8 Ki
51 0,071 RUAS 2 RUAS 3 RUAS 4 62 0,086 RUAS 5 RUAS 6 38 0,053 RUAS 7 RUAS 8 34 0,047
A = 445 (ha) A = 419 (ha) A = 364 (ha) A = 267 (ha) A = 157 (ha) A = 119 (ha) A = 70 (ha)
B.JR 3 B.JR 5
B.JR.0 Q = 0,618 (m3/dt) B.JR 2 Q = 0,582 (m3/dt) Q = 0,506 (m3/dt) Q = 0,371 (m3/dt) Q = 0,218 (m3/dt) Q = 0,165 (m3/dt) B.JR 7 Q = 0,097(m3/dt)
B.JR 8
RUAS 1
B.JR 1 B.JR 4 B.JR 6
A = 496 (ha) JR.7 Ka 1 JR.7 Ka 2
Q = 0,689 (m3/dt) JR.2 Ka JR.3 Ka JR.5 Ka JR.5 Ki 38 0,053 11 0,015 JR.8 Ka
26 0,036 55 0,076 35 0,049 110 0,153 36 0,05
KALI JURANGJERO
LEGENDA
SUNGAI
SALURAN PRIMER
SALURAN SEKUNDER
BENDUNG TETAP
BANGUNAN SADAP
BANGUNAN BAGI DAN SADAP
BANGUNAN UKUR
B. PENGURAS
B. TERJUN
JEMBATAN ORANG
GORONG-GORONG SILANG
GORONG-GORONG
T.M. HEWAN
PELIMPAH SAMPING
JEMBATAN
SIPON
PEKERJAAN :
Kajian Pemetaan
Daerah Irigasi
SKEMA JARINGAN D.I. JURANG JERO (UPTD KREJENGAN)
Digambar
Kabupaten : Probolinggo
Direncana
DIPERIKSA DIREKSI PEKERJAAN : No. Lembar :
DISETUJUI Jumlah Lembar :
PPK PERENCANAAN & PROGRAM KEPALA BIDANG PROGRAM & PERENCANAAN UMUM Tanggal NO. KONTRAK