Anda di halaman 1dari 33

LAPORAN PERHITUNGAN STRUKTUR

BANGUNAN LABORATORIUM MRI


KEPANJEN

1
DAFTAR ISI

DATA BANGUNAN............................................................................................................3
PEMODELAN DAN PEMBEBANAN STRUKTUR..........................................................4
1. Permodelan Struktur...................................................................................................4
2. Pembebanan Struktur..................................................................................................4
a. Beban dinding pada sloof................................................................................................4
b. Beban dinding beton pada sloof.....................................................................................5
c. Beban 20 ton pada area CT.Scan....................................................................................5
d. Beban Gempa...................................................................................................................7
e. Kombinasi beban..............................................................................................................9
ANALISA GAYA DALAM................................................................................................10
PERHITUNGAN STRUKTUR LABORATORIUM..........................................................13
1. PONDASI.................................................................................................................13
2. SLOOF......................................................................................................................21
3. KOLOM...................................................................................................................24
4. BALOK.....................................................................................................................26
5. PELAT......................................................................................................................29

DATA BANGUNAN

2
1. Data – data bangunan adalah sebagai berikut:
- Fungsi Struktur : Laboratorium
- Lokasi Bangunan : Kepanjen
- Struktur Utama : Beton

2. Data Struktur House Pump:


1. Balok
Balok Induk = 250 X 500
Balok Anak = 200 x 400

2. Kolom
K1 = 500 x 500
K2 = 300 x 300

3. Plat
Tebal plat = 150mm

3. Denah

Gambar . Denah MRI

PEMODELAN DAN PEMBEBANAN STRUKTUR

3
Sebelum dilakukan analisis struktur terlebih dahulu dilakukan permodelan struktur dengan
bantuan software SAP 2000 V.14
1. Permodelan Struktur

Gambar. Pemodelan Struktur

2. Pembebanan Struktur
a. Beban dinding pada sloof

Gambar . Pembebanan dinding pada sloof

Direncanakan menggunakan dinding bata ringan, dengan berat sesuai peraturan


pembebanan sebesar 100 kg/ m2

4
Tinggi bangunan direncakan 4 m. Sehingga berat dinding yang ditumpu pada sloof
sebesar = 100kg/m2 x 4 m = 400 kg/m.

b. . Beban dinding beton pada sloof

Gambar . Pembebanan dinding beton pada sloof


Direncanakan menggunakan dinding beton, dengan berat sesuai peraturan
pembebanan sebesar 250 kg/ m2
Tinggi bangunan direncakan 4 m.Sehingga berat dinding yang ditumpu pada sloof
sebesar = 250kg/m2 x 4 m = 1000 kg/m.
c. . Beban 20 ton pada area CT.Scan

Gambar . Pembebanan 20T pada area CT. Scan

5
Gambar Model information plat

Beban alat 20ton = 20.000 kg


Beban ter bagi merata = 20.000kg x (7.2m x 6m) = 463 kg/m2 (DL)
Beban hidup rumah sakit (laboratorium) = 250 kg/m2 (LL)

d. Beban Gempa
Beban gempa rencana dengan berada di lokasi Kepanjen dengan kondisi Tanah
lunak
6
-Respon spectrum (Sumber puskim) dengan parameter sebagai berikut :
Variabel Nilai
   
PGA (g) 0.431
SS (g) 0.852
S1 (g) 0.357
CRS 1.002
CR1 0.926
FPGA 0.9
FA 1.077
FV 2.572
PSA (g) 0.387
SMS (g) 0.918
SM1 (g) 0.918
SDS (g) 0.612
SD1 (g) 0.612
T0 (detik
0.2
)
TS (detik
1
)

Nilai spectrum respons tersebut harus dikalikan dengan suatu faktor skala
Ie
Sf  g
(scale factor) yang besarnya R

Dimana :
g = percepatan grafitasi (g=9,81m/det))
Ie = 1.5 (SNI 1726-2012, hal 15)
R = 5 (SNI 1726-2012, hal 35)
Sf = 9.81 x (1.5/5) = 3 (untuk 100%)

7
Gambar. Respon Spektrum Rencana

Gambar. Skala Faktor Respon Spektrum Rencana

8
e. Kombinasi beban
Setelah mendesain beban yang telah direncanakan digunakan kombinasi
pembebanan untuk mendapatkan pembebanan maksimum yang terjadi pada saat
beban bekerja secara bersamaan maupun individual. Konfigurasi kombinasi
pembebanan sebagai berikut :

- Envelope (Penggunaan kombinasi envelope digunakan untuk mencari reaksi


maksimal setiap gaya)
Dimana :
D : Beban mati
L : Beban hidup
SD : Beban dinding/beban alat
Ex, Ey : Beban gempa

9
ANALISA GAYA DALAM

Analisa struktur dilakukan secara finite elemen analysis dengan program SAP 2000.
Gaya-gaya yang diperoleh (momen, aksial, geser) selanjutnya dipakai untuk merencanakan
elemen struktur berupa, kolom, balok, pelat, dan dinding.

Gambar. 3D Ratio Kapasitas

Gambar. Gaya Aksial yang terjadi

10
Gambar. Gaya Geser 2-2 yang terjadi

Gambar. Gaya Geser 3-3 yang terjadi

11
Gambar. Gaya Momen 2-2 yang terjadi

Gambar. Gaya Momen 3-3 yang terjadi

12
PERHITUNGAN STRUKTUR LABORATORIUM

1. PONDASI
1 BAHAN STRUKTUR     UNITS
Kuat tekan beton, fc' = 30 MPa
Tegangan leleh baja (deform) untuk tulangan lentur, fy = 400 MPa
Tegangan leleh baja (polos) untuk tulangan geser, fy = 240 MPa

2 DESAIN RENCANA STRUSPILE


Diameter STRUSPILE Dp = 400 mm
Kedalaman STRUSPILE Lp = 6000 cm
Jarak minimum STRUSPILE ke tpi (1.5 D pile) S= 600 mm
Jarak antara STRUSPILE (2.0 D pile) S= 800 mm
Tegangan Ijin beton STRUSPILE 0.35.Fc' fc' = 10.5 MPa
Luas Penampang Struspile As p = 125600 mm2
131880
Daya dukung bahan Qbahan = 0 N
  Qbahan = 131.88 Ton
Safety Factor Sf = 7  
Daya dukung 1 Strupile Qijin = 18.84 Ton

3 KEBUTUHAN JUMLAH STRUSPILE


a PONDASI RAFT
BEBAN YANG TERJADI

Total Beban dari Kolom (1.2x P total) P kolom = 96.996 Ton


Beban Alat CT Scan P alat = 25 Ton
Beban Pilecap (direncanakan 7.2m x 6m x 0.25m) P cap = 20.736 Ton
Beban total Ultimate Pu = 142.732 Ton
Kebutuhan Jumlah Struspile PONDASI RAFT n= 7.6 buah
n= 8.0 buah

b PONDASI P1
BEBAN YANG TERJADI

P kolom
Total Beban dari Kolom (1.2x P total) = 23.532 Ton

13
Beban Pilecap (direncanakan 3.6m x 2.4m x 0.2m) P cap = 4.1472 Ton
27.679
Beban total Ultimate Pu = 2 Ton
Kebutuhan Jumlah Struspile PONDASI RAFT n= 0.3 buah
n= 2.0 buah

Gambar Penampang Pondasi RAFT (n Strusepile 8 buah)

Gambar Penampang Pondasi P1(n Strusepile 2 buah)

c. Desain Penulangan
Penulangan geser

14
Menurut SNI 03-2847-2013 Pasal 21.6.3, Luas tulangan memanjang, Ast, tidak boleh
kurang dari 0.01 Ag atau lebih dari 0.06 Ag. Dari diagram interaksi yang dibuat oleh
program PCACOL diperoleh Tulangan longitudinal : 10 D13, dengan rasio tulangan =
1.03 % (OK).

Penulangan Geser

Penulangan Geser
Kuat tekan beton (fc’) fc' = 30 MPa
Kuat leleh tulangan lentur (fy) fy = 400 MPa
Kuat leleh tulangan geser (fy geser) fy = 240 MPa
Diameter tulangan lentur (D lentur) D= 13.0 mm
Diameter tulangan geser (Ø geser) Ø= 10.0 mm
Tebal selimut beton (t decking) t= 40.0 mm
Faktor reduksi kekuatan (φ) φ= 0.7  
Faktor reduksi kekuatan geser (φ) φ= 0.8  

15
Diameter dalam Dc = 320 mm
Luas tulangan geser asv = 78.5 mm2
Luas Bruto Ag = 125600 mm2
Luas Ach Ach = 80384 mm2
Kebutuhan rasio tulangan geser spiral ρs = 0.019 mm
Jarak antar tulangan spiral (s) S= 49.6 mm
Jarak Minimum tulangan spiral (s) s min = 50.0 mm
Jarak Maksimum tulangan spiral (s) s max = 75.0 mm
S pakai
Jarak antar tulangan spiral (s) terpakai = 50.0 mm
Jadi pada Struspile dipasang tulangan geser spiral Ø10-50

4 Cek Ketebalan Pilecap     Units


Pondasi P1      
Pu Pu = 27.7 ton
Tebal Pilecap d= 0.3 m
Luas penampang pilecap (2.4m x 3.6m) A= 8.6 m2
a Cek Geser 1 Arah      
tegangan yang terjadi (σu) Pu/A σu = 3.2 ton/m2
At At = 6.5 m2
Gaya geser yang terjadi (Vu) Vu = 20.8 ton
Tegangan geser beton (øVn) øVn = 821583.8 N
  øVn = 82.16 Ton
øVn > Vu   OK  
b Cek Geser pons      
tegangan yang terjadi (σu) Pu/A σu = 3.2 ton/m2
Luas pons Ap = 5.4 m2
Gaya geser yang terjadi (Vu) = σu x (Lpile –
Lpons) Vu = 10.4 ton
Tegangan geser beton (øVn) øVn = 288499.6 N
  øVn = 28.850 Ton
øVn > Vu   OK  

Pondasi RAFT      
Pu Pu = 142.7 ton
Tebal Pilecap d= 0.3 m
Luas penampang pilecap (10.4m x 9.2m) A= 95.7 m2
a Cek Geser 1 Arah      
tegangan yang terjadi (σu) Pu/A σu = 1.5 ton/m2
At At = 87.4 m2
Gaya geser yang terjadi (Vu) Vu = 130.4 ton
Tegangan geser beton (øVn) øVn = 11136295.0 N
  øVn = 1113.63 Ton

16
øVn > Vu  OK  
b Cek Geser pons      
tegangan yang terjadi (σu) Pu/A σu = 1.5 ton/m2
Luas pons Ap = 19.0 m2
Gaya geser yang terjadi (Vu) = σu x (Lpile – Lpons) Vu = 114.4 ton
Tegangan geser beton (øVn) øVn = 3106233.0 N
  øVn = 310.623 Ton
øVn > Vu  OK  

17
5 Perencanaan Lentur Pilecap     Units

Reaksi Pilecap Pondasi RAFT

Pilecap Pondasi PRAFT      


a Data Perencanaa      
  Dimensi Pilecap p= 10.6 m
    l= 9.2 m
    t= 0.3 m
  Jumlah strusepile n= 8.0 buah
  Diameter tulangan utama D= 19.0 mm
  Selimut beton (tb) t= 50.0 mm
b Penulangan Pilecap Pondasi RAFT arah x
Momen ultimate Mu = 547084800 N.mm

Momen Nominal Rencana Mn = 683,856,000 N.mm


Faktor tahanan momen,(Rn) Rn = 6.7541 N/mm2
koefisien lawan (m) m= 15.69  
Rasio tulangan pada kondisi balance, ρB= 0.0325125  
Kebutuhan tulangan tarik minimum (ρ min) ρ min = 0.003423266  
Rasio tulangan pada kondisi maksimum, ρ max = 0.024384375  
Kebutuhan tulangan tarik perlu ρ = 0.020032927  
Rasio tulangan pakai (ρ min<ρ pakai<ρ max), (ρ min) ρ perlu = 0.020032927  
Kebutuhan luas tulangan As perlu = 20834.24 mm2
Direncanakan,      
Jarak Antar tulangan S= 125 mm
Diameter tulangan D= 19 mm
Luasan tulangan terpasang As pasang = 24031.05 mm2
Cek : As pasang > As perlu   OK  

18
c Penulangan Pilecap Pondasi RAFT arah y
Momen ultimate Mu = 482990400 N.mm

Momen Nominal Rencana Mn = 603,738,000 N.mm


Faktor tahanan momen,(Rn) Rn = 5.9628 N/mm2
koefisien lawan (m) m= 15.69  
Rasio tulangan pada kondisi balance, ρB= 0.0325125  
Kebutuhan tulangan tarik minimum (ρ min) ρ min = 0.003423266  
Rasio tulangan pada kondisi maksimum, ρ max = 0.024384375  
Kebutuhan tulangan tarik perlu ρ = 0.017237573  
Rasio tulangan pakai (ρ min<ρ pakai<ρ max), (ρ
min) ρ perlu = 0.017237573  
Kebutuhan luas tulangan As perlu = 15858.57 mm2
Direncanakan,      
Jarak Antar tulangan S= 175 mm
Diameter tulangan D= 19 mm
Luasan tulangan terpasang As pasang = 202417.86 mm2
Cek : As pasang > As perlu   OK  

Reaksi Pilecap pondasi S1

Pilecap Pondasi P1      
a Data Perencanaa      
  Dimensi Pilecap p= 3.6 m
    l= 2.4 m
    t= 0.3 m
  Jumlah strusepile n= 2.0 buah
  Diameter tulangan utama D= 19.0 mm
  Selimut beton (tb) t= 50.0 mm

19
b Penulangan Pilecap Pondasi P1 arah x
Momen ultimate Mu = 198086400 N.mm

Momen Nominal Rencana Mn = 247,608,000 N.mm


Faktor tahanan momen,(Rn) Rn = 2.4455 N/mm2
koefisien lawan (m) m= 15.69  
Rasio tulangan pada kondisi balance, ρB= 0.0325125  
0.00342326
Kebutuhan tulangan tarik minimum (ρ min) ρ min = 6  
0.02438437
Rasio tulangan pada kondisi maksimum, ρ max = 5  
0.00643895
Kebutuhan tulangan tarik perlu ρ = 5  
0.00643895
Rasio tulangan pakai (ρ min<ρ pakai<ρ max), (ρ min) ρ perlu = 5  
Kebutuhan luas tulangan As perlu = 2318.02 mm2
Direncanakan,      
Jarak Antar tulangan S= 200 mm
Diameter tulangan D= 16 mm
Luasan tulangan terpasang As pasang = 3617.28 mm2
Cek : As pasang > As perlu   OK  
c Penulangan Pilecap Pondasi P1 arah y
Momen ultimate Mu = 94377600 N.mm

Momen Nominal Rencana Mn = 117,972,000 N.mm


Faktor tahanan momen,(Rn) Rn = 1.1652 N/mm2
koefisien lawan (m) m= 15.69  
Rasio tulangan pada kondisi balance, ρB= 0.0325125  
0.00342326
Kebutuhan tulangan tarik minimum (ρ min) ρ min = 6  
0.02438437
Rasio tulangan pada kondisi maksimum, ρ max = 5  
0.00298266
Kebutuhan tulangan tarik perlu ρ = 4  
0.00298266
Rasio tulangan pakai (ρ min<ρ pakai<ρ max), (ρ min) ρ perlu = 4  
Kebutuhan luas tulangan As perlu = 715.84 mm2
Direncanakan,      
Jarak Antar tulangan S= 250 mm
Diameter tulangan D= 16 mm
Luasan tulangan terpasang As pasang = 2893.82 mm2

20
Cek : As pasang > As perlu   OK  

6. Rekapapitulasi Pondasi

N TYPE PONDASI
ITEM
O PONDASI RAFT PONDASI P1
1 Kuat tekan beton, 30 Mpa 30 Mpa
2 Tegangan leleh baja (deform) 400 Mpa 400 Mpa
3 Tegangan leleh baja (polos) 240 Mpa 240 Mpa
4 Dimensi Penampang 10.4m x 9.2m 3.6m x 2.4m
5 Tebal Pilecap 300 mm 300 mm
6 Penulangan arah x D19 - 125 D16 - 200
7 Penulangan arah y D19 - 175 D16 - 250
8 Dimensi Diameter Strusepile 400 mm 400 mm
9 Jumlah Strusepile 8 buah 2 buah
10 Penulangan Strusepile 10 D13 10 D13
11 Penulangan Sengkang Strusepile Ø10-50 Ø10-50

2. SLOOF
a. Bahan    
Kuat tekan beton, fc' = 30
Tegangan untuk tulangan lentur fy = 400 MPa
Tegangan untuk tulangan geser fy = 240 MPa
b. Dimensi sloof    
Lebar sloof b= 250 mm
Tinggi sloof h= 500 mm
c. Data perencanaan lain    
Tinggi kolom = 4000 mm
Diameter tulangan utama = 13 mm
Diameter tulangan geser = 10 mm
Tebal bersih selimut beton, ts = 40 mm
Faktor Distribusi Tegangan Beton β1 = 0.85 SNI 2847:2013 pasal 10.2.7.3
Faktor reduksi kekuatan lentur φ= 0.8 SNI 03-2847-2013 pasal 9.3.2.7.a
Faktor reduksi kekuatan geser φ= 0.75 SNI 03-2847-2013 pasal 9.3.2.3
Faktor reduksi kekuatan torsi φ= 0.75 SNI 03-2847-2013 pasal 9.3.2.3
21
Tinggi efektif d= 443.5 mm

22
d. Rekapitulasi sloof lentur

23
e. Rekapitulasi sloof geser

24
3. KOLOM
a. Bahan
Kuat tekan beton fc' = 30 Mpa
Tegangan leleh tulangan deform fy = 400 Mpa
Tegangan leleh tulangan polos fy = 240 Mpa
Faktor distribusi tegangan beton β = 0.85
Faktor reduksi kekuatan lentur φ = 0.8
Faktor reduksi kekuatan geser φ = 0.6
b. Desain kolom L = 4 m
Lebar Penampang Kolom b = 500 mm
Tinggi Penampang Kolom h = 500 mm
Tulangan Lentur φb = 19 mm
Tulangan Geser φs = 8 mm
Tebal Selimut beton ts = 40 mm
c. Reaksi Gaya yang terjadi Frame = 2
Aksial Envelope output SAP 569.6365 kN (Aksial Max)
kN.
Momen Envelope output SAP = 87.52
m
Gaya geser Envelope output SAP 43 kN

d. Penulangan longitudinal kolom


Dari beban aksial dan momen yang terjadi, kemudian dilakukan perhitungan
penulangan memanjang kolom menggunakan program bantu PCA COL, didapatkan
diagram interaksi antara aksial dan momen pada kolom, yaitu sebagai berikut :

25
e Kontrol Desain Kolom
- Kontrol rasio tulangan longitudinal kolom
8 D16 As = 1.36 % OK
(Desain As = 1% < As <6%)

- Kontrol Kapasitas Aksial Penampang


∅Pn=0.8 ∅ (0.85 f^' c(Ag-Ast)+fy (Ast))
Luas penampang Beton Ag = 250000 mm2
Luas penampang tulangan Ast = 3400.62 mm2
Faktor reduksi kekuatan lentur φ = 0.8
Pn = 4895061 N
= 4895.061 kN
Pu = 3916.048 kN
φPn > Pu = 569.6365

f. Desain gaya geser kolom


Cek Kuat Geser Kolom
Nu √ f ' c bw d
(
Vc = 1+
14 Ag )6
43000 √30 x 500 x 442.5
= ( 1+ )
14 ×500 X 500 6
= 204554.1 N
= 204.554 kN
φVc > Vu
0.6 x 204.554 kN > 43 kN
122.67 kN > 43 kN (OK)
Ini membuktikan bahwa Ash sudah cukup untuk menahan geser. Sehingga dipasang
sengkang sejarak d/2 = 442.5/2= 221.25 mm. Namun persyaratan jarak tulangan
transfersal tidak boleh melebihi 150 mm, sehingga tulangan geser dipasang (φ8-150).

g. Rekap desain kolom

26
Dari analisa diatas kapasitas aksial, momen dan geser telah memenuhi.

4. BALOK
e. Bahan    
Kuat tekan beton, fc' = 30
Tegangan untuk tulangan lentur fy = 400 MPa
Tegangan untuk tulangan geser fy = 240 MPa
f. Dimensi balok    
Lebar balok b= 250 mm
Tinggi balok h= 500 mm
g. Data perencanaan lain    
Tinggi kolom = 4000 mm
Diameter tulangan utama = 13 mm
Diameter tulangan geser = 10 mm
Tebal bersih selimut beton, ts = 40 mm
Faktor Distribusi Tegangan Beton β1 = 0.85 SNI 2847:2013 pasal 10.2.7.3
Faktor reduksi kekuatan lentur φ= 0.8 SNI 03-2847-2013 pasal 9.3.2.7.a
Faktor reduksi kekuatan geser φ= 0.75 SNI 03-2847-2013 pasal 9.3.2.3
Faktor reduksi kekuatan torsi φ= 0.75 SNI 03-2847-2013 pasal 9.3.2.3
Tinggi efektif d= 443.5 mm

27
h. Rekapitulasi balok lentur

28
f. Rekapitulasi balok geser

29
5. PELAT

a. Data struktur
Diketahui:
kg/m
BJ Beton = 2400      
3
fc' = 30 Mpa      
fy lentur = 400 Mpa      
fy geser = 240 Mpa      
Tebal
= 15 cm = 150 mm
Plat
720
Ly = 7.2 m = mm
0
600
Lx = 6 m = mm
0
0.003
ρ min =        
5
30
ρ max = 0.024        
M = 15.69        
Two way
ly/lx = 1.20   < 2
Slab
β1 = 0.85        
Ρb = 0.033        
B = 1000 mm      
Φ = 8 mm      
cover = 30 mm      
Dx = 116 mm      
Dy = 108 mm      

Gambar. Layout pelat tinjau

b. Perhitungan beban plat


Perhitungan Pembebanan:
Beban Mati: = 360 kg/m2
Beban Hidup: = 400 kg/m2
Beban Ultimate: = 1072 kg/m2

c. Tabel momen pelat

31
d. Penulangan pelat

As As
Mu Mn
  X Rn ρ ρ' perlu Pasang Ø-S
kgm/m Nm/m mm2 mm2
1350720 1.00 0.002 0.003 D13 -
Lx 28 1080.58 406.00 884.88
0 4 6 5 150
1350720 1.15 0.003 0.003 D13 -
Ly 28 1080.58 378.00 884.88
0 8 0 5 150
3280320 2.43 0.006 0.006 D13 -
Tx 68 2624.26 744.44 884.88
0 8 4 4 150
3280320 2.81 0.007 0.007 D13 -
Ty 68 2624.26 806.58 884.88
0 2 5 5 150
Karena As perlu < As pasang sesuai dengan kebutuhan tulangan.

e. Rekapitulasi pelat
Ti
pe
Area As perlu As pasang Hasil Analisa
pel
at
32
406.00 884.88 Lap. Arah X D13 - 150
378.00 884.88 Lap. Arah Y D13 - 150
PLAT 1 1
744.44 884.88 Tum. Arah X D13 - 150
806.58 884.88 Tum. Arah Y D13 - 150
406.00 884.88 Lap. Arah X D13 - 150
378.00 884.88 Lap. Arah Y D13 - 150
PLAT 2 13
406.00 884.88 Tum. Arah X D13 - 150
378.00 884.88 Tum. Arah Y D13 - 150
406.00 884.88 Lap. Arah X D13 - 150
378.00 884.88 Lap. Arah Y D13 - 150
PLAT 3 3
744.44 884.88 Tum. Arah X D13 - 150
806.58 884.88 Tum. Arah Y D13 - 150
406.00 884.88 Lap. Arah X D13 - 150
378.00 884.88 Lap. Arah Y D13 - 150
PLAT 4 4
406.00 884.88 Tum. Arah X D13 - 150
378.00 884.88 Tum. Arah Y D13 - 150
PLAT 5 15 406.00 884.88 Lap. Arah X D13 - 150
378.00 884.88 Lap. Arah Y D13 - 150
406.00 884.88 Tum. Arah X D13 - 150
378.00 884.88 Tum. Arah Y D13 - 150