HITUNGAN SITUASI

PROYEK : PEMBANGUNAN BENDUNGAN TAMBLANG DI KABUPATEN BULELENG


DIUKUR OLEH :
LOKASI : TP JALAN INSPEKSI
TANGGAL :
Hal :
OCC POINT BACKSIGHT KOORDINAT
NO.
X Y X Y X Y Z
J1 299304.597 9101160.201 197.436
J2 299333.188 9101244.806 193.331
J3 299353.768 9101251.771 192.308
J4 299386.626 9101280.161 187.565
J5 299428.131 9101310.033 188.819
J4 299386.607 9101280.157 187.596
J5 299428.138 9101310.007 188.824
J6 299398.838 9101400.868 184.79
J7 299479.06 9101458.76 179.843
J8 299450.46 9101337.789 188.531
J9 299483.958 9101310.096 186.197
J10 299520.489 9101276.692 180.31
J11 299528.917 9101261.567 178.972
J12 299544.793 9101257.896 170.154
J13 299570.663 9101234.839 149.326
J14 299495.652 9101495.652 194.476
J15 299557.431 9101138.136 179.988
J16 299566.906 9101130.428 176.484
J17 299761.355 9101191.919 189.719
J18 299744.803 9101255.58 187.714
J19 299736.67 9101277.73 190.323
J20 299758.775 9101196.807 189.33

TP 5E 299556.916 9101158.814 184.759


A 11 299511.288 9101214.32 192.041
A4 299511.087 9101291.426 181.217

Sketsa :

Disetujui oleh Dibuat oleh


Direksi Teknis Kontraktor Pelaksana
PP-ADI JAYA, KSO
……………………….. …………………..……..
HITUNGAN SITUASI

PROYEK : PEMBANGUNAN BENDUNGAN TAMBLANG DI KABUPATEN BULELENG


DIUKUR OLEH :
LOKASI : TP SIPLLWAY
TANGGAL :
Hal :
OCC POINT BACKSIGHT KOORDINAT
NO.
X Y X Y X Y Z
SP 1 299452.032 9100993.7 194.215
SP 2 299517.945 9101035.899 160.042
SP 3 299560.013 9101045.253 147.929
SP 4 299617.775 9101067.079 134.6
SP 5 299657.349 9101083.559 119.204
SP 6 299672.466 9101147.279 118.701

SP BM 299547.943 9100968.581 176.346

CP 0 299498.329 9100958.651 185.981


AS spw 299457.539 9100904.599 193.257
BWS 19 299448.934 9100969.459 196.933

BM 1 299323.785 9100928.197 204.057


4 KR 299374.697 9100980.149 202.992

Sketsa :

Disetujui oleh Dibuat oleh


Direksi Teknis Kontraktor Pelaksana
PP-ADI JAYA, KSO

……………………….. …………………..……..
DATA UKUR LEVEL / WATERPASS

PROYEK : PEMBANGUNAN BENDUNGAN TAMBLANG DI KABUPATEN BULELENG


LOKASI :
ALAT UKUR : HAL :
TANGGAL : NO. PROFIL :

NOMOR STAND I STAND II KOREK


HI H II RATA - RATA ELEVASI ELEVASI KOREKSI
TITIK BT BA / BB BT BA / BB SI

Disetujui oleh Dibuat oleh


DIREKSI PENGAWAS Kontraktor Pelaksana
PP-ADI JAYA, KSO
……………………….. …………………..……..