CROSS SECTION MASDIAN-Model
CROSS SECTION MASDIAN-Model
861
860
UNIVERSITAS SUMATERA UTARA
DEPARTEMEN TEKNIK SIPIL
859
FAKULTAS TEKNIK
858
Elevasi (m)
855
Lapis Pondasi Bawah Lapis Pondasi Atas
854
853
852
Titik 1 2 3 4 5 6 7 (A) 8 9 10 11 12 13 14
Jarak (m) 1,0 1,0 1,0 1,0 2,0 3,5 3,5 3,5 3,5 2,0 1,0 1,0 1,0 1,0
Kelandaian (%) 0 -0,95 0 0,95 0,085 0,0206 -0,021 -0,08 -0,95 0 0,95 0
856,00 854,20
Elevasi Muka
Tanah Asli (m)
855,69
855,69
855,69
855,93
855,86
854,74
854,74
855,93
855,69
855,69
855,69
855,86
854,74
854,74
Elevasi
Rencana (m)