FORM SERAH TERIMA DESAIN DAN PATOK STAKE OUT

PT ULIMA NITRA (Job Site BGG)

Design Name SUB CROP SEAM 8 NO EASTING NORTHING ELEVATION


Locate PIT TRANSISI 1 358128.162 9592469.848 58.201
Design By PT UN 2 358130.910 9592471.229 58.014
Day/ Date 10 Oktober 2022 3 358132.206 9592472.596 58.008
4 358143.245 9592480.261 57.442
5 358151.746 9592491.76 58.054
6 358153.533 9592492.596 57.974
7 358164.388 9592499.118 57.789
8 358170.910 9592504.922 58.066
9 358174.819 9592508.687 58.318
10 358183.204 9592512.596 58.177
11 358188.542 9592514.964 58.089
12 358190.910 9592516.325 58.111
13 358200.720 9592522.786 58.395
14 358210.910 9592527.969 58.452
15 358213.652 9592529.854 58.569
16 358217.047 9592532.596 58.797
17 358223.608 9592539.898 59.656
18 358230.91 9592544.909 60.007
19 358239.601 9592543.905 58.994
20 358245.504 9592547.190 59.109

Telah dilakukan pemasangan titik di lapangan:

Diterima oleh: Dipasang oleh: Dibuat oleh:

Produksi Surveyor Engineer


FORM SERAH TERIMA DESAIN DAN PATOK STAKE OUT
PT ULIMA NITRA (Job Site BGG)

Design Name SUB CROP SEAM 8


Locate PIT TRANSISI
Design By PT UN
Day/ Date 10 Oktober 2022

NO EASTING NORTHING ELEVATION


21 358250.910 9592549.775 59.118
22 358251.754 9592551.752 59.445
23 358251.994 9592552.596 59.597
24 358259.337 9592564.169 61.254
25 358264.019 9592572.596 62.530
26 358266.687 9592576.819 63.166
27 358270.910 9592582.805 64.067
28 358276.004 9592587.502 64.609
29 358281.867 9592592.596 65.170
30 358285.430 9592598.076 66.096
31 358299.027 9592604.479 66.063
32 358303.034 9592604.72 65.630
33 358310.910 9592605.988 64.958
34 358329.965 9592611.651 63.865

Telah dilakukan pemasangan titik di lapangan:

Diterima oleh: Dipasang oleh: Dibuat oleh:

Produksi Surveyor Engineer