Anda di halaman 1dari 89

CBR Tanah dasar kelompok 1

STA CBR STA CBR STA CBR STA


85+000 4.99 86+000 5.88 87+000 5.48 88+000
85+100 1 86+100 5.36 87+100 5.48 88+100
85+200 6.22 86+200 5.23 87+200 5.15 88+200
85+300 7.94 86+300 5.87 87+300 5.92 88+300
85+400 5.88 86+400 4.69 87+400 5.04 88+400
85+500 6.92 86+500 6.47 87+500 5.04 88+500
85+600 6.66 86+600 6.92 87+600 5.02 88+600
85+700 6.61 86+700 5.17 87+700 5.07 88+700
85+800 5.36 86+800 5.11 87+800 6.07 88+800
85+900 5.1 86+900 5.44 87+900 5.78 88+900
89+000

BETON = K 350 TIPE JALAN =

UMUR RENCANA = 20 TAHUN

DATA LALU LINTAS TAHUN 2019

JUMLAH PERTUMBUHAN
JENIS KENDARAAN
KENDARAAN LALU LINTAS

MOBIL PENUMPANG 3327 9.00%


Pick up dkk 1560 7.45%
BUS KECIL 447 1.80%
BUS BESAR 1190 1.80%
TRUK RINGAN 1.2L 2103 7.45%
TRUK SEDANG 1.2H 859 7.45%
TRUK 1.22 835 7.45%
TRUK GANDENG 4 SUMBU 832 7.45%
TRAILER 123 7.45%
DATA HARGA SATUAN PEKERJAAN

TABEL HARGA SATUAN TAHUN 2019


CBR STA CBR
NO
5.22
5.17 1
7.17 2
9.15 3
7.67 4
5.5 5
6.56 6
1.2 7
7.18
8.92 TABEL HARGA SEWA ALAT TAHUN 2019
7.12 NO
1
4 LAJUR 2 ARAH TAK TERBAGI (4/2UD) 2
3
4
5
6
7

8
9
10
11
12
13
14
15
16
17
18
19

Tabel Harga Barang


NO
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
DATA HARGA SATUAN PEKERJAAN

TABEL HARGA SATUAN TAHUN 2019


URAIAN SATUAN HARGA SATUAN (Rp)
sehri merja
Pekerjaan jam Rp 7,945 8 Rp 63,560
Tukang jam Rp 9,746 8 Rp 77,968
Mandor jam Rp 12,162 8 Rp 97,296
Kep. Tukang jam Rp 10,922 8 Rp 87,376
Operator jam Rp 10,922 8 Rp 87,376
Sopir/driver jam Rp 9,268 8 Rp 74,144
Mekanik jam Rp 11,749 8 Rp 93,992

TABEL HARGA SEWA ALAT TAHUN 2019


URAIAN SATUAN HARGA(Rp) Ket. jam kerja
Aspal Mixing Plan jam Rp 8,062,466 8
Aspal Finisher jam Rp 467,903 8
Aspal Sprayer jam Rp 49,687 8
Aspal Liquid Mixer jam Rp 168,181 8
Bulldozer 100-150 Hp jam Rp 738,277 8
Compressor 6000-6500 jam Rp 169,235 8
Dump Truck 10T jam Rp 351,181 8

Excavator 80-140 HP jam Rp 584,700 8


Generator Set jam Rp 420,460 8
Motor Grader >100Hp jam Rp 557,031 8
Wheel Loader 1.0-1.6 jam Rp 365,033 8
Tandem Roller 6-8T jam Rp 139,264 8
Vibrator Roller 5-8T jam Rp 335,346 8
Concrete Vibrator jam Rp 39,397 8
Water Pump 70-100ml jam Rp 37,258 8
Water Tanker (s) 3000-4500L jam Rp 247,981 8
Pedestrian Roller jam Rp 111,851 8
Concrete Pump jam Rp 321,305 8
Welding Set jam Rp 132,951 8

Tabel Harga Barang


NAMA BAHAN SATUAN HARGA (Rp)
Agregat Kasar m³ Rp 210,897
Agregat Halus m³ Rp 210,897
Filler kg Rp 1,534
Kerosen/ Minyak Tanah lt Rp 11,683
Semen /PC (40kg) zak Rp 61,354
Paku kg Rp 16,207
Bensin lt Rp 10,230
Solar lt Rp 11,324
Minyak Pelumas lt Rp 40,517
Bahan Agr. Base kelas A m³ Rp 236,846
Bahan Agr. Base kelas B m³ Rp 208,638
Bahan Agr. Base kelas C m³ Rp 194,040
Aspal kg Rp 11,697
Agregat pecah mesin 0-5 mm m³ Rp 210,897
Agregat pecah mesin 5-10 dan 10-20 mm m³ Rp 210,897
Agregat pecah mesin 20-30 mm m³ Rp 210,897
Batu Belah/Kerakal m³ Rp 141,809
Rp 64,499,728
Rp 3,743,224
Rp 397,496
Rp 1,345,448
Rp 5,906,216
Rp 1,353,880
Rp 2,809,448

Rp 4,677,600
Rp 3,363,680
Rp 4,456,248
Rp 2,920,264
Rp 1,114,112
Rp 2,682,768
Rp 315,176
Rp 298,064
Rp 1,983,848
Rp 894,808
Rp 2,570,440
Rp 1,063,608
tipe jalan 2
bton 4
ur 2
cbr 2
data ll 1
Harga Satuan
KODE URAIAN
(Rp)
A PEKERJAAN PERSIAPAN

1. 1m2 PEMBERSIHAN LOKASI


Upah
0.050 Oh Mandor
0.100 Oh Pekerja
Sub Jumlah

2. 1 m1 PENGUKURAN dan PEMASANGAN BOUWPLANK


Bahan
0.008 m³ Kayu kasau meranti
0.005 m³ Papan meranti
0.020 kg Paku
Upah
0.005 Oh Mandor
0.010 Oh Kepala tukang kayu
0.100 Oh Tukang kayu
0.100 Oh Pekerja
Sub Jumlah

3. 1m2 PEMASANGAN DIREKSI KEET


Bahan
0.010 m³ Kayu Meranti
0.850 m2 Triplek
0.750 lbr Seng
0.200 kg Paku
Upah
0.250 Oh Mandor
0.014 Oh Pekerja
Sub Jumlah

KODE URAIAN

B PEKERJAAN TANAH

1. 1m3 GALIAN TANAH BIASA SEDALAM 1 M


Upah
0.040 Oh Mandor
0.400 Oh Pekerja
Sub Jumlah

2. 1m3 GALIAN TANAH BIASA SEDALAM 2 M


Upah
0.052 Oh Mandor
0.526 Oh Pekerja
Sub Jumlah

3. 1m3 URUGAN TANAH KEMBALI


Upah
0.019 Oh Mandor
0.192 Oh Pekerja
Sub Jumlah

4. 1m3 URUGAN TANAH


Bahan
1.200 m³ Tanah urug
Upah
0.010 Oh Mandor
0.300 Oh Pekerja
Sub Jumlah

5. 1m3 URUGAN PASIR


Bahan
1.200 m³ Pasir urug
Upah
0.010 Oh Mandor
0.300 Oh Pekerja
Sub Jumlah

KODE URAIAN

C PEKERJAAN PONDASI

1. 1m3 PASANGAN BATU KOSONG (ANSTAMPING)


Bahan
1.200 m³ Batu kali
0.300 m³ Pasir urug
Upah
0.039 Oh Mandor
0.039 Oh Kepala tukang batu
0.390 Oh Tukang batu
0.780 Oh Pekerja
Sub Jumlah

2. 1m3 PASANGAN BATU KALI 1PC : 5 PS


Bahan
1.100 m³ Batu kali pecah 15/20
136.000 kg Semen / PC (kg)
0.544 m³ Pasir pasang
Upah
0.075 Oh Mandor
0.060 Oh Kepala tukang batu
0.600 Oh Tukang batu
1.500 Oh Pekerja
Sub Jumlah

KODE URAIAN

D PEKERJAAN DINDING
1. 1m2 PASANGAN BATU MERAH 1/2 BATA 1 PC : 3 PS
Bahan
70.000 bh Batu merah 5 x 11 x 22 cm
14.370 kg Semen / PC (kg)
0.040 m³ Pasir pasang
Upah
0.015 Oh Mandor
0.010 Oh Kepala tukang batu
0.100 Oh Tukang batu
0.320 Oh Pekerja
Sub Jumlah

2. 1m2 PASANGAN BATU MERAH 1/2 BATA 1 PC : 6 PS


Bahan
70.000 bh Batu merah 5 x 11 x 22 cm
8.320 kg Semen / PC (kg)
0.049 m³ Pasir pasang
Upah
0.015 Oh Mandor
0.010 Oh Kepala tukang batu
0.100 Oh Tukang batu
0.320 Oh Pekerja
Sub Jumlah

KODE URAIAN

E PEKERJAAN PLESTERAN

1. 1m2 PLESTERAN 1 PC : 3 PS , t = 15 mm
Bahan
6.480 kg Semen / PC (kg)
0.019 m³ Pasir pasang
Upah
0.010 Oh Mandor
0.015 Oh Kepala tukang batu
0.150 Oh Tukang batu
0.200 Oh Pekerja
Sub Jumlah
2. 1m 2
PLESTERAN 1 PC : 6 PS, t = 15 mm
Bahan
3.680 kg Semen / PC (kg)
0.023 m³ Pasir pasang
Upah
0.010 Oh Mandor
0.015 Oh Kepala tukang batu
0.150 Oh Tukang batu
0.200 Oh Pekerja
Sub Jumlah

3. 1m1 BENANGAN SUDUT


Bahan
6.500 kg Semen / PC (kg)
0.021 m³ Pasir pasang
Upah
0.000 Oh Mandor
0.000 Oh Kepala tukang batu
0.120 Oh Tukang batu
0.000 Oh Pekerja
Sub Jumlah

KODE URAIAN

F PEKERJAAN KAYU

1. 1m3 PASANG KUSEN PINTU & JENDELA KAYU JATI


Bahan
1.100 m³ Kayu Jati balok
Upah
0.300 Oh Mandor
2.000 Oh Kepala tukang kayu
20.000 Oh Tukang kayu
6.000 Oh Pekerja
Sub Jumlah

2. 1m2 PASANG PINTU PANEL KAYU JATI


Bahan
0.040 m³ Kayu Jati papan
Upah
0.050 Oh Mandor
0.250 Oh Kepala tukang kayu
2.500 Oh Tukang kayu
1.000 Oh Pekerja
Sub Jumlah

3. 1m2 PASANG PINTU & JENDELA KACA KAYU JATI


Bahan
0.035 m³ Kayu Jati papan
Upah
0.800 Oh Mandor
2.000 Oh Kepala tukang kayu
0.200 Oh Tukang kayu
0.040 Oh Pekerja
Sub Jumlah

4. 1m3 PASANG KONSTRUKSI KUDA KUDA KAYU JATI


Bahan
1.100 m³ Kayu Jati balok
15.000 kg Besi strip
0.800 kg Paku kayu segala ukuran
Upah
0.200 Oh Mandor
1.200 Oh Kepala tukang kayu
12.000 Oh Tukang kayu
4.000 Oh Pekerja biasa
Sub Jumlah

5. 1m2 PASANG KASO + RENG GENTENG KODOK KAYU JATI


Bahan
0.012 m³ Kayu Jati usuk / reng
0.150 kg Paku kayu segala ukuran
Upah
0.005 Oh Mandor
0.010 Oh Kepala tukang kayu
0.100 Oh Tukang kayu
0.100 Oh Pekerja biasa
Sub Jumlah

6. 1m2 PASANG RANGKA LANGIT - LANGIT HOLLOW


Bahan
0.023 bh Kayu Jati usuk
0.150 kg Paku kayu segala ukuran
Upah
0.010 Oh Mandor
0.030 Oh Kepala tukang kayu
0.300 Oh Tukang kayu
0.200 Oh Pekerja biasa
Sub Jumlah

7. 1m1 PASANG LISPLANG ( 2 x 30 ) cm, KAYU MERANTI


Bahan
0.011 m³ Kayu meranti (papan)
0.050 kg Paku kayu segala ukuran
Upah
0.005 Oh Mandor
0.022 Oh Kepala tukang kayu
0.220 Oh Tukang kayu
0.110 Oh Pekerja biasa
Sub Jumlah

8. 1m1 PASANG LIST PLAFON KAYU PROFIL


Bahan
1.000 m' Kayu profil
Upah
0.001 Oh Mandor
0.002 Oh Kepala tukang kayu
0.021 Oh Tukang kayu
0.021 Oh Pekerja
Sub Jumlah

KODE URAIAN

G PEKERJAAN BETON

1. 1m3 LANTAI KERJA BETON 1 PC : 3 PS : 5 KR


Bahan
10.000 kg Semen / PC (kg)
0.026 m³ Pasir beton
0.044 m³ Batu pecah/koral (mesin)
Upah
0.006 Oh Mandor
0.002 Oh Kepala tukang batu
0.020 Oh Tukang batu
1.150 Oh Pekerja
Sub Jumlah

2. 1m3 BETON BERTULANG 1 PC : 2 PS : 4 KR


Bahan
280.000 kg Semen / PC (kg)
0.450 m³ Pasir beton
0.900 m³ Batu pecah/koral (mesin)
Upah
0.080 Oh Mandor
0.025 Oh Kepala tukang batu
0.250 Oh Tukang batu
1.650 Oh Pekerja
Sub Jumlah

3. kg PEMBESIAN ( POLOS )
Bahan
1.050 kg Besi beton
0.015 kg Kawat beton
Upah
0.000 Oh Mandor
0.001 Oh Kepala tukang besi
0.007 Oh Tukang besi
0.007 Oh Pekerja
Sub Jumlah

4. 1m2 PASANG BEKISTING PONDASI


Bahan
0.040 m³ Kayu papan bekesting
0.300 kg Paku biasa 2" - 5"
0.100 ltr Minyak bekisting
Upah
0.005 Oh Mandor
0.026 Oh Kepala tukang kayu
0.260 Oh Tukang kayu
0.300 Oh Pekerja
Sub Jumlah

5. 1m2 PASANG BEKISTING SLOOF


Bahan
0.045 m³ Kayu papan bekesting
0.300 kg Paku biasa 2" - 5"
0.100 ltr Minyak bekisting
Upah
0.005 Oh Mandor
0.026 Oh Kepala tukang kayu
0.260 Oh Tukang kayu
0.300 Oh Pekerja
Sub Jumlah

6. 1m2 PASANG BEKISTING KOLOM


Bahan
0.040 m³ Kayu papan bekesting
0.400 kg Paku biasa 2" - 5"
0.200 ltr Minyak bekisting
0.015 m³ Kayu meranti ( balok)
0.350 lbr Plywood , t = 9mm
2.000 btg Dolken Ø 8 - 10 / 4m
Upah
0.006 Oh Mandor
0.033 Oh Kepala tukang kayu
0.330 Oh Tukang kayu
0.300 Oh Pekerja
Sub Jumlah

7. 1m2 PASANG BEKISTING BALOK


Bahan
0.040 m³ Kayu papan bekesting
0.400 kg Paku biasa 2" - 5"
0.200 ltr Minyak bekisting
0.018 m³ Kayu meranti ( balok)
0.350 lbr Plywood , t = 9mm
2.000 btg Dolken Ø 8 - 10 / 4m
Upah
0.006 Oh Mandor
0.033 Oh Kepala tukang kayu
0.330 Oh Tukang kayu
0.320 Oh Pekerja
Sub Jumlah

8. 1m2 PASANG BEKISTING LANTAI


Bahan
0.040 m³ Kayu papan bekesting
0.400 kg Paku biasa 2" - 5"
0.200 ltr Minyak bekisting
0.015 m³ Kayu meranti ( balok)
0.350 lbr Plywood , t = 9mm
6.000 btg Dolken Ø 8 - 10 / 4m
Upah
0.006 Oh Mandor
0.033 Oh Kepala tukang kayu
0.330 Oh Tukang kayu
0.320 Oh Pekerja
Sub Jumlah

9. 1m2 PASANG BEKISTING DINDING


Bahan
0.030 m³ Kayu papan bekesting
0.400 kg Paku biasa 2" - 5"
0.200 ltr Minyak bekisting
0.020 m³ Kayu meranti ( balok)
0.350 lbr Plywood , t = 9mm
3.000 btg Dolken Ø 8 - 10 / 4m
4.000 bh Formtie / spacer
Upah
0.006 Oh Mandor
0.033 Oh Kepala tukang kayu
0.330 Oh Tukang kayu
0.320 Oh Pekerja
Sub Jumlah

10. 1m2 PASANG BEKISTING TANGGA


Bahan
0.030 m³ Kayu papan bekesting
0.400 kg Paku biasa 2" - 5"
0.150 ltr Minyak bekisting
0.015 m³ Kayu meranti ( balok)
0.350 lbr Plywood , t = 9mm
2.000 btg Dolken Ø 8 - 10 / 4m
Upah
0.006 Oh Mandor
0.033 Oh Kepala tukang kayu
0.330 Oh Tukang kayu
0.320 Oh Pekerja
Sub Jumlah

11. 1m3 BUAT BETON MUTU K 350


Bahan
388.000 kg Semen / PC (kg)
0.650 m³ Pasir beton
0.650 m³ Batu pecah/koral ( tangan )
Upah
0.300 Oh Mandor
0.100 Oh Kepala tukang batu
1.000 Oh Tukang batu
6.000 Oh Pekerja
Sub Jumlah

KODE URAIAN

H PEKERJAAN ATAP

1. 1m2 PAS. ATAP GENTENG KODOK


Bahan
25.000 bh Genteng kodok glazuur
Upah
0.008 Oh Mandor
0.008 Oh Kepala tukang kayu
0.075 Oh Tukang kayu
0.150 Oh Pekerja
Sub Jumlah

2. 1m1 PAS. BUBUNG KODOK


Bahan
5.000 bh Bubung genteng kdk glazuur
8.000 kg Semen / PC (kg)
0.032 m³ Pasir pasang
Upah
0.002 Oh Mandor
0.020 Oh Kepala tukang kayu
0.200 Oh Tukang kayu
0.400 Oh Pekerja
Sub Jumlah

KODE URAIAN
KODE URAIAN

I PEKERJAAN LANGIT-LANGIT

1. 1m2 PAS. LANGIT LANGIT GYPSUM BOARD


Bahan
0.350 lbr Gypsumboard
0.030 kg Paku segala ukuran
0.390 bh Paku skrup
Upah
0.004 Oh Mandor
0.010 Oh Kepala tukang kayu
0.100 Oh Tukang kayu
0.070 Oh Pekerja
Sub Jumlah

2. 1m1 PAS. LIST LANGIT - LANGIT GYPSUM


Bahan
1.100 m' List gypsum
0.050 kg Lem kayu
Upah
0.003 Oh Mandor
0.005 Oh Kepala tukang kayu
0.050 Oh Tukang kayu
0.050 Oh Pekerja
Sub Jumlah

KODE URAIAN

J PEKERJAAN KERAMIK

1. 1m2 PASANG LANTAI KERAMIK 30 x 30 cm WARNA / MOTIF


Bahan
11.870 bh Ubin keramik 30 x 30 cm
11.380 kg Semen / PC (kg)
0.042 m³ Pasir pasang
1.500 kg Semen warna
Upah
0.030 Oh Mandor
0.035 Oh Kepala tukang batu
0.350 Oh Tukang batu
0.620 Oh Pekerja
Sub Jumlah

2. 1m2 PASANG LANTAI KM / WC KERAMIK 20 x 20 cm


Bahan
25.000 bh tegel keramik 20 x 20 cm
11.380 kg Semen / PC (kg)
0.042 m³ Pasir pasang
1.500 kg Semen warna
Upah
0.030 Oh Mandor
0.035 Oh Kepala tukang batu
0.350 Oh Tukang batu
0.620 Oh Pekerja
Sub Jumlah

3. ` PASANG DINDING PORSELIN 20 x 25 cm WARNA / MOTIF


Bahan
45.000 bh Tegel keramik 20 x 25 (dinding)
9.300 kg Semen / PC (kg)
0.018 m³ Pasir pasang
1.500 kg Semen warna
Upah
0.030 Oh Mandor
0.045 Oh Kepala tukang batu
0.450 Oh Tukang batu
0.600 Oh Pekerja
Sub Jumlah

KODE URAIAN

K PEKERJAAN KUNCI & KACA

1. 1 bh PASANG KUNCI TANAM BIASA


Bahan
1.000 bh Kunci tanam biasa
Upah
0.005 Oh Mandor
0.010 Oh Kepala tukang kayu
0.500 Oh Tukang kayu
0.010 Oh Pekerja
Sub Jumlah

2. 1 bh PASANG KUNCI TANAM KAMAR MANDI


Bahan
1.000 bh Kunci tanam kamar mandi
Upah
0.003 Oh Mandor
0.005 Oh Kepala tukang kayu
0.500 Oh Tukang kayu
0.005 Oh Pekerja
Sub Jumlah

3. 1 bh PASANG ENGSEL PINTU


Bahan
1.000 bh Engsel pintu
Upah
0.001 Oh Mandor
0.015 Oh Kepala tukang kayu
0.150 Oh Tukang kayu
0.015 Oh Pekerja
Sub Jumlah

4. 1 bh PASANG ENGSEL JENDELA


Bahan
1.000 bh Engsel jendela
Upah
0.001 Oh Mandor
0.010 Oh Kepala tukang kayu
0.100 Oh Tukang kayu
0.010 Oh Pekerja
Sub Jumlah

5. 1 bh PASANG GRENDEL PINTU


Bahan
1.000 bh Grendel Pintu
Upah
0.001 Oh Mandor
0.015 Oh Kepala tukang kayu
0.150 Oh Tukang kayu
0.015 Oh Pekerja
Sub Jumlah

6. 1 bh PASANG GRENDEL JENDELA


Bahan
1.000 bh Grendel Jendela
Upah
0.001 Oh Mandor
0.010 Oh Kepala tukang kayu
0.100 Oh Tukang kayu
0.010 Oh Pekerja
Sub Jumlah

7. 1 bh PASANG REL PINTU DORONG


Bahan
1.000 bh Rel pintu dorong
Upah
0.003 Oh Mandor
0.060 Oh Kepala tukang kayu
0.600 Oh Tukang kayu
0.060 Oh Pekerja
Sub Jumlah

8. 1 bh PASANG KACA RAYBEN t = 5 mm


Bahan
1.100 m2 Kaca rayban tb. 5 mm
Upah
0.001 Oh Mandor
0.015 Oh Kepala tukang kayu
0.150 Oh Tukang kayu
0.015 Oh Pekerja
Sub Jumlah

KODE URAIAN

L PEKERJAAN BESI & ALUMINIUM

1. 1m2 PASANG ROLLING DOOR


Bahan
1.000 m² Rolling door
Upah
0.005 Oh Mandor
0.105 Oh Kepala tukang besi
1.050 Oh Tukang besi
1.500 Oh Pekerja
Sub Jumlah

KODE URAIAN

M PEKERJAAN SANITASI

1. 1 bh PASANG KLOSET JONGKOK PORSELIN Kw A


Bahan
1.000 bh Kloset jongkok porselin Kw A
6.000 kg Semen / PC (kg)
0.010 m³ Pasir pasang
Upah
0.160 Oh Mandor
1.500 Oh Kepala tukang batu
1.500 Oh Tukang batu
1.000 Oh Pekerja
Sub Jumlah

2. 1 bh PASANG WASTAFEL Kw A
Bahan
1.000 bh Wastafel Kw A
6.000 kg Semen / PC (kg)
0.010 m³ Pasir pasang
Upah
0.100 Oh Mandor
0.150 Oh Kepala tukang batu
1.450 Oh Tukang batu
1.200 Oh Pekerja
Sub Jumlah

3. 1 bh PASANG TEMPAT SABUN KERAMIK


Bahan
1.000 bh Tempat sabun
Upah
0.005 Oh Mandor
0.010 Oh Kepala tukang batu
0.100 Oh Tukang batu
0.010 Oh Pekerja
Sub Jumlah

4. 1 bh PASANG BAK MANDI BATU BATA, vol 0.30 m³


Bahan
400.000 bh Batu merah 5 x 11 x 22 cm
120.000 kg Semen / PC (kg)
0.300 m³ Pasir pasang
220.000 bh Porselin 10 x 20 cm
6.000 kg Semen warna
Upah
0.300 Oh Mandor
0.300 Oh Kepala tukang batu
3.000 Oh Tukang batu
6.000 Oh Pekerja
Sub Jumlah

5. 1 m1 PASANG PIPA GALVANIS Ø 1/2"


Bahan
0.300 ljr Pipa galvanis Ø 1/2"
0.350 unit Perlengkapan
Upah
0.027 Oh Mandor
0.009 Oh Kepala Tukang Pipa
0.090 Oh Tukang Pipa
0.054 Oh Pekerja
Sub Jumlah
6. 1 m1 PASANG PIPA PVC AW Ø 2"
Bahan
0.300 m' Pipa PVC AW Ø 2"
0.350 unit Perlengkapan
Upah
0.003 Oh Mandor
0.009 Oh Kepala Tukang Pipa
0.090 Oh Tukang Pipa
0.054 Oh Pekerja
Sub Jumlah

7. 1 m1 PASANG PIPA PVC AW Ø 4"


Bahan
0.300 m' Pipa PVC AW Ø 4"
0.350 unit Perlengkapan
Upah
0.004 Oh Mandor
0.014 Oh Kepala Tukang Pipa
0.135 Oh Tukang Pipa
0.081 Oh Pekerja
Sub Jumlah

8. 1 m1 PASANG KRAN AIR Ø 1/2"


Bahan
1.000 bh Kran air Ø 1/2"
0.025 bh Seal tape
Upah
0.005 Oh Mandor
0.010 Oh Kepala Tukang Pipa
0.100 Oh Tukang Pipa
0.010 Oh Pekerja
Sub Jumlah

9. 1 bh PASANG KACA WASTAFEL


Bahan
1.000 bh Kaca cermin t = 5 mm
0.100 Perlengkapan
Upah
0.001 Oh Mandor
0.015 Oh Kepala tukang batu
0.150 Oh Tukang batu
0.015 Oh Pekerja
Sub Jumlah

KODE URAIAN

N PEKERJAAN PENGECATAN
1. 1 m2 MENGECAT BIDANG KAYU BARU : 1 lps PLAMIR, 1 lps CAT DASAR, 2 lps CAT PENUTUP
Bahan
0.200 kg Plamir
0.150 kg Cat meni
0.170 kg Cat dasar
0.260 kg Cat penutup 2 kali
Upah
0.003 Oh Mandor
0.006 Oh Kepala tukang cat
0.009 Oh Tukang cat
0.070 Oh Pekerja
Sub Jumlah

2. 1 m2 MELABUR BIDANG KAYU DENGAN POLITUR


Bahan
0.880 ltr Politur jadi
3.000 lbr Kertas gosok
Upah
0.003 Oh Mandor
0.016 Oh Kepala tukang cat
0.060 Oh Tukang cat
0.000 Oh Pekerja
Sub Jumlah

3. 1 m2 MENGECAT TEMBOK BARU : 1 lps PLAMIR,1 lps CAT DASAR, 2 lps CAT PENUTUP
Bahan
0.200 kg Plamir
0.230 kg Cat dasar
0.480 kg Cat penutup 2 kali
Upah
0.003 Oh Mandor
0.006 Oh Kepala tukang cat
0.063 Oh Tukang cat
0.020 Oh Pekerja
Sub Jumlah

4. 1 m2 PEKERJAAN WATER PROOFING


Bahan
0.360 kg Water Proofing
Upah
0.003 Oh Mandor
0.006 Oh Kepala tukang cat
0.063 Oh Tukang cat
0.020 Oh Pekerja
Sub Jumlah
5. 1 m2 MENGECAT GENTENG CAT DULUX
Bahan
0.600 kg Cat penutup 2 kali
Upah
0.004 Oh Mandor
0.005 Oh Kepala tukang cat
0.049 Oh Tukang cat
0.048 Oh Pekerja
Sub Jumlah

KODE URAIAN

O PEKERJAAN INSTALASI LISTRIK

1. 1 ttk PASANG STOP KONTAK


Bahan
1.000 bh Stop kontak
15.000 m' Kabel NYA 2.5 mm
1.000 bh T dos PVC
0.650 ljr Pipa PVC Ø 5/8"
Upah
0.050 Oh Mandor
0.050 Oh Kepala tukang listrik
0.500 Oh Tukang listrik
0.500 Oh Pekerja
Sub Jumlah

2. 1 ttk PASANG LAMPU PIJAR 5 - 40 Watt


Bahan
1.000 bh Lampu pijar 5 - 40 Watt
20.000 m' Kabel NYA 2.5 mm
1.000 bh Saklar
15.000 m' Isolator
2.000 bh T dos PVC
1.000 ljr Pipa PVC Ø 5/8"
1.000 bh Fitting plafon
6.000 bh Las dof
Upah
0.050 Oh Mandor
0.050 Oh Kepala tukang listrik
0.500 Oh Tukang listrik
0.500 Oh Pekerja
Sub Jumlah

3 1 ttk PASANG SKAKELAR


Bahan
1.000 bh Lampu pijar 5 - 40 Watt
20.000 m' Kabel NYA 2.5 mm
1.000 bh Saklar
15.000 m' Isolator
2.000 bh T dos PVC
1.000 ljr Pipa PVC Ø 5/8"
1.000 bh Fitting plafon
6.000 bh Las dof
Upah
0.050 Oh Mandor
0.050 Oh Kepala tukang listrik
0.500 Oh Tukang listrik
0.500 Oh Pekerja
Sub Jumlah

3. 1 ttk PASANG SIKRING 1 GROUP


Bahan
1.000 bh Sikring 1 group
4.000 m' Kabel NYA 4.0 mm
1.000 ljr Pipa PVC Ø 5/8"
Upah
0.006 Oh Mandor
0.006 Oh Kepala tukang listrik
0.062 Oh Tukang listrik
0.620 Oh Pekerja
Sub Jumlah
Upah (Rp) Bahan (Rp) Jumlah Harga (Rp)

Rp 82,027 Rp 4,101
Rp 45,264 Rp 4,526
Rp 8,628

Rp 7,661,097 Rp 61,289
Rp 2,823,480 Rp 12,706
Rp 14,572 Rp 291

Rp 82,027 Rp 410
Rp 69,883 Rp 699
Rp 58,622 Rp 5,862
Rp 45,264 Rp 4,526
Rp 85,783

Rp 82,027 Rp 3,281
Rp 45,264 Rp 18,106
Rp 21,387

Rp 82,027 Rp 4,265
Rp 45,264 Rp 23,809
Rp 28,074

Rp 82,027 Rp 1,559
Rp 45,264 Rp 8,691
Rp 10,249

Rp 92,404 Rp 110,885

Rp 82,027 Rp 820
Rp 45,264 Rp 13,579
Rp 125,284

Rp 115,699 Rp 138,839

Rp 97,296 Rp 973
Rp 63,560 Rp 19,068
Rp 158,880

Rp 176,419 Rp 211,703
Rp 115,699 Rp 34,710

Rp 82,027 Rp 3,199
Rp 63,700 Rp 2,484
Rp 58,622 Rp 22,863
Rp 45,264 Rp 35,306
Rp 310,264

Rp 185,251 Rp 203,776
Rp 1,324 Rp 180,064
Rp 148,819 Rp 80,958

Rp 82,027 Rp 6,152
Rp 63,700 Rp 3,822
Rp 58,622 Rp 35,173
Rp 45,264 Rp 67,896
Rp 577,841

Rp 552 Rp 38,640
Rp 1,324 Rp 19,026
Rp 148,819 Rp 5,953

Rp 82,027 Rp 1,230
Rp 63,700 Rp 637
Rp 58,622 Rp 5,862
Rp 45,264 Rp 14,484
Rp 85,833

Rp 552 Rp 38,640
Rp 1,324 Rp 11,016
Rp 148,819 Rp 7,292

Rp 82,027 Rp 1,230
Rp 63,700 Rp 637
Rp 58,622 Rp 5,862
Rp 45,264 Rp 14,484
Rp 79,162

Rp 1,324 Rp 8,580
Rp 148,819 Rp 2,828

Rp 82,027 Rp 820
Rp 63,700 Rp 956
Rp 58,622 Rp 8,793
Rp 45,264 Rp 9,053
Rp 31,029
Rp 1,324 Rp 4,872
Rp 148,819 Rp 3,423

Rp 82,027 Rp 820
Rp 63,700 Rp 956
Rp 58,622 Rp 8,793
Rp 45,264 Rp 9,053
Rp 27,917

Rp 1,324 Rp 8,606
Rp 148,819 Rp 3,125

Rp 82,027 Rp -
Rp 63,700 Rp -
Rp 58,622 Rp 7,035
Rp 45,264 Rp -
Rp 18,766

Rp 32,005,512 Rp 35,206,063

Rp 82,027 Rp 24,608
Rp 69,883 Rp 139,766
Rp 58,622 Rp 1,172,440
Rp 45,264 Rp 271,584
Rp 36,814,461

Rp 35,562,600 Rp 1,422,504

Rp 82,027 Rp 4,101
Rp 69,883 Rp 17,471
Rp 58,622 Rp 146,555
Rp 45,264 Rp 45,264
Rp 1,635,895

Rp 35,562,600 Rp 1,244,691
Rp 82,027 Rp 65,622
Rp 69,883 Rp 139,766
Rp 58,622 Rp 11,724
Rp 45,264 Rp 1,811
Rp 1,463,614

Rp 32,005,512 Rp 35,206,063
Rp 16,228 Rp 243,420
Rp 14,572 Rp 11,658

Rp 82,027 Rp 16,405
Rp 69,883 Rp 83,860
Rp 58,622 Rp 703,464
Rp 45,264 Rp 181,056
Rp 36,445,926

Rp 32,005,512 Rp 384,066
Rp 14,572 Rp 2,186

Rp 82,027 Rp 410
Rp 69,883 Rp 699
Rp 58,622 Rp 5,862
Rp 45,264 Rp 4,526
Rp 397,750

Rp 32,005,512 Rp 736,127
Rp 14,572 Rp 2,186

Rp 82,027 Rp 820
Rp 69,883 Rp 2,096
Rp 58,622 Rp 17,587
Rp 45,264 Rp 9,053
Rp 767,869

Rp 5,381,668 Rp 59,198
Rp 14,572 Rp 729

Rp 82,027 Rp 410
Rp 69,883 Rp 1,537
Rp 58,622 Rp 12,897
Rp 45,264 Rp 4,979
Rp 79,750

Rp 29,808 Rp 29,808

Rp 82,027 Rp 82
Rp 69,883 Rp 140
Rp 58,622 Rp 1,231
Rp 45,264 Rp 951
Rp 32,211

Rp 1,324 Rp 13,240
Rp 176,419 Rp 4,587
Rp 289,689 Rp 12,746

Rp 82,027 Rp 492
Rp 63,700 Rp 127
Rp 58,622 Rp 1,172
Rp 45,264 Rp 52,054
Rp 84,419

Rp 1,324 Rp 370,720
Rp 176,419 Rp 79,389
Rp 289,689 Rp 260,720

Rp 82,027 Rp 6,562
Rp 63,700 Rp 1,593
Rp 58,622 Rp 14,656
Rp 45,264 Rp 74,686
Rp 808,324

Rp 22,521 Rp 23,647
Rp 26,109 Rp 392

Rp 82,027 Rp 25
Rp 63,700 Rp 45
Rp 58,622 Rp 410
Rp 45,264 Rp 317
Rp 24,835

Rp 2,823,480 Rp 112,939
Rp 14,572 Rp 4,372
Rp 7,617 Rp 762

Rp 82,027 Rp 410
Rp 63,700 Rp 1,656
Rp 58,622 Rp 15,242
Rp 45,264 Rp 13,579
Rp 148,960

Rp 2,823,480 Rp 127,057
Rp 14,572 Rp 4,372
Rp 7,617 Rp 762

Rp 82,027 Rp 410
Rp 63,700 Rp 1,656
Rp 58,622 Rp 15,242
Rp 45,264 Rp 13,579
Rp 163,077

Rp 2,823,480 Rp 112,939
Rp 14,572 Rp 5,829
Rp 7,617 Rp 1,523
Rp 5,238,480 Rp 78,577
Rp 168,801 Rp 59,080
Rp 59,229 Rp 118,458

Rp 82,027 Rp 492
Rp 63,700 Rp 2,102
Rp 58,622 Rp 19,345
Rp 45,264 Rp 13,579
Rp 411,926

Rp 2,823,480 Rp 112,939
Rp 14,572 Rp 5,829
Rp 7,617 Rp 1,523
Rp 5,238,480 Rp 94,293
Rp 168,801 Rp 59,080
Rp 59,229 Rp 118,458

Rp 82,027 Rp 492
Rp 63,700 Rp 2,102
Rp 58,622 Rp 19,345
Rp 45,264 Rp 14,484
Rp 428,546

Rp 2,823,480 Rp 112,939
Rp 14,572 Rp 5,829
Rp 7,617 Rp 1,523
Rp 5,238,480 Rp 78,577
Rp 168,801 Rp 59,080
Rp 59,229 Rp 355,374

Rp 82,027 Rp 492
Rp 63,700 Rp 2,102
Rp 58,622 Rp 19,345
Rp 45,264 Rp 14,484
Rp 649,747

Rp 2,823,480 Rp 84,704
Rp 14,572 Rp 5,829
Rp 7,617 Rp 1,523
Rp 5,238,480 Rp 104,770
Rp 168,801 Rp 59,080
Rp 59,229 Rp 177,687
Rp -

Rp 82,027 Rp 492
Rp 63,700 Rp 2,102
Rp 58,622 Rp 19,345
Rp 45,264 Rp 14,484
Rp 470,018

Rp 2,823,480 Rp 84,704
Rp 14,572 Rp 5,829
Rp 7,617 Rp 1,143
Rp 5,238,480 Rp 78,577
Rp 168,801 Rp 59,080
Rp 59,229 Rp 118,458

Rp 82,027 Rp 492
Rp 63,700 Rp 2,102
Rp 58,622 Rp 19,345
Rp 45,264 Rp 14,484
Rp 384,215

Rp 1,534 Rp 595,135
Rp 210,897 Rp 137,083
Rp 210,897 Rp 137,083

Rp 97,296 Rp 29,189
Rp 87,376 Rp 8,738
Rp 77,968 Rp 77,968
Rp 63,560 Rp 381,360
Rp 1,366,555

Rp 579,600 Rp 14,490,000

Rp 82,027 Rp 656
Rp 69,883 Rp 559
Rp 58,622 Rp 4,397
Rp 45,264 Rp 6,790
Rp 14,502,402

Rp 5,740 Rp 28,700
Rp 1,324 Rp 10,592
Rp 148,819 Rp 4,762

Rp 82,027 Rp 164
Rp 69,883 Rp 1,398
Rp 58,622 Rp 11,724
Rp 45,264 Rp 18,106
Rp 75,446
Rp 257,121 Rp 89,992
Rp 14,572 Rp 437
Rp 29,791 Rp 11,618

Rp 82,027 Rp 287
Rp 69,883 Rp 699
Rp 58,622 Rp 5,862
Rp 45,264 Rp 3,168
Rp 112,065

Rp 11,426 Rp 12,569
Rp 13,800 Rp 690

Rp 82,027 Rp 246
Rp 69,883 Rp 349
Rp 58,622 Rp 2,931
Rp 45,264 Rp 2,263
Rp 19,048

Rp 5,023 Rp 59,623
Rp 1,324 Rp 15,067
Rp 148,819 Rp 6,250
Rp 22,356 Rp 33,534

Rp 82,027 Rp 2,461
Rp 63,700 Rp 2,230
Rp 58,622 Rp 20,518
Rp 45,264 Rp 28,064
Rp 167,746

Rp 2,318 Rp 57,950
Rp 1,324 Rp 15,067
Rp 148,819 Rp 6,250
Rp 22,356 Rp 33,534

Rp 82,027 Rp 2,461
Rp 63,700 Rp 2,230
Rp 58,622 Rp 20,518
Rp 45,264 Rp 28,064
Rp 166,073

Rp 4,471 Rp 201,195
Rp 1,324 Rp 12,313
Rp 148,819 Rp 2,679
Rp 22,356 Rp 33,534

Rp 82,027 Rp 2,461
Rp 63,700 Rp 2,867
Rp 58,622 Rp 26,380
Rp 45,264 Rp 27,158
Rp 308,587

Rp 290,517 Rp 290,517

Rp 82,027 Rp 410
Rp 69,883 Rp 699
Rp 58,622 Rp 29,311
Rp 45,264 Rp 453
Rp 321,390

Rp 74,078 Rp 74,078

Rp 82,027 Rp 205
Rp 69,883 Rp 349
Rp 58,622 Rp 29,311
Rp 45,264 Rp 226
Rp 104,170

Rp 17,056 Rp 17,056
Rp 82,027 Rp 62
Rp 69,883 Rp 1,048
Rp 58,622 Rp 8,793
Rp 45,264 Rp 679
Rp 27,638

Rp 13,027 Rp 13,027

Rp 82,027 Rp 41
Rp 69,883 Rp 699
Rp 58,622 Rp 5,862
Rp 45,264 Rp 453
Rp 20,082

Rp 16,008 Rp 16,008

Rp 82,027 Rp 62
Rp 69,883 Rp 1,048
Rp 58,622 Rp 8,793
Rp 45,264 Rp 679
Rp 26,590

Rp 16,008 Rp 16,008

Rp 82,027 Rp 41
Rp 69,883 Rp 699
Rp 58,622 Rp 5,862
Rp 45,264 Rp 453
Rp 23,063

Rp 382,536 Rp 382,536

Rp 82,027 Rp 246
Rp 69,883 Rp 4,193
Rp 58,622 Rp 35,173
Rp 45,264 Rp 2,716
Rp 424,864
Rp 153,400 Rp 168,740

Rp 82,027 Rp 62
Rp 69,883 Rp 1,048
Rp 58,622 Rp 8,793
Rp 45,264 Rp 679
Rp 179,322

Rp 1,240,123 Rp 1,240,123

Rp 82,027 Rp 427
Rp 63,700 Rp 6,689
Rp 58,622 Rp 61,553
Rp 45,264 Rp 67,896
Rp 1,376,687

Rp 150,254 Rp 150,254
Rp 1,324 Rp 7,944
Rp 148,819 Rp 1,488

Rp 82,027 Rp 13,124
Rp 63,700 Rp 95,550
Rp 58,622 Rp 87,933
Rp 45,264 Rp 45,264
Rp 401,558

Rp 560,942 Rp 560,942
Rp 1,324 Rp 7,944
Rp 148,819 Rp 1,488

Rp 82,027 Rp 8,203
Rp 63,700 Rp 9,555
Rp 58,622 Rp 85,002
Rp 45,264 Rp 54,317
Rp 727,451

Rp 30,360 Rp 30,360

Rp 82,027 Rp 410
Rp 63,700 Rp 637
Rp 58,622 Rp 5,862
Rp 45,264 Rp 453
Rp 37,722

Rp 552 Rp 220,800
Rp 1,324 Rp 158,880
Rp 148,819 Rp 44,646
Rp -
Rp 22,356 Rp 134,136

Rp 82,027 Rp 24,608
Rp 63,700 Rp 19,110
Rp 58,622 Rp 175,866
Rp 45,264 Rp 271,584
Rp 1,049,630

Rp 361,670 Rp 108,501
Rp 31,905 Rp 11,167

Rp 82,027 Rp 2,215
Rp 63,700 Rp 573
Rp 54,648 Rp 4,918
Rp 45,264 Rp 2,444
Rp 129,818
Rp 150,144 Rp 45,043
Rp 31,905 Rp 11,167

Rp 82,027 Rp 221
Rp 63,700 Rp 573
Rp 54,648 Rp 4,918
Rp 45,264 Rp 2,444
Rp 64,367

Rp 350,961 Rp 105,288
Rp 31,905 Rp 11,167

Rp 82,027 Rp 336
Rp 63,700 Rp 860
Rp 54,648 Rp 7,377
Rp 45,264 Rp 3,666
Rp 128,695

Rp 70,104 Rp 70,104
Rp 48,796 Rp 1,220

Rp 82,027 Rp 410
Rp 63,700 Rp 637
Rp 54,648 Rp 5,465
Rp 45,264 Rp 453
Rp 78,288

Rp 149,923 Rp 149,923
Rp 31,905 Rp 3,191

Rp 82,027 Rp 62
Rp 63,700 Rp 956
Rp 58,622 Rp 8,793
Rp 45,264 Rp 679
Rp 163,603
ASAR, 2 lps CAT PENUTUP

Rp 7,374 Rp 1,475
Rp 25,723 Rp 3,858
Rp 33,120 Rp 5,630
Rp 58,732 Rp 15,270

Rp 82,027 Rp 205
Rp 63,700 Rp 382
Rp 58,622 Rp 528
Rp 45,264 Rp 3,168
Rp 30,517

Rp 65,412 Rp 57,563
Rp 4,278 Rp 12,834

Rp 82,027 Rp 205
Rp 63,700 Rp 1,019
Rp 58,622 Rp 3,517
Rp 45,264 Rp -
Rp 75,138

2 lps CAT PENUTUP

Rp 7,374 Rp 1,475
Rp 33,120 Rp 7,618
Rp 58,732 Rp 28,191

Rp 82,027 Rp 205
Rp 63,700 Rp 401
Rp 58,622 Rp 3,693
Rp 45,264 Rp 905
Rp 42,489

Rp 82,027 Rp 205
Rp 63,700 Rp 401
Rp 58,622 Rp 3,693
Rp 45,264 Rp 905
Rp 5,205
Rp 42,393 Rp 25,432

Rp 82,027 Rp 287
Rp 63,700 Rp 345
Rp 58,622 Rp 2,872
Rp 45,264 Rp 2,173
Rp 31,109

Rp 45,208 Rp 45,208
Rp 3,974 Rp 59,610
Rp 5,188 Rp 5,188
Rp 7,882 Rp 5,123

Rp 82,027 Rp 4,101
Rp 69,883 Rp 3,494
Rp 54,648 Rp 27,324
Rp 45,264 Rp 22,632
Rp 172,681

Rp 7,176 Rp 7,176
Rp 3,974 Rp 79,480
Rp - Rp -
Rp 1,269 Rp 19,035
Rp 5,188 Rp 10,376
Rp 7,882 Rp 7,882
Rp -
Rp -

Rp 82,027 Rp 4,101
Rp 69,883 Rp 3,494
Rp 54,648 Rp 27,324
Rp 45,264 Rp 22,632
Rp 181,501

Rp - Rp -
Rp - Rp -
Rp 57,076 Rp 57,076
Rp - Rp -
Rp - Rp -
Rp - Rp -
Rp -
Rp -

Rp 82,027 Rp 4,101
Rp 69,883 Rp 3,494
Rp 54,648 Rp 27,324
Rp 45,264 Rp 22,632
Rp 114,628

Rp 23,763 Rp 23,763
Rp 5,961 Rp 23,844
Rp 7,882 Rp 7,882

Rp 82,027 Rp 492
Rp 69,883 Rp 419
Rp 54,648 Rp 3,388
Rp 45,264 Rp 28,064
Rp 87,852
Data Perencanan
Fungsi Kolektor Primer
Jenis Perkerasan AASTHO & BM
Panjang Jalan 3 Km
Tipe Jalan 4 lajur 2 arah tak terbagi
lebar per lajur 3.25 m
Lebar Bahu 1.5 m
Kelas Beton K-350
UR 20 thn
Kelas Jalan lentur mutu terbaik
jalan dibuka 2023
CBR TANAH STA 84+600 1
STA 88+100 1.2

DATA JUMLAH KENDARAAN

JENIS KENDARAAN JUMLAH PERTUMBUHAN


MP 3327 9 % 0.09
PICKUP,MICRO TRUCK 1560 7.45 % 0.0745
BUS KECIL 447 1.8 % 0.018
BUS BESAR 1190 1.8 % 0.018
TRUCK RINGAN 1.2 L 2103 7.45 % 0.0745
TRUCK SEDANG 1.2 H 859 7.45 % 0.0745
TRUCK 1.22 835 7.45 % 0.0745
TRUCK GANDENG 4 Sb 832 7.45 % 0.0745
TRAILER 123 7.45 % 0.0745

BUS KECIL Depan


Berat max
belakang

BUS BESAR Depan


Berat max
belakang

TRUK 1.2L Depan


Berat max
belakang

TRUK SEDANG Depan


Berat max
belakang

TRUK 1.22 Depan


Berat max
belakang

TRUK GANDENG Depan


Berat max
belakang

TRAILER Depan
Berat max
belakang
PENYELESAIAN
1. Menghitung LHR 2023 LHR = (1+I)^UR

JENIS KENDARAAN LHR


MP 5.604411
LHR BARU
PICKUP,MICRO TRUCK 4.20851
BUS KECIL 1.428748 JENIS KENDARAAN LHR 2019
BUS BESAR 1.428748 MP 3327
TRUCK RINGAN 1.2 L 4.20851 PICKUP,MICRO TRUCK 1560
TRUCK SEDANG 1.2 H 4.20851 BUS KECIL 447
TRUCK 1.22 4.20851 BUS BESAR 1190
TRUCK GANDENG 4 Sb 4.20851 TRUCK RINGAN 1.2 L 2103
TRAILER 4.20851 TRUCK SEDANG 1.2 H 859
TRUCK 1.22 835
2. Menghitung lalu lintas pada umur rencana 2058 TRUCK GANDENG 4 Sb 832
UR 35 TRAILER 123
PERENCANAAN DIBUKA 2023

Pn = Po(1+i)^n
JENIS KENDARAAN LHR 2058
MP 67917.27
PICKUP,MICRO TRUCK 19290.76
BUS KECIL 834.6026
BUS BESAR 2221.873
TRUCK RINGAN 1.2 L 26005.43
TRUCK SEDANG 1.2 H 10622.28
TRUCK 1.22 10325.5
TRUCK GANDENG 4 Sb 10288.4
TRAILER 1521.002

3. Menghitung Vdf
Beban Kendaraan minimal 5000 kg
TABEL
0.34 STRT 0.0203678708
6
0.66 STRG 0.0554651394 JENIS KENDARAAN BERAT MAX(kg)
VDF 0.0758330101
MP 2.5
0.34 STRT 0.1031123457 PICK UP 3
9 BUS KECIL 6
0.66 STRG 0.2807922681 BUS BESAR 9
VDF 0.3839046138 TRUCK RINGAL 1.2 L 8.3
TRUCK SEDANG 1.2 H 18.2
0.34 STRT 0.0745852583 TRUCK 1.22 25
8.3 TRUCK GANDENG 31.4
0.66 STRG 0.203108209 TRAILER 26.2
VDF 0.2776934674
4. Penentuan Faktor Distribusi
0.34 STRT 1.7243530153 faktor distribusi arah Da=0.3 - 0.7
18.2 Faktor distibusi lajur 4 lajur
0.66 STRG 4.6957034197
VDF 6.420056435 5. menghitung desain trafic ESA

0.25 STRT 1.7945064766


25
0.75 SDRG 3.4477149547
VDF 5.2422214313

0.18 STRT 1.2001445946 JENIS KENDARAAN LHR 2058


31.4 MP 95870.77111892
0.28 STRG 1.3476902383 PICKUP,MICRO TRUCK 25714.31570599
0.27 STRG 1.1652336395 BUS KECIL 896.3360528287
0.27 STRG 1.1652336395 BUS BESAR 2386.219022072
VDF 4.8783021118 TRUCK RINGAN 1.2 L 34664.87559596
TRUCK SEDANG 1.2 H 14159.357174
0.18 STRT 0.581728239 TRUCK 1.22 13763.75231699
26.2 TRUCK GANDENG 4 Sb 13714.30170986
0.41 STRG 3.003170278 TRAILER 2027.474892203
0.41 SDRG 0.3714213435
VDF 3.9563198605 6. TABEL PERHITUNG

JENIS KENDARAAN UR
MP
PICKUP,MICRO TRUCK
BUS KECIL
BUS BESAR
TRUCK RINGAN 1.2 L 20
TRUCK SEDANG 1.2 H
TRUCK 1.22
TRUCK GANDENG 4 Sb
TRAILER

7. PERHITUNGAN TEBAL
1 penentuan reability mengacu tabel 2.3(AASHTO 1993)
Klasifikasi jalan kolektor primer maka R = 80 - 95
2 penentuan standart normal deviate (Zr)
nilai R 90% maka nilai Zr
3 standart deviasi untuk rigid pavement
untuk standart deviasi rigid pavement yaitu 0.3-0.4
4 menentukan terminal serviceability indeks (Pt)
Pt
5 Initial serviceability(Po)
Po
6 Total loss Of Serviceability
∆PSI

8. Menentukan modulus rea


Mr 1500xCBR
K MR/19,4

9. Menentukan Modulus El
pada perencanaa ini digunakan mutu beto K-200 ( sesuai de
dengan kuat tekan karakteristik menggunakan benda uji sil
1kg/cm2 14.22

Ec 57000 akar fc'

10. Menentukan Flexu


umumnya flexural streght
Sc'(30-50) 45

11. Menentukan Load


koefisien penyaluran beban (J) ditentukan dalam AASHO, p
pada perencaan ini sama menggunakan

12. Menentukan Koefisi

diasumsikan Tjam
Thari
jadi 146 hari hujan dalam setahun
Wl 0.175
jadi Pheff

13. Menentukan Fakto


Mengacu pada Tabel 2.9 maka direncanakan dengan kualit
setelah diketahui persentase perkerasan terkena air maka d
direncanakan faktor drainase

14. Menentukan Teba

DATA PERENCANAAN
W18 60160210.98492
Zr -1.282
So 0.4
delta Psi 2
Pt 2.5
Sc' 640
Cd 1.2
J 3.1
Ec 2843437.444362
k 389.691

kiri 7.779309350679
knan 7.9077
15. Menghitung Tulangan
1m

1 inci
ikm
lebar jalan per lajur 3.25
tebal perkerasan 12
panjang jalan 3
lebar jalur 10.66325
16. Perhitungan Ruj

d=

jadi tebal perkerasan


diameter dowel
panjang dowel
jarak dowel

volume jalan
LHR BARUU
4 35
I LHR 2023 LHR 2058
0.09 4696.332 95870.771
0.0745 2079.459 25714.316
0.018 480.063 896.336
0.018 1278.021 2386.219
0.0745 2803.270 34664.876
0.0745 1145.035 14159.357
0.0745 1113.044 13763.752
0.0745 1109.045 13714.302
0.0745 163.957 2027.475

TABEL PERHITUNGANGANANGKA VDF

VDF
BELAKANG VDF
DEPAN
1 2 3
` - - - -
- - - - -
0.020367870751 0.055465139381114 - - 0.07583301013252
0.103112345679 0.280792268116888 - - 0.3839046137959
0.074585258349 0.203108209032302 - - 0.2776934673816
1.724353015347 4.69570341965363 - - 6.42005643500051
1.794506476554 3.44771495473915 - - 5.24222143129299
1.2001445945679 1.34769023825105 1.165233639477 1.165233639477 4.87830211177296
0.581728239012 3.00317027801395 0.3714213434767 - 3.95631986050297

ktor Distribusi
umumnya diambil 0.5
Dl 0.65

nghitung desain trafic ESAL

BUS KECIL 8063.162008314


BUS BESAR 108670.04837547
TRUCK RINGAN 1.2 L 1141909.1020078
W18 TRUCK SEDANG 10783471.832657
TRUCK 1.22 8559106.6081485
TRUCK GANDENG 7936309.892009
TRAILER 951531.36054696
29489062.005753

6. TABEL PERHITUNGAN ESAL


ditambahi LHR 2023
LHR 2019 LHR 2058 DA DL HARI DLM 1 THN VDF
3327 95870.7711189197 -
1560 25714.3157059866 -
447 896.336052828678 0.075833
1190 2386.21902207187 0.383905
2103 34664.8755959551 0.5 0.65 365 0.277693
859 14159.3571740016 6.420056
835 13763.7523169864 5.242221
832 13714.3017098595 4.878302
123 2027.47489220279 3.95632
TOTAL

7. PERHITUNGAN TEBAL PLAT BETON


bel 2.3(AASHTO 1993)
or primer maka R = 80 - 95 0.9

-1.282
ment yaitu 0.3-0.4 0.4
ity indeks (Pt)
2.5

4.5

Menentukan modulus reaksi tanah dasar CBR 5.04


7560
389.690721649485

. Menentukan Modulus Elastisitas beton


mutu beto K-200 ( sesuai dengan perencanaan disoal).
menggunakan benda uji silinder 150mm-300mm didapat kuat tekan beton sebesar 175 kg/cm2
psi 2488.5 psi

2843437.444362 psi
199960 kg/cm2

10. Menentukan Flexural Streght

639.9 psi
4.5 Mpa

11. Menentukan Load Transfer


itentukan dalam AASHO, pada perencanaan tersebut ditetapkan 2,5 - 3,1
3.1

12. Menentukan Koefisien Drainase

2 jam perhari
40%x365 hari 146

0.803459119497
0.008034591195 < 0.01

13. Menentukan Faktor Drainase


irencanakan dengan kualitas GOOD
kerasan terkena air maka dapat ditentukan koefisien drainase menggunakan tabel 2.10
1.2

14. Menentukan Tebal Plat (D)

Syarat dimana ruas kanan harus nilainya lebh besar dari ruas kiri

dicobab coba untuk nilai D 12


1 7.7793093506791

MANUAL KALKULATOR
15. Menghitung Tulangan Sambungan
3.281 feet

2.54 cm
39.37 inch
127.9525 inch
inch
118.11
dibulatkan 11feet
16. Perhitungan Ruji(dowel)

D/8
1.5 inch dibulatkan 0.7

12 inch 30.48 cm
0.7 inch 1.778 cm
18 inch 45.72 cm
12 inch 30.48 cm
W18 CUM ESAL
-
-
8063.162008 8063.16201
108670.0484 116733.21
1141909.102 1258642.31
1141909.102 2400551.41
10783471.83 13184023.2
7936309.892 21120333.1
951531.3605 22071864.5
22071864.5 60160211
Data Perencanan
Fungsi Kolektor Primer
Jenis Perkerasan AASTHO & BM
Panjang Jalan 3 Km
Tipe Jalan 4 lajur 2 arah tak terbagi
lebar per lajur 3.25 m
Lebar Bahu 1.5 m
Kelas Beton K-350
UR 20 thn
Kelas Jalan lentur mutu terbaik
jalan dibuka 2023
CBR TANAH STA 84+600 1.3
STA 88+100 1.2

DATA JUMLAH KENDARAAN

JENIS KENDARAAN JUMLAH PERTUMBUHAN


MP 3327 9 % 0.09
PICKUP,MICRO TRUCK 1560 7.45 % 0.0745
BUS KECIL 447 1.8 % 0.018
BUS BESAR 1190 1.8 % 0.018
TRUCK RINGAN 1.2 L 2103 7.45 % 0.0745
TRUCK SEDANG 1.2 H 859 7.45 % 0.0745
TRUCK 1.22 835 7.45 % 0.0745
TRUCK GANDENG 4 Sb 832 7.45 % 0.0745
TRAILER 123 7.45 % 0.0745

BUS KECIL Depan


Berat max
belakang

BUS BESAR Depan


Berat max
belakang

TRUK 1.2L Depan


Berat max
belakang

TRUK SEDANG Depan


Berat max
belakang

TRUK 1.22 Depan


Berat max
belakang

TRUK GANDENG Depan


Berat max
belakang

TRAILER Depan
Berat max
belakang
PENYELESAIAN
1. Menghitung LHR LHR = (1+I)^UR

JENIS KENDARAAN LHR JENIS KENDARAAN


MP 5.60441076778 MP
PICKUP,MICRO TRUCK 4.20851032068 PICKUP,MICRO TRUCK
BUS KECIL 1.42874775178 BUS KECIL
BUS BESAR 1.42874775178 BUS BESAR
TRUCK RINGAN 1.2 L 4.20851032068 TRUCK RINGAN 1.2 L
TRUCK SEDANG 1.2 H 4.20851032068 TRUCK SEDANG 1.2 H
TRUCK 1.22 4.20851032068 TRUCK 1.22
TRUCK GANDENG 4 Sb 4.20851032068 TRUCK GANDENG 4 Sb
TRAILER 4.20851032068 TRAILER

2. Menghitung lalu lintas pada umur rencana


UR 20
PERENCANAAN DIBUKA 2023
2043
Pn = Po(1+i)^n
JENIS KENDARAAN LHR 2043
MP 26,320.174
PICKUP,MICRO TRUCK 8,751.423
BUS KECIL 685.890
BUS BESAR 1,825.970
TRUCK RINGAN 1.2 L 11,797.591
TRUCK SEDANG 1.2 H 4,818.893
TRUCK 1.22 4,684.255
TRUCK GANDENG 4 Sb 4,667.426
TRAILER 690.016

3. Menghitung Vdf
Beban Kendaraan minimal 5000 kg

0.34 STRT 0.020


6
0.66 STRG 0.055 JENIS KENDARAAN
VDF 0.076
MP
0.34 STRT 0.103 PICK UP
9 BUS KECIL
0.66 STRG 0.281 BUS BESAR
VDF 0.384 TRUCK RINGAL 1.2 L
TRUCK SEDANG 1.2 H
0.34 STRT 0.075 TRUCK 1.22
8.3 TRUCK GANDENG
0.66 STRG 0.203 TRAILER
VDF 0.278
4. Penentuan Faktor Dist
0.34 STRT 1.724 faktor distribusi arah
18.2 Faktor distibusi lajur
0.66 STRG 4.696
VDF 6.420 5. menghitung

0.25 STRT 1.795


25
0.75 SDRG 3.448
VDF 5.242

0.18 STRT 1.200 JENIS KENDARAAN


31.4 MP
0.28 STRG 1.348 PICKUP,MICRO TRUCK
0.27 STRG 1.165 BUS KECIL
0.27 STRG 1.165 BUS BESAR
VDF 4.878 TRUCK RINGAN 1.2 L
TRUCK SEDANG 1.2 H
0.18 STRT 0.582 TRUCK 1.22
26.2 TRUCK GANDENG 4 Sb
0.41 STRG 3.003 TRAILER
0.41 SDRG 0.371
VDF 3.956 6. T

JENIS KENDARAAN
MP
PICKUP,MICRO TRUCK
BUS KECIL
BUS BESAR
TRUCK RINGAN 1.2 L
TRUCK SEDANG 1.2 H
TRUCK 1.22
TRUCK GANDENG 4 Sb
TRAILER

7. PERH
1 penentuan reability mengacu tabel 2.3(AASHTO 1993)
Klasifikasi jalan
2 penentuan standart normal deviate (Zr)
nilai R 90% maka nilai Zr
3 standart deviasi untuk rigid pavement
untuk standart deviasi rigid pavement yaitu 0.3-0.4
4 menentukan terminal serviceability indeks (Pt)
Pt
5 Initial serviceability(Po)
Po
6 Total loss Of Serviceability
∆PSI

8. Menen
Mr
K

9. Menen
pada perencanaa ini digunakan mutu beto K-350 ( sesua
dengan kuat tekan karakteristik menggunakan benda uj
1kg/cm2
fc'
Ec

10. M
umumnya flexural streght
Sc'
dibulatkan

11. menent
Nilai J di dapat dari tabel 2.8
Didapatkan nilai J sebesar 2,5 – 3,1 pada perencanaan in

12. M
1. Penetapan variabel persen perkerasan terkena air

Tjam
Thari
Wl

Pheff

2. Penentuan Faktor Drainase


Pilih yang Good karena biasanya menggunakan itu
didapat koefisien drainase

13. Me

Wr 18
Zr
So
D
SEGITIGA PSI
PO
PT
SC'
CD
J
EC
K
15. Menghitung

lebar jalan per lajur


tebal perkerasan
panjang jalan
lebar jalur

16

jadi

Data Perencanan
Fungsi Kolektor Primer
Jenis Perkerasan AASTHO & BM
Panjang Jalan 3 Km
Tipe Jalan 4 lajur 2 arah tak terbagi
lebar per lajur 3.25 m
Lebar Bahu 1.5 m
Kelas Beton K-350
UR 20 thn
Kelas Jalan lentur mutu terbaik
jalan dibuka 2023
CBR TANAH STA 84+600 1.3
STA 88+100 1.2
4 LHR 2023 + UR
LHR 2019 I LHR 2023 LHR 2043
3327 0.09 4,696 26,320
1560 0.0745 2,079 8,751
447 0.018 480 686
1190 0.018 1,278 1,826
2103 0.0745 2,803 11,798
859 0.0745 1,145 4,819
835 0.0745 1,113 4,684
832 0.0745 1,109 4,667
123 0.0745 164 690

TABEL PERHITUNGAN GANANGKA VDF

VDF
BERAT MAX(kg) BELAKANG
DEPAN
1 2
2.5 ` - -
3 - - -
6 0.020 0.055 -
9 0.103 0.281 -
8.3 0.075 0.203 -
18.2 1.724 4.696 -
25 1.795 3.448 -
31.4 1.200 1.348 1.165
26.2 0.582 3.003 0.371

4. Penentuan Faktor Distribusi


Da=0.3 - 0.7 umumnya diambil 0.6
4 lajur Dl = 50-75 0.7

5. menghitung desain trafic ESAL

BUS KECIL 7,973.604


LHR 2043 BUS BESAR 107,463.039
26,320.174 TRUCK RINGAN 1.2 L 502,228.283
8,751.423 W18 TRUCK SEDANG 4,742,728.241
685.890 TRUCK 1.22 3,764,419.962
1,825.970 TRUCK GANDENG 3,490,504.880
11,797.591 TRAILER 418,497.375
4,818.893
4,684.255
4,667.426
690.016

6. TABEL PERHITUNGAN ESAL

UR LHR 2019 LHR 2043 DA


3,327 26,320.174
1,560 8,751.423
447 685.890
1,190 1,825.970
20 2,103 11,797.591 0.6
859 4,818.893
835 4,684.255
832 4,667.426
123 690.016
TOTAL

7. PERHITUNGAN TEBAL PLAT BETON


ability mengacu tabel 2.3(AASHTO 1993)
kolektor primer maka R = 80 - 95 0.85 TABEL BEBAS MILIH
andart normal deviate (Zr)
-1.037 DARI TABEL
asi untuk rigid pavement
t deviasi rigid pavement yaitu 0.3-0.4 0.4 MENURUT AASTHO 0,4
erminal serviceability indeks (Pt)
2.5 STANDAR AASTHO

4.5 STANDAR AASTHO


erviceability
2 STANDAR AASTHO

8. Menentukan modulus reaksi tanah dasar


1500xCBR 7350
MR/19,4 378.87

9. Menentukan Modulus Elastisitas beton


naa ini digunakan mutu beto K-350 ( sesuai dengan perencanaan disoal).
ekan karakteristik menggunakan benda uji silinder 150mm-300mm didapat kuat tekan beton sebesar
14.22 psi
4977 psi
57000 akar fc' 4,021,228 psi
dijadikan kg/cm2 282,787 kg/cm2

10. Menentukan Flexural Streght


xural streght
45kg/cm2 4.5 Mpa
640 psi 4.5 Mpa

11. menentukan Koefisien Penyaluran Beban (J)


t dari tabel 2.8
lai J sebesar 2,5 – 3,1 pada perencanaan ini di ambil angka 3

12. Menentukan Koefisien Drainase


variabel persen perkerasan terkena air

3 jam per hari


146 jumlah hari yang hujan dalam setahun
17.5%

0.88
0.00875 < 0.01

Faktor Drainase
d karena biasanya menggunakan itu
ien drainase 1.20

13. Menentukan Tebal Plat Perkerasan

13,033,815.385
-1.037 Zr.So -0.4148
0.4 7.35 7.35
9 0.06
2 log10 segitiga -0.176091259056
4.5 per 1+ 1.0563100645135
2.5
640 MPA RUAS KIRI 7.115071565238
1.20 ruas kanan
3
4,021,228
378.866
15. Menghitung Tulangan Sambungan
1m 3.281 feet

1 inci 2.54 cm
ikm 39.37 inch
3.25 128 inch
9 inch 22.86
3 118.11
10.66325 dibulatkan 11feet

16. Perhitungan Ruji(dowel)

d= D/8
1.125 inch dibulatkan

tebal perkerasan 9 inch 22.86


diameter dowel 1.25 inch 3.175
panjang dowel 18 inch 45.72
jarak dowel 12 inch 30.48

volume jalan cm
tebal perkerasan 22.86 cm
panjang jalan 300000 cm
lebar jalan 325 cm
volume total 2,228,850,000 cm3
2,229 m3

No URAIAN PEKERJAAN KUANTITAS SAT

A PEKERJAAN PERSIAPAN
1 Pembersihan Lokasi 39,000 m2
2 Pembuatan Direksi Keet 20 m2
3 Pengukuran dan Pemasangan patok STA 3,000 m1

B PEKERJAAN TANAH
1 Galian Tanah 12,815 m3
5 Urugan Pasir 3,900 m3

G PEKERJAAN BETON
1 Beton 30 cm 8,915.4 m3
2 Pembesian 544 kg
ANG VDF
3
- -
- -
- 0.076
- 0.384
- 0.278
- 6.420
- 5.242
1.165 4.878
- 3.956

DL HARI DLM 1 THN VDF W18 CUM ESAL


- -
- -
0.075833010132524 7,973.604 7973.60367
0.383904613795901 107,463.039 115436.643
0.7 365 0.277693467381602 502,228.283 617664.926
6.42005643500051 4,742,728.241 5360393.17
5.24222143129299 3,764,419.962 9124813.13
4.87830211177296 3,490,504.880 12615318
3.95631986050297 418,497.375 13033815.4
13033815.3854943 40875414.9

BEBAS MILIH
RUT AASTHO 0,4

AR AASTHO

AR AASTHO

AR AASTHO

CBR SEGMEN 4.9

350 kg/cm2
-0.16670413827 4.22 - 0.32 pt 3.42
sc cd 3121.26906063869
2187.38310304962
log 0.15440635448895

7.23656559407745
1.1

cm
cm
cm
cm

HARGA SAT JUMLAH TOTAL


Rp Rp Rp

Rp 8,628 Rp 336,482,250 lebar 13


Rp 10,000 Rp 200,000 Rp 351,682,250 banyak tul panjang 780,000
Rp 5,000 Rp 15,000,000 65,000
besi 1.2
0.00837031
Rp 21,387 Rp 274,078,859 jadi kilo 544
Rp 893,709,923
Rp 158,880 Rp 619,631,064

Rp 1,366,555 Rp 12,183,384,349
Rp 12,196,896,375
Rp 24,835 Rp 13,512,026
TOTAL SELURUH PEKERJAAN Rp 13,442,288,548
m2

lonjor
cm

kg
STA CBR STA CBR STA CBR STA CBR

84+000 6.52 86+000 5,88 87+000 5,48


84+100 5.07 86+100 5,36 87+100 5,48
84+200 5.09 86+200 5,23 87+200 5,15
84+300 6.78 86+300 5,87 87+300 5,92
84+400 5.25 86+400 4,69 87+400 5,04
84+500 5.15 86+500 6,47 87+500 5,04
84+600 1.3 86+600 6,92 87+600 5,02
84+700 5.34 86+700 5,17 87+700 5,07
84+800 5.9 86+800 5,11 87+800 6,07
84+900 7.13 86+900 5,44 87+900 5,78
Linear
120.0

100.0

80.0
f(x) = − 24.5501729185417 x + 197.757362635206
R² = 0.83646705261528
60.0

40.0

20.0

0.0
4 5 6 7 8 9 10

Eksponen
120.0

100.0 f(x) = 4293.10214791985 exp( − 0.787424600612521 x )


R² = 0.981652666543224

80.0

60.0

40.0

20.0

0.0
4 5 6 7 8 9 10

Polinom
120.0

100.0
f(x) = 7.37553686707892 x² − 121.999363341156 x + 507.676609199098
R² = 0.964715792137142
80.0

60.0

40.0

20.0

0.0
4 5 6 7 8 9 10
y = 4293.1 e-0.787 x
90 = 4293.1 . 2.718-0.787 x
0.020964 = 4293.1-0.787 x
-1.678528 = -0.787 x 0.434249
-0.787x = -3.865355
x = 4.911506
Diurut Nilai Prosentase
STA CBR STA CBR CBR
kan CBR ≥ (%)
88+000 5,22 85+000 6.52 a b
88+100 1.2 85+100 5.07 1 4.69 41 100.0
88+200 7,17 85+200 5.09 2 4.69 41 100.0
88+300 9,15 85+300 6.78 3 4.69 41 100.0
88+400 7,67 85+400 5.25 4 5.02 38 92.7
88+500 5,50 85+500 5.15 5 5.04 37 90.2
88+600 6,56 85+600 1.3 6 5.04 37 90.2
88+700 7.74 85+700 5.34 7 5.07 35 85.4
88+800 7,18 85+800 5.9 8 5.07 35 85.4
88+900 8,92 85+900 7.13 9 5.09 33 80.5
89+000 7,12 86+000 5.88 10 5.11 32 78.0
86+100 5.36 11 5.15 31 75.6
86+200 5.23 12 5.15 31 75.6
86+300 5.87 13 5.17 29 70.7
86+400 4.69 14 5.22 28 68.3
86+500 6.47 15 5.23 27 65.9
86+600 6.92 16 5.25 26 63.4
86+700 5.17 17 5.34 25 61.0
86+800 5.11 18 5.36 24 58.5
86+900 5.44 19 5.44 23 56.1
87+000 5.48 20 5.48 22 53.7
87+100 5.48 21 5.48 22 53.7
87+200 5.15 22 5.5 20 48.8
87+300 5.92 23 5.78 19 46.3
87+400 5.04 24 5.87 18 43.9
87+500 5.04 25 5.88 17 41.5
87+600 5.02 26 5.9 16 39.0
87+700 5.07 27 5.92 15 36.6
87+800 6.07 28 6.07 14 34.1
87+900 5.78 29 6.47 13 31.7
88+000 5.22 30 6.52 12 29.3
88+100 1.2 31 6.56 11 26.8
88+200 7.17 32 6.78 10 24.4
88+300 9.15 33 6.92 9 22.0
88+400 7.67 34 7.12 8 19.5
88+500 5.5 35 7.13 7 17.1
88+600 6.56 36 7.17 6 14.6
88+700 7.74 37 7.18 5 12.2
88+800 7.18 38 7.67 4 9.8
88+900 8.92 39 7.74 3 7.3
89+000 7.12 40 8.92 2 4.9
41 9.15 1 2.4
Data Perencanan
Fungsi Kolektor Primer
Jenis Perkerasan FLEXIBLE PAVEMENT
Panjang Jalan 3 Km
Tipe Jalan 4 lajur 2 arah tak terbagi (4/2UD)
lebar per lajur 3.25 m
Lebar Bahu 1.5 m
Kelas Beton K-350
Umur Rencana (UR) 20 thn
Kelas Jalan lentur mutu terbaik
jalan dibuka 2023
CBR TANAH STA 84+600 1.3
STA 88+100 1.2

DATA JUMLAH KENDARAAN

JENIS KENDARAAN JUMLAH LHR2019 PERTUMBUHAN


MOBIL PENUMPANG 3327 9.00 %
PICKUP,MICRO TRUCK 1560 7.45 %
BUS KECIL 447 1.80 %
BUS BESAR 1190 1.80 %
TRUCK RINGAN 1.2 L 2103 7.45 %
TRUCK SEDANG 1.2 H 859 7.45 %
TRUCK 1.22 835 7.45 %
TRUCK GANDENG 4 Sb 832 7.45 %
TRAILER 123 7.45 %
Data Perencanan
Fungsi : Kolektor Primer
Jenis Perkerasan : FLEXIBLE PAVEMENT
Panjang Jalan : 3
Tipe Jalan : 4 lajur 2 arah tak terbagi (4/2UD)
lebar per lajur : 3.25
Lebar Bahu : 1.5
Kelas Beton : K-350
Umur Rencana (UR) : 20
Kelas Jalan : Lentur Mutu Terbaik
Jenis Lapisan : LASTON
Kerataan (Roughness) : > 1000
Lapis Atas : LASTON
Lapis Pondasi Atas :
Lapis Pondasi Bawah :
CBR TANAH : 5.05
FP = UR/10 : 2
Curah Hujan : 800
Kelandaian :
1. Perhitungan LHR

4 LHR 2023 + UR
JENIS KENDARAAN LHR 2019 I LHR 2023
MOBIL PENUMPANG 3327 0.0900 4696
PICKUP,MICRO TRUCK 1560 0.0745 2079
BUS KECIL 447 0.0180 480
BUS BESAR 1190 0.0180 1278
TRUCK RINGAN 1.2 L 2103 0.0745 2803
TRUCK SEDANG 1.2 H 859 0.0745 1145
TRUCK 1.22 835 0.0745 1113
TRUCK GANDENG 4 Sb 832 0.0745 1109
TRAILER 123 0.0745 164

2. Perhitungan E

JENIS KENDARAAN Konfigurasi Berat Roda Depan


Sumbu (ton) (E)
MOBIL PENUMPANG 50 : 50 0.5 (50% x 0,5 / 8,16)4
PICKUP,MICRO TRUCK 50 : 50 0.5 (50% x 0,5 / 8,16)4
BUS KECIL 34 : 66 9.0 (34% x 9,0 / 8,16)4
BUS BESAR 34 : 66 9.0 (34% x 9,0 / 8,16)4
TRUCK RINGAN 1.2 L 34 : 66 8.3 (34% x 8,3 / 8,16)4
TRUCK SEDANG 1.2 H 34 : 66 8.3 (34% x 8,3 / 8,16)4
TRUCK 1.22 25 : 75 8.3 (25% x 8.3 / 8,16)4
TRUCK GANDENG 4 Sb 17 : 35 : 24 : 24 31.4 0.18312753
TRAILER 17 : 35 : 24 : 24 31.4 0.18312753

6. Menentukan koefisien C (tabel)


Lebar lajur = 3.25 m
Jumlah lajur = 4

Jenis Konfigurasi Berat E


Kendaraan Sumbu (ton)
MOBIL PENUMPANG 50 : 50 0.3 0.0000018
PICKUP,MICRO TRUCK 50 : 50 0.5 0.0000018
BUS KECIL 34 : 66 9 0.3005677
BUS BESAR 34 : 66 9 0.3005677
TRUCK RINGAN 1.2 L 34 : 66 8.3 0.2174125
TRUCK SEDANG 1.2 H 34 : 66 8.3 0.2174125
TRUCK 1.22 25 : 75 8.3 0.0333083
TRUCK GANDENG 4 Sb 17 : 35 : 24 : 24 31.4 4.9282862
TRAILER 17 : 35 : 24 : 24 31.4 4.9282862

7. Lintas Ekivalen Permulaan (LEP), Lintas Ekivalen Akhir (LEA) & Lintas Ekivalen Tengah (LET) & Linta

Jenis Konfigurasi Berat E


Kendaraan Sumbu (ton)
MOBIL PENUMPANG 50 : 50 0.3 0.0000018
PICKUP,MICRO TRUCK 50 : 50 0.5 0.0000018
BUS KECIL 34 : 66 9 0.3005677
BUS BESAR 34 : 66 9 0.3005677
TRUCK RINGAN 1.2 L 34 : 66 8.3 0.2174125
TRUCK SEDANG 1.2 H 34 : 66 8.3 0.2174125
TRUCK 1.22 25 : 75 8.3 0.0333083
TRUCK GANDENG 4 Sb 17 : 35 : 24 : 24 31.4 4.9282862
TRAILER 17 : 35 : 24 : 24 31.4 4.9282862

Tabel LER
Lintas Ekivalen Rencana Klasifikasi Jalan
LER Lokal Kolektor Arteri
< 10 1.0-1.5 1.5 1.5-2.0
10 - 100 1.5 1.5-2.0 2
100 - 1000 1.5-2.0 2 2.0-2.5
> 1000 - 2.0-2.5 2.5
diambil Ipt 2.5
8. Penentuan Penggunaan Nomogram
LASTON
Nilai Roughness > 1000 ; Ipo = 3.9 - 3.5
mm/th

LER = 17380.944
Dengan hasil LER > 1000, Ipt = 2.0 - 2.5, maka diambil Ipt = 2.5

9. Perencanaan

% kendaraan berat = = (627+1670+6896+2817+2738+2728+403)/40102 * 100%


0.45406751214237
45.4%

Kelandaian III = 13%


% kendaraan berat = > 30%
Curah Hujan = 800 mm/th
FR = 2.0
DDT = 4.7

PENGGUNAAN NOMOGRAM 2
PAVEMENT
Km
h tak terbagi (4/2UD)
m
m

Th

mm/km

mm/th

LHR 2048
26320
8751
686
1826
11798
4819
4684
4667
690

Roda Belakang Total


(E) E
0.00000088 (50% x 0,5 / 8,16)4 0.00000088 0.0000018
0.00000088 (50% x 0,5 / 8,16) 4
0.00000088 0.0000018
0.01977539 (66% x 9,0 / 8,16) 4
0.28079227 0.3005677
0.01977539 (66% x 9,0 / 8,16) 4
0.28079227 0.3005677
0.01430433 (66% x 9,0 / 8,16) 4
0.20310821 0.2174125
0.01430433 (66% x 9,0 / 8,16) 4
0.20310821 0.2174125
0.00418130 0.086 x (75% x 8.3 / 8,16)4 0.02912697 0.0333083
3.29025937 0.72744962 0.72744962 4.9282862
3.29025937 0.72744962 0.72744962 4.9282862

0.300
0.300
0.450
0.450
0.450
0.450
0.450
0.450
0.450

tas Ekivalen Tengah (LET) & Lintas Ekivalen Rencana (LER)

C LHR2023 LHR2043 LEP LEA LET

0.300 4696 26320 0.002 0.014 (LEP+LEA)/2


0.300 2079 8751 0.001 0.005
0.450 480 686 64.931 92.770
0.450 1278 1826 172.859 246.972
0.450 2803 11798 274.260 1154.225
0.450 1145 4819 112.025 471.459
0.450 1113 4684 16.683 70.211
0.450 1109 4667 2459.560 10351.084
0.450 164 690 363.613 1530.268
64242 3463.935 13917.009 8690.472

Tol
-
-
-
2.5
)/40102 * 100%
LER

LET x FP

17380.944