PT PLN (PERSERO)

TRANSMISI JAWA BAGIAN BARAT


APP DURIKOSAMBI

DAFTAR MUTASI MATERIAL CADANG


GUDANG : APP DURIKOSAMBI
BULAN : OKTOBER 2017

No. Katalog Fisik Material


No. Deskripsi Material Merk Type Satuan No. & Tgl. TUG Lokasi Kontrak
Material
Saldo Awal Masuk Keluar Saldo Akhir

1 1002070196 PT;150KV;K;CAP;150V3-100V3X2;0,2;100VA TRENCH TCVT 170 buah 1 1 GI Maximangando Kontrak No. 357.PJ/611/P3B/2012

1002070196 PT;150KV;K;CAP;150V3-100V3X2;0,2;100VA TRENCH TCVT 170 buah 5 5 GI Cengkareng Kontrak No. 357.PJ/611/P3B/2012
- Penggantian CVT Fasa S Bay Cikupa 2 GI Balaraja
1002070196 PT;150KV;K;CAP;150V3-100V3X2;0,2;100VA TRENCH TCVT 170 buah 1 1 0 Lama (TUG 9 No 00130 Tgl 28/03/2017) GI Jatake Kontrak No. 357.PJ/611/P3B/2012
2
1002050019 CT;150kV;K;500-1000/5-5-5;5P20;80VA;P TRENCH buah 3 3 GI Maximangando Kontrak No. 350.PJ/611/P3B/2012

3 1001020007 TRF PWR;GIS;500/150kV;1P;166MVA;YnYno;OD GEC ALSTHOM unit 1 1 GITET Kembangan Transfer Posting

4 1002054228 CT;150KV;K;0.15-2-4KA/4X5;5P20;35VA;P CG LIMITED 105K:170/235/750 buah 1 1 GI Jatake Kontrak No. 355.PJ/P3B/2013


Peruntukan IBT 2 GISTET Kembangan 2 buah
5 (TUG 9 No 00373 Tgl 02/03/2017)
1002054248 CT;150KV;K;2000-4000/4X5;5P20;40VA;P CG LIMITED 105K:170/235/750 buah 3 2 1 GI Angke Kontrak No. 355.PJ/P3B/2013

6 1002030002 DS;K;150kV;3P;1250A;40kA;;OD unit 1 1 GI Ciledug Kontrak No. 225.PJ/611/P3B/2014

1002030002 DS;K;150kV;3P;1250A;40kA;;OD unit 1 1 GI Maximangando Kontrak No. 225.PJ/611/P3B/2014

7 1002030008 DS;K;150kV;3P;3150A;40 kA;;OD unit 1 1 GI Cikupa Kontrak No. 225.PJ/611/P3B/2014

8 1003110096 CABLE PWR;OIL CU;1X800mm2;150kV;UG meter 250 250 0 GI Durikosambi Transfer Posting

9 1003130087 JOINT;150kV;CU-CU;800mm2;;1P;PR TAIHAN buah 2 2 APP Durikosambi kontrak No.599.PJ/DAN.02.02/P3B/2015


- Penggantian LA Bay Trafo4 GI Tangerang Lama
10 1002090059 LA;150KV;K;10KA;GAPLESS;3;170KV SIEMENS unit 20 3 17 3 unit (TUG 9 No 00500 Tgl 23/10/2017) APP Durikosambi kontrak No : 145.PJ/DAN.02.02/TJBB/2016

11 1003050013 CONDUCTOR;ACSR;107.98mm2;60.7kN mtr 437 437 APP Durikosambi

Jakarta, 01 November2017
Mengetahui, Penanggung Jawab Gudang
Asman Admum

AGUS WIBOWO DULFATAH


PT PLN (PERSERO)
TRANSMISI JAWA BAGIAN BARAT
APP DURIKOSAMBI

DAFTAR MUTASI MATERIAL PERSEDIAAN


GUDANG : APP DURIKOSAMBI
BULAN : OKTOBER 2017

No. Katalog Fisik Material


No. Deskripsi Material Merk Type Satuan No. & Tgl. TUG Lokasi Keterangan
Material Saldo Awal Masuk Keluar Saldo Akhir
- Trafo 3 GI Milenium (TUG 9 No 00372 Tgl
1 2190731 MTR;KWH;3P;110V;2000/5A;0.2;MT;4W buah 1 1 0 29/09/2017) APP Durikosambi Pengadaan

2 3070091 ISOLATOR;AFOG;GLASS;150kV;DISC;120kN buah 2030 2030 GI Tangerang Lama Kontrak No. 140.PJ/MUM.01.02/TJBB/2016

3 3070092 ISOLATOR;AFOG;GLASS;150kV;DISC;160kN; buah 500 500 GI Tangerang Lama Kontrak No. 140.PJ/MUM.01.02/TJBB/2017
4 4180001 INSUL MEDIA;GAS;SF6 kg 120 120 BC Cikupa
- Recovery IBT 1 GIS Kembangan 400 kg (TUG 9
No 00497 Tgl 13/03/2017)
5 4180001 INSUL MEDIA;GAS;SF6 kg 600 520 80 - Penambahan GAS SF6 Sealing End & Kompartemen APP Durikosambi No : 050.SPKPB/DAN.02.02/APPDKSI/2017
CT GIS Grogol 120 kg (TUG 9 No
00498 Tgl 26/10/2017)

6 4180007 INSUL MEDIA;OIL;SHELL SHELL liter 2926 2926 APP Durikosambi No : 049/SPKPB/DAN.02.02/APPDKSI/2017
7 4180007 INSUL MEDIA;OIL;SHELL SHELL liter 8360 8360 APP Durikosambi No : 048/SPKPB/DAN.02.02/APPDKSI/2017
Penambahan Minyak Kabel SKTT 150 Kv Durikosambi -
8 4180004 INSUL MEDIA;OIL;UNDER GROUND CABLE TOTAL ISOLEC KL-23 liter 1000 1000 0 Kembangan (TUG 9 No 00492 Tgl 27/07/2017) APP Durikosambi No : 077.SPKPB/DAN.02.02/APPDKSI/2017

Jakarta, 01 November2017
Mengetahui, .
Asman Admum

AGUS WIBOWO DULFATAH