Anda di halaman 1dari 1

S.

2 Ki
64 0.089

RUAS 2
A = 225 Ha
Q = 0.313 m3/dt S. 2 Te
B. S. 2 76 0.106

S. 1 Ka 3
46 0.064
S. 2 Ka
85 0.118
S. 1 Ka 2
31 0.043

B. S. 1
S. 1 Ka 1
RUAS 1
A = 309 Ha 7 0.010
Q = 0.429 m3/dt

Bd. KA. 0

KALI RONDONINGU
LEGENDA.

SUNGAI

RUAS 1 SALURAN PRIMER


A = 683 Ha KR. 1 Ki KR. 3 Ki
Q = 0.949 m3/dt SALURAN SEKUNDER
119 0.165 75 0.104

BENDUNG TETAP
RUAS 1 RUAS 2 RUAS 3
A = 354 Ha A = 170 Ha A = 164 Ha BANGUNAN SADA.P
Q = 0.492 m3/dt Q = 0.236 m3/dt Q = 0.228 m3/dt
B. W. 1

KR. 3 Ka
BANGUNAN BAGI DA.N SADA.P
B. KR. 1 B. KR. 2 B. KR. 3 89 0.124

RUAS 1 BANGUNAN UKUR


A = 238 Ha
Q = 0.331 m3/dt B. PENGURAS
W. 1 Ki KR. 1 Ka 1 KR. 1 Ka 2 KR. 2 Ka
91 0.126 49 0.068 16 0.022 6 0.008 B. TERJUN

JEMBATAN ORANG
B. WO. 1

WO. 1 Ki
46 0.064 WO. 2 Ki GORONG-GORONG SILANG
57 0.079
GORONG-GORONG

RUAS 2 RUAS 3 T.M. HEWAN


A = 192 Ha A = 135 Ha
Q = 0.267 m3/dt Q = 0.188 m3/dt WO. 3 Ki PELIMPAH SAMPING
B. WO. 2 B. WO. 3 48 0.067
JEMBATAN

SIPON

WO. 3 Ka
87 0.121

PROPINSI JAWA TIMUR

PEKERJAAN :
Kajian Pemetaan
Daerah Irigasi
(UPTD KREJENGAN)
SKEMA JARINGAN D.I. KATIMOHO
Digambar
Kabupaten : Probolinggo
Direncana
DIPERIKSA DIREKSI PEKERJAAN : No. Lembar :
DISETUJUI Jumlah Lembar :
PPK PERENCANAAN & PROGRAM KEPALA BIDANG PROGRAM & PERENCANAAN UMUM Tanggal NO. KONTRAK