Anda di halaman 1dari 53

REPUBLIK INDONESIA

KEMENTRIAN PEKERJAAN UMUM DAN PERUMAHAN RAKYAT


DIREKTORAT JENDRAL BINAMARGA
BALAI PELAKSANAAN JALAN NASIONAL IV JAMBI

PRESERVASI JLN SP. TUAN – BTS. KAB. MUARA JAMBI –


SP. TIGA BATARA GAS PLANT (PEMATANG LUMUT) –
KUALA TUNGKAL DAN JALAN DALAM KOTA
TAHUN ANGGARAN 2020
Data Kontrak Penyedia Jasa Konsultan Supervisi
No URAIAN KETERANGAN
1 Satuan Kerja Satuan Kerja Perencanaan dan Pengawasan Jalan Nasional Provinsi Jambi

2 No. Paket 11

3 Nama Kegiatan Pengawasan Teknis Preservasi Sp. Tuan – Bts. Kab. Muara Jambi – Sp. Tiga
Batara Gas Plant (Pematang Lumut) – Kuala Tungkal dan Jalan Dalam Kota

4 Ruas Jalan Sp. Tuan – Bts. Kab. Muara Jambi – Sp. Tiga Batara Gas Plant (Pematang Lumut)
– Kuala Tungkal dan Jalan Dalam Kota

5 Lokasi dan No. Ruas Kab. Muara Jambi dan Kab. Tanjung Jabung Barat
No. 28, 29.1, 29.2 dan 30, 30.11K, 30.12K, 30.13K

6 Sumber Dana Dana DIPA - APBN Tahun Anggaran 2020

7 No. Kontrak HK. 0203-Bb4/P2JN/PPKPW/334

8 Tanggal Kontrak 01 April 2020

9 Nilai Kontrak Rp.1,794,326,000.00 ( Termasuk PPN )

10 Penyedia Jasa/Konsultan PT. ENDAH BANGUN NAGARA CONSULTANT Jo. PT. VITA CIPTA CONSULTANT Jo.
CV. DEYOSAL CIPTA CONSULTANT

11 Alamat Penyedia Jasa Jl.Barau-barau I No. 5 Kec. Jambi Selatan Kota Jambi

12 Sistem Kontrak Fixed Unit Price & At Cost


Exercise Pembagian PPK Jalan Nasional
Di Wilayah PJN 1 dan SKPD Provinsi JAMBI
PETA LOKASI ASPHALT MIXING PLANT (AMP)
PT. ANTARA KONSTRUKSI & PT. PIRAMID ANUGRAH NUSANTARA

PT. Abun Sendi


KM 45.000 (Jambi)

JARAK DARI JAMBI


No NAMA PERUSAHAAN LOKASI KABUPATEN
( KM )
1 PT. ABUN SENDI SP. TUAN MUARA JAMBI 45
NAMA PERSONIL KONSULTAN SUPERVISI
PERSONIL KONSULTAN SUPERVISI PAKET-11 TERDIRI DARI :

• PROFESSIONAL STAFF :

- 1 (SATU) ORANG SUPERVISION ENGINEER = I R H A M, ST

- 1 (SATU) ORANG INSPECTOR ENGINEER = IR. RIZAL NASH

- 1 (SATU) ORANG QUANTITY ENGINEER = AWANG KUSUMA, ST

- 1 (SATU) ORANG QUALITY ENGINEER = RICHER HASOLOAN, ST

- 1 (SATU) ORANG HEALTH SAFETY ENVIRONMENT = BAMBANG RISTIANTO, ST

• SUB PROFESSIONAL STAFF :

- 3 (TIGA) ORANG INSPECTOR 1. AHMAD TARMIZI

2. M. TAUFIK

3. SIDHI WADIONO

- 1 (SATU) ORANG SURVEYOR = ANTONI, ST

- 1 (SATU) ORANG LAB. TECHNICIAN = WAWAN KURNIAWAN

• SUPPORTING STAFF :

-1 (SATU) ORANG CAD OPERATOR = HERY PEBRIYANTO

-1 (SATU) ORANG SEKRETARIS / OPERATOR KOMPUTER = M. AMIN

-1 (SATU) ORANG OFFICE BOY = HARSOYONO


I R H A M, ST SUPPORTING STAFF
SUPERVISION ENGGINEER
Sekretaris /Op. Komputer : M. AMIN
Cad Operator : HERY PEBRIYANTO
Office Boy : HARSOYONO

Ir. RIZAL NASH AWANG KUSUMA, ST RICHER HASOLOAN, ST BAMBANG RISTIANTO, ST


Inspector Engineer Quantity Engineer Quality Engineer Health Safety Environment

AHMAD TARMIZI
Inspector 1
ANTONI, ST WAWAN KURNIAWAN
Surveyor Mat/Lab. Technician

M. TAUFIK
Inspector 2

SIDHI WADIONO
Inspector 3
LOKASI PEKERJAAN:
Preservasi Jln. Sp. Tuan – Bts. Kab. Muara Jambi- Sp. Tiga Batara Gas Plant (Pematang Lumut)

 SATKER : PELAKSANAAN JALAN NASIONAL WILAYAH I PROVINSI JAMBI


 PAKET : PRESERVASI JLN. SP. TUAN – BTS. KAB. MUARA JAMBI- SP. TIGA BATARA GAS PLANT (PEM LUMUT)

1. RUAS JALAN : 28 . 29.1 DAN 29.2


 PANJANG EFEKTIF REKONSTRUKSI, REHABILITASI JALAN : 7.20 KM
(TERDIRI DARI PEKERJAAN REKONSTRUKSI JALAN DAN/ATAU REHABILITASI JALAN DAN/ATAU PEMELIHARAAN PREVENTIF
JALAN)
 PANJANG PRESERVASI PEMELIHARAAN RUTIN JALAN : 39.31 KM
(KEGIATAN MERAWAT SERTA MEMPERBAIKI KERUSAKAN-KERUSAKAN PADA RUAS JALAN DENGAN KONDISI PELAYANAN
MANTAP)
 PANJANG PRESERVASI PEMELIHARAAN RUTIN JEMBATAN : 67.70 M
(KEGIATAN MEMELIHARAAN SERTA MEMPERBAIKI KERUSAKAN-KERUSAKAN YANG TERJADI PADA BAGIAN JEMBATAN)
 NOMOR KONTRAK : HK.02.03/BB.4/PJN-I/PPK-13/100/2020
 TANGGAL KONTRAK : 05 FEBRUARI 2020
 WAKTU PELAKSANAAN EFF. REKONSTRUKSI, REHAB JALAN : 195 (SERATUS SEMBILAN PULUH LIMA) HARI KALENDER
 WAKTU PELAKSANAAN PEMELIHARAAN RUTIN JALAN : 330 (TIGA RATUS TIGA PULUH) HARI KALENDER
 WAKTU PELAKSANAAN PEMELIHARAAN RUTIN JEMBATAN : 330 (TIGA RATUS TIGA PULUH) HARI KALENDER
 WAKTU PEMELIHARAAN : 365( TIGA RATUS ENAM PULUH LIMA) HARI KALENDER
 PENYEDIA JASA : PT. ANTARA KONSTRUKSI
PROGRES PEKERJAAN :
Preservasi Jln. Sp. Tuan – Bts. Kab. Muara Jambi- Sp. Tiga Batara Gas Plant (Pematang Lumut)

TANGGAL 06 Juni – 12 Juni 2020


Renc. 47.177
Kontrak Induk Real. 55.133
Dev. 7.956
Renc. 51.638
Rehab Gabungan Real. 54.631
Dev. 2.993
Renc. 50.477
Rehab Mayor Real. 48.402
Dev. - 2.075
Renc. 55.133
Rehab Minor Real. 74.466
Dev. 19.333
Renc. 66.787
Gabungan rutin
Real. 60.240
Dev. - 6.547
PROGRES PEKERJAAN :
Preservasi Jln. Sp. Tuan – Bts. Kab. Muara Jambi- Sp. Tiga Batara Gas Plant (Pematang Lumut)

TANGGAL 06 Juni– 12 Juni 2020


Renc. 35.409
Rutin Jalan Real. 22.970
Dev. -12.439
Renc. 74.662
Rutin Kondisi Jalan Real. 71.095
Dev. - 3.567
Renc. 63.575
Holding Real. 55.609
Dev. - 7.966
Renc. 12.903
Jembatan Real. 0.000
Dev. - 12.903
I

KONTRAK AWAL CONTRACT CHANGE ORDER (CCO) -01 2020


HARGA SATUAN
H
MATA JUMLAH JUMLAH FEBRUARI MARET APRIL MEI JUNI JULI AGUSTUS SEPTEMBER OKTOBER NOVEMBER DESEMBER
SKALA
PEMBAYAR JENIS PEKERJAAN SAT BOBOT BOBOT U %
AN KUANTITAS HARGA KUANTITAS HARGA 06 - 14 15 - 21 22 - 28 29 - 06 07 - 13 14 - 20 21 - 27 28 - 03 04 - 10 11 - 17 18 - 24 25 - 01 02 - 08 09 - 15 16 - 22 23 - 29 30 - 05 06 - 12 13 - 19 20 - 26 27 - 03 04 - 10 11 - 17 18 - 24 25 - 31 01 - 07 08 - 14 15 - 21 22 - 28 29 - 04 05 - 11 12 - 18 19 - 25 26 - 02 03 - 09 10 - 16 17 - 23 24 - 30 31 - 06 07 - 13 14 - 20 21 - 27 28 - 04 05 - 11 12 - 18 19 - 25 26 - 31
( Rp. )
(Rp.) (%) (Rp.) (%) 1 2 3 4 5 6 7 8 9 10 L
11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47
0.000
DIVISI 1 UMUM 0.000 F 100

1.2 Mobilisasi Ls 141,878,000.00 1.00 141,878,000.00 0.631 1.00 141,878,000.00 0.631 0.039 0.039 0.039 0.039 0.039 0.039 0.039 0.039 I 0.316

1 . 8 (1) Manajemen dan Keselamatan Lalu Lintas Ls 26,630,000.00 1.00 26,630,000.00 0.118 1.00 26,630,000.00 0.118 0.005 0.005 0.005 0.005 0.005 0.005 0.005 0.005 0.005 0.005 0.005 0.005 0.005 0.005 0.005 0.005 0.005 0.005 0.005 0.005 0.005 0.005 0.005 0.005 0.005
T L
1 . 17 Pengamanan Lingkungan Hidup Ls 26,000,000.00 1.00 26,000,000.00 0.116 1.00 26,000,000.00 0.116 0.005 0.005 0.005 0.005 0.005 0.005 0.005 0.005 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004

1 . 19 Keselamatan dan Kesehatan Kerja Ls 100,000,000.00 1.00 100,000,000.00 0.445 1.00 100,000,000.00 0.445 0.018 0.018 0.018 0.018 0.018 0.018 0.018 0.018 0.019 0.019 R
0.019 0.019 0.019 0.019 E 0.019 0.019 0.019 0.019 0.019 0.019 0.019 0.019 0.019 0.019 0.019

1 . 21 Manajemen Mutu Ls 51,200,000.00 1.00 51,200,000.00 0.228 1.00 51,200,000.00 0.228 0.009 0.009 0.009 0.009 0.009 0.009 0.009 0.009 0.009 0.009 0.009 0.009 0.009 0.009 0.009 0.009 0.009 0.009 0.009 0.009 0.009 0.009 0.009 0.009 0.009
I B
DIVISI 2 DRAINASE

2 . 1 (1) Galian Untuk Saluran Air M3 70,000.00 6,548.94 458,425,800.00 2.039 1,600.00 112,000,000.00 0.498 A 0.021 0.021 0.021 0.021 0.021 0.021 80
1
2 . 2 (1) Pasangan Batu Dengan Mortar M3 1,100,000.00 2,609.28 2,870,208,000.00 12.767 820.00 902,000,000.00 4.012 0.290 0.290 0.290 0.290 0.290 0.290
R
4
DIVISI 3 PEKERJAAN TANAH DAN GEOSINTETIK
P
A Rencana Kontrak
3 . 1 (1) Galian Biasa M3 50,000.00 2,445.00 122,250,000.00 0.544 600.83 30,041,500.00 0.134 0.181 0.181 0.181 0.029 0.029 3
0.029
CCO - 01
3 . 1 (8) Galian Perkerasan Beraspal Tanpa Cold Milling Machine M3 215,981.00 660.00 142,547,460.00 0.634 0.00 0.00 0.000 0.211 0.211 0.211 N
9 R
3 . 2 (1a) Timbunan Biasa dari Sumber Galian M3 208,016.00 3,853.00 801,485,648.00 3.565 1,691.65 351,891,013.12 1.565 0.594 0.594 0.594 0.312 0.312 0.312

3 . 2 (1b) Timbunan Biasa dari Galian M3 130,677.00 1,860.00 243,059,220.00 1.081 600.83 78,514,661.91 0.349 0.180 0.180 0.180 0.116 0.116 0.116 I
H O
3 . 3 (1) Penyiapan Badan Jalan M2 3,500.00 15,720.00 55,020,000.00 0.245 2,692.08 9,422,280.00 0.042 0.082 0.082 0.042
D 60
DIVISI 5 PERKERASAN BERBUTIR DAN PERKERASAN BETON SEMEN
S
5 . 1 (3) Lapis Pondasi Agregat Kelas S M3 542,558.00 2,358.00 1,279,351,764.00 5.690 4,432.83 2,405,069,461.29 10.698
H 2.674 2.674 2.674 2.674

DIVISI 6 PERKERASAN ASPAL U


E
6 . 1 (2a) Lapis Perekat - Aspal Cair/Emulsi Liter 14,488.00 20,159.66 292,073,139.10 1.299 18,931.27 274,276,271.88 1.220 0.122 0.122 0.122 0.122 0.122 0.122 0.122 0.122 0.122 0.122
L
6 . 3 (5a) Laston Lapis Aus (AC - WC) Ton 1,478,451.00 3,963.84 5,860,343,211.84 26.067 3,638.62 5,379,524,340.13 23.928 2.991 2.991 2.991 2.991 2.991 2.991 2.991 2.991
Realisasi Kontrak S
6 . 3 (6a) Laston Lapis Antara (AC - BC) Ton 1,405,932.00 4,195.00 5,897,884,739.90 26.234 4,174.65 5,869,270,195.37 26.106 CCO - 01 2.901 2.901 2.901 2.901 2.901 2.901 2.901 2.901 2.901
F
6 . 3 (8) Bahan Anti Pengelupasan Kg 100,000.00 1,183.03 118,303,000.00 0.526 1,112.05 111,205,285.93 0.495 0.049 0.049 0.049 0.049 0.049 0.049 0.049 0.049 0.049 0.049

DIVISI 9 PEKERJAAN HARIAN DAN PEKERJAAN LAIN - LAIN I Rencana Kontrak


40
Awal
9 . 2 (1) Marka Jalan Thermoplastic M2 250,000.00 2,294.28 573,570,000.00 2.551 2,211.75 552,937,500.00 2.459 0.064 0.064 0.064 0.064 0.064 0.070 0.070 0.070 0.070 0.070 0.070 0.070 0.070 0.070 0.070 0.070 0.070 0.070 0.070 0.070 0.070 0.070 0.070 0.070 0.070 0.070 0.070 0.070 0.070 0.070 0.070 0.070 0.070 0.070 0.070 0.070 0.070 0.070 0.070 0.070
T
P
9 . 2 (1) Marka Jalan Thermoplastic M2 224,813.00 760.70 171,015,317.13 0.761 0.022 0.022 0.022 0.022 0.022 0.022 0.022 0.022 0.022 0.022 0.022 0.022 0.022 0.022 0.022 0.022 0.022 0.022 0.022 0.022 0.022 0.022 0.022 0.022 0.022 0.022 0.022 0.022 0.022 0.022 0.022 0.022 0.022 0.022 0.022
R
DIVISI 10 PEKERJAAN PEMELIHARAAN
H
10 . 1 (1) Galian Tanah untuk Saluran Air dan Lereng M3 59,486.00 593.14 35,283,288.10 0.157 593.14 35,283,288.10 0.157 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 I 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004

10 . 1 (3) Pasangan Batu Dengan Mortar M3 1,100,000.00 61.52 67,674,232.40 0.301 0.00 0.00 0.000 0.008 0.008 0.008 0.008 0.008
O
10 . 1 (4) Lapis Pondasi Agregat Kelas A M3 655,260.00 614.64 402,749,006.40 1.791 578.75 379,228,546.99 1.687 0.045 0.045 0.045 0.045 0.045 0.000 1
10 . 1 (4) Lapis Pondasi Agregat Kelas A M3 634,724.00 822.99 522,374,583.17 2.323 0.058 0.058 0.058 0.058 0.058 0.058 0.058 0.058 0.058 0.058 0.058 0.058 0.058 0.058 0.058 0.058 0.058 0.058 0.058 0.058 0.058 0.058 0.058 0.058 0.058 0.058 0.058 0.058 0.058 0.058 0.058 0.058 0.058 0.058 0.058
Realisasi Kontrak 4
20
10 . 1 (6) Lapis Pondasi Agregat Kelas S M3 590,556.00 271.16 160,135,007.41 0.712 246.07 145,315,973.47 0.646 0.018 0.018 0.018 0.018 0.018 0.018 0.018 0.018 0.018 0.018 0.018 0.018 0.018 0.018 0.018 0.018 0.018 0.018 0.018 0.018 0.018 0.018 0.018 0.018 0.018 0.018 0.018 0.018 0.018 0.018 0.018 0.018 0.018 0.018 0.018 0.018 0.018 0.018 0.018 0.018
Awal
10 . 1 (8) Campuran Aspal Panas M3 3,250,722.00 696.20 2,263,150,832.79 10.066 1,327.13 4,314,144,131.45 19.189 0.252 0.252 0.252 0.252 0.252 0.227 0.227 0.227 0.227 0.227 0.227 4 0.227 0.227 0.227 0.227 0.227 0.227 0.227 0.227 0.227 0.227 0.227 0.227 0.227 0.227 0.227 0.227 0.227 0.227 0.227 0.227 0.227 0.227 0.227 0.227 0.227 0.227 0.227 0.227 0.227

10 . 1 (18) Pengendalian Tanaman Pada Rumija, 5 x Potong M2 824.00 381,717.81 314,535,475.44 1.399 381,717.81 314,535,475.44 1.399 0.035 0.035 0.035 0.035 0.035 0.032 0.032 0.032 0.032 0.032 0.032 1 0.032 0.032 0.032 0.032 0.032 0.032 0.032 0.032 0.032 0.032 0.032 0.032 0.032 0.032 0.032 0.032 0.032 0.032 0.032 0.032 0.032 0.032 0.032 0.032 0.032 0.032 0.032 0.032 0.032

10 . 1 (19) Pembersihan Drainase M' 8,949.00 13,263.05 118,691,036.24 0.528 13,263.05 118,691,036.24 0.528 0.013 0.013 0.013 0.013 0.013 0.011 0.011 0.011 0.011 0.011 0.011 0.011 0.011 0.011 0.011 0.011 0.011 0.011 0.011 0.011 0.011 0.011 0.011 0.011 0.011 0.011 0.011 0.011 0.011 0.011 0.011 0.011 0.011 0.011 0.011 0.011 0.011 0.011 0.011 0.011

10 . 2 (1) Pemeliharaan Kinerja Jembatan Jambu (Pal V) bentang 10.4 m Ls 9,184,978.40 1.00 9,184,978.40 0.041 1.00 9,184,978.40 0.041 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001
H
10 . 2 (2) Pemeliharaan Kinerja Jembatan Tuan bentang 36.3 m Ls 32,059,107.30 1.00 32,059,107.30 0.143 1.00 32,059,107.30 0.143 0.005 0.005 0.005 0.005 0.005 0.005 0.005 0.005 0.005 0.005 0.005 0.005 0.005 0.005 0.005 0.005 0.005 0.005 0.005 0.005 0.005 0.005 0.005 0.005 0.005 0.005 0.005 0.005 0.005 0.005 0.005

10 . 2 (3) Pemeliharaan Kinerja Jembatan Rutin Udang bentang 11 m Ls 9,714,881.00 1.00 9,714,881.00 0.043 1.00 9,714,881.00 0.043 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001

10 . 2 (4) Pemeliharaan Kinerja Jembatan Belidang bentang 10 m Ls 8,831,710.00 1.00 8,831,710.00 0.039 1.00 8,831,710.00 0.039 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001
0

JUMLAH NILAI PEKERJAAN TANPA PPN 22,482,239,538.31 100.00 22,482,239,538.31 100.00


CCO - 01
TANGGAL 06 APRIL
P P N 10% 2,248,223,953.83 2,248,223,953.83
SPMK 06 FEBRUARI 2020
2020 PHO 31 DESEMBER 2020 FHO 31 DESEMBER 2021
JUMLAH NILAI PEKERJAAN + PPN 24,730,463,492.14 24,730,463,492.14

DIBULATKAN 24,730,463,000.00 24,730,463,000.00

RENCANA MINGGUAN 0.107 0.107 0.107 0.726 0.937 1.711 1.612 1.400 1.330 1.248 1.248 3.571 3.580 6.838 0.000 0.000 6.838 6.838 8.319 8.319 9.059 10.540 7.625 4.126 1.905 1.905 1.972 0.446 0.446 0.446 0.446 0.446 0.446 0.446 0.446 0.446 0.446 0.446 0.446 0.446 0.446 0.446 0.446 0.446 0.446 0.000 0.000
FISIK RENCANA KONTRAK AWAL
RENCANA KUMULATIF 0 0.107 0.214 0.320 1.046 1.983 3.695 5.306 6.707 8.037 9.285 10.533 14.104 17.684 24.522 24.522 24.522 31.361 38.199 46.518 54.836 63.895 74.435 82.060 86.186 88.091 89.996 91.968 92.414 92.860 93.306 93.753 94.199 94.645 95.091 95.538 95.984 96.430 96.876 97.323 97.769 98.215 98.661 99.108 99.554 100.00 100.00 100.00

REALISASI MINGGUAN 0.063 0.095 0.097 0.847 2.090 8.302 2.041 4.027
FISIK REALISASI KONTRAK AWAL
REALISASI KUMULATIF - 0.063 0.158 0.255 1.102 3.192 11.495 13.536 17.563

RENCANA MINGGUAN 0.980 0.938 0.938 3.552 3.561 6.552 0.000 0.000 6.552 6.552 6.863 6.863 6.863 6.863 3.962 3.474 3.163 3.163 3.478 0.452 0.452 0.452 0.452 0.452 0.452 0.452 0.452 0.452 0.452 0.452 0.452 0.452 0.452 0.452 0.452 0.452 0.452 0.000 0.000
FISIK RENCANA CCO - 01
RENCANA KUMULATIF 0 17.554 18.534 19.471 20.409 23.961 27.522 34.074 34.074 34.074 40.625 47.177 54.040 60.902 67.765 74.628 78.590 82.064 85.227 88.390 91.868 92.320 92.772 93.224 93.675 94.127 94.579 95.031 95.48 95.93 96.39 96.84 97.29 97.74 98.19 98.64 99.10 99.55 100.00 100.00 100.00

REALISASI MINGGUAN 8.619 1.791 27.168 0.00 0.00 0.00 0.00 0.00 0.00 0.00
FISIK REALISASI CCO - 01
REALISASI KUMULATIF - 17.55 26.173 27.965 55.133 55.133 55.133 55.133 55.133 55.133 55.133 55.133

DEVIASI (+/-) -0.044 -0.056 -0.065 0.056 1.209 7.800 8.230 10.86 7.640 8.493 34.723 31.171 27.611 21.059 21.059 21.059 14.507 7.956
R

KONTRAK AWAL CONTRACT CHANGE ORDER (CCO - 01


H 2020
HARGA
MATA SATUAN JUMLAH JUMLAH FEBRUARI MARET APRIL MEI JUNI JULI AGUSTUS
PEMBAYAR JENIS PEKERJAAN SAT BOBOT BOBOT
U SKALA
KUANTITAS HARGA KUANTITAS HARGA 06 - 14 15 - 21 22 - 28 29 - 06 07 - 13 14 - 20 21 - 27 28 - 03 04 - 10 11 - 17 18 - 24 25 - 01 02 - 08 09 - 15 16 - 22 23 - 29 30 - 05 06 - 12 13 - 19 20 - 26 27 - 03 04 - 10 11 - 17 18 - 24 25 - 31 01 - 07 08 - 14 15 - 18 %
AN
( Rp. ) L
(Rp.) (%) (Rp.) (%) 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28

DIVISI 1 UMUM F 100

1.2 Mobilisasi Ls 141,878,000.00 1.00 141,878,000.00 0.715 1.00 141,878,000.00 0.715 0.035 0.035 0.035 0.035 0.035 0.035 0.035 0.035 0.358
1 . 8 (1) Manajemen dan Keselamatan Lalu Lintas Ls 26,630,000.00 1.00 26,630,000.00 0.134 1.00 26,630,000.00 0.134 0.005 0.005 0.005 0.005 0.005 0.005 0.005 0.005 0.005 0.005 0.005
I 0.005 0.005 0.005 0.005 0.005 0.005 0.005 0.005 0.005 0.005 0.005 0.005 0.005 0.005
1 . 17 Pengamanan Lingkungan Hidup Ls 26,000,000.00 1.00 26,000,000.00 0.131 1.00 26,000,000.00 0.131 0.005 0.005 0.005 0.005 0.005 0.005 0.005 0.005 0.005 0.005 0.005 0.005 0.005 0.005 0.005 0.005 0.005 0.005 0.005 0.005 0.005 0.005 0.005 0.005 0.005
T
1 . 19 Keselamatan dan Kesehatan Kerja Ls 100,000,000.00 1.00 100,000,000.00 0.504 1.00 100,000,000.00 0.504 0.020 0.020 0.020 0.020 0.020 0.020 0.020 0.020 0.021 0.021 0.021 0.021 0.021 0.021 0.021 0.021 0.021 0.021 0.021 0.021 0.021 0.021 0.021 0.021 0.021
L
1 . 21 Manajemen Mutu Ls 51,200,000.00 1.00 51,200,000.00 0.258 1.00 51,200,000.00 0.258 0.010 0.010 0.010 0.010 0.010 0.010 0.010 0.010 0.010 0.010 0.010
R 0.010 0.010 0.010 0.010 0.010 0.010 0.010 0.010 0.010 0.010 0.010 0.010 0.010 0.010
E
DIVISI 2 DRAINASE 80
B
2 . 1 (1) Galian Untuk Saluran Air M3 70,000.00 6,548.94 458,425,800.00 2.312 1,600.000 112,000,000.00 0.565 I A 0.024 0.024 0.024 0.024 0.024 0.024
2 . 2 (1) Pasangan Batu Dengan Mortar M3 1,100,000.00 2,609.28 2,870,208,000.00 14.474 820.000 902,000,000.00 4.549 R 0.329 0.329 0.329 0.329 0.329 0.329
DIVISI 3 PEKERJAAN TANAH DAN GEOSINTETIK A
1 N Rencana Kontrak
3 . 1 (1) Galian Biasa M3 50,000.00 2,445.00 122,250,000.00 0.616 600.830 30,041,500.00 0.151 0.205 0.205 0.205 0.033 0.033 0.033
CCO - 01
3 . 1 (8) Galian Perkerasan Beraspal Tanpa Cold Milling Machine M3 215,981.00 660.00 142,547,460.00 0.719 0.000 - - 0.240 0.240 0.240
4 I
3 . 2 (1a) Timbunan Biasa dari Sumber Galian M3 208,016.00 3,853.00 801,485,648.00 4.042 1,691.654 351,891,013.12 1.775 0.674 0.674 0.674 0.354 0.354 0.354
D 60
3 . 2 (1b) Timbunan Biasa dari Galian M3 130,677.00 1,860.00 243,059,220.00 1.226 600.830 78,514,661.91 0.396 0.204 0.204 0.204 0.132 0.132 3
0.132
H
3 . 3 (1) Penyiapan Badan Jalan M2 3,500.00 15,720.00 55,020,000.00 0.277 2,692.080 9,422,280.00 0.048 0.092 0.092 0.048 U
Realisasi Kontrak 9
DIVISI 5 PERKERASAN BERBUTIR DAN PERKERASAN BETON SEMEN L
CCO - 01
5 . 1 (3) Lapis Pondasi Agregat Kelas S M3 542,558.00 2,358.00 1,279,351,764.00 6.452 4,432.834 2,405,069,461.29 12.128 3.032 3.032 3.032 3.032
DIVISI 6 PERKERASAN ASPAL F
H I
6 . 1 (2a) Lapis Perekat - Aspal Cair/Emulsi Liter 14,488.00 19,350.00 280,342,792.51 1.414 18,123.822 262,577,936.28 1.324 0.132 0.132 0.132 0.132 0.132 0.132 0.132 0.132 0.132 0.132
T Rencana Kontrak 40
6 . 3 (5a) Laston Lapis Aus (AC - WC) Ton 1,478,451.00 3,963.84 5,860,343,211.84 29.553 3,638.622 5,379,524,340.13 27.128 3.391 3.391 3.391 3.391 3.391 3.391 3.391 3.391
R Awal
6 . 3 (6a) Laston Lapis Antara (AC - BC) Ton 1,405,932.00 3,875.76 5,449,058,990.52 27.479 3,856.281 5,421,669,248.26 27.340 3.038 3.038 3.038 3.038 3.038 3.038 3.038 3.038 3.038
I
6 . 3 (8) Bahan Anti Pengelupasan Kg 100,000.00 1,136.74 113,674,061.07 0.573 1,067.482 106,748,161.93 0.538 0.054 0.054 0.054 0.054 0.054 0.054 0.054 0.054 0.054 0.054
DIVISI 9 PEKERJAAN HARIAN DAN PEKERJAAN LAIN - LAIN 1
9 . 2 (1) Marka Jalan Thermoplastic M2 250,000.00 1,899.00 474,750,000.00 2.394 1,899.000 474,750,000.00 2.394 4 0.798 0.798 0.798
9 . 2 (1) Marka Jalan Thermoplastic M2 224,813.00 760.700 171,015,317.13 0.862 4 0.862
DIVISI 10 PEKERJAAN PEMELIHARAAN
1
Realisasi Kontrak 20

10 . 1 (1) Galian Tanah untuk Saluran Air dan Lereng M3 59,486.00 172.80 10,279,180.80 0.052 172.800 10,279,180.80 0.052 Awal 0.010 0.010 0.017 0.017 0.017
H
10 . 1 (4) Lapis Pondasi Agregat Kelas A M3 655,260.00 306.91 201,102,940.23 1.014 271.011 177,582,480.82 0.896 0.169 0.169 0.169 0.169 0.000 0.000
10 . 1 (4) Lapis Pondasi Agregat Kelas A M3 634,724.00 496.460 315,114,981.83 1.589 0.631 0.631
10 . 1 (8) Campuran Aspal Panas M3 3,250,722.00 332.59 1,081,156,187.35 5.452 995.119 3,234,854,692.83 16.313 0.909 0.909 0.909 0.909 3.994 3.994
10 . 1 (18) Pengendalian Tanaman Pada Rumija, 5 x Potong M2 824.00 28,600.00 23,566,400.00 0.119 28,600.000 23,566,400.00 0.119 0.005 0.005 0.005 0.005 0.005 0.005 0.005 0.005 0.005 0.005 0.005 0.005 0.005 0.005 0.005 0.005 0.005 0.005 0.005 0.005 0.005 0.005 0.005
10 . 1 (19) Pembersihan Drainase M' 8,949.00 2,000.00 17,898,000.00 0.090 2,000.000 17,898,000.00 0.090 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004
0

JUMLAH NILAI PEKERJAAN TANPA PPN 19,830,227,656.32 100.00 19,830,227,656.32 100.00


CCO - 01
P P N 10% 1,983,022,765.63 1,983,022,765.63 TANGGAL 06 APRIL
SPMK 06 FEBRUARI 2020 2020 PHO 18 AGUSTUS 2020 FHO 18 AGUSTUS 2021
JUMLAH NILAI PEKERJAAN + PPN 21,813,250,421.95 21,813,250,421.95
DIBULATKAN 21,813,250,000.00 21,813,250,000.00

RENCANA MINGGUAN 0.121 0.121 0.121 0.336 1.653 2.531 2.428 2.189 2.109 2.016 0.938 3.302 3.302 6.996 0.000 0.000 6.996 6.996 8.675 8.675 9.514 11.193 8.139 4.181 1.663 2.461 2.537 0.807
FISIK RENCANA KONTRAK AWAL
RENCANA KUMULATIF 0 0.121 0.242 0.363 0.699 2.352 4.883 7.311 9.500 11.608 13.625 14.563 17.865 21.167 28.163 28.163 28.163 35.159 42.156 50.830 59.505 69.019 80.212 88.351 92.532 94.195 96.656 99.193 100.00
REALISASI MINGGUAN 0.072 0.107 0.111 0.807 1.485 6.960 1.954 2.547
FISIK REALISASI KONTRAK AWAL
REALISASI KUMULATIF - 0.072 0.179 0.289 1.096 2.581 9.541 11.495 14.043
RENCANA MINGGUAN 5.260 5.212 0.587 3.275 3.275 6.666 0.000 0.000 6.666 6.666 7.018 7.018 7.018 7.018 3.981 3.435 3.083 3.881 4.239 1.669
FISIK RENCANA CCO - 01
RENCANA KUMULATIF 0 14.032 19.292 24.504 25.091 28.366 31.641 38.307 38.307 38.307 44.972 51.638 58.657 65.675 72.694 79.712 83.693 87.128 90.211 94.092 98.33 100.00
REALISASI MINGGUAN 9.759 0.688 30.152 0.000 0.000 0.000 0.000 0.000 0.000 0.000
FISIK REALISASI CCO - 01
REALISASI KUMULATIF - 14.032 23.791 24.479 54.631 54.631 54.631 54.631 54.631 54.631 54.631 54.631
DEVIASI (+/-) -0.050 -0.063 -0.074 0.397 0.229 4.659 4.184 4.543 4.499 -0.025 29.540 26.265 22.990 16.325 16.325 16.325 9.659 2.993
I

KONTRAK AWAL CONTRACT CHANGE ORDER (CCO - 01


H 2020
HARGA SATUAN
MATA JUMLAH JUMLAH FEBRUARI MARET APRIL MEI JUNI JULI AGUSTUS
PEMBAYAR JENIS PEKERJAAN SAT BOBOT BOBOT
U SKALA
KUANTITAS HARGA KUANTITAS HARGA 06 - 14 15 - 21 22 - 28 29 - 06 07 - 13 14 - 20 21 - 27 28 - 03 04 - 10 11 - 17 18 - 24 25 - 01 02 - 08 09 - 15 16 - 22 23 - 29 30 - 05 06 - 12 13 - 19 20 - 26 27 - 03 04 - 10 11 - 17 18 - 24 25 - 31 01 - 07 08 - 14 15 - 18 %
AN
( Rp. ) L
(Rp.) (%) (Rp.) (%) 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28

DIVISI 1 UMUM F 100

1.2 Mobilisasi Ls 141,878,000.00 1.00 141,878,000.00 0.940 1.00 141,878,000.00 0.940 0.058 0.058 0.058 0.058 0.058 0.058 0.058 0.058 0.470
I
1 . 8 (1) Manajemen dan Keselamatan Lalu Lintas Ls 26,630,000.00 1.00 26,630,000.00 0.176 1.00 26,630,000.00 0.176 0.007 0.007 0.007 0.007 0.007 0.007 0.007 0.007 0.007 0.007 0.007 0.007 0.007 0.007 0.007 0.007 0.007 0.007 0.007 0.007 0.007 0.007 0.007 0.007 0.007
1 . 17 Pengamanan Lingkungan Hidup Ls 26,000,000.00 1.00 26,000,000.00 0.172 1.00 26,000,000.00 0.172 0.007 0.007 0.007 0.007 0.007 0.007 0.007 0.007 0.007 0.007 0.007 0.007 0.007 0.007 0.007 0.007 0.007 0.007 0.007 0.007 0.007 0.007 0.007 0.007 0.007
T
1 . 19 Keselamatan dan Kesehatan Kerja Ls 100,000,000.00 1.00 100,000,000.00 0.663 1.00 100,000,000.00 0.663 0.027 0.027 0.027 0.027 0.027 0.027 0.027 0.027 0.028 0.028 0.028 0.028 0.028 0.028 L 0.028 0.028 0.028 0.028 0.028 0.028 0.028 0.028 0.028 0.028 0.028
1 . 21 Manajemen Mutu Ls 51,200,000.00 1.00 51,200,000.00 0.339 1.00 51,200,000.00 0.339 0.014 0.014 0.014 0.014 0.014 0.014 0.014 0.014 0.014 0.014 R
0.014 0.014 0.014 0.014 E 0.014 0.014 0.014 0.014 0.014 0.014 0.014 0.014 0.014 0.014 0.014
B 80
DIVISI 2 DRAINASE
I A
2 . 1 (1) Galian Untuk Saluran Air M3 70,000.00 4,137.84 289,648,885.50 1.919 1,600.00 112,000,000.00 0.742 0.031 0.031 0.031 0.031 0.031 0.031
R
2 . 2 (1) Pasangan Batu Dengan Mortar M3 1,100,000.00 1,651.93 1,817,123,457.51 12.041 820.00 902,000,000.00 5.977 A 0.432 0.432 0.432 0.432 0.432 0.432
DIVISI 3 PEKERJAAN TANAH DAN GEOSINTETIK 1 N Rencana Kontrak
3 . 1 (1) Galian Biasa M3 50,000.00 1,320.00 66,000,000.00 0.437 112.23 5,611,500.00 0.037 0.146 0.146 0.146 0.006 0.006 0.006 CCO - 01
3 . 1 (8) Galian Perkerasan Beraspal Tanpa Cold Milling Machine M3 215,981.00 660.00 142,547,460.00 0.945 - - 0.000 0.315 0.315 0.315 4 I
D 60
3 . 2 (1a) Timbunan Biasa dari Sumber Galian M3 208,016.00 2,728.00 567,467,648.00 3.760 596.60 124,103,092.32 0.822 0.627 0.627 0.627 0.274 0.274 0.274
3 H
3 . 2 (1b) Timbunan Biasa dari Galian M3 130,677.00 660.00 86,246,820.00 0.572 112.23 14,665,879.71 0.097 0.095 0.095 0.095 0.032 0.032 0.032 U
Rencana Kontrak
3 . 3 (1) Penyiapan Badan Jalan M2 3,500.00 13,470.00 47,145,000.00 0.312 422.95 1,480,325.00 0.010 0.104 0.104 0.010 L
9 Awal
DIVISI 5 PERKERASAN BERBUTIR DAN PERKERASAN BETON SEMEN
Realisasi Kontrak
5 . 1 (3) Lapis Pondasi Agregat Kelas S M3 542,558.00 2,020.50 1,096,238,439.00 7.264 2,924.28 1,586,593,425.65 10.514 F 2.628 2.628 2.628 2.628
CCO - 01
H I
DIVISI 6 PERKERASAN ASPAL
T 40
6 . 1 (2a) Lapis Perekat - Aspal Cair/Emulsi Liter 14,488.00 14,100.00 204,280,800.00 1.354 13,913.85 201,583,825.04 1.336 0.134 0.134 0.134 0.134 0.134 0.134 0.134 0.134 0.134 0.134
R
6 . 3 (5a) Laston Lapis Aus (AC - WC) Ton 1,478,451.00 2,583.84 3,820,080,831.84 25.314 2,532.96 3,744,853,437.16 24.815 3.102 I 3.102 3.102 3.102 3.102 3.102 3.102 3.102
6 . 3 (6a) Laston Lapis Antara (AC - BC) Ton 1,405,932.00 3,875.76 5,449,058,990.52 36.108 3,856.28 5,421,669,248.26 35.927 3.992 3.992 3.992 3.992 3.992 3.992 3.992 3.992 3.992
6 . 3 (8) Bahan Anti Pengelupasan Kg 100,000.00 936.64 93,664,061.07 0.621 907.16 90,715,690.53 0.601 0.060 0.060 0.060 1 0.060 0.060 0.060 0.060 0.060 0.060 0.060
DIVISI 9 PEKERJAAN HARIAN DAN PEKERJAAN LAIN - LAIN
4
4
9 . 2 (1) Marka Jalan Thermoplastic M2 250,000.00 1,186.50 296,625,000.00 1.966 1,186.50 296,625,000.00 1.966 0.655 0.655 0.655
Realisasi Kontrak 1 20
9 . 2 (1) Marka Jalan Thermoplastic M2 224,813.00 568.07 127,709,547.98 0.846 0.846
Awal
DIVISI 10 PEKERJAAN PEMELIHARAAN H
10 . 1 (1) Galian Tanah untuk Saluran Air dan Lereng M3 59,486.00 112.80 6,710,020.80 0.044 112.80 6,710,020.80 0.044 0.009 0.009 0.015 0.015 0.015
10 . 1 (4) Lapis Pondasi Agregat Kelas A M3 655,260.00 160.66 105,277,249.61 0.698 124.77 81,756,790.20 0.542 0.116 0.116 0.116 0.116
10 . 1 (8) Campuran Aspal Panas M3 3,250,722.00 201.20 654,031,039.77 4.334 622.65 2,024,067,920.97 13.413 0.722 0.722 0.722 0.722 3.989 3.989
10 . 1 (18) Pengendalian Tanaman Pada Rumija, 5 x Potong M2 824.00 3,600.00 2,966,400.00 0.020 3,600.00 2,966,400.00 0.020 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001
0

JUMLAH NILAI PEKERJAAN TANPA PPN 15,090,820,103.6 100.00 15,090,820,103.6 100.00


CCO - 01
P P N 10% 1,509,082,010.36 1,509,082,010.36 TANGGAL 06 APRIL
SPMK 06 FEBRUARI 2020 PHO 18 AGUSTUS 2020 FHO 18 AGUSTUS 2021
JUMLAH NILAI PEKERJAAN + PPN 16,599,902,114.0 16,599,902,114.0
2020

DIBULATKAN 16,599,902,000.0 16,599,902,000.0

RENCANA MINGGUAN 0.159 0.159 0.159 0.306 1.459 2.181 2.148 1.834 1.728 1.624 0.786 4.264 4.264 7.429 0.000 0.000 7.429 7.429 8.825 8.825 9.523 10.919 6.907 3.965 1.871 2.526 2.626 0.656
FISIK RENCANA KONTRAK AWAL
RENCANA KUMULATIF 0 0.159 0.318 0.477 0.783 2.242 4.424 6.572 8.406 10.134 11.758 12.544 16.809 21.073 28.502 28.502 28.502 35.930 43.359 52.183 61.008 70.531 81.450 88.356 92.321 94.192 96.718 99.344 100.00
REALISASI MINGGUAN 0.094 0.141 0.145 1.060 1.944 5.625 1.704 0.115
FISIK REALISASI KONTRAK AWAL
REALISASI KUMULATIF - 0.094 0.235 0.380 1.440 3.384 9.009 10.714 10.829
RENCANA MINGGUAN 4.382 4.372 0.383 4.241 4.241 7.343 0.000 0.000 7.343 7.343 7.807 7.807 7.807 7.807 3.815 3.147 2.684 3.339 3.809 1.502
FISIK RENCANA CCO - 01
RENCANA KUMULATIF 0 10.829 15.210 19.582 19.965 24.206 28.448 35.791 35.791 35.791 43.134 50.477 58.284 66.090 73.897 81.703 85.518 88.665 91.349 94.688 98.498 100.00
REALISASI MINGGUAN 1.225 0.115 36.233 0.000 0.000 0.000 0.000 0.000 0.000 0.000
FISIK REALISASI CCO - 01
REALISASI KUMULATIF - 10.829 12.054 12.169 48.402 48.402 48.402 48.402 48.402 48.402 48.402 48.402
DEVIASI (+/-) -0.065 -0.083 -0.097 0.657 1.142 4.586 4.142 2.423 -3.156 -7.413 28.437 24.196 19.954 12.611 12.611 12.611 5.268 -2.075
R

KONTRAK AWAL CONTRACT CHANGE ORDER (CCO - 01


H 2020
HARGA SATUAN
MATA JUMLAH JUMLAH FEBRUARI MARET APRIL MEI JUNI JULI AGUSTUS
PEMBAYAR JENIS PEKERJAAN SAT BOBOT BOBOT
U SKALA
KUANTITAS HARGA KUANTITAS HARGA 06 - 14 15 - 21 22 - 28 29 - 06 07 - 13 14 - 20 21 - 27 28 - 03 04 - 10 11 - 17 18 - 24 25 - 01 02 - 08 09 - 15 16 - 22 23 - 29 30 - 05 06 - 12 13 - 19 20 - 26 27 - 03 04 - 10 11 - 17 18 - 24 25 - 31 01 - 07 08 - 14 15 - 18 %
AN
( Rp. ) L
(Rp.) (%) (Rp.) (%) 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28

100
DIVISI 2 DRAINASE F

2 . 1 (1) Galian Untuk Saluran Air M3 70,000.00 2,411.10 168,776,914.50 3.561 0.00 0.00 0.00
I
2 . 2 (1) Pasangan Batu Dengan Mortar M3 1,100,000.00 957.35 1,053,084,542.49 22.220 0.00 0.00 0.00
L
DIVISI 3 PEKERJAAN TANAH DAN GEOSINTETIK T E
3 . 1 (1) Galian Biasa M3 50,000.00 1,125.00 56,250,000.00 1.187 488.60 24,430,000.00 0.52 0.396 0.396 0.396 0.120 0.120 0.120 B
R A 80

3 . 2 (1a) Timbunan Biasa dari Sumber Galian M3 208,016.00 1,125.00 234,018,000.00 4.938 1,095.05 227,787,920.80 4.81 0.823 0.823 0.823 0.607 0.607 0.607
R
3 . 2 (1b) Timbunan Biasa dari Galian M3 130,677.00 1,200.00 156,812,400.00 3.309 488.60 63,848,782.20 1.35
I
0.551 0.551 0.551 0.449 0.449 0.449 A
Realisasi Kontrak N Rencana Kontrak
3 . 3 (1) Penyiapan Badan Jalan M2 3,500.00 2,250.00 7,875,000.00 0.166 2,269.13 7,941,955.00 0.17 0.055 0.055 0.168
CCO - 01 CCO - 01
DIVISI 5 PERKERASAN BERBUTIR DAN PERKERASAN BETON SEMEN 1 I
5 . 1 (3) Lapis Pondasi Agregat Kelas S M3 542,558.00 337.50 183,113,325.00 3.864 1,508.55 818,476,035.64 17.27 D 4.317 4.317 4.317 4.317 60
4 H
DIVISI 6 PERKERASAN ASPAL
U
6 . 1 (2a) Lapis Perekat - Aspal Cair/Emulsi Liter 14,488.00 5,250.00 76,061,992.51 1.605 4,209.97 60,994,111.24 1.29 3 0.161 L 0.161 0.161 0.161 0.161 0.161 0.161 0.161

6 . 3 (5a) Laston Lapis Aus (AC - WC) Ton 1,478,451.00 1,380.00 2,040,262,380.00 43.049 1,105.66 1,634,670,902.97 34.49 4.311 4.311 4.311 4.311 4.311 4.311 4.311 4.311
9 F
6 . 3 (8) Bahan Anti Pengelupasan Kg 100,000.00 200.10 20,010,000.00 0.422 160.32 16,032,471.40 0.34 0.042 0.042 0.042 0.042 0.042 0.042 0.042 0.042
I
DIVISI 9 PEKERJAAN HARIAN DAN PEKERJAAN LAIN - LAIN T 40

H R
9 . 2 (1) Marka Jalan Thermoplastic M2 250,000.00 712.50 178,125,000.00 3.758 712.50 178,125,000.00 3.76 1.253 1.253 1.253
I Rencana Kontrak
9 . 2 (1) Marka Jalan Thermoplastic M2 224,813.00 192.63 43,305,769.15 0.91 0.914
Awal
DIVISI 10 PEKERJAAN PEMELIHARAAN Realisasi Kontrak 1
10 . 1 (1) Galian Tanah untuk Saluran Air dan Lereng M3 59,486.00 60.00 3,569,160.00 0.075 60.00 3,569,160.00 0.08 Awal 0.015 0.015 0.025 0.025 0.025 4
4 20
10 . 1 (4) Lapis Pondasi Agregat Kelas A M3 655,260.00 146.24 95,825,690.62 2.022 146.24 95,825,690.62 2.02 0.337 0.337 0.337 0.337
1
10 . 1 (4) Lapis Pondasi Agregat Kelas A M3 634,724.00 496.46 315,114,981.83 6.65 1.321 1.321 1.321 1.321

10 . 1 (8) Campuran Aspal Panas M3 3,250,722.00 131.39 427,125,147.58 9.012 372.47 1,210,786,771.86 25.55 1.502 1.502 1.502 1.502 2.004 2.004 2.004 2.004
H

10 . 1 (18) Pengendalian Tanaman Pada Rumija, 5 x Potong M2 824.00 25,000.00 20,600,000.00 0.435 25,000.00 20,600,000.00 0.43 0.019 0.019 0.019 0.019 0.019 0.019 0.019 0.019 0.019 0.019 0.019 0.019 0.019 0.019 0.019 0.019 0.019 0.019 0.019 0.019 0.019 0.019 0.019

10 . 1 (19) Pembersihan Drainase M' 8,949.00 2,000.00 17,898,000.00 0.378 2,000.00 17,898,000.00 0.38 0.016 0.016 0.016 0.016 0.016 0.016 0.016 0.016 0.016 0.016 0.016 0.016 0.016 0.016 0.016 0.016 0.016 0.016 0.016 0.016 0.016 0.016 0.016
0

JUMLAH NILAI PEKERJAAN TANPA PPN 4,739,407,552.70 100.00 4,739,407,552.70 100.00


CCO - 01
P P N 10% 473,940,755.27 473,940,755.27 TANGGAL 06 APRIL
SPMK 06 FEBRUARI 2020 2020 PHO 18 AGUSTUS 2020 FHO 18 AGUSTUS 2021
JUMLAH NILAI PEKERJAAN + PPN 5,213,348,307.97 5,213,348,307.97

DIBULATKAN 5,213,348,000.00 5,213,348,000.00

RENCANA MINGGUAN 0.000 0.000 0.000 0.431 2.270 3.644 3.319 3.319 3.319 3.264 1.425 0.035 0.035 0.373 0.000 0.000 8.983 8.983 11.561 11.561 12.850 6.481 6.481 4.868 1.001 2.254 2.254 1.288
FISIK RENCANA KONTRAK AWAL
RENCANA KUMULATIF 0 0.000 0.000 0.000 0.431 2.701 6.345 9.664 12.984 16.303 19.567 20.991 21.027 21.062 21.435 21.435 21.435 30.418 39.401 50.962 62.523 75.373 81.854 88.334 93.203 94.204 96.458 98.712 100.00
REALISASI MINGGUAN 0.000 0.000 0.000 0.003 0.022 11.211 2.748 10.293
FISIK REALISASI KONTRAK AWAL
REALISASI KUMULATIF - 0.000 0.000 0.000 0.003 0.026 11.237 13.984 24.277
RENCANA MINGGUAN 4.730 4.562 4.562 3.361 0.035 4.550 0.000 0.000 4.550 4.550 4.550 4.550 4.550 4.550 4.550 4.353 4.353 5.605 5.605 2.202
FISIK RENCANA CCO - 01
RENCANA KUMULATIF 0 24.233 28.963 33.525 38.087 41.448 41.483 46.033 46.033 46.033 50.583 55.133 59.683 64.232 68.782 73.332 77.882 82.235 86.587 92.193 97.798 100.00
REALISASI MINGGUAN 36.932 2.511 10.790 0.000 0.000 0.000 0.000 0.000 0.000 0.000
FISIK REALISASI CCO - 01
REALISASI KUMULATIF - 24.233 61.165 63.676 74.466 74.466 74.466 74.466 74.466 74.466 74.466 74.466
DEVIASI (+/-) 0.000 0.000 0.000 -0.427 -2.675 4.891 4.320 11.293 32.202 30.151 36.378 33.018 32.982 28.433 28.433 28.433 23.883 19.333
B

D
KONTRAK AWAL CONTRACT CHANGE ORDER (CCO - 01 2020
HARGA
SATUAN
H
MATA JUMLAH JUMLAH FEBRUARI MARET APRIL MEI JUNI JULI AGUSTUS SEPTEMBER OKTOBER NOVEMBER DESEMBER
SKALA
PEMBAYAR JENIS PEKERJAAN SAT BOBOT BOBOT
U %
AN KUANTITAS HARGA KUANTITAS HARGA 06 - 14 15 - 21 22 - 28 29 - 06 07 - 13 14 - 20 21 - 27 28 - 03 04 - 10 11 - 17 18 - 24 25 - 01 02 - 08 09 - 15 16 - 22 23 - 29 30 - 05 06 - 12 13 - 19 20 - 26 27 - 03 04 - 10 11 - 17 18 - 24 25 - 31 01 - 07 08 - 14 15 - 21 22 - 28 29 - 04 05 - 11 12 - 18 19 - 25 26 - 02 03 - 09 10 - 16 17 - 23 24 - 30 31 - 06 07 - 13 14 - 20 21 - 27 28 - 04 05 - 11 12 - 18 19 - 25 26 - 31
( Rp. )
(Rp.) (%) (Rp.) (%) 1 2 3 4 5 6 7 8 9 10 L
11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47

100
F
DIVISI 6 PERKERASAN ASPAL
I

6 . 1 (2a) Lapis Perekat - Aspal Cair/Emulsi Liter 14,488.00 809.66 11,730,346.59 0.453 807.45 11,698,335.60 0.451 0.045 0.045 0.045 0.045 0.045 0.045 0.045 0.045 0.045 0.045
T
Rencana Kontrak
R CCO - 01
6 . 3 (6a) Laston Lapis Antara (AC - BC) Ton 1,405,932.00 319.24 448,825,749.38 17.314 318.37 447,600,947.11 17.267 2.158 2.158 2.158 2.158 2.158 2.158 2.158 2.158

I L 80

E
6 . 3 (8) Bahan Anti Pengelupasan Kg 100,000.00 46.29 4,628,938.93 0.179 44.57 4,457,124.00 0.172 0.019 0.019 0.019 0.019 0.019 0.019 0.019 0.019 0.019
B
1 A
DIVISI 9 PEKERJAAN HARIAN DAN PEKERJAAN LAIN - LAIN R
4 A
N
9 . 2 (1) Marka Jalan Thermoplastic M2 250,000.00 395.28 98,820,000.00 3.812 312.75 78,187,500.00 3.016 0.095 0.095 0.095 0.095 0.095 0.086 0.086 0.086 0.086 0.086 0.086 0.086 0.086 0.086 0.086 0.086 0.086 0.086 0.086 0.086 0.086 0.086 0.086 0.086 0.086 0.086 0.086 0.086 0.086 0.086 0.086 0.086 0.086 0.086 0.086 0.086 0.086 0.086 0.086 0.086
3 P
I
R 60

Realisasi Kontrak 9 D
DIVISI 10 PEKERJAAN PEMELIHARAAN O
CCO - 01 H
Rencana Kontrak Awal S
U
E
H L
10 . 1 (1) Galian Tanah untuk Saluran Air dan Lereng M3 59,486.00 420.34 25,004,107.30 0.965 420.34 25,004,107.30 0.965 0.024 0.024 0.024 0.024 0.024 0.028 0.028 0.028 0.028 0.028 0.028 0.028 0.028 0.028 0.028 0.028 0.028 0.028 0.028 0.028 0.028 0.028 0.028 0.028 0.028 0.028 0.028 0.028 0.028 0.028 0.028 0.028 0.028 0.028 0.028 0.028 0.028 0.028 0.028 0.028 S

F
10 . 1 (3) Pasangan Batu Dengan Mortar M3 1,100,000.00 61.52 67,674,232.40 2.611 - - - 0.065 0.065 0.065 0.065 0.065 0.000 0.000 0.000 0.000 0.000 0.000 I 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 P
T
H 40
R
O
10 . 1 (4) Lapis Pondasi Agregat Kelas A M3 655,260.00 307.73 201,646,066.17 7.779 307.73 201,646,066.17 7.779 0.194 0.194 0.194 0.194 0.194 0.000 0.000 0.000 0.000 0.000 0.000 I 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000

1
10 . 1 (4) Lapis Pondasi Agregat Kelas A M3 634,724.00 326.54 207,259,601.34 7.995 Realisasi Kontrak 0.228 0.228 0.228 0.228 0.228 0.228 4 0.228 0.228 0.228 0.228 0.228 0.228 0.228 0.228 0.228 0.228 0.228 0.228 0.228 0.228 0.228 0.228 0.228 0.228 0.228 0.228 0.228 0.228 0.228 0.228 0.228 0.228 0.228 0.228 0.228
Awal 4
1
10 . 1 (6) Lapis Pondasi Agregat Kelas S M3 590,556.00 271.16 160,135,007.41 6.178 246.07 145,315,973.47 5.606 0.154 0.154 0.154 0.154 0.154 0.160 0.160 0.160 0.160 0.160 0.160 0.160 0.160 0.160 0.160 0.160 0.160 0.160 0.160 0.160 0.160 0.160 0.160 0.160 0.160 0.160 0.160 0.160 0.160 0.160 0.160 0.160 0.160 0.160 0.160 0.160 0.160 0.160 0.160 0.160

H 20

10 . 1 (8) Campuran Aspal Panas M3 3,250,722.00 363.61 1,181,994,645.43 45.598 332.02 1,079,289,438.62 41.636 1.140 1.140 1.140 1.140 1.140 0.224 0.224 0.224 0.224 0.224 0.224 0.224 0.224 0.224 0.224 0.224 0.224 0.224 0.224 0.224 0.224 0.224 0.224 0.224 0.224 0.224 0.224 0.224 0.224 0.224 0.224 0.224 0.224 0.224 0.224 0.224 0.224 0.224 0.224 0.224

10 . 1 (18) Pengendalian Tanaman Pada Rumija, 5 x Potong M2 824.00 353,117.81 290,969,075.44 11.225 353,117.81 290,969,075.44 11.225 0.281 0.281 0.281 0.281 0.281 0.256 0.256 0.256 0.256 0.256 0.256 0.256 0.256 0.256 0.256 0.256 0.256 0.256 0.256 0.256 0.256 0.256 0.256 0.256 0.256 0.256 0.256 0.256 0.256 0.256 0.256 0.256 0.256 0.256 0.256 0.256 0.256 0.256 0.256 0.256

10 . 1 (19) Pembersihan Drainase M' 8,949.00 11,263.05 100,793,036.24 3.888 11,263.05 100,793,036.24 3.888 0.097 0.097 0.097 0.097 0.097 0.080 0.080 0.080 0.080 0.080 0.080 0.080 0.080 0.080 0.080 0.080 0.080 0.080 0.080 0.080 0.080 0.080 0.080 0.080 0.080 0.080 0.080 0.080 0.080 0.080 0.080 0.080 0.080 0.080 0.080 0.080 0.080 0.080 0.080 0.080
0

JUMLAH NILAI PEKERJAAN TANPA PPN 2,592,221,205.29 100.00 2,592,221,205.29 100.00


CCO - 01
P P N 10% 259,222,120.53 259,222,120.53 TANGGAL 06 APRIL
2020
SPMK 06 FEBRUARI 2020 PHO 31 DESEMBER 2020 FHO 31 DESEMBER 2021
JUMLAH NILAI PEKERJAAN + PPN 2,851,443,325.82 2,851,443,325.82

DIBULATKAN 2,851,443,000.00 2,851,443,000.00

RENCANA MINGGUAN 0.000 0.000 0.000 2.051 2.051 2.051 2.051 2.051 2.051 2.097 4.281 4.281 4.281 4.281 0.000 0.000 4.281 4.281 4.281 4.281 2.116 2.051 2.051 2.051 2.051 2.051 2.051 2.051 2.051 2.051 2.051 2.051 2.051 2.051 2.051 2.051 2.051 2.051 2.051 2.051 2.051 2.051 2.051 2.051 2.051 0.000 0.000
FISIK RENCANA KONTRAK AWAL
RENCANA KUMULATIF 0 0.000 0.000 0.000 2.051 4.103 6.154 8.205 10.257 12.308 14.405 18.686 22.966 27.247 31.528 31.528 31.528 35.809 40.089 44.370 48.651 50.767 52.819 54.870 56.921 58.973 61.024 63.075 65.127 67.178 69.230 71.281 73.332 75.384 77.435 79.486 81.538 83.589 85.640 87.692 89.743 91.795 93.846 95.897 97.949 100.00 100.00 100.00

REALISASI MINGGUAN 0.000 0.000 0.000 1.174 6.766 18.763 2.759 15.440
FISIK REALISASI KONTRAK AWAL
REALISASI KUMULATIF - 0.000 0.000 0.000 1.174 7.940 26.703 29.461 44.901

RENCANA MINGGUAN 1.063 1.108 3.286 3.286 3.286 3.286 0.000 0.000 3.286 3.286 3.286 3.286 1.127 1.063 1.063 1.063 1.063 1.063 1.063 1.063 1.063 1.063 1.063 1.063 1.063 1.063 1.063 1.063 1.063 1.063 1.063 1.063 1.063 1.063 1.063 1.063 1.063 0.000 0.000
FISIK RENCANA CCO - 01
RENCANA KUMULATIF 0 44.901 45.965 47.073 50.358 53.644 56.930 60.216 60.216 60.216 63.501 66.787 70.073 73.358 74.486 75.549 76.612 77.675 78.738 79.801 80.864 81.927 82.991 84.054 85.117 86.180 87.243 88.306 89.369 90.432 91.495 92.558 93.621 94.685 95.748 96.811 97.874 98.937 100.00 100.00 100.00

REALISASI MINGGUAN 0.098 10.275 4.965 0.000 22.970 0.000 0.000 0.000 0.000 0.000
FISIK REALISASI CCO - 01
REALISASI KUMULATIF - 44.901 45.000 55.275 60.240 60.240 83.210 83.210 83.210 83.210 83.210 83.210

DEVIASI (+/-) 0.000 0.000 0.000 -0.877 3.837 20.549 21.256 34.645 -0.965 8.202 9.881 6.596 26.280 22.994 22.994 22.994 19.708 16.423
B

D
KONTRAK AWAL CONTRACT CHANGE ORDER (CCO - 01 2020
HARGA
SATUAN
H
MATA JUMLAH JUMLAH FEBRUARI MARET APRIL MEI JUNI JULI AGUSTUS SEPTEMBER OKTOBER NOVEMBER DESEMBER
SKALA
PEMBAYAR JENIS PEKERJAAN SAT BOBOT BOBOT
U %
AN KUANTITAS HARGA KUANTITAS HARGA 06 - 14 15 - 21 22 - 28 29 - 06 07 - 13 14 - 20 21 - 27 28 - 03 04 - 10 11 - 17 18 - 24 25 - 01 02 - 08 09 - 15 16 - 22 23 - 29 30 - 05 06 - 12 13 - 19 20 - 26 27 - 03 04 - 10 11 - 17 18 - 24 25 - 31 01 - 07 08 - 14 15 - 21 22 - 28 29 - 04 05 - 11 12 - 18 19 - 25 26 - 02 03 - 09 10 - 16 17 - 23 24 - 30 31 - 06 07 - 13 14 - 20 21 - 27 28 - 04 05 - 11 12 - 18 19 - 25 26 - 31
( Rp. )
(Rp.) (%) (Rp.) (%) 1 2 3 4 5 6 7 8 9 10 L
11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47

100
F

L
I
10 . 1 (1) Galian Tanah untuk Saluran Air dan Lereng M3 59,486.00 79.20 4,711,291.20 8.442 79.20 4,711,291.20 8.442 0.211 0.211 0.211 0.211 0.211 0.241 0.241 0.241 0.241 0.241 0.241 E 0.241 0.241 0.241 0.241 0.241 0.241 0.241 0.241 0.241 0.241 0.241 0.241 0.241 0.241 0.241 0.241 0.241 0.241 0.241 0.241 0.241 0.241 0.241 0.241 0.241 0.241 0.241 0.241 0.241
B
T
A
R 80
R
A
N Rencana Kontrak
10 . 1 (3) Pasangan Batu Dengan Mortar M3 1,100,000.00 1.46 1,604,885.54 2.876 - - 0.000 0.072 0.072 0.072 0.072 0.072 I CCO - 01
P
I
R
D
1 O 60
H
S
U
4 E
L
10 . 1 (6) Lapis Pondasi Agregat Kelas S M3 590,556.00 39.06 23,069,482.26 41.340 41.78 24,674,367.80 44.215 1.033 1.033 1.033 1.033 1.033 1.263 1.263 1.263 1.263 1.263 1.263 1.263 1.263 1.263 1.263 1.263 1.263 1.263 1.263 1.263 1.263 1.263 1.263 1.263 1.263 1.263 1.263 1.263 1.263 1.263 1.263 1.263 1.263 1.263 1.263 1.263 1.263 1.263 1.263 1.263 S
3
F
I
9 Rencana Kontrak P 40
Realisasi Kontrak T
CCO - 01 Awal H
R
O
10 . 1 (18) Pengendalian Tanaman Pada Rumija, 5 x Potong M2 824.00 22,600.00 18,622,400.00 33.371 22,600.00 18,622,400.00 33.371 0.834 0.834 0.834 0.834 0.834 0.754 0.754 0.754
I
H 0.754 0.754 0.754 0.754 0.754 0.754 0.754 0.754 0.754 0.754 0.754 0.754 0.754 0.754 0.754 0.754 0.754 0.754 0.754 0.754 0.754 0.754 0.754 0.754 0.754 0.754 0.754 0.754 0.754 0.754 0.754 0.754

Realisasi Kontrak 1
Awal 4 20
4
1
10 . 1 (19) Pembersihan Drainase M' 8,949.00 871.25 7,796,818.04 13.972 871.25 7,796,818.04 13.972 0.349 0.349 0.349 0.349 0.349 0.133 0.133 0.133 0.133 0.133 0.133 0.133 0.133 0.133 0.133 0.133 0.133 0.133 0.133 0.133 0.133 0.133 0.133 0.133 0.133 0.133 0.133 0.133 0.133 0.133 0.133 0.133 0.133 0.133 0.133 0.133 0.133 0.133 0.133 0.133
H

JUMLAH NILAI PEKERJAAN TANPA PPN 55,804,877.04 100.00 55,804,877.04 100.00 CCO - 01
TANGGAL 06 APRIL
2020

P P N 10% 5,580,487.70 5,580,487.70

SPMK 06 FEBRUARI 2020 PHO 31 DESEMBER 2020 FHO 31 DESEMBER 2021

JUMLAH NILAI PEKERJAAN + PPN 61,385,364.74 61,385,364.74

DIBULATKAN 61,385,000.00 61,385,000.00

RENCANA MINGGUAN 0.00 0.00 0.00 2.50 2.50 2.50 2.50 2.50 2.50 2.50 2.50 2.50 2.50 2.50 0.00 0.00 2.50 2.50 2.50 2.50 2.50 2.50 2.50 2.50 2.50 2.50 2.50 2.50 2.50 2.50 2.50 2.50 2.50 2.50 2.50 2.50 2.50 2.50 2.50 2.50 2.50 2.50 2.50 2.50 2.50 0.00 0.00

FISIK RENCANA KONTRAK AWAL

RENCANA KUMULATIF 0 0.00 0.00 0.00 2.50 5.00 7.50 10.00 12.50 15.00 17.50 20.00 22.50 25.00 27.50 27.50 27.50 30.00 32.50 35.00 37.50 40.00 42.50 45.00 47.50 50.00 52.50 55.00 57.50 60.00 62.50 65.00 67.50 70.00 72.50 75.00 77.50 80.00 82.50 85.00 87.50 90.00 92.50 95.00 97.50 100.00 100.00 100.00

REALISASI MINGGUAN 0.00 0.00 0.00 0.15 1.70 9.49 4.31 0.62

FISIK REALISASI KONTRAK AWAL

REALISASI KUMULATIF - 0.00 0.00 0.00 0.15 1.85 11.34 15.65 16.27

RENCANA MINGGUAN 2.39 2.39 2.39 2.39 2.39 2.39 0.00 0.00 2.39 2.39 2.39 2.39 2.39 2.39 2.39 2.39 2.39 2.39 2.39 2.39 2.39 2.39 2.39 2.39 2.39 2.39 2.39 2.39 2.39 2.39 2.39 2.39 2.39 2.39 2.39 2.39 2.39 0.00 0.00

FISIK RENCANA CCO - 01

RENCANA KUMULATIF 0 16.27 18.66 21.05 23.45 25.84 28.23 30.62 30.62 30.62 33.02 35.41 37.80 40.19 42.59 44.98 47.37 49.76 52.15 54.55 56.94 59.33 61.72 64.12 66.51 68.90 71.29 73.68 76.08 78.47 80.86 83.25 85.65 88.04 90.43 92.82 95.22 97.61 100.00 100.00 100.00

REALISASI MINGGUAN 0.616 6.08 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

FISIK REALISASI CCO - 01

REALISASI KUMULATIF - 16.27 16.886 22.970 22.970 22.970 22.970 22.970 22.970 22.970 22.970 22.970

DEVIASI (+/-) 0.00 0.00 0.00 -2.35 -3.15 3.84 5.65 3.77 -1.776 1.915 -0.477 -2.870 -5.262 -7.654 -7.654 -7.654 -10.046 -12.439
U

D
KONTRAK AWAL CONTRACT CHANGE ORDER (CCO - 01 2020
HARGA SATUAN H
MATA JUMLAH JUMLAH FEBRUARI MARET APRIL MEI JUNI JULI AGUSTUS SEPTEMBER OKTOBER NOVEMBER DESEMBER
SKALA
PEMBAYAR JENIS PEKERJAAN SAT BOBOT BOBOT
U %
AN KUANTITAS HARGA KUANTITAS HARGA 06 - 14 15 - 21 22 - 28 29 - 06 07 - 13 14 - 20 21 - 27 28 - 03 04 - 10 11 - 17 18 - 24 25 - 01 02 - 08 09 - 15 16 - 22 23 - 29 30 - 05 06 - 12 13 - 19 20 - 26 27 - 03 04 - 10 11 - 17 18 - 24 25 - 31 01 - 07 08 - 14 15 - 21 22 - 28 29 - 04 05 - 11 12 - 18 19 - 25 26 - 02 03 - 09 10 - 16 17 - 23 24 - 30 31 - 06 07 - 13 14 - 20 21 - 27 28 - 04 05 - 11 12 - 18 19 - 25 26 - 31
( Rp. )
(Rp.) (%) (Rp.) (%) 1 2 3 4 5 6 7 8 9 10 L
11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47

F 100

DIVISI 9 PEKERJAAN HARIAN DAN PEKERJAAN LAIN - LAIN


I Rencana Kontrak
L CCO - 01
E
9 . 2 (1) Marka Jalan Thermoplastic M2 250,000.00 164.43 41,107,500.00 4.605 164.43 41,107,500.00 4.605 0.115 0.115 0.115 0.115 0.115 0.132 T 0.132 0.132 0.132
0.132 0.132 0.132 0.132 0.132 0.132 0.132 0.132 0.132 0.132 0.132 0.132 0.132 0.132 0.132 0.132 0.132 0.132 0.132 0.132 0.132 0.132 0.132 0.132 0.132 0.132 0.132 0.132 0.132 0.132 0.132
B
A
R 80
R
DIVISI 10 PEKERJAAN PEMELIHARAAN Realisasi Kontrak
A
CCO - 01 I
N

10 . 1 (1) Galian Tanah untuk Saluran Air dan Lereng M3 59,486.00 173.14 10,299,168.10 1.154 173.14 10,299,168.10 1.154 0.029 0.029 0.029 0.029 0.029 0.033 0.033 0.033 0.033 0.033 0.033 0.033 0.033 0.033 0.033 0.033 0.033 0.033 0.033 0.033 0.033 0.033 0.033 0.033 0.033 0.033 0.033 0.033 0.033 0.033 0.033 0.033 0.033 0.033 0.033 0.033 0.033 0.033 0.033 0.033
P
I
1 R
D
O 60
H
4 S
10 . 1 (3) Pasangan Batu Dengan Mortar M3 1,100,000.00 29.10 32,004,704.16 3.585 - - 0.000 0.090 0.090 0.090 0.090 0.090 U
E
L
3 S

10 . 1 (4) Lapis Pondasi Agregat Kelas A M3 655,260.00 124.81 81,782,630.67 9.161 124.81 81,782,630.67 9.161 0.229 0.229 0.229 0.229 0.229 F Rencana Kontrak
9
Realisasi Kontrak I Awal P 40
Awal T
H
10 . 1 (6) Lapis Pondasi Agregat Kelas S M3 590,556.00 110.45 65,226,910.20 7.306 110.45 65,226,910.20 7.306 0.183 0.183 0.183 0.183 0.183 0.209 0.209 0.209 0.209 0.209 0.209 R 0.209 0.209 0.209 0.209 0.209 0.209 0.209 0.209 0.209 0.209 0.209 0.209 0.209 0.209 0.209 0.209 0.209 0.209 0.209 0.209 0.209 0.209 0.209 0.209 0.209 0.209 0.209 0.209 0.209
H O
I

10 . 1 (8) Campuran Aspal Panas M3 3,250,722.00 147.05 478,018,297.82 53.545 156.90 510,023,001.98 57.130 1.339 1.339 1.339 1.339 1.339 0.102 0.102 0.102 0.102 0.102 0.102 1 0.102 0.102 0.102 0.102 0.102 0.102 0.102 0.102 0.102 0.102 0.102 0.102 0.102 0.102 0.102 0.102 0.102 0.102 0.102 0.102 0.102 0.102 0.102 0.102 0.102 0.102 0.102 0.102 0.102
4
4 20

10 . 1 (18) Pengendalian Tanaman Pada Rumija, 5 x Potong M2 824.00 171,920.00 141,662,080.00 15.868 171,920.00 141,662,080.00 15.868 0.397 0.397 0.397 0.397 0.397 0.362 0.362 0.362 0.362 0.362 0.362 1 0.362 0.362 0.362 0.362 0.362 0.362 0.362 0.362 0.362 0.362 0.362 0.362 0.362 0.362 0.362 0.362 0.362 0.362 0.362 0.362 0.362 0.362 0.362 0.362 0.362 0.362 0.362 0.362 0.362

H
10 . 1 (19) Pembersihan Drainase M' 8,949.00 4,765.00 42,641,985.00 4.777 4,765.00 42,641,985.00 4.777 0.119 0.119 0.119 0.119 0.119 0.101 0.101 0.101 0.101 0.101 0.101 0.101 0.101 0.101 0.101 0.101 0.101 0.101 0.101 0.101 0.101 0.101 0.101 0.101 0.101 0.101 0.101 0.101 0.101 0.101 0.101 0.101 0.101 0.101 0.101 0.101 0.101 0.101 0.101 0.101

JUMLAH NILAI PEKERJAAN TANPA PPN 892,743,275.95 100.000 892,743,275.95 100.000


CCO - 01
TANGGAL 06 APRIL
P P N 10% 89,274,327.60 89,274,327.60 2020
SPMK 06 FEBRUARI 2020 PHO 31 DESEMBER 2020 FHO 31 DESEMBER 2021
JUMLAH NILAI PEKERJAAN + PPN 982,017,603.55 982,017,603.55

DIBULATKAN 982,018,000.00 982,018,000.00

RENCANA MINGGUAN 0.000 0.000 0.000 2.500 2.500 2.500 2.500 2.500 2.500 2.500 2.500 2.500 2.500 2.500 0.000 0.000 2.500 2.500 2.500 2.500 2.500 2.500 2.500 2.500 2.500 2.500 2.500 2.500 2.500 2.500 2.500 2.500 2.500 2.500 2.500 2.500 2.500 2.500 2.500 2.500 2.500 2.500 2.500 2.500 2.500 0.000 0.000
FISIK RENCANA KONTRAK AWAL
RENCANA KUMULATIF 0 0.000 0.000 0.000 2.500 5.000 7.500 10.000 12.500 15.000 17.500 20.000 22.500 25.000 27.500 27.500 27.500 30.000 32.500 35.000 37.500 40.000 42.500 45.000 47.500 50.000 52.500 55.000 57.500 60.000 62.500 65.000 67.500 70.000 72.500 75.000 77.500 80.000 82.500 85.000 87.500 90.000 92.500 95.000 97.500 100.00 100.00 100.00

REALISASI MINGGUAN 0.000 0.000 0.000 1.811 7.602 53.792 3.831 0.119
FISIK REALISASI KONTRAK AWAL
REALISASI KUMULATIF - 0.000 0.000 0.000 1.811 9.413 63.205 67.035 67.154

RENCANA MINGGUAN 0 0.938 0.938 0.938 0.938 0.938 0.938 0.000 0.000 0.938 0.938 0.938 0.938 0.938 0.938 0.938 0.938 0.938 0.938 0.938 0.938 0.938 0.938 0.938 0.938 0.938 0.938 0.938 0.938 0.938 0.938 0.938 0.938 0.938 0.938 0.938 0.938 0.938 0.000 0.000
FISIK RENCANA CCO - 01
RENCANA KUMULATIF 0 67.154 68.092 69.031 69.969 70.908 71.846 72.785 72.785 72.785 73.723 74.662 75.600 76.538 77.477 78.415 79.354 80.292 81.231 82.169 83.108 84.046 84.985 85.923 86.862 87.800 88.738 89.677 90.615 91.554 92.492 93.431 94.369 95.308 96.246 97.185 98.123 99.062 100.00 100.00 100.00

REALISASI MINGGUAN 0.119 3.704 0.119 0.000 0.000 0.000 0.000 0.000 0.000 0.000
FISIK REALISASI CCO - 01
REALISASI KUMULATIF - 67.154 67.273 70.976 71.095 71.095 71.095 71.095 71.095 71.095 71.095 71.095

DEVIASI (+/-) 0.000 0.000 0.000 -0.689 4.413 55.705 57.035 54.654 -0.820 1.945 1.126 0.187 -0.751 -1.690 -1.690 -1.690 -2.628 -3.567
B

D
KONTRAK AWAL CONTRACT CHANGE ORDER (CCO - 01 2020
HARGA
SATUAN
H
MATA JUMLAH JUMLAH FEBRUARI MARET APRIL MEI JUNI JULI AGUSTUS SEPTEMBER OKTOBER NOVEMBER DESEMBER
SKALA
PEMBAYAR JENIS PEKERJAAN SAT BOBOT BOBOT
U %
AN KUANTITAS HARGA KUANTITAS HARGA 06 - 14 15 - 21 22 - 28 29 - 06 07 - 13 14 - 20 21 - 27 28 - 03 04 - 10 11 - 17 18 - 24 25 - 01 02 - 08 09 - 15 16 - 22 23 - 29 30 - 05 06 - 12 13 - 19 20 - 26 27 - 03 04 - 10 11 - 17 18 - 24 25 - 31 01 - 07 08 - 14 15 - 21 22 - 28 29 - 04 05 - 11 12 - 18 19 - 25 26 - 02 03 - 09 10 - 16 17 - 23 24 - 30 31 - 06 07 - 13 14 - 20 21 - 27 28 - 04 05 - 11 12 - 18 19 - 25 26 - 31
( Rp. )
(Rp.) (%) (Rp.) (%) 1 2 3 4 5 6 7 8 9 10 L
11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47

100
F
DIVISI 6 PERKERASAN ASPAL
I

6 . 1 (2a) Lapis Perekat - Aspal Cair/Emulsi Liter 14,488.00 809.66 11,730,346.59 0.714 807.45 11,698,335.60 0.712 0.071 0.071 0.071 0.071 0.071 0.071 0.071 0.071 0.071 0.071
T
Rencana Kontrak
R
6 . 3 (6a) Laston Lapis Antara (AC - BC) Ton 1,405,932.00 319.24 448,825,749.38 27.306 318.37 447,600,947.11 27.232 3.404 3.404 3.404 3.404 3.404 3.404 3.404 3.404 CCO - 01

I L 80

E
6 . 3 (8) Bahan Anti Pengelupasan Kg 100,000.00 46.29 4,628,938.93 0.282 44.57 4,457,124.00 0.271 0.030 0.030 0.030 0.030 0.030 0.030 0.030 0.030 0.030
B
1 A
DIVISI 9 PEKERJAAN HARIAN DAN PEKERJAAN LAIN - LAIN R
4 A
N
9 . 2 (1) Marka Jalan Thermoplastic M2 250,000.00 230.85 57,712,500.00 3.511 148.32 37,080,000.00 2.256 0.088 0.088 0.088 0.088 0.088 0.064 0.064 0.064 0.064 0.064 0.064 0.064 0.064 0.064 0.064 0.064 0.064 0.064 0.064 0.064 0.064 0.064 0.064 0.064 0.064 0.064 0.064 0.064 0.064 0.064 0.064 0.064 0.064 0.064 0.064 0.064 0.064 0.064 0.064 0.064
3 P
I
R 60

9 D
DIVISI 10 PEKERJAAN PEMELIHARAAN Realisasi Kontrak O
H
CCO - 01 S
U
E
H L
10 . 1 (1) Galian Tanah untuk Saluran Air dan Lereng M3 59,486.00 168.00 9,993,648.00 0.608 168.00 9,993,648.00 0.608 0.015 0.015 0.015 0.015 0.015 0.017 0.017 0.017 0.017 0.017 0.017 0.017 0.017 0.017 0.017 0.017 0.017 0.017 0.017 0.017 0.017 0.017 0.017 0.017 0.017 0.017 0.017 0.017 0.017 0.017 0.017 0.017 0.017 0.017 0.017 0.017 0.017 0.017 0.017 0.017 S

F
10 . 1 (3) Pasangan Batu Dengan Mortar M3 1,100,000.00 30.97 34,064,642.70 2.072 - - 0.000 0.052 0.052 0.052 0.052 0.052 I
P
T
H 40
R Rencana Kontrak
O
10 . 1 (4) Lapis Pondasi Agregat Kelas A M3 655,260.00 182.93 119,863,435.50 7.292 182.93 119,863,435.50 7.292 Realisasi Kontrak
0.182 0.182 0.182 0.182 0.182 I Awal
Awal
1
10 . 1 (4) Lapis Pondasi Agregat Kelas A M3 634,724.00 326.54 207,259,601.34 12.610 0.360 0.360 0.360 0.360 0.360 0.360 4 0.360 0.360 0.360 0.360 0.360 0.360 0.360 0.360 0.360 0.360 0.360 0.360 0.360 0.360 0.360 0.360 0.360 0.360 0.360 0.360 0.360 0.360 0.360 0.360 0.360 0.360 0.360 0.360 0.360

4
1
10 . 1 (6) Lapis Pondasi Agregat Kelas S M3 590,556.00 121.65 71,838,614.95 4.371 93.83 55,414,695.47 3.371 0.109 0.109 0.109 0.109 0.109 -0.595 -0.595 -0.595 -0.595 -0.595 -0.595 -0.595 -0.595 -0.595 -0.595 -0.595 -0.595 -0.595 -0.595 -0.595 -0.595 -0.595 -0.595 -0.595 -0.595 -0.595 -0.595 -0.595 -0.595 -0.595 -0.595 -0.595 -0.595 -0.595 -0.595 -0.595 -0.595 -0.595 -0.595 -0.595

H 20

10 . 1 (8) Campuran Aspal Panas M3 3,250,722.00 216.56 703,976,347.61 42.829 175.12 569,266,436.64 34.634 1.071 1.071 1.071 1.071 1.071 0.944 0.944 0.944 0.944 0.944 0.944 0.944 0.944 0.944 0.944 0.944 0.944 0.944 0.944 0.944 0.944 0.944 0.944 0.944 0.944 0.944 0.944 0.944 0.944 0.944 0.944 0.944 0.944 0.944 0.944 0.944 0.944 0.944 0.944 0.944

10 . 1 (18) Pengendalian Tanaman Pada Rumija, 5 x Potong M2 824.00 158,597.81 130,684,595.44 7.951 158,597.81 130,684,595.44 7.951 0.199 0.199 0.199 0.199 0.199 0.207 0.207 0.207 0.207 0.207 0.207 0.207 0.207 0.207 0.207 0.207 0.207 0.207 0.207 0.207 0.207 0.207 0.207 0.207 0.207 0.207 0.207 0.207 0.207 0.207 0.207 0.207 0.207 0.207 0.207 0.207 0.207 0.207 0.207 0.207

10 . 1 (19) Pembersihan Drainase M' 8,949.00 5,626.80 50,354,233.20 3.064 5,626.80 50,354,233.20 3.064 0.077 0.077 0.077 0.077 0.077 0.088 0.088 0.088 0.088 0.088 0.088 0.088 0.088 0.088 0.088 0.088 0.088 0.088 0.088 0.088 0.088 0.088 0.088 0.088 0.088 0.088 0.088 0.088 0.088 0.088 0.088 0.088 0.088 0.088 0.088 0.088 0.088 0.088 0.088 0.088
0

JUMLAH NILAI PEKERJAAN TANPA PPN 1,643,673,052.30 100.00 1,643,673,052.30 100.00


CCO - 01
TANGGAL 06 APRIL
P P N 10% 164,367,305.23 164,367,305.23
2020
SPMK 06 FEBRUARI 2020 PHO 31 DESEMBER 2020 FHO 31 DESEMBER 2021
JUMLAH NILAI PEKERJAAN + PPN 1,808,040,357.53 1,808,040,357.53

DIBULATKAN 1,808,040,000.00 1,808,040,000.00

RENCANA MINGGUAN 0.000 0.000 0.000 1.792 1.792 1.792 1.792 1.792 1.792 1.864 5.308 5.308 5.308 5.308 0.000 0.000 5.308 5.308 5.308 5.308 1.895 1.792 1.792 1.792 1.792 1.792 1.792 1.792 1.792 1.792 1.792 1.792 1.792 1.792 1.792 1.792 1.792 1.792 1.792 1.792 1.792 1.792 1.792 1.792 1.792 0.000 0.000
FISIK RENCANA KONTRAK AWAL
RENCANA KUMULATIF 0 0.000 0.000 0.000 1.792 3.585 5.377 7.170 8.962 10.755 12.619 17.927 23.235 28.544 33.852 33.852 33.852 39.161 44.469 49.777 55.086 56.981 58.773 60.566 62.358 64.151 65.943 67.736 69.528 71.321 73.113 74.906 76.698 78.490 80.283 82.075 83.868 85.660 87.453 89.245 91.038 92.830 94.623 96.415 98.208 100.00 100.00 100.00

REALISASI MINGGUAN 0.000 0.000 0.000 0.863 6.484 0.052 2.123 24.265
FISIK REALISASI KONTRAK AWAL
REALISASI KUMULATIF - 0.000 0.000 0.000 0.863 7.347 7.399 9.522 33.787

RENCANA MINGGUAN 1.086 1.157 4.591 4.591 4.591 4.591 0.000 0.000 4.591 4.591 4.591 4.591 1.187 1.086 1.086 1.086 1.086 1.086 1.086 1.086 1.086 1.086 1.086 1.086 1.086 1.086 1.086 1.086 1.086 1.086 1.086 1.086 1.086 1.086 1.086 1.086 1.086 0.000 0.000
FISIK RENCANA CCO - 01
RENCANA KUMULATIF 0 33.787 34.873 36.030 40.621 45.212 49.803 54.394 54.394 54.394 58.985 63.575 68.166 72.757 73.944 75.030 76.116 77.201 78.287 79.373 80.458 81.544 82.629 83.715 84.801 85.886 86.972 88.058 89.143 90.229 91.315 92.400 93.486 94.572 95.657 96.743 97.829 98.914 100.00 100.00 100.00

REALISASI MINGGUAN 0.069 13.987 7.766 0.000 0.000 0.000 0.000 0.000 0.000 0.000
FISIK REALISASI CCO - 01
REALISASI KUMULATIF - 33.787 33.857 47.844 55.609 55.609 55.609 55.609 55.609 55.609 55.609 55.609

DEVIASI (+/-) 0.000 0.000 0.000 -0.929 3.762 2.022 2.353 24.825 -1.016 11.814 14.989 10.398 5.807 1.216 1.216 1.216 -3.375 -7.966
B

I
KONTRAK AWAL CONTRACT CHANGE ORDER (CCO - 01 2020
HARGA D
SATUAN
MATA JUMLAH JUMLAH FEBRUARI MARET APRIL MEI JUNI JULI AGUSTUS SEPTEMBER OKTOBER NOVEMBER DESEMBER
H SKALA
PEMBAYAR JENIS PEKERJAAN SAT BOBOT BOBOT
%
AN KUANTITAS HARGA KUANTITAS HARGA 06 - 14 15 - 21 22 - 28 29 - 06 07 - 13 14 - 20 21 - 27 28 - 03 04 - 10 11 - 17 18U- 24 25 - 01 02 - 08 09 - 15 16 - 22 23 - 29 30 - 05 06 - 12 13 - 19 20 - 26 27 - 03 04 - 10 11 - 17 18 - 24 25 - 31 01 - 07 08 - 14 15 - 21 22 - 28 29 - 04 05 - 11 12 - 18 19 - 25 26 - 02 03 - 09 10 - 16 17 - 23 24 - 30 31 - 06 07 - 13 14 - 20 21 - 27 28 - 04 05 - 11 12 - 18 19 - 25 26 - 31
( Rp. )
(Rp.) (%) (Rp.) (%) 1 2 3 4 5 6 7 8 9 10 L
11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47

100
F
L
DIVISI 10 PEKERJAAN PEMELIHARAAN
I E
B
T A
R 80
R A
N
10 . 2 (1) Pemeliharaan Kinerja Jembatan Jambu (Pal V) bentang 10.4 m Ls 9,184,978.40 1.00 9,184,978.40 15.362 1.00 9,184,978.40 15.362 I 0.496 0.496 0.496 0.496 0.496 0.496 0.496 0.496 0.496 0.496 0.496 0.496 0.496 0.496 0.496 0.496 0.496 0.496 0.496 0.496 0.496 0.496 0.496 0.496 0.496 0.496 0.496 0.496 0.496 0.496 0.496
P
I
R
D Rencana Kontrak
1 O
H CCO - 01 60
S
U
4 E
L
10 . 2 (2) Pemeliharaan Kinerja Jembatan Tuan bentang 36.3 m Ls 32,059,107.30 1.00 32,059,107.30 53.619 1.00 32,059,107.30 53.619 1.730 1.730 1.730 1.730 1.730 1.730 1.730 1.730 1.730 1.730 1.730 1.730 1.730 1.730 1.730 1.730 1.730 1.730 1.730 1.730 1.730 1.730 1.730 1.730 1.730 1.730 1.730 1.730 1.730 1.730 1.730 S
3 F
I
9 P 40
T
H
R
O
10 . 2 (3) Pemeliharaan Kinerja Jembatan Rutin Udang bentang 11 m Ls 9,714,881.00 1.00 9,714,881.00 16.248 1.00 9,714,881.00 16.248 0.524 0.524 I 0.524 0.524 0.524 0.524 0.524 0.524 0.524 0.524 0.524 0.524 0.524 0.524 0.524 0.524 0.524 0.524 0.524 0.524 0.524 0.524 0.524 0.524 0.524 0.524 0.524 0.524 0.524 0.524 0.524
H
1
4 20

4
1
10 . 2 (4) Pemeliharaan Kinerja Jembatan Belidang bentang 10 m Ls 8,831,710.00 1.00 8,831,710.00 14.771 1.00 8,831,710.00 14.771 0.476 0.476 Rencana
0.476 0.476 0.476 0.476 0.476 0.476 0.476 0.476 Kontrak
0.476 0.476 0.476 0.476 0.476 0.476 0.476 0.476 0.476 0.476 0.476 0.476 0.476 0.476 0.476 0.476 0.476 0.476 0.476 0.476 0.476
H Awal

JUMLAH NILAI PEKERJAAN TANPA PPN 59,790,676.70 100.00 59,790,676.70 100.00

CCO - 01
TANGGAL 06 APRIL 2020
P P N 10% 5,979,067.67 5,979,067.67

SPMK 06 FEBRUARI 2020 PHO 31 DESEMBER 2020 FHO 31 DESEMBER 2021

JUMLAH NILAI PEKERJAAN + PPN 65,769,744.37 65,769,744.37

DIBULATKAN 65,769,000.00 65,769,000.00

RENCANA MINGGUAN 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 3.226 3.226 0.000 0.000 3.226 3.226 3.226 3.226 3.226 3.226 3.226 3.226 3.226 3.226 3.226 3.226 3.226 3.226 3.226 3.226 3.226 3.226 3.226 3.226 3.226 3.226 3.226 3.226 3.226 3.226 3.226 3.226 3.226 0.000 0.000
FISIK RENCANA KONTRAK AWAL
RENCANA KUMULATIF 0 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 3.226 6.452 6.452 6.452 9.677 12.903 16.129 19.355 22.581 25.806 29.032 32.258 35.484 38.710 41.935 45.161 48.387 51.613 54.839 58.065 61.290 64.516 67.742 70.968 74.194 77.419 80.645 83.871 87.097 90.323 93.548 96.774 100.00 100.00 100.00

REALISASI MINGGUAN 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000
FISIK REALISASI KONTRAK AWAL
REALISASI KUMULATIF - 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000

RENCANA MINGGUAN 0.000 0.000 0.000 0.000 3.226 3.226 0.000 0.000 3.226 3.226 3.226 3.226 3.226 3.226 3.226 3.226 3.226 3.226 3.226 3.226 3.226 3.226 3.226 3.226 3.226 3.226 3.226 3.226 3.226 3.226 3.226 3.226 3.226 3.226 3.226 3.226 3.226 0.000 0.000
FISIK RENCANA CCO - 01
RENCANA KUMULATIF 0 0.000 0.000 0.000 0.000 3.226 6.452 6.452 6.452 9.677 12.903 16.129 19.355 22.581 25.806 29.032 32.258 35.484 38.710 41.935 45.161 48.387 51.613 54.839 58.065 61.290 64.516 67.742 70.968 74.194 77.419 80.645 83.871 87.097 90.323 93.548 96.774 100.00 100.00 100.00

REALISASI MINGGUAN 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000
FISIK REALISASI CCO - 01
REALISASI KUMULATIF - 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000

DEVIASI (+/-) 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 -3.226 -6.452 -6.452 -6.452 -9.677 ######
STRIPMAP :
Preservasi Jln. Sp. Tuan – Bts. Kab. Muara Jambi- Sp. Tiga Batara Gas Plant (Pematang Lumut)
STRIPMAP :
Preservasi Jln. Sp. Tuan – Bts. Kab. Muara Jambi- Sp. Tiga Batara Gas Plant (Pematang Lumut)
STRIPMAP :
Preservasi Jln. Sp. Tuan – Bts. Kab. Muara Jambi- Sp. Tiga Batara Gas Plant (Pematang Lumut)
TYPICAL :
Preservasi Jln. Sp. Tuan – Bts. Kab. Muara Jambi- Sp. Tiga Batara Gas Plant (Pematang Lumut)
TYPICAL :
Preservasi Jln. Sp. Tuan – Bts. Kab. Muara Jambi- Sp. Tiga Batara Gas Plant (Pematang Lumut)
TYPICAL :
Preservasi Jln. Sp. Tuan – Bts. Kab. Muara Jambi- Sp. Tiga Batara Gas Plant (Pematang Lumut)
TYPICAL :
Preservasi Jln. Sp. Tuan – Bts. Kab. Muara Jambi- Sp. Tiga Batara Gas Plant (Pematang Lumut)
TYPICAL :
Preservasi Jln. Sp. Tuan – Bts. Kab. Muara Jambi- Sp. Tiga Batara Gas Plant (Pematang Lumut)
TYPICAL :
Preservasi Jln. Sp. Tuan – Bts. Kab. Muara Jambi- Sp. Tiga Batara Gas Plant (Pematang Lumut)
DOKUMENTASI :

Preservasi Jln. Sp. Tuan – Bts. Kab. Muara Jambi- Sp. Tiga Batara Gas Plant (Pematang Lumut)
DOKUMENTASI :

Preservasi Jln. Sp. Tuan – Bts. Kab. Muara Jambi- Sp. Tiga Batara Gas Plant (Pematang Lumut)
DOKUMENTASI :

Preservasi Jln. Sp. Tuan – Bts. Kab. Muara Jambi- Sp. Tiga Batara Gas Plant (Pematang Lumut)
DOKUMENTASI :

Preservasi Jln. Sp. Tuan – Bts. Kab. Muara Jambi- Sp. Tiga Batara Gas Plant (Pematang Lumut)
LOKASI PEKERJAAN :
Preservasi Jln. Sp. Tiga Batara Gas Plan (Pematang Lumut) – Kuala Tungkal dan Jalan Dlm Kota
Tungkal
2. Ruas Jalan : 30 , 30.11K, 30.12K dan 30.13K (SKPD)
1. Preservasi Pemeliharaan Rutin Jalan (A) = 38,76 Km
a. Pemeliharaan Rutin Jalan = 2,01 Km
b. Pemeliharaan Rutin Kondisi Jalan = 2,70 Km
c. Holding = 34,05 Km
2. Preservasi Rekonstruksi, Rehabilitasi Jalan (B) = 1,10 Km
a. Rehabilitasi Mayor Jalan = 1,10 Km
3. Preservasi Rutin Jembatan (C) = 295.5 m
a. Pemeliharaan Rutin Jembatan = 295.5 m
4. Layanan Dukungan Administrasi Satker (D) = 12 Bulan
a. Layanan Dukungan Administrasi Satker = 12 Bulan

 Nomor Kontrak : KU.02.09/PPK3.1/SKPD-BM/094/2020


 Tanggal Kontrak : 30 Januari 2020
 Waktu Pelaksanaan Pemeliharaan Rutin Jalan : 336 (Tiga Ratus Tiga Puluh Enam) Hari Kalender
 Waktu Pelaksanaan Rehabilitasi Mayor : 105 (Seratus Lima) Hari Kalender
 Waktu Pelaksanaan Pemeliharaan Rutin jembatan : 336 (Tiga ratus tiga puluh Enam) Hari Kalender
 Penyedia Jasa : PT. PIRAMID ANUGRAH NUSANTARA
PROGRES PEKERJAAN :
Preservasi Jln. Sp. Tiga Batara Gas Plan (Pematang Lumut) – Kuala Tungkal dan Jalan Dlm Kota
Tungkal

Tanggal 06 Juni– 12 Juni 2020

Renc. 74.414
Induk
Real 90.700
Dev. 16.286
Renc. 39.275
Rutin Jalan
Real 51.374
Dev. 12.098
Renc. 49.770
Jembatan
Real. 100
Dev. 50.230
PROGRES PEKERJAAN :
Preservasi Jln. Sp. Tiga Batara Gas Plan (Pematang Lumut) – Kuala Tungkal dan Jalan Dlm Kota
Tungkal

Tanggal 06 Juni -12 Juni 2020

Renc. 56.383
Rutin Kondisi Real 90.327
Dev. 33.943
Renc. 59.735
Holding Real. 84.656
Dev. 24.921
U

KONTRAK AWAL ADDENDUM 01 H 2020


HARGA
MATA SATUAN
JUMLAH JUMLAH JAN - FEBRUARI MARET APRIL MEI JUNI JULI AGUSTUS SEPTEMBER OKTOBER NOVEMBER DESEMBER
SKALA
PEMBAYAR JENIS PEKERJAAN SAT BOBOT BOBOT U
%
AN KUANTITAS HARGA KUANTITAS HARGA 31 - 07 08 - 14 15 - 21 22 - 28 29 - 06 07 - 13 14 - 20 21 - 27 28 - 03 04 - 10 11 - 17 18 - 24 25 - 01 02 - 08 09 - 15 16 - 22 23 - 29 30 - 05 06 - 12 13 - 19 20 - 26 27 - 03 04 - 10 11 - 17 18 - 24 25 - 31 01 - 07 08 - 14 15 - 21 22 - 28 29 - 04 05 - 11 12 - 18 19 - 25 26 - 02 03 - 09 10 - 16 17 - 23 24 - 30 31 - 06 07 - 13 14 - 20 21 - 27 28 - 04 05 - 11 12 - 18 19 - 25 26 - 31
( Rp. )
(Rp.) (%) (Rp.) (%) 1 2 3 4 5 6 7 8 9 10 11
L
12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 48

DIVISI 1 UMUM F 100

1.2 Mobilisasi Ls 222,850,000.00 1.00 222,850,000.00 2.421 1.00 222,850,000.00 2.421 0.053 0.053 0.053 0.053 0.053 0.053 0.029 0.029 0.029 0.029 0.029 0.029 0.029 0.029 0.029 0.029 0.029 0.029 0.029 0.029 0.029 0.029 0.029 0.029 0.029 0.029 0.029 0.029 0.029 0.029 0.029 0.029 0.029 0.029 0.029 0.029 0.029 0.029 0.029 0.029 0.029 0.029 0.029 0.029
I
1 . 8 (1) Manajemen dan Keselamatan Lalu Lintas Ls 32,600,000.00 1.00 32,600,000.00 0.354 1.00 32,600,000.00 0.354 0.008 0.008 0.008 0.008 0.008 0.008 0.009 Realisasi
0.009 0.009CC0
0.009 0.009 0.009 0.009 0.009 0.009 0.009 0.009 0.009 0.009 0.009 0.009 0.009 0.009 0.009 0.009 0.009 0.009 0.009 0.009 0.009 0.009 0.009 0.009 0.009 0.009 0.009 0.009 0.009 0.009 0.009 0.009 0.009 0.009 0.009
T
1 . 17 Pengamanan Lingkungan Hidup Ls 35,550,000.00 1.00 35,550,000.00 0.386 1.00 35,550,000.00 0.386 0.009 0.009 0.009 0.009 0.009 0.009 0.009 0.009 0.009 0.009 0.009 0.009 0.009 0.009 0.009 0.009 0.009 0.009 0.009 0.009 0.009 0.009 0.009 0.009 0.009 0.009 0.009 0.009 0.009 0.009 0.009 0.009 0.009 0.009 0.009 0.009 0.009 0.009 0.009 0.009 0.009 0.009 0.009 0.009

1 . 19 Keselamatan dan Kesehatan Kerja Ls 169,750,000.00 1.00 169,750,000.00 1.844 1.00 169,750,000.00 1.844 0.042 0.042 0.042 0.042 0.042 0.042 0.028 0.028 0.028 0.028 0.028 0.028
R 0.028 0.028 0.028 L 0.028 0.028 0.028 0.028 0.028 0.028 0.028 0.028 0.028 0.028 0.028 0.028 0.028 0.028 0.028 0.028 0.028 0.028 0.028 0.028 0.028 0.028 0.028 0.028 0.028 0.028 0.028 0.028 0.028

DIVISI 2 DRAINASE Rencana


I E Addendum 01
2 . 1 (1) Galian Untuk Saluran Air M3 50,708.00 2,036.35 103,259,235.80 1.122 80.00 4,056,640.00 0.044 0.007 0.007 0.007 0.007 0.007 0.007

2 . 2 (1) Pasangan Batu Dengan Mortar M3 1,121,224.00 585.45 656,420,590.80 7.132 41.00 45,970,184.00 0.499 0.083 0.083 0.083 0.083 0.083 0.083 B

DIVISI 3 PEKERJAAN TANAH DAN GEOSINTETIK


1 80
A
3 . 1 (1) Galian Biasa M3 50,000.00 371.25 18,562,500.00 0.202 - - 0.000 0.000 0.000 0.000 4
3 . 1 (7) Galian Perkerasan Beraspal Dengan Cold Milling Machine M3 555,543.00 70.00 38,888,010.00 0.423 70.00 38,888,010.00 0.423 0.010 0.010 0.010 0.010 0.010 0.010 0.011 0.011 0.011 0.011 0.011 0.011 0.011 0.011 0.011
R 0.011 0.011 0.011 0.011 0.011 0.011 0.011 0.011 0.011 0.011 0.011 0.011 0.011 0.011 0.011 0.011 0.011 0.011 0.011 0.011 0.011 0.011 0.011 0.011 0.011 0.011 0.011 0.011 0.011
3 P
3 . 1 (8) Galian Perkerasan Beraspal Tanpa Cold Milling Machine M3 246,232.00 49.50 12,188,484.00 0.132 46.78 11,517,702.23 0.125 0.042 0.042 0.042 A
3 . 2 (1a) Timbunan Biasa dari Sumber Galian M3 221,094.00 880.00 194,562,720.00 2.114 911.67 201,564,766.98 2.190 0.438 0.438 0.438 0.438 0.438 0.025 0.025 0.025 9
N
3 . 3 (1) Penyiapan Badan Jalan M2 3,500.00 3,300.00 11,550,000.00 0.125 3,300.00 11,550,000.00 0.125 0.042 0.042 0.042 R
DIVISI 5 PERKERASAN BERBUTIR DAN PERKERASAN BETON SEMEN H
5 . 1 (3) Lapis Pondasi Agregat Kelas S M3 700,000.00 495.00 346,500,000.00 3.765 635.12 444,583,601.39 4.831 0.355 0.355 0.355
I Rencana O
Kontrak Awal
DIVISI 6 PERKERASAN ASPAL D 60

6 . 1 (2a) Lapis Perekat - Aspal Cair/Emulsi Liter 16,000.00 2,965.00 47,440,000.00 0.515 3,407.02 54,512,355.65 0.592 0.085 0.027 0.027 0.027 0.027 0.027 0.027
S
H
6 . 3 (5a) Laston Lapis Aus (AC - WC) Ton 1,749,320.00 455.40 796,640,328.00 8.656 586.98 1,026,814,923.33 11.157 0.417 0.417 0.417 0.417 0.417 0.417

6 . 3 (6a) Laston Lapis Antara (AC - BC) Ton 1,677,904.00 876.30 1,470,347,275.20 15.976 961.85 1,613,896,408.83 17.536 2.923 1.016 1.016 1.016 1.016 1.016 U
E
6 . 3 (8) Bahan Anti Pengelupasan Kg 100,000.00 582.47 58,246,700.00 0.633 220.12 22,011,574.92 0.239 0.034 0.010 0.010 0.010 0.010 0.010 0.010
L
DIVISI 9 PEKERJAAN HARIAN DAN PEKERJAAN LAIN - LAIN
S
9 . 2 (1) Marka Jalan Thermoplastic M2 331,708.00 2,418.03 802,080,152.30 8.715 3,232.10 1,072,111,948.86 11.649 0.265 0.265 0.265 0.265 0.265 0.265 0.307 0.307 0.307 0.307 0.307 0.307 0.307 0.307 0.307 0.307 0.307 0.307 0.307 0.307 0.307 0.307 0.307 0.307 0.307 0.307 0.307 0.307 0.307 0.307 0.307 0.307 0.307 0.307 0.307 0.307 0.307 0.307 0.307 0.307 0.307 0.307 0.307 0.307
F
DIVISI 10 PEKERJAAN PEMELIHARAAN

10 . 1 (1) Galian Tanah untuk Saluran Air dan Lereng M3 70,000.00 290.56 20,339,474.12 0.221 290.56 20,339,474.12 0.221 0.005 0.005 0.005 0.005 0.005 0.005 0.006 0.006 0.006 0.006 0.006 0.006 0.006 0.006 0.006 I 0.006 0.006 0.006 0.006 0.006 0.006 0.006 0.006 0.006 0.006 0.006 0.006 0.006 0.006 0.006 0.006 0.006 0.006 0.006 0.006 0.006 0.006 0.006 0.006 0.006 0.006 0.006 0.006 0.006
40
10 . 1 (2) Timbunan Pilihan untuk Lereng Tepi Saluran M3 330,000.00 990.00 326,700,000.00 3.550 198.71 65,574,300.00 0.712 0.016 0.016 0.016 0.016 0.016 0.016 0.019 0.019 0.019 0.019 0.019 0.019 0.019 0.019 0.019 0.019 0.019 0.019 0.019 0.019 0.019 0.019 0.019 0.019 0.019 0.019 0.019 0.019 0.019 0.019 0.019 0.019 0.019 0.019 0.019 0.019 0.019 0.019 0.019 0.019 0.019 0.019 0.019 0.019
T
10 . 1 (3) Pasangan Batu Dengan Mortar M3 1,386,124.00 198.73 275,464,422.53 2.993 35.04 48,572,631.61 0.528 0.012 0.012 0.012 0.012 0.012 0.012 0.014 0.014 0.014 0.014 0.014 0.014 0.014 0.014 0.014 0.014 0.014 0.014 0.014 0.014 0.014 0.014 0.014 0.014 0.014 0.014 0.014 0.014 0.014 0.014 0.014 0.014 0.014 0.014 0.014 0.014 0.014 0.014 0.014 0.014 0.014 0.014 0.014 0.014 P

10 . 1 (4) Lapis Pondasi Agregat Kelas A M3 916,443.00 305.03 279,543,968.16 3.037 519.58 476,167,057.72 5.174 0.118 0.118 0.118 0.118 0.118 0.118 0.059 0.059 0.059 0.059 0.059 0.059 0.059 0.059 0.059 R 0.059 0.059 0.059 0.059 0.059 0.059 0.059 0.059 0.059 0.059 0.059 0.059 0.059 0.059 0.059 0.059 0.059 0.059 0.059 0.059 0.059 0.059 0.059 0.059 0.059 0.059 0.059 0.059 0.059

10 . 1 (6) Lapis Pondasi Agregat Kelas S M3 730,000.00 458.91 335,006,688.50 3.640 307.56 224,521,188.50 2.440 0.055 0.055 0.055 0.055 0.055 0.055 0.005 0.005 0.005 0.005 0.005 0.005 0.005 0.005 0.005 0.005 0.005 0.005 0.005 0.005 0.005 0.005 0.005 0.005 0.005 0.005 0.005 0.005 0.005 0.005 0.005 0.005 0.005 0.005 0.005 0.005 0.005 0.005 0.005 0.005 0.005 0.005 0.005 0.005 H
I
10 . 1 (8) Campuran Aspal Panas M3 4,008,142.00 537.38 2,153,878,946.64 23.403 655.04 2,625,508,513.70 28.527 0.648 0.648 0.648 0.648 0.648 0.648 0.285 0.285 0.285 0.285 0.285 0.285 0.285 0.285 0.285 0.285 0.285 0.285 0.285 0.285 0.285 0.285 0.285 0.285 0.285 0.285 0.285 0.285 0.285 0.285 0.285 0.285 0.285 0.285 0.285 0.285 0.285 0.285 0.285 0.285 0.285 0.285 0.285 0.285

10 . 1 (18) Pengendalian Tanaman Pada Rumija, 5 x Potong M2 957.00 369,663.81 353,768,263.29 3.844 312,587.50 299,146,237.50 3.250 0.074 0.074 0.074 0.074 0.074 0.074 0.067 0.067 0.067 0.067 0.067 0.067 0.067 0.067 0.067 0.067 0.067 0.067 0.067 0.067 0.067 0.067 0.067 0.067 0.067 0.067 0.067 0.067 0.067 0.067 0.067 0.067 0.067 0.067 0.067 0.067 0.067 0.067 0.067 0.067 0.067 0.067 0.067 0.067 O
1
10 . 1 (19) Pembersihan Drainase M' 6,727.00 27,730.69 186,544,326.07 2.027 26,850.69 180,624,566.07 1.963 0.045 0.045 0.045 0.045 0.045 0.045 0.051 0.051 0.051 0.051 0.051 0.051 0.051 0.051 0.051 0.051 0.051 0.051 0.051 0.051 0.051 0.051 0.051 0.051 0.051 0.051 0.051 0.051 0.051 0.051 0.051 0.051 0.051 0.051 0.051 0.051 0.051 0.051 0.051 0.051 0.051 0.051 0.051 0.051

10 . 2 (1) Pemeliharaan Kinerja Jembatan Mahang (bentang 10.8 m) Ls 9,312,667.20 1.00 9,312,667.20 0.101 1.00 9,312,667.20 0.101 0.002 0.002 0.002 0.002 0.002 0.002 4
20
10 . 2 (2) Pemeliharaan Kinerja Jembatan Teluk Serdang (bentang 61.3 m) Ls 52,858,009.20 1.00 52,858,009.20 0.574 1.00 52,858,009.20 0.574 0.013 0.013 0.013 0.013 0.013 0.013 0.015 0.015 0.015 0.015 0.015 0.015 0.015 0.015 0.015 0.015 0.015 0.015 0.015 0.015 0.015 0.015 0.015 0.015 0.015 0.015 0.015 0.015 0.015 0.015 0.015 0.015 0.015 0.015 0.015 0.015 0.015 0.015 0.015 0.015 0.015 0.015 0.015 0.015
4
10 . 2 (3) Pemeliharaan Kinerja Jembatan Parit Empat (bentang 10.8 m) Ls 9,312,667.20 1.00 9,312,667.20 0.101 1.00 9,312,667.20 0.101 0.002 0.002 0.002 0.002 0.002 0.002

10 . 2 (4) Pemeliharaan Kinerja Jembatan Parit Enam (bentang 10.8 m) Ls 9,312,667.20 1.00 9,312,667.20 0.101 1.00 9,312,667.20 0.101 0.002 0.002 0.002 0.002 0.002 0.002 0.003 0.003 0.003 0.003 0.003 0.003 0.003 0.003 0.003 1 0.003 0.003 0.003 0.003 0.003 0.003 0.003 0.003 0.003 0.003 0.003 0.003 0.003 0.003 0.003 0.003 0.003 0.003 0.003 0.003 0.003 0.003 0.003 0.003 0.003 0.003 0.003 0.003 0.003

10 . 2 (5) Pemeliharaan Kinerja Jembatan Parit Tujuh (bentang 10.8 m) Ls 9,312,667.20 1.00 9,312,667.20 0.101 1.00 9,312,667.20 0.101 0.002 0.002 0.002 0.002 0.002 0.002 0.003 0.003 0.003 0.003 0.003 0.003 0.003 0.003 0.003 0.003 0.003 0.003 0.003 0.003 0.003 0.003 0.003 0.003 0.003 0.003 0.003 0.003 0.003 0.003 0.003 0.003 0.003 0.003 0.003 0.003 0.003 0.003 0.003 0.003 0.003 0.003 0.003 0.003

10 . 2 (6) Pemeliharaan Kinerja Jembatan Parit Delapan (bentang 10.8 m) Ls 9,312,667.20 1.00 9,312,667.20 0.101 1.00 9,312,667.20 0.101 0.002 0.002 0.002 0.002 0.002 0.002 0.003 0.003 0.003
Realisasi 0.003 0.003
Kontrak 0.003 0.003 0.003 0.003 H 0.003 0.003 0.003 0.003 0.003 0.003 0.003 0.003 0.003 0.003 0.003 0.003 0.003 0.003 0.003 0.003 0.003 0.003 0.003 0.003 0.003 0.003 0.003 0.003 0.003 0.003 0.003 0.003 0.003

10 . 2 (7) Pemeliharaan Kinerja Jembatan Pembengis (bentang 65 m) Ls 56,048,460.00 1.00 56,048,460.00 0.609 1.00 56,048,460.00 0.609 0.014 0.014 0.014 0.014 0.014 0.014 Awal
10 . 2 (8) Pemeliharaan Kinerja Jembatan Parit Gompong (bentang 17.9 m) Ls 15,434,883.60 1.00 15,434,883.60 0.168 1.00 15,434,883.60 0.168 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004

10 . 2 (9) Pemeliharaan Kinerja Jembatan A Beram Kecil (bentang 40.3 m) Ls 34,750,045.20 1.00 34,750,045.20 0.378 1.00 34,750,045.20 0.378 0.009 0.009 0.009 0.009 0.009 0.009 0.010 0.010 0.010 0.010 0.010 0.010 0.010 0.010 0.010 0.010 0.010 0.010 0.010 0.010 0.010 0.010 0.010 0.010 0.010 0.010 0.010 0.010 0.010 0.010 0.010 0.010 0.010 0.010 0.010 0.010 0.010 0.010 0.010 0.010 0.010 0.010 0.010 0.010

10 . 2 (10) Pemeliharaan Kinerja Jembatan B Parit Beram Kecil (bentang 57 m) Ls 49,150,188.00 1.00 49,150,188.00 0.534 1.00 49,150,188.00 0.534 0.012 0.012 0.012 0.012 0.012 0.012 0.014 0.014 0.014 0.014 0.014 0.014 0.014 0.014 0.014 0.014 0.014 0.014 0.014 0.014 0.014 0.014 0.014 0.014 0.014 0.014 0.014 0.014 0.014 0.014 0.014 0.014 0.014 0.014 0.014 0.014 0.014 0.014 0.014 0.014 0.014 0.014 0.014 0.014 0

JUMLAH NILAI PEKERJAAN TANPA PPN 9,203,487,007.41 100.000 9,203,487,007.41 100.000

P P N 10% 920,348,700.74 920,348,700.74


SPMK 31 JANUARI 2020 PHO 31 DESEMBER 2020 FHO 31 DESEMBER 2021
JUMLAH NILAI PEKERJAAN + PPN 10,123,835,708.15 10,123,835,708.15

DIBULATKAN 10,123,835,000.00 10,123,835,000.00

RENCANA MINGGUAN 0 1.353 1.929 1.929 1.929 1.775 4.602 5.622 5.809 6.998 6.998 6.998 6.029 3.670 3.671 1.353 0.000 0.000 1.353 1.353 1.353 1.353 1.353 1.353 1.353 1.353 1.353 1.353 1.353 1.353 1.353 1.353 1.353 1.353 1.353 1.353 1.353 1.353 1.353 1.353 1.353 1.353 1.353 1.353 1.353 1.353 1.463 0.000 0.000
FISIK RENCANA KONTRAK AWAL
RENCANA KUMULATIF 0 1.353 3.281 5.210 7.139 8.914 13.516 19.138 24.947 31.945 38.943 45.940 51.970 55.639 59.310 60.663 60.663 60.663 62.015 63.368 64.721 66.073 67.426 68.779 70.131 71.484 72.837 74.189 75.542 76.894 78.247 79.600 80.952 82.305 83.658 85.010 86.363 87.716 89.068 90.421 91.774 93.126 94.479 95.832 97.184 98.537 100.00 100.00 100.00

RENCANA MINGGUAN 1.503 1.917 9.823 35.344 2.108 3.802


FISIK REALISASI KONTRAK AWAL
RENCANA KUMULATIF 0 1.503 3.420 13.243 48.587 50.695 54.497

RENCANA MINGGUAN 2.444 2.451 2.534 2.509 2.509 1.848 1.393 1.386 0.948 0.000 0.000 0.948 0.948 0.948 0.948 0.948 0.948 0.948 0.948 0.948 0.948 0.948 0.948 0.948 0.948 0.948 0.948 0.948 0.948 0.948 0.948 0.948 0.948 0.948 0.948 0.948 0.948 0.948 0.948 0.948 0.00 0.00
FISIK RENCANA ADDENDUM 01
RENCANA KUMULATIF 0 54.497 56.941 59.392 61.926 64.435 66.944 68.792 70.185 71.571 72.519 72.519 72.519 73.467 74.414 75.362 76.309 77.257 78.205 79.152 80.100 81.048 81.995 82.943 83.890 84.838 85.786 86.733 87.681 88.629 89.576 90.52 91.47 92.42 93.37 94.31 95.26 96.21 97.16 98.10 99.05 100.00 100.00 100.00

REALISASI MINGGUAN 18.469 0.000 0.000 0.000 16.196 0.000 0.000 1.537 0.000 0.000 0.000 0.000 0.000
FISIK REALISASI ADDENDUM 01
REALISASI KUMULATIF - 54.497 72.966 72.966 72.966 72.966 89.163 89.163 89.163 90.700 90.700 90.700 90.700 90.700 90.700

DEVIASI (+/-) 0.150 0.138 8.033 41.448 41.781 40.981 16.026 13.575 11.040 8.531 22.219 20.371 18.977 19.129 18.181 18.181 18.181 17.234 16.286
U

KONTRAK AWAL ADDENDUM 01 D 2020


HARGA
SATUAN
MATA JUMLAH JUMLAH JAN - FEBRUARI MARET APRILH MEI JUNI JULI AGUSTUS SEPTEMBER OKTOBER NOVEMBER DESEMBER
SKALA
PEMBAYAR JENIS PEKERJAAN SAT BOBOT BOBOT
%
AN KUANTITAS HARGA KUANTITAS HARGA U ###### ###### ###### ###### ###### ###### ###### ###### ###### ###### ###### ###### ###### ###### ###### ###### ###### ###### ###### ###### ###### ###### ###### ###### ###### ###### ###### ###### ###### ###### ###### ###### ###### ###### ###### ######
###### ###### ###### ###### ###### ###### ###### ###### ###### ###### ###### ######
( Rp. )
(Rp.) (%) (Rp.) (%) 1 2 3 4 5 6 7 8 9 10 11 L
12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 48

100
F
L
DIVISI 10 PEKERJAAN PEMELIHARAAN E
I
B
P
A
T Rencana
R
R 80
10 . 1 (1) Galian Tanah untuk Saluran Air dan Lereng M3 70,000.00 31.20 2,184,000.00 4.697 31.20 2,184,000.00 4.697 0.107 0.107 0.107 0.107 0.107 0.107 0.124 0.124 0.124 0.124 0.124 0.124 0.124 0.124 0.124 A 0.124 0.124 0.124 0.124 0.124 Kontrak
0.124 0.124CCO
0.124 0.124 0.124 0.124 0.124 0.124 0.124 0.124 0.124 0.124 0.124 0.124 0.124 0.124 0.124 0.124 0.124 0.124 0.124 0.124 0.124 0.124
R
N
O
Realisasi I
I
10 . 1 (3) Pasangan Batu Dengan Mortar M3 1,386,124.00 6.05 8,388,896.85 18.040 6.05 8,388,896.85 18.040 0.410 0.410 0.410 0.410 0.410 0.410 0.475 0.475Kontrak CCO0.475 0.475 0.475 0.475 0.475
0.475 0.475 0.475 0.475 0.475 0.475 0.475 0.475 0.475 0.475 0.475 0.475 0.475 0.475 0.475 0.475 0.475 0.475 0.475 0.475 0.475 0.475 0.475 0.475 0.475 0.475 0.475 0.475 0.475 0.475 0.475 S
D
H 60
1 E
U
L
10 . 1 (6) Lapis Pondasi Agregat Kelas S M3 730,000.00 9.41 6,871,688.50 14.777 9.41 6,871,688.50 4 0.389 0.389 0.389
14.777 0.336 0.336 0.336 0.336 0.336 0.336 0.389 0.389 0.389 0.389 0.389 0.389 0.389 0.389 0.389 0.389 0.389 0.389 0.389 0.389 0.389 0.389 0.389 0.389 0.389 0.389 0.389 0.389 0.389 0.389 0.389 0.389 0.389 0.389 0.389 0.389 0.389 0.389 0.389 0.389 0.389 S

F
Rencana 3
I 40

10 . 1 (8) Campuran Aspal Panas M3 4,008,142.00 0.97 3,885,092.04 8.355 - -


Kontrak Awal
0.000 0.000 0.000 0.000 0.000 0.000 0.000
T
9
R Rencana
I Kontrak Awal P
H
10 . 1 (18) Pengendalian Tanaman Pada Rumija, 5 x Potong M2 957.00 18,500.00 17,704,500.00 38.072 22,559.66 21,589,592.04 46.427 1.055 1.055 1.055 1.055 1.055 1.055 1.011 1.011 1.011 1.011 1.011 1.011 1.011 1.011 1.011 1 1.011 1.011 1.011 1.011 1.011 1.011 1.011 1.011 1.011 1.011 1.011 1.011 1.011 1.011 1.011 1.011 1.011 1.011 1.011 1.011 1.011 1.011 1.011 1.011 1.011 1.011 1.011 1.011 1.011
H 20
4
4
O
1
10 . 1 (19) Pembersihan Drainase M' 6,727.00 1,110.19 7,468,222.57 16.060 1,110.19 7,468,222.57 16.060 0.365 0.365 0.365 0.365 0.365 0.365 0.251 0.251 0.251 0.251 0.251 0.251 0.251 0.251 0.251 0.251 0.251 0.251 0.251 0.251 0.251 0.251 0.251 0.251 0.251 0.251 0.251 0.251 0.251 0.251 0.251 0.251 0.251 0.251 0.251 0.251 0.251 0.251 0.251 0.251 0.251 0.251 0.251 0.251
H
0

JUMLAH NILAI PEKERJAAN TANPA PPN 46,502,399.96 100.00 46,502,399.96 100.00

P P N 10% 4,650,240.00 4,650,240.00


SPMK 31 JANUARI 2020 PHO 31 DESEMBER 2020 FHO 31 DESEMBER 2021
JUMLAH NILAI PEKERJAAN + PPN 51,152,639.95 51,152,639.95

DIBULATKAN 51,153,000.00 51,153,000.00

RENCANA MINGGUAN 0 2.273 2.273 2.273 2.273 2.273 2.273 2.273 2.273 2.273 2.273 2.273 2.273 2.273 2.273 2.273 0.000 0.000 2.273 2.273 2.273 2.273 2.273 2.273 2.273 2.273 2.273 2.273 2.273 2.273 2.273 2.273 2.273 2.273 2.273 2.273 2.273 2.273 2.273 2.273 2.273 2.273 2.273 2.273 2.273 2.273 2.273 0.000 0.000
FISIK RENCANA KONTRAK AWAL
RENCANA KUMULATIF 0 2.273 4.545 6.818 9.091 11.364 13.636 15.909 18.182 20.455 22.727 25.000 27.273 29.545 31.818 34.091 34.091 34.091 36.364 38.636 40.909 43.182 45.455 47.727 50.000 52.273 54.545 56.818 59.091 61.364 63.636 65.909 68.182 70.455 72.727 75.000 77.273 79.545 81.818 84.091 86.364 88.636 90.909 93.182 95.455 97.727 100.00 100.00 100.00

RENCANA MINGGUAN 4.528 3.499 0.000 6.510 0.000 0.000


FISIK REALISASI KONTRAK AWAL
RENCANA KUMULATIF 0 4.528 8.026 8.026 14.536 14.536 14.536

RENCANA MINGGUAN 2.249 2.249 2.249 2.249 2.249 2.249 2.249 2.249 2.249 0.000 0.000 2.249 2.249 2.249 2.249 2.249 2.249 2.249 2.249 2.249 2.249 2.249 2.249 2.249 2.249 2.249 2.249 2.249 2.249 2.249 2.249 2.249 2.249 2.249 2.249 2.249 2.249 2.249 2.249 2.249 0.000 0.000
FISIK RENCANA ADDENDUM 01
RENCANA KUMULATIF 0 14.536 16.785 19.034 21.283 23.532 25.781 28.030 30.279 32.528 34.777 34.777 34.777 37.026 39.275 41.524 43.773 46.023 48.272 50.521 52.770 55.019 57.268 59.517 61.766 64.015 66.264 68.513 70.762 73.011 75.260 77.509 79.758 82.008 84.257 86.506 88.755 91.004 93.253 95.502 97.751 100.00 100.00 100.00

REALISASI MINGGUAN 13.537 0.000 0.000 0.000 23.301 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000
FISIK REALISASI ADDENDUM 01
REALISASI KUMULATIF 0 14.536 28.073 28.073 28.073 28.073 51.374 51.374 51.374 51.374 51.374 51.374 51.374 51.374 51.374

DEVIASI (+/-) 2.255 3.481 1.208 5.445 3.172 0.899 11.288 9.039 6.790 4.541 25.593 23.344 21.095 18.846 16.597 16.597 16.597 14.347 12.098
U

KONTRAK AWAL ADDENDUM 01 D 2020


HARGA
SATUAN
MATA JUMLAH JUMLAH JAN - FEBRUARI MARET APRIL H MEI JUNI JULI AGUSTUS SEPTEMBER OKTOBER NOVEMBER DESEMBER
SKALA
PEMBAYAR JENIS PEKERJAAN SAT BOBOT BOBOT
%
AN KUANTITAS HARGA KUANTITAS HARGA 31 - 07 08 - 14 15 - 21 22 - 28 29 - 06 07 - 13 14 - 20 21 - 27 28 - 03 04 - 10 11 - 17 18U- 24 25 - 01 02 - 08 09 - 15 16 - 22 23 - 29 30 - 05 06 - 12 13 - 19 20 - 26 27 - 03 04 - 10 11 - 17 18 - 24 25 - 31 01 - 07 08 - 14 15 - 21 22 - 28 29 - 04 05 - 11 12 - 18 19 - 25 26 - 02 03 - 09 10 - 16 17 - 23 24 - 30 31 - 06 07 - 13 14 - 20 21 - 27 28 - 04 05 - 11 12 - 18 19 - 25 26 - 31
( Rp. )
(Rp.) (%) (Rp.) (%) 1 2 3 4 5 6 7 8 9 10 11 L
12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 48

100
F
DIVISI 9 PEKERJAAN HARIAN DAN PEKERJAAN LAIN - LAIN
I
Realisasi
Kontrak CCO T L
9 . 2 (1) Marka Jalan Thermoplastic M2 331,708.00 30.60 10,150,264.80 8.243 30.60 10,150,264.80 8.243 0.187 0.187 0.187 0.187 0.187 0.187 0.217 0.217 0.217 0.217 0.217 0.217 0.217 0.217 0.217 0.217 0.217 0.217 0.217 0.217 0.217 0.217 0.217 0.217 0.217 0.217 0.217 0.217 0.217 0.217 0.217 0.217 0.217 0.217 0.217 0.217 0.217 0.217 0.217 0.217 0.217 0.217 0.217 0.217
E
R B
P 80
A Rencana
DIVISI 10 PEKERJAAN PEMELIHARAAN I R Kontrak CCO R
A
N
O
1
10 . 1 (1) Galian Tanah untuk Saluran Air dan Lereng M3 70,000.00 31.20 2,184,000.00 1.774 31.20 2,184,000.00 1.774 0.040 0.040 0.040 0.040 0.040 0.040 0.047 0.047 0.047 0.047 0.047 0.047 0.047 0.047 0.047 0.047 0.047 0.047 0.047 0.047 0.047 0.047 0.047 0.047 0.047 0.047 0.047 0.047 0.047 0.047 0.047 0.047 0.047 0.047 0.047 0.047 0.047 0.047 0.047 0.047 0.047 0.047 0.047 0.047
I
S
4 D 60

H
10 . 1 (3) Pasangan Batu Dengan Mortar M3 1,386,124.00 2.34 3,243,530.16 2.634 2.34 3,243,530.16 2.634 0.060 0.060 0.060 0.060 0.060 0.060 0.069 0.069 0.069 0.069 0.069 0.069 E
Realisasi 3 0.069 0.069 0.069 U 0.069 0.069 0.069 0.069 0.069 0.069 0.069 0.069 0.069 0.069 0.069 0.069 0.069 0.069 0.069 0.069 0.069 0.069 0.069 0.069 0.069 0.069 0.069 0.069 0.069 0.069 0.069 0.069 0.069

L
Kontrak Awal S
9
10 . 1 (4) Lapis Pondasi Agregat Kelas A M3 916,443.00 8.99 8,243,326.85 6.695 - - 0.000 0.000 0.000 0.000 0.000 0.000 0.000 F Rencana
I
Kontrak Awal
H T 40

R
10 . 1 (6) Lapis Pondasi Agregat Kelas S M3 730,000.00 13.00 9,490,000.00 7.707 13.00 9,490,000.00 7.707 0.175 0.175 0.175 0.175 0.175 0.175 0.203 0.203 0.203 0.203 0.203 0.203 0.203 0.203 0.203 0.203 0.203 0.203 0.203 0.203 0.203 0.203 0.203 0.203 0.203 0.203 0.203 0.203 0.203 0.203 0.203 0.203 0.203 0.203 0.203 0.203 0.203 0.203 0.203 0.203 0.203 0.203 0.203 0.203
I
P

1
H
10 . 1 (8) Campuran Aspal Panas M3 4,008,142.00 17.81 71,393,832.64 57.981 17.81 71,393,832.64 57.981 1.318 1.318 1.318 1.318 1.318 1.318 0.669 0.669 0.669 0.669 0.669 0.669 0.669 0.669 0.669 4 0.669 0.669 0.669 0.669 0.669 0.669 0.669 0.669 0.669 0.669 0.669 0.669 0.669 0.669 0.669 0.669 0.669 0.669 0.669 0.669 0.669 0.669 0.669 0.669 0.669 0.669 0.669 0.669 0.669
4
O 20
1
10 . 1 (18) Pengendalian Tanaman Pada Rumija, 5 x Potong M2 957.00 15,600.00 14,929,200.00 12.125 24,213.72 23,172,526.85 18.819 0.428 0.428 0.428 0.428 0.428 0.428 0.336 0.336 0.336 0.336 0.336 0.336 0.336 0.336 0.336 0.336 0.336 0.336 0.336 0.336 0.336 0.336 0.336 0.336 0.336 0.336 0.336 0.336 0.336 0.336 0.336 0.336 0.336 0.336 0.336 0.336 0.336 0.336 0.336 0.336 0.336 0.336 0.336 0.336
H

10 . 1 (19) Pembersihan Drainase M' 6,727.00 520.00 3,498,040.00 2.841 520.00 3,498,040.00 2.841 0.065 0.065 0.065 0.065 0.065 0.065 0.075 0.075 0.075 0.075 0.075 0.075 0.075 0.075 0.075 0.075 0.075 0.075 0.075 0.075 0.075 0.075 0.075 0.075 0.075 0.075 0.075 0.075 0.075 0.075 0.075 0.075 0.075 0.075 0.075 0.075 0.075 0.075 0.075 0.075 0.075 0.075 0.075 0.075

JUMLAH NILAI PEKERJAAN TANPA PPN 123,132,194.45 100.00 123,132,194.45 100.00

P P N 10% 12,313,219.45 12,313,219.45


SPMK 31 JANUARI 2020 PHO 31 DESEMBER 2020 FHO 31 DESEMBER 2021
JUMLAH NILAI PEKERJAAN + PPN 135,445,413.90 135,445,413.90

DIBULATKAN 135,445,000.00 135,445,000.00

RENCANA MINGGUAN 0 2.273 2.273 2.273 2.273 2.273 2.273 2.273 2.273 2.273 2.273 2.273 2.273 2.273 2.273 2.273 0.000 0.000 2.273 2.273 2.273 2.273 2.273 2.273 2.273 2.273 2.273 2.273 2.273 2.273 2.273 2.273 2.273 2.273 2.273 2.273 2.273 2.273 2.273 2.273 2.273 2.273 2.273 2.273 2.273 2.273 2.273 0.00 0.00
FISIK RENCANA KONTRAK AWAL
RENCANA KUMULATIF 0 2.273 4.545 6.818 9.091 11.364 13.636 15.909 18.182 20.455 22.727 25.000 27.273 29.545 31.818 34.091 34.091 34.091 36.364 38.636 40.909 43.182 45.455 47.727 50.000 52.273 54.545 56.818 59.091 61.364 63.636 65.909 68.182 70.455 72.727 75.000 77.273 79.545 81.818 84.091 86.364 88.636 90.909 93.182 95.455 97.727 100.00 100.00 100.00

RENCANA MINGGUAN 2.425 3.637 0.000 32.552 0.000 0.000


FISIK RENCANA ADDENDUM 01
RENCANA KUMULATIF 0 2.425 6.062 6.062 38.614 38.614 38.614

RENCANA MINGGUAN 1.615 1.615 1.615 1.615 1.615 1.615 1.615 1.615 1.615 0.000 0.000 1.615 1.615 1.615 1.615 1.615 1.615 1.615 1.615 1.615 1.615 1.615 1.615 1.615 1.615 1.615 1.615 1.615 1.615 1.615 1.615 1.615 1.615 1.615 1.615 1.615 1.615 1.615 1.615 1.615 0.00 0.00
FISIK RENCANA ADDENDUM 01
RENCANA KUMULATIF 0 38.614 40.229 41.845 43.460 45.076 46.691 48.306 49.922 51.537 53.153 53.153 53.153 54.768 56.383 57.999 59.614 61.230 62.845 64.461 66.076 67.691 69.307 70.922 72.538 74.153 75.769 77.384 78.999 80.615 82.230 83.846 85.461 87.077 88.692 90.307 91.923 93.538 95.154 96.769 98.385 100.00 100.00 100.00

REALISASI MINGGUAN 27.855 0.000 0.000 0.000 23.858 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000
FISIK REALISASI
REALISASI KUMULATIF 0 38.614 66.469 66.469 66.469 66.469 90.327 90.327 90.327 90.327 90.327 90.327 90.327 90.327 90.327

DEVIASI (+/-) 0.152 1.517 -0.756 29.523 27.250 24.977 26.239 24.624 23.009 21.393 43.636 42.020 40.405 38.790 37.174 37.174 37.174 35.559 33.943
B

D
KONTRAK AWAL ADDENDUM 01 2020
HARGA
SATUAN H
MATA JUMLAH JUMLAH JAN - FEBRUARI MARET APRIL MEI JUNI JULI AGUSTUS SEPTEMBER OKTOBER NOVEMBER DESEMBER
SKALA
PEMBAYAR JENIS PEKERJAAN SAT BOBOT BOBOT
%
AN KUANTITAS HARGA KUANTITAS HARGA 31 - 07 08 - 14 15 - 21 22 - 28 29 - 06 07 - 13 14 - 20 21 - 27 28 - 03 04 - 10 11 - 17 18U- 24 25 - 01 02 - 08 09 - 15 16 - 22 23 - 29 30 - 05 06 - 12 13 - 19 20 - 26 27 - 03 04 - 10 11 - 17 18 - 24 25 - 31 01 - 07 08 - 14 15 - 21 22 - 28 29 - 04 05 - 11 12 - 18 19 - 25 26 - 02 03 - 09 10 - 16 17 - 23 24 - 30 31 - 06 07 - 13 14 - 20 21 - 27 28 - 04 05 - 11 12 - 18 19 - 25 26 - 31
( Rp. )
(Rp.) (%) (Rp.) (%) 1 2 3 4 5 6 7 8 9 10 11 L
12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 48

F 100
DIVISI 1 UMUM
Realisai
1.2 Mobilisasi Ls 222,850,000.00 1.00 222,850,000.00 4.433 1.00 222,850,000.00
Kontrak CC0
4.433 0.096 0.096 0.096 0.096 0.096 0.096 0.053 0.053 0.053 0.053 0.053 0.053 0.053 0.053 0.053
I
0.053 0.053 0.053 0.053 0.053 0.053 0.053 0.053 0.053 0.053 0.053 0.053 0.053 0.053 0.053 0.053 0.053 0.053 0.053 0.053 0.053 0.053 0.053 0.053 0.053 0.053 0.053 0.053 0.053

T
1 . 8 (1) Manajemen dan Keselamatan Lalu Lintas Ls 32,600,000.00 1.00 32,600,000.00 0.648 1.00 32,600,000.00 0.648 0.015 0.015 0.015 0.015 0.015 0.015 0.016 0.016 0.016 0.016 0.016 0.016 0.016 0.016 0.016 0.016 0.016 0.016 0.016 0.016 0.016 0.016 0.016 0.016 0.016 0.016 0.016 0.016 0.016 0.016 0.016 0.016 0.016 0.016 0.016 0.016 0.016 0.016 0.016 0.016 0.016 0.016 0.016 0.016

R
1 . 17 Pengamanan Lingkungan Hidup Ls 35,550,000.00 1.00 35,550,000.00 0.707 1.00 35,550,000.00 0.707 0.016 0.016 0.016 0.016 0.016 0.016 0.017 0.017 0.017 0.017 0.017 0.017 0.017 0.017 0.017 0.017 0.017 0.017 0.017 0.017 0.017 0.017 0.017 0.017 0.017 0.017 0.017 0.017 0.017 0.017 0.017 0.017 0.017 0.017 0.017 0.017 0.017 0.017 0.017 0.017 0.017 0.017 0.017 0.017

I L P
1 . 19 Keselamatan dan Kesehatan Kerja Ls 169,750,000.00 1.00 169,750,000.00 3.377 1.00 169,750,000.00 3.377 0.077 0.077 0.077 0.077 0.077 0.077 0.050 0.050 0.050 0.050 0.050 0.050 0.050 0.050 0.050 E 0.050 0.050 0.050 0.050 0.050 0.050 0.050 0.050 0.050 0.050 0.050 0.050 0.050 0.050 0.050 0.050 0.050 0.050 0.050 0.050 0.050 0.050 0.050 0.050 0.050 0.050 0.050 0.050 0.050 80

B Rencana
DIVISI 3 PEKERJAAN TANAH DAN GEOSINTETIK
1 A Kontrak CCO R
R
3 . 1 (7) Galian Perkerasan Beraspal Dengan Cold Milling Machine M3 555,543.00 70.00 38,888,010.00 0.774 70.00 38,888,010.00 0.774 0.018 0.018 0.018 0.018 0.018 0.018 0.020 0.020 0.020 0.020 0.020 0.020 0.020 0.020 0.020 0.020 0.020 0.020 0.020 0.020 0.020 0.020 0.020 0.020 0.020 0.020 0.020 0.020 0.020 0.020 0.020 0.020 0.020 0.020 0.020 0.020 0.020 0.020 0.020 0.020 0.020 0.020 0.020 0.020
4 A
N O
DIVISI 6 PERKERASAN ASPAL
3
6 . 1 (2a) Lapis Perekat - Aspal Cair/Emulsi Liter 16,000.00 490.00 7,840,000.00 0.156 174.83 2,797,200.00 0.056 0.006 0.019 0.014 0.017 0.019 0.019 0.019
9 I S 60

D
6 . 3 (6a) Laston Lapis Antara (AC - BC) Ton 1,677,904.00 193.20 324,171,052.80 6.449 68.87 115,559,027.06 2.299 0.575 0.575 0.805 0.345 0.766 0.766 0.766
H
H U E
6 . 3 (8) Bahan Anti Pengelupasan Kg 100,000.00 28.02 2,801,700.00 0.056 9.99 998,630.37 0.020 0.002 0.007 0.005 0.006 0.007 0.007 0.007
Realisai L
Kontrak Awal Rencana
DIVISI 9 PEKERJAAN HARIAN DAN PEKERJAAN LAIN - LAIN
F Kontrak Awal S
I
9 . 2 (1) Marka Jalan Thermoplastic M2 331,708.00 2,123.43 704,358,975.50 14.011 2,747.64 911,414,169.12 18.130 0.412 0.412 0.412 0.412 0.412 0.412 0.477 0.477 0.477 0.477 0.477 0.477 0.477 0.477 0.477 0.477 0.477 0.477 0.477 0.477 0.477 0.477 0.477 0.477 0.477 0.477 0.477 0.477 0.477 0.477 0.477 0.477 0.477 0.477 0.477 0.477 0.477 0.477 0.477 0.477 0.477 0.477 0.477 0.477
T
40
R
DIVISI 10 PEKERJAAN PEMELIHARAAN
I
10 . 1 (1) Galian Tanah untuk Saluran Air dan Lereng M3 70,000.00 228.16 15,971,474.12 0.318 228.16 15,971,474.12 0.318 0.007 0.007 0.007 0.007 0.007 0.007 0.008 0.008 0.008 0.008 0.008 0.008 0.008 0.008 0.008 0.008 0.008 0.008 0.008 0.008 0.008 0.008 0.008 0.008 0.008 0.008 0.008 0.008 0.008 0.008 0.008 0.008 0.008 0.008 0.008 0.008 0.008 0.008 0.008 0.008 0.008 0.008 0.008 0.008
P
10 . 1 (2) Timbunan Pilihan untuk Lereng Tepi Saluran M3 330,000.00 990.00 326,700,000.00 6.499 198.71 65,574,300.00 1.304 0.030 0.030 0.030 0.030 0.030 0.030 0.034 0.034 0.034 0.034 0.034 0.034 0.034 0.034 0.034
1 0.034 0.034 0.034 0.034 0.034 0.034 0.034 0.034 0.034 0.034 0.034 0.034 0.034 0.034 0.034 0.034 0.034 0.034 0.034 0.034 0.034 0.034 0.034 0.034 0.034 0.034 0.034 0.034 0.034
4
10 . 1 (3) Pasangan Batu Dengan Mortar M3 1,386,124.00 190.34 263,831,995.52 5.248 26.65 36,940,204.60 0.735 0.017 0.017 0.017 0.017 0.017 0.017 0.019 0.019 0.019 0.019 0.019 0.019 0.019 0.019 0.019 4 0.019 0.019 0.019 0.019 0.019 0.019 0.019 0.019 0.019 0.019 0.019 0.019 0.019 0.019 0.019 0.019 0.019 0.019 0.019 0.019 0.019 0.019 0.019 0.019 0.019 0.019 0.019 0.019 0.019 H
1
10 . 1 (4) Lapis Pondasi Agregat Kelas A M3 916,443.00 274.17 251,258,032.90 4.998 476.59 436,767,111.15 8.688 0.197 0.197 0.197 0.197 0.197 0.197 0.097 0.097 0.097 0.097 0.097 0.097 0.097 0.097 0.097 0.097 0.097 0.097 0.097 0.097 0.097 0.097 0.097 0.097 0.097 0.097 0.097 0.097 0.097 0.097 0.097 0.097 0.097 0.097 0.097 0.097 0.097 0.097 0.097 0.097 0.097 0.097 0.097 0.097 20
H O
10 . 1 (6) Lapis Pondasi Agregat Kelas S M3 730,000.00 436.50 318,645,000.00 6.339 285.15 208,159,500.00 4.141 0.094 0.094 0.094 0.094 0.094 0.094

10 . 1 (8) Campuran Aspal Panas M3 4,008,142.00 457.48 1,833,662,464.34 36.476 576.12 2,309,177,123.44 45.935 1.044 1.044 1.044 1.044 1.044 1.044 0.504 0.504 0.504 0.504 0.504 0.504 0.504 0.504 0.504 0.504 0.504 0.504 0.504 0.504 0.504 0.504 0.504 0.504 0.504 0.504 0.504 0.504 0.504 0.504 0.504 0.504 0.504 0.504 0.504 0.504 0.504 0.504 0.504 0.504 0.504 0.504 0.504 0.504

10 . 1 (18) Pengendalian Tanaman Pada Rumija, 5 x Potong M2 957.00 322,363.81 308,502,163.29 6.137 265,814.13 254,384,118.61 5.060 0.115 0.115 0.115 0.115 0.115 0.115 0.106 0.106 0.106 0.106 0.106 0.106 0.106 0.106 0.106 0.106 0.106 0.106 0.106 0.106 0.106 0.106 0.106 0.106 0.106 0.106 0.106 0.106 0.106 0.106 0.106 0.106 0.106 0.106 0.106 0.106 0.106 0.106 0.106 0.106 0.106 0.106 0.106 0.106

10 . 1 (19) Pembersihan Drainase M' 6,727.00 25,220.50 169,658,303.50 3.375 25,220.50 169,658,303.50 3.375 0.077 0.077 0.077 0.077 0.077 0.077 0.089 0.089 0.089 0.089 0.089 0.089 0.089 0.089 0.089 0.089 0.089 0.089 0.089 0.089 0.089 0.089 0.089 0.089 0.089 0.089 0.089 0.089 0.089 0.089 0.089 0.089 0.089 0.089 0.089 0.089 0.089 0.089 0.089 0.089 0.089 0.089 0.089 0.089
0

JUMLAH NILAI PEKERJAAN TANPA PPN 5,027,039,171.97 100.000 5,027,039,171.97 100.000

P P N 10% 502,703,917.20 502,703,917.20


SPMK 31 JANUARI 2020 PHO 31 DESEMBER 2020 FHO 31 DESEMBER 2021
JUMLAH NILAI PEKERJAAN + PPN 5,529,743,089.17 5,529,743,089.17

DIBULATKAN 5,529,743,000.00 5,529,743,000.00

RENCANA MINGGUAN 0 2.117 2.117 3.750 3.803 4.427 3.148 2.117 2.117 2.117 2.117 2.117 2.117 2.117 2.117 2.117 0.000 0.000 2.117 2.117 2.117 2.117 2.117 2.117 2.117 2.117 2.117 2.117 2.117 2.117 2.117 2.117 2.117 2.117 2.117 2.117 2.117 2.117 2.117 2.117 2.117 2.117 2.117 2.117 2.117 2.117 2.319 0.00 0.00
FISIK RENCANA KONTRAK AWAL
RENCANA KUMULATIF 0 2.117 4.234 7.984 11.787 16.213 19.361 21.478 23.594 25.711 27.828 29.945 32.061 34.178 36.295 38.412 38.412 38.412 40.528 42.645 44.762 46.879 48.995 51.112 53.229 55.346 57.463 59.579 61.696 63.813 65.930 68.046 70.163 72.280 74.397 76.513 78.630 80.747 82.864 84.980 87.097 89.214 91.331 93.447 95.564 97.681 100.00 100.00 100.00

RENCANA MINGGUAN 2.235 2.290 8.187 22.792 0.656 4.797


FISIK REALISASI KONTRAK AWAL
RENCANA KUMULATIF 0 2.235 4.525 12.712 35.504 36.160 40.957

RENCANA MINGGUAN 2.283 2.283 2.283 1.491 1.491 1.491 1.491 1.491 1.491 0.000 0.000 1.491 1.491 1.491 1.491 1.491 1.491 1.491 1.491 1.491 1.491 1.491 1.491 1.491 1.491 1.491 1.491 1.491 1.491 1.491 1.491 1.491 1.491 1.491 1.491 1.491 1.491 1.491 1.491 1.491 0.000 0.000
FISIK RENCANA ADDENDUM 01
RENCANA KUMULATIF 0 40.957 43.239 45.522 47.805 49.296 50.787 52.279 53.770 55.261 56.753 56.753 56.753 58.244 59.735 61.226 62.718 64.209 65.700 67.192 68.683 70.174 71.665 73.157 74.648 76.139 77.631 79.122 80.613 82.104 83.596 85.087 86.578 88.070 89.561 91.052 92.544 94.035 95.526 97.017 98.509 100.00 100.00 100.00

REALISASI MINGGUAN 26.223 0.000 0.000 0.000 17.476 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000
FISIK REALISASI ADDENDUM 01
REALISASI KUMULATIF 0 40.957 67.179 67.179 67.179 67.179 84.656 84.656 84.656 84.656 84.656 84.656 84.656 84.656 84.656

DEVIASI (+/-) 0.118 0.291 4.728 23.717 19.947 21.596 23.940 21.657 19.375 17.883 33.868 32.377 30.886 29.395 27.903 27.903 27.903 26.412 24.921
I

I
KONTRAK AWAL ADDENDUM 01 2020
HARGA
SATUAN D
JUMLAH JUMLAH SISA JAN - FEBRUARI MARET APRIL MEI JUNI JULI AGUSTUS SEPTEMBER OKTOBER NOVEMBER DESEMBER
MATA
H SKALA
PEMBAYAR JENIS PEKERJAAN SAT BOBOT BOBOT
%
AN
KUANTITAS HARGA KUANTITAS HARGA BOBOT
31 - 07 08 - 14 15 - 21 22 - 28 29 - 06 07 - 13 14 - 20 21 - 27 28 - 03 04 - 10 11 - 17 18 - 24 25 - 01 02 - 08 09 - 15 16 - 22 23 - 29 30 - 05 06 - 12 13 - 19 20 - 26 27 - 03 04 - 10 11 - 17 18 - 24 25 - 31 01 - 07 08 - 14 15 - 21 22 - 28 29 - 04 05 - 11 12 - 18 19 - 25 26 - 02 03 - 09 10 - 16 17 - 23 24 - 30 31 - 06 07 - 13 14 - 20 21 - 27 28 - 04 05 - 11 12 - 18 19 - 25 26 - 31
U
( Rp. )

(Rp.) (%) (Rp.) (%) (%) 1 2 3 4 5 6 7 8 9 10 11 12


L 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 48

100
F
DIVISI 10 PEKERJAAN PEMELIHARAAN
I

Realisasi T L
10 . 2 (1) Pemeliharaan Kinerja Jembatan Mahang (bentang 10.8 m) Ls 9,312,667.20 1.00 9,312,667.20 3.655 1.00 9,312,667.20 3.655 0.083 0.083 0.083 0.083 0.083 0.083
Kontrak CCO E
R B
A 80

10 . 2 (2) Pemeliharaan Kinerja Jembatan Teluk Serdang (bentang 61.3 m) Ls 52,858,009.20 1.00 52,858,009.20 20.745 1.00 52,858,009.20 20.745 0.471 0.471 0.471 0.471 0.471 0.471 0.546 0.546 0.546 0.546 0.546 0.546 0.546 0.546 0.546 0.546 0.546 0.546 0.546 0.546 0.546 0.546 0.546 0.546 0.546 0.546 0.546 0.546 0.546 0.546 0.546 0.546 0.546 0.546 0.546 0.546 0.546 0.546 0.546 0.546 0.546 0.546 0.546 0.546 P
I R
A
R
N
10 . 2 (3) Pemeliharaan Kinerja Jembatan Parit Empat (bentang 10.8 m) Ls 9,312,667.20 1.00 9,312,667.20 3.655 1.00 9,312,667.20 3.655 0.083 0.083 0.083 0.083 0.083 0.083 1
Rencana O

4 I Kontrak CCO
S
10 . 2 (4) Pemeliharaan Kinerja Jembatan Parit Enam (bentang 10.8 m) Ls 9,312,667.20 1.00 9,312,667.20 3.655 1.00 9,312,667.20 3.655 0.083 0.083 0.083 0.083 0.083 0.083 0.096 0.096 0.096 0.096 0.096 0.096 0.096 0.096 0.096 D 0.096 0.096 0.096 0.096 0.096 0.096 0.096 0.096 0.096 0.096 0.096 0.096 0.096 0.096 0.096 0.096 0.096 0.096 0.096 0.096 0.096 0.096 0.096 0.096 0.096 0.096 0.096 0.096 0.096 60

3 H
E
U
9 L
10 . 2 (5) Pemeliharaan Kinerja Jembatan Parit Tujuh (bentang 10.8 m) Ls 9,312,667.20 1.00 9,312,667.20 3.655 1.00 9,312,667.20 3.655 0.083 0.083 0.083 0.083 0.083 0.083 0.096 0.096 0.096 0.096 0.096 0.096 0.096 0.096 0.096 0.096 0.096 0.096 0.096 0.096 0.096 0.096 0.096 0.096 0.096 0.096 0.096 0.096 0.096 0.096 0.096 0.096 0.096 0.096 0.096 0.096 0.096 0.096 0.096 0.096 0.096 0.096 0.096 0.096 S
F
H I
10 . 2 (6) Pemeliharaan Kinerja Jembatan Parit Delapan (bentang 10.8 m) Ls 9,312,667.20 1.00 9,312,667.20 3.655 1.00 9,312,667.20 3.655 0.083 0.083 0.083 0.083 0.083 0.083 0.096 0.096 0.096 0.096 0.096 0.096 0.096 0.096 0.096 T 0.096 0.096 0.096 0.096 0.096 0.096 0.096 0.096 0.096 0.096 0.096 0.096 0.096 0.096 0.096 0.096 0.096 0.096 0.096 0.096 0.096 0.096 0.096 0.096 0.096 0.096 0.096 0.096 0.096
40

R
I Rencana P
10 . 2 (7) Pemeliharaan Kinerja Jembatan Pembengis (bentang 65 m) Ls 56,048,460.00 1.00 56,048,460.00 21.997 1.00 56,048,460.00 21.997 0.500 Realisasi
0.500 0.500 0.500 0.500 0.500 Kontrak Awal
Kontrak CCO
H
1
10 . 2 (8) Pemeliharaan Kinerja Jembatan Parit Gompong (bentang 17.9 m) Ls 15,434,883.60 1.00 15,434,883.60 6.058 1.00 15,434,883.60 6.058 0.138 0.138 0.138 0.138 0.138 0.138 0.159 0.159 0.159 0.159 0.159 0.159 0.159 0.159 0.159 4 0.159 0.159 0.159 0.159 0.159 0.159 0.159 0.159 0.159 0.159 0.159 0.159 0.159 0.159 0.159 0.159 0.159 0.159 0.159 0.159 0.159 0.159 0.159 0.159 0.159 0.159 0.159 0.159 0.159 O
4 20
1

10 . 2 (9) Pemeliharaan Kinerja Jembatan A Beram Kecil (bentang 40.3 m) Ls 34,750,045.20 1.00 34,750,045.20 13.638 1.00 34,750,045.20 13.638 0.310 0.310 0.310 0.310 0.310 0.310 0.359 0.359 0.359 0.359 0.359 0.359 0.359 0.359 0.359 0.359 0.359 0.359 0.359 0.359 0.359 0.359 0.359 0.359 0.359 0.359 0.359 0.359 0.359 0.359 0.359 0.359 0.359 0.359 0.359 0.359 0.359 0.359 0.359 0.359 0.359 0.359 0.359 0.359
H

10 . 2 (10) Pemeliharaan Kinerja Jembatan B Parit Beram Kecil (bentang 57 m) Ls 49,150,188.00 1.00 49,150,188.00 19.289 1.00 49,150,188.00 19.289 0.438 0.438 0.438 0.438 0.438 0.438 0.508 0.508 0.508 0.508 0.508 0.508 0.508 0.508 0.508 0.508 0.508 0.508 0.508 0.508 0.508 0.508 0.508 0.508 0.508 0.508 0.508 0.508 0.508 0.508 0.508 0.508 0.508 0.508 0.508 0.508 0.508 0.508 0.508 0.508 0.508 0.508 0.508 0.508

JUMLAH NILAI PEKERJAAN TANPA PPN 254,804,922.00 100.000 254,804,922.00 100.000

P P N 10% 25,480,492.20 25,480,492.20


SPMK 31 JANUARI 2020 PHO 31 DESEMBER 2020 FHO 31 DESEMBER 2021
JUMLAH NILAI PEKERJAAN + PPN 280,285,414.20 280,285,414.20

DIBULATKAN 280,286,000.00 280,286,000.00

RENCANA MINGGUAN 2.273 2.273 2.273 2.273 2.273 2.273 2.273 2.273 2.273 2.273 2.273 2.273 2.273 2.273 2.273 0.000 0.000 2.273 2.273 2.273 2.273 2.273 2.273 2.273 2.273 2.273 2.273 2.273 2.273 2.273 2.273 2.273 2.273 2.273 2.273 2.273 2.273 2.273 2.273 2.273 2.273 2.273 2.273 2.273 2.273 2.273 0.000 0.000
FISIK RENCANA KONTRAK AWAL
RENCANA KUMULATIF 2.273 4.545 6.818 9.091 11.364 13.636 15.909 18.182 20.455 22.727 25.000 27.273 29.545 31.818 34.091 34.091 34.091 36.364 38.636 40.909 43.182 45.455 47.727 50.000 52.273 54.545 56.818 59.091 61.364 63.636 65.909 68.182 70.455 72.727 75.000 77.273 79.545 81.818 84.091 86.364 88.636 90.909 93.182 95.455 97.727 100.00 100.00 100.00

RENCANA MINGGUAN 3.655 0.000 0.000 3.655 21.997 0.000


FISIK REALISASI KONTRAK AWAL
RENCANA KUMULATIF 3.655 3.655 3.655 7.310 29.306 29.306

RENCANA MINGGUAN 1.860 1.860 1.860 1.860 1.860 1.860 1.860 1.860 1.860 0.000 0.000 1.860 1.860 1.860 1.860 1.860 1.860 1.860 1.860 1.860 1.860 1.860 1.860 1.860 1.860 1.860 1.860 1.860 1.860 1.860 1.860 1.860 1.860 1.860 1.860 1.860 1.860 1.860 1.860 1.860 0.000 0.000
FISIK RENCANA ADDENDUM 01
RENCANA KUMULATIF 29.306 31.167 33.027 34.887 36.748 38.608 40.468 42.329 44.189 46.050 46.050 46.050 47.910 49.770 51.631 53.491 55.351 57.212 59.072 60.932 62.793 64.653 66.513 68.374 70.234 72.095 73.955 75.815 77.676 79.536 81.396 83.257 85.117 86.977 88.838 90.698 92.559 94.419 96.279 98.140 100.00 100.00 100.00

REALISASI MINGGUAN 70.694 0.00 0.00 0.00 0.00 0.00 0.000 0.000 0.000 0.000 0.000 0.000 0.000
FISIK REALISASI ADDENDUM 01
REALISASI KUMULATIF 29.306 100.00 100.00 100.00 100.00 100.00 100.00 100.00 100.00 100.00 100.00 100.00 100.00 100.00

DEVIASI (+/-) 1.382 -0.891 -3.163 -1.781 17.943 15.670 68.833 66.973 65.113 63.252 61.392 59.532 57.671 55.811 53.950 53.950 53.950 52.090 50.230
STRIP MAP :
Preservasi Jln. Sp. Tiga Batara Gas Plan (Pematang Lumut) – Kuala Tungkal dan Jalan Dlm Kota
Tungkal
STRIP MAP :
Preservasi Jln. Sp. Tiga Batara Gas Plan (Pematang Lumut) – Kuala Tungkal dan Jalan Dlm Kota
Tungkal
STRIP MAP :
Preservasi Jln. Sp. Tiga Batara Gas Plan (Pematang Lumut) – Kuala Tungkal dan Jalan Dlm Kota
Tungkal
STRIP MAP :
Preservasi Jln. Sp. Tiga Batara Gas Plan (Pematang Lumut) – Kuala Tungkal dan Jalan Dlm Kota
Tungkal
DOKUMENTASI :

Preservasi Jln. Sp. Tiga Batara Gas Plan (Pematang Lumut) – Kuala Tungkal dan Jalan Dlm Kota
Tungkal
DOKUMENTASI :

Preservasi Jln. Sp. Tiga Batara Gas Plan (Pematang Lumut) – Kuala Tungkal dan Jalan Dlm Kota
Tungkal
DOKUMENTASI :

Preservasi Jln. Sp. Tiga Batara Gas Plan (Pematang Lumut) – Kuala Tungkal dan Jalan Dlm Kota
Tungkal

MARKA KUNING
MARKA KUNING RUAS JALAN N=29.1 , N=29.2 DAN RUAS N=30

AWAL AKHIR

PANJANG MARKA KUNING = 340 M1


PANJANG MARKA KUNING RUAS = 29.1 P=100 M1
PANJANG MARKA KUNING RUAS = 29.2 P=240 M1
DOKUMENTASI :

Preservasi Jln. Sp. Tiga Batara Gas Plan (Pematang Lumut) – Kuala Tungkal dan Jalan Dlm Kota
Tungkal

MARKA KUNING
MARKA KUNING RUAS JALAN N= 30

AWAL

PANJANG MARKA KUNING RUAS = 30 P=34.06 KM


STA 00+000 - STA 34+060
DOKUMENTASI :

Preservasi Jln. Sp. Tiga Batara Gas Plan (Pematang Lumut) – Kuala Tungkal dan Jalan Dlm Kota
Tungkal

MARKA KUNING
MARKA KUNING RUAS JALAN N= 30
DOKUMENTASI :

Preservasi Jln. Sp. Tiga Batara Gas Plan (Pematang Lumut) – Kuala Tungkal dan Jalan Dlm Kota
Tungkal

MARKA KUNING
MARKA KUNING RUAS JALAN N= 30.13K

PANJANG MARKA KUNING RUAS = 30.13K P=4.94 KM


STA 00+000 - STA 4+943
DOKUMENTASI :

Preservasi Jln. Sp. Tiga Batara Gas Plan (Pematang Lumut) – Kuala Tungkal dan Jalan Dlm Kota
Tungkal

MARKA KUNING
MARKA KUNING RUAS JALAN N= 30.12K
MARKA KUNING RUAS JALAN N= 30.11K

PANJANG MARKA KUNING RUAS = 30.12K P=0.6 KM STA 00+000 - STA 0+600
RUAS = 30.11K P=0.2 KM STA 00+000 - STA 0+200

Anda mungkin juga menyukai