Lokasi/Gardu Induk : SUNGAI RUMBAI


Bay : F. TRANSCO UTAMA

Merk/Type : REYROLLE/7SR22 S/N. GF1604502895 Rasio CT : 600 / 5 I nom : 5A

1. Penyetelan
Over Current Relay : Earth Faulth Relay :
Arus Setting : 0.60 x In Amp. Arus Setting : 0.050 x In Amp.
td / t : 0.110 (SI-IEC) td / t : 0.100 (SI-IEC)
Inst. : 4.00 x In Amp. Inst. : 0.40 x In Amp.
td / t : 0.00 (DT) td / t : 0.00 (DT)

2. Arus Kerja Minimum

Setting Pickup Reset Deviasi Karakteristik Waktu (sec)


No. Fasa
(Amp) (Amp) (Amp) (%) 200% 300% 500%
1 R 3.00 3.022 3.006 99.471 1.1160 0.7070 0.4790
2 S 3.00 3.022 3.006 99.471 1.1160 0.7070 0.4790
3 T 3.00 3.022 3.006 99.471 1.1160 0.7070 0.4790
4 N 0.25 0.292 0.280 95.890 1.2480 0.7380 0.4860

3. Instantaneous

Arus Kerja Waktu Kerja Setting Instantaneous


Fasa
(Amp) (sec) (Amp)
R 22.00 0.041 20.00
S 22.00 0.041 20.00
T 22.00 0.041 20.00
N 2.20 0.361 2.00

4. Kesimpulan/Hasil Pengujian
Visual Ok
Circuit Baik
Hasil Test Baik
Hasil Function Test Ok

Tanggal Pelaksana Mengetahui Menyetujui

2/3/2021
PT PLN (PERSERO)
FORMULIR HASIL PENGUJIAN OVER
UIP3B SUMATERA CURRENT SISTEM MANAJEMEN MUTU
ISO 9001:2015
& GROUND FAULT RELAY

No. Dokumen FR-TRS-BOP-014 Tanggal 06 JUNI 2019


Revisi 1 Halaman 1 dari 1

KURVA HASIL UJI RELAY OCR-GFR

PHASA R
1.2000
1.1160
1.0000
0.8000
0.7070
0.6000
0.4790
0.4000
0.2000
0.0000
200% 300% 500%

PHASA R

PHASA S
1.2000
1.1160
1.0000
0.8000
0.7070
0.6000
0.4790
0.4000
0.2000
0.0000
200% 300% 500%

PHASA S

PHASA T
1.2000
1.1160
1.0000
0.8000
0.7070
0.6000
0.4790
0.4000
0.2000
0.0000
200% 300% 500%

PHASA T

GROUND FAULT
1.4000
1.2000 1.2480
1.0000
0.8000 0.7380
0.6000
0.4860
0.4000
0.2000
0.0000
200% 300% 500%

GROUND FAULT
0.0000
200% 300% 500%

GROUND FAULT