Anda di halaman 1dari 2

RAB MATERIAL & BAHAN

Proyek : Rumah Muh. Harun


Lokasi : Gg. Wulan APT. Pranoto

SATUAN VOLUME HARGA SAT. JUMLAH HARGA BOBOT


NO. URAIAN PEKERJAAN
[SAT.] [VOL.] [Rp.] [Rp.] [%]
A PEKERJAAN PONDASI
1 Pondasi Setempat Ukuran ......
1.1 Batu Kali
1.2 Pasir Uruk
1.3 Semen
1.4 Pasir
1.5 Sloof
SUB-TOTAL [Rp.]
B PEKERJAAN PEMBESIAN COLOM & TIANG
1 Besi Beton
2 Kawat Ikat

SUB-TOTAL [Rp.]
C PEKERJAAN DINDING BATA UTAMA
1 Dinding 1/2 Bata Camp. 1:6 ( 98,5 M2 ) T 3,5M (344,75 M2) *
1.1 Batu Bata Bh 24.132,50 800 19.306.000
1.2 Semen (40Kg) Zak 72,00 65.000 4.680.000
1.3 Pasir M3 17,00 300.000 5.100.000
2 Plesteran 1:4 Tebal 15MM **
2.1 Semen (40Kg) Zak 108,00 65.000 7.020.000
2.2 Pasir M3 8,50 300.000 2.550.000
3 Acian Semen ***
3.1 Semen (40Kg) Zak 28,00 65.000 1.820.000

SUB-TOTAL [Rp.] 40.476.000


D PEKERJAAN DINDING BATA LEBIH
1 Dinding 1/2 Bata Camp 1:6 (38,25M2)
1.1 Batu Bata Bh 2700,00 800 2.160.000
1.2 Semen (40Kg) Zak 8,00 65.000 520.000
1.3 Pasir M3 1,90 300.000 570.000
2 Plesteran 1:4 Tebal 15MM **
2.2 Semen (40Kg) Zak 6,00 65.000 390.000
2.3 Pasir M3 0,90 300.000 270.000
3 Acian Semen ***
3.2 Semen (40Kg) Zak 3,00 65.000 195.000

SUB-TOTAL [Rp.] 4.105.000


E KUSEN, PINTU, JENDELA, DAN AKSESORIS
1 Kusen & Pintu Utama Unit 1,00 2.000.000 2.000.000
2 Kusen & Pintu Kamar Tidur Unit 6,00 750.000 4.500.000
3 Kusen & Pintu K.Mandi ( Pintu PVC ) Unit 3,00 300.000 900.000
4 Kusen & Cendela Depan + Dapur + Ruang Keluarga Unit 9,00 1.500.000 13.500.000
5 Kusen & Cendela Kamar Unit 10,00 500.000 5.000.000
SUB-TOTAL [Rp.] 25.900.000
F PEKERJAAN ATAP
1 Kuda - kuda Kayu Btg
2 Kayu Gording Btg
3 Kayu List Plang Btg 22,00
4 Seng / Genteng ( MULTI ROOF STONE ) 2x5 (10 Daun) Lmbr 140,00 90.000 12.600.000
SUB-TOTAL [Rp.] 12.600.000
G PEKERJAAN INSTALASI LISTRIK
1 Pek. Instalasi Titik Lampu Ttk 16,00 70.000 1.120.000
2 Pek. Pas. Saklar Bh 9,00 25.000 225.000
3 Pek. Pas. Stop Kontak Set 9,00 25.000 225.000
4 Pek. Panel box Unt 1,00 100.000 100.000
SUB-TOTAL [Rp.] 1.670.000
H PEKERJAAN SANITAIR
1 Pek. Instalasi Air Bersih [Pipa PVC 3/4" dan 1/2"] M' dst…
2 Pek. Instalasi Air Kotor K.Mandi, Dapur, Air Hujan [Pipa PVC Ø3"] M' dst…
3 Pek. Instalasi Air Buangan Closet [Pipa PVC Ø4"] M' dst…
4 Pek. Septick tank Unt dst…
SUB-TOTAL [Rp.]
I PEKERJAAN FINISHING
1 Keramik Lantai (Keramik 40x40) M2 152,00 70.000 10.640.000
2 Keramik K.Mandi M2 7,15 70.000 500.500
3 Keramik Teras M2 0
4 Plafon Kalsi Board/ Nusaboard 2400x1200 = 2,88 M2 Lmbr 60,00 75.000 4.500.000
5 Pek. Finishing Plesteran Motif Tpk. Depan M2 0
6 Pek. Cat Dinding Luar M2 0
7 Pek. Cat Dinding Dalam dan Plafon M2 0
8 Pek. Cat Kusen, Daun Pintu, dan Daun Jendela M2 0
SUB-TOTAL [Rp.] 15.640.500
TOTAL [Rp.] 100.391.500

* Berdasarkan SNI 6897 : 2008 No. 16 Bahwa memasang Dinding 1 M2 Membutuhkan BT = 70 Bh, PC = 8,32 Kg, PP = 0,049 M3
** Berdasarkan SNI 2837 : 2008 No. 17 Bahwa memasang Plesteran 1:4 untuk 1 M2 Membutuhkan PC = 6,24 Kg, PP = 0,024 Kg,
*** Berdasarkan SNI 2837 : 2008 No. 06 Bahwa memasang Acian untuk 1 M2 Membutuhkan PC = 3,25 Kg