Anda di halaman 1dari 1

JR.1 Ki JR.4 Ki JR.6 Ki JR.

8 Ki
51 0,071 RUAS 2 RUAS 3 RUAS 4 62 0,086 RUAS 5 RUAS 6 38 0,053 RUAS 7 RUAS 8 34 0,047
A = 445 (ha) A = 419 (ha) A = 364 (ha) A = 267 (ha) A = 157 (ha) A = 119 (ha) A = 70 (ha)
B.JR 3 B.JR 5
B.JR.0 Q = 0,618 (m3/dt) B.JR 2 Q = 0,582 (m3/dt) Q = 0,506 (m3/dt) Q = 0,371 (m3/dt) Q = 0,218 (m3/dt) Q = 0,165 (m3/dt) B.JR 7 Q = 0,097(m3/dt)
B.JR 8
RUAS 1
B.JR 1 B.JR 4 B.JR 6
A = 496 (ha) JR.7 Ka 1 JR.7 Ka 2
Q = 0,689 (m3/dt) JR.2 Ka JR.3 Ka JR.5 Ka JR.5 Ki 38 0,053 11 0,015 JR.8 Ka
26 0,036 55 0,076 35 0,049 110 0,153 36 0,05
KALI JURANGJERO

LEGENDA

SUNGAI

SALURAN PRIMER
SALURAN SEKUNDER

BENDUNG TETAP

BANGUNAN SADAP
BANGUNAN BAGI DAN SADAP

BANGUNAN UKUR

B. PENGURAS

B. TERJUN

JEMBATAN ORANG

GORONG-GORONG SILANG

GORONG-GORONG

T.M. HEWAN

PELIMPAH SAMPING

JEMBATAN

SIPON

PROPINSI JAWA TIMUR

PEKERJAAN :
Kajian Pemetaan
Daerah Irigasi
SKEMA JARINGAN D.I. JURANG JERO (UPTD KREJENGAN)

Digambar
Kabupaten : Probolinggo
Direncana
DIPERIKSA DIREKSI PEKERJAAN : No. Lembar :
DISETUJUI Jumlah Lembar :
PPK PERENCANAAN & PROGRAM KEPALA BIDANG PROGRAM & PERENCANAAN UMUM Tanggal NO. KONTRAK