 650.00 650.00
0.200 ho Pekerja 40,000.00 8,000.00 8,000.00
0.010 ho Mandor 75,000.00 750.00 750.00
15,400.00 68,750.00 84,150.00
IX PEKERJAAN LANTAI
1 1 M2 PEK. LANTAI GERANIT
1.200 m2 Granit 60x60 37,000.00 44,400.00 44,400.00
0.600 kg Semen Portland 1,080.00 648.00 648.00
0.045 m2 Pasir Pasang 120,000.00 5,400.00 5,400.00
1.500 kg Semen Warna 12,000.00 18,000.00 18,000.00
0.350 ho Tukang Batu 55,000.00 19,250.00 19,250.00
0.035 ho Kepala Tukang 65,000.00 2,275.00 2,275.00
0.700 ho Pekerja 35,000.00 24,500.00 24,500.00
0.035 ho Mandor 70,000.00 2,450.00 2,450.00
48,475.00 68,448.00 116,923.00
2 1 M' PEK. PLIN GERANIT
0.120 m2 Granit 60x60 350,000.00 42,000.00 42,000.00
0.600 kg Semen Portland 1,080.00 648.00 648.00
0.002 m2 Pasir Pasang 120,000.00 240.00 240.00
0.060 kg Semen Warna 12,000.00 720.00 720.00
0.350 ho Tukang Batu 55,000.00 19,250.00 19,250.00
0.035 ho Kepala Tukang 65,000.00 2,275.00 2,275.00
0.700 ho Pekerja 35,000.00 24,500.00 24,500.00
0.035 ho Mandor 70,000.00 2,450.00 2,450.00
48,475.00 43,608.00 92,083.00
3 1 M' PEK. PAS. LANTAI KERAMIK 20X20
1.200 m2 Keramik 20x20 40,000.00 48,000.00 48,000.00
0.012 kg Semen Portland 1,080.00 12.96 12.96
0.010 m2 Pasir Pasang 120,000.00 1,200.00 1,200.00
0.060 kg Semen Warna 12,000.00 720.00 720.00
0.350 ho Tukang Batu 55,000.00 19,250.00 19,250.00
0.035 ho Kepala Tukang 65,000.00 2,275.00 2,275.00
0.700 ho Pekerja 35,000.00 24,500.00 24,500.00
0.035 ho Mandor 70,000.00 2,450.00 2,450.00
48,475.00 49,932.96 98,407.96
4 1 M' PEK. PAS. DINDING KERAMIK 20X25
1.200 m2 Keramik 20x25 45,000.00 54,000.00 54,000.00
0.600 kg Semen Portland 1,080.00 648.00 648.00
0.045 m2 Pasir Pasang 120,000.00 5,400.00 5,400.00
1.620 kg Semen Warna 12,000.00 19,440.00 19,440.00
0.350 ho Tukang Batu 55,000.00 19,250.00 19,250.00
0.035 ho Kepala Tukang 65,000.00 2,275.00 2,275.00
0.700 ho Pekerja 35,000.00 24,500.00 24,500.00
0.035 ho Mandor 70,000.00 2,450.00 2,450.00
48,475.00 79,488.00 127,963.00
1 M3 BETON COR 1 : 2 : 3
6.600 zak Semen 52,500.00 346,500.00 346,500.00
0.312 m3 Pasir Cor 150,000.00 46,800.00 46,800.00
0.468 m3 Koral 150,000.00 70,200.00 70,200.00
0.800 ho Tukang Batu 45,000.00 36,000.00 36,000.00
0.080 ho Kepala Tukang Batu 60,000.00 4,800.00 4,800.00
5.300 ho Pekerja 35,000.00 185,500.00 185,500.00
0.119 ho Mandor 75,000.00 8,925.00 8,925.00
235,225.00 463,500.00 698,725.00