KEGIATAN : Peningkatan Kapasitas Struktur Jalan pada Ruas Jalan Karang Baru - Lubuk Tunjung Kecamatan Sindang Beliti

buk Tunjung Kecamatan Sindang Beliti Ilir (DAK)


LOKASI : REJANG LEBONG
SUMBER DANA : DAK
TAHUN ANGGARAN : 2022
KONTRAK AWAL ADDENDUM % PELAKSANAAN
WAKTU
KODE URAIAN PEKERJAAN BOBOT Bulan ke 1 Bulan Ke 2 Bulan Ke 3 Bulan Ke 4 Bulan Ke 5 Bulan Ke 6 Bulan Ke 7
SAT VOL BOBOT (%) VOL
(%) Minggu Ke Minggu Ke Minggu Ke Minggu Ke Minggu Ke Minggu Ke Minggu Ke
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25
6/29/2022 7/1/2022 7/8/2022 7/15/2022 7/22/2022 8/1/2022 8/8/2022 8/15/2022 8/22/2022 9/1/2022 9/8/2022 9/15/2022 9/22/2022 10/1/2022 10/8/2022 10/15/2022 10/22/2022 11/1/2022 11/8/2022 11/15/2022 11/22/2022 12/1/2022 12/8/2022 12/15/2022 12/22/2022
6/30/2022 7/7/2022 7/14/2022 7/21/2022 7/31/2022 8/7/2022 8/14/2022 8/21/2022 8/31/2022 9/7/2022 9/14/2022 9/21/2022 9/30/2022 10/7/2022 10/14/2022 10/21/2022 10/31/2022 11/7/2022 11/14/2022 11/21/2022 11/30/2022 12/7/2022 12/14/2022 12/21/2022 12/26/2022

I DIVISI 1. UMUM
1.2 Mobilisasi LS 1.00 0.34 1.00 0.34 0.115 0.115 0.115
1.8.(1) Manajemen dan Keselamatan Lalu Lintas LS 1.00 0.14 1.00 0.14 0.006 0.006 0.006 0.006 0.006 0.006 0.006 0.006 0.006 0.006 0.006 0.006 0.006 0.006 0.006 0.006 0.006 0.006 0.006 0.006 0.006 0.006
1.19 Keselamatan dan Kesehatan Kerja LS 1.00 0.30 1.00 0.30 0.014 0.014 0.014 0.014 0.014 0.014 0.014 0.014 0.014 0.014 0.014 0.014 0.014 0.014 0.014 0.014 0.014 0.014 0.014 0.014 0.014 0.014
Manajemen Mutu LS 1.00 0.21 1.00 0.21 0.010 0.010 0.010 0.010 0.010 0.010 0.010 0.010 0.010 0.010 0.010 0.010 0.010 0.010 0.010 0.010 0.010 0.010 0.010 0.010 0.010 0.010

II DIVISI 2. DRAINASE
2.1.(1) Galian untuk Selokan Drainase dan Saluran Air (Manual) M3 28.50 0.02 28.50 0.02 0.007 0.007 0.007
2.2.(1) Pasangan Batu dengan Mortar M3 14.85 0.30 14.85 0.30 0.148 0.148

III DIVISI 3. PEKERJAAN TANAH


3.1.(1) Galian Biasa M3 254.13 0.21 254.13 0.21 0.030 0.030 0.030 0.030 0.030 0.030 0.030
3.1.(4) Galian Struktur dengan kedalaman 0 - 2 meter (Manual) M3 69.04 0.02 69.04 0.02 0.005 0.005 0.005 0.005
3.1.(8) Galian Perkerasan Beraspal tanpa Cold Milling Machine M3 626.14 4.38 357.30 2.50 0.312 0.312 0.312 0.312 0.312 0.312 0.312 0.312
3.2.(2a) Timbunan Pilihan dari sumber galian M3 506.38 3.52 191.24 1.33 0.443 0.443 0.443
3.3.(1) Penyiapan Badan Jalan M2 13729.70 1.76 7,728.00 0.99 0.090 0.090 0.090 0.090 0.090 0.090 0.090 0.090 0.090 0.090 0.090

V DIVISI 5. PERKERASAN BERBUTIR


5.1.(1) Lapis Pondasi Agregat Kelas A M3 2031.58 21.93 2,031.59 21.93 5.482 5.482 5.482 5.482
5.1.(2) Lapis Pondasi Agregat Kelas B M3 2097.13 19.14 2,097.12 19.14 4.786 4.786 4.786 4.786
RENCANA

adendu
VI DIVISI 6. PERKERASAN ASPAL
6.1 (1) Lapis Resap Pengikat - Aspal Cair/Emulsi Liter 10560.00 2.91 10,560.00 2.91 0.970 0.970 0.970

m
6.3(6a) Laston Lapis Antara (AC-BC) Ton 1781.70 40.06 1,781.70 40.06 10.016 10.016 10.016 10.016
6.3.(8) Bahan anti pengelupasan Kg 299.33 0.35 299.33 0.35 0.086 0.086 0.086 0.086

VII DIVISI 7. STRUKTUR


7.1 (7a) Beton strukur, fc’20 Mpa (Box culvert) M3 6.72 0.19 6.72 0.19 0.097 0.097
7.1 (8) Beton , fc’15 Mpa (Bahu Jalan) M3 15.80 0.40 196.00 4.99 2.493 2.493
7.3 (1) Baja Tulangan Polos-BjTP 280 Kg 1297.40 0.38 1,297.40 0.38 0.192 0.192
7.9.(1) Pasangan Batu M3 119.99 2.08 119.99 2.08 1.039 1.039

IX DIVISI 9. PEKERJAAN HARIAN & PEKERJAAN LAIN-LAIN REALISASI


9.2.(1) Marka Jalan Termoplastik M2 264.00 0.76 354.00 1.02 0.508 0.508
9.2.(5) Patok Pengarah Buah 250.00 0.54 250.00 0.54 0.181 0.181 0.181
9.2.(5) Patok Kilometer Buah 5.00 0.04 5.00 0.04 0.037

BOBOT % 100.00 100.00

Rencana % 0.11 0.11 0.03 0.03 0.03 5.19 5.51 5.66 5.66 6.36 5.92 6.07 6.15 11.51 11.20 11.23 10.08 2.55 2.55 1.28 1.28 0.79 0.54 0.03 0.11
Rencana Kumulatif % 0.11 0.23 0.26 0.29 0.32 5.19 10.70 16.36 22.03 28.39 34.31 40.38 46.53 58.04 69.24 80.46 90.54 93.10 95.65 96.93 98.21 99.00 99.54 99.57 99.68
Realisasi % 0.01 0.54 0.82 0.53 1.76 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
KONTYRAK AWAL Realisasi Kumulatif 0.01 0.56 1.38 1.91 3.67 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
%
Deviasi % -0.10 0.43 0.79 0.50 1.73 -5.19 -5.51 -5.66 -5.66 -6.36 -5.92 -6.07 -6.15 -11.51 -11.20 -11.23 -10.08 -2.55 -2.55 -1.28 -1.28 -0.79 -0.54 -0.03 -0.11
Deviasi Kumulatif % -0.10 0.33 1.12 1.62 3.35 -1.84 -7.35 -13.01 -18.68 -25.04 -30.96 -37.03 -43.18 -54.69 -65.89 -77.11 -87.19 -89.75 -92.30 -93.58 -94.86 -95.65 -96.19 -96.22 -96.33
Rencana % 0.11 0.11 0.03 0.03 0.03 5.19 5.51 5.66 5.66 6.36 5.92 6.07 6.15 11.51 11.20 11.23 10.08 2.55 2.55 1.28 1.28 0.79 0.54 0.03 0.11
Rencana Kumulatif % 0.11 0.23 0.26 0.29 0.32 5.51 11.02 16.68 22.34 28.71 34.63 40.70 46.85 58.36 69.55 80.78 90.86 93.42 95.97 97.25 98.53 99.32 99.86 99.89 100.00
Realisasi % 0.01 0.54 0.82 0.53 1.76 3.81 3.34 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
ADENDUM Realisasi Kumulatif 0.01 0.56 1.38 1.91 3.67 7.48 10.83 10.83 10.83 10.83 10.83 10.83 10.83 10.83 10.83 10.83 10.83 10.83 10.83 10.83 10.83 10.83 10.83 10.83 10.83
%
Deviasi % -0.10 PEJABAT
0.43 0.79 0.50 1.73 -1.38 -2.17 -5.66 -5.66 -6.36 -5.92 -6.07 -6.15 -11.51 -11.20 -11.23 -10.08 -2.55 -2.55 -1.28 -1.28 -0.79 -0.54 -0.03 -0.11
Deviasi Kumulatif % -0.10 0.33
PELAKSANA 1.12 1.62 3.35 1.97 -0.20 -5.86 -11.52 -17.88 -23.80 -29.87 -36.02 -47.53 -58.73 -69.96 -80.04 -82.59 -85.15 -86.43 -87.71 -88.49 -89.03 -89.06 -89.17
TEKNIS
KEGIATAN
KEPALA BIDANG BINA MARGA PEJABAT
DPUPRKP KABUPATEN
PELAKSANA REJANG LEBONG
DPUPRKP KABPUPATEN REJANG LEBONG (PPTK) KONSULTAN PENGAWAS KONTRAKTOR PELAKSANA
KPA (SELAKU PPK) TEKNIS
(PPTK) CV. DINAMIKA CONSULTANT CV. INDO ARTHA PERSADA
KEGIATAN

EDY KUSNADI, ST
RONI SAPUTRA, ST ALFIAN OBEN SANDRA JAYA
NIP. 198606617 201902 1 001
NIP. 19760605 201001 1 012 WAKIL DIREKTUR DIREKTUR
REKAPITULASI RAB CCO

Kegiatan : Peningkatan Kapasitas Struktur Jalan pada Ruas Jalan Karang Baru - Lubuk Tunjung Kecamatan Sindang Beliti Ilir (DAK)
Lokasi : REJANG LEBONG
Sumber Dana : DAK
Tahun Anggaran : 2022

JUMLAH HARGA JUMLAH HARGA BOBOT (%) BOBOT (%) KETERANGAN


BAB URAIAN KONTRAK AWAL KONTRAK CCO
KONTRAK AWAL KONTRAK CCO
(Rp.) (Rp.)

I DIVISI 1. UMUM 68,799,250.00 68,799,250.00 1.00 1.00 TETAP

II DIVISI 2. DRAINASE 21,722,653.94 21,722,653.94 0.32 0.32 TETAP

III DIVISI 3. PEKERJAAN TANAH 679,216,831.02 346,844,639.57 9.90 5.05 BERKURANG

V DIVISI 5. PERKERASAN BERBUTIR 2,818,955,164.66 2,818,952,602.95 41.07 41.07 TETAP

VI DIVISI 6. PERKERASAN ASPAL 2,973,429,884.91 2,973,426,519.80 43.32 43.32 TETAP

VII DIVISI 7. STRUKTUR 209,923,578.11 524,556,874.80 3.06 7.64 BERTAMBAH

IX DIVISI 9. PEKERJAAN HARIAN & PEKERJAAN LAIN-LAIN 91,790,051.71 109,534,887.51 1.34 1.60 BERTAMBAH

JUMLAH Rp 6,863,837,414 Rp 6,863,837,429 100.00 100.00


PPN 11% Rp 755,022,116 Rp 755,022,117
JUMLAH TOTAL Rp 7,618,859,530 Rp 7,618,859,546
PEMBULATAN Rp 7,618,859,500 Rp 7,618,859,500

Disetuji Oleh:
PEJABAT PELAKSANA TEKNIS KEGIATAN
PEJABAT PELAKSANA TEKNIS KEGIATAN PEJABAT PELAKSANA TEKNIS KEGIATAN KONSULTAN PENGAWAS Diajukan Oleh:
DPUPRKP KABUPATEN REJANG LEBONG DPUPRKP KABUPATEN REJANG LEBONG
CV. DINAMIKA CONSULTANT KONTRAKTOR PELAKSANA
(PPTK)
KPA (SELAKU PPK) CV. INDO ARTHA PERSADA
EDY KUSNADI, ST
EDY KUSNADI, ST ALFIAN OBEN SANDRA JAYA
NIP. 198606617 201902 1 001 NIP. 198606617 201902 1 001
WAKIL DIREKTUR DIREKTUR
PERUBAHAN KONTRAK SETELAH CCO

KEGIATAN : Peningkatan Kapasitas Struktur Jalan pada Ruas Jalan Karang Baru - Lubuk Tunjung Kecamatan Sindang Beliti Ilir (DAK)
LOKASI : REJANG LEBONG
SUMBER DANA : DAK
TAHUN ANGGARAN : 2022

KONTRAK AWAL PENAMBAHAN PENGURANGAN KONTRAK SETELAH ADDENDUM


KODE URAIAN PEKERJAAN JUMLAH HARGA
VOL SAT HARGA SATUAN (Rp.) JUMLAH HARGA SATUAN (Rp.) BOBOT (%) VOL HARGA SATUAN (Rp.) JUMLAH HARGA SATUAN (Rp.) VOL HARGA SATUAN (Rp.) VOL HARGA SATUAN (Rp.) JUMLAH HARGA SATUAN (Rp.) KETERANGAN
SATUAN (Rp.)
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15.00 16

I DIVISI 1. UMUM
1.2 Mobilisasi 1.00 LS Rp 23,650,000 Rp 23,650,000.00 0.34 - - 1.00 Rp 23,650,000.00 Rp 23,650,000.00 TETAP
1.8.(1) Manajemen dan Keselamatan Lalu Lintas 1.00 LS Rp 9,800,000 Rp 9,800,000.00 0.14 - - 1.00 Rp 9,800,000.00 Rp 9,800,000.00 TETAP
1.19 Keselamatan dan Kesehatan Kerja 1.00 LS Rp 20,799,250 Rp 20,799,250.00 0.30 1.00 Rp 20,799,250.00 Rp 20,799,250.00 TETAP
Manajemen Mutu 1.00 LS Rp 14,550,000 Rp 14,550,000.00 0.21 - - 1.00 Rp 14,550,000.00 Rp 14,550,000.00 TETAP
SUB TOTAL Rp 68,799,250.00 - - Rp 68,799,250.00

II DIVISI 2. DRAINASE
2.1.(1) Galian untuk Selokan Drainase dan Saluran Air (Manual) 28.50 M3 Rp 48,522 Rp 1,382,883.33 0.02 - - 28.50 Rp 48,522.22 Rp 1,382,883.33 TETAP
2.2.(1) Pasangan Batu dengan Mortar 14.85 M3 Rp 1,369,682 Rp 20,339,770.61 0.30 - - 14.85 Rp 1,369,681.52 Rp 20,339,770.61 TETAP

SUB TOTAL Rp 21,722,653.94 - - Rp 21,722,653.94

III DIVISI 3. PEKERJAAN TANAH


3.1.(1) Galian Biasa 254.13 M3 Rp 57,201 Rp 14,536,411.85 0.21 - - 254.13 Rp 57,200.69 Rp 14,536,125.85 TETAP
3.1.(4) Galian Struktur dengan kedalaman 0 - 2 meter (Manual) 69.04 M3 Rp 20,358 Rp 1,405,503.12 0.02 - - 69.04 Rp 20,357.81 Rp 1,405,503.12 TETAP
3.1.(8) Galian Perkerasan Beraspal tanpa Cold Milling Machine 626.14 M3 Rp 480,018 Rp 300,558,566.87 4.38 - 268.84 Rp 480,018.15 Rp 129,048,080.49 357.30 Rp 480,018.15 Rp 171,510,486.38 BERKURANG
3.2.(2a) Timbunan Pilihan dari sumber galian 506.38 M3 Rp 477,350 Rp 241,720,385.21 3.52 - 315.14 Rp 477,349.79 Rp 150,432,539.86 191.24 Rp 477,349.79 Rp 91,287,845.34 BERKURANG
3.3.(1) Penyiapan Badan Jalan 13,729.70 M2 Rp 8,813 Rp 120,995,963.97 1.76 - 6,001.70 Rp 8,812.72 Rp 52,891,285.10 7,728.00 Rp 8,812.72 Rp 68,104,678.88 BERKURANG
SUB TOTAL Rp 679,216,831.02 - Rp 332,371,905.45 Rp 346,844,639.57

V DIVISI 5. PERKERASAN BERBUTIR


5.1.(1) Lapis Pondasi Agregat Kelas A 2,031.58 M3 Rp 740,787 Rp 1,504,968,372.49 21.93 - - 2,031.59 Rp 740,787.16 Rp 1,504,972,076.43 TETAP
5.1.(2) Lapis Pondasi Agregat Kelas B 2,097.13 M3 Rp 626,564 Rp 1,313,986,792.16 19.14 - - 2,097.12 Rp 626,564.30 Rp 1,313,980,526.52 TETAP

SUB TOTAL Rp 2,818,955,164.66 - - Rp 2,818,952,602.95

VI DIVISI 6. PERKERASAN ASPAL


6.1 (1) Lapis Resap Pengikat - Aspal Cair/Emulsi 10,560.00 Liter Rp 18,916 Rp 199,751,346.81 2.91 - - 10,560.00 Rp 18,915.85 Rp 199,751,346.81 TETAP
6.3(6a) Laston Lapis Antara (AC-BC) 1,781.70 Ton Rp 1,543,434 Rp 2,749,938,675.80 40.06 - - 1,781.70 Rp 1,543,434.43 Rp 2,749,935,650.67 TETAP
6.3.(8) Bahan anti pengelupasan 299.33 Kg Rp 79,310 Rp 23,739,862.30 0.35 - - 299.33 Rp 79,310.00 Rp 23,739,522.32 TETAP

SUB TOTAL Rp 2,973,429,884.91 - - Rp 2,973,426,519.80

VII DIVISI 7. STRUKTUR


7.1 (7a) Beton strukur, fc’20 Mpa (Box culvert) 6.72 M3 Rp 1,988,293 Rp 13,361,330.67 0.19 - - 6.72 Rp 1,988,293.25 Rp 13,361,330.67 TETAP
7.1 (8) Beton , fc’15 Mpa (Bahu Jalan) 15.80 M3 Rp 1,746,023 Rp 27,587,159.20 0.40 180.20 Rp 1,746,022.73 Rp 314,633,296.69 - 196.00 Rp 1,746,022.73 Rp 342,220,455.89 BERTAMBAH
7.3 (1) Baja Tulangan Polos-BjTP 280 1,297.40 Kg Rp 20,272 Rp 26,300,763.06 0.38 Rp - - 1,297.40 Rp 20,271.90 Rp 26,300,763.06 TETAP
7.9.(1) Pasangan Batu 119.99 M3 Rp 1,189,052 Rp 142,674,325.18 2.08 Rp - - 119.99 Rp 1,189,051.80 Rp 142,674,325.18 TETAP

SUB TOTAL Rp 209,923,578.11 Rp 314,633,296.69 - Rp 524,556,874.80

IX DIVISI 9. PEKERJAAN HARIAN & PEKERJAAN LAIN-LAIN


9.2.(1) Marka Jalan Termoplastik 264.00 M2 Rp 197,165 Rp 52,051,518.34 0.76 90.00 Rp 197,164.84 Rp 17,744,835.80 354.00 Rp 197,164.84 Rp 69,796,354.14 BERTAMBAH
9.2.(5) Patok Pengarah 250.00 Buah Rp 148,807 Rp 37,201,782.44 0.54 Rp - 250.00 Rp 148,807.13 Rp 37,201,782.44 TETAP
9.2.(5) Patok Kilometer 5.00 Buah Rp 507,350 Rp 2,536,750.93 0.04 Rp - 5.00 Rp 507,350.19 Rp 2,536,750.93 TETAP

SUB TOTAL Rp 91,790,051.71 100.00 Rp 17,744,835.80 - Rp 109,534,887.51


JUMLAH TOTAL Rp 6,863,837,414.36 Rp 332,378,132.49 Rp 332,371,905.45 6,863,837,428.57
PPN 11% Rp 755,022,115.58 PPN 11% Rp 755,022,117.14
TOTAL Rp 7,618,859,529.93 TOTAL Rp 7,618,859,545.72
PEMBULATAN Rp 7,618,859,500.00 - PEMBULATAN Rp 7,618,859,500.00

PEJABAT PELAKSANA TEKNIS KEGIATAN


KEPALA BIDANG BINA MARGA PEJABAT PELAKSANA TEKNIS KEGIATAN
DPUPRKP KABUPATEN REJANG LEBONG
DPUPRKP KABPUPATEN REJANG LEBONG (PPTK) KONSULTAN PENGAWAS KONTRAKTOR PELAKSANA
KPA (SELAKU PPK) (PPTK) CV. DINAMIKA CONSULTANT CV. INDO ARTHA PERSADA

EDY KUSNADI, ST
RONI SAPUTRA, ST ALFIAN OBEN SANDRA JAYA
NIP. 198606617 201902 1 001
NIP. 19760605 201001 1 012 WAKIL DIREKTUR DIREKTUR
PEMERINTAH KABUPATEN REJANG LEBONG
DINAS PEKERJAAN UMUM PENATAAN
RUANGPERUMAHAN DAN KAWASAN PEMUKIMAN

PEKERJAAN :

Peningkatan Kapasitas Struktur Jalan pada Ruas Jalan Karang


Baru - Lubuk Tunjung Kecamatan Sindang Beliti Ilir (DAK)

BACKUP DATA
DIVISI 2. DRAINASE
Galian untuk Selokan Drainase dan Saluran Air

SUMBER DANA DAK


Tahun Anggaran 2022
PEMERINTAH KABUPATEN REJANG LEBONG
DINAS PEKERJAAN UMUM PENATAAN RUANG PERUMAHAN
DAN KAWASAN PEMUKIMAN
TAHUN ANGGARAN 2022

REKAPITULASI

KEGIATAN : PENINGKATAN JALAN

PAKET KEGIATAN : Peningkatan Kapasitas Struktur Jalan pada Ruas Jalan Karang Baru - Lubuk Tunjung
Kecamatan Sindang Beliti Ilir (DAK)
KONTRAKTOR : CV. Indo Artha Persada

PAY ITEM : 2.1(1)


PEKERJAAN : Galian untuk Selokan Drainase dan Saluran Air

VOLUME
No. LOKASI STA SATUAN KET
M3

1 0+400 - 0+438 M3 28.50


2 1+100 - 1+125 M3 0.00

JUMLAH ( M3 ) 28.50

KEPALA BIDANG BINA MARGA PEJABAT PELAKSANA TEKNIS KEGIATAN


DPUPRKP KABUPATEN REJANG LEBONG DPUPRKP KABUPATEN REJANG LEBONG KONSULTAN PENGAWAS KONTRAKTOR PELAKSANA
KPA (SELAKU PPK) (PPTK) CV. DINAMIKA CV. INDO ARTHA PERSADA

RONI SAPUTRA, ST EDY KUSNADI, ST ALFIAN OBEN SANDRA JAYA


NIP. 197606605 201001 1 012 NIP. 198606617 201902 1 001 WAKIL DIREKTUR DIREKTUR
RONI SAPUTRA, ST EDY KUSNADI, ST ALFIAN OBEN SANDRA JAYA
NIP. 197606605 201001 1 012 NIP. 198606617 201902 1 001 WAKIL DIREKTUR DIREKTUR
BACKUP VOLUME
Peningkatan Kapasitas Struktur Jalan pada Ruas Jalan Karang Baru - Lubuk Tunjung Kecamatan Sindang Beliti Ilir (DAK)

DIVISI 2. DRAINASE
Galian untuk Selokan Drainase dan Saluran Air (Manual)

Panjang (L1+L2)/2 Luas Area H (TINGGI) Volume


STA Posisi Ket
M (L1=0,6, L2=0,4) M M² M M³

0 + 400 - 0 + 438 L/R 38.00 0.50 19.00 0.75 28.50


0 + 438 - 0 + 488 L/R 50.00 0.50 25.00 0.75
0 + 488 - 0 + 538 L/R 50.00 0.50 25.00 0.75
0 + 538 - 0 + 573 L/R 35.00 0.50 17.50 0.75
1 + 100 - 1 + 125 L/R 25.00 0.50 12.50 0.75

JUMLAH TOTAL 198.00 28.50

KONSULTAN PENGAWAS KONTRAKTOR


CV. DINAMIKA CONSULTANT CV. INDO ARTHA PERSADA

ALFIAN OBEN SANDRA JAYA


WAKIL DIREKTUR DIREKTUR

PEJABAT PELAKSANA TEKNIS KEGIATAN


DPUPRKP KABUPATEN REJANG LEBONG
(PPTK)

EDY KUSNADI, ST
NIP. 198606617 201902 1 001
PEMERINTAH KABUPATEN REJANG LEBONG
DINAS PEKERJAAN UMUM PENATAAN
RUANGPERUMAHAN DAN KAWASAN PEMUKIMAN

PEKERJAAN :

Peningkatan Kapasitas Struktur Jalan pada Ruas Jalan Karang


Baru - Lubuk Tunjung Kecamatan Sindang Beliti Ilir (DAK)

BACKUP DATA
DIVISI 2. DRAINASE
Pasangan Batu dengan Mortar

SUMBER DANA DAK


Tahun Anggaran 2022
PEMERINTAH KABUPATEN REJANG LEBONG
DINAS PEKERJAAN UMUM PENATAAN RUANG PERUMAHAN
DAN KAWASAN PEMUKIMAN
TAHUN ANGGARAN 2022

REKAPITULASI

KEGIATAN : PENINGKATAN JALAN


Peningkatan Kapasitas Struktur Jalan pada Ruas Jalan Karang Baru - Lubuk Tunjung Kecamatan
PAKET KEGIATAN :
Sindang Beliti Ilir (DAK)
KONTRAKTOR : CV. Indo Artha Persada

PAY ITEM : 2.2.(1)


PEKERJAAN : Pasangan Batu dengan Mortar

VOLUME
No. LOKASI STA SATUAN KET
M3

1 Pasangan Batu dengan Mortar


0+000 - 0+044 M3 14.85

JUMLAH ( M3 ) 14.85
BACKUP VOLUME
Pekerjaan : Peningkatan Kapasitas Struktur Jalan pada Ruas Jalan Karang Baru - Lubuk Tunjung Kecamatan Sindang Beliti Ilir (DAK)
Pay Item : 2.2.(1)
Pekerjaan : Pasangan Batu dengan mortar

Dimensi Saluran
No. Gambar STA L/R Panjang (M) L1 L2 L3 L4 H1 H2 Luas (M2) Volume KET
(M) (M) (M) (M) (M) (M)

1 0+000 - 0+044 R 44.00 0.60 0.20 0.40 0.70 0.60 0.15 0.34 14.85
0+050 - 0+100 R 50.00 0.60 0.20 0.40 0.70 0.60 0.15 0.34 16.88
0+500 - 0+550 L/R 50.00 0.60 0.20 0.40 0.70 0.60 0.15 0.34 33.75
0+550 - 0+600 L/R 50.00 0.60 0.20 0.40 0.70 0.60 0.15 0.34 33.75
0+620 - 0+650 L/R 30.00 0.60 0.20 0.40 0.70 0.60 0.15 0.34 20.25
0+650 - 0+700 L/R 50.00 0.60 0.20 0.40 0.70 0.60 0.15 0.34 33.75
0+975 - 1+000 L/R 25.00 0.60 0.20 0.40 0.70 0.60 0.15 0.34 16.88
1+000 - 1+050 L/R 50.00 0.60 0.20 0.40 0.70 0.60 0.15 0.34 33.75
1+050 - 1+075 L/R 25.00 0.60 0.20 0.40 0.70 0.60 0.15 0.34 16.88
2+300 - 2+321 L/R 21.00 0.60 0.20 0.40 0.70 0.60 0.15 0.34 14.18
2+321 - 2+371 L/R 50.00 0.60 0.20 0.40 0.70 0.60 0.15 0.34 33.75
3+125 - 3+175 L/R 50.00 0.60 0.20 0.40 0.70 0.60 0.15 0.34 33.75
3+175 - 3+225 L/R 50.00 0.60 0.20 0.40 0.70 0.60 0.15 0.34 33.75
3+225 - 3+275 L/R 50.00 0.60 0.20 0.40 0.70 0.60 0.15 0.34 33.75
3+275 - 3+325 L/R 50.00 0.60 0.20 0.40 0.70 0.60 0.15 0.34 33.75
3+325 - 3+350 L/R 25.00 0.60 0.20 0.40 0.70 0.60 0.15 0.34 16.88

SUB TOTAL 670.00 420.53

KONSULTAN PENGAWAS KONTRAKTOR


CV. DINAMIKA CONSULTANT CV. INDO ARTHA PERSADA

ALFIAN OBEN SANDRA JAYA


WAKIL DIREKTUR DIREKTUR

PEJABAT PELAKSANA TEKNIS KEGIATAN


DPUPRKP KABUPATEN REJANG LEBONG
(PPTK)

EDY KUSNADI, ST
NIP. 198606617 201902 1 001
EDY KUSNADI, ST
NIP. 198606617 201902 1 001
PEMERINTAH KABUPATEN REJANG LEBONG
DINAS PEKERJAAN UMUM PENATAAN
RUANGPERUMAHAN DAN KAWASAN PEMUKIMAN

PEKERJAAN :

Peningkatan Kapasitas Struktur Jalan pada Ruas Jalan Karang


Baru - Lubuk Tunjung Kecamatan Sindang Beliti Ilir (DAK)

BACKUP DATA
DIVISI 3. PEKERJAAN TANAH DAN GEOSINTETIK
Galian Biasa

SUMBER DANA DAK


Tahun Anggaran 2022
PEMERINTAH KABUPATEN REJANG LEBONG
DINAS PEKERJAAN UMUM PENATAAN RUANG PERUMAHAN
DAN KAWASAN PEMUKIMAN
TAHUN ANGGARAN 2022

REKAPITULASI

KEGIATAN : PENINGKATAN JALAN

PAKET KEGIATAN : Peningkatan Kapasitas Struktur Jalan pada Ruas Jalan Karang Baru - Lubuk Tunjung Ke

KONTRAKTOR : CV. Indo Artha Persada

PAY ITEM : 3.1.(1)


PEKERJAAN : Galian Biasa

VOLUME
No. LOKASI STA SATUAN KET
M3

1 0+200 - 2+533 M3 254.13

JUMLAH ( M3 ) 254.13
BACKUP VOLUME
Peningkatan Kapasitas Struktur Jalan pada Ruas Jalan Karang Baru - Lubuk Tunjung Kecamatan Sindang Beliti Ilir (DAK)

DIVISI 3. PEKERJAAN TANAH DAN GEOSINTETIK


Galian Biasa

Panjang Lebar (L/R) Luas Tebal Volume


STA Posisi Ket
M M M² M M³

0 + 200 - 0 + 250 L/R 50.00 0.50 25.00 0.25 6.25


0 + 250 - 0 + 300 L/R 50.00 0.50 25.00 0.25 6.25
0 + 300 - 0 + 350 L/R 50.00 0.50 25.00 0.25 6.25
0 + 350 - 0 + 400 L/R 50.00 0.50 25.00 0.25 6.25
0 + 400 - 0 + 450 L/R 50.00 0.50 25.00 0.25 6.25
0 + 450 - 0 + 500 L/R 50.00 0.50 25.00 0.25 6.25
0 + 500 - 0 + 550 L/R 50.00 0.50 25.00 0.25 6.25
0 + 550 - 0 + 600 L/R 50.00 0.50 25.00 0.25 6.25
0 + 600 - 0 + 650 L/R 50.00 0.50 25.00 0.25 6.25
0 + 650 - 0 + 700 L/R 50.00 0.50 25.00 0.25 6.25
1 + 000 - 1 + 050 L/R 50.00 0.50 25.00 0.25 6.25
1 + 050 - 1 + 100 L/R 50.00 0.50 25.00 0.25 6.25
1 + 100 - 1 + 150 L/R 50.00 0.50 25.00 0.25 6.25
1 + 150 - 1 + 200 L/R 50.00 0.50 25.00 0.25 6.25
1 + 200 - 1 + 250 L/R 50.00 0.50 25.00 0.25 6.25
1 + 250 - 1 + 300 L/R 50.00 0.50 25.00 0.25 6.25
1 + 300 - 1 + 350 L/R 50.00 0.50 25.00 0.25 6.25
1 + 350 - 1 + 400 L/R 50.00 0.50 25.00 0.25 6.25
1 + 400 - 1 + 450 L/R 50.00 0.50 25.00 0.25 6.25
1 + 450 - 1 + 500 L/R 50.00 0.50 25.00 0.25 6.25
1 + 500 - 1 + 550 L/R 50.00 0.50 25.00 0.25 6.25
Panjang Lebar (L/R) Luas Tebal Volume
STA Posisi Ket
M M M² M M³
1 + 550 - 1 + 600 L/R 50.00 0.50 25.00 0.25 6.25
1 + 600 - 1 + 650 L/R 50.00 0.50 25.00 0.25 6.25
1 + 650 - 1 + 700 L/R 50.00 0.50 25.00 0.25 6.25
1 + 700 - 1 + 750 L/R 50.00 0.50 25.00 0.25 6.25
1 + 750 - 1 + 800 L/R 50.00 0.50 25.00 0.25 6.25
1 + 800 - 1 + 850 L/R 50.00 0.50 25.00 0.25 6.25
1 + 850 - 1 + 900 L/R 50.00 0.50 25.00 0.25 6.25
1 + 900 - 1 + 950 L/R 50.00 0.50 25.00 0.25 6.25
1 + 950 - 2 + 000 L/R 50.00 0.50 25.00 0.25 6.25
2 + 000 - 2 + 050 L/R 50.00 0.50 25.00 0.25 6.25
2 + 050 - 2 + 100 L/R 50.00 0.50 25.00 0.25 6.25
2 + 100 - 2 + 150 L/R 50.00 0.50 25.00 0.25 6.25
2 + 150 - 2 + 200 L/R 50.00 0.50 25.00 0.25 6.25
2 + 200 - 2 + 250 L/R 50.00 0.50 25.00 0.25 6.25
2 + 250 - 2 + 300 L/R 50.00 0.50 25.00 0.25 6.25
2 + 300 - 2 + 350 L/R 50.00 0.50 25.00 0.25 6.25
2 + 350 - 2 + 400 L/R 50.00 0.50 25.00 0.25 6.25
2 + 400 - 2 + 450 L/R 50.00 0.50 25.00 0.25 6.25
2 + 450 - 2 + 500 L/R 50.00 0.50 25.00 0.25 6.25
2 + 500 - 2 + 533 L/R 33.00 0.50 16.50 0.25 4.13

JUMLAH TOTAL 2,033.00 254.13

KONSULTAN PENGAWAS KONTRAKTOR


CV. DINAMIKA CONSULTANT CV. INDO ARTHA PERSADA

ALFIAN OBEN SANDRA JAYA


WAKIL DIREKTUR DIREKTUR

PEJABAT PELAKSANA TEKNIS KEGIATAN


DPUPRKP KABUPATEN REJANG LEBONG
(PPTK)

EDY KUSNADI, ST
NIP. 198606617 201902 1 001
PEMERINTAH KABUPATEN REJANG LEBONG
DINAS PEKERJAAN UMUM PENATAAN
RUANGPERUMAHAN DAN KAWASAN PEMUKIMAN

PEKERJAAN :

Peningkatan Kapasitas Struktur Jalan pada Ruas Jalan Karang


Baru - Lubuk Tunjung Kecamatan Sindang Beliti Ilir (DAK)

BACKUP DATA
DIVISI 3. PEKERJAAN TANAH DAN GEOSINTETIK
Galian Struktur dengan kedalaman 0 - 2 meter (Manual)

SUMBER DANA DAK


Tahun Anggaran 2022
PEMERINTAH KABUPATEN REJANG LEBONG
DINAS PEKERJAAN UMUM PENATAAN RUANG PERUMAHAN
DAN KAWASAN PEMUKIMAN
TAHUN ANGGARAN 2022

REKAPITULASI

KEGIATAN : PENINGKATAN JALAN


Peningkatan Kapasitas Struktur Jalan pada Ruas Jalan Karang Baru - Lubuk Tunjung
PAKET KEGIATAN :
Kecamatan Sindang Beliti Ilir (DAK)
KONTRAKTOR : CV. Indo Artha Persada

PAY ITEM : 3.1.(4)


PEKERJAAN : Galian Struktur dengan kedalaman 0 - 2 meter (Manual)

VOLUME
No. LOKASI STA SATUAN KET
M3

1 0+000 - 2+100 M3 69.04

JUMLAH ( M3 ) 69.04
BACKUP VOLUME
Peningkatan Kapasitas Struktur Jalan pada Ruas Jalan Karang Baru - Lubuk Tunjung Kecamatan Sindang Beliti Ilir (DAK)

DIVISI 3. PEKERJAAN TANAH DAN GEOSINTETIK


Galian Struktur dengan kedalaman 0 - 2 meter (Manual)

Panjang Lebar (L/R) Luas Tebal Volume


STA Posisi Ket
M M M² M M³

0 + 000 - 0 + 050 L 25.00 0.60 15.00 0.40 6.00


1 + 527 - 1 + 595 L 68.00 0.60 40.80 0.40 16.32
1 + 527 - 1 + 555 R 28.00 0.60 16.80 0.40 6.72
2 + 000 - 2 + 050 L/R 50.00 1.00 50.00 0.40 20.00
2 + 050 - 2 + 100 L/R 50.00 1.00 50.00 0.40 20.00

JUMLAH TOTAL 221.00 69.04

KONSULTAN PENGAWAS KONTRAKTOR


CV. DINAMIKA CONSULTANT CV. INDO ARTHA PERSADA

ALFIAN OBEN SANDRA JAYA


WAKIL DIREKTUR DIREKTUR

PEJABAT PELAKSANA TEKNIS KEGIATAN


DPUPRKP KABUPATEN REJANG LEBONG
(PPTK)

EDY KUSNADI, ST
NIP. 198606617 201902 1 001
PEMERINTAH KABUPATEN REJANG LEBONG
DINAS PEKERJAAN UMUM PENATAAN
RUANGPERUMAHAN DAN KAWASAN PEMUKIMAN

PEKERJAAN :

Peningkatan Kapasitas Struktur Jalan pada Ruas Jalan Karang


Baru - Lubuk Tunjung Kecamatan Sindang Beliti Ilir (DAK)

BACKUP DATA
DIVISI 3. PEKERJAAN TANAH DAN GEOSINTETIK
Galian Perkerasan Beraspal tanpa Cold Milling Machine

SUMBER DANA DAK


Tahun Anggaran 2022
PEMERINTAH KABUPATEN REJANG LEBONG
DINAS PEKERJAAN UMUM PENATAAN RUANG PERUMAHAN
DAN KAWASAN PEMUKIMAN
TAHUN ANGGARAN 2022

REKAPITULASI

KEGIATAN : PENINGKATAN JALAN


Peningkatan Kapasitas Struktur Jalan pada Ruas Jalan Karang Baru - Lubuk Tunjung
PAKET KEGIATAN :
Kecamatan Sindang Beliti Ilir (DAK)
KONTRAKTOR : CV. Indo Artha Persada

PAY ITEM : 3.1.(8)


PEKERJAAN : Galian Perkerasan Beraspal tanpa Cold Milling Machine

VOLUME
No. LOKASI STA SATUAN KETERANGAN
M3

1 0+000 - 2+500 M3 357.30

JUMLAH ( M3 ) 357.30
BACKUP VOLUME
Peningkatan Kapasitas Struktur Jalan pada Ruas Jalan Karang Baru - Lubuk Tunjung Kecamatan Sindang Beliti Ilir (DAK)

DIVISI 3. PEKERJAAN TANAH DAN GEOSINTETIK


Galian Perkerasan Beraspal tanpa Cold Milling Machine

Panjang Lebar (L/R) Luas Tebal Volume


STA Posisi Ket
M M M² M M³

0 + 000 - 0 + 050 L/R 50.00 3.00 150.00 0.06 9.00


0 + 050 - 0 + 100 L/R 50.00 3.00 150.00 0.06 9.00
0 + 100 - 0 + 150 L/R 50.00 3.00 150.00 0.06 9.00
0 + 150 - 0 + 200 L/R 50.00 3.00 150.00 0.06 9.00
0 + 200 - 0 + 250 L/R 50.00 3.00 150.00 0.06 9.00
0 + 250 - 0 + 300 L/R 50.00 3.00 150.00 0.06 9.00
0 + 300 - 0 + 350 L/R 50.00 3.00 150.00 0.06 9.00
0 + 350 - 0 + 400 L/R 50.00 3.00 150.00 0.06 9.00
0 + 400 - 0 + 450 L/R 50.00 3.00 150.00 0.06
0 + 450 - 0 + 500 L/R 50.00 3.00 150.00 0.06
0 + 500 - 0 + 550 L/R 50.00 3.00 150.00 0.06 9.00
0 + 550 - 0 + 600 L/R 50.00 3.00 150.00 0.06 9.00
0 + 600 - 0 + 650 L/R 50.00 3.00 150.00 0.06
0 + 650 - 0 + 700 L/R 50.00 3.00 150.00 0.06 9.00
0 + 700 - 0 + 750 L/R 50.00 3.00 150.00 0.06 9.00
0 + 750 - 0 + 800 L/R 50.00 3.00 150.00 0.06 9.00
0 + 800 - 0 + 850 L/R 50.00 3.00 150.00 0.06 9.00
0 + 850 - 0 + 900 L/R 50.00 3.00 150.00 0.06 9.00
0 + 900 - 0 + 950 L/R 50.00 3.00 150.00 0.06 9.00
0 + 950 - 1 + 000 L/R 50.00 3.00 150.00 0.06 9.00
1 + 000 - 1 + 025 L/R 25.00 3.00 75.00 0.06 4.50
1 + 025 - 1 + 075 L/R 50.00 3.00 150.00 0.06
1 + 075 - 1 + 125 L/R 50.00 3.00 150.00 0.06
1 + 125 - 1 + 150 L/R 25.00 3.00 75.00 0.06 4.50
1 + 150 - 1 + 200 L/R 50.00 3.00 150.00 0.06 9.00
1 + 200 - 1 + 250 L/R 50.00 3.00 150.00 0.06 9.00
1 + 250 - 1 + 300 L/R 50.00 3.00 150.00 0.06 9.00
1 + 300 - 1 + 320 L/R 20.00 3.00 60.00 0.06 3.60
1 + 320 - 1 + 350 L/R 30.00 3.00 90.00 0.06
1 + 350 - 1 + 400 L/R 50.00 3.00 150.00 0.06 9.00
1 + 400 - 1 + 450 L/R 50.00 3.00 150.00 0.06 9.00
1 + 450 - 1 + 500 L/R 50.00 3.00 150.00 0.06 9.00
1 + 500 - 1 + 550 L/R 50.00 3.00 150.00 0.06 9.00
1 + 550 - 1 + 600 L/R 50.00 3.00 150.00 0.06 9.00
1 + 600 - 1 + 650 L/R 50.00 3.00 150.00 0.06 9.00
1 + 650 - 1 + 700 L/R 50.00 3.00 150.00 0.06 9.00
1 + 700 - 1 + 715 L/R 15.00 3.00 45.00 0.06
1 + 715 - 1 + 750 L/R 35.00 3.00 105.00 0.06 6.30
1 + 750 - 1 + 800 L/R 50.00 3.00 150.00 0.06 9.00
1 + 800 - 1 + 850 L/R 50.00 3.00 150.00 0.06 9.00
1 + 850 - 1 + 900 L/R 50.00 3.00 150.00 0.06 9.00
1 + 900 - 1 + 915 L/R 15.00 3.00 45.00 0.06 2.70
1 + 915 - 1 + 965 L/R 50.00 3.00 150.00 0.06
1 + 965 - 1 + 985 L/R 20.00 3.00 60.00 0.06
1 + 985 - 2 + 000 L/R 15.00 3.00 45.00 0.06 2.70
2 + 000 - 2 + 050 L/R 50.00 3.00 150.00 0.06 9.00
Panjang Lebar (L/R) Luas Tebal Volume
STA Posisi Ket
M M M² M M³
2 + 050 - 2 + 100 L/R 50.00 3.00 150.00 0.06 9.00
2 + 100 - 2 + 150 L/R 50.00 3.00 150.00 0.06 9.00
2 + 150 - 2 + 200 L/R 50.00 3.00 150.00 0.06 9.00
2 + 200 - 2 + 250 L/R 50.00 3.00 150.00 0.06
2 + 250 - 2 + 300 L/R 50.00 3.00 150.00 0.06
2 + 300 - 2 + 350 L/R 50.00 3.00 150.00 0.06
2 + 350 - 2 + 400 L/R 50.00 3.00 150.00 0.06 9.00
2 + 400 - 2 + 450 L/R 50.00 3.00 150.00 0.06 9.00
2 + 450 - 2 + 500 L/R 50.00 3.00 150.00 0.06 9.00
2 + 500 - 2 + 550 L/R 50.00 3.00 150.00 0.06
2 + 550 - 2 + 600 L/R 50.00 3.00 150.00 0.06
2 + 600 - 2 + 650 L/R 50.00 3.00 150.00 0.06
2 + 650 - 2 + 700 L/R 50.00 3.00 150.00 0.06
2 + 700 - 2 + 750 L/R 50.00 3.00 150.00 0.06
2 + 750 - 2 + 800 L/R 50.00 3.00 150.00 0.06
2 + 800 - 2 + 850 L/R 50.00 3.00 150.00 0.06
2 + 850 - 2 + 900 L/R 50.00 3.00 150.00 0.06
2 + 900 - 2 + 950 L/R 50.00 3.00 150.00 0.06
2 + 950 - 3 + 000 L/R 50.00 3.00 150.00 0.06
3 + 000 - 3 + 050 L/R 50.00 3.00 150.00 0.06
3 + 050 - 3 + 100 L/R 50.00 3.00 150.00 0.06
3 + 100 - 3 + 150 L/R 50.00 3.00 150.00 0.06
3 + 150 - 3 + 200 L/R 50.00 3.00 150.00 0.06
3 + 200 - 3 + 250 L/R 50.00 3.00 150.00 0.06
3 + 250 - 3 + 300 L/R 50.00 3.00 150.00 0.06
3 + 300 - 3 + 350 L/R 50.00 3.00 150.00 0.06
3 + 350 - 3 + 400 L/R 50.00 3.00 150.00 0.06
3 + 400 - 3 + 450 L/R 50.00 3.00 150.00 0.06
3 + 450 - 3 + 500 L/R 50.00 3.00 150.00 0.06
3 + 500 - 3 + 550 L/R 50.00 3.00 150.00 0.06
3 + 550 - 3 + 600 L/R 50.00 3.00 150.00 0.06
3 + 600 - 3 + 650 L/R 50.00 3.00 150.00 0.06
3 + 650 - 3 + 700 L/R 50.00 3.00 150.00 0.06
3 + 700 - 3 + 750 L/R 50.00 3.00 150.00 0.06
3 + 750 - 3 + 800 L/R 50.00 3.00 150.00 0.06
3 + 800 - 3 + 850 L/R 50.00 3.00 150.00 0.06
3 + 850 - 3 + 900 L/R 50.00 3.00 150.00 0.06
3 + 900 - 3 + 950 L/R 50.00 3.00 150.00 0.06
3 + 950 - 4 + 000 L/R 50.00 3.00 150.00 0.06
4 + 000 - 4 + 050 L/R 50.00 3.00 150.00 0.06
4 + 050 - 4 + 100 L/R 50.00 3.00 150.00 0.06
4 + 100 - 4 + 150 L/R 50.00 3.00 150.00 0.06
4 + 150 - 4 + 200 L/R 50.00 3.00 150.00 0.06
4 + 200 - 4 + 250 L/R 50.00 3.00 150.00 0.06
4 + 250 - 4 + 300 L/R 50.00 3.00 150.00 0.06
4 + 300 - 4 + 350 L/R 50.00 3.00 150.00 0.06
4 + 350 - 4 + 400 L/R 50.00 3.00 150.00 0.06

JUMLAH TOTAL 4,400.00 357.30

KONSULTAN PENGAWAS KONTRAKTOR


CV. DINAMIKA CONSULTANT CV. INDO ARTHA PERSADA

ALFIAN OBEN SANDRA JAYA


WAKIL DIREKTUR DIREKTUR

PEJABAT PELAKSANA TEKNIS KEGIATAN


DPUPRKP KABUPATEN REJANG LEBONG
(PPTK)

EDY KUSNADI, ST
NIP. 198606617 201902 1 001
PEJABAT PELAKSANA TEKNIS KEGIATAN
DPUPRKP KABUPATEN REJANG LEBONG
(PPTK)

Panjang EDY KUSNADI,


Lebar (L/R) STLuas Tebal Volume
STA Posisi NIP. 198606617 201902 1 001 Ket
M M M² M M³
PEMERINTAH KABUPATEN REJANG LEBONG
DINAS PEKERJAAN UMUM PENATAAN
RUANGPERUMAHAN DAN KAWASAN PEMUKIMAN

PEKERJAAN :

Peningkatan Kapasitas Struktur Jalan pada Ruas Jalan Karang


Baru - Lubuk Tunjung Kecamatan Sindang Beliti Ilir (DAK)

BACKUP DATA
DIVISI 3. PEKERJAAN TANAH DAN GEOSINTETIK
Timbunan Pilihan dari sumber galian

SUMBER DANA DAK


Tahun Anggaran 2022
PEMERINTAH KABUPATEN REJANG LEBONG
DINAS PEKERJAAN UMUM PENATAAN RUANG PERUMAHAN
DAN KAWASAN PEMUKIMAN
TAHUN ANGGARAN 2022

REKAPITULASI

KEGIATAN : PENINGKATAN JALAN


Peningkatan Kapasitas Struktur Jalan pada Ruas Jalan Karang Baru - Lubuk Tunjung
PAKET KEGIATAN :
Kecamatan Sindang Beliti Ilir (DAK)
KONTRAKTOR : CV. Indo Artha Persada

PAY ITEM : 3.2.(2a)


PEKERJAAN : Timbunan Pilihan dari sumber galian

VOLUME
No. LOKASI STA SATUAN KETERANGAN
M3

1 2+000 - 3+680 M3 191.24

JUMLAH ( M3 ) 191.24
BACKUP VOLUME
Peningkatan Kapasitas Struktur Jalan pada Ruas Jalan Karang Baru - Lubuk Tunjung Kecamatan Sindang Beliti Ilir (DAK)

DIVISI 3. PEKERJAAN TANAH DAN GEOSINTETIK


Timbunan Pilihan dari sumber galian

Panjang Lebar (L/R) Luas Tebal Volume


STA Posisi Ket
M M M² M M³

0+400 - 0+450 L/R 50.00 3.30 165.00 0.15


0+600 - 0+636 L/R 36.00 3.30 118.80 0.15
0+636 - 0+650 L/R 14.00 3.30 46.20 0.15
1+000 - 1+050 L/R 50.00 3.30 165.00 0.15
1+050 - 1+100 L/R 50.00 3.30 165.00 0.15
1+300 - 1+350 L/R 50.00 3.30 165.00 0.15
1+500 - 1+550 L/R 50.00 3.30 165.00 0.15
1+550 - 1+600 L/R 50.00 3.30 165.00 0.15
1+850 - 1+900 L/R 50.00 3.30 165.00 0.15
1+900 - 1+950 L/R 50.00 3.30 165.00 0.15
1+950 - 1+975 L/R 25.00 3.30 82.50 0.15
1+982 - 2+000 L/R 18.00 3.30 59.40 0.15
2+000 - 2+050 L/R 50.00 3.30 165.00 0.15
2+050 - 2+100 L/R 50.00 3.30 165.00 0.15
2+100 - 2+106 L/R 6.34 3.30 20.93 0.15 3.14
2+106 - 2+156 L/R 50.00 3.30 165.00 0.15 24.75
2+400 - 2+450 L/R 50.00 3.30 165.00 0.15 24.75
3+400 - 3+450 L/R 50.00 3.30 165.00 0.15 24.75
3+450 - 3+500 L/R 50.00 3.30 165.00 0.15 24.75
3+500 - 3+550 L/R 50.00 3.30 165.00 0.15 24.75
3+550 - 3+600 L/R 50.00 3.30 165.00 0.15 24.75
3+600 - 3+650 L/R 50.00 3.30 165.00 0.15 24.75
3+650 - 3+680 L/R 30.00 3.30 99.00 0.15 14.85

JUMLAH TOTAL 979.34 191.24

KONSULTAN PENGAWAS KONTRAKTOR


CV. DINAMIKA CONSULTANT CV. INDO ARTHA PERSADA

ALFIAN OBEN SANDRA JAYA


WAKIL DIREKTUR DIREKTUR

PEJABAT PELAKSANA TEKNIS KEGIATAN


DPUPRKP KABUPATEN REJANG LEBONG
(PPTK)

EDY KUSNADI, ST
NIP. 198606617 201902 1 001
PEMERINTAH KABUPATEN REJANG LEBONG
DINAS PEKERJAAN UMUM PENATAAN
RUANGPERUMAHAN DAN KAWASAN PEMUKIMAN

PEKERJAAN :

Peningkatan Kapasitas Struktur Jalan pada Ruas Jalan Karang


Baru - Lubuk Tunjung Kecamatan Sindang Beliti Ilir (DAK)

BACKUP DATA
DIVISI 3. PEKERJAAN TANAH
Penyiapan Badan Jalan

SUMBER DANA DAK


Tahun Anggaran 2022
PEMERINTAH KABUPATEN REJANG LEBONG
DINAS PEKERJAAN UMUM PENATAAN RUANG PERUMAHAN
DAN KAWASAN PEMUKIMAN
TAHUN ANGGARAN 2022

REKAPITULASI

KEGIATAN : PENINGKATAN JALAN


Peningkatan Kapasitas Struktur Jalan pada Ruas Jalan Karang Baru - Lubuk Tunjung
PAKET KEGIATAN :
Kecamatan Sindang Beliti Ilir (DAK)
KONTRAKTOR : CV. Indo Artha Persada

PAY ITEM : 3.3.(1)


PEKERJAAN : Penyiapan Badan Jalan

VOLUME
No. LOKASI STA SATUAN KET
M3

1 0+000 - 4+400 M3 7728.00

JUMLAH ( M3 ) 7728.00
BACKUP VOLUME
Peningkatan Kapasitas Struktur Jalan pada Ruas Jalan Karang Baru - Lubuk Tunjung Kecamatan Sindang Beliti Ilir
(DAK)
DIVISI 3. PEKERJAAN TANAH
3.3.1 Penyiapan Badan Jalan

Lebar
Panjang Lebar Volume
STA Posisi (rata-rata) Ket
M M M M²

0 + 000 - 0 + 050 L/R 50.00 3.20 3.20


0 + 050 - 0 + 100 L/R 50.00 3.20 3.20
0 + 100 - 0 + 150 L/R 50.00 3.20 3.20
0 + 150 - 0 + 200 L/R 50.00 3.20 3.20
0 + 200 - 0 + 250 L/R 50.00 3.20 3.20
0 + 250 - 0 + 300 L/R 50.00 3.20 3.20
0 + 300 - 0 + 350 L/R 50.00 3.20 3.20
0 + 350 - 0 + 400 L/R 50.00 3.20 3.20
0 + 400 - 0 + 450 L/R 50.00 3.20 3.20 160.00
0 + 450 - 0 + 500 L/R 50.00 3.20 3.20 160.00
0 + 500 - 0 + 550 L/R 50.00 3.20 3.20
0 + 550 - 0 + 600 L/R 50.00 3.20 3.20
0 + 600 - 0 + 650 L/R 50.00 3.20 3.20 160.00
0 + 650 - 0 + 700 L/R 50.00 3.20 3.20
0 + 700 - 0 + 750 L/R 50.00 3.20 3.20
0 + 750 - 0 + 800 L/R 50.00 3.20 3.20
0 + 800 - 0 + 850 L/R 50.00 3.20 3.20
0 + 850 - 0 + 900 L/R 50.00 3.20 3.20
0 + 900 - 0 + 950 L/R 50.00 3.20 3.20
0 + 950 - 1 + 000 L/R 50.00 3.20 3.20
1 + 000 - 1 + 025 L/R 25.00 3.20 3.20
1 + 025 - 1 + 075 L/R 50.00 3.20 3.20 160.00
1 + 075 - 1 + 125 L/R 50.00 3.20 3.20 160.00
1 + 125 - 1 + 150 L/R 25.00 3.20 3.20
1 + 150 - 1 + 200 L/R 50.00 3.20 3.20
1 + 200 - 1 + 250 L/R 50.00 3.20 3.20
1 + 250 - 1 + 300 L/R 50.00 3.20 3.20
1 + 300 - 1 + 320 L/R 20.00 3.20 3.20
1 + 320 - 1 + 350 L/R 30.00 3.20 3.20 96.00
1 + 350 - 1 + 400 L/R 50.00 3.20 3.20
1 + 400 - 1 + 450 L/R 50.00 3.20 3.20
1 + 450 - 1 + 500 L/R 50.00 3.20 3.20
Lebar
Panjang Lebar Volume
STA Posisi (rata-rata) Ket
M M M M²
1 + 500 - 1 + 550 L/R 50.00 3.20 3.20
1 + 550 - 1 + 600 L/R 50.00 3.20 3.20
1 + 600 - 1 + 650 L/R 50.00 3.20 3.20
1 + 650 - 1 + 700 L/R 50.00 3.20 3.20
1 + 700 - 1 + 715 L/R 15.00 3.20 3.20 48.00
1 + 715 - 1 + 750 L/R 35.00 3.20 3.20
1 + 750 - 1 + 800 L/R 50.00 3.20 3.20
1 + 800 - 1 + 850 L/R 50.00 3.20 3.20
1 + 850 - 1 + 900 L/R 50.00 3.20 3.20
1 + 900 - 1 + 915 L/R 15.00 3.20 3.20
1 + 915 - 1 + 965 L/R 50.00 3.20 3.20 160.00
1 + 965 - 1 + 985 L/R 20.00 3.20 3.20 64.00
1 + 985 - 2 + 000 L/R 15.00 3.20 3.20
2 + 000 - 2 + 050 L/R 50.00 3.20 3.20
2 + 050 - 2 + 100 L/R 50.00 3.20 3.20
2 + 100 - 2 + 150 L/R 50.00 3.20 3.20
2 + 150 - 2 + 200 L/R 50.00 3.20 3.20
2 + 200 - 2 + 250 L/R 50.00 3.20 3.20 160.00
2 + 250 - 2 + 300 L/R 50.00 3.20 3.20 160.00
2 + 300 - 2 + 350 L/R 50.00 3.20 3.20 160.00
2 + 350 - 2 + 400 L/R 50.00 3.20 3.20
2 + 400 - 2 + 450 L/R 50.00 3.20 3.20
2 + 450 - 2 + 500 L/R 50.00 3.20 3.20
2 + 500 - 2 + 550 L/R 50.00 3.20 3.20 160.00
2 + 550 - 2 + 600 L/R 50.00 3.20 3.20 160.00
2 + 600 - 2 + 650 L/R 50.00 3.20 3.20 160.00
2 + 650 - 2 + 700 L/R 50.00 3.20 3.20 160.00
2 + 700 - 2 + 750 L/R 50.00 3.20 3.20 160.00
2 + 750 - 2 + 800 L/R 50.00 3.20 3.20 160.00
2 + 800 - 2 + 850 L/R 50.00 3.20 3.20 160.00
2 + 850 - 2 + 900 L/R 50.00 3.20 3.20 160.00
2 + 900 - 2 + 950 L/R 50.00 3.20 3.20 160.00
2 + 950 - 3 + 000 L/R 50.00 3.20 3.20 160.00
3 + 000 - 3 + 050 L/R 50.00 3.20 3.20 160.00
3 + 050 - 3 + 100 L/R 50.00 3.20 3.20 160.00
3 + 100 - 3 + 150 L/R 50.00 3.20 3.20 160.00
3 + 150 - 3 + 200 L/R 50.00 3.20 3.20 160.00
3 + 200 - 3 + 250 L/R 50.00 3.20 3.20 160.00
3 + 250 - 3 + 300 L/R 50.00 3.20 3.20 160.00
3 + 300 - 3 + 350 L/R 50.00 3.20 3.20 160.00
3 + 350 - 3 + 400 L/R 50.00 3.20 3.20 160.00
3 + 400 - 3 + 450 L/R 50.00 3.20 3.20 160.00
3 + 450 - 3 + 500 L/R 50.00 3.20 3.20 160.00
Lebar
Panjang Lebar Volume
STA Posisi (rata-rata) Ket
M M M M²
3 + 500 - 3 + 550 L/R 50.00 3.20 3.20 160.00
3 + 550 - 3 + 600 L/R 50.00 3.20 3.20 160.00
3 + 600 - 3 + 650 L/R 50.00 3.20 3.20 160.00
3 + 650 - 3 + 700 L/R 50.00 3.20 3.20 160.00
3 + 700 - 3 + 750 L/R 50.00 3.20 3.20 160.00
3 + 750 - 3 + 800 L/R 50.00 3.20 3.20 160.00
3 + 800 - 3 + 850 L/R 50.00 3.20 3.20 160.00
3 + 850 - 3 + 900 L/R 50.00 3.20 3.20 160.00
3 + 900 - 3 + 950 L/R 50.00 3.20 3.20 160.00
3 + 950 - 4 + 000 L/R 50.00 3.20 3.20 160.00
4 + 000 - 4 + 050 L/R 50.00 3.20 3.20 160.00
4 + 050 - 4 + 100 L/R 50.00 3.20 3.20 160.00
4 + 100 - 4 + 150 L/R 50.00 3.20 3.20 160.00
4 + 150 - 4 + 200 L/R 50.00 3.20 3.20 160.00
4 + 200 - 4 + 250 L/R 50.00 3.20 3.20 160.00
4 + 250 - 4 + 300 L/R 50.00 3.20 3.20 160.00
4 + 300 - 4 + 350 L/R 50.00 3.20 3.20 160.00
4 + 350 - 4 + 400 L/R 50.00 3.20 3.20 160.00

JUMLAH TOTAL 4,400.00 7,728.00

KONSULTAN PENGAWAS KONTRAKTOR


CV. DINAMIKA CONSULTANT CV. INDO ARTHA PERSADA

ALFIAN OBEN SANDRA JAYA


WAKIL DIREKTUR DIREKTUR

PEJABAT PELAKSANA TEKNIS KEGIATAN


DPUPRKP KABUPATEN REJANG LEBONG
(PPTK)

EDY KUSNADI, ST
NIP. 198606617 201902 1 001
PEMERINTAH KABUPATEN REJANG LEBONG
DINAS PEKERJAAN UMUM PENATAAN
RUANGPERUMAHAN DAN KAWASAN PEMUKIMAN

PEKERJAAN :

Peningkatan Kapasitas Struktur Jalan pada Ruas Jalan Karang


Baru - Lubuk Tunjung Kecamatan Sindang Beliti Ilir (DAK)

BACKUP DATA

DIVISI 7. STRUKTUR

Beton , fc’15 Mpa (Bahu Jalan)

SUMBER DANA DAK


Tahun Anggaran 2022
PEMERINTAH KABUPATEN REJANG LEBONG
DINAS PEKERJAAN UMUM PENATAAN RUANG PERUMAHAN
DAN KAWASAN PEMUKIMAN
TAHUN ANGGARAN 2022

REKAPITULASI

KEGIATAN : PENINGKATAN JALAN

PAKET KEGIATAN : Peningkatan Kapasitas Struktur Jalan pada Ruas Jalan Karang Baru - Lubuk Tunjung
Kecamatan Sindang Beliti Ilir (DAK)
KONTRAKTOR : CV. Indo Artha Persada

PAY ITEM : 7.1.(8)


PEKERJAAN : Beton , fc’15 Mpa (Bahu Jalan)

VOLUME
No. LOKASI STA SATUAN KETERANGAN
M3

1 0+550 - 3+350 M3 196.00

JUMLAH ( M3 ) 196.00
BACKUP VOLUME
Peningkatan Kapasitas Struktur Jalan pada Ruas Jalan Karang Baru - Lubuk Tunjung Kecamatan Sindang Beliti Ilir (DAK)

DIVISI 7. STRUKTUR
Beton , fc’15 Mpa (Bahu Jalan)

Panjang Lebar (Ka+Ki) Luas Tebal Volume


STA Posisi Ket
M M M² M M³

0 + 550 - 0 + 600 L/R 50.00 1.00 50.00 0.20 20.00


1 + 075 - 1 + 125 L/R 50.00 1.00 50.00 0.20 20.00
1 + 190 - 1 + 225 L/R 35.00 1.00 35.00 0.20 14.00
1 + 320 - 1 + 375 L/R 55.00 1.00 55.00 0.20 22.00
1 + 900 - 1 + 950 L/R 50.00 1.00 50.00 0.20 20.00
2 + 000 - 2 + 050 L/R 50.00 1.00 50.00 0.20 20.00
2 + 350 - 2 + 400 L/R 50.00 1.00 50.00 0.20 20.00
2 + 400 - 2 + 450 L/R 50.00 1.00 50.00 0.20 20.00
3 + 250 - 3 + 300 L/R 50.00 1.00 50.00 0.20 20.00
3 + 300 - 3 + 350 L/R 50.00 1.00 50.00 0.20 20.00

JUMLAH TOTAL 490.00 196.00

KONSULTAN PENGAWAS KONTRAKTOR


CV. DINAMIKA CONSULTANT CV. INDO ARTHA PERSADA

ALFIAN OBEN SANDRA JAYA


WAKIL DIREKTUR DIREKTUR

PEJABAT PELAKSANA TEKNIS KEGIATAN


DPUPRKP KABUPATEN REJANG LEBONG
(PPTK)

EDY KUSNADI, ST
NIP. 198606617 201902 1 001
PEMERINTAH KABUPATEN REJANG LEBONG
DINAS PEKERJAAN UMUM PENATAAN
RUANGPERUMAHAN DAN KAWASAN PEMUKIMAN

PEKERJAAN :

Peningkatan Kapasitas Struktur Jalan pada Ruas Jalan Karang


Baru - Lubuk Tunjung Kecamatan Sindang Beliti Ilir (DAK)

BACKUP DATA
DIVISI 5. PERKERASAN BERBUTIR
Lapis Pondasi Agregat Kelas A

SUMBER DANA DAK


Tahun Anggaran 2022
PEMERINTAH KABUPATEN REJANG LEBONG
DINAS PEKERJAAN UMUM PENATAAN RUANG PERUMAHAN
DAN KAWASAN PEMUKIMAN
TAHUN ANGGARAN 2022

REKAPITULASI

KEGIATAN : PENINGKATAN JALAN


Peningkatan Kapasitas Struktur Jalan pada Ruas Jalan Karang Baru - Lubuk Tunjung
PAKET KEGIATAN :
Kecamatan Sindang Beliti Ilir (DAK)
KONTRAKTOR : CV. Indo Artha Persada

PAY ITEM : 5.1.(1)


PEKERJAAN : Lapis Pondasi Agregat Kelas A

VOLUME
No. LOKASI STA SATUAN KET
M3

1 Lapis Pondasi Agregat Kelas A M3 2031.59

JUMLAH ( M3 ) 2031.59
BACKUP VOLUME
Peningkatan Kapasitas Struktur Jalan pada Ruas Jalan Karang Baru - Lubuk Tunjung Kecamatan Sindang Beliti Ilir (DAK)

DIVISI 5. PERKERASAN BERBUTIR


5.1 (1)Lapis Pondasi Agregat Kelas A

Panjang Lebar Luas Tebal Volume


STA Posisi Ket
M M M² M M³

0 + 000 - 0 + 050 L/R 50.0 3.10 155.00 0.15 23.25


0 + 050 - 0 + 100 L/R 50.0 3.10 155.00 0.15 23.25
0 + 100 - 0 + 150 L/R 50.0 3.10 155.00 0.15 23.25
0 + 150 - 0 + 200 L/R 50.0 3.10 155.00 0.15 23.25
0 + 200 - 0 + 250 L/R 50.0 3.10 155.00 0.15 23.25
0 + 250 - 0 + 300 L/R 50.0 3.10 155.00 0.15 23.25
0 + 300 - 0 + 350 L/R 50.0 3.10 155.00 0.15 23.25
0 + 350 - 0 + 400 L/R 50.0 3.10 155.00 0.15 23.25
0 + 400 - 0 + 450 L/R 50.0 3.10 155.00 0.15 23.25
0 + 450 - 0 + 500 L/R 50.0 3.10 155.00 0.15 23.25
0 + 500 - 0 + 550 L/R 50.0 3.10 155.00 0.15 23.25
0 + 550 - 0 + 585 L/R 35.0 3.10 108.50 0.15 16.28
0 + 585 - 0 + 595 L/R 10.0 3.10 31.00 0.15
0 + 595 - 0 + 600 L/R 5.0 3.10 15.50 0.15 2.33
0 + 600 - 0 + 636 L/R 36.0 3.10 111.60 0.15 16.74
0 + 636 - 0 + 650 L/R 14.0 3.10 43.40 0.15 6.51
0 + 650 - 0 + 750 L/R 100.0 3.10 310.00 0.15 46.50
0 + 750 - 0 + 800 L/R 50.0 3.10 155.00 0.15 23.25
0 + 800 - 0 + 850 L/R 50.0 3.10 155.00 0.15 23.25
0 + 850 - 0 + 900 L/R 50.0 3.10 155.00 0.15 23.25
0 + 900 - 0 + 950 L/R 50.0 3.10 155.00 0.15 23.25
0 + 950 - 1 + 000 L/R 50.0 3.10 155.00 0.15 23.25
1 + 000 - 1 + 050 L/R 50.0 3.10 155.00 0.15 23.25
1 + 050 - 1 + 100 L/R 50.0 3.10 155.00 0.15 23.25
1 + 100 - 1 + 125 L/R 25.0 3.10 77.50 0.15 11.63
1 + 125 - 1 + 130 L/R 5.0 3.10 15.50 0.15
1 + 130 - 1 + 150 L/R 20.0 3.10 62.00 0.15 9.30
1 + 150 - 1 + 200 L/R 50.0 3.10 155.00 0.15 23.25
Panjang Lebar Luas Tebal Volume
STA Posisi Ket
M M M² M M³
1 + 200 - 1 + 250 L/R 50.0 3.10 155.00 0.15 23.25
1 + 250 - 1 + 300 L/R 50.0 3.10 155.00 0.15 23.25
1 + 300 - 1 + 350 L/R 50.0 3.10 155.00 0.15 23.25
1 + 350 - 1 + 400 L/R 50.0 3.10 155.00 0.15 23.25
1 + 400 - 1 + 450 L/R 50.0 3.10 155.00 0.15 23.25
1 + 450 - 1 + 500 L/R 50.0 3.10 155.00 0.15 23.25
1 + 500 - 1 + 550 L/R 50.0 3.10 155.00 0.15 23.25
1 + 550 - 1 + 600 L/R 50.0 3.10 155.00 0.15 23.25
1 + 600 - 1 + 650 L/R 50.0 3.10 155.00 0.15 23.25
1 + 650 - 1 + 700 L/R 50.0 3.10 155.00 0.15 23.25
1 + 700 - 1 + 750 L/R 50.0 3.10 155.00 0.15 23.25
1 + 750 - 1 + 800 L/R 50.0 3.10 155.00 0.15 23.25
1 + 800 - 1 + 850 L/R 50.0 3.10 155.00 0.15 23.25
1 + 850 - 1 + 900 L/R 50.0 3.10 155.00 0.15 23.25
1 + 900 - 1 + 950 L/R 50.0 3.10 155.00 0.15 23.25
1 + 950 - 1 + 975 L/R 25.0 3.10 77.50 0.15 11.63
1 + 975 - 1 + 982 L/R 7.0 3.10 21.70 0.15
1 + 982 - 2 + 000 L/R 18.0 3.10 55.80 0.15 8.37
2 + 000 - 2 + 050 L/R 50.0 3.10 155.00 0.15 23.25
2 + 050 - 2 + 100 L/R 50.0 3.10 155.00 0.15 23.25
2 + 100 - 2 + 150 L/R 50.0 3.10 155.00 0.15 23.25
2 + 150 - 2 + 200 L/R 50.0 3.10 155.00 0.15 23.25
2 + 200 - 2 + 250 L/R 50.0 3.10 155.00 0.15 23.25
2 + 250 - 2 + 300 L/R 50.0 3.10 155.00 0.15 23.25
2 + 300 - 2 + 350 L/R 50.0 3.10 155.00 0.15 23.25
2 + 350 - 2 + 400 L/R 50.0 3.10 155.00 0.15 23.25
2 + 400 - 2 + 450 L/R 50.0 3.10 155.00 0.15 23.25
2 + 450 - 2 + 500 L/R 50.0 3.10 155.00 0.15 23.25
2 + 500 - 2 + 550 L/R 50.0 3.10 155.00 0.15 23.25
2 + 550 - 2 + 600 L/R 50.0 3.10 155.00 0.15 23.25
2 + 600 - 2 + 650 L/R 50.0 3.10 155.00 0.15 23.25
2 + 650 - 2 + 700 L/R 50.0 3.10 155.00 0.15 23.25
2 + 700 - 2 + 750 L/R 50.0 3.10 155.00 0.15 23.25
2 + 750 - 2 + 800 L/R 50.0 3.10 155.00 0.15 23.25
2 + 800 - 2 + 850 L/R 50.0 3.10 155.00 0.15 23.25
2 + 850 - 2 + 900 L/R 50.0 3.10 155.00 0.15 23.25
2 + 900 - 2 + 950 L/R 50.0 3.10 155.00 0.15 23.25
2 + 950 - 3 + 000 L/R 50.0 3.10 155.00 0.15 23.25
3 + 000 - 3 + 050 L/R 50.0 3.10 155.00 0.15 23.25
3 + 050 - 3 + 100 L/R 50.0 3.10 155.00 0.15 23.25
3 + 100 - 3 + 150 L/R 50.0 3.10 155.00 0.15 23.25
3 + 150 - 3 + 200 L/R 50.0 3.10 155.00 0.15 23.25
Panjang Lebar Luas Tebal Volume
STA Posisi Ket
M M M² M M³
3 + 200 - 3 + 250 L/R 50.0 3.10 155.00 0.15 23.25
3 + 250 - 3 + 300 L/R 50.0 3.10 155.00 0.15 23.25
3 + 300 - 3 + 350 L/R 50.0 3.10 155.00 0.15 23.25
3 + 350 - 3 + 400 L/R 50.0 3.10 155.00 0.15 23.25
3 + 400 - 3 + 450 L/R 50.0 3.10 155.00 0.15 23.25
3 + 450 - 3 + 500 L/R 50.0 3.10 155.00 0.15 23.25
3 + 500 - 3 + 550 L/R 50.0 3.10 155.00 0.15 23.25
3 + 550 - 3 + 600 L/R 50.0 3.10 155.00 0.15 23.25
3 + 600 - 3 + 680 L/R 80.0 3.10 248.00 0.15 37.20
3 + 680 - 3 + 682 L/R 2.0 3.10 6.20 0.15
3 + 682 - 3 + 775 L/R 93.0 3.10 288.30 0.15 43.25
3 + 775 - 3 + 782 L/R 7.0 3.10 21.70 0.15
3 + 782 - 3 + 850 L/R 68.0 3.10 210.80 0.15 31.62
3 + 850 - 3 + 900 L/R 50.0 3.10 155.00 0.15 23.25
3 + 900 - 3 + 950 L/R 50.0 3.10 155.00 0.15 23.25
3 + 950 - 4 + 000 L/R 50.0 3.10 155.00 0.15 23.25
4 + 000 - 4 + 050 L/R 50.0 3.10 155.00 0.15 23.25
4 + 050 - 4 + 100 L/R 50.0 3.10 155.00 0.15 23.25
4 + 100 - 4 + 150 L/R 50.0 3.10 155.00 0.15 23.25
4 + 150 - 4 + 200 L/R 50.0 3.10 155.00 0.15 23.25
4 + 200 - 4 + 250 L/R 50.0 3.10 155.00 0.15 23.25
4 + 250 - 4 + 300 L/R 50.0 3.10 155.00 0.15 23.25
4 + 300 - 4 + 350 L/R 50.0 3.10 155.00 0.15 23.25
4 + 350 - 4 + 400 L/R 50.0 3.10 155.00 0.15 23.25

JUMLAH TOTAL 4400.0 2,031.59

KONSULTAN PENGAWAS KONTRAKTOR


CV. DINAMIKA CONSULTANT CV. INDO ARTHA PERSADA

ALFIAN OBEN SANDRA JAYA


WAKIL DIREKTUR DIREKTUR

PEJABAT PELAKSANA TEKNIS KEGIATAN


DPUPRKP KABUPATEN REJANG LEBONG
(PPTK)

EDY KUSNADI, ST
NIP. 198606617 201902 1 001
PEMERINTAH KABUPATEN REJANG LEBONG
DINAS PEKERJAAN UMUM PENATAAN
RUANGPERUMAHAN DAN KAWASAN PEMUKIMAN

PEKERJAAN :

Peningkatan Kapasitas Struktur Jalan pada Ruas Jalan Karang


Baru - Lubuk Tunjung Kecamatan Sindang Beliti Ilir (DAK)

BACKUP DATA
DIVISI 5. PERKERASAN BERBUTIR
Lapis Pondasi Agregat Kelas B

SUMBER DANA DAK


Tahun Anggaran 2022
PEMERINTAH KABUPATEN REJANG LEBONG
DINAS PEKERJAAN UMUM PENATAAN RUANG PERUMAHAN
DAN KAWASAN PEMUKIMAN
TAHUN ANGGARAN 2022

REKAPITULASI

KEGIATAN : PENINGKATAN JALAN


Peningkatan Kapasitas Struktur Jalan pada Ruas Jalan Karang Baru - Lubuk Tunjung
PAKET KEGIATAN :
Kecamatan Sindang Beliti Ilir (DAK)
KONTRAKTOR : CV. Indo Artha Persada

PAY ITEM : 5.1.(2)


PEKERJAAN : Lapis Pondasi Agregat Kelas B

VOLUME
No. LOKASI STA SATUAN KET
M3

1 Lapis Pondasi Agregat Kelas B M3 2097.12

JUMLAH ( M3 ) 2097.12
BACKUP VOLUME
Peningkatan Kapasitas Struktur Jalan pada Ruas Jalan Karang Baru - Lubuk Tunjung Kecamatan Sindang Beliti Ilir (DAK)

DIVISI 5. PERKERASAN BERBUTIR


5.1 (2)Lapis Pondasi Agregat Kelas B

Panjang Lebar Luas Tebal Volume


STA Posisi Ket
M M M² M M³

0 + 000 - 0 + 050 L/R 50.0 3.20 160.00 0.15 24.00


0 + 050 - 0 + 100 L/R 50.0 3.20 160.00 0.15 24.00
0 + 100 - 0 + 150 L/R 50.0 3.20 160.00 0.15 24.00
0 + 150 - 0 + 200 L/R 50.0 3.20 160.00 0.15 24.00
0 + 200 - 0 + 250 L/R 50.0 3.20 160.00 0.15 24.00
0 + 250 - 0 + 300 L/R 50.0 3.20 160.00 0.15 24.00
0 + 300 - 0 + 350 L/R 50.0 3.20 160.00 0.15 24.00
0 + 350 - 0 + 400 L/R 50.0 3.20 160.00 0.15 24.00
0 + 400 - 0 + 450 L/R 50.0 3.20 160.00 0.15 24.00
0 + 450 - 0 + 500 L/R 50.0 3.20 160.00 0.15 24.00
0 + 500 - 0 + 550 L/R 50.0 3.20 160.00 0.15 24.00
0 + 550 - 0 + 585 L/R 35.0 3.20 112.00 0.15 16.80
0 + 585 - 0 + 595 L/R 10.0 3.20 32.00 0.15
0 + 595 - 0 + 600 L/R 5.0 3.20 16.00 0.15 2.40
0 + 600 - 0 + 636 L/R 36.0 3.20 115.20 0.15 17.28
0 + 636 - 0 + 650 L/R 14.0 3.20 44.80 0.15 6.72
0 + 650 - 0 + 750 L/R 100.0 3.20 320.00 0.15 48.00
0 + 750 - 0 + 800 L/R 50.0 3.20 160.00 0.15 24.00
0 + 800 - 0 + 850 L/R 50.0 3.20 160.00 0.15 24.00
0 + 850 - 0 + 900 L/R 50.0 3.20 160.00 0.15 24.00
0 + 900 - 0 + 950 L/R 50.0 3.20 160.00 0.15 24.00
0 + 950 - 1 + 000 L/R 50.0 3.20 160.00 0.15 24.00
1 + 000 - 1 + 050 L/R 50.0 3.20 160.00 0.15 24.00
1 + 050 - 1 + 100 L/R 50.0 3.20 160.00 0.15 24.00
1 + 100 - 1 + 125 L/R 25.0 3.20 80.00 0.15 12.00
1 + 125 - 1 + 130 L/R 5.0 3.20 16.00 0.15
1 + 130 - 1 + 150 L/R 20.0 3.20 64.00 0.15 9.60
1 + 150 - 1 + 200 L/R 50.0 3.20 160.00 0.15 24.00
1 + 200 - 1 + 250 L/R 50.0 3.20 160.00 0.15 24.00
Panjang Lebar Luas Tebal Volume
STA Posisi Ket
M M M² M M³
1 + 250 - 1 + 300 L/R 50.0 3.20 160.00 0.15 24.00
1 + 300 - 1 + 350 L/R 50.0 3.20 160.00 0.15 24.00
1 + 350 - 1 + 400 L/R 50.0 3.20 160.00 0.15 24.00
1 + 400 - 1 + 450 L/R 50.0 3.20 160.00 0.15 24.00
1 + 450 - 1 + 500 L/R 50.0 3.20 160.00 0.15 24.00
1 + 500 - 1 + 550 L/R 50.0 3.20 160.00 0.15 24.00
1 + 550 - 1 + 600 L/R 50.0 3.20 160.00 0.15 24.00
1 + 600 - 1 + 650 L/R 50.0 3.20 160.00 0.15 24.00
1 + 650 - 1 + 700 L/R 50.0 3.20 160.00 0.15 24.00
1 + 700 - 1 + 750 L/R 50.0 3.20 160.00 0.15 24.00
1 + 750 - 1 + 800 L/R 50.0 3.20 160.00 0.15 24.00
1 + 800 - 1 + 850 L/R 50.0 3.20 160.00 0.15 24.00
1 + 850 - 1 + 900 L/R 50.0 3.20 160.00 0.15 24.00
1 + 900 - 1 + 950 L/R 50.0 3.20 160.00 0.15 24.00
1 + 950 - 1 + 975 L/R 25.0 3.20 80.00 0.15 12.00
1 + 975 - 1 + 982 L/R 7.0 3.20 22.40 0.15
1 + 982 - 2 + 000 L/R 18.0 3.20 57.60 0.15 8.64
2 + 000 - 2 + 050 L/R 50.0 3.20 160.00 0.15 24.00
2 + 050 - 2 + 100 L/R 50.0 3.20 160.00 0.15 24.00
2 + 100 - 2 + 150 L/R 50.0 3.20 160.00 0.15 24.00
2 + 150 - 2 + 200 L/R 50.0 3.20 160.00 0.15 24.00
2 + 200 - 2 + 250 L/R 50.0 3.20 160.00 0.15 24.00
2 + 250 - 2 + 300 L/R 50.0 3.20 160.00 0.15 24.00
2 + 300 - 2 + 350 L/R 50.0 3.20 160.00 0.15 24.00
2 + 350 - 2 + 400 L/R 50.0 3.20 160.00 0.15 24.00
2 + 400 - 2 + 450 L/R 50.0 3.20 160.00 0.15 24.00
2 + 450 - 2 + 500 L/R 50.0 3.20 160.00 0.15 24.00
2 + 500 - 2 + 550 L/R 50.0 3.20 160.00 0.15 24.00
2 + 550 - 2 + 600 L/R 50.0 3.20 160.00 0.15 24.00
2 + 600 - 2 + 650 L/R 50.0 3.20 160.00 0.15 24.00
2 + 650 - 2 + 700 L/R 50.0 3.20 160.00 0.15 24.00
2 + 700 - 2 + 750 L/R 50.0 3.20 160.00 0.15 24.00
2 + 750 - 2 + 800 L/R 50.0 3.20 160.00 0.15 24.00
2 + 800 - 2 + 850 L/R 50.0 3.20 160.00 0.15 24.00
2 + 850 - 2 + 900 L/R 50.0 3.20 160.00 0.15 24.00
2 + 900 - 2 + 950 L/R 50.0 3.20 160.00 0.15 24.00
2 + 950 - 3 + 000 L/R 50.0 3.20 160.00 0.15 24.00
3 + 000 - 3 + 050 L/R 50.0 3.20 160.00 0.15 24.00
3 + 050 - 3 + 100 L/R 50.0 3.20 160.00 0.15 24.00
3 + 100 - 3 + 150 L/R 50.0 3.20 160.00 0.15 24.00
3 + 150 - 3 + 200 L/R 50.0 3.20 160.00 0.15 24.00
Panjang Lebar Luas Tebal Volume
STA Posisi Ket
M M M² M M³
3 + 200 - 3 + 250 L/R 50.0 3.20 160.00 0.15 24.00
3 + 250 - 3 + 300 L/R 50.0 3.20 160.00 0.15 24.00
3 + 300 - 3 + 350 L/R 50.0 3.20 160.00 0.15 24.00
3 + 350 - 3 + 400 L/R 50.0 3.20 160.00 0.15 24.00
3 + 400 - 3 + 450 L/R 50.0 3.20 160.00 0.15 24.00
3 + 450 - 3 + 500 L/R 50.0 3.20 160.00 0.15 24.00
3 + 500 - 3 + 550 L/R 50.0 3.20 160.00 0.15 24.00
3 + 550 - 3 + 600 L/R 50.0 3.20 160.00 0.15 24.00
3 + 600 - 3 + 680 L/R 80.0 3.20 256.00 0.15 38.40
3 + 680 - 3 + 682 L/R 2.0 3.20 6.40 0.15
3 + 682 - 3 + 775 L/R 93.0 3.20 297.60 0.15 44.64
3 + 775 - 3 + 782 L/R 7.0 3.20 22.40 0.15
3 + 782 - 3 + 850 L/R 68.0 3.20 217.60 0.15 32.64
3 + 850 - 3 + 900 L/R 50.0 3.20 160.00 0.15 24.00
3 + 900 - 3 + 950 L/R 50.0 3.20 160.00 0.15 24.00
3 + 950 - 4 + 000 L/R 50.0 3.20 160.00 0.15 24.00
4 + 000 - 4 + 050 L/R 50.0 3.20 160.00 0.15 24.00
4 + 050 - 4 + 100 L/R 50.0 3.20 160.00 0.15 24.00
4 + 100 - 4 + 150 L/R 50.0 3.20 160.00 0.15 24.00
4 + 150 - 4 + 200 L/R 50.0 3.20 160.00 0.15 24.00
4 + 200 - 4 + 250 L/R 50.0 3.20 160.00 0.15 24.00
4 + 250 - 4 + 300 L/R 50.0 3.20 160.00 0.15 24.00
4 + 300 - 4 + 350 L/R 50.0 3.20 160.00 0.15 24.00
4 + 350 - 4 + 400 L/R 50.0 3.20 160.00 0.15 24.00

JUMLAH TOTAL 4,400.00 2,097.12

KONSULTAN PENGAWAS KONTRAKTOR


CV. DINAMIKA CONSULTANT CV. INDO ARTHA PERSADA

ALFIAN OBEN SANDRA JAYA


WAKIL DIREKTUR DIREKTUR

PEJABAT PELAKSANA TEKNIS KEGIATAN


DPUPRKP KABUPATEN REJANG LEBONG
(PPTK)

EDY KUSNADI, ST
NIP. 198606617 201902 1 001
PEMERINTAH KABUPATEN REJANG LEBONG
DINAS PEKERJAAN UMUM PENATAAN
RUANGPERUMAHAN DAN KAWASAN PEMUKIMAN

PEKERJAAN :

Peningkatan Kapasitas Struktur Jalan pada Ruas Jalan Karang


Baru - Lubuk Tunjung Kecamatan Sindang Beliti Ilir (DAK)

BACKUP DATA
DIVISI 6. PERKERASAN ASPAL
Lapis Resap Pengikat - Aspal Cair

SUMBER DANA DAK


Tahun Anggaran 2022
PEMERINTAH KABUPATEN REJANG LEBONG
DINAS PEKERJAAN UMUM PENATAAN RUANG PERUMAHAN
DAN KAWASAN PEMUKIMAN
TAHUN ANGGARAN 2022

REKAPITULASI

KEGIATAN : PENINGKATAN JALAN


Peningkatan Kapasitas Struktur Jalan pada Ruas Jalan Karang Baru - Lubuk Tunjung
PAKET KEGIATAN :
Kecamatan Sindang Beliti Ilir (DAK)
KONTRAKTOR : CV. Indo Artha Persada

PAY ITEM : 6.1 (1)(a)


PEKERJAAN : Lapis Resap Pengikat - Aspal Cair

VOLUME
No. LOKASI STA SATUAN KET
M3

1 Lapis Resap Pengikat - Aspal Cair M3 10560.00

JUMLAH ( M3 ) 10560.00
BACKUP VOLUME
Peningkatan Kapasitas Struktur Jalan pada Ruas Jalan Karang Baru - Lubuk Tunjung Kecamatan Sindang Beliti Ilir (DAK)

DIVISI 6. PERKERASAN ASPAL


6.1 (1a) Lapis Resap Pengikat - Aspal Cair

Panjang Lebar Luas Spray Volume


STA Posisi Ket
M M M² Ltr/M² Liter

0 + 000 - 0 + 050 L/R 50.0 3.00 150.00 0.80 120.00


0 + 050 - 0 + 100 L/R 50.0 3.00 150.00 0.80 120.00
0 + 100 - 0 + 150 L/R 50.0 3.00 150.00 0.80 120.00
0 + 150 - 0 + 200 L/R 50.0 3.00 150.00 0.80 120.00
0 + 200 - 0 + 250 L/R 50.0 3.00 150.00 0.80 120.00
0 + 250 - 0 + 300 L/R 50.0 3.00 150.00 0.80 120.00
0 + 300 - 0 + 350 L/R 50.0 3.00 150.00 0.80 120.00
0 + 350 - 0 + 400 L/R 50.0 3.00 150.00 0.80 120.00
0 + 400 - 0 + 450 L/R 50.0 3.00 150.00 0.80 120.00
0 + 450 - 0 + 500 L/R 50.0 3.00 150.00 0.80 120.00
0 + 500 - 0 + 550 L/R 50.0 3.00 150.00 0.80 120.00
0 + 550 - 0 + 585 L/R 35.0 3.00 105.00 0.80 84.00
0 + 585 - 0 + 595 L/R 10.0 3.00 30.00 0.80 24.00
0 + 595 - 0 + 600 L/R 5.0 3.00 15.00 0.80 12.00
0 + 600 - 0 + 636 L/R 36.0 3.00 108.00 0.80 86.40
0 + 636 - 0 + 650 L/R 14.0 3.00 42.00 0.80 33.60
0 + 650 - 0 + 750 L/R 100.0 3.00 300.00 0.80 240.00
0 + 750 - 0 + 800 L/R 50.0 3.00 150.00 0.80 120.00
0 + 800 - 0 + 850 L/R 50.0 3.00 150.00 0.80 120.00
0 + 850 - 0 + 900 L/R 50.0 3.00 150.00 0.80 120.00
0 + 900 - 0 + 950 L/R 50.0 3.00 150.00 0.80 120.00
0 + 950 - 1 + 000 L/R 50.0 3.00 150.00 0.80 120.00
Panjang Lebar Luas Spray Volume
STA Posisi Ket
M M M² Ltr/M² Liter
1 + 000 - 1 + 050 L/R 50.0 3.00 150.00 0.80 120.00
1 + 050 - 1 + 100 L/R 50.0 3.00 150.00 0.80 120.00
1 + 100 - 1 + 125 L/R 25.0 3.00 75.00 0.80 60.00
1 + 125 - 1 + 130 L/R 5.0 3.00 15.00 0.80 12.00
1 + 130 - 1 + 150 L/R 20.0 3.00 60.00 0.80 48.00
1 + 150 - 1 + 200 L/R 50.0 3.00 150.00 0.80 120.00
1 + 200 - 1 + 250 L/R 50.0 3.00 150.00 0.80 120.00
1 + 250 - 1 + 300 L/R 50.0 3.00 150.00 0.80 120.00
1 + 300 - 1 + 350 L/R 50.0 3.00 150.00 0.80 120.00
1 + 350 - 1 + 400 L/R 50.0 3.00 150.00 0.80 120.00
1 + 400 - 1 + 450 L/R 50.0 3.00 150.00 0.80 120.00
1 + 450 - 1 + 500 L/R 50.0 3.00 150.00 0.80 120.00
1 + 500 - 1 + 550 L/R 50.0 3.00 150.00 0.80 120.00
1 + 550 - 1 + 600 L/R 50.0 3.00 150.00 0.80 120.00
1 + 600 - 1 + 650 L/R 50.0 3.00 150.00 0.80 120.00
1 + 650 - 1 + 700 L/R 50.0 3.00 150.00 0.80 120.00
1 + 700 - 1 + 750 L/R 50.0 3.00 150.00 0.80 120.00
1 + 750 - 1 + 800 L/R 50.0 3.00 150.00 0.80 120.00
1 + 800 - 1 + 850 L/R 50.0 3.00 150.00 0.80 120.00
1 + 850 - 1 + 900 L/R 50.0 3.00 150.00 0.80 120.00
1 + 900 - 1 + 950 L/R 50.0 3.00 150.00 0.80 120.00
1 + 950 - 1 + 975 L/R 25.0 3.00 75.00 0.80 60.00
1 + 975 - 1 + 982 L/R 7.0 3.00 21.00 0.80 16.80
1 + 982 - 2 + 000 L/R 18.0 3.00 54.00 0.80 43.20
2 + 000 - 2 + 050 L/R 50.0 3.00 150.00 0.80 120.00
2 + 050 - 2 + 100 L/R 50.0 3.00 150.00 0.80 120.00
2 + 100 - 2 + 150 L/R 50.0 3.00 150.00 0.80 120.00
2 + 150 - 2 + 200 L/R 50.0 3.00 150.00 0.80 120.00
2 + 200 - 2 + 250 L/R 50.0 3.00 150.00 0.80 120.00
2 + 250 - 2 + 300 L/R 50.0 3.00 150.00 0.80 120.00
2 + 300 - 2 + 350 L/R 50.0 3.00 150.00 0.80 120.00
2 + 350 - 2 + 400 L/R 50.0 3.00 150.00 0.80 120.00
2 + 400 - 2 + 450 L/R 50.0 3.00 150.00 0.80 120.00
2 + 450 - 2 + 500 L/R 50.0 3.00 150.00 0.80 120.00
2 + 500 - 2 + 550 L/R 50.0 3.00 150.00 0.80 120.00
2 + 550 - 2 + 600 L/R 50.0 3.00 150.00 0.80 120.00
2 + 600 - 2 + 650 L/R 50.0 3.00 150.00 0.80 120.00
2 + 650 - 2 + 700 L/R 50.0 3.00 150.00 0.80 120.00
2 + 700 - 2 + 750 L/R 50.0 3.00 150.00 0.80 120.00
2 + 750 - 2 + 800 L/R 50.0 3.00 150.00 0.80 120.00
2 + 800 - 2 + 850 L/R 50.0 3.00 150.00 0.80 120.00
2 + 850 - 2 + 900 L/R 50.0 3.00 150.00 0.80 120.00
2 + 900 - 2 + 950 L/R 50.0 3.00 150.00 0.80 120.00
2 + 950 - 3 + 000 L/R 50.0 3.00 150.00 0.80 120.00
Panjang Lebar Luas Spray Volume
STA Posisi Ket
M M M² Ltr/M² Liter
3 + 000 - 3 + 050 L/R 50.0 3.00 150.00 0.80 120.00
3 + 050 - 3 + 100 L/R 50.0 3.00 150.00 0.80 120.00
3 + 100 - 3 + 150 L/R 50.0 3.00 150.00 0.80 120.00
3 + 150 - 3 + 200 L/R 50.0 3.00 150.00 0.80 120.00
3 + 200 - 3 + 250 L/R 50.0 3.00 150.00 0.80 120.00
3 + 250 - 3 + 300 L/R 50.0 3.00 150.00 0.80 120.00
3 + 300 - 3 + 350 L/R 50.0 3.00 150.00 0.80 120.00
3 + 350 - 3 + 400 L/R 50.0 3.00 150.00 0.80 120.00
3 + 400 - 3 + 450 L/R 50.0 3.00 150.00 0.80 120.00
3 + 450 - 3 + 500 L/R 50.0 3.00 150.00 0.80 120.00
3 + 500 - 3 + 550 L/R 50.0 3.00 150.00 0.80 120.00
3 + 550 - 3 + 600 L/R 50.0 3.00 150.00 0.80 120.00
3 + 600 - 3 + 680 L/R 80.0 3.00 240.00 0.80 192.00
3 + 680 - 3 + 682 L/R 2.0 3.00 6.00 0.80 4.80
3 + 682 - 3 + 775 L/R 93.0 3.00 279.00 0.80 223.20
3 + 775 - 3 + 782 L/R 7.0 3.00 21.00 0.80 16.80
3 + 782 - 3 + 850 L/R 68.0 3.00 204.00 0.80 163.20
3 + 850 - 3 + 900 L/R 50.0 3.00 150.00 0.80 120.00
3 + 900 - 3 + 950 L/R 50.0 3.00 150.00 0.80 120.00
3 + 950 - 4 + 000 L/R 50.0 3.00 150.00 0.80 120.00
4 + 000 - 4 + 050 L/R 50.0 3.00 150.00 0.80 120.00
4 + 050 - 4 + 100 L/R 50.0 3.00 150.00 0.80 120.00
4 + 100 - 4 + 150 L/R 50.0 3.00 150.00 0.80 120.00
4 + 150 - 4 + 200 L/R 50.0 3.00 150.00 0.80 120.00
4 + 200 - 4 + 250 L/R 50.0 3.00 150.00 0.80 120.00
4 + 250 - 4 + 300 L/R 50.0 3.00 150.00 0.80 120.00
4 + 300 - 4 + 350 L/R 50.0 3.00 150.00 0.80 120.00
4 + 350 - 4 + 400 L/R 50.0 3.00 150.00 0.80 120.00

JUMLAH TOTAL 4,350.00 10,560.00

KONSULTAN PENGAWAS KONTRAKTOR


CV. DINAMIKA CONSULTANT CV. INDO ARTHA PERSADA

ALFIAN OBEN SANDRA JAYA


WAKIL DIREKTUR DIREKTUR

PEJABAT PELAKSANA TEKNIS KEGIATAN


DPUPRKP KABUPATEN REJANG LEBONG
(PPTK)

EDY KUSNADI, ST
NIP. 198606617 201902 1 001
PEMERINTAH KABUPATEN MUSI RAWAS
DINAS PEKERJAAN UMUM BINA MARGA

PEKERJAAN :
Peningkatan Struktur Jalan Simpang Temuan Jaya - Simpang
Jene (DAK Reguler)

BACKUP DATA
DIVISI 6. PERKERASAN ASPAL
Lapis Perekat - Aspal Cair

SUMBER DANA DAK (REGULER)


Tahun Anggaran 2021
PEMERINTAH KABUPATEN MUSI RAWAS
DINAS PEKERJAAN UMUM BINA MARGA
KEGIATAN PENINGKATAN JALAN
TAHUN ANGGARAN 2021

REKAPITULASI

KEGIATAN : PENINGKATAN JALAN


PAKET KEGIATAN : Peningkatan Struktur Jalan Simpang Temuan Jaya - Simpang Jene (DAK Reguler)
KONTRAKTOR : PT. CIPTA REKAYASA FADILAH

PAY ITEM : 6.1 (2)(a)


PEKERJAAN : Lapis Perekat - Aspal Cair

VOLUME
No. LOKASI STA SATUAN KET
M3

1 Lapis Perekat - Aspal Cair M3 5323.47

JUMLAH ( M3 ) 5323.47

KONTRAKTOR
DINAS PEKERJAAN UMUM BINA MARGA KONSULTAN SUPERVISI PT. CIPTA REKAYASA FADILAH
ASISTEN TEKNIS KEGIATAN CV. PIRAMIDA ENGINEERING CONSULTANT
(ASTEK)

ALVIN SETIAWAN, ST PRIYYADI, ST ABDUL BADRUN


NIP. 19881030 201212 1 001 SUPERVISION ENGINEER MANAGER PROYEK
ALVIN SETIAWAN, ST PRIYYADI, ST ABDUL BADRUN
NIP. 19881030 201212 1 001 SUPERVISION ENGINEER MANAGER PROYEK
BACKUP VOLUME
Peningkatan Struktur Jalan Simpang Temuan Jaya - Simpang Jene (DAK Reguler)

DIVISI 6. PERKERASAN ASPAL


6.1 (2a) Lapis Resap Perekat - Aspal Cair

Panjang Lebar Luas Spray Volume


STA Posisi Ket
M M M² Ltr/M² Liter

SEGMEN PATCHING

7 + 850 - 7 + 865 L/R 15.00 4.00 60.00 0.15 9.00


8 + 210 - 8 + 220 L/R 10.00 4.00 40.00 0.15 6.00
8 + 225 - 8 + 231 L/R 6.00 4.00 24.00 0.15 3.60
8 + 295 - 8 + 310 L/R 15.00 4.00 60.00 0.15 9.00
8 + 346 - 8 + 368 L/R 21.50 4.00 86.00 0.15 12.90
8 + 404 - 8 + 410 L/R 6.30 4.00 25.20 0.15 3.78
8 + 425 - 8 + 445 L/R 20.00 4.00 80.00 0.15 12.00
8 + 490 - 8 + 501 L/R 11.00 4.00 44.00 0.15 6.60
8 + 565 - 8 + 595 L/R 30.00 4.00 120.00 0.15 18.00
8 + 625 - 8 + 660 L/R 35.00 4.00 140.00 0.15 21.00
8 + 710 - 8 + 755 L/R 44.50 4.00 178.00 0.15 26.70
8 + 790 - 8 + 813 L/R 23.00 4.00 92.00 0.15 13.80
8 + 880 - 8 + 911 L/R 30.70 4.00 122.80 0.15 18.42
9 + 200 - 9 + 216 L/R 16.00 4.00 64.00 0.15 9.60
9 + 460 - 9 + 502 L/R 42.00 4.00 168.00 0.15 25.20
9 + 511 - 9 + 536 L/R 25.00 4.00 100.00 0.15 15.00
9 + 705 - 9 + 729 L/R 24.30 4.00 97.20 0.15 14.58
9 + 900 - 9 + 916 L/R 16.20 4.00 64.80 0.15 9.72
9 + 980 - 9 + 987 L/R 6.70 4.00 26.80 0.15 4.02
10 + 030 - 10 + 083 L/R 53.00 4.00 212.00 0.15 31.80
10 + 093 - 10 + 099 L/R 6.00 4.00 24.00 0.15 3.60
10 + 153 - 10 + 160 L/R 7.00 4.00 28.00 0.15 4.20
10 + 188 - 10 + 198 L/R 10.00 4.00 40.00 0.15 6.00
10 + 630 - 10 + 665 L/R 35.00 4.00 140.00 0.15 21.00
10 + 800 - 10 + 840 L/R 40.00 4.00 160.00 0.15 24.00
10 + 850 - 10 + 879 L/R 29.00 4.00 116.00 0.15 17.40

SEGMEN 1
10 + 956 - 11 + 000 L/R 44.00 4.00 176.00 0.15 26.40
11 + 000 - 11 + 020 L/R 20.00 4.00 80.00 0.15 12.00
SEGMEN 2 L/R 20.00 4.00 80.00 0.15 12.00 Beton Rigid
11 + 040 - 11 + 050 L/R 10.00 4.00 40.00 0.15 6.00
11 + 050 - 11 + 100 L/R 50.00 4.00 200.00 0.15 30.00
11 + 100 - 11 + 150 L/R 50.00 4.00 200.00 0.15 30.00
11 + 150 - 11 + 187 L/R 36.60 4.00 146.40 0.15 21.96
SEGMEN 3 L/R 79.70 4.00 318.80 0.15 47.82 Beton Rigid
11 + 266 - 11 + 300 L/R 33.70 4.00 134.80 0.15 20.22
Panjang Lebar Luas Spray Volume
STA Posisi Ket
M M M² Ltr/M² Liter
11 + 300 - 11 + 350 L/R 50.00 4.00 200.00 0.15 30.00
11 + 350 - 11 + 400 L/R 50.00 4.00 200.00 0.15 30.00
11 + 400 - 11 + 450 L/R 50.00 4.00 200.00 0.15 30.00
11 + 450 - 11 + 500 L/R 50.00 4.00 200.00 0.15 30.00
11 + 500 - 11 + 550 L/R 50.00 4.00 200.00 0.15 30.00
11 + 550 - 11 + 600 L/R 50.00 4.00 200.00 0.15 30.00
11 + 600 - 11 + 650 L/R 50.00 4.00 200.00 0.15 30.00
11 + 650 - 11 + 700 L/R 50.00 4.00 200.00 0.15 30.00
11 + 700 - 11 + 750 L/R 50.00 4.00 200.00 0.15 30.00
11 + 750 - 11 + 800 L/R 50.00 4.00 200.00 0.15 30.00
11 + 800 - 11 + 850 L/R 50.00 4.00 200.00 0.15 30.00
11 + 850 - 11 + 900 L/R 50.00 4.00 200.00 0.15 30.00
11 + 900 - 11 + 950 L/R 50.00 4.00 200.00 0.15 30.00
11 + 950 - 12 + 000 L/R 50.00 4.00 200.00 0.15 30.00
12 + 000 - 12 + 006 L/R 5.70 4.00 22.80 0.15 3.42
SEGMEN 4 Jembatan Besi
12 + 012 - 12 + 050 L/R 37.80 4.00 151.20 0.15 22.68
12 + 050 - 12 + 100 L/R 50.00 4.00 200.00 0.15 30.00
12 + 100 - 12 + 150 L/R 50.00 4.00 200.00 0.15 30.00
12 + 150 - 12 + 200 L/R 50.00 4.00 200.00 0.15 30.00
12 + 200 - 12 + 250 L/R 50.00 4.00 200.00 0.15 30.00
12 + 250 - 12 + 300 L/R 50.00 4.00 200.00 0.15 30.00
12 + 300 - 12 + 350 L/R 50.00 4.00 200.00 0.15 30.00
12 + 350 - 12 + 400 L/R 50.00 4.00 200.00 0.15 30.00
12 + 400 - 12 + 450 L/R 50.00 4.00 200.00 0.15 30.00
12 + 450 - 12 + 500 L/R 50.00 4.00 200.00 0.15 30.00
12 + 500 - 12 + 550 L/R 50.00 4.00 200.00 0.15 30.00
12 + 550 - 12 + 600 L/R 50.00 4.00 200.00 0.15 30.00
12 + 600 - 12 + 650 L/R 50.00 4.00 200.00 0.15 30.00
12 + 650 - 12 + 700 L/R 50.00 4.00 200.00 0.15 30.00
12 + 700 - 12 + 750 L/R 50.00 4.00 200.00 0.15 30.00
12 + 750 - 12 + 800 L/R 50.00 4.00 200.00 0.15 30.00
12 + 800 - 12 + 850 L/R 50.00 4.00 200.00 0.15 30.00
12 + 850 - 12 + 866 L/R 16.00 4.00 64.00 0.15 9.60
SEGMEN 5 L/R 12.00 4.00 48.00 0.15 7.20 Beton Rigid
12 + 878 - 12 + 900 L/R 22.00 4.00 88.00 0.15 13.20
12 + 900 - 12 + 950 L/R 50.00 4.00 200.00 0.15 30.00
12 + 950 - 13 + 000 L/R 50.00 4.00 200.00 0.15 30.00
13 + 000 - 13 + 050 L/R 50.00 4.00 200.00 0.15 30.00
13 + 050 - 13 + 100 L/R 50.00 4.00 200.00 0.15 30.00
13 + 100 - 13 + 150 L/R 50.00 4.00 200.00 0.15 30.00
13 + 150 - 13 + 200 L/R 50.00 4.00 200.00 0.15 30.00
13 + 200 - 13 + 206 L/R 5.70 4.00 22.80 0.15 3.42
SEGMEN 6 L/R 23.50 4.00 94.00 0.15 14.10 Beton Rigid
13 + 229 - 13 + 250 L/R 20.80 4.00 83.20 0.15 12.48
13 + 250 - 13 + 300 L/R 50.00 4.00 200.00 0.15 30.00
13 + 300 - 13 + 342 L/R 41.50 4.00 166.00 0.15 24.90
SEGMEN 7 L/R 67.00 4.00 268.00 0.15 40.20 Beton Rigid
13 + 409 - 13 + 450 L/R 41.50 4.00 166.00 0.15 24.90
13 + 450 - 13 + 500 L/R 50.00 4.00 200.00 0.15 30.00
13 + 500 - 13 + 550 L/R 50.00 4.00 200.00 0.15 30.00
13 + 550 - 13 + 600 L/R 50.00 4.00 200.00 0.15 30.00
13 + 600 - 13 + 650 L/R 50.00 4.00 200.00 0.15 30.00
13 + 650 - 13 + 700 L/R 50.00 4.00 200.00 0.15 30.00
13 + 700 - 13 + 750 L/R 50.00 4.00 200.00 0.15 30.00
Panjang Lebar Luas Spray Volume
STA Posisi Ket
M M M² Ltr/M² Liter
13 + 750 - 13 + 779 L/R 29.40 4.00 117.60 0.15 17.64
SEGMEN 8 L/R 24.50 4.00 98.00 0.15 14.70 Beton Rigid
13 + 804 - 13 + 844 L/R 40.00 4.00 160.00 0.15 24.00
SEGMEN 9 L/R 14.50 4.00 58.00 0.15 8.70 Beton Rigid
13 + 858 - 13 + 876 L/R 18.00 4.00 72.00 0.15 10.80
SEGMEN 10 L/R 36.50 4.00 146.00 0.15 21.90 Beton Rigid
13 + 913 - 13 + 950 L/R 37.10 4.00 148.40 0.15 22.26
13 + 950 - 14 + 000 L/R 50.00 4.00 200.00 0.15 30.00
14 + 000 - 14 + 050 L/R 50.00 4.00 200.00 0.15 30.00
Panjang Lebar Luas Spray Volume
STA Posisi Ket
M M M² Ltr/M² Liter
14 + 050 - 14 + 100 L/R 50.00 4.00 200.00 0.15 30.00
14 + 100 - 14 + 150 L/R 50.00 4.00 200.00 0.15 30.00
14 + 150 - 14 + 200 L/R 50.00 4.00 200.00 0.15 30.00
14 + 200 - 14 + 250 L/R 50.00 4.00 200.00 0.15 30.00
14 + 250 - 14 + 300 L/R 50.00 4.00 200.00 0.15 30.00
14 + 300 - 14 + 322 L/R 21.70 4.00 86.80 0.15 13.02
SEGMEN 11 L/R 40.50 4.00 162.00 0.15 24.30 Beton Rigid
14 + 362 - 14 + 400 L/R 37.80 4.00 151.20 0.15 22.68
14 + 400 - 14 + 450 L/R 50.00 4.00 200.00 0.15 30.00
14 + 450 - 14 + 500 L/R 50.00 4.00 200.00 0.15 30.00
14 + 500 - 14 + 550 L/R 50.00 4.00 200.00 0.15 30.00
14 + 550 - 14 + 600 L/R 50.00 4.00 200.00 0.15 30.00
14 + 600 - 14 + 650 L/R 50.00 4.00 200.00 0.15 30.00
14 + 650 - 14 + 669 L/R 19.00 4.00 76.00 0.15 11.40
SEGMEN 12 L/R 19.50 4.00 78.00 0.15 11.70 Beton Rigid
14 + 689 - 14 + 700 L/R 11.50 4.00 46.00 0.15 6.90
14 + 700 - 14 + 750 L/R 50.00 4.00 200.00 0.15 30.00
14 + 750 - 14 + 800 L/R 50.00 4.00 200.00 0.15 30.00
14 + 800 - 14 + 840 L/R 40.20 4.00 160.80 0.15 24.12
SEGMEN 13 L/R 50.00 4.00 200.00 0.15 30.00 Beton Rigid
14 + 890 - 14 + 900 L/R 9.80 4.00 39.20 0.15 5.88
14 + 900 - 14 + 950 L/R 50.00 4.00 200.00 0.15 30.00
14 + 950 - 14 + 977 L/R 26.50 4.00 106.00 0.15 15.90
SEGMEN 14 L/R 20.00 4.00 80.00 0.15 12.00 Beton Rigid
14 + 997 - 15 + 000 L/R 3.50 4.00 14.00 0.15 2.10
15 + 000 - 15 + 042 L/R 41.70 4.00 166.80 0.15 25.02
SEGMEN 15 L/R 20.00 4.00 80.00 0.15 12.00 Beton Rigid
15 + 062 - 15 + 100 L/R 38.30 4.00 153.20 0.15 22.98
15 + 100 - 15 + 150 L/R 50.00 4.00 200.00 0.15 30.00 Bahu Beton
15 + 150 - 15 + 200 L/R 50.00 4.00 200.00 0.15 30.00 Bahu Beton
15 + 200 - 15 + 250 L/R 50.00 4.00 200.00 0.15 30.00 Bahu Beton
15 + 250 - 15 + 300 L/R 50.00 4.00 200.00 0.15 30.00 Bahu Beton
15 + 300 - 15 + 350 L/R 50.00 4.00 200.00 0.15 30.00 Bahu Beton
15 + 350 - 15 + 400 L/R 50.00 4.00 200.00 0.15 30.00 Bahu Beton
15 + 400 - 15 + 450 L/R 50.00 4.00 200.00 0.15 30.00 Bahu Beton
15 + 450 - 15 + 500 L/R 50.00 4.00 200.00 0.15 30.00 Bahu Beton
15 + 500 - 15 + 550 L/R 50.00 4.00 200.00 0.15 30.00 Bahu Beton
15 + 550 - 15 + 600 L/R 50.00 4.00 200.00 0.15 30.00 Bahu Beton
15 + 600 - 15 + 650 L/R 50.00 4.00 200.00 0.15 30.00
15 + 650 - 15 + 700 L/R 50.00 4.00 200.00 0.15 30.00
15 + 700 - 15 + 726 L/R 26.40 4.00 105.60 0.15 15.84
SEGMEN 16 L/R 30.00 4.00 120.00 0.15 18.00 Beton Rigid
15 + 756 - 15 + 800 L/R 43.60 4.00 174.40 0.15 26.16
15 + 800 - 15 + 850 L/R 50.00 4.00 200.00 0.15 30.00
15 + 850 - 15 + 900 L/R 50.00 4.00 200.00 0.15 30.00
15 + 900 - 15 + 950 L/R 50.00 4.00 200.00 0.15 30.00
15 + 950 - 16 + 000 L/R 50.00 4.00 200.00 0.15 30.00
16 + 000 - 16 + 050 L/R 50.00 4.00 200.00 0.15 30.00
16 + 050 - 16 + 100 L/R 50.00 4.00 200.00 0.15 30.00
16 + 100 - 16 + 150 L/R 50.00 4.00 200.00 0.15 30.00
16 + 150 - 16 + 200 L/R 50.00 4.00 200.00 0.15 30.00
16 + 200 - 16 + 250 L/R 50.00 4.00 200.00 0.15 30.00
16 + 250 - 16 + 300 L/R 50.00 4.00 200.00 0.15 30.00
16 + 300 - 16 + 350 L/R 50.00 4.00 200.00 0.15 30.00
16 + 350 - 16 + 400 L/R 50.00 4.00 200.00 0.15 30.00
Panjang Lebar Luas Spray Volume
STA Posisi Ket
M M M² Ltr/M² Liter
16 + 400 - 16 + 411 L/R 10.80 4.00 43.20 0.15 6.48
SEGMEN 17 Jembatan Besi
16 + 429 - 16 + 450 L/R 21.20 4.00 84.80 0.15 12.72 Tanpa Bahu
16 + 450 - 16 + 488 L/R 37.70 4.00 150.80 0.15 22.62 Tanpa Bahu
SEGMEN 18 L/R 50.00 4.00 200.00 0.15 30.00 Beton Rigid
16 + 538 - 16 + 550 L/R 12.30 4.00 49.20 0.15 7.38 Tanpa Bahu
16 + 550 - 16 + 600 L/R 50.00 4.00 200.00 0.15 30.00 Tanpa Bahu
16 + 600 - 16 + 650 L/R 50.00 4.00 200.00 0.15 30.00 Tanpa Bahu
16 + 650 - 16 + 700 L/R 50.00 4.00 200.00 0.15 30.00 Tanpa Bahu
16 + 700 - 16 + 750 L/R 50.00 4.00 200.00 0.15 30.00 Tanpa Bahu
16 + 750 - 16 + 800 L/R 50.00 4.00 200.00 0.15 30.00 Tanpa Bahu
16 + 800 - 16 + 850 L/R 50.00 4.00 200.00 0.15 30.00 Tanpa Bahu
16 + 850 - 16 + 900 L/R 50.00 4.00 200.00 0.15 30.00 Tanpa Bahu
16 + 900 - 16 + 950 L/R 50.00 4.00 200.00 0.15 30.00 Tanpa Bahu
16 + 950 - 17 + 000 L/R 50.00 4.00 200.00 0.15 30.00 Tanpa Bahu
17 + 000 - 17 + 050 L/R 50.00 4.00 200.00 0.15 30.00 Tanpa Bahu
17 + 050 - 17 + 100 L/R 50.00 4.00 200.00 0.15 30.00 Tanpa Bahu
17 + 100 - 17 + 132 L/R 32.40 4.00 129.60 0.15 19.44 Tanpa Bahu
SEGMEN 19 Jembatan Besi
17 + 156 - 17 + 200 L/R 43.60 4.00 174.40 0.15 26.16 Tanpa Bahu
17 + 200 - 17 + 250 L/R 50.00 4.00 200.00 0.15 30.00 Tanpa Bahu
17 + 250 - 17 + 300 L/R 50.00 4.00 200.00 0.15 30.00 Tanpa Bahu
17 + 300 - 17 + 350 L/R 50.00 4.00 200.00 0.15 30.00 Tanpa Bahu
17 + 350 - 17 + 400 L/R 50.00 4.00 200.00 0.15 30.00 Tanpa Bahu
17 + 400 - 17 + 450 L/R 50.00 4.00 200.00 0.15 30.00 Tanpa Bahu
17 + 450 - 17 + 500 L/R 50.00 4.00 200.00 0.15 30.00 Tanpa Bahu
17 + 500 - 17 + 550 L/R 50.00 4.00 200.00 0.15 30.00 Tanpa Bahu
17 + 550 - 17 + 600 L/R 50.00 4.00 200.00 0.15 30.00 Tanpa Bahu
17 + 600 - 17 + 650 L/R 50.00 4.00 200.00 0.15 30.00 Tanpa Bahu
17 + 650 - 17 + 700 L/R 50.00 4.00 200.00 0.15 30.00 Tanpa Bahu
17 + 700 - 17 + 750 L/R 50.00 4.00 200.00 0.15 30.00 Tanpa Bahu
17 + 750 - 17 + 800 L/R 50.00 4.00 200.00 0.15 30.00 Tanpa Bahu
17 + 800 - 17 + 850 L/R 50.00 4.00 200.00 0.15 30.00 Tanpa Bahu
17 + 850 - 17 + 900 L/R 50.00 4.00 200.00 0.15 30.00 Tanpa Bahu
17 + 900 - 17 + 950 L/R 50.00 4.00 200.00 0.15 30.00 Tanpa Bahu
17 + 950 - 18 + 000 L/R 50.00 4.00 200.00 0.15 30.00 Tanpa Bahu
18 + 000 - 18 + 050 L/R 50.00 4.00 200.00 0.15 30.00 Tanpa Bahu
18 + 050 - 18 + 100 L/R 50.00 4.00 200.00 0.15 30.00 Tanpa Bahu
18 + 100 - 18 + 150 L/R 50.00 4.00 200.00 0.15 30.00 Tanpa Bahu
18 + 150 - 18 + 200 L/R 50.00 4.00 200.00 0.15 30.00 Tanpa Bahu
18 + 200 - 18 + 250 L/R 50.00 4.00 200.00 0.15 30.00 Tanpa Bahu
18 + 250 - 18 + 300 L/R 50.00 4.00 200.00 0.15 30.00 Tanpa Bahu
18 + 300 - 18 + 350 L/R 50.00 4.00 200.00 0.15 30.00 Tanpa Bahu
18 + 350 - 18 + 400 L/R 50.00 4.00 200.00 0.15 30.00 Tanpa Bahu
18 + 400 - 18 + 450 L/R 50.00 4.00 200.00 0.15 30.00 Tanpa Bahu
18 + 450 - 18 + 500 L/R 50.00 4.00 200.00 0.15 30.00 Tanpa Bahu
18 + 500 - 18 + 550 L/R 50.00 4.00 200.00 0.15 30.00 Tanpa Bahu
18 + 550 - 18 + 600 L/R 50.00 4.00 200.00 0.15 30.00 Tanpa Bahu
18 + 600 - 18 + 610 L/R 10.00 3.50 35.00 0.15 5.25 Tanpa Bahu
18 + 610 - 18 + 650 L/R 40.00 4.00 160.00 0.15 24.00 Tanpa Bahu
18 + 650 - 18 + 700 L/R 50.00 4.00 200.00 0.15 30.00 Tanpa Bahu
18 + 700 - 18 + 750 L/R 50.00 4.00 200.00 0.15 30.00 Tanpa Bahu
18 + 750 - 18 + 800 L/R 50.00 4.00 200.00 0.15 30.00 Tanpa Bahu
18 + 800 - 18 + 850 L/R 50.00 4.00 200.00 0.15 30.00 Tanpa Bahu
18 + 850 - 18 + 900 L/R 50.00 4.00 200.00 0.15 30.00 Tanpa Bahu
Panjang Lebar Luas Spray Volume
STA Posisi Ket
M M M² Ltr/M² Liter
18 + 900 - 18 + 950 L/R 50.00 4.00 200.00 0.15 30.00 Tanpa Bahu
18 + 950 - 19 + 000 L/R 50.00 4.00 200.00 0.15 30.00 Tanpa Bahu
19 + 000 - 19 + 050 L/R 50.00 4.00 200.00 0.15 30.00 Tanpa Bahu
19 + 050 - 19 + 100 L/R 50.00 4.00 200.00 0.15 30.00 Tanpa Bahu
19 + 100 - 19 + 150 L/R 50.00 4.00 200.00 0.15 30.00 Tanpa Bahu
19 + 150 - 19 + 200 L/R 50.00 4.00 200.00 0.15 30.00 Tanpa Bahu
19 + 200 - 19 + 300 L/R 100.00 4.00 400.00 0.15 60.00 Tanpa Bahu

JUMLAH TOTAL 8,873.70 5,323.47

DINAS PEKERJAAN UMUM BINA MARGA DINAS PEKERJAAN UMUM BINA MARGA
PENGAWAS LAPANGAN 1 PENGAWAS LAPANGAN 2

YULIUS OKTARIKO, ST APRI AJUDAYA


NIP. 19840730 201903 1 001 NIP. 19840730 201903 1 001

KONSULTAN SUPERVISI KONTRAKTOR


CV. PIRAMIDA ENGINEERING CONSULTANT PT. CIPTA REKAYASA FADILAH

BUDIANTO, ST
INSPECTOR DODY EKO NOERSANTO, ST
MANAGER TEKNIK
PEMERINTAH KABUPATEN REJANG LEBONG
DINAS PEKERJAAN UMUM PENATAAN
RUANGPERUMAHAN DAN KAWASAN PEMUKIMAN

PEKERJAAN :

Peningkatan Kapasitas Struktur Jalan pada Ruas Jalan Karang


Baru - Lubuk Tunjung Kecamatan Sindang Beliti Ilir (DAK)

BACKUP DATA
DIVISI 6. PERKERASAN ASPAL
Laston Lapis Antara (AC-BC)

SUMBER DANA DAK


Tahun Anggaran 2022
PEMERINTAH KABUPATEN REJANG LEBONG
DINAS PEKERJAAN UMUM PENATAAN RUANG PERUMAHAN
DAN KAWASAN PEMUKIMAN
TAHUN ANGGARAN 2022

REKAPITULASI

KEGIATAN : PENINGKATAN JALAN


Peningkatan Kapasitas Struktur Jalan pada Ruas Jalan Karang Baru - Lubuk Tunjung
PAKET KEGIATAN :
Kecamatan Sindang Beliti Ilir (DAK)
KONTRAKTOR : CV. Indo Artha Persada

PAY ITEM : 6.3.(6a)


PEKERJAAN : Laston Lapis Antara (AC-BC)

VOLUME
No. LOKASI STA SATUAN KET
Ton

1 Laston Lapis Antara (AC-BC) Ton 1781.70

JUMLAH ( Ton ) 1781.70


BACKUP VOLUME
Peningkatan Kapasitas Struktur Jalan pada Ruas Jalan Karang Baru - Lubuk Tunjung Kecamatan Sindang Beliti Ilir (DAK)

DIVISI 6. PERKERASAN ASAL


Laston Lapis Antara (AC-BC)

Panjang Lebar Tebal BJ Volume


STA Posisi Ket
M M M Ton/M³ Ton

0 + 000 - 0 + 050 L/R 50.0 3.00 0.06 2.25 20.25


0 + 050 - 0 + 100 L/R 50.0 3.00 0.06 2.25 20.25
0 + 100 - 0 + 150 L/R 50.0 3.00 0.06 2.25 20.25
0 + 150 - 0 + 200 L/R 50.0 3.00 0.06 2.25 20.25
0 + 200 - 0 + 250 L/R 50.0 3.00 0.06 2.25 20.25
0 + 250 - 0 + 300 L/R 50.0 3.00 0.06 2.25 20.25
0 + 300 - 0 + 350 L/R 50.0 3.00 0.06 2.25 20.25
0 + 350 - 0 + 400 L/R 50.0 3.00 0.06 2.25 20.25
0 + 400 - 0 + 450 L/R 50.0 3.00 0.06 2.25 20.25
0 + 450 - 0 + 500 L/R 50.0 3.00 0.06 2.25 20.25
0 + 500 - 0 + 550 L/R 50.0 3.00 0.06 2.25 20.25
0 + 550 - 0 + 585 L/R 35.0 3.00 0.06 2.25 14.17
0 + 585 - 0 + 595 L/R 10.0 3.00 0.06 2.25 4.05
0 + 595 - 0 + 600 L/R 5.0 3.00 0.06 2.25 2.02
0 + 600 - 0 + 636 L/R 36.0 3.00 0.06 2.25 14.58
0 + 636 - 0 + 650 L/R 14.0 3.00 0.06 2.25 5.67
0 + 650 - 0 + 750 L/R 100.0 3.00 0.06 2.25 40.49
0 + 750 - 0 + 800 L/R 50.0 3.00 0.06 2.25 20.25
0 + 800 - 0 + 850 L/R 50.0 3.00 0.06 2.25 20.25
0 + 850 - 0 + 900 L/R 50.0 3.00 0.06 2.25 20.25
0 + 900 - 0 + 950 L/R 50.0 3.00 0.06 2.25 20.25
0 + 950 - 1 + 000 L/R 50.0 3.00 0.06 2.25 20.25
1 + 000 - 1 + 050 L/R 50.0 3.00 0.06 2.25 20.25
1 + 050 - 1 + 100 L/R 50.0 3.00 0.06 2.25 20.25
1 + 100 - 1 + 125 L/R 25.0 3.00 0.06 2.25 10.12
1 + 125 - 1 + 130 L/R 5.0 3.00 0.06 2.25 2.02
1 + 130 - 1 + 150 L/R 20.0 3.00 0.06 2.25 8.10
1 + 150 - 1 + 200 L/R 50.0 3.00 0.06 2.25 20.25
Panjang Lebar Tebal BJ Volume
STA Posisi Ket
M M M Ton/M³ Ton
1 + 200 - 1 + 250 L/R 50.0 3.00 0.06 2.25 20.25
1 + 250 - 1 + 300 L/R 50.0 3.00 0.06 2.25 20.25
1 + 300 - 1 + 350 L/R 50.0 3.00 0.06 2.25 20.25
1 + 350 - 1 + 400 L/R 50.0 3.00 0.06 2.25 20.25
1 + 400 - 1 + 450 L/R 50.0 3.00 0.06 2.25 20.25
1 + 450 - 1 + 500 L/R 50.0 3.00 0.06 2.25 20.25
1 + 500 - 1 + 550 L/R 50.0 3.00 0.06 2.25 20.25
1 + 550 - 1 + 600 L/R 50.0 3.00 0.06 2.25 20.25
1 + 600 - 1 + 650 L/R 50.0 3.00 0.06 2.25 20.25
1 + 650 - 1 + 700 L/R 50.0 3.00 0.06 2.25 20.25
1 + 700 - 1 + 750 L/R 50.0 3.00 0.06 2.25 20.25
1 + 750 - 1 + 800 L/R 50.0 3.00 0.06 2.25 20.25
1 + 800 - 1 + 850 L/R 50.0 3.00 0.06 2.25 20.25
1 + 850 - 1 + 900 L/R 50.0 3.00 0.06 2.25 20.25
1 + 900 - 1 + 950 L/R 50.0 3.00 0.06 2.25 20.25
1 + 950 - 1 + 975 L/R 25.0 3.00 0.06 2.25 10.12
1 + 975 - 1 + 982 L/R 7.0 3.00 0.06 2.25 2.83
1 + 982 - 2 + 000 L/R 18.0 3.00 0.06 2.25 7.29
2 + 000 - 2 + 050 L/R 50.0 3.00 0.06 2.25 20.25
2 + 050 - 2 + 100 L/R 50.0 3.00 0.06 2.25 20.25
2 + 100 - 2 + 150 L/R 50.0 3.00 0.06 2.25 20.25
2 + 150 - 2 + 200 L/R 50.0 3.00 0.06 2.25 20.25
2 + 200 - 2 + 250 L/R 50.0 3.00 0.06 2.25 20.25
2 + 250 - 2 + 300 L/R 50.0 3.00 0.06 2.25 20.25
2 + 300 - 2 + 350 L/R 50.0 3.00 0.06 2.25 20.25
2 + 350 - 2 + 400 L/R 50.0 3.00 0.06 2.25 20.25
2 + 400 - 2 + 450 L/R 50.0 3.00 0.06 2.25 20.25
2 + 450 - 2 + 500 L/R 50.0 3.00 0.06 2.25 20.25
2 + 500 - 2 + 550 L/R 50.0 3.00 0.06 2.25 20.25
2 + 550 - 2 + 600 L/R 50.0 3.00 0.06 2.25 20.25
2 + 600 - 2 + 650 L/R 50.0 3.00 0.06 2.25 20.25
2 + 650 - 2 + 700 L/R 50.0 3.00 0.06 2.25 20.25
2 + 700 - 2 + 750 L/R 50.0 3.00 0.06 2.25 20.25
2 + 750 - 2 + 800 L/R 50.0 3.00 0.06 2.25 20.25
2 + 800 - 2 + 850 L/R 50.0 3.00 0.06 2.25 20.25
2 + 850 - 2 + 900 L/R 50.0 3.00 0.06 2.25 20.25
2 + 900 - 2 + 950 L/R 50.0 3.00 0.06 2.25 20.25
2 + 950 - 3 + 000 L/R 50.0 3.00 0.06 2.25 20.25
3 + 000 - 3 + 050 L/R 50.0 3.00 0.06 2.25 20.25
3 + 050 - 3 + 100 L/R 50.0 3.00 0.06 2.25 20.25
3 + 100 - 3 + 150 L/R 50.0 3.00 0.06 2.25 20.25
3 + 150 - 3 + 200 L/R 50.0 3.00 0.06 2.25 20.25
3 + 200 - 3 + 250 L/R 50.0 3.00 0.06 2.25 20.25
Panjang Lebar Tebal BJ Volume
STA Posisi Ket
M M M Ton/M³ Ton
3 + 250 - 3 + 300 L/R 50.0 3.00 0.06 2.25 20.25
3 + 300 - 3 + 350 L/R 50.0 3.00 0.06 2.25 20.25
3 + 350 - 3 + 400 L/R 50.0 3.00 0.06 2.25 20.25
3 + 400 - 3 + 450 L/R 50.0 3.00 0.06 2.25 20.25
3 + 450 - 3 + 500 L/R 50.0 3.00 0.06 2.25 20.25
3 + 500 - 3 + 550 L/R 50.0 3.00 0.06 2.25 20.25
3 + 550 - 3 + 600 L/R 50.0 3.00 0.06 2.25 20.25
3 + 600 - 3 + 680 L/R 80.0 3.00 0.06 2.25 32.39
3 + 680 - 3 + 682 L/R 2.0 3.00 0.06 2.25 0.81
3 + 682 - 3 + 775 L/R 93.0 3.00 0.06 2.25 37.66
3 + 775 - 3 + 782 L/R 7.0 3.00 0.06 2.25 2.83
3 + 782 - 3 + 850 L/R 68.0 3.00 0.06 2.25 27.54
3 + 850 - 3 + 900 L/R 50.0 3.00 0.06 2.25 20.25
3 + 900 - 3 + 950 L/R 50.0 3.00 0.06 2.25 20.25
3 + 950 - 4 + 000 L/R 50.0 3.00 0.06 2.25 20.25
4 + 000 - 4 + 050 L/R 50.0 3.00 0.06 2.25 20.25
4 + 050 - 4 + 100 L/R 50.0 3.00 0.06 2.25 20.25
4 + 100 - 4 + 150 L/R 50.0 3.00 0.06 2.25 20.25
4 + 150 - 4 + 200 L/R 50.0 3.00 0.06 2.25 20.25
4 + 200 - 4 + 250 L/R 50.0 3.00 0.06 2.25 20.25
4 + 250 - 4 + 300 L/R 50.0 3.00 0.06 2.25 20.25
4 + 300 - 4 + 350 L/R 50.0 3.00 0.06 2.25 20.25
4 + 350 - 4 + 400 L/R 50.0 3.00 0.06 2.25 20.25

JUMLAH TOTAL 4,400.00 1,781.70

KONSULTAN PENGAWAS KONTRAKTOR


CV. DINAMIKA CONSULTANT CV. INDO ARTHA PERSADA

ALFIAN OBEN SANDRA JAYA


WAKIL DIREKTUR DIREKTUR

PEJABAT PELAKSANA TEKNIS KEGIATAN


DPUPRKP KABUPATEN REJANG LEBONG
(PPTK)

EDY KUSNADI, ST
NIP. 198606617 201902 1 001
PEMERINTAH KABUPATEN REJANG LEBONG
DINAS PEKERJAAN UMUM PENATAAN
RUANGPERUMAHAN DAN KAWASAN PEMUKIMAN

PEKERJAAN :

Peningkatan Kapasitas Struktur Jalan pada Ruas Jalan Karang


Baru - Lubuk Tunjung Kecamatan Sindang Beliti Ilir (DAK)

BACKUP DATA
DIVISI 6. PERKERASAN ASPAL
Bahan anti pengelupasan

SUMBER DANA DAK


Tahun Anggaran 2022
PEMERINTAH KABUPATEN REJANG LEBONG
DINAS PEKERJAAN UMUM PENATAAN RUANG PERUMAHAN
DAN KAWASAN PEMUKIMAN
TAHUN ANGGARAN 2022

REKAPITULASI

KEGIATAN : PENINGKATAN JALAN


Peningkatan Kapasitas Struktur Jalan pada Ruas Jalan Karang Baru - Lubuk Tunjung
PAKET KEGIATAN :
Kecamatan Sindang Beliti Ilir (DAK)
KONTRAKTOR : CV. Indo Artha Persada

PAY ITEM : 6.3.(8)


PEKERJAAN : Bahan anti pengelupasan

VOLUME
No. LOKASI STA SATUAN KET
Ton

1 Bahan anti pengelupasan Ton 299.33

JUMLAH ( Ton ) 299.33


BACKUP VOLUME
Peningkatan Struktur Jalan Simpang Temuan Jaya - Simpang Jene (DAK Reguler)

DIVISI 6. PERKERASAN ASAL


Bahan anti pengelupasan

Panjang Lebar Tebal BJ Volume BAP


STA Posisi
M M M Ton/M³ Ton 0.02%

0 + 000 - 0 + 050 L/R 50.0 3.00 0.06 2.25 20.25 3.4014


0 + 050 - 0 + 100 L/R 50.0 3.00 0.06 2.25 20.25 3.4014
0 + 100 - 0 + 150 L/R 50.0 3.00 0.06 2.25 20.25 3.4014
0 + 150 - 0 + 200 L/R 50.0 3.00 0.06 2.25 20.25 3.4014
0 + 200 - 0 + 250 L/R 50.0 3.00 0.06 2.25 20.25 3.4014
0 + 250 - 0 + 300 L/R 50.0 3.00 0.06 2.25 20.25 3.4014
0 + 300 - 0 + 350 L/R 50.0 3.00 0.06 2.25 20.25 3.4014
0 + 350 - 0 + 400 L/R 50.0 3.00 0.06 2.25 20.25 3.4014
0 + 400 - 0 + 450 L/R 50.0 3.00 0.06 2.25 20.25 3.4014
0 + 450 - 0 + 500 L/R 50.0 3.00 0.06 2.25 20.25 3.4014
0 + 500 - 0 + 550 L/R 50.0 3.00 0.06 2.25 20.25 3.4014
0 + 550 - 0 + 585 L/R 35.0 3.00 0.06 2.25 14.18 2.3810
0 + 585 - 0 + 595 L/R 10.0 3.00 0.06 2.25 4.05 0.6803
0 + 595 - 0 + 600 L/R 5.0 3.00 0.06 2.25 2.03 0.3401
0 + 600 - 0 + 636 L/R 36.0 3.00 0.06 2.25 14.58 2.4490
0 + 636 - 0 + 650 L/R 14.0 3.00 0.06 2.25 5.67 0.9524
0 + 650 - 0 + 750 L/R 100.0 3.00 0.06 2.25 40.50 6.8029
0 + 750 - 0 + 800 L/R 50.0 3.00 0.06 2.25 20.25 3.4014
0 + 800 - 0 + 850 L/R 50.0 3.00 0.06 2.25 20.25 3.4014
0 + 850 - 0 + 900 L/R 50.0 3.00 0.06 2.25 20.25 3.4014
0 + 900 - 0 + 950 L/R 50.0 3.00 0.06 2.25 20.25 3.4014
0 + 950 - 1 + 000 L/R 50.0 3.00 0.06 2.25 20.25 3.4014
Panjang Lebar Tebal BJ Volume BAP
STA Posisi
M M M Ton/M³ Ton 0.02%
1 + 000 - 1 + 050 L/R 50.0 3.00 0.06 2.25 20.25 3.4014
1 + 050 - 1 + 100 L/R 50.0 3.00 0.06 2.25 20.25 3.4014
1 + 100 - 1 + 125 L/R 25.0 3.00 0.06 2.25 10.13 1.7007
1 + 125 - 1 + 130 L/R 5.0 3.00 0.06 2.25 2.03 0.3401
1 + 130 - 1 + 150 L/R 20.0 3.00 0.06 2.25 8.10 1.3606
1 + 150 - 1 + 200 L/R 50.0 3.00 0.06 2.25 20.25 3.4014
1 + 200 - 1 + 250 L/R 50.0 3.00 0.06 2.25 20.25 3.4014
1 + 250 - 1 + 300 L/R 50.0 3.00 0.06 2.25 20.25 3.4014
1 + 300 - 1 + 350 L/R 50.0 3.00 0.06 2.25 20.25 3.4014
1 + 350 - 1 + 400 L/R 50.0 3.00 0.06 2.25 20.25 3.4014
1 + 400 - 1 + 450 L/R 50.0 3.00 0.06 2.25 20.25 3.4014
1 + 450 - 1 + 500 L/R 50.0 3.00 0.06 2.25 20.25 3.4014
1 + 500 - 1 + 550 L/R 50.0 3.00 0.06 2.25 20.25 3.4014
1 + 550 - 1 + 600 L/R 50.0 3.00 0.06 2.25 20.25 3.4014
1 + 600 - 1 + 650 L/R 50.0 3.00 0.06 2.25 20.25 3.4014
1 + 650 - 1 + 700 L/R 50.0 3.00 0.06 2.25 20.25 3.4014
1 + 700 - 1 + 750 L/R 50.0 3.00 0.06 2.25 20.25 3.4014
1 + 750 - 1 + 800 L/R 50.0 3.00 0.06 2.25 20.25 3.4014
1 + 800 - 1 + 850 L/R 50.0 3.00 0.06 2.25 20.25 3.4014
1 + 850 - 1 + 900 L/R 50.0 3.00 0.06 2.25 20.25 3.4014
1 + 900 - 1 + 950 L/R 50.0 3.00 0.06 2.25 20.25 3.4014
1 + 950 - 1 + 975 L/R 25.0 3.00 0.06 2.25 10.13 1.7007
1 + 975 - 1 + 982 L/R 7.0 3.00 0.06 2.25 2.84 0.4762
1 + 982 - 2 + 000 L/R 18.0 3.00 0.06 2.25 7.29 1.2245
2 + 000 - 2 + 050 L/R 50.0 3.00 0.06 2.25 20.25 3.4014
2 + 050 - 2 + 100 L/R 50.0 3.00 0.06 2.25 20.25 3.4014
2 + 100 - 2 + 150 L/R 50.0 3.00 0.06 2.25 20.25 3.4014
2 + 150 - 2 + 200 L/R 50.0 3.00 0.06 2.25 20.25 3.4014
2 + 200 - 2 + 250 L/R 50.0 3.00 0.06 2.25 20.25 3.4014
2 + 250 - 2 + 300 L/R 50.0 3.00 0.06 2.25 20.25 3.4014
2 + 300 - 2 + 350 L/R 50.0 3.00 0.06 2.25 20.25 3.4014
2 + 350 - 2 + 400 L/R 50.0 3.00 0.06 2.25 20.25 3.4014
2 + 400 - 2 + 450 L/R 50.0 3.00 0.06 2.25 20.25 3.4014
2 + 450 - 2 + 500 L/R 50.0 3.00 0.06 2.25 20.25 3.4014
2 + 500 - 2 + 550 L/R 50.0 3.00 0.06 2.25 20.25 3.4014
2 + 550 - 2 + 600 L/R 50.0 3.00 0.06 2.25 20.25 3.4014
2 + 600 - 2 + 650 L/R 50.0 3.00 0.06 2.25 20.25 3.4014
2 + 650 - 2 + 700 L/R 50.0 3.00 0.06 2.25 20.25 3.4014
2 + 700 - 2 + 750 L/R 50.0 3.00 0.06 2.25 20.25 3.4014
2 + 750 - 2 + 800 L/R 50.0 3.00 0.06 2.25 20.25 3.4014
2 + 800 - 2 + 850 L/R 50.0 3.00 0.06 2.25 20.25 3.4014
2 + 850 - 2 + 900 L/R 50.0 3.00 0.06 2.25 20.25 3.4014
2 + 900 - 2 + 950 L/R 50.0 3.00 0.06 2.25 20.25 3.4014
2 + 950 - 3 + 000 L/R 50.0 3.00 0.06 2.25 20.25 3.4014
Panjang Lebar Tebal BJ Volume BAP
STA Posisi
M M M Ton/M³ Ton 0.02%
3 + 000 - 3 + 050 L/R 50.0 3.00 0.06 2.25 20.25 3.4014
3 + 050 - 3 + 100 L/R 50.0 3.00 0.06 2.25 20.25 3.4014
3 + 100 - 3 + 150 L/R 50.0 3.00 0.06 2.25 20.25 3.4014
3 + 150 - 3 + 200 L/R 50.0 3.00 0.06 2.25 20.25 3.4014
3 + 200 - 3 + 250 L/R 50.0 3.00 0.06 2.25 20.25 3.4014
3 + 250 - 3 + 300 L/R 50.0 3.00 0.06 2.25 20.25 3.4014
3 + 300 - 3 + 350 L/R 50.0 3.00 0.06 2.25 20.25 3.4014
3 + 350 - 3 + 400 L/R 50.0 3.00 0.06 2.25 20.25 3.4014
3 + 400 - 3 + 450 L/R 50.0 3.00 0.06 2.25 20.25 3.4014
3 + 450 - 3 + 500 L/R 50.0 3.00 0.06 2.25 20.25 3.4014
3 + 500 - 3 + 550 L/R 50.0 3.00 0.06 2.25 20.25 3.4014
3 + 550 - 3 + 600 L/R 50.0 3.00 0.06 2.25 20.25 3.4014
3 + 600 - 3 + 680 L/R 80.0 3.00 0.06 2.25 32.40 5.4423
3 + 680 - 3 + 682 L/R 2.0 3.00 0.06 2.25 0.81 0.1361
3 + 682 - 3 + 775 L/R 93.0 3.00 0.06 2.25 37.67 6.3267
3 + 775 - 3 + 782 L/R 7.0 3.00 0.06 2.25 2.84 0.4762
3 + 782 - 3 + 850 L/R 68.0 3.00 0.06 2.25 27.54 4.6259
3 + 850 - 3 + 900 L/R 50.0 3.00 0.06 2.25 20.25 3.4014
3 + 900 - 3 + 950 L/R 50.0 3.00 0.06 2.25 20.25 3.4014
3 + 950 - 4 + 000 L/R 50.0 3.00 0.06 2.25 20.25 3.4014
4 + 000 - 4 + 050 L/R 50.0 3.00 0.06 2.25 20.25 3.4014
4 + 050 - 4 + 100 L/R 50.0 3.00 0.06 2.25 20.25 3.4014
4 + 100 - 4 + 150 L/R 50.0 3.00 0.06 2.25 20.25 3.4014
4 + 150 - 4 + 200 L/R 50.0 3.00 0.06 2.25 20.25 3.4014
4 + 200 - 4 + 250 L/R 50.0 3.00 0.06 2.25 20.25 3.4014
4 + 250 - 4 + 300 L/R 50.0 3.00 0.06 2.25 20.25 3.4014
4 + 300 - 4 + 350 L/R 50.0 3.00 0.06 2.25 20.25 3.4014
4 + 350 - 4 + 400 L/R 50.0 3.00 0.06 2.25 20.25 3.4014

JUMLAH TOTAL 4,400.00 299.33

KONSULTAN PENGAWAS KONTRAKTOR


CV. DINAMIKA CONSULTANT CV. INDO ARTHA PERSADA

ALFIAN OBIN SANDRA JAYA


WAKIL DIREKTUR DIREKTUR

PEJABAT PELAKSANA TEKNIS KEGIATAN


DPUPRKP KABUPATEN REJANG LEBONG
(PPTK)

EDY KUSNADI, ST
NIP. 198606617 201902 1 001
PEMERINTAH KABUPATEN REJANG LEBONG
DINAS PEKERJAAN UMUM PENATAAN
RUANGPERUMAHAN DAN KAWASAN PEMUKIMAN

PEKERJAAN :

Peningkatan Kapasitas Struktur Jalan pada Ruas Jalan Karang


Baru - Lubuk Tunjung Kecamatan Sindang Beliti Ilir (DAK)

BACKUP DATA
DIVISI 7. STRUKTUR
Pasangan Batu
SUMBER DANA DAK
Tahun Anggaran 2022
PEMERINTAH KABUPATEN REJANG LEBONG
DINAS PEKERJAAN UMUM PENATAAN RUANG PERUMAHAN
DAN KAWASAN PEMUKIMAN
TAHUN ANGGARAN 2022

REKAPITULASI

KEGIATAN : PENINGKATAN JALAN

PAKET KEGIATAN : Peningkatan Struktur Jalan Simpang Temuan Jaya - Simpang Jene (DAK Reguler)

KONTRAKTOR : CV. Indo Artha Persada

PAY ITEM : 7.9.(1)


PEKERJAAN : Pasangan Batu

VOLUME
No. LOKASI STA SATUAN KETERANGAN
M3

1 Pasangan Batu m3 119.99

JUMLAH ( M3 ) 119.99
BACKUP VOLUME
Peningkatan Kapasitas Struktur Jalan pada Ruas Jalan Karang Baru - Lubuk Tunjung Kecamatan Sindang Beliti Ilir
7.9.(1)
Pasangan Batu

Dimensi Pasangan Batu Kali


Panjang
No. Gambar STA L/R L1 L2 L3 H1 H2 H3 H4
(M)
(M) (M) (M) (M) (M) (M) (M)
1 0+000 0+025 L 25.00 0.30 0.60 0.60 2.00 -
2 1+527 1+595 L 68.00 0.30 0.60 0.60 2.00 -
3 1+527 1+555 R 28.00 0.30 0.60 0.60 2.00 -

L/R 2.50 0.40 0.70 0.70 1.38 0.50

SUB TOTAL 123.50

KONSULTAN PENGAWAS KONTRAKTOR


CV. DINAMIKA CONSULTANT CV. INDO ARTHA PERSADA

ALFIAN OBEN SANDRA JAYA


WAKIL DIREKTUR DIREKTUR

PEJABAT PELAKSANA TEKNIS KEGIATAN


DPUPRKP KABUPATEN REJANG LEBONG
(PPTK)

EDY KUSNADI, ST
NIP. 198606617 201902 1 001
KUP VOLUME
n Karang Baru - Lubuk Tunjung Kecamatan Sindang Beliti Ilir (DAK)
7.9.(1)
Pasangan Batu

Volume Plester
Luas (M2) KET
(M3) (M2)

0.90 22.50 15.20 Pas. Batu dinding


0.90 61.20 15.20 Pas. Batu dinding
0.90 25.20 15.20 Pas. Batu dinding

1.11 11.09 12.14 Pas. Box

119.99 57.74
PEMERINTAH KABUPATEN REJANG LEBONG
DINAS PEKERJAAN UMUM PENATAAN
RUANGPERUMAHAN DAN KAWASAN PEMUKIMAN

PEKERJAAN :

Peningkatan Kapasitas Struktur Jalan pada Ruas Jalan Karang


Baru - Lubuk Tunjung Kecamatan Sindang Beliti Ilir (DAK)

BACKUP DATA
DIVISI 9. PEKERJAAN HARIAN & PEKERJAAN LAIN-
LAIN

Marka Jalan Termoplastik

SUMBER DANA DAK


Tahun Anggaran 2022
PEMERINTAH KABUPATEN REJANG LEBONG
DINAS PEKERJAAN UMUM PENATAAN RUANG PERUMAHAN
DAN KAWASAN PEMUKIMAN
TAHUN ANGGARAN 2022

REKAPITULASI

KEGIATAN : PENINGKATAN JALAN


Peningkatan Kapasitas Struktur Jalan pada Ruas Jalan Karang Baru - Lubuk Tunjung
PAKET KEGIATAN :
Kecamatan Sindang Beliti Ilir (DAK)
KONTRAKTOR : CV. Indo Artha Persada
KONSULTAN :

PAY ITEM : 9.2.(1)


PEKERJAAN : Marka Jalan Termoplastik

VOLUME
No. LOKASI STA SATUAN KETERANGAN
M2

1 Marka Jalan Termoplastik M2 354.00

JUMLAH ( M3 ) 354.00
PEMERINTAH KABUPATEN REJANG LEBONG
DINAS PEKERJAAN UMUM PENATAAN RUANG PERUMAHAN
DAN KAWASAN PEMUKIMAN

TAHUN ANGGARAN 2022

BACK UP DATA
KEGIATAN : PENINGKATAN JALAN
Peningkatan Kapasitas Struktur Jalan pada Ruas Jalan Karang Baru - Lubuk Tunjung Kecamatan
PAKET KEGIATAN :
Sindang Beliti Ilir (DAK)
KONTRAKTOR : CV. Indo Artha Persada
KONSULTAN :

PAY ITEM : 9.2.(1)


PEKERJAAN : Marka Jalan Termoplastik

PANJANG LEBAR
No. URAIAN ( 2/3 PANJANG) VOLUME KET.
(M) (M)

0 + 000 - 0 + 050 50.0 0.12 0.67 4.00


0 + 050 - 0 + 100 50.0 0.12 0.67 4.00
0 + 100 - 0 + 150 50.0 0.12 0.67 4.00
0 + 150 - 0 + 200 50.0 0.12 0.67 4.00
0 + 200 - 0 + 250 50.0 0.12 0.67 4.00
0 + 250 - 0 + 300 50.0 0.12 0.67 4.00
0 + 300 - 0 + 350 50.0 0.12 0.67 4.00
0 + 350 - 0 + 400 50.0 0.12 0.67 4.00
0 + 400 - 0 + 450 50.0 0.12 0.67 4.00
0 + 450 - 0 + 500 50.0 0.12 0.67 4.00
0 + 500 - 0 + 550 50.0 0.12 0.67 4.00
0 + 550 - 0 + 585 35.0 0.12 0.67 2.80
0 + 585 - 0 + 595 10.0 0.12 0.67 0.80
0 + 595 - 0 + 600 5.0 0.12 0.67 0.40
0 + 600 - 0 + 636 36.0 0.12 0.67 2.88
0 + 636 - 0 + 650 14.0 0.12 0.67 1.12
0 + 650 - 0 + 750 100.0 0.12 0.67 8.00
0 + 750 - 0 + 800 50.0 0.12 0.67 4.00
0 + 800 - 0 + 850 50.0 0.12 0.67 4.00
0 + 850 - 0 + 900 50.0 0.12 0.67 4.00
0 + 900 - 0 + 950 50.0 0.12 0.67 4.00
0 + 950 - 1 + 000 50.0 0.12 0.67 4.00
1 + 000 - 1 + 050 50.0 0.12 0.67 4.00
1 + 050 - 1 + 100 50.0 0.12 0.67 6.00
1 + 100 - 1 + 125 25.0 0.12 0.67 2.00
1 + 125 - 1 + 130 5.0 0.12 0.67 0.40
1 + 130 - 1 + 150 20.0 0.12 0.67 1.60
1 + 150 - 1 + 200 50.0 0.12 0.67 4.00
1 + 200 - 1 + 250 50.0 0.12 0.67 4.00
1 + 250 - 1 + 300 50.0 0.12 0.67 4.00
1 + 300 - 1 + 350 50.0 0.12 0.67 4.00
1 + 350 - 1 + 400 50.0 0.12 0.67 4.00
1 + 400 - 1 + 450 50.0 0.12 0.67 4.00
1 + 450 - 1 + 500 50.0 0.12 0.67 4.00
1 + 500 - 1 + 550 50.0 0.12 0.67 4.00
1 + 550 - 1 + 600 50.0 0.12 0.67 4.00
1 + 600 - 1 + 650 50.0 0.12 0.67 4.00
1 + 650 - 1 + 700 50.0 0.12 0.67 4.00
1 + 700 - 1 + 750 50.0 0.12 0.67 4.00
1 + 750 - 1 + 800 50.0 0.12 0.67 4.00
1 + 800 - 1 + 850 50.0 0.12 0.67 4.00
1 + 850 - 1 + 900 50.0 0.12 0.67 4.00
1 + 900 - 1 + 950 50.0 0.12 0.67 4.00
1 + 950 - 1 + 975 25.0 0.12 0.67 2.00
1 + 975 - 1 + 982 7.0 0.12 0.67 0.56
1 + 982 - 2 + 000 18.0 0.12 0.67 1.44
2 + 000 - 2 + 050 50.0 0.12 0.67 4.00
2 + 050 - 2 + 100 50.0 0.12 0.67 4.00
2 + 100 - 2 + 150 50.0 0.12 0.67 4.00
2 + 150 - 2 + 200 50.0 0.12 0.67 4.00
2 + 200 - 2 + 250 50.0 0.12 0.67 4.00
2 + 250 - 2 + 300 50.0 0.12 0.67 4.00
2 + 300 - 2 + 350 50.0 0.12 0.67 4.00
2 + 350 - 2 + 400 50.0 0.12 0.67 4.00
2 + 400 - 2 + 450 50.0 0.12 0.67 4.00
2 + 450 - 2 + 500 50.0 0.12 0.67 4.00
2 + 500 - 2 + 550 50.0 0.12 0.67 4.00
2 + 550 - 2 + 600 50.0 0.12 0.67 4.00
2 + 600 - 2 + 650 50.0 0.12 0.67 4.00
2 + 650 - 2 + 700 50.0 0.12 0.67 4.00
2 + 700 - 2 + 750 50.0 0.12 0.67 4.00
2 + 750 - 2 + 800 50.0 0.12 0.67 4.00
2 + 800 - 2 + 850 50.0 0.12 0.67 4.00
2 + 850 - 2 + 900 50.0 0.12 0.67 4.00
2 + 900 - 2 + 950 50.0 0.12 0.67 4.00
2 + 950 - 3 + 000 50.0 0.12 0.67 4.00
3 + 000 - 3 + 050 50.0 0.12 0.67 4.00
3 + 050 - 3 + 100 50.0 0.12 0.67 4.00
3 + 100 - 3 + 150 50.0 0.12 0.67 4.00
3 + 150 - 3 + 200 50.0 0.12 0.67 4.00
3 + 200 - 3 + 250 50.0 0.12 0.67 4.00
3 + 250 - 3 + 300 50.0 0.12 0.67 4.00
3 + 300 - 3 + 350 50.0 0.12 0.67 4.00
3 + 350 - 3 + 400 50.0 0.12 0.67 4.00
3 + 400 - 3 + 450 50.0 0.12 0.67 4.00
3 + 450 - 3 + 500 50.0 0.12 0.67 4.00
3 + 500 - 3 + 550 50.0 0.12 0.67 4.00
3 + 550 - 3 + 600 50.0 0.12 0.67 4.00
3 + 600 - 3 + 680 80.0 0.12 0.67 6.40
3 + 680 - 3 + 682 2.0 0.12 0.67 0.16
3 + 682 - 3 + 775 93.0 0.12 0.67 7.44
3 + 775 - 3 + 782 7.0 0.12 0.67 0.56
3 + 782 - 3 + 850 68.0 0.12 0.67 5.44
3 + 850 - 3 + 900 50.0 0.12 0.67 4.00
3 + 900 - 3 + 950 50.0 0.12 0.67 4.00
3 + 950 - 4 + 000 50.0 0.12 0.67 4.00
4 + 000 - 4 + 050 50.0 0.12 0.67 4.00
4 + 050 - 4 + 100 50.0 0.12 0.67 4.00
4 + 100 - 4 + 150 50.0 0.12 0.67 4.00
4 + 150 - 4 + 200 50.0 0.12 0.67 4.00
4 + 200 - 4 + 250 50.0 0.12 0.67 4.00
4 + 250 - 4 + 300 50.0 0.12 0.67 4.00
4 + 300 - 4 + 350 50.0 0.12 0.67 4.00
4 + 350 - 4 + 400 50.0 0.12 0.67 4.00

PANJANG 4400.00

TOTAL (M) 354.00

KONSULTAN PENGAWAS KONTRAKTOR


CV. DINAMIKA CONSULTANT CV. INDO ARTHA PERSADA

ALFIAN OBIN SANDRA JAYA


WAKIL DIREKTUR DIREKTUR

PEJABAT PELAKSANA TEKNIS KEGIATAN


DPUPRKP KABUPATEN REJANG LEBONG
(PPTK)

EDY KUSNADI, ST
NIP. 198606617 201902 1 001

Anda mungkin juga menyukai