Anda di halaman 1dari 9

SHOP DRAWING

LEOEND

KEY PLAN

(A) (D) E F G
4800
BUU 800 J0
400
NO DATE REVS

OIUET UIB
1
PENGLOLA ) ) RG MM TER N l ANITA
.0 22 -0.05

U RG. ME B00

PROJECT

MUSHOLA|| +0.00 MUSHOLA PEMBANGUNAN GEDUNG KULAH


L+0.00 1400 TERPADU UNIVERSITAS PALANGKA RAYA
2

OWNER

3 KORIDOR
*0.00
KORIDOR
0.00
Q0-
3
300
4

LOKASI
UNIVERSITAS PALANGKA RAYA

800 800
EE 800- 800- 800 400
KONTRAKTOR

4800- DIGAMBAR DRIKSA

MYAMUAD EADO
DIPERIKSA OLEH:
A R S A DESAIN KONSULTAN

InstolasiAC Ceiling Lantai 1 Ged. A KONSULTAN PENGAWAS

SIMBOL KE TERANGSAN JUMLAH


JOHAN S.U, ST.
AC CEILING 24200 Btu/h 9 Buoh Tema Leader
KooRONATORLAPANGAN SEBSN RK

FRANSISCOHRHLE,SI,
NAMA GAMBAR SCALE

Instalasi AC Lantai 1 Gedung A INSTALASI AC


LANTA 1 1:200
200 1200
SKALA GEDUNG A
NO. HALAMAW
KODE GAR

MEP
SHOP DRAWING

LEGEND

KEY PLAN

A G H)
4800
B00
800 800 B00 BOO NODATE|REVMSI

TOILET OcONTROL
U18. UE TOTLET
RIA
m KULLAM m ) OPENGELOLA ) RGMArATER KO CS .05
t0.00" A
00 AL 00
RG. ME PROJECT
RG STUDIp
PODCAST MUSHOLAA PEMBANGUNAN GEDUNG KULAH
USHOL +0.00
+0.00 TERPADU UNIVERSITAS PALANGKA RAYA|

600 3
KORIDOR KORIDOR
0.00

300

HHH

LOKASI
UNIVERSITAS PALANGKA RAYA
KONTRAKTOR

800 00-
400 800 800 800 DIGAMEAR DPERIKSA
4800-

AQOH
DIPERIKSA OLER:

KONSULTNPNGAAS
Instalasi AC Ceiling Lantai 1 Ged. B
SIMBOL KETERANGAN JUMLA
JOHAN S.U, S..
emaLeadR_
AC CEILING 24200 Btu/h Buoh
oORD NAURLAPANGANSSNR

RANSISOO RSI
NAMA GAMBAR SCALE
Instalasi AC Lantai 1 Gedung B INSTALASI AC
LANTAIN1 1.:200

SKALA 2 1200 GEDUNG B

KODE AMBAR NO. HALAMA

MEP
SHOP DRAWING

LEGEND

KEY PLAN

A B (D) G (H)
4800-
400 B00
800 800- 400

NODATE REVS

OLET RGCONTROL oILET


PRIA A
2400 t3.
RG KULIAH FLEXTBLE U1B.5 RG KUUAH FLETRIE
RG. ME 400
+4.00
PROJECT

MUSHOLA MUSHOLA PEMBANGUNAN GEDUNG KULIAH


L+4.00
2 D D 1400 TERPADU UNVERSITAS PALANGKA
RAYA
OWNER
500

KORIDOR
+4.00
KORIDOR
+400
BO0
3)
300

LOKASI
|UNIVERSITAS PALANGKA RAYA
KONTRAKTOR

400
800 800 400-
4800

DIAMEARR DPERIKSA

MUH
DIPERIKSAOLEN:

Instalasi AC Ceiling Lantai 2 Ged. A InstalasiAC Ceiling Lontoi 2 Ged. B KONSULTAN PENGAWAS

SIMBOL KETERANGAN JUMLAH SIMBOL KETERANGAN


JUMLA
JOHAN S.U, 8ST.
AC CEILING 24200 Btu/h 9 Buah AC CEILING 24200 8tu/n Buoh Tema Leade
KOORUNATORLAPANGAN SESNFEK

FRANSISCOHRHE, SIL,
NAMA GAMBAR SCALE|
Instalasi AC Lantai 2 Gedung A & B
INSTALASI AC
LANTAI 2 1:200
SKALA
ABD
KODE GAMBAR NO. ALAMAN

MEP
SHOP DRAwING
LEGEND

KEY PLAN

(B D)
G
00
800 0- 400

NO DATE REVISI
1
U D

G CONTROL
ELOLA O LE
+7.95 C D
AALRIBL G KULIAH FLEXIBLE
RG. ME
BO0

PROJECTT

NUSHOLA PEMBANGLINAN GEDUNG KULAH


+8.00
TERPADU UNIVERSITAS PALANGKA
RAYA
2
wNER
300

KORIDOR KORIDORR
+8.00 8.00

300

LOKASI

UNIVERSITAS PALANGKA RAYA

KONTRAKTOR

400 800 800 800 800- -B00


-4800
DIGAMBAR DPERAKSA

UNAMMAD FAQoH
DIPERIKSA OLEH

KONSULTAN PENGAWAS
InstalasiAC Ceiling Lantai 3 Ged. A Instalasi AC Ceiling Lantai 3 Ged. B
SIMBOL KETERANGAN JUMLAH SIMBOL KETERANGAN JUMLAH
JOHAN S.U, ST.
AC CEILING 24200 Btu/h 9 Buah O AC CEILING 24200 Btu/h Buon
Tama Leeder
KoORD NATOR LAPANGAN SESN FK

FRANSISCO HRHS,SI,
NAMAGAMBAR SCALE
InstalasiAC Lantai 3 Gedung A &B
INSTALASI AC 1:20o
SKALA 400 G0D 1200 LANTA
ABb NO. HALAMAN
KODE GAMBAR

MEP
SHOP DRAWING
LEGEND

KEY PLAN

(B D) E H
4800
400 800- 800 B00- BO0 00 00

NO DATE REVS BT

CONTROL
NGELOLA
+12
12.00-
WANITA
195
RG ROLALEAbE
RoROLAR IBLE
RG. ME 800
h +12.00 PROJECT

HUSHOLA USHO PEMBANGUNAN GEDUNG KULIAH


+12.00
L
12.00 1400 TERPADU UNIVERSITAS PALANGKARAYA
2
oWNER
00

00
KOKD

LOKASI
UNIVERSITAs PALANGKA RAYA

KONTRAKTOR

0- 800 800 800 800


4800-
DIGAMBAR DIPERIKSA

DIPERIKSAOLEN:
AONGInTAN

Instalasi AC Ceiling Lantai 4 Ced. B KONSULTAN PENGAWAS


Instalasi AC Ceiling Lantai 4 Ged. A
SIMBOL KETERANCAN JUMLA SIMBOL KETERANGAN JUMLAH
JOHAN .U, S.T.

AC CEILING 24200 Bugh AC CEILING 24200 Btu/h Buah ADAMCANSESNRSK


Bu/ -
KOORDNATORLAPANGAN SESNFK

FRANSISCO MRHB, ST, LS


NAMAGAMBAR SCALE

Instalasi AC Lantai 4 Gedung A &B INSTALASI AC


LANTAI 4 1:200
SKALA
200 AXB

KODE GAMBAR o..HALAMAN

MEP
SHOP DRAWING

LEGEND

KEY PLANN

B G) D E G (H)
4800-
J0 800- 300 00
B00 00 O0

NODATE REVISI

E
CONTRO P
A FNGELOLA
1S95
RG KULIAHEEXIBLE 15.95
RG KULIALEIBLE

RG. ME
16.00
BO0
PROJECT
L
NUSHOLA || MUSHOLA
+16.00 U PEMBANGUNAN GEDUNG KULJAH
C | +16.00 TERPADU UNVERSITAS PALANGKA
RAYA

WNER
00

KORIDOR ORIDO 600 3


+16.00
KO6.0
LOKASI
UNIVERSITAS PALANGKA RAYA

KONTRAKTOR

+00 B00 00 00 800 400

4800
DIGAMBAR DIPERIKSA

MUHnMAS FAgOH
DIPERIKSA OLEH:
A DESAN KONSLTAN

InstalasiAC Ceiling Lantai 5 Ged. A InstalasiAC Ceiling Lantai 5 Ged. B KONSULTAN PENGAWAS

SIMBOL KE TERANGAN JUMLA SIMBOL KETERANGAN JUMLAH


JOHAN 8.U, 8.T.
AC CEILING 24200 Btu/h 9 Buah AC CEILING 24200 Btu/h Buoh ma
KoORU NATORLAPANGAN SBSN RSN

RANSISCO HRHE,S, 2
NAMA GAMBAR SCALE

Instalasi AC Lantai 5 Gedung A & B INSTALASI AC


200
200 5
SKALA . A
NO. HALAMAN
KODEGAMBAR

MEP
SHOP DRAWNG
LEGEND

KEY PLAN

E) G) H
4800
HOO B00 800 B00 300
NODATE REMS

JIB.1
19.25 RUMNGDOSEN WANTA

ERE ER 800
PROJECT

PEMBANGUNAN GEDUNG KULAH


TERPADU UNIVERSITAS PALANGKA RAYA
2
OWNER
300

KORIDOR KORIDOR 00 3
t20.00 +20.00
tttt

LOKASI

UNIVERSITAS PALANGKA RAYA


LO0 300 800 800 300 800 -400

4800 KONTRAKTOR

DIGAMBAR |DPERIKSA
.

DIPERIKSA OLEH:

KONSULTAN PENGAWAS
Instalasi AC Ceiling Lantai 6 Ged.
SIMBOL KETERANCAN JUMLAH
JOHAN S.U, 8ST.
AC CEILING 24200 Btu/h Buah
KOORDNATOR LAPANGAN SBSN FSK

NAMA GAMBAR SCALE


Instalasi AC Lantai 6 Gedung A INSTALASI AC
LANTAI6 |1:200
SKALA GEDUNGA

KODEGAMBAR NO. HALAMAN

MEP
SHOP DRAWING

LEGEND

KEY PLAN

B C D E (H)
4800

00 800 300 S00 800- 800 100

NO DATE|REVMSI

TTTT
TA U185 VIANITA
+19.95 13.9

+ 20.00 ' P RUA PA


RTEMUAN
20.00
SERB 800

PROJECT
AUSHOLA MusHoLA
20.00 400 PEMBANGUNAN GEDUNG KULAH
TERPADU UNIVERSITAS PALANGKARAYA

300 OWNER

KORIDOR 00
KORIDOR
+20.00 tZ0.00

300
HHHHHH

LOKASI

400- UNIVERSITAS PALANGKA RAYA


800 800 800
4800-
KONTRAKTOR

DIOAMBAR DPERIKSA

MUH MMAD FAQOH


DIPERIKSA OLEH:

KONSULTAN PENGAWAS
Instalasi AC Ceiling Lantai 6 Ged. B
SIMBOL KETERANGAN JUMLA
JOHAN S.U., 3.T.
AC CEILING 24200 Btu/h 9 Buoh Toma Leader
KoORDINATOR LAPNIGAN SES FK

FRANSISCO MRKHB,SL, M
NAMAGAMBAR SCALE

Instalasi AC Lantai 6 Gedung B INSTALASI AC


LANTA 6 |1:200
00 00 GEDUNG B

KODE GAMBAR NO. HALAMAN

MEP
SHOP DRAwING
LEGEND

KEY PLAN

3) E) F) H
ODAIE REVSI
4,00 8,00- 00- 8,00 8,00 4,00

PROJECT

PEMBANGUNAN GEDUNG KULUAH


PADU UNVERSITAS PALANGKA
RAYA
RUMAH LIFT
* 2400 OWNER

3
ATAP DAK
+24.00 LOKASI

UNIVERSITAS PALANGKA RAYA

KONTRAKTOR

DIGAMBAR DPERIKSA

4,00 8,00- 5,00 8,00- 8,00- 3,00 4,00


8,00-

URADAD ENCO|
DIPERKSAOLEH:

KONSULTAN PENGAWAS
Instalasi Outdoor Ged. A
SIMBOL KETERANGAN JUMLAH
JoRAN S.U, 8.T.

Outdoor Unit Multi-V 5 Pro kapasitas 191,100 Btu/h 6 Buah Tema Leader
KOORDNATOR LAPANGANSNRSK

InstalasiOutdoor Ced. B
Instalasi Output AC Lantai Roof Top SIMBOL KETERANCAN JUMLAH
ERANSISCOHRHB, ST,
NAMA GAMBAR SCALE

Gedung A & B Outdoor Unit Multi-V 5 Pro kopasitos 191,100 Btu/h 6 Buah
INSTALASI OUTPU:200
AC ROOE TOP

SKALA
KOOE GAMBAR JAAN
.ALAAN

MEP

Anda mungkin juga menyukai