NOMOR SPK : 445/75.a/KONTRAK-TK.PANAS/DISPAR-TW/VIII/2021
TANGGAL SPK : 24 AGUSTUS 2021 PENGAWAS : CV. RELOKA KARYA KONSULTAN TERHITUNG : 24 AGUSTUS 2021 LAPORAN REALISASI MINGGUAN MASSA KONTRAK : 120 (SERATUS DUA PULUH) HARI KALENDER PAKET : PEMBANGUNAN TALUD MINGGU LALU = 0.00% LOKASI : ROSWAR MINGGU INI = 0.17% T.A : 2020 KOMULATIF = 0.17%
REALISASI S/D REALISASI S/D KOMULATIF S/D
HARGA. SATUAN JUMLAH HARGA NO DAFTAR ITEM PEKERJAAN SAT VOL. RIL BOBOT MINGGU LALU MINGGU INI MINGGU INI (Rp) SATUAN (Rp) VOLUME BOBOT VOLUME BOBOT VOLUME BOBOT I PEKERJAAN PERSIAPAN 1 Pengukuran dan Pas. Bouwplank M 250.00 25,700.00 6,425,000 0.69% 0 0.00% 50 0.14% 50 0.14% 2 Papan Nama Pekerjaan Ls 1.00 500,000.00 500,000 0.05% 0 0.00% 0 0.00% 0 0.00% 3 Gudang Semen dan Peralatan M2 9.00 755,200.00 6,796,800 0.73% 0 0.00% 0 0.00% 0 0.00% 2 Administrasi, Dokumen dan Pelaporan Ls 1.00 5,500,000.00 5,500,000 0.59% 0 0.00% 0.05 0.03% 0.05 0.03% 3 Keselamatan Dan kesehatan Kerja (K3) Ls 1.00 19,094,124.45 19,094,124 2.05% 0 0.00% 0 0.00% 0 0.00%
Jumlah Pekerjaan Persiapan 38,315,924.45 4.11% 0.00% 0.17% 0.17%
III PEKERJAAN PASANGAN DAN BETON 1 Galian Tanah M3 220.00 227,920.00 50,142,400.00 5.38% 0 0.00% 0 0.00% 0 0.00% 2 Urugan Pasir Bawah pondasi M3 10.00 813,933.56 8,139,336 0.87% 0 0.00% 0 0.00% 0 0.00% 3 Pasangan Batu Kosong M3 40.00 1,017,416.95 40,696,678.00 4.36% 0 0.00% 0 0.00% 0 0.00% 4 Pas. Batu Kali Talud 1 Pc 3 Psr M3 325.00 1,972,460.66 641,049,715 68.73% 0 0.00% 0 0.00% 0 0.00% 5 Urugan Tanah Kembali M3 70.12 122,375.00 8,581,052.47 0.92% 0 0.00% 0 0.00% 0 0.00% 6 Cor Beton Tulangan 1 2 3 M3 25.00 2,900,677.45 72,516,936 7.77% 0 0.00% 0 0.00% 0 0.00% 7 Plesteran Mata Sapi 1 2 M2 480.00 142,230.59 68,270,685 7.32% 0 0.00% 0 0.00% 0 0.00% Jumlah Pekerjaan Pas. & Beton 889,396,802.82 95.36% 0.00% 0.00% 0.00% II PEKERJAAN AKHIR 1 Pek. Pembersihan Akhir Ls 1.00 5,000,000.00 5,000,000.00 0.54% 0 0.00% 0 0.00% 0 0.00% Jumlah Pekerjaan Akhir 5,000,000.00 0.54% 0.00% 0.00% 0.00% Jumlah Bobot 100.00% 0.00% 0.17% 0.17%
MENGETAHUI; DIPERISKA; DIBUAT;
PEJABAT PEMBUAT KOMITMEN CV. RELOKA KARYA KONSULTAN CV. MEYAK INDAH
DIANA ARMAYANTI, S. KOM Reinhaed Gloria Ba'ka, St. SIPORA B. MANDACAN