Anda di halaman 1dari 1

REPUBLIK INDONESIA

KEMENTERIAN PEKERJAAN UMUM DAN PERUMAHAN RAKYAT


DIREKTORAT JENDERAL BINA MARGA
BALAI BESAR PELAKSANAAN JALAN NASIONAL XI
SATKER PELAKSANAAN JALAN NASIONAL WILAYAH II
PROVINSI KALIMANTAN SELATAN

PAKET PEKERJAAN

PENGGANTIAN JEMBATAN S. PELUKAN KECIL CS

A1 P1 P2 A2

100.66

0.03 Gelagar Beton Pratekan 0.46


0.46 0.03 0.03
Pile Slab 1 Pile Slab 2 Pile Slab 3
82.55 20 m K-500 Klas A 139.94
25.00 m 24.14 m 29.97 m
20.60 m
Pagar Pengaman 30m 2% 15.00 m 0% 40.67 m 2% 24.99 m 4% 20.00 m Pagar Pengaman 25 m
USULANPERUBAHANDESAIN
MAB +9.120 1.30
MA.Pengukuran +8.320

Cerucuk Galam Ø10-12cm 30/30 panjang 7 m


Cerucuk Galam Ø10-12cm 30/30 panjang 7 m JUDUL GAMBAR :

TAMPAK SAMPING
TAMPAK SAMPING DESAIN

Lokasi : JEMBATAN S. JAYAU

Diajukan Oleh :
PENYEDIA JASA

DIGAMBAR DIPERIKSA

PARAF
A1 P1 P2 A2

M. YUSUF, ST Ir. ERY AGUNG KUSWORO


General Superintendent
30.00 100.66 30.00
Gelagar Beton Pratekan 0.46 Diperiksa Oleh :
0.03 Pile Slab 1 0.46 Pile Slab 2 0.03 Pile Slab 3 0.03
20 m K-500 Klas A Konsultan Supervisi
25.00 m 24.14 m 29.97 m
20.60 m Pagar Pengaman 25 m PT. ANUGERAH KRIDAPRADANA
Pagar Pengaman 30m 2% 15.00 m 0% 55.66 m 2% 30.00 m

MAB +9.120 1.30


MA.Pengukuran +8.320

Cerucuk Galam Ø10-12cm 30/30 panjang 7 m


Cerucuk Galam Ø10-12cm 30/30 panjang 7 m

SUGENG PRIYONO, ST
Ketua Tim Supervisi / Site Engineer

Disetujui Oleh :
Konsultan Perencana
TAMPAK SAMPING USULAN PT. Winsolusi Konsultan

IWAN MA'RUF, ST
Ketua Tim

Diketahui Oleh :
KOORDINATOR LAPANGAN

ACHMAD HERYADI, ST
NIP. 19750104 200812 1 001