DATA SALURAN
1866
X = = 186.6
10
0.3665 - 0.52
X5 = 186.6 + x 82.1725 = 174.576
1.049
1.4999 - 0.52
X10 = 186.6 + x 82.1725 = 263.360
1.049
2.250 - 0.52
X15 = 186.6 + x 82.1725 = 322.118
1.049
1611
X = = 161.1000
10
0.3665 - 0.52
X5 = 161.1 + x 30.6115 = 156.621
1.049
1.4999 - 0.52
X10 = 161.1 + x 30.6115 = 189.695
1.049
2.2502 - 0.52
X15 = 161.1 + x 30.6115 = 211.590
1.049
Tabel 3.7. Curah hujan rata - rata kedua stasiun dengan metode gumbel
priode ulang stasiun A stasiun B rata - rata
no
(tahun) (mm) (mm) (mm)
1 2 174.5757 156.6206 165.598
2 5 263.3596 189.6951 227
3 10 322.1180 211.5900 267
A. Stasiun A
Tabel 3.8. Perhitungan curah hujan stasiun A dengan metode hasper
hujan maks Urutan Terbesar periode ulang standar variabel
R (mm) m T = (𝑛+1)
/█(𝑚 lc
355 1 11 @) 1.69
315 2 5.5 1.06
1 R1 - X R2 - X 1
sn = [ + ] = [
2 lc1 lc2 2
sn = 110.3885 (fungsi besarnya data)
RT = R + Sn. UT
T = 5 tahun UT = 0.22
T = 10 tahun UT = 0.64 (lampiran 4)
T = 15 tahun UT = 1.26
B. Stasiun kota B
Tabel 3.9. Perhitungan curah hujan stasiun B dengan metode hasper
hujan maks Urutan Terbesar periode ulang standar variabel
R (mm) m T = (𝑛+1)
/█(𝑚 lc
225 1 11 @) 1.69
215 2 5.5 1.06
1 R1 - X R2 - X
sn = [ + ]
2 lc1 lc2
1 225 - 161.1000 215 - 161.100
= [ +
2 1.69 1.06
sn = 44.3299
RT = R + Sn. UT
T = 5 tahun UT = 0.22
T = 10 tahun UT = 0.64 (lampiran 4)
T = 15 tahun UT = 1.26
Tabel 3.10. Curah hujan rata - rata kedua stasiun dengan metode Hasper
priode ulang stasiun kota lama stasiun kota baru rata - rata
no
(tahun) (mm) (mm) (mm)
1 5 210.8855 170.8526 190.8690
2 10 257.2487 189.4711 223.3599
3 15 418.4159 216.9556 317.6858
GRAFIK INSESITAS CURAH HUJAN
550.0000
500.0000
450.0000
400.0000
350.0000
300.0000
250.0000
200.0000
150.0000
100.0000
50.0000
0.0000
0 5 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85 90 95
3.2.2. INTENSITAS CURAH HUJAN
R2 = 165.59817 mm
R5 = 227 mm
R10 = 267 mm
rumus =
I = R [ 24 ] (2/3)
24 tc
tT = tt + ts
= 243.9148 + 3.2265 = 247.141 menit
Cs = 2.tT 2 x 247.141
= = 0.9935147
2.tT + ts 2x 247.141 + 3.2265
Qr (B1-B0) = 0.00278 x I x Cs x C x A
= 0.00278 22.342019 0.9935 x 0.82 x 4.2525
= 0.2152 m3/dt
tT = tt + ts
= 5.6986 + 2.6348 = 8.3333 menit
Qr (B1-B2) = 0.00278 x I x Cs x C x A
= 0.00278 214.06218 0.8635 0.82 0
= 0.0000 m3/dt
tT = tt + ts
= 8.8332 + 2.4533 = 11.2866 menit
Cs = 2.tT 2 x 11.2866
= = 0.9020
2.tT + ts 2 x 11.2866 + 2.4533
Saluran C1-C0
Diketahui :
A = 4.57 Ha
C = 0.69
Lt = 315 (tabel 3.1)
Sc = 0.31746032 %
315 0.77
tt = 0.0197 [ ] = 15.1361 menit
0.003
Vr = 1.95 m/dtk = 117 m/detik ( 1.9 x 60) 114
Ls = 393.92 (tabel 3.2)
393.92
ts = = 3.3668 menit
117
tT = tt + ts
= 15.1361 + 3.3668 = 18.5030 menit
Cs = 2.tT 2 x 18.5030
= = 0.9166
2.tT + ts 2 x 18.5030 + 3.3668
Qr (C1-C0) 0.00278 x I x Cs x C x A
= 0.00278 126.15711 0.9166 0.69 4.5675
= 1.0131 m3/dt
Saluran C1-C2
Diketahui :
A = 0.00 Ha
C = 0.75
Lt = 255 (tabel 3.1)
Sc = 0.784 %
255 0.77
tt = 0.0197 [ √0.007843137255 ] = 9.0808 menit
Vr = 1.95 m/dtk = 117 m/detik ( 1.9 x 60) 114
Ls = 273 (tabel 3.2)
273
ts = = 2.3333 menit
117
tT = tt + ts
= 9.0808 + 2.3333 = 11.4141 menit
Cs = 2.tT 2 x 11.4141
= = 0.9073
2.tT + ts 2 x 11.4141 + 2.3333
Qr (C1-C2) 0.00278 x I x Cs x C x A
= 0.00278 173.56318 0.9073 0.75 0
= 0.0000 m3/dt
Saluran C2-C3
Diketahui :
A = 0.00 Ha
C = 0.67
Lt = 0 (tabel 3.1)
Sc = #DIV/0! %
0 0.77
tt = 0.0197 [ √ ] = #DIV/0! menit
#DIV/0!
Vr = 1.95 m/dtk = 117 m/detik ( 1.9 x 60) 114
Ls = 281.79 (tabel 3.2)
281.79
ts = = 2.4085 menit
117
tT = tt + ts
= #DIV/0! + 2.4085 = #DIV/0! menit
Cs = 2.tT 2 x #DIV/0!
= = #DIV/0!
2.tT + ts 2 x #DIV/0! + 2.4085
Saluran D1-D0
Diketahui :
A = 0.00 Ha
C = 0.82
Lt = 315 (tabel 3.1)
Sc = 0.317 %
315 0.77
tt = 0.0197 [ ] = 15.1361 menit
0.003174603175
Vr = 1.95 m/dtk = 117 m/detik ( 1.9 x 60) 114
Ls = 383.43 (tabel 3.2)
383.43
ts = = 3.2772 menit
117
tT = tt + ts
= 15.1361 + 3.2772 = 18.4133 menit
Qr (D1-D0) 0.00278 x I x Cs x C x A
= 0.00278 126.18218 0.9183 0.82 0
= 0.0000 m3/dt
Saluran D1-D2
Diketahui :
A = 0.00 Ha
C = 0.80
Lt = 195 (tabel 3.1)
Sc = 0.513 %
195 0.77
tt = 0.0197 [ √0.005128205128 ] = 8.699 menit
Vr = 1.95 m/dtk = 117 m/detik ( 1.9 x 60) 114
Ls = 443.51 (tabel 3.2)
443.51
ts = = 3.7907 menit
117
tT = tt + ts
= 8.699 + 3.7907 = 12.489 menit
Cs = 2.tT 2 x 12.489
= = 0.8682
2.tT + ts 2 x 12.489 + 3.7907
Qr (D1-D2) 0.00278 x I x Cs x C x A +
= 0.00278 175.52107 0.8682 0.8 0
= 0.0000 m3/dt
Saluran E0-E1
Diketahui :
A = 0.00 Ha
C = 0.76
Lt = 285 (tabel 3.1)
Sc = 0.351 %
285 0.77
tt = 0.0197 [ √0.00350877193 ] = 13.4838 menit
Vr = 1.95 m/dtk = 117 m/detik
Ls = 364.53 (tabel 3.2)
364.53
ts = = 3.1156 menit
117
tT = tt + ts
= 13.4838 + 3.1156 = 16.599 menit
Cs = 2.tT 2 x 16.599
= = 0.9142
2.tT + ts 2 x 16.599 + 3.1156
Qr (E0-E1) = 0.00278 x I x Cs x C x A
= 0.00278 135.21466 0.9142 0.76 0
= 0.0000 m3/dt
Tabel 3.21. Perhitungan debit recana pada setiap saluran
notasi aliran permukaan aliran dalam saluran parameter curah hujan koefisien luas areal (Ha) debit rencana (m^3/dt)
panjang kemiringan waktu panjang kec.renc waktu waktu intensitas periode
saluran Cs C bagian kamulatif bagian kamulatif
lt (m) sc (%) tt (m) Ls (m) Vr (menit) ts tT (menit) (mm/jam) (Thn)
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16
B1-B0 315.00 0.317 243.915 377.5 1.95 3.226 247.141 22 5 0.9935 0.82 4.25 4.25 6.26 6.256
C1-C0 315.00 0.317 15.1361 393.92 2 3.283 18.419 126 5 0.9182 0.69 4.57 4.57 6.13 12.386
###
3.2.3. PERHITUNGAN DIMENSI SALURAN
Saluran B1-B0
Diketahui :
debit rencana (Qr) = 6.256 m3/dt
kcepatan recana(Vr) = 1.95 m/dt
kemiringan talud (I) = 0.3333
m. manning (n) = 0.018
penyelesaian
F = B.H + zH^2 diambil B= 1.984
= 1.98429 H + 0.3333 H^2
P = B + 2 H√ z^2 + 1
= 1.98429 + 2 H √ 0.3333 ^2 + 1
= 1.98429 + 2.1082 H
F 1.98429 H + 0.3333 H^2
R = =
P 1.98429 + 2.1082 H
V = (1/n) x R^2/3 x S^1/2
Q = F.V
B.H + 0.3333 H^2 (2/3)
= B H + 0.3333 H^2 (1/n) ( ) (S)^1/2
B + 2.1082 H
1.984 H + 0.3333 H^2 (2/3)
= 6.2560 = 1.98429 H + 0.3333 H^2 1 / 0.018 ( ) (S)^1/2
1.984 + 2.1082 H
F = B.H + zH^2
= 1.98429 x 1.32286 + 0.3333 1.3229 ^2 = 3.20821 m²
T = B + 2.z.H
= 1.98429 + 2 0.3333 1.32 = 2.8661 m
P = B + 2 H√ z^2 + 1
= 1.98429 + 2 1.3229 √ 0.3333 ^2 + 1= 4.7731 m
F 3.20821
R = = = 0.672 m
P 4.7731
Vs = (1/n) x R^2/3 x S^1/2
1 ^2/3 ^1/2
= x 0.6721 x 0.002093 = 1.95 m/dt
0.018
Pembuktian 0.00659
Qs = F.V 0.00897
= 3.20821 x 1.9500 = 6.256 m3/dt
Kesimpulan
Qs = 6.256 m3/dt
Vs = 1.9500 m/dt
B = 1.98429 m
H = 1.32286 m
F = 3.20821 m2
T = 2.86611 m
P = 4.7731 m
R = 0.67214 m
S = 0.00209
w = 0.20 m
z = 0.3333
Saluran C1-C0
Diketahui :
debit rencana (Qr) = 12.386 m3/dt
kcepatan recana(Vr) = 1.95 m/dt
kemiringan talud (I) = 0.3333
m. manning (n) = 0.018
penyelesaian
F = B.H + zH^2 diambil B= 2.792
= 2.79205 H + 0.3333 H^2
P = B + 2 H√ z^2 + 1
= 2.79205 + 2 H √ 0.3333 ^2 + 1
= 2.79205 + 2.1082 H
F 2.79205 H + 0.3333 H^2
R = =
P 2.79205 + 2.1082 H
V = (1/n) x R^2/3 x S^1/2
Q = F.V
B.H + 0.3333 H^2 (2/3)
= B H + 0.3333 H^2 (1/n) ( ) (S)^1/2
B + 2.1082 H
2.792 H + 0.3333 H^2 (2/3)
= 12.3860 = 2.79205 H + 0.3333 H^2 1 / 0.018 ( ) (S)^1/2
2.792 + 2.1082 H
Dengan cara coba - coba dapat :
H = 1.86 m
Qs = 12.386 m3/dt
S = 0.0013
F = B.H + zH^2
= 2.79205 x 1.86136 + 0.3333 1.8614 ^2 = 6.35179 m²
T = B + 2.z.H
= 2.79205 + 2 0.3333 1.86 = 4.0328 m
P = B + 2 H√ z^2 + 1
= 2.79205 + 2 1.8614 √ 0.3333 ^2 + 1= 6.71611 m
F 6.35179
R = = = 0.946 m
P 6.7161
Vs = (1/n) x R^2/3 x S^1/2
1 ^2/3 ^1/2
= x 0.9458 x 0.001327 = 1.95 m/dt
0.018
Pembuktian 0.00659
Qs = F.V 0.00897
= 6.35179 x 1.9500 = 12.386 m3/dt
Kesimpulan
Qs = 12.386 m3/dt
Vs = 1.9500 m/dt
B = 2.79205 m
H = 1.86136 m
F = 6.35179 m2
T = 4.03283 m
P = 6.71611 m
R = 0.94576 m
S = 0.00133
w = 0.20 m
z = 0.3333
Saluran B1-B2
Diketahui :
debit rencana (Qr) = 5.064 m3/dt
kcepatan recana(Vr) = 1.95 m/dt
kemiringan talud (I) = 0.3333
m. manning (n) = 0.018
penyelesaian
F = B.H + zH^2 diambil B= 1.7853
= 1.78527 H + 0.3333 H^2
P = B + 2 H√ z^2 + 1
= 1.78527 + 2 H √ 0.3333 ^2 + 1
= 1.78527 + 2.1082 H
F 1.78527 H + 0.3333 H^2
R = =
P 1.78527 + 2.1082 H
V = (1/n) x R^2/3 x S^1/2
Q = F.V
B.H + 0.3333 H^2 (2/3)
= B H + 0.3333 H^2 (1/n) ( ) (S)^1/2
B + 2.1082 H
1.785 H + 0.3333 H^2 (2/3)
= 5.0640 = 1.78527 H + 0.3333 H^2 1 / 0.018 ( ) (S)^1/2
1.785 + 2.1082 H
F = B.H + zH^2
= 1.7853 x 1.19018 + 0.3333 1.1902 ^2 = 2.5969 m2
T = B + 2.z.H
= 1.78527 + 2 0.3333 1.19018 = 2.578645 m
P = B + 2 H√ z^2 + 1
= 1.78527 + 2 1.1902 √ 0.3333 ^2 + 1= 4.29437 m
F 2.59692
R = = = 0.60473 m
P 4.2944
Vs = (1/n) x R^2/3 x S^1/2
1 ^2/3 ^1/2
= x 0.6047 x 0.002409 = 1.95 m/dt
0.018
Pembuktian
Qs = F.V
= 2.59692 x 1.9500 = 5.064 m3/dt
Kesimpulan
Qs = 5.064 m3/dt
Vs = 1.9500 m/dt
B = 1.78527 m
H = 1.19018 m
F = 2.59692 m2
T = 2.57864 m
P = 4.29437 m
R = 0.60473 m 1.08974
S = 0.00241 1.8333
w = 0.20 m 0.77098
z = 0.3333
nomer debit kecepatan dimensi saluran keliling
rencana rencan z B H F T basah
saluran
(m^3/dt) (m/dt) (m) (m) (m) (m^2) (m) (m)
1 2 3 4 5 6 7 8 9
A0-B0 2.550 2.34 0.3333 1.1565 0.7710 1.090 1.670 2.782
B1-B0 6.256 1.95 0.3333 1.9843 1.3229 3.208 2.866 4.773
B1-B2 5.064 1.95 0.3333 1.7853 1.1902 2.597 2.579 4.294
A3-B3 4.310 2.34 0.3333 1.5035 1.0023 1.842 2.172 3.617
B2-B3 19.404 1.95 0.3333 3.4946 2.3298 9.951 5.048 8.406
B0-C0 6.256 2.34 0.3333 1.8114 1.2076 2.674 2.616 4.357
C1-C0 12.386 1.95 0.3333 2.7920 1.8614 6.352 4.033 6.716
C1-C2 3.720 1.95 0.3333 1.5301 1.0201 1.908 2.210 3.681
B3-C3 23.714 2.15 0.3333 3.6792 2.4528 11.030 5.314 8.850
C2-C3 34.614 1.95 0.3333 4.6675 3.1117 17.751 6.742 11.227
C0-D0 18.642 2.34 0.3333 3.1269 2.0846 7.967 4.516 7.522
D1-D0 18.642 1.95 0.3333 3.4253 2.2836 9.560 4.948 8.239
C3-D2 58.328 2.34 0.3333 5.5310 3.6873 24.926 7.989 13.305
D1-D2 7.630 1.95 0.3333 2.1914 1.4609 3.913 3.165 5.271
E0-E1 62.708 1.95 0.3333 6.2823 4.1882 32.158 9.074 15.112
D2-E1 65.958 2.34 0.3333 5.8817 3.9211 28.187 8.495 14.148
E1-S 128.666 2.34 0.3333 8.2148 5.4766 54.985 11.865 19.760
D0-S 37.284 2.34 0.3333 4.4221 2.9481 15.933 6.387 10.637
0.6666667
0.5
0.6666667
0.5
0.6666667
0.5
jari-jari kemiringan kontrol kontrol
hidrolis saluran kecepatan debit 1.090
(m) (Si) (m/dt) (m^3/dt) 3.208
10 11 12 13 2.597
0.392 0.0062 2.3400 2.5500 1.842
0.672 0.0021 1.9500 6.2560 0.666666666667 9.951
0.605 0.0024 1.9500 5.0640 0.5 2.674
0.509 0.0044 2.3400 4.3100 6.352
1.184 0.0010 1.9500 19.4040 1.908
0.614 0.0034 2.3400 6.2560 15.933
0.946 0.0013 1.9500 12.3860 11.030
0.518 0.0030 1.9500 3.7200 17.751
1.246 0.0011 2.1500 23.7140 9.560
1.581 0.0007 1.9500 34.6140 24.926
1.059 0.0016 2.3400 18.6420 3.913
1.160 0.0010 1.9500 18.6420 32.158
1.874 0.0008 2.3400 58.3280 28.187
0.742 0.0018 1.9500 7.6300 54.985
2.128 0.0005 1.9500 62.7080 15.933
1.992 0.0007 2.3400 65.9580
2.783 0.0005 2.3400 128.6660
1.498 0.0010 2.3400 37.2840
3.2.5 PERENCANAAN DIMENSI GORONG-GORONG DAN KEHILANGAN ENERGI
F= Qr 6.256 m²
= 2.7200
Va 2.3
F= BH B = 1.5
= 1.5 H²
H=
F 2.7200 1.3466 m
= =
1.5 1.5
B= 1.5 x H = 2.0199 m
Kehilangan energi
∆H masuk = Σ masuk (Va - V1)
2. g
= 0.5 ( 2.3 - 1.95 )²
2 x 9.8
= 0.5 ( 0.35 )²
19.6
= 0.5 0.00625
= 0.00313
F= Qr 18.642
= 8.1052
Va 2.3
F= BH B = 1.5
= 1.5 H²
H=
F 8.1052 2.3245
= =
1.5 1.5
B= 1.5 x H = 3.4868
Kehilangan energi
∆H masuk = Σ masuk (Va - V1)
2. g
= 0.5 ( 2.3 - 2.34 )²
2 x 9.8
= 0.5 ( -0.04 )²
19.6
= 0.5 0.00008
= 0.00004
F= Qr 37.284
= 16.2104
Va 2.3
F= BH B = 1.5
= 1.5 H²
H=
F 16.2104 3.2874
= =
1.5 1.5
B= 1.5 x H = 4.9311
Kehilangan energi
∆H masuk = Σ masuk (Va - V1)
2. g
= 0.5 ( 2.3 - 2.34 )²
2 x 9.8
= 0.5 ( -0.04 )²
19.6
= 0.5 0.00008
= 0.00004