[NAMA PROYEK :TL 50 KV RAHA BAU BAU SEC. 2
'NO. KONTRAK : 006.PJ/KON.02.02/UIPSULBAGSEL/2018,
KONSULTAN SUPERVISI: PT PLN (Persero) PUSMANPRO
LUNGKUP ASSESSMENT : ASSESSMENT MATURITY LEVEL K3 DAN KEAMANAN BULAN SEPTEMBER 2021.
‘TANGGAL: 25 OKTOBER 2021,
No | PROGRAM KERIA RITERIA
BoBOT
SATUAN
JEN MANAJEMEN,
REAUSASI
‘NILA YANG
DILAPORKAN
“LA [Menyusun program kera J, Kegiatan | 8 8 5
Jsuperis K3L dan
Jmemonitorng
realisasinyasetiap bulan setiap bulan
Ta [Membuat ingkaran HSE_|Ringkasan HSE performance Kontrakiar |Laporan ASE performance (formuli'6), | 10 | persentase | 100% | 100% 70
‘NILAL
ASSESMENT
lperformance bulanan
Jpada provek yang dlawas!
nsultan supervis Konstruks teri
Fatality
LT = Lose Time injury
IRWOC = Restricted Work Days Cases
IMTC= Medico! Treatment Case
IFAC = Fist Ald Case
ED = Envirenmentol Damage
FIRE = Fire Case
NMI = Near Mis incident
JManhours : Manpower x Work hours
inimal memuat :
Manpower x Work Hours)
Dipindai dengan CamScanner[NAMA PROYEK :TL 150 KV RAHA - BAU BAU SEC. 2
LUINGKUP ASSESSMENT : ASSESSMENT MATURITY LEVEL K3 DAN KEAMANAN BULAN SEPTEMBER 2021
‘TANGGAL: 25 OKTOBER 2021,
No | PROGRAM KERIA sosor | saruan | tarcer | reausasi | NWLAIYANG aia
DILAPORKAN | ASSESMENT
a a 5 15
[dan keamanan ke proyek
yang disupervist
lb. Melaporkan hail inspeks! kepada PLN
LPP kitrng dan UIP Sulbagsel melalui
Inspekta
22 |Melaksanatan audit HSSE |a, Melakukan audit HSSE ke Kontraktor |e. Berita acara audit HSSE 15 | Kegiatan | & T =
‘sesual dengan persyaratan audit dari
ketidaksesuaian audit HSSE
Dipindai dengan CamScanner[NAMA PROYEK :TL 150 KV RAHA.- BAU BAU SEC. 2
LINGKUP ASSESSMENT : ASSESSMENT MATURITY LEVEL K3 DAN KEAMANAN BULAN SEPTEMBER 2021
‘TANGGAL: 25 OKTOBER 2021
NILATYANG ‘NILA
Bosor | satuan | TaRcer | REAUSASI
DILAPORKAN | ASSESMENT
1. [Supervsi Penerapan
identiikas! Bahaya,
15 | Persentase
100% | 100% 15
Job Safety Analysis
lus), LOTO, danizin kerja} sesuai dengan jenis pekerjaan,
[dalam setiap pelaksanaan
pekerjaan yang
berpotensi bahaya, peran
4. |Memberikan edukasi K3L
ja. Daftar hadi Kegiatan
kepada kontraktor
lb. Dokumentast
Je. Mater!
Dipindai dengan CamScannerNAMA PROYEK : TL 150 kV RAHA - BAU BAU SEC. 2
INO. KONTRAK :006.P]/KON.02.02/UIPSULBAGSEL/2018
KONSULTAN SUPERVISI PT PLN (Persero) PUSMANPRO
LINGKUP ASSESSMENT : ASSESSMENT MATURITY LEVEL K3 DAN KEAMANAN BULAN SEPTEMBER 2021
TANGGAL:25 OFTOBER 2023
NKATYANG | Wal
no RAM KERIA KRITERA Evioence osor Tancet
noci sATUAN REALSASI aa e
a a ee
‘5.1 |Melaporkan insiden |Apabila terjadi Insiden, konsultan supervisi |Print screen wa/sms S Kejadian oO 0 s
[inn maksinal am dar keadan)
2 | Rial moar level | ial mata levelbuanan ane Tmatary Fanvaieer| 20 | aperan | 300] — 5280 Tae
onrattor aleporkan oleh Kontaktor
Dipindai dengan CamScanner[NAMA PROYEK : TL 150 kV RAHA BAU BAU SEC. 2
NO. KONTRAK :006.P]/KON.02.02/UIPSULBAGSEL/2018
KONSULTAN SUPERVISI : PT PLN (Persero) PUSMANPRO
LUNGKUP ASSESSMENT : ASSESSMENT MATURITY LEVEL K3 DAN KEAMANAN BULAN SEPTENIBER 2021
‘TANGGAL: 25 OKTOBER 2021
Dipindai dengan CamScanner
No | PROGRAM KERIA ARITERIA, EVIDENCE Bosor | saTUAN | TARGET | neausas; | NUAIYANG | NILAL
|atapockan sesusi dengan |¢ilapang:
kondistimplementas! di
tapangan
TOTAL 100 9848,
Dibuat Oleh, Diperiksa
HSE Supervisor Project Te
Baio Firdaus ‘MuhamadPROGRAM KESELAMATAN KESEHATAN KERJA, KEAMANAN (K3) DAN LINGKUNGAN
KONSULTAN SUPERVISI KONSTRUKS! PROYEK PEMBANGUNAN TL 150 kV RAHA - BAU BAU SEC. 1
BULAN OKTOBER TAHUN 2021
PTPIN (Persero) PUSMANPRO
ann TTANGGAL
Pendampingan safety
Joriing
oe a ase [Is faa
lpendampingan safety
Dipindai dengan CamScanner
induction
|Sofety patra!
[aiview working permit, 5A
{dion 18PPR Kontroktor
Penggunaan safe cord
inspection (APD dan alat
keri)
fEvaluasi sistem
pembatas/pengaman
heDOKUMENTASI PELAKSANAAN PROGRAM KESELAMATAN KESEHATAN KERIA, KEAMANAN (K3) DAN LINGKUNGAN
KONSULTAN SUPERVIS! KONSTRUKSI PROYEK PEMBANGUNAN TL 150 KV RAHA - BAU BAU SEC. 1
BULAN OKTOBER TAHUN 2021,
PTPLN (Persero) PUSMANPRO
KEGIATAN
we]
Pendampingan safety briefing
‘DOKUMENTASE
Pendampingan sofety induction
safety patrot
Dipindai dengan CamScannerJPemakaian sofe card
levaluaslrambu K3
Pendampingan safety inspection
Evaluat sister pembatas/pengaman
Dipindai dengan CamScannerDAFTAR REKAPITULASI REVIEW SOP, IBPPR, JSA, DAN WP
PROYEK PEMBANGUNAN TL 150 kV RAHA - BAU BAU SEC. 2
BULAN OKTOBER TAHUN 2021
PT PLN (Persero) PUSMANPRO
JENIS DOKUM
No. DAFTAR PEKERJAAN sor] TePPR oT Tap] KETERANGAN
1_|Pekerjaan pondasi tapak tower
Pondasi Tower TIP 236 BELUM LENGKAP
Pondasi Tower TIP 267 v = = = LENGKAP
Pondasi Tower TIP 271 v ¥ v Ld BELUM
|Pondasi Tower TIP 272 ¥ v v a7 LENGKAP
Pondasi Tower TIP 273 ¥ v ¥ ¥ LENGKAP
Pondasi Tower TIP 274 v a ¥ ¥ LENGKAP
Pondasi Tower TIP 275 ¥ v v ¥ LENGKAP,
|Pondasi Borpile TIP 256 BELUM LENGKAP
Pondasi Borpile TIP 257 v v v v LENGKAP
Pondasi Borpile TIP 258 Y v ¥ ¥ LENGKAP |
|Pondasi Borpile TIP 259 7 inf v ¥ LENGKAP
[Erection Tower TIP 255 ‘ v Y ¥ LENGKAP
Erection Tower TIP 258 = bal ¥ v LENGKAP
Erection Tower TIP 260 ¥ ¥ ¥ v LENGKAP
Erection Tower TIP 261 < a . v LENGKAP
Erection Tower TIP 263 ¥ La = v LENGKAP
Erection Tower TIP 265 BELUM LENGKAP
rection Tower TIP 276 i ¥ — 2 LENGKAP
Erection Tower TIP 277 - v v a LENGKAP
2. |Pekerjaan loading & unloading material Y 7 LENGKAP |
|gudang | PT Multifabrindo Gemilang
Bau-bau, 25 Oktober 2021
Disetujul Oleh, Dibuat Oleh,
Project Le HSE Konsultan Supervisi
il
Baso Firdaus
MuhamadWafld Alfirdaus
Dipindai dengan CamScannerLHSSE PERFORMANCE KONTAKTOR DAN KONSULTAN SUPERVISI KONSTRUKSI
'PROYEK PEMBANGUNAN TL 150 kV RAHA. BAU BAU SEC. 2
BULAN OKTOBER TAHUN 2021,
PTPLN (Persero) PUSMANPRO
tosrne | waiou
i
No. ‘URAAN PENIELASAN SINGKAT ETERANGAN
T
z
z
7
5
@
7
7
| MANHOURS PROYEK PEMBANGUNAN TL 250 kV RAHA -BAU BAU SEC. 2
‘BULAN OKTOBER TAMUN 2021
T
PERUSAAAN UMMAH NS.OEN
A
z : SS [TE
[Rontraktor (PT. Mufufabrindo Gemilang) z i a a
ot 3 a
a 3 2.
oo = A
oe ¢ e
ot ¢ 3,
° To e is
o oe o 2
to i=3 I
- = 7
¢ n
[aaean z 2 os]
i= . I
a = . nae
—— ¢ ¢ =
Dipindai dengan CamScannerTUM
MANPOWER,
WouRS
fs Otenber 2022
21 Ottober 02
||) 8|3]8] 8/58 18/3] 8]8/3]-
a
[Konstan Super (FT PLN (Perera)
He] 88
slits FPPPEBERREKRRRRIE HET
Dipindai dengan CamScanner(MANHOURS:
sees] el lst
Dipindai dengan CamScanner