3 Selasa, 27 Apr 2021 * Membeli ATK 3 Paket @ Rp. 365.000,- 1,095,000 132,300,000
4 Jumat, 30 Apr 2021 * Pembelian Kayu Kaso 4/6 kls III P.4m 9 Batang @25.000,- 225,000 132,075,000
* Pembelian paku 2kg @Rp.25.000,- 50,000 132,025,000
11 Selasa, 01 Jun 2021 *Membayar Upah Kerja Pembersihan dan galian (17,18,19 Mei 2021)
- Pekerja : 47 OH @ Rp 100,000 4,700,000 82,435,000
15 Senin, 14 Jun 2021 *Membayar Upah Kerja Pembersihan dan galian (20,22,23 Mei 2021)
- Pekerja : 46 OH @ Rp 100,000 4,600,000 71,035,000
3 Friday, June 25, 2021 * Membayar Pembelian Meterial Tanggal 01,02 Juni 2021
- Batu Gunung : 12 m3 @ Rp 250,000 3,000,000 55,721,000
- Pasir : 20 m3 @ Rp 250,000 5,000,000 50,721,000
4 Friday, June 25, 2021 * Membayar Pembelian Meterial Tanggal 02 Juni 2021
- Semen : 100 Zak @ Rp 62,000 6,200,000 44,521,000
5 Friday, June 25, 2021 * Membayar Pembelian Meterial Tanggal 07,08,10 Juni 2021
- Batu gunung : 14 m3 @ Rp 250,000 3,500,000 41,021,000
- Semen : 100 Zak @ Rp 62,000 6,200,000 34,821,000
6 Friday, June 25, 2021 * Pembayaran Pembelian Meterial Tanggal 11,14 Juni 2021:
- Batu Gunung : 16 m3 @ Rp 250,000 4,000,000 30,821,000
- Semen : 50 Zak @ Rp 62,000 3,100,000 27,721,000
15 Monday, July 05, 2021 Pelaporan 3 bulan (April, Mei, Juni 2021) @ Rp. 1.300.000,- 3,900,000 1,367,000