Code
NO ITEM SATUAN HARGA QTY JUMLAH TOTAL SALDO
A BIAYA MATERIAL
1 Pasir a truck 1,072,000 5 5,360,000
2 Semen Tiga Roda b sak 54,019 135 7,292,500
3 Batu Belah c colt 710,000 5 3,550,000
4 Batu Split d colt 812,500 4 3,250,000
5 Batu Bata e pcs 650 17,000 11,050,000
6 Kusen (Kamper) f pintu 450,000 - 7,000,000
7 Besi Tiang uk 10 g pcs 61,272 323 19,791,000
8 Tali Kawat h kg 20 15,009.50 295,000
9 Paku i kg 33,214 14 465,000
10 Paku uk.4 cm j pcs 13,000 10 130,000
11 Besi Cincin Tiang uk. 6 full k pcs 28,788 66 1,900,000
12 Papan l lmbr 20,000 24 480,000
13 Tali Benang m kg 3,667 3 11,000
14 Kaso n btg 168,333 24 4,040,000
15 Kopi o 21,500 2 43,000
16 Ember p pcs 10,000 4 40,000
17 Scop q pcs 60,000 1 60,000
18 Selang Air r mtr 6,000 20 120,000
19 Ragaji Besi s pcs 15,000 2 30,000
20 Kayu t btg 8,923 52 464,000
21 Biaya Lain2 u 75,000 1 75,000
22 Pengki Plastik v pcs 10,000 1 10,000
23 Ram ayakan Pasir w mtr 15,000 2 22,500
24 kue x 87,625 4 350,500
25 Triplex y 117,500 40 4,700,000
26 paralon z 12,000 4 48,000
27 Awi gede a1 10,000 250 2,500,000
28 awi kecil a2 9000 135 1,215,000
29
30
31
32
33
34
35
36
37
38
39
40
41
12
13
14
15
16
17
18
19
20
TOTAL 11,300,000
15### 915000
10### 280000
15000
1210000
160000
20000
42,800.00
53,500 25 1,337,500
-
NOTA PEMBAYAR
NAMA
PERIODE
POSISI UPAH/HARI
TUKANG 85,000
KENEK 70,000
NOTA PEMBAYAR
NAMA
PERIODE
POSISI UPAH/HARI
TUKANG 85,000
KENEK 70,000
NOTA PEMBAYAR
NAMA
PERIODE
POSISI UPAH/HARI
TUKANG 85,000
KENEK 70,000
PERIODE
X = TUKANG 85,000 X =
X = KENEK 70,000 X =
= =
PERIODE
X = TUKANG 85,000 X =
X = KENEK 70,000 X =
= =
PERIODE
X = TUKANG 85,000 X =
X = KENEK 70,000 X =
= =
18/03/14 sabtu minggu senin selasa rabu kamis jumat sabtu minggu senin selasa
MERET 2014
NO NAMA POSISI Harga /hari Jumlah Hari Biaya Pengeluaran
18 19 20 21 22 23 24 25 26 27 28 29 30 31 1 2 3 4 5 6 7 8
S
3 Mang Ujang Kenek 70,000 60 4,200,000 0 0 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1
N A
LUN AS LUN AS LUN AS
LIBUR
LIBUR
LIBUR
4 Mang Sarip Kenek 70,000 38 2,660,000 0 0 1 1 1 1 1 1 1 0 1 1 1 1 1 1 1 1 1
LU
5 Mang Aep Kenek 70,000 16 1,120,000 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
1 2 3 4
1700000
18/03/14 sabtu minggu senin selasa rabu kamis jumat sabtu minggu senin selasa
MERET 2014
NO NAMA POSISI Harga /hari Jumlah Hari Biaya Pengeluaran
18 19 20 21 22 23 24 25 26 27 28 29 30 31 1 2 3 4 5 6 7 8
2 Proses Rencana
Pondasi Rumah
Aktual
Rencana
Cor Rumah
LIBUR
LIBUR
Aktual
rabu kamis jumat sabtu minggu senin selasa rabu kamis jumat sabtu minggu senin selasa rabu kamis jumat sabtu minggu senin selasa rabu kamis jumat sabtu minggu senin selasa rabu kamis jumat sabtu minggu senin selasa rabu kamis jumat
9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16
1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1
1 1 1 1 1 1 1 1 0 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1
1 1 1 1 1 1 1 1 1 1 1 1 1 1 0 1 1 1 1 0 1 0 1 1 1 1 1 1 1 1 1
PEMILU
AS LUN AS
LIBUR
LIBUR
LIBUR
LIBUR
LIBUR
LIBUR
1 1 1 1 1 1 1 1 LUN AS
1 1 1 1 1 1 LUN AS
1 1 0 1 1 1 LUN AS
1 0 0 1 1 0 LUN AS
0 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 1 1 1 1 1 1
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 4 0 4 4 4 4 4 4 0 4 3 4 4 4 4 0 4 3 4 3 4 4 0 3 4 2 3 4 4 0 4 4 4 4 4 4 0
5 6 7 8 9
9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16
rabu kamis jumat sabtu minggu senin selasa rabu kamis jumat sabtu minggu senin selasa rabu kamis jumat sabtu minggu senin selasa rabu kamis jumat sabtu minggu senin selasa rabu kamis jumat sabtu minggu senin selasa rabu kamis jumat
9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16
sabtu minggu senin selasa rabu kamis jumat sabtu minggu senin selasa rabu kamis jumat sabtu minggu senin selasa rabu kamis jumat sabtu minggu senin selasa rabu kamis jumat sabtu minggu senin selasa rabu kamis jumat sabtu minggu senin
17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23
1 0 0 1 1 1 1 1 1 1 1 1 0 0 1 1 1 1
PE
1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
N
G
1 EC0 0 0 1 1 1 1 1 1 1 1 1 1 1 1 1 1
O LIBUR
LIBUR
LIBUR
LIBUR
LIBUR
LIBUR
0 RA0
LUN AS 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
N
1 0 0 1 1 1 1 1 1 1 1 1 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0 0 1 1 1 1 1 1
0 0 0 0 0 0 0 0 0 0 0 0 1 1 1 1 1 1
4 0 0 2 3 3 0 3 3 3 3 3 3 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 3 3 4 4 4 4 0 0 0 0
10 11 12 13 14 15
2014
17 18 19 20 21 22 23 24 25 26 27 28 29 30 31
sabtu minggu senin selasa rabu kamis jumat sabtu minggu senin selasa rabu kamis jumat sabtu minggu senin selasa rabu kamis jumat sabtu minggu senin selasa rabu kamis jumat sabtu minggu senin selasa rabu kamis jumat sabtu minggu senin
17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23
selasa rabu kamis jumat sabtu minggu senin selasa rabu kamis jumat sabtu minggu senin selasa rabu kamis jumat sabtu minggu senin selasa rabu kamis jumat sabtu minggu senin selasa rabu kamis jumat sabtu minggu senin selasa rabu kamis
JULI 2014
24 25 26 27 28 29 30 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31
LIBUR
LIBUR
LIBUR
LIBUR
LIBUR
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
15 16 17 18 19 20
TOTAL
HARI
64
50
60
38
16
240
TOTAL
HARI
75 Hari
PEMBAYARAN UPAH PEGAWAI (PEMBANGUNAN RUMAH)
6 420,000 15/05/14
1,660,000
7,440,000
PEMBAYARAN
10 11 12 13
Hari Upah Tgl Hari Upah Tgl Hari Upah Tgl Hari Upah
1 85,000 22/05/14 0 - - -
0 - 0 - - -
270,000
PEMBAYARAN
13 14 15 16 17
Tgl Hari Upah Tgl Hari Upah Tgl Hari Upah Tgl Hari
4 340,000 0 - 0 - 0
0 - 0 - 0 - 0
6 420,000 0 - 0 - 0
0 - 0 - 0 - 0
0 - 0 - 0 - 0
6 510,000 0 - 0 - 0
6 420,000 0 - 0 - 0
22 1,690,000 - - - - -
17 18 19 20
Upah Tgl Hari Upah Tgl Hari Upah Tgl Hari Upah
- 0 - 0 - 0 -
- 0 - 0 - 0 -
- 0 - 0 - 0 -
- 0 - 0 - 0 -
- 0 - 0 - 0 -
- 0 - 0 - 0 -
- 0 - 0 - 0 -
- - - - - - -
20 21 22 23 24
Tgl Hari Upah Tgl Hari Upah Tgl Hari Upah Tgl Hari
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - - - - - -
24 25 26
Upah Tgl Hari Upah Tgl Hari Upah Tgl
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - - - -
TAHAP PEKERJAAN PEMBANGUNAN RUMAH
A Persiapan Awal
1 Tenaga Kerja
1 Tukang
2 Kenek
2 Pengukuran Lahan Tanah
3 Persiapan Bahan Material
1 Pasir
2 Semen
3 Batu Belah
4 Batu Split (Batu Kerikil u/ cor)
5 Besi Tiang uk. 10
6 Besi Cincin Tiang uk. 6
7 Tali Kawat
8 Batu Bata Merah
9 Kusen Kayu (kamper)
10 Kusen Alumunium (u/ kamar mandi)
11 Kayu Balok (u membuat cincin tiang)
12 Kayu Kaso
13 Benag Nilon
14 Papan
15 Paku
16 Regaji Besi
17 Scoop
18 Pacul
19 Ember
20 Selang
21 Ram Kawat (u/ ayakan pasir)
22 Daun Pintu
23 Engsel Pintu
24 Pipa Paralon (pemasangan kabel listrik)
25 Lampu
26 Stop Kontak
27 Saklar
28 GRC (langit-langit)
29 Gipsum
30 Rangka atap (baja ringan)
31 Keramik
32 Cat Tembok
33 Cat Pintu
34 Kran Air
35 Pipa Paralon (pemasangan saluran air)
36 Toren (penampung air)
37 Wastafle Dapur
38 Closet Duduk
39 Closet Jongkok
40 Kaca
41 AC (air condicioner)
42 Kulkas
43 Kompor Gas
44 Kursi
45 TV
46 Kasur
47 Lemari
48 Kitcen Set
NO Jenis Pekerjaan Satuan Harga Jumlah Total
49 Jet pump
50 Gerbang Teralis
B Pekerjaan Pondasi
1 Galian Tanah
2 Pemasangan Batu Belah
3 Pemasangan Besi Tiang (sloop atas)
4 Penyemenan
5 Pemasangan Besi Tiang (sloop bawah)
C Pemasangan Batu Bata dan Kusen
1 Pemasangan Batu Bata
2 Pemasangan Kusen Pintu & Jendela
3 Plester Dinding
4 Penghalusan Dinding (acian)
D Instalasi Listrik
1 Pemasangan Pipa Paralon (untuk kabel listrik)
2 Pemasangan Kabel-kabel Listrik
3 Pemasangan Stop Kontak & saklar
4 Pemasangan Titik Lampu
E Instalasi air
1 Pengerjaan Saluran Pembuangan
2 Pengerjaan Saluran Air Bersih
3 Pengerjaan Septictank dan Rembesan
4 Pengerjaan Bor Tanah
F Pekerjaan Sanitasi
1 Pemasangan Closet
2 Pembuatan Bak Mandi
3 Pemasangan Kran
4 Pemasangan Wastafle
5 Pemasangan Toren (penampung air)
G Pengerjaan Keramik
1 Pemasangan Keramik Lantai
2 Pemasangan Keramik Kamar Mandi
3 Pemasangan Keramik Dinding (u/ kamar mandi)
H Pengecatan
1 Pengecatan Dinding Dalam
2 Pengecatan Dinding Luar
3 Pengecatan Kusen dan Daun Pintu
BIAYA PEMBANGUNAN RUMAH LANTAI 2
JL. Kolam Renang Gg. Nusantara II Kel. Purwamekar Kab. Purwakarta
9
TOTAL BIAYA MAKAN & MINUM
G. Biaya Instalasi Listrik
1 26/05/14 Com Saklar d1 pcs 3.00
2 27/05/14 Com Saklar d1 pcs 4.00
3 27/05/14 stop contack broco d2 pcs 1.00
4 27/05/14 saklar d3 pcs 1.00
5 27/05/14 socet tv d4 pcs 2.00
6 16/06/14 Instalasi Listrik 1300VA d5 unit 1.00
7 15/06/14 Paralon uk. 5/8 (onta) d6 pcs 15.00
8
9
10
11
12
13
TOTAL BIAYA INSTALASI LISTRIK
H. Biaya Instalasi Air
1 16/06/14 Kne 3R (Bengkokan 3" Inc) e1 pcs 8.00
2 Paralon Wavin (PVC 3 AW Wavin) e2 btg 12.00
3 Sambungan Paralon (T 3R) e3 pcs 1.00
4 Lem Paralon Isarplas e4 pcs 10.00
5 e5
6 e6
7 e7
8 e8
9 e9
10 e10
TOTAL BIAYA INSTALASI AIR
62,000,000 62,000,000
1,936,000
-
1,500,000
65,436,000
85,000 5,440,000
85,000 4,250,000
70,000 4,200,000
70,000 2,660,000
70,000 1,120,000
85,000 510,000
70,000 420,000
-
120,000 120,000
120,000 120,000
120,000 120,000
120,000 120,000
120,000 120,000
100,000 100,000
100,000 100,000
100,000 100,000
100,000 100,000
100,000 100,000
100,000 100,000
100,000 100,000
100,000 100,000
100,000 100,000
100,000 100,000
100,000 100,000
100,000 100,000
100,000 100,000
100,000 100,000
100,000 100,000
100,000 100,000
-
-
-
-
20,800,000
61,000 4,270,000
28,000 560,000
15,000 30,000
53,000 530,000
61,000 915,000
28,000 280,000
15,000 15,000
62,000 248,000
12,000 12,000
53,500 1,337,500
12,000 48,000
53,500 1,872,500
61,000 183,000
27,500 110,000
53,500 1,872,500
13,000 130,000
295,000 590,000
12,000 48,000
61,000 610,000
27,500 55,000
15,000 15,000
61,000 4,270,000
27,500 825,000
15,000 75,000
60,000 6,000,000
15,000 150,000
2,500,000 5,000,000
60,000 3,000,000
2,500,000 2,500,000
56,000 560,000
10,000 5,000
250,000 250,000
250,000 250,000
250,000 250,000
230,000 230,000
250,000 250,000
250,000 250,000
56,000 560,000
230,000 230,000
25,000 50,000
50,000 50,000
1,600,000 1,600,000
250,000 250,000
56,000 560,000
650 5,200,000
20,000 100,000
250,000 250,000
650 4,550,000
1,600,000 1,600,000
650 1,300,000
250,000 250,000
13,000 26,000
18,000 18,000
20,000 10,000
15,000 15,000
17,000 85,000
12,000 6,000
12,000 36,000
16,000 48,000
13,000 13,000
7,000,000 7,000,000
250,000 250,000
55,000 1,100,000
250,000 250,000
53,500 3,210,000
18,000 108,000
550,000 550,000
47,000 188,000
400,000 400,000
102,000 102,000
5,000 20,000
47,000 47,000
56,000 560,000
1,700,000 1,700,000
-
-
-
-
-
-
-
-
69,888,500
8,000 240,000
117,500 4,700,000
2,250,000 2,250,000
130,000 650,000
130,000 390,000
117,000 2,340,000
130,000 650,000 2,250,000.00
20,000 320,000
10,500 105,000 17.31
10,000 80,000
9,000 108,000
10,000 750,000
9,000 225,000
10,000 650,000
9,000 315,000
10,000 200,000
9,000 270,000
10,000 200,000
9,000 270,000
10,000 400,000
9,000 90,000
10,000 300,000
9,000 45,000
28,000 280,000
20,000 20,000
20,000 160,000
5,500 44,000
10,000 200,000
16,000 16,000
-
-
-
-
-
16,268,000
5,000 5,000
10,000 40,000
15,000 22,500
6,000 120,000
60,000 60,000
10,000 10,000
200,000 200,000
3,000 6,000
15,000 30,000
6,000 90,000
7,500 22,500 20,000.00
6,000 90,000
10,000 20,000
7,500 150,000
10,000 50,000
15,000 15,000
-
-
-
-
-
-
-
-
-
-
-
-
931,000
10,600 10,600
-
147,000 147,000
13,000 78,000
15,000 15,000
9,000 45,000
17,000 17,000
29,000 29,000
100,000 100,000
17,000 17,000
60,000 60,000
32,000 32,000
53,000 53,000
35,000 35,000
30,000 30,000
15,000 15,000
30,000 30,000
34,500 34,500
30,000 30,000
205,000 205,000
25,000 25,000
56,000 56,000
50,000 50,000
30,000 30,000
50,000 50,000
30,000 30,000
12,000 12,000
45,000 45,000
64,000 64,000
45,000 45,000
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
1,390,100
3,000 9,000
2,500 10,000
25,000 25,000
14,500 14,500
35,000 70,000
1,800,000 1,800,000
6,000 90,000
-
-
-
-
-
-
2,018,500
13,000 104,000
140,000 1,680,000
18,000 18,000
7,500 75,000
-
-
-
-
-
-
1,877,000
113,173,100
109,036,100
(4,137,000)