I DIVISI 1. UMUM
1.2 Mobilisasi LS 1.00 0.34 1.00 0.34 0.115 0.115 0.115
1.8.(1) Manajemen dan Keselamatan Lalu Lintas LS 1.00 0.14 1.00 0.14 0.006 0.006 0.006 0.006 0.006 0.006 0.006 0.006 0.006 0.006 0.006 0.006 0.006 0.006 0.006 0.006 0.006 0.006 0.006 0.006 0.006 0.006
1.19 Keselamatan dan Kesehatan Kerja LS 1.00 0.30 1.00 0.30 0.014 0.014 0.014 0.014 0.014 0.014 0.014 0.014 0.014 0.014 0.014 0.014 0.014 0.014 0.014 0.014 0.014 0.014 0.014 0.014 0.014 0.014
Manajemen Mutu LS 1.00 0.21 1.00 0.21 0.010 0.010 0.010 0.010 0.010 0.010 0.010 0.010 0.010 0.010 0.010 0.010 0.010 0.010 0.010 0.010 0.010 0.010 0.010 0.010 0.010 0.010
II DIVISI 2. DRAINASE
2.1.(1) Galian untuk Selokan Drainase dan Saluran Air (Manual) M3 28.50 0.02 28.50 0.02 0.007 0.007 0.007
2.2.(1) Pasangan Batu dengan Mortar M3 14.85 0.30 14.85 0.30 0.148 0.148
adendu
VI DIVISI 6. PERKERASAN ASPAL
6.1 (1) Lapis Resap Pengikat - Aspal Cair/Emulsi Liter 10560.00 2.91 10,560.00 2.91 0.970 0.970 0.970
m
6.3(6a) Laston Lapis Antara (AC-BC) Ton 1781.70 40.06 1,781.70 40.06 10.016 10.016 10.016 10.016
6.3.(8) Bahan anti pengelupasan Kg 299.33 0.35 299.33 0.35 0.086 0.086 0.086 0.086
Rencana % 0.11 0.11 0.03 0.03 0.03 5.19 5.51 5.66 5.66 6.36 5.92 6.07 6.15 11.51 11.20 11.23 10.08 2.55 2.55 1.28 1.28 0.79 0.54 0.03 0.11
Rencana Kumulatif % 0.11 0.23 0.26 0.29 0.32 5.19 10.70 16.36 22.03 28.39 34.31 40.38 46.53 58.04 69.24 80.46 90.54 93.10 95.65 96.93 98.21 99.00 99.54 99.57 99.68
Realisasi % 0.01 0.54 0.82 0.53 1.76 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
KONTYRAK AWAL Realisasi Kumulatif 0.01 0.56 1.38 1.91 3.67 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
%
Deviasi % -0.10 0.43 0.79 0.50 1.73 -5.19 -5.51 -5.66 -5.66 -6.36 -5.92 -6.07 -6.15 -11.51 -11.20 -11.23 -10.08 -2.55 -2.55 -1.28 -1.28 -0.79 -0.54 -0.03 -0.11
Deviasi Kumulatif % -0.10 0.33 1.12 1.62 3.35 -1.84 -7.35 -13.01 -18.68 -25.04 -30.96 -37.03 -43.18 -54.69 -65.89 -77.11 -87.19 -89.75 -92.30 -93.58 -94.86 -95.65 -96.19 -96.22 -96.33
Rencana % 0.11 0.11 0.03 0.03 0.03 5.19 5.51 5.66 5.66 6.36 5.92 6.07 6.15 11.51 11.20 11.23 10.08 2.55 2.55 1.28 1.28 0.79 0.54 0.03 0.11
Rencana Kumulatif % 0.11 0.23 0.26 0.29 0.32 5.51 11.02 16.68 22.34 28.71 34.63 40.70 46.85 58.36 69.55 80.78 90.86 93.42 95.97 97.25 98.53 99.32 99.86 99.89 100.00
Realisasi % 0.01 0.54 0.82 0.53 1.76 3.81 3.34 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
ADENDUM Realisasi Kumulatif 0.01 0.56 1.38 1.91 3.67 7.48 10.83 10.83 10.83 10.83 10.83 10.83 10.83 10.83 10.83 10.83 10.83 10.83 10.83 10.83 10.83 10.83 10.83 10.83 10.83
%
Deviasi % -0.10 PEJABAT
0.43 0.79 0.50 1.73 -1.38 -2.17 -5.66 -5.66 -6.36 -5.92 -6.07 -6.15 -11.51 -11.20 -11.23 -10.08 -2.55 -2.55 -1.28 -1.28 -0.79 -0.54 -0.03 -0.11
Deviasi Kumulatif % -0.10 0.33
PELAKSANA 1.12 1.62 3.35 1.97 -0.20 -5.86 -11.52 -17.88 -23.80 -29.87 -36.02 -47.53 -58.73 -69.96 -80.04 -82.59 -85.15 -86.43 -87.71 -88.49 -89.03 -89.06 -89.17
TEKNIS
KEGIATAN
KEPALA BIDANG BINA MARGA PEJABAT
DPUPRKP KABUPATEN
PELAKSANA REJANG LEBONG
DPUPRKP KABPUPATEN REJANG LEBONG (PPTK) KONSULTAN PENGAWAS KONTRAKTOR PELAKSANA
KPA (SELAKU PPK) TEKNIS
(PPTK) CV. DINAMIKA CONSULTANT CV. INDO ARTHA PERSADA
KEGIATAN
EDY KUSNADI, ST
RONI SAPUTRA, ST ALFIAN OBEN SANDRA JAYA
NIP. 198606617 201902 1 001
NIP. 19760605 201001 1 012 WAKIL DIREKTUR DIREKTUR
REKAPITULASI RAB CCO
Kegiatan : Peningkatan Kapasitas Struktur Jalan pada Ruas Jalan Karang Baru - Lubuk Tunjung Kecamatan Sindang Beliti Ilir (DAK)
Lokasi : REJANG LEBONG
Sumber Dana : DAK
Tahun Anggaran : 2022
IX DIVISI 9. PEKERJAAN HARIAN & PEKERJAAN LAIN-LAIN 91,790,051.71 109,534,887.51 1.34 1.60 BERTAMBAH
Disetuji Oleh:
PEJABAT PELAKSANA TEKNIS KEGIATAN
PEJABAT PELAKSANA TEKNIS KEGIATAN PEJABAT PELAKSANA TEKNIS KEGIATAN KONSULTAN PENGAWAS Diajukan Oleh:
DPUPRKP KABUPATEN REJANG LEBONG DPUPRKP KABUPATEN REJANG LEBONG
CV. DINAMIKA CONSULTANT KONTRAKTOR PELAKSANA
(PPTK)
KPA (SELAKU PPK) CV. INDO ARTHA PERSADA
EDY KUSNADI, ST
EDY KUSNADI, ST ALFIAN OBEN SANDRA JAYA
NIP. 198606617 201902 1 001 NIP. 198606617 201902 1 001
WAKIL DIREKTUR DIREKTUR
PERUBAHAN KONTRAK SETELAH CCO
KEGIATAN : Peningkatan Kapasitas Struktur Jalan pada Ruas Jalan Karang Baru - Lubuk Tunjung Kecamatan Sindang Beliti Ilir (DAK)
LOKASI : REJANG LEBONG
SUMBER DANA : DAK
TAHUN ANGGARAN : 2022
I DIVISI 1. UMUM
1.2 Mobilisasi 1.00 LS Rp 23,650,000 Rp 23,650,000.00 0.34 - - 1.00 Rp 23,650,000.00 Rp 23,650,000.00 TETAP
1.8.(1) Manajemen dan Keselamatan Lalu Lintas 1.00 LS Rp 9,800,000 Rp 9,800,000.00 0.14 - - 1.00 Rp 9,800,000.00 Rp 9,800,000.00 TETAP
1.19 Keselamatan dan Kesehatan Kerja 1.00 LS Rp 20,799,250 Rp 20,799,250.00 0.30 1.00 Rp 20,799,250.00 Rp 20,799,250.00 TETAP
Manajemen Mutu 1.00 LS Rp 14,550,000 Rp 14,550,000.00 0.21 - - 1.00 Rp 14,550,000.00 Rp 14,550,000.00 TETAP
SUB TOTAL Rp 68,799,250.00 - - Rp 68,799,250.00
II DIVISI 2. DRAINASE
2.1.(1) Galian untuk Selokan Drainase dan Saluran Air (Manual) 28.50 M3 Rp 48,522 Rp 1,382,883.33 0.02 - - 28.50 Rp 48,522.22 Rp 1,382,883.33 TETAP
2.2.(1) Pasangan Batu dengan Mortar 14.85 M3 Rp 1,369,682 Rp 20,339,770.61 0.30 - - 14.85 Rp 1,369,681.52 Rp 20,339,770.61 TETAP
EDY KUSNADI, ST
RONI SAPUTRA, ST ALFIAN OBEN SANDRA JAYA
NIP. 198606617 201902 1 001
NIP. 19760605 201001 1 012 WAKIL DIREKTUR DIREKTUR
PEMERINTAH KABUPATEN REJANG LEBONG
DINAS PEKERJAAN UMUM PENATAAN
RUANGPERUMAHAN DAN KAWASAN PEMUKIMAN
PEKERJAAN :
BACKUP DATA
DIVISI 2. DRAINASE
Galian untuk Selokan Drainase dan Saluran Air
REKAPITULASI
PAKET KEGIATAN : Peningkatan Kapasitas Struktur Jalan pada Ruas Jalan Karang Baru - Lubuk Tunjung
Kecamatan Sindang Beliti Ilir (DAK)
KONTRAKTOR : CV. Indo Artha Persada
VOLUME
No. LOKASI STA SATUAN KET
M3
JUMLAH ( M3 ) 28.50
DIVISI 2. DRAINASE
Galian untuk Selokan Drainase dan Saluran Air (Manual)
EDY KUSNADI, ST
NIP. 198606617 201902 1 001
PEMERINTAH KABUPATEN REJANG LEBONG
DINAS PEKERJAAN UMUM PENATAAN
RUANGPERUMAHAN DAN KAWASAN PEMUKIMAN
PEKERJAAN :
BACKUP DATA
DIVISI 2. DRAINASE
Pasangan Batu dengan Mortar
REKAPITULASI
VOLUME
No. LOKASI STA SATUAN KET
M3
JUMLAH ( M3 ) 14.85
BACKUP VOLUME
Pekerjaan : Peningkatan Kapasitas Struktur Jalan pada Ruas Jalan Karang Baru - Lubuk Tunjung Kecamatan Sindang Beliti Ilir (DAK)
Pay Item : 2.2.(1)
Pekerjaan : Pasangan Batu dengan mortar
Dimensi Saluran
No. Gambar STA L/R Panjang (M) L1 L2 L3 L4 H1 H2 Luas (M2) Volume KET
(M) (M) (M) (M) (M) (M)
1 0+000 - 0+044 R 44.00 0.60 0.20 0.40 0.70 0.60 0.15 0.34 14.85
0+050 - 0+100 R 50.00 0.60 0.20 0.40 0.70 0.60 0.15 0.34 16.88
0+500 - 0+550 L/R 50.00 0.60 0.20 0.40 0.70 0.60 0.15 0.34 33.75
0+550 - 0+600 L/R 50.00 0.60 0.20 0.40 0.70 0.60 0.15 0.34 33.75
0+620 - 0+650 L/R 30.00 0.60 0.20 0.40 0.70 0.60 0.15 0.34 20.25
0+650 - 0+700 L/R 50.00 0.60 0.20 0.40 0.70 0.60 0.15 0.34 33.75
0+975 - 1+000 L/R 25.00 0.60 0.20 0.40 0.70 0.60 0.15 0.34 16.88
1+000 - 1+050 L/R 50.00 0.60 0.20 0.40 0.70 0.60 0.15 0.34 33.75
1+050 - 1+075 L/R 25.00 0.60 0.20 0.40 0.70 0.60 0.15 0.34 16.88
2+300 - 2+321 L/R 21.00 0.60 0.20 0.40 0.70 0.60 0.15 0.34 14.18
2+321 - 2+371 L/R 50.00 0.60 0.20 0.40 0.70 0.60 0.15 0.34 33.75
3+125 - 3+175 L/R 50.00 0.60 0.20 0.40 0.70 0.60 0.15 0.34 33.75
3+175 - 3+225 L/R 50.00 0.60 0.20 0.40 0.70 0.60 0.15 0.34 33.75
3+225 - 3+275 L/R 50.00 0.60 0.20 0.40 0.70 0.60 0.15 0.34 33.75
3+275 - 3+325 L/R 50.00 0.60 0.20 0.40 0.70 0.60 0.15 0.34 33.75
3+325 - 3+350 L/R 25.00 0.60 0.20 0.40 0.70 0.60 0.15 0.34 16.88
EDY KUSNADI, ST
NIP. 198606617 201902 1 001
EDY KUSNADI, ST
NIP. 198606617 201902 1 001
PEMERINTAH KABUPATEN REJANG LEBONG
DINAS PEKERJAAN UMUM PENATAAN
RUANGPERUMAHAN DAN KAWASAN PEMUKIMAN
PEKERJAAN :
BACKUP DATA
DIVISI 3. PEKERJAAN TANAH DAN GEOSINTETIK
Galian Biasa
REKAPITULASI
PAKET KEGIATAN : Peningkatan Kapasitas Struktur Jalan pada Ruas Jalan Karang Baru - Lubuk Tunjung Ke
VOLUME
No. LOKASI STA SATUAN KET
M3
JUMLAH ( M3 ) 254.13
BACKUP VOLUME
Peningkatan Kapasitas Struktur Jalan pada Ruas Jalan Karang Baru - Lubuk Tunjung Kecamatan Sindang Beliti Ilir (DAK)
EDY KUSNADI, ST
NIP. 198606617 201902 1 001
PEMERINTAH KABUPATEN REJANG LEBONG
DINAS PEKERJAAN UMUM PENATAAN
RUANGPERUMAHAN DAN KAWASAN PEMUKIMAN
PEKERJAAN :
BACKUP DATA
DIVISI 3. PEKERJAAN TANAH DAN GEOSINTETIK
Galian Struktur dengan kedalaman 0 - 2 meter (Manual)
REKAPITULASI
VOLUME
No. LOKASI STA SATUAN KET
M3
JUMLAH ( M3 ) 69.04
BACKUP VOLUME
Peningkatan Kapasitas Struktur Jalan pada Ruas Jalan Karang Baru - Lubuk Tunjung Kecamatan Sindang Beliti Ilir (DAK)
EDY KUSNADI, ST
NIP. 198606617 201902 1 001
PEMERINTAH KABUPATEN REJANG LEBONG
DINAS PEKERJAAN UMUM PENATAAN
RUANGPERUMAHAN DAN KAWASAN PEMUKIMAN
PEKERJAAN :
BACKUP DATA
DIVISI 3. PEKERJAAN TANAH DAN GEOSINTETIK
Galian Perkerasan Beraspal tanpa Cold Milling Machine
REKAPITULASI
VOLUME
No. LOKASI STA SATUAN KETERANGAN
M3
JUMLAH ( M3 ) 357.30
BACKUP VOLUME
Peningkatan Kapasitas Struktur Jalan pada Ruas Jalan Karang Baru - Lubuk Tunjung Kecamatan Sindang Beliti Ilir (DAK)
EDY KUSNADI, ST
NIP. 198606617 201902 1 001
PEJABAT PELAKSANA TEKNIS KEGIATAN
DPUPRKP KABUPATEN REJANG LEBONG
(PPTK)
PEKERJAAN :
BACKUP DATA
DIVISI 3. PEKERJAAN TANAH DAN GEOSINTETIK
Timbunan Pilihan dari sumber galian
REKAPITULASI
VOLUME
No. LOKASI STA SATUAN KETERANGAN
M3
JUMLAH ( M3 ) 191.24
BACKUP VOLUME
Peningkatan Kapasitas Struktur Jalan pada Ruas Jalan Karang Baru - Lubuk Tunjung Kecamatan Sindang Beliti Ilir (DAK)
EDY KUSNADI, ST
NIP. 198606617 201902 1 001
PEMERINTAH KABUPATEN REJANG LEBONG
DINAS PEKERJAAN UMUM PENATAAN
RUANGPERUMAHAN DAN KAWASAN PEMUKIMAN
PEKERJAAN :
BACKUP DATA
DIVISI 3. PEKERJAAN TANAH
Penyiapan Badan Jalan
REKAPITULASI
VOLUME
No. LOKASI STA SATUAN KET
M3
JUMLAH ( M3 ) 7728.00
BACKUP VOLUME
Peningkatan Kapasitas Struktur Jalan pada Ruas Jalan Karang Baru - Lubuk Tunjung Kecamatan Sindang Beliti Ilir
(DAK)
DIVISI 3. PEKERJAAN TANAH
3.3.1 Penyiapan Badan Jalan
Lebar
Panjang Lebar Volume
STA Posisi (rata-rata) Ket
M M M M²
EDY KUSNADI, ST
NIP. 198606617 201902 1 001
PEMERINTAH KABUPATEN REJANG LEBONG
DINAS PEKERJAAN UMUM PENATAAN
RUANGPERUMAHAN DAN KAWASAN PEMUKIMAN
PEKERJAAN :
BACKUP DATA
DIVISI 7. STRUKTUR
REKAPITULASI
PAKET KEGIATAN : Peningkatan Kapasitas Struktur Jalan pada Ruas Jalan Karang Baru - Lubuk Tunjung
Kecamatan Sindang Beliti Ilir (DAK)
KONTRAKTOR : CV. Indo Artha Persada
VOLUME
No. LOKASI STA SATUAN KETERANGAN
M3
JUMLAH ( M3 ) 196.00
BACKUP VOLUME
Peningkatan Kapasitas Struktur Jalan pada Ruas Jalan Karang Baru - Lubuk Tunjung Kecamatan Sindang Beliti Ilir (DAK)
DIVISI 7. STRUKTUR
Beton , fc’15 Mpa (Bahu Jalan)
EDY KUSNADI, ST
NIP. 198606617 201902 1 001
PEMERINTAH KABUPATEN REJANG LEBONG
DINAS PEKERJAAN UMUM PENATAAN
RUANGPERUMAHAN DAN KAWASAN PEMUKIMAN
PEKERJAAN :
BACKUP DATA
DIVISI 5. PERKERASAN BERBUTIR
Lapis Pondasi Agregat Kelas A
REKAPITULASI
VOLUME
No. LOKASI STA SATUAN KET
M3
JUMLAH ( M3 ) 2031.59
BACKUP VOLUME
Peningkatan Kapasitas Struktur Jalan pada Ruas Jalan Karang Baru - Lubuk Tunjung Kecamatan Sindang Beliti Ilir (DAK)
EDY KUSNADI, ST
NIP. 198606617 201902 1 001
PEMERINTAH KABUPATEN REJANG LEBONG
DINAS PEKERJAAN UMUM PENATAAN
RUANGPERUMAHAN DAN KAWASAN PEMUKIMAN
PEKERJAAN :
BACKUP DATA
DIVISI 5. PERKERASAN BERBUTIR
Lapis Pondasi Agregat Kelas B
REKAPITULASI
VOLUME
No. LOKASI STA SATUAN KET
M3
JUMLAH ( M3 ) 2097.12
BACKUP VOLUME
Peningkatan Kapasitas Struktur Jalan pada Ruas Jalan Karang Baru - Lubuk Tunjung Kecamatan Sindang Beliti Ilir (DAK)
EDY KUSNADI, ST
NIP. 198606617 201902 1 001
PEMERINTAH KABUPATEN REJANG LEBONG
DINAS PEKERJAAN UMUM PENATAAN
RUANGPERUMAHAN DAN KAWASAN PEMUKIMAN
PEKERJAAN :
BACKUP DATA
DIVISI 6. PERKERASAN ASPAL
Lapis Resap Pengikat - Aspal Cair
REKAPITULASI
VOLUME
No. LOKASI STA SATUAN KET
M3
JUMLAH ( M3 ) 10560.00
BACKUP VOLUME
Peningkatan Kapasitas Struktur Jalan pada Ruas Jalan Karang Baru - Lubuk Tunjung Kecamatan Sindang Beliti Ilir (DAK)
EDY KUSNADI, ST
NIP. 198606617 201902 1 001
PEMERINTAH KABUPATEN MUSI RAWAS
DINAS PEKERJAAN UMUM BINA MARGA
PEKERJAAN :
Peningkatan Struktur Jalan Simpang Temuan Jaya - Simpang
Jene (DAK Reguler)
BACKUP DATA
DIVISI 6. PERKERASAN ASPAL
Lapis Perekat - Aspal Cair
REKAPITULASI
VOLUME
No. LOKASI STA SATUAN KET
M3
JUMLAH ( M3 ) 5323.47
KONTRAKTOR
DINAS PEKERJAAN UMUM BINA MARGA KONSULTAN SUPERVISI PT. CIPTA REKAYASA FADILAH
ASISTEN TEKNIS KEGIATAN CV. PIRAMIDA ENGINEERING CONSULTANT
(ASTEK)
SEGMEN PATCHING
SEGMEN 1
10 + 956 - 11 + 000 L/R 44.00 4.00 176.00 0.15 26.40
11 + 000 - 11 + 020 L/R 20.00 4.00 80.00 0.15 12.00
SEGMEN 2 L/R 20.00 4.00 80.00 0.15 12.00 Beton Rigid
11 + 040 - 11 + 050 L/R 10.00 4.00 40.00 0.15 6.00
11 + 050 - 11 + 100 L/R 50.00 4.00 200.00 0.15 30.00
11 + 100 - 11 + 150 L/R 50.00 4.00 200.00 0.15 30.00
11 + 150 - 11 + 187 L/R 36.60 4.00 146.40 0.15 21.96
SEGMEN 3 L/R 79.70 4.00 318.80 0.15 47.82 Beton Rigid
11 + 266 - 11 + 300 L/R 33.70 4.00 134.80 0.15 20.22
Panjang Lebar Luas Spray Volume
STA Posisi Ket
M M M² Ltr/M² Liter
11 + 300 - 11 + 350 L/R 50.00 4.00 200.00 0.15 30.00
11 + 350 - 11 + 400 L/R 50.00 4.00 200.00 0.15 30.00
11 + 400 - 11 + 450 L/R 50.00 4.00 200.00 0.15 30.00
11 + 450 - 11 + 500 L/R 50.00 4.00 200.00 0.15 30.00
11 + 500 - 11 + 550 L/R 50.00 4.00 200.00 0.15 30.00
11 + 550 - 11 + 600 L/R 50.00 4.00 200.00 0.15 30.00
11 + 600 - 11 + 650 L/R 50.00 4.00 200.00 0.15 30.00
11 + 650 - 11 + 700 L/R 50.00 4.00 200.00 0.15 30.00
11 + 700 - 11 + 750 L/R 50.00 4.00 200.00 0.15 30.00
11 + 750 - 11 + 800 L/R 50.00 4.00 200.00 0.15 30.00
11 + 800 - 11 + 850 L/R 50.00 4.00 200.00 0.15 30.00
11 + 850 - 11 + 900 L/R 50.00 4.00 200.00 0.15 30.00
11 + 900 - 11 + 950 L/R 50.00 4.00 200.00 0.15 30.00
11 + 950 - 12 + 000 L/R 50.00 4.00 200.00 0.15 30.00
12 + 000 - 12 + 006 L/R 5.70 4.00 22.80 0.15 3.42
SEGMEN 4 Jembatan Besi
12 + 012 - 12 + 050 L/R 37.80 4.00 151.20 0.15 22.68
12 + 050 - 12 + 100 L/R 50.00 4.00 200.00 0.15 30.00
12 + 100 - 12 + 150 L/R 50.00 4.00 200.00 0.15 30.00
12 + 150 - 12 + 200 L/R 50.00 4.00 200.00 0.15 30.00
12 + 200 - 12 + 250 L/R 50.00 4.00 200.00 0.15 30.00
12 + 250 - 12 + 300 L/R 50.00 4.00 200.00 0.15 30.00
12 + 300 - 12 + 350 L/R 50.00 4.00 200.00 0.15 30.00
12 + 350 - 12 + 400 L/R 50.00 4.00 200.00 0.15 30.00
12 + 400 - 12 + 450 L/R 50.00 4.00 200.00 0.15 30.00
12 + 450 - 12 + 500 L/R 50.00 4.00 200.00 0.15 30.00
12 + 500 - 12 + 550 L/R 50.00 4.00 200.00 0.15 30.00
12 + 550 - 12 + 600 L/R 50.00 4.00 200.00 0.15 30.00
12 + 600 - 12 + 650 L/R 50.00 4.00 200.00 0.15 30.00
12 + 650 - 12 + 700 L/R 50.00 4.00 200.00 0.15 30.00
12 + 700 - 12 + 750 L/R 50.00 4.00 200.00 0.15 30.00
12 + 750 - 12 + 800 L/R 50.00 4.00 200.00 0.15 30.00
12 + 800 - 12 + 850 L/R 50.00 4.00 200.00 0.15 30.00
12 + 850 - 12 + 866 L/R 16.00 4.00 64.00 0.15 9.60
SEGMEN 5 L/R 12.00 4.00 48.00 0.15 7.20 Beton Rigid
12 + 878 - 12 + 900 L/R 22.00 4.00 88.00 0.15 13.20
12 + 900 - 12 + 950 L/R 50.00 4.00 200.00 0.15 30.00
12 + 950 - 13 + 000 L/R 50.00 4.00 200.00 0.15 30.00
13 + 000 - 13 + 050 L/R 50.00 4.00 200.00 0.15 30.00
13 + 050 - 13 + 100 L/R 50.00 4.00 200.00 0.15 30.00
13 + 100 - 13 + 150 L/R 50.00 4.00 200.00 0.15 30.00
13 + 150 - 13 + 200 L/R 50.00 4.00 200.00 0.15 30.00
13 + 200 - 13 + 206 L/R 5.70 4.00 22.80 0.15 3.42
SEGMEN 6 L/R 23.50 4.00 94.00 0.15 14.10 Beton Rigid
13 + 229 - 13 + 250 L/R 20.80 4.00 83.20 0.15 12.48
13 + 250 - 13 + 300 L/R 50.00 4.00 200.00 0.15 30.00
13 + 300 - 13 + 342 L/R 41.50 4.00 166.00 0.15 24.90
SEGMEN 7 L/R 67.00 4.00 268.00 0.15 40.20 Beton Rigid
13 + 409 - 13 + 450 L/R 41.50 4.00 166.00 0.15 24.90
13 + 450 - 13 + 500 L/R 50.00 4.00 200.00 0.15 30.00
13 + 500 - 13 + 550 L/R 50.00 4.00 200.00 0.15 30.00
13 + 550 - 13 + 600 L/R 50.00 4.00 200.00 0.15 30.00
13 + 600 - 13 + 650 L/R 50.00 4.00 200.00 0.15 30.00
13 + 650 - 13 + 700 L/R 50.00 4.00 200.00 0.15 30.00
13 + 700 - 13 + 750 L/R 50.00 4.00 200.00 0.15 30.00
Panjang Lebar Luas Spray Volume
STA Posisi Ket
M M M² Ltr/M² Liter
13 + 750 - 13 + 779 L/R 29.40 4.00 117.60 0.15 17.64
SEGMEN 8 L/R 24.50 4.00 98.00 0.15 14.70 Beton Rigid
13 + 804 - 13 + 844 L/R 40.00 4.00 160.00 0.15 24.00
SEGMEN 9 L/R 14.50 4.00 58.00 0.15 8.70 Beton Rigid
13 + 858 - 13 + 876 L/R 18.00 4.00 72.00 0.15 10.80
SEGMEN 10 L/R 36.50 4.00 146.00 0.15 21.90 Beton Rigid
13 + 913 - 13 + 950 L/R 37.10 4.00 148.40 0.15 22.26
13 + 950 - 14 + 000 L/R 50.00 4.00 200.00 0.15 30.00
14 + 000 - 14 + 050 L/R 50.00 4.00 200.00 0.15 30.00
Panjang Lebar Luas Spray Volume
STA Posisi Ket
M M M² Ltr/M² Liter
14 + 050 - 14 + 100 L/R 50.00 4.00 200.00 0.15 30.00
14 + 100 - 14 + 150 L/R 50.00 4.00 200.00 0.15 30.00
14 + 150 - 14 + 200 L/R 50.00 4.00 200.00 0.15 30.00
14 + 200 - 14 + 250 L/R 50.00 4.00 200.00 0.15 30.00
14 + 250 - 14 + 300 L/R 50.00 4.00 200.00 0.15 30.00
14 + 300 - 14 + 322 L/R 21.70 4.00 86.80 0.15 13.02
SEGMEN 11 L/R 40.50 4.00 162.00 0.15 24.30 Beton Rigid
14 + 362 - 14 + 400 L/R 37.80 4.00 151.20 0.15 22.68
14 + 400 - 14 + 450 L/R 50.00 4.00 200.00 0.15 30.00
14 + 450 - 14 + 500 L/R 50.00 4.00 200.00 0.15 30.00
14 + 500 - 14 + 550 L/R 50.00 4.00 200.00 0.15 30.00
14 + 550 - 14 + 600 L/R 50.00 4.00 200.00 0.15 30.00
14 + 600 - 14 + 650 L/R 50.00 4.00 200.00 0.15 30.00
14 + 650 - 14 + 669 L/R 19.00 4.00 76.00 0.15 11.40
SEGMEN 12 L/R 19.50 4.00 78.00 0.15 11.70 Beton Rigid
14 + 689 - 14 + 700 L/R 11.50 4.00 46.00 0.15 6.90
14 + 700 - 14 + 750 L/R 50.00 4.00 200.00 0.15 30.00
14 + 750 - 14 + 800 L/R 50.00 4.00 200.00 0.15 30.00
14 + 800 - 14 + 840 L/R 40.20 4.00 160.80 0.15 24.12
SEGMEN 13 L/R 50.00 4.00 200.00 0.15 30.00 Beton Rigid
14 + 890 - 14 + 900 L/R 9.80 4.00 39.20 0.15 5.88
14 + 900 - 14 + 950 L/R 50.00 4.00 200.00 0.15 30.00
14 + 950 - 14 + 977 L/R 26.50 4.00 106.00 0.15 15.90
SEGMEN 14 L/R 20.00 4.00 80.00 0.15 12.00 Beton Rigid
14 + 997 - 15 + 000 L/R 3.50 4.00 14.00 0.15 2.10
15 + 000 - 15 + 042 L/R 41.70 4.00 166.80 0.15 25.02
SEGMEN 15 L/R 20.00 4.00 80.00 0.15 12.00 Beton Rigid
15 + 062 - 15 + 100 L/R 38.30 4.00 153.20 0.15 22.98
15 + 100 - 15 + 150 L/R 50.00 4.00 200.00 0.15 30.00 Bahu Beton
15 + 150 - 15 + 200 L/R 50.00 4.00 200.00 0.15 30.00 Bahu Beton
15 + 200 - 15 + 250 L/R 50.00 4.00 200.00 0.15 30.00 Bahu Beton
15 + 250 - 15 + 300 L/R 50.00 4.00 200.00 0.15 30.00 Bahu Beton
15 + 300 - 15 + 350 L/R 50.00 4.00 200.00 0.15 30.00 Bahu Beton
15 + 350 - 15 + 400 L/R 50.00 4.00 200.00 0.15 30.00 Bahu Beton
15 + 400 - 15 + 450 L/R 50.00 4.00 200.00 0.15 30.00 Bahu Beton
15 + 450 - 15 + 500 L/R 50.00 4.00 200.00 0.15 30.00 Bahu Beton
15 + 500 - 15 + 550 L/R 50.00 4.00 200.00 0.15 30.00 Bahu Beton
15 + 550 - 15 + 600 L/R 50.00 4.00 200.00 0.15 30.00 Bahu Beton
15 + 600 - 15 + 650 L/R 50.00 4.00 200.00 0.15 30.00
15 + 650 - 15 + 700 L/R 50.00 4.00 200.00 0.15 30.00
15 + 700 - 15 + 726 L/R 26.40 4.00 105.60 0.15 15.84
SEGMEN 16 L/R 30.00 4.00 120.00 0.15 18.00 Beton Rigid
15 + 756 - 15 + 800 L/R 43.60 4.00 174.40 0.15 26.16
15 + 800 - 15 + 850 L/R 50.00 4.00 200.00 0.15 30.00
15 + 850 - 15 + 900 L/R 50.00 4.00 200.00 0.15 30.00
15 + 900 - 15 + 950 L/R 50.00 4.00 200.00 0.15 30.00
15 + 950 - 16 + 000 L/R 50.00 4.00 200.00 0.15 30.00
16 + 000 - 16 + 050 L/R 50.00 4.00 200.00 0.15 30.00
16 + 050 - 16 + 100 L/R 50.00 4.00 200.00 0.15 30.00
16 + 100 - 16 + 150 L/R 50.00 4.00 200.00 0.15 30.00
16 + 150 - 16 + 200 L/R 50.00 4.00 200.00 0.15 30.00
16 + 200 - 16 + 250 L/R 50.00 4.00 200.00 0.15 30.00
16 + 250 - 16 + 300 L/R 50.00 4.00 200.00 0.15 30.00
16 + 300 - 16 + 350 L/R 50.00 4.00 200.00 0.15 30.00
16 + 350 - 16 + 400 L/R 50.00 4.00 200.00 0.15 30.00
Panjang Lebar Luas Spray Volume
STA Posisi Ket
M M M² Ltr/M² Liter
16 + 400 - 16 + 411 L/R 10.80 4.00 43.20 0.15 6.48
SEGMEN 17 Jembatan Besi
16 + 429 - 16 + 450 L/R 21.20 4.00 84.80 0.15 12.72 Tanpa Bahu
16 + 450 - 16 + 488 L/R 37.70 4.00 150.80 0.15 22.62 Tanpa Bahu
SEGMEN 18 L/R 50.00 4.00 200.00 0.15 30.00 Beton Rigid
16 + 538 - 16 + 550 L/R 12.30 4.00 49.20 0.15 7.38 Tanpa Bahu
16 + 550 - 16 + 600 L/R 50.00 4.00 200.00 0.15 30.00 Tanpa Bahu
16 + 600 - 16 + 650 L/R 50.00 4.00 200.00 0.15 30.00 Tanpa Bahu
16 + 650 - 16 + 700 L/R 50.00 4.00 200.00 0.15 30.00 Tanpa Bahu
16 + 700 - 16 + 750 L/R 50.00 4.00 200.00 0.15 30.00 Tanpa Bahu
16 + 750 - 16 + 800 L/R 50.00 4.00 200.00 0.15 30.00 Tanpa Bahu
16 + 800 - 16 + 850 L/R 50.00 4.00 200.00 0.15 30.00 Tanpa Bahu
16 + 850 - 16 + 900 L/R 50.00 4.00 200.00 0.15 30.00 Tanpa Bahu
16 + 900 - 16 + 950 L/R 50.00 4.00 200.00 0.15 30.00 Tanpa Bahu
16 + 950 - 17 + 000 L/R 50.00 4.00 200.00 0.15 30.00 Tanpa Bahu
17 + 000 - 17 + 050 L/R 50.00 4.00 200.00 0.15 30.00 Tanpa Bahu
17 + 050 - 17 + 100 L/R 50.00 4.00 200.00 0.15 30.00 Tanpa Bahu
17 + 100 - 17 + 132 L/R 32.40 4.00 129.60 0.15 19.44 Tanpa Bahu
SEGMEN 19 Jembatan Besi
17 + 156 - 17 + 200 L/R 43.60 4.00 174.40 0.15 26.16 Tanpa Bahu
17 + 200 - 17 + 250 L/R 50.00 4.00 200.00 0.15 30.00 Tanpa Bahu
17 + 250 - 17 + 300 L/R 50.00 4.00 200.00 0.15 30.00 Tanpa Bahu
17 + 300 - 17 + 350 L/R 50.00 4.00 200.00 0.15 30.00 Tanpa Bahu
17 + 350 - 17 + 400 L/R 50.00 4.00 200.00 0.15 30.00 Tanpa Bahu
17 + 400 - 17 + 450 L/R 50.00 4.00 200.00 0.15 30.00 Tanpa Bahu
17 + 450 - 17 + 500 L/R 50.00 4.00 200.00 0.15 30.00 Tanpa Bahu
17 + 500 - 17 + 550 L/R 50.00 4.00 200.00 0.15 30.00 Tanpa Bahu
17 + 550 - 17 + 600 L/R 50.00 4.00 200.00 0.15 30.00 Tanpa Bahu
17 + 600 - 17 + 650 L/R 50.00 4.00 200.00 0.15 30.00 Tanpa Bahu
17 + 650 - 17 + 700 L/R 50.00 4.00 200.00 0.15 30.00 Tanpa Bahu
17 + 700 - 17 + 750 L/R 50.00 4.00 200.00 0.15 30.00 Tanpa Bahu
17 + 750 - 17 + 800 L/R 50.00 4.00 200.00 0.15 30.00 Tanpa Bahu
17 + 800 - 17 + 850 L/R 50.00 4.00 200.00 0.15 30.00 Tanpa Bahu
17 + 850 - 17 + 900 L/R 50.00 4.00 200.00 0.15 30.00 Tanpa Bahu
17 + 900 - 17 + 950 L/R 50.00 4.00 200.00 0.15 30.00 Tanpa Bahu
17 + 950 - 18 + 000 L/R 50.00 4.00 200.00 0.15 30.00 Tanpa Bahu
18 + 000 - 18 + 050 L/R 50.00 4.00 200.00 0.15 30.00 Tanpa Bahu
18 + 050 - 18 + 100 L/R 50.00 4.00 200.00 0.15 30.00 Tanpa Bahu
18 + 100 - 18 + 150 L/R 50.00 4.00 200.00 0.15 30.00 Tanpa Bahu
18 + 150 - 18 + 200 L/R 50.00 4.00 200.00 0.15 30.00 Tanpa Bahu
18 + 200 - 18 + 250 L/R 50.00 4.00 200.00 0.15 30.00 Tanpa Bahu
18 + 250 - 18 + 300 L/R 50.00 4.00 200.00 0.15 30.00 Tanpa Bahu
18 + 300 - 18 + 350 L/R 50.00 4.00 200.00 0.15 30.00 Tanpa Bahu
18 + 350 - 18 + 400 L/R 50.00 4.00 200.00 0.15 30.00 Tanpa Bahu
18 + 400 - 18 + 450 L/R 50.00 4.00 200.00 0.15 30.00 Tanpa Bahu
18 + 450 - 18 + 500 L/R 50.00 4.00 200.00 0.15 30.00 Tanpa Bahu
18 + 500 - 18 + 550 L/R 50.00 4.00 200.00 0.15 30.00 Tanpa Bahu
18 + 550 - 18 + 600 L/R 50.00 4.00 200.00 0.15 30.00 Tanpa Bahu
18 + 600 - 18 + 610 L/R 10.00 3.50 35.00 0.15 5.25 Tanpa Bahu
18 + 610 - 18 + 650 L/R 40.00 4.00 160.00 0.15 24.00 Tanpa Bahu
18 + 650 - 18 + 700 L/R 50.00 4.00 200.00 0.15 30.00 Tanpa Bahu
18 + 700 - 18 + 750 L/R 50.00 4.00 200.00 0.15 30.00 Tanpa Bahu
18 + 750 - 18 + 800 L/R 50.00 4.00 200.00 0.15 30.00 Tanpa Bahu
18 + 800 - 18 + 850 L/R 50.00 4.00 200.00 0.15 30.00 Tanpa Bahu
18 + 850 - 18 + 900 L/R 50.00 4.00 200.00 0.15 30.00 Tanpa Bahu
Panjang Lebar Luas Spray Volume
STA Posisi Ket
M M M² Ltr/M² Liter
18 + 900 - 18 + 950 L/R 50.00 4.00 200.00 0.15 30.00 Tanpa Bahu
18 + 950 - 19 + 000 L/R 50.00 4.00 200.00 0.15 30.00 Tanpa Bahu
19 + 000 - 19 + 050 L/R 50.00 4.00 200.00 0.15 30.00 Tanpa Bahu
19 + 050 - 19 + 100 L/R 50.00 4.00 200.00 0.15 30.00 Tanpa Bahu
19 + 100 - 19 + 150 L/R 50.00 4.00 200.00 0.15 30.00 Tanpa Bahu
19 + 150 - 19 + 200 L/R 50.00 4.00 200.00 0.15 30.00 Tanpa Bahu
19 + 200 - 19 + 300 L/R 100.00 4.00 400.00 0.15 60.00 Tanpa Bahu
DINAS PEKERJAAN UMUM BINA MARGA DINAS PEKERJAAN UMUM BINA MARGA
PENGAWAS LAPANGAN 1 PENGAWAS LAPANGAN 2
BUDIANTO, ST
INSPECTOR DODY EKO NOERSANTO, ST
MANAGER TEKNIK
PEMERINTAH KABUPATEN REJANG LEBONG
DINAS PEKERJAAN UMUM PENATAAN
RUANGPERUMAHAN DAN KAWASAN PEMUKIMAN
PEKERJAAN :
BACKUP DATA
DIVISI 6. PERKERASAN ASPAL
Laston Lapis Antara (AC-BC)
REKAPITULASI
VOLUME
No. LOKASI STA SATUAN KET
Ton
EDY KUSNADI, ST
NIP. 198606617 201902 1 001
PEMERINTAH KABUPATEN REJANG LEBONG
DINAS PEKERJAAN UMUM PENATAAN
RUANGPERUMAHAN DAN KAWASAN PEMUKIMAN
PEKERJAAN :
BACKUP DATA
DIVISI 6. PERKERASAN ASPAL
Bahan anti pengelupasan
REKAPITULASI
VOLUME
No. LOKASI STA SATUAN KET
Ton
EDY KUSNADI, ST
NIP. 198606617 201902 1 001
PEMERINTAH KABUPATEN REJANG LEBONG
DINAS PEKERJAAN UMUM PENATAAN
RUANGPERUMAHAN DAN KAWASAN PEMUKIMAN
PEKERJAAN :
BACKUP DATA
DIVISI 7. STRUKTUR
Pasangan Batu
SUMBER DANA DAK
Tahun Anggaran 2022
PEMERINTAH KABUPATEN REJANG LEBONG
DINAS PEKERJAAN UMUM PENATAAN RUANG PERUMAHAN
DAN KAWASAN PEMUKIMAN
TAHUN ANGGARAN 2022
REKAPITULASI
PAKET KEGIATAN : Peningkatan Struktur Jalan Simpang Temuan Jaya - Simpang Jene (DAK Reguler)
VOLUME
No. LOKASI STA SATUAN KETERANGAN
M3
JUMLAH ( M3 ) 119.99
BACKUP VOLUME
Peningkatan Kapasitas Struktur Jalan pada Ruas Jalan Karang Baru - Lubuk Tunjung Kecamatan Sindang Beliti Ilir
7.9.(1)
Pasangan Batu
EDY KUSNADI, ST
NIP. 198606617 201902 1 001
KUP VOLUME
n Karang Baru - Lubuk Tunjung Kecamatan Sindang Beliti Ilir (DAK)
7.9.(1)
Pasangan Batu
Volume Plester
Luas (M2) KET
(M3) (M2)
119.99 57.74
PEMERINTAH KABUPATEN REJANG LEBONG
DINAS PEKERJAAN UMUM PENATAAN
RUANGPERUMAHAN DAN KAWASAN PEMUKIMAN
PEKERJAAN :
BACKUP DATA
DIVISI 9. PEKERJAAN HARIAN & PEKERJAAN LAIN-
LAIN
REKAPITULASI
VOLUME
No. LOKASI STA SATUAN KETERANGAN
M2
JUMLAH ( M3 ) 354.00
PEMERINTAH KABUPATEN REJANG LEBONG
DINAS PEKERJAAN UMUM PENATAAN RUANG PERUMAHAN
DAN KAWASAN PEMUKIMAN
BACK UP DATA
KEGIATAN : PENINGKATAN JALAN
Peningkatan Kapasitas Struktur Jalan pada Ruas Jalan Karang Baru - Lubuk Tunjung Kecamatan
PAKET KEGIATAN :
Sindang Beliti Ilir (DAK)
KONTRAKTOR : CV. Indo Artha Persada
KONSULTAN :
PANJANG LEBAR
No. URAIAN ( 2/3 PANJANG) VOLUME KET.
(M) (M)
PANJANG 4400.00
EDY KUSNADI, ST
NIP. 198606617 201902 1 001