THR :
Bonus :
Lembur : 50.00% x Rp 133,632
Jamsostek : 4.89% x Rp 132,132
Dana Pensiun : 0.00% x Rp -
Rp -
Rp - SBS
= Rp 66,816 74,340
= Rp 6,461 7,190
= Rp - -
Sub Total = Rp 73,277
Total = Rp 206,909
hari
hari
hari
hari
hari
hari
hari
hari
hari
hari
hari
hari
hari 281.32
89.88%
100% =
= Rp 230,210
Rp 230,210
28 Orang
3 Orang
12 Orang
4 Orang
38 Orang
68 Orang
Disetujui Oleh
CEO
Page : 01
PT. GARSINDO NUSANTARA PLANTATION MILL (GNPM)
2007 MILL
LABOUR
BI
NO. DESCRIPTION Jml Jumlah
Kary Upah
A. PROCESS WORKERS
A LOADING RAMP
1 RAMP OPERATOR (7E) 1 2,965,000
2 RAMP BOTTOM -
3 RAMP CLEANER -
4 RAMP CAPSTAN OPERATOR (4E) 2 5,840,000
5 TRANSFER CARRIAGE OPERATOR (5E) 1 2,935,000
6 CRANE OPERATOR (3E) 1 2,905,000
7 MILL SPAREMAN -
B STERILIZER
1 STERILIZER OPERATOR (4D) 3 9,120,000
2 STERILIZER DOOR/TROLLEY OPERATOR -
C THRESER
1 CAPSTAN OPERATOR (4E) 2 5,840,000
2 SSBC OPERATOR -
3 TRANSFER CARRIAGE OPERATOR (5E) 1 2,935,000
4 CHAIN MAN + CAGE HANDLING -
5 TIPPLER OPERATOR (6E) 2 5,900,000
D PRESSING
1 PRESSING OPERATOR (3D) 2 6,050,000
2 MANDOR PROCESS (5C) 2 6,350,000
E KERNEL
1 KERNEL PLANT OPERATOR (6E) 2 5,900,000
F KLARIFIKASI
1 CLARIFICATION OPERATOR (1D) 3 8,985,000
2 OIL RECOVERY -
G BOILER
2 BOILER OPERATOR (3D) 1 3,025,000
3 FIREMAN (5E) 1 2,935,000
I DESPATCH OIL
1 OIL DESPATCH OPERATOR (1D) 1 2,995,000
J DESPATCH KERNEL
1 KERNEL DESPATCH OPERATOR (6E) 1 2,950,000
L General Proses
1 PROCESS CLERK
M Running Account
1 SUPIR FM
2 SUPIR ASKEP
3 SUPIR KTU
4 OPR DIESEL GENSET (7E) 1 2,965,000
5 OPR TURBINE (8E) 1 2,980,000
6 OPR WATER TREATMENT/INTAKE PLANT (7E) 1 2,965,000
7 SUPIR DUMP TRUK -
8 SUPIR MOBIL L-300 (POOL) (3E) 1 2,905,000
9 SUPIR TRUK/ENGKEL -
10 WHELL LOADER OPERATOR (7E) 1 2,965,000
Sub total 5 14,780,000
N ADMINISTRASI
1 KASIR / SSB (7D) 1 3,085,000
2 OFFICE CLEANER -
3 PEMBUKUAN -
4 PERSONALIA / PAYROLL (4C) 1 3,160,000
5 PRODUCTION CLERK -
6 PURCHASING / ARSIPARIS -
7 STORE ATTENDANT (5C) 1 3,175,000
8 STORE KEEPER (8E) 1 2,980,000
Sub total 4 12,400,000
P LABORATORY
1 LABORATORY ANALIS (6C) 2 6,380,000
2 SAMPLE BOY (8E) 3 8,940,000
3 SORTER (PEMBANTU ANALISIS) -
Sub total 5 15,320,000
Q SATPAM
1 DANTIM SATPAM (3D) 1 3,025,000
2 SATPAM (5E) 3 8,805,000
Sub total 4 11,830,000
R COMPOUND
1 Ka Compound/Perawatan (6E) 1 2,950,000
Sub total 1 2,950,000
S DOMESTIC
1 GARDENER ASSISTANT
2 GARDENER MANAGER
3 GARDENER PC
4 NIGHT WATCHMAN
Sub total 0 0
T WORKSHOP
1 ELECTRICAL CHARGEMAN (MANDOR) (7C) 1 3,205,000
2 MECHANICAL FOREMAN (MANDOR) (8C) 1 3,220,000
3 GRADE 1 ELECTRICAL ( FOREMAN ELECTRICAL ) -
4 GRADE 1 FITTER ( FOREMAN MAINTENANCE ) -
5 GRADE 2 ELECTRICAL (1D) 1 2,995,000
6 GRADE 2 FITTER -
7 GRADE 3 ELECTRICAL (5D) 1 3,055,000
8 GRADE 3 FITTER (6D) 1 3,070,000
9 GREASER -
10 LATHE/MACHINIST/SCRAPPER MACHINE OPERATOR (E8) 1 2,980,000
11 MAINTENANCE CLERK (E5) 1 2,935,000
12 MAINTENANCE HELPER -
13 ELECTRICAL HELPER -
14 SHIFT FITTER (E7) 1 2,965,000
15 WELDER -
Sub total 8 24,425,000
U Kasus Khusus
1 ADMIN PC -
2 GARDENER VPM -
3 DRIVER ASKEP (MM PROJECT) -
4 DRIVER PC -
5 DRIVER VPM -
6 PERAWAT -
7 MANTERI KLINIK -
8 POS WATER INTAKE -
9 SECURITY POS DEPAN -
10 MUDIM -
11 TUKANG KEBUN PERUMAHAN
12 PENJAGA KEAMANAN PERUMAHAN
Sub total - -
- - - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - - - - -
38 68 2,556,000
- - 3,372,500 3,372,500
- - 3,273,500 3,273,500
- - 3,257,000 3,257,000
- - 3,290,000 3,290,000
- - 3,257,000 3,257,000
- - - -
- - 3,240,500 3,240,500
- - 3,306,500 3,306,500
121,500 - 16,483,000 16,726,000
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - - -
Istri
2,556,000 - - 5,112,000 3,825,360
Anak
4,400,550 8,225,910
6,845,670
PT. GARSINDO NUSANTARA PLANTATION MILL (GNPM)
2007 MILL
THR :
Bonus :
Lembur : 50.00% x Rp 126,870
Jamsostek : 4.89% x Rp 125,370
Dana Pensiun : 0.00% x Rp -
Sub Total
Total
Rp -
Rp -
= Rp 63,435 70,579
= Rp 6,131 6,821
= Rp - -
= Rp 69,566
= Rp 196,436
281.32 Pembulatan
= 89.88%
= Rp 218,557
Rp 218,557
45 Orang
2 Orang
65 Orang
1 Orang
40 Orang
67 Orang
Disetujui Oleh
CEO
Page : 01
PT. GARSINDO NUSANTARA PLANTATION MILL (GNPM)
2007 MILL
LABO
BIAYA LANG
NO. DESCRIPTION Jml Jumlah Upah Naik
Kary Upah 0.1
A. PROCESS WORKERS
A LOADING RAMP
1 RAMP OPERATOR 1 2,850,000 285,000
2 RAMP BOTTOM 0 - -
3 RAMP CLEANER 0 - -
4 RAMP CAPSTAN OPERATOR 2 5,700,000 570,000
5 TRANSFER CARRIAGE OPERATOR 1 2,850,000 285,000
6 CRANE OPERATOR 1 2,850,000 285,000
7 MILL SPAREMAN 2 5,700,000 570,000
B STERILIZER
1 STERILIZER OPERATOR 1 2,850,000 285,000
2 STERILIZER DOOR/TROLLEY OPERATOR 0 - -
C THRESER
1 CAPSTAN OPERATOR 2 5,700,000 570,000
2 HOIST CRANE OPERATOR 0 - -
3 SSBC OPERATOR 0 - -
4 TRANSFER CARRIAGE OPERATOR 1 2,850,000 285,000
5 CHAIN MAN + CAGE HANDLING - -
6 TIPPLER OPERATOR 2 5,700,000 570,000
D PRESSING
1 PRESSING OPERATOR 2 5,700,000 570,000
2 MANDOR PROCESS 0 - -
3 AUTO FEEDER OPERATOR 0 - -
E KERNEL
1 KERNEL PLANT OPERATOR 2 5,700,000 570,000
F KLARIFIKASI
1 CLARIFICATION OPERATOR 3 8,550,000 855,000
2 OIL RECOVERY 0 - -
G BOILER
1 BOILER OPERATOR 1 2,850,000 285,000
2 FIREMAN 5 14,250,000 1,425,000
I DESPATCH OIL
1 OIL DESPATCH OPERATOR 0 - -
J DESPATCH KERNEL
1 KERNEL DESPATCH OPERATOR 0 - -
K Empty Bunch Treatment
1 USB COLLECTOR 1 2,850,000 285,000
2 INCINERATOR
L General Proses
1 PROCESS CLERK 0 - -
M Running Account
1 SUPIR FOR MANAGER 1 2,850,000 285,000
2 SUPIR ASKEP - -
3 SUPIR KTU - -
4 OPR DIESEL GENSET 2 5,700,000 570,000
5 OPR TURBINE 1 2,850,000 285,000
6 OPR WATER TREATMENT/INTAKE PLANT 1 2,850,000 285,000
7 SUPIR DUMP TRUK 1 2,850,000 285,000
8 DRIVER FOR POOL VEHICLE 0 - -
9 SUPIR TRUK/ENGKEL 0 - -
10 WHELL LOADER OPERATOR 1 2,850,000 285,000
11 SUPIR BUS SEKOLAH 1 2,850,000 285,000
Sub total 8 22,800,000 2,280,000
N ADMINISTRASI
1 KASIR / SSB 0 - -
2 OFFICE CLEANER 1 2,850,000 285,000
3 PEMBUKUAN 1 2,850,000 285,000
4 PERSONALIA / PAYROLL 0 - -
5 PRODUCTION CLERK 1 2,850,000 285,000
6 PURCHASING / ARSIPARIS 0 - -
7 STORE ATTENDANT 0 - -
8 STORE KEEPER 0 - -
Sub total 3 8,550,000 855,000
P LABORATORY
1 LABORATORY ANALIS 0 - -
2 SAMPLE BOY 3 8,550,000 855,000
3 SORTER 2 5,700,000 570,000
Sub total 5 14,250,000 1,425,000
Q SATPAM
1 DANTIM SATPAM 0 - -
2 SATPAM 6 17,100,000 1,710,000
Sub total 6 17,100,000 1,710,000
R COMPOUND
1 COMPOUND UPKEEP 2 5,700,000 570,000
Sub total 2 5,700,000 570,000
S DOMESTIC
1 GARDENER ASSISTANT 1 2,850,000 285,000
2 GARDENER MANAGER 1 2,850,000 285,000
3 GARDENER PC 0 - -
4 NIGHT WATCHMAN 0 - -
Sub total 2 5,700,000 570,000
T WORKSHOP
1 ELECTRICAL CHARGEMAN (MANDOR) 0 - -
2 MECHANICAL FOREMAN (MANDOR) 0 - -
3 GRADE 1 ELECTRICAL ( FOREMAN ELECTRICAL ) 0 - -
4 GRADE 1 FITTER ( FOREMAN MAINTENANCE ) 0 - -
5 GRADE 2 ELECTRICAL 0 - -
6 GRADE 2 FITTER 1 2,850,000 285,000
7 GRADE 3 ELECTRICAL 1 2,850,000 285,000
8 GRADE 3 FITTER 1 2,850,000 285,000
9 GREASER 1 2,850,000 285,000
10 LATHE/MACHINIST/SCRAPPER MACHINE OPERATOR 0 - -
11 MAINTENANCE CLERK 0 - -
12 MAINTENANCE HELPER 5 14,250,000 1,425,000
13 ELECTRICAL HELPER 1 2,850,000 285,000
14 SHIFT FITTER 1 2,850,000 285,000
15 WELDER 0 - -
Sub total 11 31,350,000 3,135,000
U Kasus Khusus
1 ADMIN PC - -
2 GARDENER VPM - -
3 DRIVER ASKEP (MM PROJECT) - -
4 DRIVER PC - -
5 DRIVER VPM - -
6 PERAWAT - -
7 MANTERI KLINIK - -
8 POS WATER INTAKE - -
9 SECURITY POS DEPAN - -
10 MUDIN/KOSTER 1 2,850,000 285,000
11 TUKANG KEBUN PERUMAHAN 0 - -
12 PENJAGA KEAMANAN PERUMAHAN - -
Sub total 1 2,850,000 285,000
- - - -
- - - -
45,000 - 139,365 3,319,365 1 2
- - - -
- - - -
45,000 - 139,365 3,319,365 - -
45,000 - 139,365 3,319,365 1 3
- - - -
45,000 - 139,365 3,319,365 - -
- - - -
- - - -
- - - - 1 1
135,000 - 418,095 9,958,095 2 4 -
- - - -
135,000 - 418,095 9,958,095 2 1
45,000 - 139,365 3,319,365 - -
180,000 - 557,460 13,277,460 2 1 -
- - - -
135,000 - 418,095 9,958,095 1 2
90,000 - 278,730 6,638,730 2 3
225,000 - 696,825 16,596,825 3 5 -
- - - - -
270,000 - 836,190 19,916,190 6 10
270,000 - 836,190 19,916,190 6 10 -
- - - -
- - - -
- - - -
- - - -
- - - -
45,000 - 139,365 3,319,365 1 1
45,000 - 139,365 3,319,365 1 1
45,000 - 139,365 3,319,365 - -
45,000 - 139,365 3,319,365 - -
- - - -
- - - -
225,000 - 696,825 16,596,825 4 7
45,000 - 139,365 3,319,365 - -
45,000 - 139,365 3,319,365 - -
- - - -
495,000 - 1,533,015 36,513,015 6 9 -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
45,000 - 139,365 3,319,365 1 1
- - - -
- - - -
45,000 - 139,365 3,319,365 1 1 -
40 67 2,587,500
- 3,180,000 3,180,000
- - -
- - -
- 6,360,000 6,360,005
- 3,180,000 3,180,000
3,180,000 3,180,000
6,360,000 6,360,003
- 3,180,000 3,180,000
- - -
- 6,360,000 6,360,006
- - -
- - -
- 3,180,000 3,180,000
- - -
- 6,360,000 6,360,000
- 6,360,000 6,360,004
- -
- - -
- 6,360,000 6,360,003
- 9,540,000 9,540,004
- - -
- 3,180,000 3,180,002
- 15,900,000 15,900,007
- 3,180,000 3,180,000
- - -
- - -
- 3,180,000 3,180,003
- - -
- - 89,040,000 89,040,037
- - 89,040,000 89,040,037
- - 89,040,000 89,040,037
3,180,000 3,180,002
- -
- -
6,360,000 6,360,003
3,180,000 3,180,000
3,180,000 3,180,000
3,180,000 3,180,000
- -
- -
3,180,000 3,180,003
3,180,000 3,180,000
- - 25,440,000 25,440,008
- - -
3,180,000 3,180,000
- 3,180,000 3,180,004
- - -
- 3,180,000 3,180,000
- - -
- - -
- - 2
- - 9,540,000 9,540,006
- - -
- 9,540,000 9,540,003
- 3,180,000 3,180,000
- - 12,720,000 12,720,003
- - -
- 9,540,000 9,540,003
- 6,360,000 6,360,005
- - 15,900,000 15,900,008
- - - -
- 19,080,000 19,080,016
- - 19,080,000 19,080,016
- 6,360,000 6,360,006
- - 6,360,000 6,360,006
-
3,180,000 3,180,002
- 3,180,000 3,180,004
- - -
- - -
- - 6,360,000 6,360,006
- - -
- - -
- - -
- - -
- - -
3,180,000 3,180,002
- 3,180,000 3,180,002
3,180,000 3,180,000
- 3,180,000 3,180,000
- - -
- - -
- 15,900,000 15,900,011
- 3,180,000 3,180,000
- 3,180,000 3,180,000
- -
- - 34,980,000 34,980,015
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- 3,180,000 3,180,002
- - -
- - -
- - 3,180,000 3,180,002
2,587,500 - - 5,175,000
15
9