LAPORAN BULANAN
PEKERJAAN :
Pekerjaan Desain, Suplai dan Pemasangan
Transmisi 500 kV Balaraja - Kembangan
LOT 1 : Transmisi 500 kV Balajara - Cikupa
Kontrak No :
Nomor Pihak Pertama : 0334.PJ/DAN.02.02/010700/2019
Nomor Pihak Kedua : 2772/BTU/HPS/VIII/2019
Tanggal : 28 Agustus 2019
PERIODE :
BULAN KE - 07
MARET 2020
EMPAT RATUS DELAPAN PULUH DUA MILYAR DELAPAN RATUS EMPAT PULUH JUTA TUJUH RATUS EMPAT
PULUH EMPAT RIBU DELAPAN RATUS TUJUH PULUH RUPIAH
REKAPITULASI
LAPORAN KEMAJUAN PEKERJAAN PROGRESS FISIK
LAPORAN BULANAN
4/57
LAPORAN KEMAJUAN PEKERJAAN
LAPORAN BULANAN
5/57
LAPORAN KEMAJUAN PEKERJAAN
LAPORAN BULANAN
14.1 Type 4AA10 - 3 Tower Sets 1 0.4987 0.0106 0.0968 0.6062 - - - - - - - - - - - ###
14.2 Type 4AA10 ± 0 Tower (Standard Height) Sets 0 - - - - - - - - - - - - - - - ###
14.3 Type 4AA10 + 3 Tower Sets 0 - - - - - - - - - - - - - - - ###
14.4 Type 4AA10 + 6 Tower Sets 0 - - - - - - - - - - - - - - - ###
14.5 Type 4AA10 + 9 Tower Sets 0 - - - - - - - - - - - - - - - ###
14.6 Type 4AA10 + 12 Tower Sets 0 - - - - - - - - - - - - - - - ###
14.7 Type 4AA10 + 15 Tower Sets 0 - - - - - - - - - - - - - - - ###
SUBTOTAL BOBOT ITEMS 14.14.1 - 14.14.7 0.4987 0.0106 0.0968 0.6062 - - - - - - - - - -
6/57
LAPORAN KEMAJUAN PEKERJAAN
LAPORAN BULANAN
7/57
LAPORAN KEMAJUAN PEKERJAAN
LAPORAN BULANAN
26 OTHERS
8/57
LAPORAN KEMAJUAN PEKERJAAN
LAPORAN BULANAN
TOTAL BOBOT CIVIL 19.5817 0.4520 49.3013 69.3349 8.5375 0.1899 14.3896 - - 0.0289 8.5375 0.1899 14.4185 23.1460
9/57
LAPORAN KEMAJUAN PEKERJAAN
LAPORAN BULANAN
dibulatkan
1 CONDUCTORS, INCLUDING ALL JOINT AND JUMPER CONNECTIONS
FOR 500 KV dibulatkan
Two circuit of quadruple line conductors ACSR-AS 450-A1/SA1A-54/7 for
1.1a kmr 25 12.3935 0.3281 1.4525 14.1740 25 12.3935 25 0.3281 4.916 0.2856 - - - 25 12.3935 25 0.3281 4.916 0.2856 13.0072 91.7679
section balaraja - Cikupa
Two circuit of quadruple line conductors ACSR-AS 450-A1/SA1A-54/7 for
1.1b kmr 5.10 2.5283 0.0669 0.2963 2.8915 5.10 2.5283 5.10 0.0669 - - - - 5.1 2.5283 5.1 0.0669 - 2.5952 89.7527
Incomer at Balaraja Substation Recofiguration
Two earth conductor, OPGW 100 mm² 24 core, complete with joint boxes,
1.2a kmr 25 0.7076
dibulatkan 0.1640 0.2552 1.1268 25 0.7076 25 0.1640 3.533 0.0361 - - - 25 0.7076 25 0.1640 3.533 0.0361 0.9077 80.5557
fixing device, fixing clamps and necessary acceccories
Two earth conductor, OPGW 100 mm² 48 core, complete with joint boxes,
1.2b kmr 1 0.0344 0.0066 0.0102 0.0512 1 0.0344 1 0.0066 - - - - 1 0.0344 1 0.0066 - 0.0410 80.0645
fixing device, fixing clamps and necessary acceccories
Set of three of quadruple ACSR-AS 450-A1/SA1A-54/7 downleads to
1.3 substation gantry at Balaraja Substation (excluding low duty inverse Sets 2 0.0496 0.0262 0.0349 0.1107 2 0.0496 2 0.0262 - - - - 2 0.0496 2 0.0262 - 0.0758 68.5043
insulator sets U 210 BP)
Set of two OPGW 100 mm² 24 core, earth conductors to Balaraja substation
1.4 Sets 1 0.0142 0.0066 0.0051 0.0258 1 0.0142 1 0.0066 - - - - 1 0.0142 1 0.0066 - 0.0207 80.2333
gantry including all fittings
Set of Gantry Boxes (GB) complete, installed on gantry at Balaraja
1.5 Sets 2 0.0050 0.0003 0.0034 0.0087 2 0.0050 2 0.0003 - - - - 2 0.0050 2 0.0003 - 0.0053 60.6918
substation
1.6a Armour Rod for ACSR-AS 450-A1/SA1A-54/7 Sets 552 0.0702 0.0036 0.0138 0.0877 552 0.0702 552 0.0036 - - - - 552 0.0702 552 0.0036 - 0.0738 84.2181
1.6b Armour Rod for OPGW 100 mm² Sets 46 0.0045 0.0002 0.0012 0.0058 46 0.0045 46 0.0002 - - - - 46 0.0045 46 0.0002 - 0.0047 80.2513
1.7 Counter weight per 100 kg Units 0 - - - -
1.8 Repair sleeves for ACSR-AS 450-A1/SA1A-54/7 Sets 91 0.0208 0.0011 0.0052 0.0271 91 0.0208 91 0.0011 - - - - 91 0.0208 91 0.0011 - 0.0219 80.8722
1.9 Compression Mid Span Joint for ACSR-AS 450-A1/SA1A-54/7 Sets 362 0.0690 0.0036 0.0619 0.1345 362 0.0690 362 0.0036 - - - - 362 0.0690 362 0.0036 - 0.0727 54.0159
Funk net for crossing transmission line with main roads (include foundation
1.10 Sets 1 0.0465 0.0033 0.0421 0.0919 - - - - - - - - - - -
and structures) between T01-T02
ADSS (All Dielectric Self Supporting) cable 24 core from jointing point to
1.11 Cikupa substation. Completed with fixing device, fixing clamps, joint boxes, kmr 1.5 0.0310 0.0082 0.0153 0.0546 1.5 0.0310 1.5 0.0082 - - - - 1.5 0.0310 1.5 0.0082 - 0.0392 71.9369
and necessary accessories.
FOR 150 KV
Two circuit of twin conductors, TACSR-AS 410-A1/SA1A-54/7 for Temporary
1.12 kmr 1.5 0.3669 0.0197 0.0436 0.4302 1.5 0.3669 1.5 0.0197 1.416 0.0411 - - - 1.5 0.3669 1.5 0.0197 1.416 0.0411 0.4277 99.4329
Tower
Two circuit of twin conductors, TACSR-AS 410-A1/SA1A-54/7 for Combine
1.13 kmr 1.5 0.3669 0.0197 0.0436 0.4302 1.5 0.3669 1.5 0.0197 - - - - 1.5 0.3669 1.5 0.0197 - 0.3866 89.8704
Compact Lattice Tower
1.14 Two earth conductor, GSW 70 mm2 kmr 3 0.0525 0.0197 0.0230 0.0952 3 0.0525 3 0.0197 1.416 0.0108 - - - 3 0.0525 3 0.0197 1.416 0.0108 0.0831 87.2632
1.15 Armour Rod for TACSR-AS 450-A1/SA1A-54/7 Sets 12 0.0027 0.0001 0.0003 0.0031 12 0.0027 12 0.0001 - - - - 12 0.0027 12 0.0001 - 0.0028 90.4514
SUBTOTAL BOBOT ITEMS 1.1.1 - 1.1.15 16.7637 0.6779 2.3074 19.7490 16.7172 0.6746 0.3737 - - - 16.7172 0.6746 0.3737 17.7655
2 DAMPING SYSTEMS :
CONDUCTOR VIBRATION DAMPERS, CONDUCTOR SPACERS, AND
SPACER DAMPERS
FOR 500 KV
2.1 Line conductor spacer dampers (span) 450 mm Sets 903 0.2298 0.0084 0.0309 0.2691 903 0.2298 903 0.0084 - - - - 903 0.2298 903 0.0084 - 0.2382 88.5321
2.2 Earth conductor vibration dampers for OPGW 100mm2 Sets 92 0.0110 0.0004 0.0020 0.0134 92 0.0110 92 0.0004 - - - - 92 0.0110 92 0.0004 - 0.0114 85.1097
2.3 Line conductor spacer (jumper) 250 mm Sets 900 0.2005 0.0074 0.0277 0.2356 900 0.2005 900 0.0074 - - - - 900 0.2005 900 0.0074 - 0.2079 88.2507
FOR 150 KV
2.4 Line conductor vibration dampers for TACSR-AS 410 mm Sets 30 0.0044 0.0002 0.0006 0.0053 30 0.0044 30 0.0002 - - - - 30 0.0044 30 0.0002 - 0.0046 87.6623
2.5 Line conductor spacer (span) 400 mm Sets 30 0.0036 0.0001 0.0009 0.0046 30 0.0036 30 0.0001 - - - - 30 0.0036 30 0.0001 - 0.0038 81.5362
2.6 Line conductor spacer (jumper) 200 mm Sets 90 0.0054 0.0002 0.0021 0.0076 90 0.0054 90 0.0002 24 0.0005 - - - 90 0.0054 90 0.0002 24 0.0005 0.0061 80.2336
2.7 Earth conductor vibration dampers for GSW 70 mm2 Sets 32 0.0036 0.0001 0.0007 0.0044 32 0.0036 32 0.0001 20 0.0004 - - - 32 0.0036 32 0.0001 20 0.0004 0.0042 94.1116
SUBTOTAL BOBOT ITEMS 2.2.1 - 2.2.7 0.4583 0.0169 0.0648 0.5399 0.4583 0.0169 0.0010 - - - 0.4583 0.0169 0.0010 0.4762
Earthing angle comprasing 4 sets of galvanized steel angle, lead wire (GSW
3.1 90 mm, 4 x 5 m), including all clamps. (galvanized steel angle supplied by tower 53 0.0140 0.0014 0.0042 0.0196 47 0.0124 47 0.0013 47 0.0037 - - - 47 0.0124 47 0.0013 47 0.0037 0.0174 88.6792
PLN)
Continuous or cross-connected counterpoise cable 30 m length each leg,
3.2 450 mm depth, including galvanized steel angle 1000 mm all joints and tower 53 0.0082 0.0008 0.0181 0.0272 - - - - - - - - - - -
clamps (the counterpoise shall be running for 30 m until the end)
3.3 Extra to items 3.2 for laying in rock, 450 mm depth. per 1 m run 0 - - - - - - - - - - - - - - -
3.4 Extra to items 3.2 for installing at 1000 mm depth. per 1 m run 0 - - - - - - - - - - - - - - -
3.5 Extra to items 3.2 for 2 m earthing rod, including joints. Each 0 - - - - - - - - - - - - - - -
Earthing of Towers within the last three tower before Substation, additionally
3.6 Lot 0 - - - - - - - - - - - - - - -
to the Basic Earthing, 1 Earthing Rod per leg with length of 6 m
SUBTOTAL BOBOT ITEMS 3.3.1 - 3.3.6 0.0222 0.0023 0.0223 0.0468 0.0124 0.0013 0.0037 - - - 0.0124 0.0013 0.0037 0.0174
INSULATOR STRING SETS COMPLETE WITH ALL FITTINGS BETWEEN
4
TOWER AND CONDUCTORS
4.1 FOR STANDARD LATTICE TOWER 500 KV
4.1.1 500 kV Vee suspension Porcelain/Glass string set (U 210 BP) Sets 132 1.2255 0.0613 0.0586 1.3454 132 1.2255 132 0.0613 48 0.0213 - - - 132 1.2255 132 0.0613 48 0.0213 1.3081 97.2264
500 kV Quadruple Tension set Porcelain/Glass Insulator (160 kN) string set
4.1.2 Sets 324 5.3243 0.2662 0.1439 5.7345 324 5.3243 324 0.2662 108 0.0480 - - - 324 5.3243 324 0.2662 108 0.0480 5.6385 98.3267
with arching horn line ends
LAPORAN KEMAJUAN PEKERJAAN
LAPORAN BULANAN
4.1.3 Jumper Suspension single Porcelain/Glass String set ( U 160 BLP) Sets 261 dibulatkan
1.4555 0.0728 0.1159 1.6443 261 1.4555 261 0.0728 - - - - 261 1.4555 261 0.0728 - 1.5283 92.9483
500 kV Single Tension set Porcelain/Glass inverse Insulator (210 kN) string
4.1.4 Sets 6 0.0428 0.0021 0.0027 0.0476 6 0.0428 6 0.0021 - - - - 6 0.0428 6 0.0021 - 0.0449 94.4012
set for Gantry at Balaraja Substation
500 kV Double Tension set Composite Insulator with arching horn line ends
4.2.2 Sets 36 0.2004 0.0100 0.0160 0.2264 - - - - - - - - - - -
(as shown on the drawing).
500 kV Single Line Post Jumper Composite Insulator Set (as shown on the
4.2.3 Sets 45 0.3206 0.0160 0.0200 0.3566 - - - - - - - - - - -
drawing).
150 kV Double Tension set Composite Insulator with arching horn line ends
4.2.5 Sets 36 0.0880 0.0044 0.0119 0.1043 - - - - - - - - - - -
(as shown on the drawing).
150 kV Single Line Post Jumper Composite Insulator Set (as shown on the
4.2.6 Sets 45 0.2134 0.0107 0.0149 0.2389 - - - - - - - - - - -
drawing).
SUBTOTAL BOBOT ITEMS 4.4.1 - 4.4.2.6 9.0301 0.4516 0.3886 9.8702 8.0481 0.4025 0.0693 - - - 8.0481 0.4025 0.0693 8.5199
SUBTOTAL BOBOT ITEMS 6.6.1 - 6.6.3 - - 0.3549 0.3549 - - 0.3362 - - - - - 0.3362 0.3362
TOTAL BOBOT ELECTROMECHANICAL 26.3625 1.1530 3.1495 30.6651 25.3243 1.0996 0.7854 - - - 25.3243 1.0996 0.7854 27.2093
BORING
NO. TYPE SONDIR
NO. TITIK 1 TITIK 2
TOWER TOWER
TITIK 1 TITIK 2 MULAI SELESAI MULAI
1 T.120N BB +3 25 Februari 2020 23 Februari 2020 24 Februari 2020
2 T.01A FF -3 27 September 2019 21 Februari 2020 21 Februari 2020
3 T.01 CC -3 19 September 2019 07 Oktober 2019 08 Oktober 2019 09 Oktober 2019
4 T.02 BB +3 19 September 2019 10 Oktober 2019 11 Oktober 2019 12 Oktober 2019
5 T.03 CC +0 20 September 2019 16 Oktober 2019 17 Oktober 2019
6 T.04 BB +0 20 September 2019 16 Oktober 2019 17 Oktober 2019 18 Oktober 2019
7 T.05 AA +0 20 September 2019 04 Desember 2019 05 Desember 2019 05 Desember 2019
8 T.06 AA +0 20 September 2019 20 Oktober 2019 21 Oktober 2019 21 Oktober 2019
9 T.07 CC -3 21 September 2019 21 Oktober 2019 22 Oktober 2019 23 Oktober 2019
10 T.08 CC +15 21 September 2019 27 Oktober 2019 28 Oktober 2019 29 Oktober 2019
11 T.09 DD +15 22 September 2019 28 Oktober 2019 29 Oktober 2019 30 Oktober 2019
12 T.10 CC +3 22 September 2019 01 November 2019 02 November 2019 03 November 2019
13 T.11 AA +3 23 September 2019 04 November 2019 05 November 2019 06 November 2019
14 T.12 AA -3 23 September 2019 28 November 2019 29 November 2019 29 November 2019
15 T.13 AA +0 23 September 2019 04 November 2019 05 November 2019 06 November 2019
16 T.14 AA -3 24 September 2019 08 November 2019 09 November 2019 10 November 2019
17 T.15 BB +0 24 September 2019 08 November 2019 09 November 2019 10 November 2019
18 T.16 AA -3 25 September 2019 12 November 2019 13 November 2019 14 November 2019
19 T.17 AA -3 25 September 2019 18 November 2019 19 November 2019 20 November 2019
20 T.18 CC +6 25 September 2019 23 November 2019 24 November 2019 25 November 2019
21 T.19 CC +12 25 September 2019 28 November 2019 29 November 2019 30 November 2019
22 T.20 CC +6 26 September 2019 02 Desember 2019 03 Desember 2019 04 Desember 2019
23 T.21 DD +3 26 September 2019 11 Oktober 2019 12 Oktober 2019 13 Oktober 2019
24 T.22 CC +3 26 September 2019 08 Oktober 2019 09 Oktober 2019
25 T.23 AA +3 28 Januari 2020 20 Februari 2020 21 Februari 2020
26 T.24 AA +6 28 Januari 2020 14 Februari 2020 15 Februari 2020
27 T.25 CC -3 27 Januari 2020 09 Februari 2020 09 Februari 2020
28 T.26 AA -3 01 Februari 2020 07 Februari 2020 07 Februari 2020
29 T.27 FF -3 31 Januari 2020 02 Februari 2020 04 Februari 2020
30 T.28 AA +15 15 Maret 2020 13 Maret 2020 14 Maret 2020
31 T.29 FF -3 26 Januari 2020 07 Februari 2020 08 Februari 2020
32 T.30 CC +3 26 Januari 2020 10 Februari 2020 11 Februari 2020
33 T.31 DD +6 25 Januari 2020 04 Februari 2020 06 Februari 2020
34 T.32 CC +3 24 Januari 2020 30 Januari 2020 01 Februari 2020
35 T.33 AA +6 24 Januari 2020 02 Februari 2020 03 Februari 2020 06 Februari 2020
36 T.34 CC +6 23 Oktober 2020 22 Januari 2021 23 Januari 2021
37 T.35 EE +3 23 Oktober 2020 25 Januari 2021 26 Januari 2021
38 T.36 AA +6 16 Februari 2020 18 Januari 2021 19 Januari 2021
39 T.37 EE +15 16 Februari 2020
40 T.38 DD +15 27 September 2020 28 September 2020 28 September 2020
41 T.39 EE +3 12 Maret 2020 24 Maret 2020 25 Maret 2020
42 T.40 AA +0 12 Maret 2020 25 Maret 2020 26 Maret 2020
43 T.41 AA -3 21 Maret 2020 21 Maret 2020 22 Maret 2020
44 T.42 AA -3 21 Maret 2020
45 T.43 AA -3
46 T.44 BB -3 18 Maret 2020 16 Maret 2020 17 Maret 2020 17 Maret 2020
47 T.45 AA +0 10 Oktober 2020 28 Januari 2021 29 Januari 2021
48 T.46 AA -3 10 Oktober 2020 31 Januari 2021 01 Februari 2021
49 T.47 FF +3 17 November 2020 04 Februari 2021 05 Februari 2021
50 T.48 4FF +0 30 September 2019 08 Desember 2019 09 Desember 2019
51 T.49 4AA +3 30 September 2019 10 Desember 2019 11 Desember 2019
52 T.50 4CC +3 30 September 2019 13 Desember 2019 14 Desember 2019
53 T.51 4FF +0 30 September 2019 15 Desember 2019 16 Desember 2019
INVESTIGATION
BORING
TITIK 2
SELESAI
09 Oktober 2019
12 Oktober 2019
18 Oktober 2019
06 Desember 2019
22 Oktober 2019
23 Oktober 2019
29 Oktober 2019
30 Oktober 2019
03 November 2019
06 November 2019
30 November 2019
06 November 2019
11 November 2019
10 November 2019
15 November 2019
20 November 2019
26 November 2019
30 November 2019
04 Desember 2019
13 Oktober 2019
07 Februari 2020
29 September 2020
18 Maret 2020
PERHITUNGAN VOLUME CONCRETE BORED PILE K225 DIAMETER 60 cm
TOTAL (m)
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
403.2
417.6
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
352.8
403.2
339.2
614.4
230.4
0.0
244.2
0.0
174.4
672.0
123.2
864.0
499.2
0.0
0.0
218.0
600.0
966.0
158.4
544.0
990.0
544.0
0.0
0.0
0.0
0.0
0.0
327.6
355.6
10,041.4
PERHITUNGAN VOLUME EXCAVATION OF SOIL
TYPE AA +0 SOIL CLASS 6 (T.45 CHIMNEY EXT. 2,0 M) TYPE AA -3 SOIL CLASS 6 (T.46 LEG AB CHIMNE
Diameter Panjang Ø 10 D 19 D 22 Mark Qty Diameter Panjang
19 5600 739200 38.75 1 152 19 5600
19 2010 8040 2 4 19 2010
19 4142 99408 3 0 19 4650
19 4650 0 4 24 19 5159
10 2780 63940 5 0 10 2780
10 2780 0 30.192308 6 30 10 2780
10 950 7600 7 8 10 950
10 1514 826644 84.666667 8 595 10 1514
19 12787 895090 9 70 19 13787
19 4950 39600 10 8 19 4950
898.184 1781.338 0 Panjang Total
Berat Per Meter 0.62 2.23 2.98 Berat Per Meter
Berat 556.87408 3972.3837 0 Berat
o +6 SOIL CLASS 5 (T.06) TYPE AA -3 to +6 SOIL CLASS 7 (T.40, T.43)
Ø 10 D 19 D 22 Mark Qty Diameter Panjang Ø 10 D 19
1294800 156 1 156 19 8300 1294800
42750 2 25 19 1710 42750
97040 3 20 22 4852
0 4 0 22 5361
83400 30.769231 5 30 10 2780 83400
0 6 0 10 2780 0
3800 7 8 10 950 7600
153476 34.146341 8 34 19 4514 153476
87.2 1491.026 97.04 Panjang Total 91 1491.026
0.62 2.23 2.98 Berat Per Meter 0.62 2.23
54.064 3324.988 289.1792 Berat 56.42 3324.988
6 (T.46 LEG AB CHIMNEY EXT. 3,0 M) TYPE AA -3 SOIL CLASS 6 (T.46 LEG CD CHIMNEY EXT. 2,5 M)
Ø 10 D 19 D 22 Mark Qty Diameter Panjang Ø 10 D 19
851200 38.75 1 152 19 5600 851200
8040 2 4 19 2010 8040
0 3 24 19 4650 111600
123816 4 0 19 5159 0
0 26.346154 5 26 10 2780 72280
83400 6 0 10 2780 0
7600 7 8 10 950 7600
900830 84.666667 8 595 10 1514 900830
965090 9 70 19 13787 965090
39600 10 8 19 4950 39600
991.83 1987.746 0 Panjang Total 980.71 1975.53
0.62 2.23 2.98 Berat Per Meter 0.62 2.23
614.9346 4432.6736 0 Berat 608.0402 4405.4319
T.43)
D 22
97040
0
97.04
2.98
289.1792
N, T.44)
D 22
155392
0
155.392
2.98
463.06816
07)
D 22
139664
0
139.664
2.98
416.19872
7
D 22
139664
0
139.664
2.98
416.19872
D 22
215520
0
215.52
2.98
642.2496
7
D 22
215520
0
215.52
2.98
642.2496
G A)
D 22
0
2.98
0
9)
D 22
0
2.98
0
D 22
0
2.98
0
7)
D 22
1255600
38080
104764
0
77400
1475.844
2.98
4398.0151
PROGRES
KETERANGAN
BELUM
√ Belum Erection
x Menunggu Amandemen
x Menunggu Amandemen
x Menunggu Amandemen
x Menunggu Amandemen
x Menunggu Amandemen
x Menunggu Amandemen
x Menunggu Amandemen
x Menunggu Amandemen
x Menunggu Amandemen
x Menunggu Amandemen
x Menunggu Amandemen
x Belum Erection
x Belum Erection
x Belum Erection
x Belum Erection
x Base Leg
x Menunggu Amandemen
x Belum Erection
√ Belum Erection
20