Anda di halaman 1dari 1

PEMERINTAH PROVINSI LAMPUNG

BWS.2 Ki
D:\4. DATA 4\1. 2021 CV. JAYA KONSULTANT\IRIGASI\0. MASTER\LOGO PROVINSI LAMPUNG.png

DINAS PENGELOLAAN SUMBER DAYA AIR


- Bangunan Bagi Rusak Jl. Gatot Subroto NO. 50 Teluk Betung Bandar Lampung
BK.1' Ki BK.2 Ki BK.3 Ki BK.4 Ki BWS.1 Ki BWS.2 Ki BWS.3 Ki

Jalan TOL
5 Ha 8,50 Lt/dt 15 Ha 25,50 Lt/dt 30 Ha 51 Lt/dt 10 Ha 15 Lt/dt 40 Ha 51 Lt/dt 10 Ha 15 Lt/dt 10 Ha 15 Lt/dt
KETERANGAN
A = 131 Ha A = 126 Ha
Q = 222,7 Lt/dt Q = 214,2 Lt/dt
BENDUNG
BWS.3. Tgh
WAY KETIBUNG

BK.3 71 Ha 120,7 Lt/dt


BK.0 A = 866 Ha BK.2 A = 843 Ha
A = 801 Ha BK.4 A = 196 Ha BWS.1 BWS.2 A = 131 Ha
BWS.3' BWS.3
BK.1 Q = 1623,6 Lt/dt BK.1' A = 861 Ha Q = 1513,1 Lt/dt Q = 316,2 Lt/dt
Q = 1584,5 Lt/dt Q = 222,7 Lt/dt
Q = 1615,1 Lt/dt

Jalan Desa BK.2 Ka BK.3 Ka BK.4 Tgh BWS.1 Ka BWS.2 Ka BWS.3' Ka BWS.3 Ka

3 Ha 5,10 Lt/dt 12 Ha 20,40 Lt/dt 20 Ha 30 Lt/dt 25 Ha 42,5 Lt/dt 20 Ha 30 Lt/dt 5 Ha 8,50 Lt/dt 45 Ha 78,5 Lt/dt

BWS.2 Ka
NAMA GAMBAR
BK.2 Ka
A = 575 Ha - Bangunan Bagi Rusak
- Sisa Lahan 2 Ha
Q = 1151,9 Lt/dt
Alih Fungsi Lahan

U BK.5' Ka
BK.5'
SEKEMA JARINGAN IRIGASI SIDOMULYO
10 Ha 15 Lt/dt

BK.5' Ka
- Bangunan Rusak
A = 575 Ha
Q = 1151,9 Lt/dt
SKALA
BK.5 BK.5 Ki
NotScal
133 Ha 226,1 Lt/dt

A = 442 Ha
Q = 925,8 Lt/dt NAMA KEGIATAN
BK.6' Ki
BK.6' 10 Ha 15 Lt/dt
BK.6' Ka

10 Ha
PENGEMBANGAN DAN PENGELOLAAN SISTEM IRIGASI
15 Lt/dt
A = 412 Ha PRIMER DAN SEKUNDER PADA DAERAH IRIGASI YANG
Q = 895,8 Lt/dt LUASNYA 1000 HA - 3000 HA DAN DAERAH IRIGASI LINTAS
BK.6
BK.6 Ki BK.6 Ki DAERAH KABUPATEN / KOTA
- Luas lahan terpotong TOL
55 Ha 93,5 Lt/dt

A = 357 Ha
Q = 802.3 Lt/dt

BK.7 BK.7 Ki BSD.2 Ki NAMA PEKERJAAN


10 Ha 15 Lt/dt - Posisi Sawah Lebih Tinggi (Tidak Berfungsi)

BSD.2 Ki

A = 347 Ha
34 Ha 57,8 Lt/dt PENYUSUNAN DED REHABILITASI
Q = 787,3 Lt/dt JARINGAN IRIGASI ( Lokasi 8 )

BSD.2
BK.8
A = 138 Ha BSD.1 A = 88 Ha
Q = 434 Lt/dt Q = 349 Lt/dt LOKASI

Jalan TOL
BSD.1 Ka BSD.2 Ka DAERAH IRIGASI : WAY KETIBUNG
50 Ha 85 Lt/dt 88 Ha 349 Lt/dt KECAMATAN : SIDOMULYO
A = 209 Ha
Q = 353,3 Lt/dt KABUPATEN : LAMPUNG SELATAN

BK.9 Ki
BK.9
3 Ha 5,10 Lt/dt

A = 206 Ha
Q = 348,2 Lt/dt DRAFTER Ardian , Amd

BK.9 Ka
BJM.3 Ka 10 Ha 15 Lt/dt
BJM.1 Ka
- Posisi Sawah Lebih
- Petani Tidak Mau BK.10'
Tinggi (Tidak Berfungsi)
(Tidak Berfungsi)
BJM.3 Ka BJM.1 Ka A = 196 Ha BPJ.1 Ki

206 Ha 350,2 Lt/dt 10 Ha 15 Lt/dt


Q = 333,2 Lt/dt 55 Ha 93,5 Lt/dt
TEAM LEADER Cahyo Sujatmiko, S.T

A = 25 Ha
Q = 42,5 Lt/dt
BJM.3 BJM.2 BJM.1 BJM.1' BK.10 BPJ.1
B. Talang Rusak
A = 85 Ha
Q = 144,5 Lt/dt
A = 90 Ha A = 90 Ha KONSULTAN PERENCANA
Q = 153 Lt/dt Q = 153 Lt/dt
CV. TUNAS NUSANTARA KONSULTAN

BJM.3 Ki BJM.2 Ki BJM.1 Ki BJM.1' Ki BK.10 Tgh BPJ.1 Ka

131 Ha 222,7 Lt/dt 25 Ha 42,5 Lt/dt 60 Ha 102 Lt/dt 5 Ha 8,50 Lt/dt 16 Ha 27,2 Lt/dt 35 Ha 59,5 Lt/dt

BJM.3 Ki
- Posisi Sawah Lebih
Tinggi (Tidak Berfungsi)

(INDRA SAPUTRA. ST)


DIREKTUR

SEKEMA JARINGAN IRIGASI SIDOMULYO TAHUN NO. LEMBAR JMLH. LBR


NotScal

2021 01 48

Anda mungkin juga menyukai