STA 0+380 STA 0+400 STA 0+420

STA 0+360

2378
KEMENTERIAN AGAMA REPUBLIK INDONESIA
UNIVERSITAS ISLAM NEGERI

2296
WALISONGO SEMARANG
STA 0+340 Jalan Walisongo Nomor 3-5 Semarang 50185
Telepon (024) 7604554,7624334 Faksimil (024) 7601293
www.walisongo.ac.id

PEKERJAAN
BAHU LAJUR

BAHU LAJUR Pembangunan Jalan dan Pengembangan


400 1000 640150 1000
2500 Fasilitas Kampus 2 dan Kampus 3 UIN
1000 400 1000 640150 1000
2500
BAHU LAJUR
Walisongo Semarang Tahun 2021
BAHU LAJUR
1000 400 1000 640150 1000
Hole Drain 4" 2500
BAHU LAJUR 400 1000 640150 1000
2500
Timbunan Biasa dari Galian
(Dipadatkan Pakai Alat) AC-BC, t = 6 cm
MENGETAHUI
Hole Drain 4" Hole Drain 4"
Aggregate Class A, t = 20 cm AC-BC, t = 6 cm AC-BC, t = 6 cm
Aggregate Class B, t = 30 cm Aggregate Class A, t = 20 cm Aggregate Class A, t = 20 cm
400 1000 640150 1000
2500 Plester+Aci 2 cm
40.152
40.400

39.451
40.171
2%
40.221
Timbunan Biasa dari Galian
(Dipadatkan Pakai Alat) Plester+Aci 2 cm
41.876
41.876
Aggregate Class B, t = 30 cm

41.697
Timbunan Biasa dari Galian
(Dipadatkan Pakai Alat) Plester+Aci 2 cm
43.351
43.351
Aggregate Class B, t = 30 cm
An. Kuasa Pengguna Anggaran PPK
41.647 41.647

Hole Drain 4"


AC-BC, t = 6 cm
40.927 2% 42.402 2%
UIN Walisongo Semarang

2296

2378
Aggregate Class A, t = 20 cm
Hole Drain 4" Aggregate Class B, t = 30 cm Lantai Kerja 5 cm
AC-BC, t = 6 cm 38.904 Lantai Kerja 5 cm Lantai Kerja 5 cm
38.725
Aggregate Class A, t = 20 cm Timbunan Biasa dari Galian
Plester+Aci 2 cm 38.675
Plester+Aci 2 cm Aggregate Class B, t = 30 cm 38.655 37.955 2% (Dipadatkan Pakai Alat)

600

600
Timbunan Biasa dari Galian 37.080
(Dipadatkan Pakai Alat) 36.831 36.851 36.901
36.131 2%
Timbunan Biasa dari Galian 1000 1000
(Dipadatkan Pakai Alat)

2000

2000
Lantai Kerja 5 cm

Lantai Kerja 5 cm
400 Timbunan Tanah Pilihan
(Dipadatkan Pakai Alat)
800

Timbunan Biasa dari Galian


(Dipadatkan Pakai Alat)
3179

400
600

400
800

1000
400

800
Hole Drain 2"

M. Sirojuddin Munir, S.Ag, M.M


4223

400

3339
NIP. 19750801 200312 1 004
600

KONSULTAN

600
1000
2000

2000
0+ 340

0+ 360

0+400

0+420
0+380
Sigit Wijanarko, ST
Team Leader
Udith Udith Udith Udith Udith
KONTRAKTOR PELAKSANA

Udith Udith Udith Udith Udith

Ayub Wahyudi
Leader KSO

STA 0+380 STA 0+420 Engineering


STA 0+400

1200
Drafter

1200
STA 0+360 SHOP DRAWING
1200

STA 0+340
1200

LAJUR BAHU

LAJUR BAHU
JUDUL GAMBAR :
1200

1000 150640 1000 400


2500
LAJUR BAHU 1000 150640 1000 400 Hole Drain 4"
2500 AC-BC, t = 6 cm
Timbunan Biasa dari Galian
(Dipadatkan Pakai Alat)
Aggregate Class A, t = 20 cm Plester+Aci 2 cm
Aggregate Class B, t = 30 cm 43.827
1000 150640 1000 400
2500 Galian Tanah CL
41.697
41.647
43.351 Hole Drain 2"
DETAIL PATOK

300 1200
(Pakai Alat) 2% 42.402
Galian Tanah
(Pakai Alat)
LAJUR BAHU
AC-BC, t = 6 cm
Aggregate Class A, t = 20 cm
Aggregate Class B, t = 30 cm
Hole Drain 4" Plester+Aci 2 cm
42.352 Lantai Kerja 5 cm
600
STA 0+340 S/D 0+420

2000
1000 150640 1000 400 41.697 41.876 Hole Drain 2"
41.647

300 1200
CL
LAJUR BAHU 2500 2% 40.927
Hole Drain 4"
AC-BC, t = 6 cm
Aggregate Class A, t = 20 cm Plester+Aci 2 cm
Aggregate Class B, t = 30 cm 40.876
600
1000 150640 1000 400 Galian Tanah
40.221 40.400 Hole Drain 2" Lantai Kerja 5 cm
Catatan :

2000
40.171
300 1200

CL Timbunan Biasa dari Galian


2500 (Pakai Alat) 2% 39.451
(Dipadatkan Pakai Alat)

AC-BC, t = 6 cm
Aggregate Class A, t = 20 cm Plester+Aci 2 cm
Hole Drain 4"
Aggregate Class B, t = 30 cm 39.380 600
Plester+Aci 2 cm
Lantai Kerja 5 cm
38.725
2000

Hole Drain 4" 38.904 Hole Drain 2" Timbunan Biasa dari Galian
AC-BC, t = 6 cm CL 38.675
300 1200

Galian Tanah 2% 37.955 (Dipadatkan Pakai Alat)


Aggregate Class A, t = 20 cm 37.952
(Pakai Alat)
Aggregate Class B, t = 30 cm
1051

Hole Drain 2"


1296

37.080
CL
36.901
2%
36.851
36.131
600
Lantai Kerja 5 cm
2000
600

Timbunan Biasa dari Galian


(Dipadatkan Pakai Alat)
1000
Lantai Kerja 5 cm
2000

Timbunan Biasa dari Galian


(Dipadatkan Pakai Alat)

SKALA NO. GAMBAR KODE


: EXISTING TANAH
1 : 300 19 -