1. Penyetelan
Over Current Relay : Earth Faulth Relay :
Arus Setting : 0.60 x In Amp. Arus Setting : 0.050 x In Amp.
td / t : 0.110 (SI-IEC) td / t : 0.100 (SI-IEC)
Inst. : 4.00 x In Amp. Inst. : 0.40 x In Amp.
td / t : 0.00 (DT) td / t : 0.00 (DT)
3. Instantaneous
4. Kesimpulan/Hasil Pengujian
Visual Ok
Circuit Baik
Hasil Test Baik
Hasil Function Test Ok
2/3/2021
PT PLN (PERSERO)
FORMULIR HASIL PENGUJIAN OVER
UIP3B SUMATERA CURRENT SISTEM MANAJEMEN MUTU
ISO 9001:2015
& GROUND FAULT RELAY
PHASA R
1.2000
1.1160
1.0000
0.8000
0.7070
0.6000
0.4790
0.4000
0.2000
0.0000
200% 300% 500%
PHASA R
PHASA S
1.2000
1.1160
1.0000
0.8000
0.7070
0.6000
0.4790
0.4000
0.2000
0.0000
200% 300% 500%
PHASA S
PHASA T
1.2000
1.1160
1.0000
0.8000
0.7070
0.6000
0.4790
0.4000
0.2000
0.0000
200% 300% 500%
PHASA T
GROUND FAULT
1.4000
1.2000 1.2480
1.0000
0.8000 0.7380
0.6000
0.4860
0.4000
0.2000
0.0000
200% 300% 500%
GROUND FAULT
0.0000
200% 300% 500%
GROUND FAULT