Anda di halaman 1dari 1

STA 0+320

KEMENTERIAN AGAMA REPUBLIK INDONESIA

3962
UNIVERSITAS ISLAM NEGERI
STA 0+300 WALISONGO SEMARANG
Jalan Walisongo Nomor 3-5 Semarang 50185
Telepon (024) 7604554,7624334 Faksimil (024) 7601293
www.walisongo.ac.id

3179
400 STA 0+280
PEKERJAAN

4223
STA 0+260 BAHU LAJUR
Pembangunan Jalan dan Pengembangan
STA 0+240 Plester+Aci 2 cm

400 1000 640150 1000 Fasilitas Kampus 2 dan Kampus 3 UIN


38.867 2500
Galian Tanah
(Pakai Alat) Walisongo Semarang Tahun 2021

3339
BAHU LAJUR Beton Fc 20 Mpa (Wiremesh)
1651

Hole Drain 4" (Non Include)


Hole Drain 2"
AC-BC, t = 6 cm
Aggregate Class A, t = 20 cm

3962
Plester+Aci 2 cm
33.909 400 1000 640150 1000 35.929
35.700
Aggregate Class B, t = 30 cm
MENGETAHUI
2500 35.750
34.980 2%
Hole Drain 4"

BAHU LAJUR
BAHU LAJUR AC-BC, t = 6 cm
Aggregate Class A, t = 20 cm An. Kuasa Pengguna Anggaran PPK
BOX CULVERT Aggregate Class B, t = 30 cm

600
Hole Drain 2"

3179
BAHU LAJUR
Plester+Aci 2 cm

400 1000 640150 1000


32.501

31.552
32.272
2%
32.322
1000
Lantai Kerja 5 cm
Timbunan Biasa dari Galian
UIN Walisongo Semarang
(Dipadatkan Pakai Alat)
1000 400 1000 640150 1000 32.271 2500

2000
Plester+Aci 2 cm Galian Tanah
2500 (Pakai Alat)
400 1000 640150 1000 Beton fc'30 MPa

600
30.152

Hole Drain 4"


2500 Lantai Kerja 5 cm

3179
Beton Fc 20 Mpa (Wiremesh) AC-BC, t = 6 cm 1000 Timbunan Biasa dari Galian
Hole Drain 4" Hole Drain 2"
(Non Include) Aggregate Class A, t = 20 cm (Dipadatkan Pakai Alat)
AC-BC, t = 6 cm

2000
27.539 Aggregate Class B, t = 30 cm
Plester+Aci 2 cm Aggregate Class A, t = 20 cm AC-BC, t = 6 cm
Hole Drain 4"

4223
27.539 27.837 Aggregate Class B, t = 30 cm

3339
Aggregate Class A, t = 20 cm
27.310 27.360 29.072 Aggregate Class B, t = 30 cm
(Dipadatkan Pakai Alat) 26.590 2% 27.607 27.657

600
26.888 2% 28.843 28.893
1651

28.123 2%

2000
Beton fc'30 MPa

600
600

600
Lantai Kerja 5 cm Lantai Kerja 5 cm
Lantai Kerja 5 cm
1000 1200

2000
Timbunan Biasa dari Galian
2000

1000 (Dipadatkan Pakai Alat)

M. Sirojuddin Munir, S.Ag, M.M


0+ 240

0+ 260

0+ 280

0+ 300

0+ 320
NIP. 19750801 200312 1 004

KONSULTAN

Udith Udith Udith Udith Udith Udith

Sigit Wijanarko, ST
Team Leader

KONTRAKTOR PELAKSANA
Udith Udith Udith Udith Udith Udith

STA 0+320

1200
STA 0+300 Ayub Wahyudi
Leader KSO
LAJUR BAHU

STA 0+280 Engineering


1000 150640 1000 400 1000
2500
Drafter
STA 0+240 LAJUR BAHU
STA 0+260 AC-BC, t = 6 cm
Hole Drain 4"

Aggregate Class A, t = 20 cm

2500
1000 150640 1000
CL
Aggregate Class B, t = 30 cm

2%
35.700
35.929

34.980
Plester+Aci 2 cm

35.929

Timbunan Biasa dari Galian


SHOP DRAWING
Hole Drain 4"
(Dipadatkan Pakai Alat)

1727
AC-BC, t = 6 cm
Aggregate Class A, t = 20 cm
LAJUR BAHU
Aggregate Class B, t = 30 cm 32.501

JUDUL GAMBAR :
Plester+Aci 2 cm
32.322 32.272 32.252 Lantai Kerja 5 cm

600
CL Timbunan Biasa dari Galian
2% 31.552
(Dipadatkan Pakai Alat)
1000 150640 1000 400
1000
2500

2000
BOX CULVERT LAJUR BAHU
LAJUR BAHU
Lantai Kerja 5 cm

Hole Drain 4"

DETAIL PATOK
1000 150640 1000 400 1000 AC-BC, t = 6 cm
Aggregate Class A, t = 20 cm
2500 1000 150640 1000 400 1000 Aggregate Class B, t = 30 cm 29.072

2500 28.893 28.843


Hole Drain 4" CL 28.123

STA 0+240 S/D 0+320


Hole Drain 4" 2%
AC-BC, t = 6 cm
AC-BC, t = 6 cm
Aggregate Class A, t = 20 cm
27.539 Aggregate Class A, t = 20 cm
Aggregate Class B, t = 30 cm 27.837
Plester+Aci 2 cm Aggregate Class B, t = 30 cm
27.539 Plester+Aci 2 cm
27.360 27.310 Timbunan Biasa dari Galian 27.607 27.837
CL 2% 26.590 (Dipadatkan Pakai Alat) Lantai Kerja 5 cm
CL 26.888 Timbunan Biasa dari Galian
2%
(Dipadatkan Pakai Alat)
1728

2898

Lantai Kerja 5 cm
Catatan :
600

Lantai Kerja 5 cm

Timbunan Biasa dari Galian


(Dipadatkan Pakai Alat)
1000
2000

600

Timbunan Biasa dari Galian


(Dipadatkan Pakai Alat) 1000
400
2000

800
1400
400
400
+20.250
800

600
1400

400 +20.100 1000


600

1000

SKALA NO. GAMBAR KODE


: EXISTING TANAH
1 : 300 18 -
: RENCANA JALAN

Anda mungkin juga menyukai