Anda di halaman 1dari 5
ST 3281 Mertsda Pelaksanaan Konswuts Tugas 8 - Concrere Formwork 4 Steel Conswuction Nama Laily Wahyu Muntila Nim Isd1e109 Problem 1 Design formwork tebal ¢loor slab = Isa mm Shui « a Renurp —lanrai = oyu at mm ‘Jout = Kays S0x200 mm Granger WO x 200 mm Recat formwork = 0.24 Ffo Hox deglecnn == Aug Minimem valve of LL = 2.4 Kho Concrete — densiry 240% kg/m? Determine = Jour Spacing = guringer spacing - chore spacing Jouiob + Hirwng beban toral design Bebon foral = Uaneree = 0.152 ¥ 9H KAAOZ/ow = 3:58 Kha Formuort = 9.04 Ka {we load = saa Ka Roban total = = 22 Ka > Deck design TBebon yang bekeqa pada deck TI W = bebon roral Kaeo biz | - a + 6.22 EN/m Jost = Bending (tabet 13-SA} Zor mere span - wand : ‘s tary Yh 2s 1X9 (mee) * = gaqajst mm a2 7 tabel (7 ~4 Sheor (Fabel B-SA} 3 /or more spor - wed Ae Ul fva 4 ad yoo we heli , bw K\WNIS 4 (axig) = 4106.9, mm tow 6.32 = Dexlecrion ae a) (ney? [ovo two \ wa Te (pier 702.85 mm Jow ya Kba2 Dan pehnngan bed bending » sheer, dan deplecnon, didoparkan Panjang benvang —sheanng maksinvm (oak aniva jour) Sebeur 102.85 mm 4 Jorak ontora your dipith sebesar GID mm © Joist design Beban pada yout » we O61 xx 6.22 Fta We 3.79 N/m ID mm > Bending 1 = 100 gia x aasaxwe 700 ee = agia,74 mm > Shear ell Akt BvA gad = tll VAAL KTOL + (ax 1B4) = 2918.02 mm {p00 1000 379) > Deflecnon : h ‘ ‘ Ae (=) , Ba, (sax! wots \ = an3.38 mn wooo \ (ov 3.19 Dor pecwngan — bending cheor . don deslecon didapatton Panjang benrang Jost moksimvn 2219.74 mm . Panjang banrang tessebut menrakan eck conor seanger. Haka dipih yok anrac gringer — 2[00 mm * Stringer design Beban pada singer sue Wer Qi xt x @-2a = 13.06 N/m | sme -—_ 2100 mm . Bending gj (fo Y!* tov (8e194 5.004 10 J. R20. 48 mm s : a) “000 13 0b 3 sheor : fel TWA gad = 1 (ae wve-37K102 \ 4 caxtgq) = 2084.63 mm ae yoo WR0b 3 pele 72.8 aT = 2399.2 mm \ 2 Re (ee 4b.26x 10° poo ee ) a 13. 06 Didopatkan pang beniang maksmum —Smngar Yours 1820.88 am," maka diombil —panjeng benang Sirng-¢ 7 shore spaang sebesor (800 mm © Cok shore simength Renrang makin sinnge~ f= Shore sme noth Jood pe unte Wngrh of Smnge- Dar hail tersebut, panyang bevang mofymum — stanger dibarafi Olth Relwaren Shore. maka diambil yok onve~ chore — Yaw jad mm + Check for Cushing dilakokon Pada pelerakon Jour pada Sinnge- pengecekon P= bebon jout x jvak anty singer 7 3.19 Ka.1 = 7.96 EN Georng reo = 38x89 * 3299 mm 2 fe-t £1.96 KIdDe , 2353.64 Had 2732 Fla tol! 2382 * Final design Decking = aSmm Ckcbat) Joust = SDXQ0 mm dengor spasi GID mm Cronin a Arnnger {uo x 20D mm dengan pas Quo mm Shore = Aneval asp mm 4 Sool 2G qa unwk memenksa Kvaltas los yada sambungan suk baa © Meyda X78 Gambungan awak (e000 wyval dengan banvan gamba X-ray + Moda ulbasonte Pada metode Int, Keienjongen pada sambunger aye dapar dileerahi dengon adanyo pevbahr fuen ulrrarenile Yang melali sambunger Semokin hnnggi pewbahen. maka wares (as jemakin buME © Hake erch Pode merode im. sambungen las dipotong, melnurang tuhadap Sumbu !a? don Ferwdta dibenkonlawrein yoda bain yang twpctong * Peel keshng Pada meode wi + ‘sompel (as dusbek dan ukwan yong tutta diamah ayokoh sesvai Sposifikasi arou dak + Cquided bond ten Pada mehode Ini. sampel dibeng hokkan (80. ” dan dipertaa secon viol pakah ada caces / kverakan.

Anda mungkin juga menyukai