DIV.II PEKERJAAN PEMATANGAN LANTAI DALAM BANGUNAN T = 10 CM 1.02 0.34 0.34 0.34
DIV. V PEKERJAAN DINDING 18.99 3.17 3.17 3.17 3.17 3.17 3.17
50.00
DIV. VI PEKERJAAN BETON STRUKTUR 26.02 8.67 8.67 8.67
DIV. VII PEKERJAAN BETON BERTULANG KOLOM PRAKTIS 6.52 1.63 1.63 1.63 1.63
DIV. VIII PEKERJAAN BETON BERTULANG BALOK LATEI 3.02 1.51 1.51 25.00
DIV. IX PEKERJAAN RABAT LANTAI BETON TEBAL 15 CM 7.58 2.53 2.53 2.53
DIV. X PEKERJAAN ATAP BAJA 35.94 7.19 7.19 7.19 7.19 7.19
BOBOT RENCANA 100.00 0.46 0.34 9.01 9.01 19.03 11.98 14.51 16.02 16.02 3.63 0.00
BOBOT RENCANA KOMULATIF 0 0.46 0.80 9.81 18.82 37.85 49.83 64.34 80.36 96.37 100.0 RENCANA
BOBOT REALISASI 0 0.18 0.53 3.13 7.84 4.86
BOBOT REALISASI KOMULATIF 0.18 0.71 3.84 11.68 16.54 REALISASI
DEVIASI -0.28 -0.09 -5.97 -7.14 -21.31
DIV.II PEKERJAAN PEMATANGAN LANTAI DALAM BANGUNAN T = 10 CM 1.02 0.34 0.34 0.34
DIV. V PEKERJAAN DINDING 18.99 3.17 3.17 3.17 3.17 3.17 3.17
50.00
DIV. VI PEKERJAAN BETON STRUKTUR 26.02 8.67 8.67 8.67
DIV. VII PEKERJAAN BETON BERTULANG KOLOM PRAKTIS 6.52 1.63 1.63 1.63 1.63
DIV. VIII PEKERJAAN BETON BERTULANG BALOK LATEI 3.02 1.51 1.51
25.00
DIV. IX PEKERJAAN RABAT LANTAI BETON TEBAL 15 CM 7.58 2.53 2.53 2.53
DIV. X PEKERJAAN ATAP BAJA 35.94 7.19 7.19 7.19 7.19 7.19
BOBOT RENCANA 100 0.46 0.34 9.01 9.01 19.03 11.98 14.51 16.02 16.02 3.63 0.00
BOBOT RENCANA KOMULATIF 0 0.46 0.80 9.81 18.82 37.85 49.83 64.34 80.36 96.37 100.0 RENCANA
BOBOT REALISASI 0 0.18 0.53 3.13 7.84 4.86 4.91
BOBOT REALISASI KOMULATIF 0.18 0.71 3.84 11.68 16.54 21.45 REALISASI
DEVIASI -0.28 -0.09 -5.97 -7.14 -21.31 -28.38
DIV.II PEKERJAAN PEMATANGAN LANTAI DALAM BANGUNAN T = 10 CM 1.02 0.34 0.34 0.34
DIV. V PEKERJAAN DINDING 18.99 3.17 3.17 3.17 3.17 3.17 3.17
DIV. VII PEKERJAAN BETON BERTULANG KOLOM PRAKTIS 6.52 1.63 1.63 1.63 1.63
DIV. VIII PEKERJAAN BETON BERTULANG BALOK LATEI 3.02 1.51 1.51
25
DIV. IX PEKERJAAN RABAT LANTAI BETON TEBAL 15 CM 7.58 2.53 2.53 2.53
DIV. X PEKERJAAN ATAP BAJA 35.94 7.19 7.19 7.19 7.19 7.19
BOBOT RENCANA 100 0.46 0.34 9.01 9.01 19.03 11.98 14.51 16.02 16.02 3.63 0
BOBOT RENCANA KOMULATIF 0 0.46 0.80 9.81 18.82 37.85 49.83 64.34 80.36 96.37 100.0 RENCANA
BOBOT REALISASI 0 0.18 0.53 3.13 7.84 4.86 4.91 1.87 1.63 4.19 4.81
BOBOT REALISASI KOMULATIF 0.18 0.71 3.84 11.68 16.54 21.45 23.32 24.95 24.56 44.83 REALISASI
DEVIASI -0.28 -0.09 -5.97 -7.14 -21.31 -28.38 -41.02 -55.40 -71.81 -55.17
DIV. V PEKERJAAN DINDING 18.99 3.17 3.17 3.17 3.17 3.17 3.17
DIV. VIII PEKERJAAN BETON BERTULANG BALOK LATEI 3.02 1.51 1.51
25
DIV. IX PEKERJAAN RABAT LANTAI BETON TEBAL 15 CM 7.58 2.53 2.53 2.53
DIV. X PEKERJAAN ATAP BAJA 35.94 7.19 7.19 7.19 7.19 7.19
BOBOT RENCANA 100 0.46 0.34 9.01 9.01 19.03 11.98 14.51 16.02 16.02 3.63
0
BOBOT RENCANA KOMULATIF 0 0.46 0.80 9.81 18.82 37.85 49.83 64.34 80.36 96.37 100.0 RENCANA
BOBOT REALISASI 0 0.18 0.53 3.13 7.84 4.86 4.91 1.87 1.63 4.19 6.14
BOBOT REALISASI KOMULATIF 0.18 0.71 3.84 11.68 16.54 21.45 23.32 24.95 29.14 35.28 REALISASI
DEVIASI -0.28 -0.09 -5.97 -7.14 -21.31 -28.38 -41.02 -55.40 -67.23 -64.72
DIV. VII PEKERJAAN BETON BERTULANG KOLOM PRAKTIS 7.67 1.63 1.63 1.63 1.63 50
DIV. VIII PEKERJAAN BETON BERTULANG BALOK LATEI 6.26 1.51 1.51
DIV. IX PEKERJAAN RABAT LANTAI BETON TEBAL 15 CM 3.31 2.53 2.53 2.53
25
DIV. X PEKERJAAN ATAP BAJA - 7.19 7.19 7.19 7.19 7.19
DIV.II PEKERJAAN PEMATANGAN LANTAI DALAM BANGUNAN T = 10 CM 1.02 0.34 0.34 0.34
DIV. V PEKERJAAN DINDING 18.99 3.17 3.17 3.17 3.17 3.17 3.17
50.00
DIV. VI PEKERJAAN BETON STRUKTUR 26.02 8.67 8.67 8.67
DIV. VII PEKERJAAN BETON BERTULANG KOLOM PRAKTIS 6.52 1.63 1.63 1.63 1.63
DIV. VIII PEKERJAAN BETON BERTULANG BALOK LATEI 3.02 1.51 1.51 25.00
DIV. IX PEKERJAAN RABAT LANTAI BETON TEBAL 15 CM 7.58 2.53 2.53 2.53
DIV. X PEKERJAAN ATAP BAJA 35.94 7.19 7.19 7.19 7.19 7.19
BOBOT RENCANA 100.00 0.46 0.34 9.01 9.01 19.03 11.98 14.51 16.02 16.02 3.63 0.00
BOBOT RENCANA KOMULATIF 0 0.46 0.80 9.81 18.82 37.85 49.83 64.34 80.36 96.37 100.0 RENCANA
BOBOT REALISASI 0 0.18 0.53 3.13 7.84 4.86
BOBOT REALISASI KOMULATIF 0.18 0.71 3.84 11.68 16.54 REALISASI
DEVIASI -0.28 -0.09 -5.97 -7.14 -21.31
DIV.II PEKERJAAN PEMATANGAN LANTAI DALAM BANGUNAN T = 10 CM 1.02 0.34 0.34 0.34
DIV. V PEKERJAAN DINDING 18.99 3.17 3.17 3.17 3.17 3.17 3.17
50.00
DIV. VI PEKERJAAN BETON STRUKTUR 26.02 8.67 8.67 8.67
DIV. VII PEKERJAAN BETON BERTULANG KOLOM PRAKTIS 6.52 1.63 1.63 1.63 1.63
DIV. VIII PEKERJAAN BETON BERTULANG BALOK LATEI 3.02 1.51 1.51
25.00
DIV. IX PEKERJAAN RABAT LANTAI BETON TEBAL 15 CM 7.58 2.53 2.53 2.53
DIV. X PEKERJAAN ATAP BAJA 35.94 7.19 7.19 7.19 7.19 7.19
BOBOT RENCANA 100 0.46 0.34 9.01 9.01 19.03 11.98 14.51 16.02 16.02 3.63 0.00
BOBOT RENCANA KOMULATIF 0 0.46 0.80 9.81 18.82 37.85 49.83 64.34 80.36 96.37 100.0 RENCANA
BOBOT REALISASI 0 0.18 0.53 3.13 7.84 4.86 4.91
BOBOT REALISASI KOMULATIF 0.18 0.71 3.84 11.68 16.54 21.45 REALISASI
DEVIASI -0.28 -0.09 -5.97 -7.14 -21.31 -28.38
DIV.II PEKERJAAN PEMATANGAN LANTAI DALAM BANGUNAN T = 10 CM 1.02 0.34 0.34 0.34
DIV. V PEKERJAAN DINDING 18.99 3.17 3.17 3.17 3.17 3.17 3.17
DIV. VII PEKERJAAN BETON BERTULANG KOLOM PRAKTIS 6.52 1.63 1.63 1.63 1.63
DIV. VIII PEKERJAAN BETON BERTULANG BALOK LATEI 3.02 1.51 1.51
25
DIV. IX PEKERJAAN RABAT LANTAI BETON TEBAL 15 CM 7.58 2.53 2.53 2.53
DIV. X PEKERJAAN ATAP BAJA 35.94 7.19 7.19 7.19 7.19 7.19
BOBOT RENCANA 100 0.46 0.34 9.01 9.01 19.03 11.98 14.51 16.02 16.02 3.63 0
BOBOT RENCANA KOMULATIF 0 0.46 0.80 9.81 18.82 37.85 49.83 64.34 80.36 96.37 100.0 RENCANA
BOBOT REALISASI 0 0.18 0.53 3.13 7.84 4.86 4.91 1.87 1.63 4.19 4.81
BOBOT REALISASI KOMULATIF 0.18 0.71 3.84 11.68 16.54 21.45 23.32 24.95 24.56 44.83 REALISASI
DEVIASI -0.28 -0.09 -5.97 -7.14 -21.31 -28.38 -41.02 -55.40 -71.81 -55.17
DIV. V PEKERJAAN DINDING 18.99 3.17 3.17 3.17 3.17 3.17 3.17
DIV. VIII PEKERJAAN BETON BERTULANG BALOK LATEI 3.02 1.51 1.51
25
DIV. IX PEKERJAAN RABAT LANTAI BETON TEBAL 15 CM 7.58 2.53 2.53 2.53
DIV. X PEKERJAAN ATAP BAJA 35.94 7.19 7.19 7.19 7.19 7.19
BOBOT RENCANA 100 0.46 0.34 9.01 9.01 19.03 11.98 14.51 16.02 16.02 3.63
0
BOBOT RENCANA KOMULATIF 0 0.46 0.80 9.81 18.82 37.85 49.83 64.34 80.36 96.37 100.0 RENCANA
BOBOT REALISASI 0 0.18 0.53 3.13 7.84 4.86 4.91 1.87 1.63 4.19 6.14
BOBOT REALISASI KOMULATIF 0.18 0.71 3.84 11.68 16.54 21.45 23.32 24.95 29.14 35.28 REALISASI
DEVIASI -0.28 -0.09 -5.97 -7.14 -21.31 -28.38 -41.02 -55.40 -67.23 -64.72
DIV. VI PEKERJAAN BETON STRUKTUR 24.02 4.00 4.00 4.00 4.00 4.00 4.00
DIV. VII PEKERJAAN BETON BERTULANG KOLOM PRAKTIS 7.67 1.63 1.63 1.63 1.63 50
DIV. VIII PEKERJAAN BETON BERTULANG BALOK LATEI 6.26 1.51 1.51
DIV. IX PEKERJAAN RABAT LANTAI BETON TEBAL 15 CM 3.31 2.53 2.53 2.53
25
DIV. X PEKERJAAN ATAP BAJA - 7.19 7.19 7.19 7.19 7.19
DIV.II PEKERJAAN PEMATANGAN LANTAI DALAM BANGUNAN T = 10 CM 1.02 0.34 0.34 0.34
DIV. V PEKERJAAN DINDING 18.99 3.17 3.17 3.17 3.17 3.17 3.17
50.00
DIV. VI PEKERJAAN BETON STRUKTUR 26.02 8.67 8.67 8.67
DIV. VII PEKERJAAN BETON BERTULANG KOLOM PRAKTIS 6.52 1.63 1.63 1.63 1.63
DIV. VIII PEKERJAAN BETON BERTULANG BALOK LATEI 3.02 1.51 1.51 25.00
DIV. IX PEKERJAAN RABAT LANTAI BETON TEBAL 15 CM 7.58 2.53 2.53 2.53
DIV. X PEKERJAAN ATAP BAJA 35.94 7.19 7.19 7.19 7.19 7.19
BOBOT RENCANA 100.00 0.46 0.34 9.01 9.01 19.03 11.98 14.51 16.02 16.02 3.63 0.00
BOBOT RENCANA KOMULATIF 0 0.46 0.80 9.81 18.82 37.85 49.83 64.34 80.36 96.37 100.0 RENCANA
BOBOT REALISASI 0 0.18 0.53 3.13 7.84 4.86
BOBOT REALISASI KOMULATIF 0.18 0.71 3.84 11.68 16.54 REALISASI
DEVIASI -0.28 -0.09 -5.97 -7.14 -21.31
DIV.II PEKERJAAN PEMATANGAN LANTAI DALAM BANGUNAN T = 10 CM 1.02 0.34 0.34 0.34
DIV. V PEKERJAAN DINDING 18.99 3.17 3.17 3.17 3.17 3.17 3.17
50.00
DIV. VI PEKERJAAN BETON STRUKTUR 26.02 8.67 8.67 8.67
DIV. VII PEKERJAAN BETON BERTULANG KOLOM PRAKTIS 6.52 1.63 1.63 1.63 1.63
DIV. VIII PEKERJAAN BETON BERTULANG BALOK LATEI 3.02 1.51 1.51
25.00
DIV. IX PEKERJAAN RABAT LANTAI BETON TEBAL 15 CM 7.58 2.53 2.53 2.53
DIV. X PEKERJAAN ATAP BAJA 35.94 7.19 7.19 7.19 7.19 7.19
BOBOT RENCANA 100 0.46 0.34 9.01 9.01 19.03 11.98 14.51 16.02 16.02 3.63 0.00
BOBOT RENCANA KOMULATIF 0 0.46 0.80 9.81 18.82 37.85 49.83 64.34 80.36 96.37 100.0 RENCANA
BOBOT REALISASI 0 0.18 0.53 3.13 7.84 4.86 4.91
BOBOT REALISASI KOMULATIF 0.18 0.71 3.84 11.68 16.54 21.45 REALISASI
DEVIASI -0.28 -0.09 -5.97 -7.14 -21.31 -28.38
DIV.II PEKERJAAN PEMATANGAN LANTAI DALAM BANGUNAN T = 10 CM 1.02 0.34 0.34 0.34
DIV. V PEKERJAAN DINDING 18.99 3.17 3.17 3.17 3.17 3.17 3.17
DIV. VII PEKERJAAN BETON BERTULANG KOLOM PRAKTIS 6.52 1.63 1.63 1.63 1.63
DIV. VIII PEKERJAAN BETON BERTULANG BALOK LATEI 3.02 1.51 1.51
25
DIV. IX PEKERJAAN RABAT LANTAI BETON TEBAL 15 CM 7.58 2.53 2.53 2.53
DIV. X PEKERJAAN ATAP BAJA 35.94 7.19 7.19 7.19 7.19 7.19
BOBOT RENCANA 100 0.46 0.34 9.01 9.01 19.03 11.98 14.51 16.02 16.02 3.63 0
BOBOT RENCANA KOMULATIF 0 0.46 0.80 9.81 18.82 37.85 49.83 64.34 80.36 96.37 100.0 RENCANA
BOBOT REALISASI 0 0.18 0.53 3.13 7.84 4.86 4.91 1.87 1.63 4.19 4.81
BOBOT REALISASI KOMULATIF 0.18 0.71 3.84 11.68 16.54 21.45 23.32 24.95 24.56 44.83 REALISASI
DEVIASI -0.28 -0.09 -5.97 -7.14 -21.31 -28.38 -41.02 -55.40 -71.81 -55.17
DIV. V PEKERJAAN DINDING 18.99 3.17 3.17 3.17 3.17 3.17 3.17
DIV. VIII PEKERJAAN BETON BERTULANG BALOK LATEI 3.02 1.51 1.51
25
DIV. IX PEKERJAAN RABAT LANTAI BETON TEBAL 15 CM 7.58 2.53 2.53 2.53
DIV. X PEKERJAAN ATAP BAJA 35.94 7.19 7.19 7.19 7.19 7.19
BOBOT RENCANA 100 0.46 0.34 9.01 9.01 19.03 11.98 14.51 16.02 16.02 3.63
0
BOBOT RENCANA KOMULATIF 0 0.46 0.80 9.81 18.82 37.85 49.83 64.34 80.36 96.37 100.0 RENCANA
BOBOT REALISASI 0 0.18 0.53 3.13 7.84 4.86 4.91 1.87 1.63 4.19 6.14
BOBOT REALISASI KOMULATIF 0.18 0.71 3.84 11.68 16.54 21.45 23.32 24.95 29.14 35.28 REALISASI
DEVIASI -0.28 -0.09 -5.97 -7.14 -21.31 -28.38 -41.02 -55.40 -67.23 -64.72
DIV. VI PEKERJAAN BETON STRUKTUR 24.02 4.00 4.00 4.00 4.00 4.00
DIV. VII PEKERJAAN BETON BERTULANG KOLOM PRAKTIS 7.67 1.63 1.63 1.63 1.63 50
DIV. VIII PEKERJAAN BETON BERTULANG BALOK LATEI 6.26 1.51 1.51
DIV. IX PEKERJAAN RABAT LANTAI BETON TEBAL 15 CM 3.31 2.53 2.53 2.53
25
DIV. X PEKERJAAN ATAP BAJA - 7.19 7.19 7.19 7.19 7.19
DIV.II PEKERJAAN PEMATANGAN LANTAI DALAM BANGUNAN T = 10 CM 1.02 0.34 0.34 0.34
DIV. V PEKERJAAN DINDING 18.99 3.17 3.17 3.17 3.17 3.17 3.17
50.00
DIV. VI PEKERJAAN BETON STRUKTUR 26.02 8.67 8.67 8.67
DIV. VII PEKERJAAN BETON BERTULANG KOLOM PRAKTIS 6.52 1.63 1.63 1.63 1.63
DIV. VIII PEKERJAAN BETON BERTULANG BALOK LATEI 3.02 1.51 1.51 25.00
DIV. IX PEKERJAAN RABAT LANTAI BETON TEBAL 15 CM 7.58 2.53 2.53 2.53
DIV. X PEKERJAAN ATAP BAJA 35.94 7.19 7.19 7.19 7.19 7.19
BOBOT RENCANA 100.00 0.46 0.34 9.01 9.01 19.03 11.98 14.51 16.02 16.02 3.63 0.00
BOBOT RENCANA KOMULATIF 0 0.46 0.80 9.81 18.82 37.85 49.83 64.34 80.36 96.37 100.0 RENCANA
BOBOT REALISASI 0 0.18 0.53 3.13 7.84 4.86
BOBOT REALISASI KOMULATIF 0.18 0.71 3.84 11.68 16.54 REALISASI
DEVIASI -0.28 -0.09 -5.97 -7.14 -21.31
DIV.II PEKERJAAN PEMATANGAN LANTAI DALAM BANGUNAN T = 10 CM 1.02 0.34 0.34 0.34
DIV. V PEKERJAAN DINDING 18.99 3.17 3.17 3.17 3.17 3.17 3.17
50.00
DIV. VI PEKERJAAN BETON STRUKTUR 26.02 8.67 8.67 8.67
DIV. VII PEKERJAAN BETON BERTULANG KOLOM PRAKTIS 6.52 1.63 1.63 1.63 1.63
DIV. VIII PEKERJAAN BETON BERTULANG BALOK LATEI 3.02 1.51 1.51
25.00
DIV. IX PEKERJAAN RABAT LANTAI BETON TEBAL 15 CM 7.58 2.53 2.53 2.53
DIV. X PEKERJAAN ATAP BAJA 35.94 7.19 7.19 7.19 7.19 7.19
BOBOT RENCANA 100 0.46 0.34 9.01 9.01 19.03 11.98 14.51 16.02 16.02 3.63 0.00
BOBOT RENCANA KOMULATIF 0 0.46 0.80 9.81 18.82 37.85 49.83 64.34 80.36 96.37 100.0 RENCANA
BOBOT REALISASI 0 0.18 0.53 3.13 7.84 4.86 4.91
BOBOT REALISASI KOMULATIF 0.18 0.71 3.84 11.68 16.54 21.45 REALISASI
DEVIASI -0.28 -0.09 -5.97 -7.14 -21.31 -28.38
DIV.II PEKERJAAN PEMATANGAN LANTAI DALAM BANGUNAN T = 10 CM 1.02 0.34 0.34 0.34
DIV. V PEKERJAAN DINDING 18.99 3.17 3.17 3.17 3.17 3.17 3.17
DIV. VII PEKERJAAN BETON BERTULANG KOLOM PRAKTIS 6.52 1.63 1.63 1.63 1.63
DIV. VIII PEKERJAAN BETON BERTULANG BALOK LATEI 3.02 1.51 1.51
25
DIV. IX PEKERJAAN RABAT LANTAI BETON TEBAL 15 CM 7.58 2.53 2.53 2.53
DIV. X PEKERJAAN ATAP BAJA 35.94 7.19 7.19 7.19 7.19 7.19
BOBOT RENCANA 100 0.46 0.34 9.01 9.01 19.03 11.98 14.51 16.02 16.02 3.63 0
BOBOT RENCANA KOMULATIF 0 0.46 0.80 9.81 18.82 37.85 49.83 64.34 80.36 96.37 100.0 RENCANA
BOBOT REALISASI 0 0.18 0.53 3.13 7.84 4.86 4.91 1.87 1.63 4.19 4.81
BOBOT REALISASI KOMULATIF 0.18 0.71 3.84 11.68 16.54 21.45 23.32 24.95 24.56 44.83 REALISASI
DEVIASI -0.28 -0.09 -5.97 -7.14 -21.31 -28.38 -41.02 -55.40 -71.81 -55.17
DIV. V PEKERJAAN DINDING 18.99 3.17 3.17 3.17 3.17 3.17 3.17
DIV. VIII PEKERJAAN BETON BERTULANG BALOK LATEI 3.02 1.51 1.51
25
DIV. IX PEKERJAAN RABAT LANTAI BETON TEBAL 15 CM 7.58 2.53 2.53 2.53
DIV. X PEKERJAAN ATAP BAJA 35.94 7.19 7.19 7.19 7.19 7.19
BOBOT RENCANA 100 0.46 0.34 9.01 9.01 19.03 11.98 14.51 16.02 16.02 3.63
0
BOBOT RENCANA KOMULATIF 0 0.46 0.80 9.81 18.82 37.85 49.83 64.34 80.36 96.37 100.0 RENCANA
BOBOT REALISASI 0 0.18 0.53 3.13 7.84 4.86 4.91 1.87 1.63 4.19 6.14
BOBOT REALISASI KOMULATIF 0.18 0.71 3.84 11.68 16.54 21.45 23.32 24.95 29.14 35.28 REALISASI
DEVIASI -0.28 -0.09 -5.97 -7.14 -21.31 -28.38 -41.02 -55.40 -67.23 -64.72
DIV. VI PEKERJAAN BETON STRUKTUR 24.02 4.00 4.00 4.00 4.00 4.00 4.00
DIV. VII PEKERJAAN BETON BERTULANG KOLOM PRAKTIS 7.67 1.63 1.63 1.63 1.63 50
DIV. VIII PEKERJAAN BETON BERTULANG BALOK LATEI 6.26 1.51 1.51
DIV. IX PEKERJAAN RABAT LANTAI BETON TEBAL 15 CM 3.31 2.53 2.53 2.53
25
DIV. X PEKERJAAN ATAP BAJA - 7.19 7.19 7.19 7.19 7.19
DIV. VII PEKERJAAN BETON BERTULANG KOLOM PRAKTIS 3.09 1.03 1.03 1.03
50
DIV. VIII PEKERJAAN BETON BERTULANG BALOK LATEI 4.25 1.42 1.42 1.42
DIV. VI PEKERJAAN BETON STRUKTUR 19.39 3.23 3.23 3.23 3.23 3.23 3.23
DIV. VII PEKERJAAN BETON BERTULANG KOLOM PRAKTIS 3.09 1.03 1.03 1.03
50
DIV. VIII PEKERJAAN BETON BERTULANG BALOK LATEI 4.25 1.42 1.42 1.42
DIV. IX PEKERJAAN RABAT LANTAI BETON TEBAL 15 CM 0.13 0.13
DIV. VI PEKERJAAN BETON STRUKTUR 19.39 3.23 3.23 3.23 3.23 3.23 3.23
DIV. VII PEKERJAAN BETON BERTULANG KOLOM PRAKTIS 3.09 1.03 1.03 1.03
50
DIV. VIII PEKERJAAN BETON BERTULANG BALOK LATEI 4.25 1.42 1.42 1.42
DIV. IX PEKERJAAN RABAT LANTAI BETON TEBAL 15 CM 0.13 0.13
DIV. VI PEKERJAAN BETON STRUKTUR 19.39 3.23 3.23 3.23 3.23 3.23 3.23
DIV. VII PEKERJAAN BETON BERTULANG KOLOM PRAKTIS 3.09 1.03 1.03 1.03
50
DIV. VIII PEKERJAAN BETON BERTULANG BALOK LATEI 4.25 1.42 1.42 1.42
DIV. IX PEKERJAAN RABAT LANTAI BETON TEBAL 15 CM 0.13 0.13
DIV. VI PEKERJAAN BETON STRUKTUR 19.39 3.23 3.23 3.23 3.23 3.23 3.23
DIV. VII PEKERJAAN BETON BERTULANG KOLOM PRAKTIS 3.09 1.03 1.03 1.03
50
DIV. VIII PEKERJAAN BETON BERTULANG BALOK LATEI 4.25 1.42 1.42 1.42
DIV. IX PEKERJAAN RABAT LANTAI BETON TEBAL 15 CM 0.13 0.13
KEMAJUAN PEKERJAAN
JUMLAH HARGA BOBOT
NO JENIS PEKERJAAN S/D MINGGU LALU MINGGU INI S/D MINGGU INI
(RP) (%) PRESTASI BOBOT PRESTASI BOBOT PRESTASI BOBOT
KEMAJUAN PEKERJAAN
JUMLAH HARGA BOBOT
NO JENIS PEKERJAAN S/D MINGGU LALU MINGGU INI S/D MINGGU INI
(RP) (%) PRESTASI BOBOT PRESTASI BOBOT PRESTASI BOBOT
KEMAJUAN PEKERJAAN
JUMLAH HARGA BOBOT
NO JENIS PEKERJAAN S/D MINGGU LALU MINGGU INI S/D MINGGU INI
(RP) (%) PRESTASI BOBOT PRESTASI BOBOT PRESTASI BOBOT
KEMAJUAN PEKERJAAN
JUMLAH HARGA BOBOT
NO JENIS PEKERJAAN S/D TGL 19 DES. 2011 MINGGU INI S/D MINGGU INI
(RP) (%) PRESTASI BOBOT PRESTASI BOBOT PRESTASI BOBOT
KEMAJUAN PEKERJAAN
JUMLAH HARGA BOBOT
NO JENIS PEKERJAAN S/D MINGGU LALU MINGGU INI S/D MINGGU INI
(RP) (%) PRESTASI BOBOT PRESTASI BOBOT PRESTASI BOBOT
KEMAJUAN PEKERJAAN
JUMLAH HARGA BOBOT
NO JENIS PEKERJAAN S/D MINGGU LALU MINGGU INI S/D MINGGU INI
(RP) (%) PRESTASI BOBOT PRESTASI BOBOT PRESTASI BOBOT
KEMAJUAN PEKERJAAN
JUMLAH HARGA BOBOT
NO JENIS PEKERJAAN S/D MINGGU LALU MINGGU INI S/D MINGGU INI
(RP) (%) PRESTASI BOBOT PRESTASI BOBOT PRESTASI BOBOT
KEMAJUAN PEKERJAAN
JUMLAH HARGA BOBOT
NO JENIS PEKERJAAN S/D MINGGU LALU MINGGU INI S/D MINGGU INI
(RP) (%) PRESTASI BOBOT PRESTASI BOBOT PRESTASI BOBOT
KEMAJUAN PEKERJAAN
JUMLAH HARGA BOBOT
NO JENIS PEKERJAAN S/D MINGGU LALU MINGGU INI S/D MINGGU INI
(RP) (%) PRESTASI BOBOT PRESTASI BOBOT PRESTASI BOBOT
KEMAJUAN PEKERJAAN
JUMLAH HARGA BOBOT
NO JENIS PEKERJAAN S/D BULAN LALU BULAN INI S/D BULAN INI
(RP) (%) PRESTASI BOBOT PRESTASI BOBOT PRESTASI BOBOT
KEMAJUAN PEKERJAAN
JUMLAH HARGA BOBOT
NO JENIS PEKERJAAN S/D MINGGU LALU MINGGU INI S/D MINGGU INI
(RP) (%) PRESTASI BOBOT PRESTASI BOBOT PRESTASI BOBOT
F.X.Y. Wadu, SST Muhamad Darlan Atapukan, ST Ahmad Yunus dan Ronny Wibowo
NIP. ………………. Inspector Pelaksana
62
373
33.33333 1.75 0.2 0.35 11.6666666666667
2.95 0.2 0.59 19.6666666666667 31.33333
5,400,000.00
4,200,000.00
500,000.00
250,000.00
10,350,000.00
0.49
5.2675 14.3
3.84 40.32
11 7.56
2.4 6.72
1.45 20.16
6.4 3.675
1.8 14.08
8.8 1.87
6.72 5.75
6.72 0.9
1.925
1.925
1.76
2.3125
2.695
2.695
6.4
3.6
17.92
2.2
3.3
1.8
1.15
275,000,000 1.85
26.88
3.6
374.00 6.4
245 1.8
1
#REF! 2.56
1.28
3.3
12.8
14.08
8.8
14.08
JOHANIS MILLA 4.2
DIREKTUR 13.44
8.82 1.0005
3.45
LAPORAN MINGGUAN KEMAJUAN PEKERJAAN
KEMAJUAN PEKERJAAN
JUMLAH HARGA BOBOT
NO JENIS PEKERJAAN S/D MINGGU LALU MINGGU INI S/D MINGGU INI
(RP) (%) PRESTASI BOBOT PRESTASIBOBOT PRESTASI BOBOT
F.X.Y. Wadu, SST Muhamad Darlan Atapukan, ST Ahmad Yunus dan Ronny Wibowo
NIP. ………………. Inspector Pelaksana
62
373
33.33333 1.75 0.2 0.35 11.66666667
2.95 0.2 0.59 19.66666667 31.33333
HARGA SATUAN
NO URAIAN SATUAN
(Rp)
II BAHAN
1 Tanah Urug M3 30,000.00
2 Pasir Urug M3 75,000.00
3 Pasir Pasang M3 110,000.00
4 Batu Kali M3 100,000.00
5 Batu Merah Bh 600.00
6 Bataco Bh 3,500.00
7 Sirtu M3 90,000.00
8 Urugan Pilihan M3 90,000.00
9 Pasir Cor Untuk Beton M3 110,000.00
10 Batu 10/15 cm M3 100,000.00
11 Batu Pecah 1/2 cm M3 400,000.00
12 Batu Pecah 2/3 M3 365,000.00
13 Semen PC Zak 47,000.00
14 Semen Putih PC Kg 5,000.00
15 Semen Warna PC Kg 7,500.00
16 Balok Kayu Klas I ( 6/12, 8/12 ) M3 6,000,000.00
17 Balok Kayu Klas II ( 6/12, 8/12 ) M3 2,750,000.00
18 Papan Kayu Klas I M3 6,000,000.00
19 Papan Kayu Klas II M3 2,750,000.00
20 Papan Bakisting klas III M3 1,000,000.00
21 Usuk Klas II ( 5/7 ) M3 980,000.00
22 Tripleks 3 mm Lbr 48,000.00
23 Tripleks 4 mm Lbr 95,000.00
24 Tripleks 6 mm Lbr 110,000.00
25 Tripleks 9 mm Lbr 120,000.00
26 Seng Gelombang BJLS 0.30 Lbr 55,000.00
27 Seng Plat BJLS 0.30 Lbr 50,000.00
28 Seng Plat BJLS 0.20 Lbr 22,500.00
29 Seng Gelombang BJLS 0.20 Lbr 38,000.00
30 Hengsel 4 x 3 cm Pasang 15,000.00
HARGA SATUAN
NO URAIAN SATUAN
(Rp)
31 Hengsel Jendela Bh 10,000.00
32 Kunci Tanam 2 Slag ( Kuda Terbang ) Bh 55,000.00
33 Kunci Pintu ( Veronika ) Bh 16,500.00
34 Grendel Kecil Bh 4,500.00
35 Grendel Besar Bh 9,900.00
36 Kait Angin Bh 6,100.00
37 Besi Angker Dook Bh 12,500.00
38 Paku Seng Kg 22,500.00
39 Paku Biasa 5, 6, 7 Cm Kg 17,500.00
40 Paku Biasa 8 - 15 Cm Kg 17,500.00
41 Paku Biasa 3, 4 Cm Kg 17,500.00
42 Closet
Paku Beton ( Paku Putih ) Kg 20,000.00
43 Jongk
Paku Tripleks ( 2 Cm ) Kg 17,500.00
ok
44 Bh 130,000.00
( INA /
45 Pipa
AMER Hawa PVC Ø 2" Bh 30,000.00
46 Pipa PVC
ICAN ) Ø 4" M¹ 35,000.00
47 Pipa PVC Ø 2" M¹ 30,000.00
48 Pipa PVC Ø 1.5" M¹ 25,000.00
49 Pipa PVC Ø 1" M¹ 20,000.00
50 Pipa Instalasi Btg 10,000.00
51 Klem Pipa Buah 1,000.00
52 Pipa GIP Ø 4" M¹ 87,500.00
53 Pipa GIP Ø 2" M¹ 60,000.00
54 Pipa GIP Ø 1.5" M¹ 45,000.00
55 Pipa GIP Ø 1" M¹ 35,000.00
56 Floor Drain Buah 15,000.00
57 Kran Air (Kuningan) Bh 15,000.00
58 Menie Kayu ( Pedang ) Kg 30,000.00
59 Menie Seng Kg 30,000.00
60 Menie Kayu ( Altec ) Kg 30,000.00
61 Minyak Cat Liter 25,000.00
62 Cat Tembok ( Matex 5 Kg ) Kaleng 85,000.00
63 Cat Tembok ( Mawar 5 Kg ) Kaleng 70,000.00
64 Cat Tembok ( V - Tex ) Kaleng 25,000.00
65 Cat ( Emco ) Kg 25,000.00
66 Cat ( Avi ) Kg 24,000.00
67 Thinner ( Spesial A ) Kg 30,000.00
68 List kayu Plafond (diprofil) M' 10,000.00
69 Kwas Rool Bh 20,000.00
70 Kwas Cat ( Nomor 2 ) Bh 7,000.00
71 Kwas Cat ( Nomor 4 ) Bh 9,400.00
HARGA SATUAN
NO URAIAN SATUAN
(Rp)
72 Besi Beton 12 MM Staf 130,000.00
73 Baja Tulangan Beton Kg 13,000.00
74 Kawat Beton / Bindrat Kg 12,500.00
75 Kawat Duri Roll 95,000.00
76 Kertas Amplas Lbr 3,500.00
77 Plamur Kg 22,500.00
78 Cat Kilap ( Deluxe ) Kaleng 25,000.00
79 Kaca 5 mm M2 150,000.00
80 Mur Baut Kg 30,000.00
81 Plat Bh 5,000.00
82 Pekerjaan Bak Air Kamar WC Ls 150,000.00
83 Batu Bunga Bh 7,500.00
84 Teakwood ( 4" x 8" x 3 MM ) Lbr 85,000.00
85 Lem PVC Tube 8,000.00
86 Keramik Putih ( 30 x 30 Cm ) Dos 60,000.00
87 Keramik Putih ( 20 x 20 Cm ) Dos 50,000.00
88 Wafel Keramik 20/20 Dos 45,000.00
89 Kapur / Tanah Putih M3 125,000.00
90 Rangka Nako M' 55,000.00
91 Kaca Nako 5 mm Sisir 15,000.00
92 Skrup Kayu Buah 700.00
93 Teak Oil Kg 50,000.00
94 Politur Kaleng 44,000.00
95 Kapur Gamping M3 125,000.00
96 Batu Roster Bh 5,000.00
97 Meteran Daya 1300 Watt UNIT 5,000,000.00
98 R2 4400 VA UNIT 1,750,000.00
99 Kabel Snur 2 x 23 M ( Kayanuta ) Roll 75,000.00
100 Kabel Snur ( Naga ) Roll 60,000.00
101 Kabel NYM 2 x 11/2 M M¹ 15,000.00
102 Kabel NYA M¹ 15,000.00
103 Saklar Engkel ( Braco ) Buah 15,000.00
104 Saklar Seri ( Braco ) Buah 20,000.00
105 Steker 1250 ( Nico ) Buah 7,000.00
106 Stop Kontak 3650 ( Braco ) Buah 15,000.00
107 Fitting Gandeng ( Nico ) Buah 5,000.00
108 Fitting Tempel ( Braco ) Buah 8,500.00
109 Jeck ( Braco ) Buah 5,000.00
110 Neon TL 40 Watt ( Philips ) Buah 40,000.00
111 Neon TL 20 Watt ( Philips ) Buah 30,000.00
112 Neon TL 10 Watt ( Philips ) Buah 25,000.00
113 Neon TL 40 Watt ( Chioda ) Buah 35,000.00
114 Neon TL 20 Watt ( Chioda ) Buah 20,000.00
115 Lampu Pijar 40 Watt (Philips) Buah 20,000.00
116 Lampu Pijar 25 Watt (Philips) Buah 15,000.00
117 Box Skring Buah 55,000.00
118 Pipa Arde Btg 10,000.00
119 T Dos Buah 3,000.00
120 Isolator Buah 3,000.00
121 Besi Canal Kg 20,000.00
122 Plat Essel t = 5 mm M² 75,000.00
123 Kawat Duri Roll 100,000.00
124 Besi Siku 50.50.5 mm Staf 112,000.00
125 Kawat Las Kg 25,000.00
126 Pagar BRC Unit 265,000.00
DAFTAR HARGA UPAH DAN BAHAN
#REF! #REF!
#REF! #REF!
Lokasi :
Tahun Anggaran :
3434.3
2
NO URAIAN
II BAHAN
1 Tanah Urug
2 Pasir Urug
3 Pasir Pasang
4 Batu Kali
5 Batu Merah
6 Bataco
7 Sirtu
8 Urugan Pilihan
9 Pasir Cor Untuk Beton
10 Batu 10/15 cm
11 Batu Pecah 1/2 cm
12 Batu Pecah 2/3
13 Semen PC
14 Semen Putih PC
15 Semen Warna PC
16 Balok Kayu Klas I ( 6/12, 8/12 )
17 Balok Kayu Klas II ( 6/12, 8/12 )
18 Papan Kayu Klas I
19 Papan Kayu Klas II
20 Papan Bakisting klas III
21 Usuk Klas II ( 5/7 )
22 Tripleks 3 mm
23 Tripleks 4 mm
24 Tripleks 6 mm
25 Tripleks 9 mm
26 Seng Gelombang BJLS 0.30
27 Seng Plat BJLS 0.30
28 Seng Plat BJLS 0.20
29 Seng Gelombang BJLS 0.20
30 Hengsel 4 x 3 cm
2
NO URAIAN
72 Besi Beton 12 MM
73 Baja Tulangan Beton 9.324
74 Kawat Beton / Bindrat 14478.76
75 Kawat Duri
76 Kertas Amplas
77 Plamur
78 Cat Kilap ( Deluxe )
79 Kaca 5 mm
80 Mur Baut
81 Plat
82 Pekerjaan Bak Air Kamar WC
83 Batu Bunga
84 Teakwood ( 4" x 8" x 3 MM )
85 Lem PVC
86 Keramik Putih ( 30 x 30 Cm )
87 Keramik Putih ( 20 x 20 Cm )
88 Wafel Keramik 20/20
89 Kapur / Tanah Putih
90 Rangka Nako
91 Kaca Nako 5 mm
92 Skrup Kayu
93 Teak Oil
94 Politur
95 Kapur Gamping
96 Batu Roster
97 Meteran Daya 1300 Watt
98 R2 4400 VA
99 Kabel Snur 2 x 23 M ( Kayanuta )
100 Kabel Snur ( Naga )
101 Kabel NYM 2 x 11/2 M
102 Kabel NYA
103 Saklar Engkel ( Braco )
104 Saklar Seri ( Braco )
105 Steker 1250 ( Nico )
106 Stop Kontak 3650 ( Braco )
107 Fitting Gandeng ( Nico )
108 Fitting Tempel ( Braco )
109 Jeck ( Braco )
110 Neon TL 40 Watt ( Philips )
111 Neon TL 20 Watt ( Philips )
112 Neon TL 10 Watt ( Philips )
113 Neon TL 40 Watt ( Chioda )
114 Neon TL 20 Watt ( Chioda )
115 Lampu Pijar 40 Watt (Philips)
116 Lampu Pijar 25 Watt (Philips)
117 Box Skring
118 Pipa Arde
119 T Dos
120 Isolator
121 Besi Canal
122 Plat Essel t = 5 mm
123 Kawat Duri
124 Besi Siku 50.50.5 mm
125 Kawat Las
126 Pagar BRC
DAFTAR ANALISA HARGA SATUAN PEKERJAAN
#REF! #REF! #REF!
#REF! #REF! #REF!
Lokasi : Lewoleba - Kecamatan Nubatukan Kabupaten Lembata
Tahun Anggaran : 2011
No Uraian Pekerjaan Sat Koofisien Harga Jumlah Harga
Satuan
1 1 M' Pasangan Bouplank
- Kayu Usuk dan Papan Klas II M3 0.01 1,000,000.00 10,000.00
- Paku Kg 0.12 17,500.00 2,100.00
- Pekerja Org 0.12 25,000.00 3,000.00
- Mandor Org 0.003 40,000.00 120.00
15,220.00
2 1 M3 Galian Tanah Biasa
- Pekerja Org 0.75 25,000.00 18,750.00
- Mandor Org 0.025 40,000.00 1,000.00
19,750.00
3 1 M3 Galian Tanah Keras
- Pekerja Org 1.00 25,000.00 25,000.00
- Mandor Org 0.033 40,000.00 1,320.00
26,320.00
4 1 M3 Urugan Tanah
- Tanah Urug M3 1.20 30,000.00 36,000.00
- Pekerja Org 0.30 25,000.00 7,500.00
- Mandor Org 0.01 40,000.00 400.00
43,900.00
5 1 M3 Urugan Pasir/Sirtu
- Pasir Urug M3 0.20 75,000.00 15,000.00
- Pekerja Org 0.30 25,000.00 7,500.00
- Mandor Org 0.01 40,000.00 400.00
22,900.00
6 1 M3 Pas. Batu Kali / Karang Kosong
- Batu Kali / Karang M3 1.17 100,000.00 117,000.00
- Pekerja Org 1.50 25,000.00 37,500.00
- Mandor Org 0.075 40,000.00 3,000.00
157,500.00
7 1 M3 Pas. Batu Kali / Karang 1 PC : 2 PS
- Batu Kali / Karang M3 1.17 100,000.00 117,000.00
- Semen Zak 6.66 47,000.00 313,020.00
- Pasir M3 0.427 110,000.00 46,970.00
- Tukang Batu Org 1.20 35,000.00 42,000.00
- Kepala Tukang Batu Org 0.12 40,000.00 4,800.00
- Pekerja Org 3.60 25,000.00 90,000.00
- Mandor Org 0.180 40,000.00 7,200.00
620,990.00
8 1 M3 Pas. Batu Kali / Karang 1 PC : 3 PS
- Batu Kali / Karang M3 1.17 100,000.00 117,000.00
- Semen Zak 5.05 47,000.00 237,350.00
- Pasir M3 0.427 110,000.00 46,970.00
- Tukang Batu Org 1.20 35,000.00 42,000.00
- Kepala Tukang Batu Org 0.12 40,000.00 4,800.00
- Pekerja Org 3.60 25,000.00 90,000.00
- Mandor Org 0.180 40,000.00 7,200.00
545,320.00 348,473.50
9 1 M3 Pas. Batu Kali / Karang 1 PC : 4 PS
- Batu Kali / Karang M3 1.17 100,000.00 117,000.00
- Semen Zak 4.07 47,000.00 191,290.00
- Pasir M3 0.520 110,000.00 57,200.00
- Tukang Batu Org 1.20 35,000.00 42,000.00
- Kepala Tukang Batu Org 0.12 40,000.00 4,800.00
- Pekerja Org 3.60 25,000.00 90,000.00
- Mandor Org 0.180 40,000.00 7,200.00
509,490.00
32 1 M2 Tegel Keramik 20 x 20 CM
- Tegel Keramik 20/20 Bh 25.00 2,000.00 50,000.00
- Kapur Gamping M3 0.003 125,000.00 375.00
- Pasir M3 0.032 110,000.00 3,520.00
- Semen Zak 0.003 47,000.00 117.50
- Semen Warna Zak 0.020 300,000.00 6,000.00
- Tukang Batu Org 0.250 35,000.00 8,750.00
- Kepala Tukang Batu Org 0.025 40,000.00 1,000.00
- Pekerja Org 0.50 25,000.00 12,500.00
- Mandor Org 0.025 40,000.00 1,000.00
83,262.50
33 1 M' Pas. Tegel Plint Keramik 10 x 30 CM
- Tegel Plint Keramik Bh 3.30 18,181.82 60,000.00
- Semen Zak 0.096 47,000.00 4,512.00
- Pasir M3 0.007 110,000.00 770.00
- Semen Warna Zak 0.001 300,000.00 300.00
- Tukang Batu Org 0.10 35,000.00 3,500.00
- Kepala Tukang Batu Org 0.010 40,000.00 400.00
- Pekerja Org 0.20 25,000.00 5,000.00
- Mandor Org 0.010 40,000.00 400.00
74,882.00
34 1 M2 Pasangan Mozaik
- Mozaik Bh 11.11 5,400.54 60,000.00
- Kapur Gamping M3 0.007 125,000.00 875.00
- Pasir M3 0.036 110,000.00 3,960.00
- Semen Zak 0.480 47,000.00 22,560.00
- Semen Warna Zak 0.002 300,000.00 600.00
- Tukang Batu Org 0.250 35,000.00 8,750.00
- Kepala Tukang Batu Org 0.025 40,000.00 1,000.00
- Pekerja Org 0.50 25,000.00 12,500.00
- Mandor Org 0.025 40,000.00 1,000.00
111,245.00
DEPAN
1 9. A-B 3.6 3.6 13.0 BV1.70 0.80 0.80 2.0 1.3 7.2 4.5 11.7
2 9. B-Q 48.2 3.6 173.5 P80B 0.90 2.10 2.0 3.8 J55 0.65 2.45 20.0 31.9 0.4 3.6 7.0 10.1 19.3 84.0 103.3
JM 1.25 2.45 8.0 24.5
3 9. Q-R 3.6 3.6 13.0 BV1.70 0.80 0.80 2.0 1.3 7.2 4.5 11.7
4 8A. A-B 3.6 3.6 13.0 P70A 0.80 2.10 2.0 3.4 4.0 5.6 9.6
5 8A. Q-R 3.6 3.6 13.0 P70A 0.80 2.10 2.0 3.4 4.0 5.6 9.6
6 7A. A-B 3.6 3.6 13.0 P70V3 3.8 5.6 3.5 9.1
7 7A. Q-R 3.6 3.6 13.0 P70V3 3.8 5.6 3.5 9.1
8 7. B-G 18.0 3.6 64.8 PGV70 2.0 9.4 BV470 2.0 4.3 0.4 3.6 5.0 7.2 6.2 35.6 41.8
BV270 2.0 2.2
9 7. N-Q 10.8 3.6 38.9 PGV70 2.0 9.4 BV470 1.0 2.1 0.4 3.6 3.0 4.3 3.3 19.8 23.0
10 6. B-H 21.6 3.6 77.8 PGV70 2.0 9.4 BV470 2.0 8.5 0.4 3.6 6.0 8.6 7.1 38.9 46.0
PG120 1.0 3.6 BV370 1.0 1.6
11 6. K-Q 21.6 3.6 77.8 PGV70 4.0 18.8 BV470 1.0 2.1 0.4 3.6 6.0 8.6 5.3 42.9 48.2
16 4. A-B 3.6 3.6 13.0 BV1.70 0.80 0.80 2.0 1.3 7.2 4.5 11.7
17 4. B-Q 48.2 3.6 173.5 J55 0.65 2.45 20.0 31.9 BV1.70 0.80 0.80 2.0 1.3 0.4 3.6 7.0 10.1 19.3 86.5 105.8
JM 1.25 2.45 8.0 24.5
18 4. Q-R 3.6 3.6 13.0 BV1.70 0.80 0.80 2.0 1.3 7.2 4.5 11.7
19 3. H-L 16.8 3.6 60.5 J55A 0.65 2.45 6.0 9.6 6.7 24.9 31.6
JK5 2.40 2.50 2.0 12.0
PUT 2.60 2.80 1.0 7.3
20 R. 9-7A 9.6 3.6 34.6 BV1.70 0.80 0.80 1.0 0.6 0.4 3.6 2.0 2.9 19.2 11.2 30.4
PS 0.60 1.00 1.0 0.6
24 R.7A-5A 9.2 3.6 33.1 PUS 1.30 2.80 1.0 3.6 BV1.70 0.80 0.80 2.0 1.3 0.4 3.6 2.0 2.9 3.2 25.8 29.0
27 Q. 9-4 14.4 3.6 51.8 0.4 3.6 4.0 5.8 23.0 23.0 46.1
29 L. 9-3 10.8 3.6 38.9 J55A 0.65 2.45 3.0 4.8 0.4 3.6 3.5 5.0 3.2 25.8 29.1
31 K. 9-3 11.8 3.6 42.5 0.4 3.6 3.0 4.3 3.5 34.6 38.2
33 E1. 6-5 3.6 3.6 13.0 P70V3 3.8 1.4 7.7 9.1
34 KM FE-45 11.9 3.6 42.8 P70 0.8 2.8 2.0 4.5 23.8 14.6 38.4
BELAKANG
35 K1. 10-9 4.3 3.6 15.5 PUS J 10.8 1.2 3.5 4.7
37 L. 14-10 15.4 3.6 55.4 J55 0.65 2.45 10.0 15.9 0.4 3.6 4.0 5.8 6.2 18.4 24.6
JM 1.25 2.45 3.0 9.2
39 J. 14-10 14.4 3.6 51.8 PGV70 1.0 4.7 BV470 1.0 2.1 0.4 3.6 4.0 5.8 5.4 31.1 36.6
BV370 1.0 1.6
BV270 1.0 1.1
40 I. 14-10 5.4 31.1 36.6
41 10. G-L 16.8 3.6 60.5 PG120 2.0 7.3 4.1 36.1 40.2
PGV70 2.0 9.4
PUS 1.30 2.80 1.0 3.6
42 14. L-K 5.4 3.6 19.4 P80A 0.90 2.10 1.0 1.9 BV370 1.0 1.6 1.8 15.9
43 KM. 14-KJ 10.8 3.6 38.9 P70 0.8 2.8 1.0 2.2 BV1.70 0.80 0.80 1.0 0.6 18.4 15.9 34.3
P70A 0.8 2.1 1.0 1.7
44 KM. 14-I-G 16.2 3.6 58.3 P70 0.8 2.8 2.0 4.5 BV1.70 0.80 0.80 2.0 1.3 26.0 23.2 49.2
P70A 0.8 2.1 2.0 3.4
KOLOM PRAKTIS KOLOM PRAKTIS BALOK LATEI TERPASANG BALOK LATEI TERPASANG
LANTAI I LANTAI II LANTAI I LANTAI II
DIMENSI DIMENSI DIMENSI DIMENSI
B = 0.15 B = 0.15 B = 0.15 B = 0.12
H = 0.15 H = 0.15 H = 0.15 H = 0.15
TGGI = 3.60 TGGI = 3.60 PJG = 103.20 PJG = 80.80
VOLUME = 0.08 VOLUME = 0.08 VOLUME = 2.32 VOLUME = 1.45
JUMLAH = 216.00 JUMLAH = 166.00
VOL TOTAL = 17.50 VOL TOTAL = 13.45
BESI BESI BESI BESI
D 12 = 2759.95 D 12 = 2121.07 D 12 = 366.29 D 12 = 286.78
D8 = 628.65 D8 = 483.13 D8 = 83.43 D8 = 65.32
BERAT BESI = 3388.60 BERAT BESI = 2604.20 BERAT BESI = 449.72 BERAT BESI = 352.11
KOLOM STRUKTUR TINGGI 4,8 M KOLOM STRUKTUR TINGGI 3,8 M BERAT BESI PER M3 SESUAI KONTRAK LT I 113.7
TINGGI 4.8 TINGGI 3.8 BERAT BESI PER M3 SESUAI KONTRAK LT II 112.6
JUMLAH TIANG 23.0 JUMLAH TIANG 8.0 LUAS KOLOM 0.12571
DIAMETER 0.4 DIAMETER 0.4 AS (2%) 0.002514
VOL. BETON 13.9 VOL. BETON 3.8 LUAS D19 0.00028
BESI BESI JUMLAH TULANGAN 8.86427
D19 2455.83 D19 676.24
D10 202.38 D10 70.39
BERAT 2658.21 BERAT 746.64
BEKISTING
TGGI 3.8
KELILING 1.3
LUAS/TIANG 4.8
LUAS 8 TIAN 38.2
PERBANDINGAN PAS. DINDING 1/2 BATALANTAI I ANTARA KONTRAK DAN PELAKSANAAN
TEBAL PAS. BATA = 0.15 CM
KONTRAK PELAKSANAAN SELISIH
TRASRAM BIASA JUMLAH TRASRAM BIASA JUMLAH TRASRAM BIASA JUMLAH
PAS. BATU 57.7 126.2 183.9 57.8 129.0 186.8 0.1 2.8 2.9
PLESTERAN 2 SISI 541.5 1042.9 1584.4 770.9 1719.7 2518.9 229.4 676.8 934.5
LANTAI I
SAYAP KIRI
1 9. K-R 28.7 3.6 103.3 P80B 0.90 2.10 1.0 1.9 J55 0.65 2.45 10.0 15.9 BV1.7 0.80 0.80 2.0 1.3 0.4 3.6 7.0 10.1 60.0 8.6 53.3 61.9
JM 1.25 2.45 4.0 12.3
8A. Q-R 3.6 3.6 13.0 P70A 0.80 2.10 2.0 3.4 4.0 5.6 9.6
7A. Q-R 3.6 3.6 13.0 P70V3 3.8 5.6 3.5 9.1
7. L-Q 10.8 3.6 38.9 PGV70 2.0 9.4 BV470 1.0 2.1 0.4 3.6 3.0 4.3 2.5 20.6 23.0
6. K-Q 21.6 3.6 77.8 PGV70 18.8 2.0 4.3 0.4 3.6 6.0 8.6 5.3 40.8 46.1
4. K-R 29.7 3.6 106.9 J55 0.65 2.45 10.0 15.9 0.4 3.6 7.0 10.1 8.9 57.8 66.7
JM 1.25 2.45 4.0 12.3
BV1.70 0.80 0.80 3.0 1.9
3. H1-L 9.4 3.6 33.8 J55A 0.65 2.45 3.0 4.8 2.8 16.6 19.4
JK5 2.40 2.50 1.0 6.0
PUSH 2.60 2.80 0.5 3.6
R. 9-4 24.7 3.6 88.9 BV1.70 0.80 0.80 4.0 2.6 0.4 3.6 5.0 7.2 49.4 29.2 78.6
PS 0.60 1.00 1.0 0.6
Q. 9-4 13.4 3.6 48.2 0.4 3.6 4.0 5.8 14.6 27.9 42.5
L. 9-3 10.8 3.6 38.9 J55A 0.65 2.45 3.0 4.8 0.4 3.6 3.5 5.0 3.2 25.8 29.1
K. 9-3 11.8 3.6 42.5 0.4 3.6 3.0 4.3 3.5 34.6 38.2
PELAKSANAAN
TRASRAM = 250.50 M2 = 25.05 M3 = 37.58 M3
BIASA = 661.32 M2 = 66.13 M3 = 99.20 M3
TOTAL = 911.82 M2 = 91.18 M3 = 136.77 M3
KONTRAK
TRASRAM = 577.02 M2 = 57.70 M3 = 384.68 M2
BIASA = 1262.28 M2 = 126.23 M3 = 841.52 M2
TOTAL = 1839.29 M2 = 183.93 M3 = 1226.20 M2
LAPORAN HARIAN PELAKSANAAN PEKERJAAN
Pekerjaan : Pembangunan Kantor Dewan Perwakilan Rakyat Daerah Hari ke : 90 (sembilan puluh)
Lokasi : Lewoleba - Kecamatan Nubatukan Kabupaten Lembata Tanggal : 3 januari 2012.
Tahun Anggaran : 2011 Minggu ke : 14 (empat belas)
URAIAN PEKERJAAN
NO. PEKERJAAN VOLUME SATUAN
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
Pekerjaan : Pembangunan Kantor Dewan Perwakilan Rakyat Daerah Hari ke : 91 (sembilan puluh satu)
Lokasi : Lewoleba - Kecamatan Nubatukan Kabupaten Lembata Tanggal : 4 januari 2012.
Tahun Anggaran : 2011 Minggu ke : 14 (empat belas)
URAIAN PEKERJAAN
NO. PEKERJAAN VOLUME SATUAN
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
Pekerjaan : Pembangunan Kantor Dewan Perwakilan Rakyat Daerah Hari ke : 92 (sembilan puluh dua)
Lokasi : Lewoleba - Kecamatan Nubatukan Kabupaten Lembata Tanggal : 5 januari 2012.
Tahun Anggaran : 2011 Minggu ke : 14 (empat belas)
URAIAN PEKERJAAN
NO. PEKERJAAN VOLUME SATUAN
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
Pekerjaan : Pembangunan Kantor Dewan Perwakilan Rakyat Daerah Hari ke : 93 (sembilan puluh tiga)
Lokasi : Lewoleba - Kecamatan Nubatukan Kabupaten Lembata Tanggal : 6 januari 2012.
Tahun Anggaran : 2011 Minggu ke : 14 (empat belas)
URAIAN PEKERJAAN
NO. PEKERJAAN VOLUME SATUAN
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
Pekerjaan : Pembangunan Kantor Dewan Perwakilan Rakyat Daerah Hari ke : 94 (sembilan puluh empat)
Lokasi : Lewoleba - Kecamatan Nubatukan Kabupaten Lembata Tanggal : 7 januari 2012.
Tahun Anggaran : 2011 Minggu ke : 14 (empat belas)
URAIAN PEKERJAAN
NO. PEKERJAAN VOLUME SATUAN
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
URAIAN PEKERJAAN
NO. PEKERJAAN VOLUME SATUAN
1 Libur
2
3
4
5
6
7
8
9
10
11
12
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
URAIAN PEKERJAAN
NO. PEKERJAAN VOLUME SATUAN
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
URAIAN PEKERJAAN
NO. PEKERJAAN VOLUME SATUAN
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
URAIAN PEKERJAAN
NO. PEKERJAAN VOLUME SATUAN
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
URAIAN PEKERJAAN
NO. PEKERJAAN VOLUME SATUAN
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
URAIAN PEKERJAAN
NO. PEKERJAAN VOLUME SATUAN
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
Pekerjaan : Pembangunan Kantor Dewan Perwakilan Rakyat Daerah Hari ke : 101 (delapan puluh tiga)
Lokasi : Lewoleba - Kecamatan Nubatukan Kabupaten Lembata Tanggal : 14 januari 2012.
Tahun Anggaran : 2011 Minggu ke : 15 (lima belas)
URAIAN PEKERJAAN
NO. PEKERJAAN VOLUME SATUAN
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
URAIAN PEKERJAAN
NO. PEKERJAAN VOLUME SATUAN
1 Libur
2
3
4
5
6
7
8
9
10
11
12
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
URAIAN PEKERJAAN
NO. PEKERJAAN VOLUME SATUAN
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
URAIAN PEKERJAAN
NO. PEKERJAAN VOLUME SATUAN
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
URAIAN PEKERJAAN
NO. PEKERJAAN VOLUME SATUAN
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
URAIAN PEKERJAAN
NO. PEKERJAAN VOLUME SATUAN
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
Pekerjaan : Pembangunan Kantor Dewan Perwakilan Rakyat Daerah Hari ke : 107 (delapan puluh sembilan)
Lokasi : Lewoleba - Kecamatan Nubatukan Kabupaten Lembata Tanggal : 20 Januari 2012.
Tahun Anggaran : 2011 Minggu ke : 16 (enam belas)
URAIAN PEKERJAAN
NO. PEKERJAAN VOLUME SATUAN
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
URAIAN PEKERJAAN
NO. PEKERJAAN VOLUME SATUAN
6
7
8
9
10
11
12
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
URAIAN PEKERJAAN
NO. PEKERJAAN VOLUME SATUAN
1 Libur
2
3
4
5
6
7
8
9
10
11
12
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
URAIAN PEKERJAAN
NO. PEKERJAAN VOLUME SATUAN
1 Libur
2
3
4
5
6
7
8
9
10
11
12
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
URAIAN PEKERJAAN
NO. PEKERJAAN VOLUME SATUAN
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
URAIAN PEKERJAAN
NO. PEKERJAAN VOLUME SATUAN
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
URAIAN PEKERJAAN
NO. PEKERJAAN VOLUME SATUAN
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
URAIAN PEKERJAAN
NO. PEKERJAAN VOLUME SATUAN
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
URAIAN PEKERJAAN
NO. PEKERJAAN VOLUME SATUAN
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
URAIAN PEKERJAAN
NO. PEKERJAAN VOLUME SATUAN
1 Libur
2
3
4
5
6
7
8
9
10
11
12
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
URAIAN PEKERJAAN
NO. PEKERJAAN VOLUME SATUAN
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17