LEOEND
KEY PLAN
(A) (D) E F G
4800
BUU 800 J0
400
NO DATE REVS
OIUET UIB
1
PENGLOLA ) ) RG MM TER N l ANITA
.0 22 -0.05
U RG. ME B00
PROJECT
OWNER
3 KORIDOR
*0.00
KORIDOR
0.00
Q0-
3
300
4
LOKASI
UNIVERSITAS PALANGKA RAYA
800 800
EE 800- 800- 800 400
KONTRAKTOR
MYAMUAD EADO
DIPERIKSA OLEH:
A R S A DESAIN KONSULTAN
FRANSISCOHRHLE,SI,
NAMA GAMBAR SCALE
MEP
SHOP DRAWING
LEGEND
KEY PLAN
A G H)
4800
B00
800 800 B00 BOO NODATE|REVMSI
TOILET OcONTROL
U18. UE TOTLET
RIA
m KULLAM m ) OPENGELOLA ) RGMArATER KO CS .05
t0.00" A
00 AL 00
RG. ME PROJECT
RG STUDIp
PODCAST MUSHOLAA PEMBANGUNAN GEDUNG KULAH
USHOL +0.00
+0.00 TERPADU UNIVERSITAS PALANGKA RAYA|
600 3
KORIDOR KORIDOR
0.00
300
HHH
LOKASI
UNIVERSITAS PALANGKA RAYA
KONTRAKTOR
800 00-
400 800 800 800 DIGAMEAR DPERIKSA
4800-
AQOH
DIPERIKSA OLER:
KONSULTNPNGAAS
Instalasi AC Ceiling Lantai 1 Ged. B
SIMBOL KETERANGAN JUMLA
JOHAN S.U, S..
emaLeadR_
AC CEILING 24200 Btu/h Buoh
oORD NAURLAPANGANSSNR
RANSISOO RSI
NAMA GAMBAR SCALE
Instalasi AC Lantai 1 Gedung B INSTALASI AC
LANTAIN1 1.:200
MEP
SHOP DRAWING
LEGEND
KEY PLAN
A B (D) G (H)
4800-
400 B00
800 800- 400
NODATE REVS
KORIDOR
+4.00
KORIDOR
+400
BO0
3)
300
LOKASI
|UNIVERSITAS PALANGKA RAYA
KONTRAKTOR
400
800 800 400-
4800
DIAMEARR DPERIKSA
MUH
DIPERIKSAOLEN:
Instalasi AC Ceiling Lantai 2 Ged. A InstalasiAC Ceiling Lontoi 2 Ged. B KONSULTAN PENGAWAS
FRANSISCOHRHE, SIL,
NAMA GAMBAR SCALE|
Instalasi AC Lantai 2 Gedung A & B
INSTALASI AC
LANTAI 2 1:200
SKALA
ABD
KODE GAMBAR NO. ALAMAN
MEP
SHOP DRAwING
LEGEND
KEY PLAN
(B D)
G
00
800 0- 400
NO DATE REVISI
1
U D
G CONTROL
ELOLA O LE
+7.95 C D
AALRIBL G KULIAH FLEXIBLE
RG. ME
BO0
PROJECTT
KORIDOR KORIDORR
+8.00 8.00
300
LOKASI
KONTRAKTOR
UNAMMAD FAQoH
DIPERIKSA OLEH
KONSULTAN PENGAWAS
InstalasiAC Ceiling Lantai 3 Ged. A Instalasi AC Ceiling Lantai 3 Ged. B
SIMBOL KETERANGAN JUMLAH SIMBOL KETERANGAN JUMLAH
JOHAN S.U, ST.
AC CEILING 24200 Btu/h 9 Buah O AC CEILING 24200 Btu/h Buon
Tama Leeder
KoORD NATOR LAPANGAN SESN FK
FRANSISCO HRHS,SI,
NAMAGAMBAR SCALE
InstalasiAC Lantai 3 Gedung A &B
INSTALASI AC 1:20o
SKALA 400 G0D 1200 LANTA
ABb NO. HALAMAN
KODE GAMBAR
MEP
SHOP DRAWING
LEGEND
KEY PLAN
(B D) E H
4800
400 800- 800 B00- BO0 00 00
NO DATE REVS BT
CONTROL
NGELOLA
+12
12.00-
WANITA
195
RG ROLALEAbE
RoROLAR IBLE
RG. ME 800
h +12.00 PROJECT
00
KOKD
LOKASI
UNIVERSITAs PALANGKA RAYA
KONTRAKTOR
DIPERIKSAOLEN:
AONGInTAN
MEP
SHOP DRAWING
LEGEND
KEY PLANN
B G) D E G (H)
4800-
J0 800- 300 00
B00 00 O0
NODATE REVISI
E
CONTRO P
A FNGELOLA
1S95
RG KULIAHEEXIBLE 15.95
RG KULIALEIBLE
RG. ME
16.00
BO0
PROJECT
L
NUSHOLA || MUSHOLA
+16.00 U PEMBANGUNAN GEDUNG KULJAH
C | +16.00 TERPADU UNVERSITAS PALANGKA
RAYA
WNER
00
KONTRAKTOR
4800
DIGAMBAR DIPERIKSA
MUHnMAS FAgOH
DIPERIKSA OLEH:
A DESAN KONSLTAN
InstalasiAC Ceiling Lantai 5 Ged. A InstalasiAC Ceiling Lantai 5 Ged. B KONSULTAN PENGAWAS
RANSISCO HRHE,S, 2
NAMA GAMBAR SCALE
MEP
SHOP DRAWNG
LEGEND
KEY PLAN
E) G) H
4800
HOO B00 800 B00 300
NODATE REMS
JIB.1
19.25 RUMNGDOSEN WANTA
ERE ER 800
PROJECT
KORIDOR KORIDOR 00 3
t20.00 +20.00
tttt
LOKASI
4800 KONTRAKTOR
DIGAMBAR |DPERIKSA
.
DIPERIKSA OLEH:
KONSULTAN PENGAWAS
Instalasi AC Ceiling Lantai 6 Ged.
SIMBOL KETERANCAN JUMLAH
JOHAN S.U, 8ST.
AC CEILING 24200 Btu/h Buah
KOORDNATOR LAPANGAN SBSN FSK
MEP
SHOP DRAWING
LEGEND
KEY PLAN
B C D E (H)
4800
NO DATE|REVMSI
TTTT
TA U185 VIANITA
+19.95 13.9
PROJECT
AUSHOLA MusHoLA
20.00 400 PEMBANGUNAN GEDUNG KULAH
TERPADU UNIVERSITAS PALANGKARAYA
300 OWNER
KORIDOR 00
KORIDOR
+20.00 tZ0.00
300
HHHHHH
LOKASI
DIOAMBAR DPERIKSA
KONSULTAN PENGAWAS
Instalasi AC Ceiling Lantai 6 Ged. B
SIMBOL KETERANGAN JUMLA
JOHAN S.U., 3.T.
AC CEILING 24200 Btu/h 9 Buoh Toma Leader
KoORDINATOR LAPNIGAN SES FK
FRANSISCO MRKHB,SL, M
NAMAGAMBAR SCALE
MEP
SHOP DRAwING
LEGEND
KEY PLAN
3) E) F) H
ODAIE REVSI
4,00 8,00- 00- 8,00 8,00 4,00
PROJECT
3
ATAP DAK
+24.00 LOKASI
KONTRAKTOR
DIGAMBAR DPERIKSA
URADAD ENCO|
DIPERKSAOLEH:
KONSULTAN PENGAWAS
Instalasi Outdoor Ged. A
SIMBOL KETERANGAN JUMLAH
JoRAN S.U, 8.T.
Outdoor Unit Multi-V 5 Pro kapasitas 191,100 Btu/h 6 Buah Tema Leader
KOORDNATOR LAPANGANSNRSK
InstalasiOutdoor Ced. B
Instalasi Output AC Lantai Roof Top SIMBOL KETERANCAN JUMLAH
ERANSISCOHRHB, ST,
NAMA GAMBAR SCALE
Gedung A & B Outdoor Unit Multi-V 5 Pro kopasitos 191,100 Btu/h 6 Buah
INSTALASI OUTPU:200
AC ROOE TOP
SKALA
KOOE GAMBAR JAAN
.ALAAN
MEP