DINAS PENDIDIKAN
Jalan Poros Utama Komplek Perkantoran Suka Makmue
T. ANGGARAN : 2015
KONSULTAN PERENCANA
TABEL PEMBESIAN CETAKAN BEKISITNG
INPUT 40 x 40 cm
Kolom 40 x 40 cm
Pajang Kolom/M3 = 6.2500
INPUT 30 x 30 cm
Kolom 30 x 30 cm
Pajang Kolom/M3 = 11.1111
INPUT 25 x 30 cm
Kolom 25 x 30 cm
Pajang Kolom/M3 = 13.3333
INPUT 25 x 25 cm
Kolom 25 x 25 cm
Pajang Kolom/M3 = 16.0000
INPUT 20 x 20 cm
Kolom 20 x 20 cm
Pajang Kolom /M3 = 25.0000
1 of 5
TABEL PEMBESIAN CETAKAN BEKISITNG
INPUT 15 x 15 cm
Kolom 15 x 15 cm
Pajang Kolom /M3 = 44.4444
INPUT 13 x 13 cm
Kolom 13 x 13 cm
Pajang Kolom /M3 = 59.1716
INPUT 30 x 45 cm
Sloof 30 x 45 cm
Pajang Sloof/M3 = 7.4074
INPUT 25 x 40 cm
Sloof 25 x 40 cm
Pajang Sloof/M3 = 10.0000
INPUT 25 x 35 cm
Sloof 25 x 35 cm
Pajang Sloof/M3 = 11.4286
1 of 5
TABEL PEMBESIAN CETAKAN BEKISITNG
INPUT 25 x 30 cm
Sloof 25 x 30 cm
Pajang Sloof/M3 = 13.3333
INPUT 20 x 25 cm
Sloof 20 x 25 cm
Pajang Sloof/M3 = 20.0000
INPUT 15 x 25 cm
Sloof 15 x 25 cm
Pajang Sloof/M3 = 26.6667
INPUT 15 x 20 cm
Sloof 15 x 20 cm
Pajang Sloof/M3 = 33.3333
INPUT 30 x 40 cm
Ring Balok 30 x 40 cm
Pajang Ring Balk/M3 = 8.3333
1 of 5
TABEL PEMBESIAN CETAKAN BEKISITNG
INPUT 25 x 30 cm
Ring Balok 25 x 30 cm
Pajang Ring Balk/M3 = 13.3333
INPUT 20 x 30 cm
Ring Balok 20 x 30 cm
Pajang Ring Balk/M3 = 16.6667
INPUT 20 x 25 cm
Ring Balok 20 x 25 cm
Pajang Ring Balk/M3 = 20.0000
INPUT 15 x 20 cm
Ring Balok 15 x 20 cm
Pajang Ring Balk/M3 = 33.3333
INPUT 15 x 18 cm
Ring Balok 15 x 18 cm
Pajang Ring Balk/M3 = 37.0370
1 of 5
TABEL PEMBESIAN CETAKAN BEKISITNG
INPUT 15 x 15 cm
Ring Balok 15 x 15 cm
Pajang Ring Balk/M3 = 44.4444
INPUT 13 x 15 cm
Balok Latai 13 x 15 cm
Pajang Balok/M3 = 51.2821
INPUT 13 x 13 cm
Balok Latai 13 x 13 cm
Pajang Balok/M3 = 59.1716
INPUT 90 x 90 cm
Pondasi Tapak 90 x 90 cm
Pajang Pondasi/M3 = 1.2346
1 of 5
TABEL PEMBESIAN CETAKAN BEKISITNG
INPUT 80 x 80 cm
Pondasi Tapak 80 x 80 cm
Pajang Pondasi/M3 = 1.5625
INPUT 0.12 x 1 M
Plat Lantai 0.12 x 1 M
Luas Plat/ M3 = 8.3333
INPUT 0.1 x 1 M
Plat Lantai 0.1 x 1 M
Luas Plat/ M3 = 10.0000
INPUT 0.07 x 1 M
Plat Lantai 0.07 x 1 M
Luas Plat/ M3 = 14.2857
1 of 5
TABEL PEMBESIAN CETAKAN BEKISITNG
1 of 5
ENGINEERING ESTIMATE ( EE )
REKAPITULASI RENCANA ANGGARAN BIAYA ( RAB )
JUMLAH HARGA
N0. JENIS PEKERJAAN
(Rp.)
JUMLAH #N/A
PPN 10% #N/A
TOTAL #N/A
DIBULATKAN #N/A
Terbilang : ###
IAN RIZKIAN, ST
Direktur
Rekapitulasi 9
ENGINEERING ESTIMATE ( EE )
RENCANA ANGGARAN BIAYA ( RAB )
HARGA JUMLAH
NO URAIAN PEKERJAAN VOLUME SAT. ANALISA SATUAN HARGA
(Rp) (Rp)
1 2 3 4 5 6 7
A PEKERJAAN PERSIAPAN
1 Pekerjaan Pembongkaran Pasangan Lama 1.00 Unit Taksir 2,000,000.00 2,000,000.00
1 Papan Nama Proyek 1.00 Unit Taksir 400,000.00 400,000.00
2 Administrasi / P3K / Pelaporan 1.00 Ls Taksir 3,000,000.00 3,000,000.00
Sub Jumlah A 5,400,000.00
B PEKERJAAN REHAB ATAP & PLAFOND
1 Lisplank Kayu 2/30 cm 5.09 M2 #N/A #N/A
2 Rangka Plafond Kayu 5/5 Kayu Klas II 160.48 M2 A. 4.5.1.4 #N/A #N/A
3 Plafond Triplek 4 mm 160.48 M2 A. 4.5.1.5 78,200.00 12,549,312.63
4 List Profil Pinggir Plafond 178.19 M1 A. 4.5.1.9 52,900.00 9,426,145.20
Sub Jumlah B #N/A
C PEKERJAAN MEKANIKAL ELETRIKAL
1 Armature :
- Lampu HE 23 Watt + Accessories Lengkap Terpasang 14.00 Bh Taksir 120,000.00 1,680,000.00
- Saklar Tunggal 1.00 Bh Taksir 32,000.00 32,000.00
- Saklar Ganda 2.00 Bh Taksir 35,000.00 70,000.00
2 Perbaikan Instalasi Listrik, Termasuk Kabel, Pipa PVC Terpasang 1.00 Ls A. 4.4.1.9 127,900.00 127,900.00
Sub Jumlah C 1,909,900.00
D PEKERJAAN REHAB KUSEN, PINTU, JENDELA & VENTILASI
1 Pmsg. Pintu Type-P1 :
- Kusen Pintu Kayu Klas I 0.11 M3 A. 4.6.1.1 9,056,600.00 988,980.72
- Daun Pintu Panel Kayu Klas II 3.88 M2 A. 4.6.1.5 756,200.00 2,935,870.88
- Kunci Pintu 2 Slaag 10.00 Bh A. 4.6.2.2 345,200.00 3,452,000.00
- Engsel Pintu 4" 4.00 Bh A. 4.6.2.5 54,800.00 219,200.00
- Pacok Pintu 4.00 Bh A. 4.6.2.11 59,100.00 236,400.00
2 Pmsg. Pintu Type-P3 :
- Kusen Pintu Kayu Klas I 0.04 M3 A. 4.6.1.1 9,056,600.00 395,592.29
- Daun Pintu Panel Kayu Klas II 2.83 M2 A. 4.6.1.5 756,200.00 2,138,079.88
- Engsel Pintu 4" 4.00 Bh A. 4.6.2.5 54,800.00 219,200.00
- Pacok Pintu 4.00 Bh A. 4.6.2.11 59,100.00 236,400.00
3 Pmsg. Jendela Type-J1 :
- Kusen Jendela Kayu Klas I 0.15 M3 A. 4.6.1.1 9,056,600.00 1,337,949.63
- Daun Jendela Panel Kayu Klas II + Kaca Polos t=5 mm 6.00 Bh Taksir 0.00
- Engsel Jendela 3" 12.00 Bh #N/A #N/A
- Pacok Jendela 18.00 Bh A. 4.6.2.16 196,600.00 3,538,800.00
4 Pmsg. Ventelasi : 0.00
- Kaca Polos t= 5 mm 19.24 M2 #N/A #N/A
Sub Jumlah D #N/A
E PEKERJAAN REHAB SANITAIR
1 Kran Air 2.00 Bh A. 5.1.1.19 106,700.00 213,400.00
2 Floor Drain 2.00 Bh A. 5.1.1.14 83,900.00 167,800.00
3 Instalasi Air Kotor Pipa PVC 4" Type AW + Acs. Terpasang 1.00 Ls Taksir 1,250,000.00 1,250,000.00
4 Instalasi Air Bersih Pipa PVC 3/4" Type AW + Acs. Terpasang 1.00 Ls Taksir 1,250,000.00 1,250,000.00
Sub Jumlah E 2,881,200.00
F PEKERJAAN REHAB LANTAI
1 Lantai Keramik Toilet / Kamar Mandi 20x20 cm 1.00 M2 A. 4.4.3.6 #N/A #N/A
1 Lantai Keramik Selasar 30/30 cm 8.08 M2 A. 4.4.3.8 #N/A #N/A
Sub Jumlah F #N/A
NO. ANALISA
A A.2.2.1
1 A. 2.2.1.1
2 A. 2.2.1.2
3 A. 2.2.1.3
4 A. 2.2.1.4
5 A. 2.2.1.5
6 A. 2.2.1.6
7 A. 2.2.1.7
8 A. 2.2.1.8
9 A. 2.2.1.9
10 A. 2.2.1.10
11 A. 2.2.1.11
12 A. 2.2.1.12
13 A. 2.2.1.13
14 A. 2.2.1.14
15 A. 2.2.1.15
16 A. 2.2.1.16
B A.2.3.1
1 A. 2.3.1.1
2 A. 2.3.1.2
3 A. 2.3.1.3
4 A. 2.3.1.4
5 A. 2.3.1.5
6 A. 2.3.1.6
7 A. 2.3.1.7
8 A. 2.3.1.8
9 A. 2.3.1.9
10 A. 2.3.1.10
11 A. 2.3.1.11
12 A. 2.3.1.11a
13 A. 2.3.1.12
14 A. 2.3.1.13
15 A. 2.3.1.14
C A.3.2.1
1 A. 3.2.1.1
2 A. 3.2.1.2
3 A. 3.2.1.3
4 A. 3.2.1.4
5 A. 3.2.1.5
6 A. 3.2.1.6
7 A. 3.2.1.7
8 A. 3.2.1.8
9 A. 3.2.1.9
10 A. 3.2.1.10
11 A. 3.2.1.11
D A.4.1.1
1 A. 4.1.1.1
2 A. 4.1.1.2
3 A. 4.1.1.3
4 A. 4.1.1.4
5 A. 4.1.1.5
6 A. 4.1.1.6
7 A. 4.1.1.7
8 A. 4.1.1.8
9 A. 4.1.1.9
10 A. 4.1.1.10
11 A. 4.1.1.11
12 A. 4.1.1.12
13 A. 4.1.1.13
14 A. 4.1.1.14
15 A. 4.1.1.15
16 A. 4.1.1.16
17 A. 4.1.1.17
18 A. 4.1.1.18
19 A. 4.1.1.19
20 A. 4.1.1.20
21 A. 4.1.1.21
22 A. 4.1.1.22
23 A. 4.1.1.23
24 A. 4.1.1.24
25 A. 4.1.1.25
26 A. 4.1.1.26
27 A. 4.1.1.27
28 A. 4.1.1.28
29 A. 4.1.1.29
30 A. 4.1.1.30
31 A. 4.1.1.31
32 A. 4.1.1.32
33 A. 4.1.1.33
34 A. 4.1.1.34
35 A. 4.1.1.35
36 A. 4.1.1.36
E A.4.1.2
1 A. 4.1.2.1
2 A. 4.1.2.2
3 A. 4.1.2.3
4 A. 4.1.2.4
5 A. 4.1.2.5
6 A. 4.1.2.6
7 A. 4.1.2.7
8 A. 4.1.2.8
9 A. 4.1.2.9
10 A. 4.1.2.10
11 A. 4.1.2.11
12 A. 4.1.2.12
13 A. 4.1.2.13
14 A. 4.1.2.14
15 A. 4.1.2.15
16 A. 4.1.2.16
17 A. 4.1.2.17
18 A. 4.1.2.18
19 A. 4.1.2.19
20 A. 4.1.2.20
21 A. 4.1.2.21
22 A. 4.1.2.22
23 A. 4.1.2.23
24 A. 4.1.2.24
F A.4.2.1
1 A. 4.2.1.1
2 A. 4.2.1.2
3 A. 4.2.1.3
4 A. 4.2.1.4
5 A. 4.2.1.5
6 A. 4.2.1.6
7 A. 4.2.1.7
8 A. 4.2.1.8
9 A. 4.2.1.9
10 A. 4.2.1.10
11 A. 4.2.1.11
12 A. 4.2.1.12
13 A. 4.2.1.13
14 A. 4.2.1.14
15 A. 4.2.1.15
16 A. 4.2.1.16
17 A. 4.2.1.17
18 A. 4.2.1.18
19 A. 4.2.1.19
20 A. 4.2.1.20
21 A. 4.2.1.21
G A.4.4.1
1 A. 4.4.1.1
2 A. 4.4.1.2
3 A. 4.4.1.3
4 A. 4.4.1.4
5 A. 4.4.1.5
6 A. 4.4.1.6
7 A. 4.4.1.7
8 A. 4.4.1.8
9 A. 4.4.1.9
10 A. 4.4.1.10
11 A. 4.4.1.11
12 A. 4.4.1.12
13 A. 4.4.1.13
14 A. 4.4.1.14
15 A. 4.4.1.15
16 A. 4.4.1.16
17 A. 4.4.1.17
18 A. 4.4.1.18
19 A. 4.4.1.19
20 A. 4.4.1.20
21 A. 4.4.1.21
22 A. 4.4.1.22
23 A. 4.4.1.23
24 A. 4.4.1.24
H A.4.4.2
1 A. 4.4.2.1
2 A. 4.4.2.2
3 A. 4.4.2.3
4 A. 4.4.2.4
5 A. 4.4.2.5
6 A. 4.4.2.6
7 A. 4.4.2.7
8 A. 4.4.2.8
9 A. 4.4.2.9
10 A. 4.4.2.10
11 A. 4.4.2.11
12 A. 4.4.2.12
13 A. 4.4.2.13
14 A. 4.4.2.14
15 A. 4.4.2.15
16 A. 4.4.2.16
17 A. 4.4.2.17
18 A. 4.4.2.18
19 A. 4.4.2.19
20 A. 4.4.2.20
21 A. 4.4.2.21
22 A. 4.4.2.22
23 A. 4.4.2.23
24 A. 4.4.2.24
25 A. 4.4.2.25
26 A. 4.4.2.26
27 A. 4.4.2.27
I A.4.4.3
1 A. 4.4.3.1
2 A. 4.4.3.2
3 A. 4.4.3.3
4 A. 4.4.3.4
5 A. 4.4.3.5
6 A. 4.4.3.6
7 A. 4.4.3.7
8 A. 4.4.3.8
9 A. 4.4.3.9
10 A. 4.4.3.10
11 A. 4.4.3.11
12 A. 4.4.3.12
13 A. 4.4.3.13
14 A. 4.4.3.14
15 A. 4.4.3.15
16 A. 4.4.3.16
17 A. 4.4.3.17
18 A. 4.4.3.18
19 A. 4.4.3.19
20 A. 4.4.3.20
21 A. 4.4.3.21
22 A. 4.4.3.22
23 A. 4.4.3.23
24 A. 4.4.3.24
25 A. 4.4.3.25
26 A. 4.4.3.26
27 A. 4.4.3.27
28 A. 4.4.3.28
29 A. 4.4.3.29
30 A. 4.4.3.30
31 A. 4.4.3.31
32 A. 4.4.3.32
33 A. 4.4.3.33
34 A. 4.4.3.34
35 A. 4.4.3.35
36 A. 4.4.3.36
37 A. 4.4.3.37
38 A. 4.4.3.38
39 A. 4.4.3.39
40 A. 4.4.3.40
41 A. 4.4.3.41
42 A. 4.4.3.42
43 A. 4.4.3.43
44 A. 4.4.3.44
45 A. 4.4.3.45
46 A. 4.4.3.46
47 A. 4.4.3.47
48 A. 4.4.3.48
49 A. 4.4.3.49
50 A. 4.4.3.50
51 A. 4.4.3.51
52 A. 4.4.3.52
53 A. 4.4.3.53
54 A. 4.4.3.54
55 A. 4.4.3.55
56 A. 4.4.3.56
57 A. 4.4.3.57
58 A. 4.4.3.58
59 A. 4.4.3.59
60 A. 4.4.3.60
61 A. 4.4.3.61
62 A. 4.4.3.62
63 A. 4.4.3.63
J A.4.5.1
1 A. 4.5.1.1
2 A. 4.5.1.2
3 A. 4.5.1.3
4 A. 4.5.1.4
5 A. 4.5.1.5
6 A. 4.5.1.6
7 A. 4.5.1.7
8 A. 4.5.1.8
9 A. 4.5.1.9
K A.4.5.2
1 A. 4.5.2.1
2 A. 4.5.2.2
3 A. 4.5.2.3
4 A. 4.5.2.4
5 A. 4.5.2.5
6 A. 4.5.2.6
7 A. 4.5.2.7
8 A. 4.5.2.8
9 A. 4.5.2.9
10 A. 4.5.2.10
11 A. 4.5.2.11
12 A. 4.5.2.12
13 A. 4.5.2.13
14 A. 4.5.2.14
15 A. 4.5.2.15
16 A. 4.5.2.16
17 A. 4.5.2.17
18 A. 4.5.2.18
19 A. 4.5.2.19
20 A. 4.5.2.20
21 A. 4.5.2.21
22 A. 4.5.2.22
23 A. 4.5.2.23
24 A. 4.5.2.24
25 A. 4.5.2.25
26 A. 4.5.2.26
27 A. 4.5.2.27
28 A. 4.5.2.28
29 A. 4.5.2.29
30 A. 4.5.2.30
31 A. 4.5.2.31
32 A. 4.5.2.32
33 A. 4.5.2.33
34 A. 4.5.2.34
35 A. 4.5.2.35
36 A. 4.5.2.36
37 A. 4.5.2.37
38 A. 4.5.2.38
39 A. 4.5.2.39
40 A. 4.5.2.40
41 A. 4.5.2.41
42 A. 4.5.2.42
L A.4.6.1
1 A. 4.6.1.1
2 A. 4.6.1.2
3 A. 4.6.1.3
4 A. 4.6.1.4
5 A. 4.6.1.5
6 A. 4.6.1.6
7 A. 4.6.1.7
8 A. 4.6.1.8
9 A. 4.6.1.9
10 A. 4.6.1.10
11 A. 4.6.1.11
12 A. 4.6.1.12
13 A. 4.6.1.13
14 A. 4.6.1.14
15 A. 4.6.1.15
16 A. 4.6.1.16
17 A. 4.6.1.17
18 A. 4.6.1.18
19 A. 4.6.1.19
20 A. 4.6.1.20
21 A. 4.6.1.21
22 A. 4.6.1.22
23 A. 4.6.1.23
24 A. 4.6.1.24
25 A. 4.6.1.25
26 A. 4.6.1.26
27 A. 4.6.1.27
28 A. 4.6.1.28
M A.4.6.2
1 A. 4.6.2.1
2 A. 4.6.2.2
3 A. 4.6.2.3
4 A. 4.6.2.4
5 A. 4.6.2.5
6 A. 4.6.2.6
7 A. 4.6.2.7
8 A. 4.6.2.8
9 A. 4.6.2.9
10 A. 4.6.2.10
11 A. 4.6.2.11
12 A. 4.6.2.12
13 A. 4.6.2.13
14 A. 4.6.2.14
15 A. 4.6.2.15
16 A. 4.6.2.16
17 A. 4.6.2.17
18 A. 4.6.2.18
19 A. 4.6.2.19
20 A. 4.6.2.20
21 A. 4.6.2.21
22 A. 4.6.2.22
23 A. 4.6.2.23
N A.4.7.1
1 A. 4.7.1.1
2 A. 4.7.1.2
3 A. 4.7.1.3
4 A. 4.7.1.4
5 A. 4.7.1.5
6 A. 4.7.1.6
7 A. 4.7.1.7
8 A. 4.7.1.8
9 A. 4.7.1.9
10 A. 4.7.1.10
11 A. 4.7.1.11
12 A. 4.7.1.12
13 A. 4.7.1.13
14 A. 4.7.1.14
15 A. 4.7.1.15
16 A. 4.7.1.16
17 A. 4.7.1.17
18 A. 4.7.1.18
19 A. 4.7.1.19
20 A. 4.7.1.20
21 A. 4.7.1.21
O A.5.1.1
1 A. 5.1.1.1
2 A. 5.1.1.2
3 A. 5.1.1.3
4 A. 5.1.1.4
5 A. 5.1.1.5
6 A. 5.1.1.6
7 A. 5.1.1.7
8 A. 5.1.1.8
9 A. 5.1.1.9
10 A. 5.1.1.10
11 A. 5.1.1.11
12 A. 5.1.1.12
13 A. 5.1.1.13
14 A. 5.1.1.14
15 A. 5.1.1.15
16 A. 5.1.1.16
17 A. 5.1.1.17
18 A. 5.1.1.18
19 A. 5.1.1.19
20 A. 5.1.1.20
21 A. 5.1.1.21
22 A. 5.1.1.22
23 A. 5.1.1.23
24 A. 5.1.1.24
25 A. 5.1.1.25
26 A. 5.1.1.26
27 A. 5.1.1.27
28 A. 5.1.1.28
29 A. 5.1.1.29
30 A. 5.1.1.30
31 A. 5.1.1.31
32 A. 5.1.1.32
33 A. 5.1.1.33
34 A. 5.1.1.34
35 A. 5.1.1.35
36 A. 5.1.1.36
P A.8.4.1
1 A. 8.4.1.1
2 A. 8.4.1.2
3 A. 8.4.1.3
4 A. 8.4.1.4
5 A. 8.4.1.5
6 A. 8.4.1.6
7 A. 8.4.1.7
8 A. 8.4.1.8
9 A. 8.4.1.9
10 A. 8.4.1.10
11 A. 8.4.1.11
12 A. 8.4.1.12
13 A. 8.4.1.13
14 A. 8.4.1.14
15 A. 8.4.1.15
16 A. 8.4.1.16
17 A. 8.4.1.17
18 A. 8.4.1.18
19 A. 8.4.1.19
20 A. 8.4.1.20
21 A. 8.4.1.21
22 A. 8.4.1.22
23 A. 8.4.1.23
24 A. 8.4.1.24
25 A. 8.4.1.25
26 A. 8.4.1.26
27 A. 8.4.1.27
28 A. 8.4.1.28
29 A. 8.4.1.29
30 A. 8.4.1.30
31 A. 8.4.1.31
32 A. 8.4.1.32
33 A. 8.4.1.33
34 A. 8.4.1.34
35 A. 8.4.1.35
36 A. 8.4.1.36
37 A. 8.4.1.37
38 A. 8.4.1.38
39 A. 8.4.1.39
40 A. 8.4.1.40
41 A. 8.4.1.41
42 A. 8.4.1.42
43 A. 8.4.1.43
44 A. 8.4.1.44
45 A. 8.4.1.45
46 A. 8.4.1.46
47 A. 8.4.1.47
48 A. 8.4.1.48
49 A. 8.4.1.49
50 A. 8.4.1.50
51 A. 8.4.1.51
52 A. 8.4.1.52
53 A. 8.4.1.53
54 A. 8.4.1.54
55 A. 8.4.1.55
56 A. 8.4.1.56
57 A. 8.4.1.57
58 A. 8.4.1.58
59 A. 8.4.1.59
60 A. 8.4.1.60
61 A. 8.4.1.61
62 A. 8.4.1.62
63 A. 8.4.1.63
64 A. 8.4.1.64
65 A. 8.4.1.65
66 A. 8.4.1.66
67 A. 8.4.1.67
68 A. 8.4.1.68
69 A. 8.4.1.69
70 A. 8.4.1.70
71 A. 8.4.1.71
72 A. 8.4.1.72
73 A. 8.4.1.73
74 A. 8.4.1.74
75 A. 8.4.1.75
76 A. 8.4.1.76
77 A. 8.4.1.77
78 A. 8.4.1.78
79 A. 8.4.1.79
Q A.8.4.2
1 A. 8.4.2.1
2 A. 8.4.2.2
3 A. 8.4.2.3
4 A. 8.4.2.4
5 A. 8.4.2.5
6 A. 8.4.2.6
7 A. 8.4.2.7
R A. 8.4.3
1 A. 8.4.3.1
2 A. 8.4.3.2
3 A. 8.4.3.3
4 A. 8.4.3.4
5 A. 8.4.3.5
6 A. 8.4.3.6
7 A. 8.4.3.7
8 A. 8.4.3.8
9 A. 8.4.3.9
10 A. 8.4.3.10
11 A. 8.4.3.11
12 A. 8.4.3.12
REKAP ANALISA SATUAN PEKERJAAN
URAIAN PEKERJAAN
373,800.00
473,100.00
5,583,500.00
517,300.00
1,527,000.00
1,641,600.00
1,474,900.00
1,545,000.00
20,900.00
476,400.00
168,600.00
214,200.00
1,598,600.00
799,300.00
61,300.00
#N/A
87,400.00
107,900.00
128,700.00
116,300.00
176,800.00
140,900.00
6,400.00
38,200.00
64,900.00
64,900.00
127,300.00
114,100.00
294,400.00
415,400.00
190,800.00
1,125,300.00
1,067,600.00
1,027,600.00
999,500.00
961,100.00
826,100.00
932,300.00
901,000.00
650,500.00
4,005,900.00
984,200.00
808,000.00
851,800.00
886,300.00
718,000.00
927,000.00
724,300.00
994,800.00
1,014,000.00
1,046,700.00
1,057,000.00
1,161,200.00
1,174,500.00
971,200.00
127,400.00
188,000.00
223,800.00
259,700.00
252,900.00
406,700.00
223,800.00
237,700.00
453,600.00
403,100.00
485,600.00
502,300.00
425,600.00
143,900.00
5,967,200.00
7,553,700.00
12,653,100.00
9,478,000.00
8,386,200.00
8,064,200.00
8,890,600.00
124,500.00
155,600.00
72,400.00
90,600.00
97,500.00
99,500.00
#N/A
#N/A
#N/A
9,100.00
14,700.00
11,900.00
79,500.00
87,500.00
74,000.00
116,200.00
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
96,600.00
84,400.00
57,100.00
48,300.00
33,800.00
2,530,700.00
25,900.00
#N/A
#N/A
#N/A
#N/A
#N/A
87,900.00
29,003,200.00
896,400.00
#N/A
#N/A
#N/A
545,000.00
205,100.00
197,500.00
#N/A
#N/A
287,500.00
272,000.00
262,200.00
256,300.00
252,400.00
#N/A
139,100.00
132,100.00
127,900.00
125,300.00
123,600.00
120,800.00
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
567,500.00
567,500.00
1,239,800.00
85,600.00
77,700.00
74,100.00
71,800.00
70,400.00
69,300.00
68,600.00
68,000.00
#N/A
#N/A
#N/A
#N/A
104,000.00
82,100.00
96,200.00
94,300.00
92,800.00
#N/A
40,700.00
75,000.00
#N/A
#N/A
59,100.00
34,900.00
16,600.00
70,800.00
44,900.00
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
275,600.00
253,700.00
240,700.00
#N/A
#N/A
78,200.00
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
275,500.00
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
78,200.00
#N/A
70,200.00
#N/A
52,900.00
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
129,200.00
#N/A
#N/A
#N/A
102,700.00
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
9,056,600.00
#N/A
#N/A
#N/A
756,200.00
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
141,500.00
82,200.00
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
345,200.00
157,300.00
#N/A
54,800.00
40,900.00
#N/A
#N/A
36,200.00
#N/A
59,100.00
250,200.00
#N/A
#N/A
#N/A
196,600.00
220,800.00
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
44,600.00
#N/A
#N/A
#N/A
#N/A
#N/A
32,100.00
21,300.00
#N/A
#N/A
#N/A
#N/A
39,000.00
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
916,300.00
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
83,900.00
#N/A
#N/A
#N/A
#N/A
106,700.00
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
3,494,619.59
6,666,738.29
7,550,932.27
8,073,901.33
4,681,480.00
5,781,794.00
8,003,504.53
8,470,932.21
7,273,285.59
7,814,926.98
4,666,850.14
4,168,447.12
ANALISA HARGA SATUAN PERKERJAAN
A. 3.2.1.10 Pemasangan 1 m3 pondasi siklop, 60% beton campuran 1SP : 2PB : 3Kr dan 40% batu belah
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 3.400 100,000.00 340,000.00
Tukang Batu L.02 OH 0.850 120,000.00 102,000.00
Kepala Tukang L.03 OH 0.085 240,000.00 20,400.00
Mandor L.04 OH 0.170 180,000.00 30,600.00
JUMLAH TENAGA KERJA 493,000.00
B BAHAN
Batu belah m3 0.480 350,000.00 168,000.00
Semen Portlan Kg 194.000 1,425.00 276,450.00
Pasir Beton m3 0.312 90,000.00 28,080.00
Kerikil m3 0.468 120,000.00 56,160.00
Besi beton Kg 126.000 20,480.00 2,580,480.00
Kawat beton Kg 1.800 22,000.00 39,600.00
JUMLAH HARGA BAHAN 3,148,770.00
C PERALATAN
A. 4.1.1.1 Membuat 1 m3 beton mutu f'c = 7,4 Mpa (K 100), slump 12 ± 2) cm, w/c = 0,87
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 1.650 100,000.00 165,000.00
Tukang Batu L.02 OH 0.275 120,000.00 33,000.00
Kepala Tukang L.03 OH 0.028 240,000.00 6,720.00
Mandor L.04 OH 0.083 180,000.00 14,940.00
JUMLAH TENAGA KERJA 219,660.00
B BAHAN
Semen Portland kg 247.000 1,425.00 351,975.00
Pasir Beton kg 869.000 64.29 55,864.29
Kerikil (Maks 30mm) kg 999.000 85.71 85,628.57
Air Liter 215.000 100.00 21,500.00
JUMLAH HARGA BAHAN 514,967.86
C PERALATAN
A. 4.1.1.2 Membuat 1 m3 beton mutu f'c = 9,8 Mpa (K 125), slump 12 ± 2) cm, w/c = 0,78
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 1.650 100,000.00 165,000.00
Tukang Batu L.02 OH 0.275 120,000.00 33,000.00
Kepala Tukang L.03 OH 0.028 240,000.00 6,720.00
Mandor L.04 OH 0.083 180,000.00 14,940.00
JUMLAH TENAGA KERJA 219,660.00
B BAHAN
1. Semen Portland kg 276.000 1,425.00 393,300.00
2. Pasir Beton kg 828.000 64.29 53,228.57
3. Kerikil(Maks 30mm) kg 1,012.000 85.71 86,742.86
4. Air Liter 215.000 100.00 21,500.00
JUMLAH HARGA BAHAN 554,771.43
C PERALATAN
A. 4.1.1.3 Membuat 1 m3 beton mutu f'c = 12,2 Mpa (K 150), slump 12 ± 2) cm, w/c = 0,72
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 1.650 100,000.00 165,000.00
Tukang Batu L.02 OH 0.275 120,000.00 33,000.00
Kepala Tukang L.03 OH 0.028 240,000.00 6,720.00
Mandor L.04 OH 0.083 180,000.00 14,940.00
JUMLAH TENAGA KERJA 219,660.00
B BAHAN
Semen Portland kg 299.000 1,425.00 426,075.00
Pasir Beton kg 799.000 64.29 51,364.29
Kerikil(Maks 30mm) kg 1,017.000 85.71 87,171.43
Air Liter 215.000 100.00 21,500.00
JUMLAH HARGA BAHAN 586,110.71
C PERALATAN
A. 4.1.1.5 Membuat 1 m3 beton mutu f'c = 14,5 Mpa (K 175), slump (12 ± 2) cm, w/c = 0,66
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 1.650 100,000.00 165,000.00
Tukang Batu L.02 OH 0.275 120,000.00 33,000.00
Kepala Tukang L.03 OH 0.028 240,000.00 6,720.00
Mandor L.04 OH 0.083 180,000.00 14,940.00
JUMLAH TENAGA KERJA 219,660.00
B BAHAN
Semen Portland kg 326.000 1,425.00 464,550.00
Pasir Beton kg 760.000 64.29 48,857.14
Kerikil kg 1,029.000 85.71 88,200.00
(Maks
Air 30mm) Liter 215.000 100.00 21,500.00
JUMLAH HARGA BAHAN 623,107.14
C PERALATAN
A. 4.1.1.6 Membuat 1 m3 beton mutu f'c = 16,9 Mpa (K 200), slump (12 ± 2) cm, w/c = 0,61
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 1.650 100,000.00 165,000.00
Tukang Batu L.02 OH 0.275 120,000.00 33,000.00
Kepala Tukang L.03 OH 0.028 240,000.00 6,720.00
Mandor L.04 OH 0.083 180,000.00 14,940.00
JUMLAH TENAGA KERJA
B BAHAN
Semen Portland kg 352.000 1,425.00 501,600.00
Pasir Beton kg 731.000 64.29 46,992.86
Kerikil kg 1,031.000 85.71 88,371.43
(Maks
Air 30mm) Liter 215.000 100.00 21,500.00
JUMLAH HARGA BAHAN 658,464.29
C PERALATAN
A. 4.1.1.7 Membuat 1 m3 beton mutu f'c = 19,3 Mpa (K 225), slump (12 ± 2) cm, w/c = 0,58
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 1.650 100,000.00 165,000.00
Tukang Batu L.02 OH 0.275 120,000.00 33,000.00
Kepala Tukang L.03 OH 0.028 240,000.00 6,720.00
Mandor L.04 OH 0.083 180,000.00 14,940.00
JUMLAH TENAGA KERJA 219,660.00
B BAHAN
Semen Portland kg 371.000 1,425.00 528,675.00
Pasir Beton kg 698.000 64.29 44,871.43
Kerikil (Maks 30mm) kg 1,047.000 85.71 89,742.86
Air Liter 215.000 100.00 21,500.00
JUMLAH HARGA BAHAN 684,789.29
C PERALATAN
A. 4.1.1.8 Membuat 1 m3 beton mutu f'c = 21,7 Mpa (K 250), slump (12 ± 2) cm, w/c = 0,56
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 1.650 100,000.00 165,000.00
Tukang Batu L.02 OH 0.275 120,000.00 33,000.00
Kepala Tukang L.03 OH 0.028 240,000.00 6,720.00
Mandor L.04 OH 0.083 180,000.00 14,940.00
JUMLAH TENAGA KERJA 219,660.00
B BAHAN
Semen Portland kg 384.000 1,425.00 547,200.00
Pasir Beton kg 692.000 64.29 44,485.71
Kerikil kg 1,039.000 85.71 89,057.14
(Maksimum
Air 30mm) Liter 215.000 100.00 21,500.00
JUMLAH HARGA BAHAN 702,242.86
C PERALATAN
A. 4.1.1.9 Membuat 1 m3 beton mutu f'c = 24,0 Mpa (K 275), slump (12 ± 2) cm, w/c = 0,53
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 1.650 100,000.00 165,000.00
Tukang Batu L.02 OH 0.275 120,000.00 33,000.00
Kepala Tukang L.03 OH 0.028 240,000.00 6,720.00
Mandor L.04 OH 0.083 180,000.00 14,940.00
JUMLAH TENAGA KERJA 219,660.00
B BAHAN
Semen Portland kg 406.000 1,425.00 578,550.00
Pasir Beton kg 684.000 64.29 43,971.43
Kerikil (Maks 30mm) kg 1,026.000 85.71 87,942.86
Air Liter 215.000 100.00 21,500.00
JUMLAH HARGA BAHAN 731,964.29
C PERALATAN
A. 4.1.1.10 Membuat 1 m3 beton mutu f'c = 26,4 Mpa (K 300), slump (12 ± 2) cm, w/c = 0,52
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 1.650 100,000.00 165,000.00
Tukang Batu L.02 OH 0.275 120,000.00 33,000.00
Kepala Tukang L.03 OH 0.028 240,000.00 6,720.00
Mandor L.04 OH 0.083 180,000.00 14,940.00
JUMLAH TENAGA KERJA 219,660.00
B BAHAN
Semen Portland kg 413.000 1,425.00 588,525.00
Pasir Beton m3 681.000 64.29 43,778.57
Kerikil (Maks 30mm) m3 1,021.000 85.71 87,514.29
Air Liter 215.000 100.00 21,500.00
JUMLAH HARGA BAHAN 741,317.86
C PERALATAN
A. 4.4.1.1 Pemasangan 1 m2 dinding bata merah (5x11x22) cm tebal 1 batu campuran 1SP : 2PP
Jumlah
Harga Satuan
No Uraian Kode Satuan Koefisien Harga
(Rp)
(Rp)
A TENAGA
Pekerja L.01 OH 0.600 100,000.00 60,000.00
Tukang Batu L.02 OH 0.200 120,000.00 24,000.00
Kepala Tukang L.03 OH 0.020 240,000.00 4,800.00
Mandor L.04 OH 0.030 180,000.00 5,400.00
JUMLAH TENAGA KERJA 94,200.00
B BAHAN
Bata merah bh 140.000 700.00 98,000.00
Semen Portlan Kg 43.500 1,425.00 61,987.50
Pasir Pasang m3 0.080 90,000.00 7,200.00
JUMLAH HARGA BAHAN 167,187.50
C PERALATAN
A. 4.4.1.3 Pemasangan 1 m2 dinding bata merah (5x11x22) cm tebal 1 batu campuran 1SP : 4PP
Jumlah
Harga Satuan
No Uraian Kode Satuan Koefisien Harga
(Rp)
(Rp)
A TENAGA
Pekerja L.01 OH 0.600 100,000.00 60,000.00
Tukang Batu L.02 OH 0.200 120,000.00 24,000.00
Kepala Tukang L.03 OH 0.020 240,000.00 4,800.00
Mandor L.04 OH 0.030 180,000.00 5,400.00
JUMLAH TENAGA KERJA 94,200.00
B BAHAN
Bata merah bh 140.000 700.00 98,000.00
Semen Portlan Kg 26.550 1,425.00 37,833.75
Pasir Pasang m3 0.093 90,000.00 8,370.00
JUMLAH HARGA BAHAN 144,203.75
C PERALATAN
A. 4.4.1.7 Pemasangan 1 m2 dinding bata merah (5x11x22) cm tebal 1/2 batu campuran 1SP : 2PP
Jumlah
Harga Satuan
No Uraian Kode Satuan Koefisien Harga
(Rp)
(Rp)
A TENAGA
Pekerja L.01 OH 0.300 100,000.00 30,000.00
Tukang Batu L.02 OH 0.100 120,000.00 12,000.00
Kepala Tukang L.03 OH 0.010 240,000.00 2,400.00
Mandor L.04 OH 0.015 180,000.00 2,700.00
JUMLAH TENAGA KERJA 47,100.00
B BAHAN
Bata merah bh 70.000 700.00 49,000.00
Semen Portlan Kg 18.950 1,425.00 27,003.75
Pasir Pasang m3 0.038 90,000.00 3,420.00
JUMLAH HARGA BAHAN 79,423.75
C PERALATAN
A. 4.4.1.9 Pemasangan 1 m2 dinding bata merah (5x11x22) cm tebal 1/2 batu campuran 1SP : 4PP
Jumlah
Harga Satuan
No Uraian Kode Satuan Koefisien Harga
(Rp)
(Rp)
A TENAGA
Pekerja L.01 OH 0.300 100,000.00 30,000.00
Tukang Batu L.02 OH 0.100 120,000.00 12,000.00
Kepala Tukang L.03 OH 0.010 240,000.00 2,400.00
Mandor L.04 OH 0.015 180,000.00 2,700.00
JUMLAH TENAGA KERJA 47,100.00
B BAHAN
Bata merah bh 70.000 700.00 49,000.00
Semen Portlan Kg 11.500 1,425.00 16,387.50
Pasir Pasang m3 0.043 90,000.00 3,870.00
JUMLAH HARGA BAHAN 69,257.50
C PERALATAN
A. 4.4.3.33 Pemasangan 1 m2 lantai keramik artistik 10cm x 10cm atau 5cm x 20cm
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.700 100,000.00 70,000.00
Tukang Batu L.02 OH 0.350 120,000.00 42,000.00
Kepala tukang L.03 OH 0.035 240,000.00 8,400.00
Mandor L.04 OH 0.035 180,000.00 6,300.00
JUMLAH TENAGA KERJA 126,700.00
B BAHAN
Ubin keramik Bh 106.000 #N/A #N/A
Semen Portlan Kg 8.190 1,425.00 11,670.75
Pasir pasang M3 0.045 90,000.00 4,050.00
Semen warna Kg 3.200 4,000.00 12,800.00
JUMLAH HARGA BAHAN #N/A
C PERALATAN
A. 4.5.1.5 Pemasangan 1 m2 langit-langit tripleks ukuran (120 x 240) cm, tebal 3 mm, 4 mm & 6 mm
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.100 100,000.00 10,000.00
Tukang kayu L.02 OH 0.100 120,000.00 12,000.00
Kepala tukang L.03 OH 0.010 240,000.00 2,400.00
Mandor L.04 OH 0.005 180,000.00 900.00
JUMLAH TENAGA KERJA 25,300.00
B BAHAN
Tripleks Lembar 0.375 120,000.00 45,000.00
Paku tripleks kg 0.030 26,640.00 799.20
JUMLAH HARGA BAHAN 45,799.20
C PERALATAN
A. 4.5.1.7 Pemasangan 1 m2 langit-langit gypsum board ukuran (120 x 240 x 9) mm, tebal 9 mm
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.100 100,000.00 10,000.00
Tukang kayu L.02 OH 0.050 120,000.00 6,000.00
Kepala tukang L.03 OH 0.005 240,000.00 1,200.00
Mandor L.04 OH 0.005 180,000.00 900.00
JUMLAH TENAGA KERJA 18,100.00
B BAHAN
Gypsum board Lembar 0.364 123,250.00 44,863.00
Paku skrup kg 0.110 8,500.00 935.00
JUMLAH HARGA BAHAN 45,798.00
C PERALATAN
A. 4.6.1.1 Pembuatan dan pemasangan 1 m3 kusen pintu dan kusen jendela, kayu kelas I
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 7.000 100,000.00 700,000.00
Tukang kayu L.03 OH 21.000 120,000.00 2,520,000.00
Kepala tukang L.03 OH 2.100 240,000.00 504,000.00
Mandor L.04 OH 0.350 180,000.00 63,000.00
JUMLAH TENAGA KERJA 3,787,000.00
B BAHAN
Balok kayu m3 1.100 4,000,000.00 4,400,000.00
Paku 10 cm Kg 1.250 26,640.00 33,300.00
Lem kayu Kg 1.000 13,000.00 13,000.00
JUMLAH HARGA BAHAN 4,446,300.00
C PERALATAN
A. 4.6.1.2 Pembuatan dan pemasangan 1 m3 kusen pintu dan kusen jendela, kayu kelas II atau III
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 6.000 100,000.00 600,000.00
Tukang kayu L.03 OH 18.000 120,000.00 2,160,000.00
Kepala tukang L.03 OH 1.800 240,000.00 432,000.00
Mandor L.04 OH 0.300 180,000.00 54,000.00
JUMLAH TENAGA KERJA 3,246,000.00
B BAHAN
Balok kayu m3 1.200 #N/A #N/A
Paku 10 cm Kg 1.250 #N/A #N/A
Lem kayu Kg 1.000 #N/A #N/A
JUMLAH HARGA BAHAN #N/A
C PERALATAN
A. 4.6.1.4 Pembuatan dan pemasangan 1 m2 pintu klamp sederhana, kayu kelas III
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.350 100,000.00 35,000.00
Tukang kayu L.03 OH 1.050 120,000.00 126,000.00
Kepala tukang L.03 OH 0.105 240,000.00 25,200.00
Mandor L.04 OH 0.018 180,000.00 3,240.00
JUMLAH TENAGA KERJA 189,440.00
B BAHAN
Papan kayu m3 0.040 #N/A #N/A
Paku 5 – 7 cm Kg 0.050 #N/A #N/A
Anl. Permen PU 11/PRT/M/2013 90
ANALISA HARGA SATUAN PERKERJAAN
JUMLAH HARGA BAHAN #N/A
C PERALATAN
A. 4.6.1.5 Pembuatan dan pemasangan 1 m2 daun pintu panel, kayu kelas I atau II
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 1.000 100,000.00 100,000.00
Tukang kayu L.03 OH 3.000 120,000.00 360,000.00
Kepala tukang L.03 OH 0.300 240,000.00 72,000.00
Mandor L.04 OH 0.050 180,000.00 9,000.00
JUMLAH TENAGA KERJA 541,000.00
B BAHAN
Papan kayu m3 0.040 3,500,000.00 140,000.00
Lem kayu Kg 0.500 13,000.00 6,500.00
JUMLAH HARGA BAHAN 146,500.00
C PERALATAN
A. 4.6.1.6 Pembuatan dan pemasangan 1 m2 pintu dan jendela kaca, kayu kelas I atau II
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.800 100,000.00 80,000.00
Tukang kayu L.03 OH 2.400 120,000.00 288,000.00
Kepala tukang L.03 OH 0.240 240,000.00 57,600.00
Mandor L.04 OH 0.040 180,000.00 7,200.00
JUMLAH TENAGA KERJA 432,800.00
B BAHAN
Papan kayu m3 0.024 #N/A #N/A
Lem kayu Kg 0.300 #N/A #N/A
JUMLAH HARGA BAHAN #N/A
C PERALATAN
A. 4.6.1.7 Pembuatan dan pemasangan 1 m2 pintu dan jendela jalusi, kayu kelas I atau II
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
Anl. Permen PU 11/PRT/M/2013 91
ANALISA HARGA SATUAN PERKERJAAN
A TENAGA
Pekerja L.01 OH 1.000 100,000.00 100,000.00
Tukang kayu L.03 OH 3.000 120,000.00 360,000.00
Kepala tukang L.03 OH 0.300 240,000.00 72,000.00
Mandor L.04 OH 0.050 180,000.00 9,000.00
JUMLAH TENAGA KERJA 541,000.00
B BAHAN
Papan kayu m3 0.064 #N/A #N/A
Lem kayu Kg 0.500 #N/A #N/A
JUMLAH HARGA BAHAN #N/A
C PERALATAN
A. 4.6.1.8 Pembuatan 1 m2 daun pintu plywood rangkap, tangka kayu kelas II tertutup (lebar sampai 90 cm)
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.700 100,000.00 70,000.00
Tukang kayu L.03 OH 2.100 120,000.00 252,000.00
Kepala tukang L.03 OH 0.210 240,000.00 50,400.00
Mandor L.04 OH 0.035 180,000.00 6,300.00
JUMLAH TENAGA KERJA 378,700.00
B BAHAN
Papan kayu m3 0.025 #N/A #N/A
Paku 1 cm – 2,5 cm kg 0.030 #N/A #N/A
Lem kayu kg 0.500 #N/A #N/A
Plywood tebal 4 mm Lembar 1.000 #N/A #N/A
Ukuran (90 x 220) cm JUMLAH HARGA BAHAN #N/A
C PERALATAN
A. 4.6.1.9 Pembuatan 1 m2 pintu plywood rangkap, rangka expose kayu kelas I atau II
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.800 100,000.00 80,000.00
Tukang kayu L.03 OH 2.400 120,000.00 288,000.00
Kepala tukang L.03 OH 0.240 240,000.00 57,600.00
Mandor L.04 OH 0.040 180,000.00 7,200.00
JUMLAH TENAGA KERJA 432,800.00
B BAHAN
Papan kayu m3 0.026 #N/A #N/A
Paku 1 cm – 2,5 kg 0.030 #N/A #N/A
cm kayu
Lem kg 0.500 #N/A #N/A
Plywood 4 mm Lembar 1.000 #N/A #N/A
(90 x 220) cm JUMLAH HARGA BAHAN #N/A
A. 4.6.1.12 Pemasangan 1 m2 taekwood rangkap lapis formika, rangka expose kayu kelas II
A. 4.6.1.13 Pemasangan 1 m3 konstruksi kuda-kuda konvensional, kayu kelas I, II dan III bentang 6 meter
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 4.000 100,000.00 400,000.00
Tukang kayu L.03 OH 12.000 120,000.00 1,440,000.00
Kepala tukang L.03 OH 1.200 240,000.00 288,000.00
Mandor L.04 OH 0.200 180,000.00 36,000.00
JUMLAH TENAGA KERJA 2,164,000.00
B BAHAN
Balok kayu m3 1.100 #N/A #N/A
Besi strip tebal 5mm kg 15.000 #N/A #N/A
Paku 12 cm kg 5.600 #N/A #N/A
JUMLAH HARGA BAHAN #N/A
C PERALATAN
A. 4.6.1.19 Pemasangan 1 m2 rangka langit-langit (50 x 100) cm, kayu kelas II atau III
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.150 100,000.00 15,000.00
Tukang kayu L.03 OH 0.300 120,000.00 36,000.00
Kepala tukang L.03 OH 0.030 240,000.00 7,200.00
Mandor L.04 OH 0.075 180,000.00 13,500.00
JUMLAH TENAGA KERJA 71,700.00
B BAHAN
Kaso-kaso 5 x 7cm M3 0.015 #N/A #N/A
Paku 7 cm – 10 cm kg 0.200 #N/A #N/A
Anl. Permen PU 11/PRT/M/2013 96
ANALISA HARGA SATUAN PERKERJAAN
JUMLAH HARGA BAHAN #N/A
C PERALATAN
A. 4.6.1.20 Pemasangan 1 m2 rangka langit-langit (60 x 60) cm, kayu kelas II atau III
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.200 100,000.00 20,000.00
Tukang kayu L.03 OH 0.300 120,000.00 36,000.00
Kepala tukang L.03 OH 0.030 240,000.00 7,200.00
Mandor L.04 OH 0.010 180,000.00 1,800.00
JUMLAH TENAGA KERJA 65,000.00
B BAHAN
Kaso-kaso M3 0.016 3,500,000.00 57,050.00
5 x 7 7cm
Paku – 10 cm kg 0.250 26,640.00 6,660.00
JUMLAH HARGA BAHAN 63,710.00
C PERALATAN
A. 4.6.1.21 Pemasangan 1 m1 lisplank ukuran (3 x 20) cm, kayu kelas I atau kelas II
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.100 100,000.00 10,000.00
Tukang kayu L.03 OH 0.200 120,000.00 24,000.00
Kepala tukang L.03 OH 0.020 240,000.00 4,800.00
Mandor L.04 OH 0.005 180,000.00 900.00
JUMLAH TENAGA KERJA 39,700.00
B BAHAN
Papan kayu M3 0.011 3,000,000.00 32,400.00
Paku 5 dan 7 cm kg 0.100 26,640.00 2,664.00
JUMLAH HARGA BAHAN 35,064.00
C PERALATAN
A. 4.7.1.4 1 m2 Pengecatan bidang kayu baru (1 lapis plamur, 1 lapis cat dasar, 2 lapis cat panutup)
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.070 100,000.00 7,000.00
Tukang cat L.02 OH 0.009 120,000.00 1,080.00
Kepala tukang L.03 OH 0.006 240,000.00 1,440.00
Mandor L.04 OH 0.003 180,000.00 540.00
JUMLAH TENAGA KERJA 10,060.00
B BAHAN
Cat menie Kg 0.200 40,000.00 8,000.00
Plamuur Kg 0.150 14,000.00 2,100.00
Cat dasar Kg 0.170 25,200.00 4,284.00
Cat penutup Kg 0.260 50,000.00 13,000.00
Kuas Bh 0.010 25,000.00 250.00
Pengencer Kg 0.030 31,500.00 945.00
Ampelas Lbr 0.200 9,600.00 1,920.00
JUMLAH HARGA BAHAN 30,499.00
C PERALATAN
A. 4.7.1.10 Pengecatan 1 m2 tembok baru (1 lapis plamuur, 1 lapis cat dasar, 2 lapis cat penutup)
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.020 100,000.00 2,000.00
Tukang cat L.02 OH 0.063 120,000.00 7,560.00
Kepala tukang L.03 OH 0.006 240,000.00 1,512.00
Mandor L.04 OH 0.003 180,000.00 540.00
JUMLAH TENAGA KERJA 11,612.00
B BAHAN
Plamuur Kg 0.100 14,000.00 1,400.00
Cat dasar Kg 0.100 25,200.00 2,520.00
Cat penutup Kg 0.260 52,720.00 13,707.20
JUMLAH HARGA BAHAN 17,627.20
C PERALATAN
A. 4.7.1.11 Pengecatan 1 m2 tembok lama (1 lapis cat dasar, 2 lapis cat penutup)
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.028 100,000.00 2,800.00
Tukang cat L.02 OH 0.042 120,000.00 5,040.00
Kepala tukang L.03 OH 0.004 240,000.00 1,008.00
Mandor L.04 OH 0.003 180,000.00 540.00
JUMLAH TENAGA KERJA 9,388.00
B BAHAN
Cat dasar Kg 0.120 25,200.00 3,024.00
Cat penutup Kg 0.180 38,800.00 6,984.00
JUMLAH HARGA BAHAN 10,008.00
C PERALATAN
1 Membuat 1 m3 beton mutu f'c = 19,3 Mpa (K 225), slump (12 ± 2) cm, w/c = 0,58 M3 1.100 994,800.00 1,094,280.00
2 Pembesian 10 Kg dengan besi polos atau besi ulir x 0.1 Kg 73.277 259,700.00 1,903,006.25
3 Pemasangan 1 m2 bekisting untuk pondasi M2 2.222 223,800.00 497,333.33
JUMLAH HARGA 3,494,619.59
1 Membuat 1 m3 beton mutu f'c = 19,3 Mpa (K 225), slump (12 ± 2) cm, w/c = 0,58 M3 1.100 994,800.00 1,094,280.00
2 Pembesian 10 Kg dengan besi polos atau besi ulir x 0.1 Kg 121.419 259,700.00 3,153,258.29
3 Pemasangan 1 m2 bekisting untuk kolom 3 x Pakai M2 5.333 453,600.00 2,419,200.00
JUMLAH HARGA 6,666,738.29
1 Membuat 1 m3 beton mutu f'c = 19,3 Mpa (K 225), slump (12 ± 2) cm, w/c = 0,58 M3 1.100 994,800.00 1,094,280.00
2 Pembesian 10 Kg dengan besi polos atau besi ulir x 0.1 Kg 132.178 259,700.00 3,432,652.27
3 Pemasangan 1 m2 bekisting untuk kolom 3 x Pakai M2 6.667 453,600.00 3,024,000.00
JUMLAH HARGA 7,550,932.27
1 Membuat 1 m3 beton mutu f'c = 19,3 Mpa (K 225), slump (12 ± 2) cm, w/c = 0,58 M3 1.100 994,800.00 1,094,280.00
2 Pembesian 10 Kg dengan besi polos atau besi ulir x 0.1 Kg 179.186 259,700.00 4,653,467.49
3 Pemasangan 1 m2 bekisting untuk kolom 3 x Pakai M2 5.128 453,600.00 2,326,153.85
JUMLAH HARGA 8,073,901.33
1 Membuat 1 m3 beton mutu f'c = 19,3 Mpa (K 225), slump (12 ± 2) cm, w/c = 0,58 M3 1.100 994,800.00 1,094,280.00
2 Pembesian 10 Kg dengan besi polos atau besi ulir x 0.1 Kg 113.721 259,700.00 2,953,333.33
3 Pemasangan 1 m2 bekisting untuk sloof 3 x Pakai M2 2.667 237,700.00 633,866.67
JUMLAH HARGA 4,681,480.00
1 Membuat 1 m3 beton mutu f'c = 19,3 Mpa (K 225), slump (12 ± 2) cm, w/c = 0,58 M3 1.100 994,800.00 1,094,280.00
2 Pembesian 10 Kg dengan besi polos atau besi ulir x 0.1 Kg 128.758 259,700.00 3,343,847.34
3 Pemasangan 1 m2 bekisting untuk balok 3 x Pakai M2 3.333 403,100.00 1,343,666.67
JUMLAH HARGA 5,781,794.00
1 Membuat 1 m3 beton mutu f'c = 19,3 Mpa (K 225), slump (12 ± 2) cm, w/c = 0,58 M3 1.100 994,800.00 1,094,280.00
2 Pembesian 10 Kg dengan besi polos atau besi ulir x 0.1 Kg 197.061 259,700.00 5,117,668.98
3 Pemasangan 1 m2 bekisting untuk balok 3 x Pakai M2 4.444 403,100.00 1,791,555.56
JUMLAH HARGA 8,003,504.53
A. 8.4.3.8 Membuat Balok 15x18 Cm
Jumlah
Harga Satuan
No. Uraian Satuan Koefisien Harga
(Rp)
(Rp)
1 Membuat 1 m3 beton mutu f'c = 19,3 Mpa (K 225), slump (12 ± 2) cm, w/c = 0,58 M3 1.100 994,800.00 1,094,280.00
2 Pembesian 10 Kg dengan besi polos atau besi ulir x 0.1 Kg 215.060 259,700.00 5,585,096.66
3 Pemasangan 1 m2 bekisting untuk balok 3 x Pakai M2 4.444 403,100.00 1,791,555.56
JUMLAH HARGA 8,470,932.21
1 Membuat 1 m3 beton mutu f'c = 19,3 Mpa (K 225), slump (12 ± 2) cm, w/c = 0,58 M3 1.100 994,800.00 1,094,280.00
2 Pembesian 10 Kg dengan besi polos atau besi ulir x 0.1 Kg 158.330 259,700.00 4,111,826.10
3 Pemasangan 1 m2 bekisting untuk balok 3 x Pakai M2 5.128 403,100.00 2,067,179.49
JUMLAH HARGA 7,273,285.59
1 Membuat 1 m3 beton mutu f'c = 19,3 Mpa (K 225), slump (12 ± 2) cm, w/c = 0,58 M3 1.100 994,800.00 1,094,280.00
2 Pembesian 10 Kg dengan besi polos atau besi ulir x 0.1 Kg 179.186 259,700.00 4,653,467.49
3 Pemasangan 1 m2 bekisting untuk balok 3 x Pakai M2 5.128 403,100.00 2,067,179.49
JUMLAH HARGA 7,814,926.98
1 Membuat 1 m3 beton mutu f'c = 19,3 Mpa (K 225), slump (12 ± 2) cm, w/c = 0,58 M3 1.100 994,800.00 1,094,280.00
2 Pembesian 10 Kg dengan besi polos atau besi ulir x 0.1 Kg 85.625 259,700.00 2,223,681.25
3 Pemasangan 1 m2 bekisting untuk lantai 3 x Pakai M2 2.778 485,600.00 1,348,888.89
JUMLAH HARGA 4,666,850.14
1 Membuat 1 m3 beton mutu f'c = 19,3 Mpa (K 225), slump (12 ± 2) cm, w/c = 0,58 M3 1.100 994,800.00 1,094,280.00
2 Pembesian 10 Kg dengan besi polos atau besi ulir x 0.1 Kg 56.045 259,700.00 1,455,500.45
3 Pemasangan 1 m2 bekisting untuk lantai 3 x Pakai M2 3.333 485,600.00 1,618,666.67
JUMLAH HARGA 4,168,447.12
DAFTAR HARGA SATUAN UPAH DAN BAHAN
KABUPATEN NAGAN RAYA
1 2 3 4 5
A. UPAH KERJA
1 Tukang @ Rp. 120,000 OH
2 Tukang Kayu @ Rp. 120,000 OH
3 Tukang Ukur @ Rp. 120,000 OH
4 Tukang Gali @ Rp. 120,000 OH
5 Tukang Las @ Rp. 120,000 OH
6 Tukang Cat @ Rp. 120,000 OH
7 Tukang Pipa @ Rp. 120,000 OH
8 Tukang Besi @ Rp. 120,000 OH
9 Tukang Batu @ Rp. 120,000 OH
10 Kepala Tukang @ Rp. 240,000 OH
11 Pekerja @ Rp. 100,000 OH
12 Mandor @ Rp. 180,000 OH
1 2 3 4 5
B. BAHAN DAN MATERIAL
1 Air @ Rp. 100.00 liter
2 Atap Genteng Setara Multiroof / emiral @ Rp. 121,200.00 Lembar
3 Atap Bitumen Selulosa (Onduline) (2,00x0,95) cm @ Rp. 166,250.00 Lembar
4 Alumanium Komposit Panel @ Rp. 1,800,000.00 Lembar
5 Alumanium Komposit Panel @ Rp. 625,000.00 m2
6 Bak Cuci piring Stenless Stell @ Rp. 439,200.00 Unit
7 Bak Cuci tangan/Wastafel Keramik Gantung @ Rp. 352,800.00 Unit
8 Bak Mandi Fibre @ Rp. 732,000.00 Unit
9 Bak Mandi Plastik @ Rp. 612,000.00 Unit
10 Bak Mandi Porselin @ Rp. 1,200,000.00 Unit
11 Bak Air Fibre @ Rp. 500,000.00 Unit
12 Bambu @ Rp. 20,000.00 Unit
13 Bathcuip porselen @ Rp. 1,500,000.00 Unit
14 Batu Alam @ Rp. 372,000.00 m2
15 Batu Bata @ Rp. 700.00 Unit
16 Bata rooster @ Rp. 15,000.00 Unit
17 Batu Kali/Batu Belah (Sungai Gunung) @ Rp. 350,000.00 m3
18 Batu pecah 2-3 @ Rp. 450,000.00 m3
19 Baut Kap Æ 1/2 - 8 @ Rp. 12,000.00 Unit
20 Baut Reng @ Rp. 400.00 Unit
21 Baut Truss @ Rp. 700.00 Unit
22 Baut Baja @ Rp. 8,400.00 Unit
23 Baja Profil @ Rp. 32,000.00 Kg
24 Besi Bout (Kuda-Kuda) 5/8-10* @ Rp. 84,000.00 Unit
25 Besi Beton Polos @ Rp. 20,480.00 Kg
26 Besi Beton dia, 10" @ Rp. 54,000.00 Btg
27 Besi Beton dia, 12" @ Rp. 90,000.00 Btg
28 Besi Beton dia, 14" @ Rp. 114,000.00 Btg
29 Besi Beton dia, 16" @ Rp. 158,400.00 Btg
30 Besi Beton Ulir @ Rp. 23,480.00 Kg
31 Besi Siku @ Rp. 28,125.00 Kg
1 2 3 4 5
32 Besi Siku L.40.40.3 - 6 mm @ Rp. 117,187.50 Btg
33 Besi Siku L.40.40.4-6 mm @ Rp. 187,500.00 Btg
34 Besi Siku L 50.50.5 @ Rp. 273,437.50 Btg
35 Besi Siku L 70.70.7 @ Rp. 703,125.00 Btg
36 Besi Siku L 100.100.10 @ Rp. 1,453,125.00 Btg
37 Besi H Beam @ Rp. 1,093,750.00 Btg
38 Besi Plat Uk. 120 x 240 Tebal = 3 mm @ Rp. 1,125,000.00 Lbr
39 Besi Plat Uk. 120 x 240 Tebal = 4 mm @ Rp. 1,484,375.00 Lbr
40 Besi Plat Uk. 120 x 240 Tebal = 5 mm @ Rp. 1,718,750.00 Lbr
41 Besi Plat Uk. 120 x 240 Tebal = 6 mm @ Rp. 2,031,250.00 Lbr
42 Besi Plat Uk. 120 x 240 Tebal = 8 mm @ Rp. 2,812,500.00 Lbr
43 Besi Plat Uk. 120 x 240 Tebal =10mm @ Rp. 3,437,500.00 Lbr
44 Besi Plat Uk. 120 x 240 Tebal =12mm @ Rp. 4,375,000.00 Lbr
45 Besi Hollow 2.5 cm (Tebal 1.8 mm) @ Rp. 93,000.00 Btg
46 Besi Hollow 4 cm (Tebal = 1,8 mm) @ Rp. 142,187.50 Btg
47 Besi Strip T = 5 mm @ Rp. 25,000.00 Kg
48 Beton Rooster/ Kerawang @ Rp. 144,000.00 Unit
49
50 Bubungan Genteng @ Rp. 82,800.00 Unit
51 Bubungan Seng 8 Kaki @ Rp. 59,880.00 Lbr
52 Cat Dasar @ Rp. 25,200.00 kg
53 Cat Kayu Mengkilat @ Rp. 50,000.00 kg
54 Cat Menie @ Rp. 40,000.00 kg
55 Cat Tembok Kualitas Sedang @ Rp. 38,800.00 kg
56 Cat Tembok Untuk Interior Kualitas Baik @ Rp. 52,720.00 kg
57 Cat Tembok Weathersied / Exterior Kualitas Baik @ Rp. 180,000.00 kg
58 Cotton Plaster @ Rp. 77,500.00 Unit
59 Compoun @ Rp. 45,000.00 kg
60 Conblok @ Rp. 15,000.00 Unit
61 Dempul @ Rp. 30,000.00 kg
62 Engsel Jendela @ Rp. 21,780.00 Psg
63 Engsel Pintu @ Rp. 26,640.00 Psg
64 Elbow GIP dia 1" @ Rp. 9,000.00 Unit
65 Elbow GIP dia 2" @ Rp. 37,500.00 Unit
66 Elbow GIP dia 3" @ Rp. 109,500.00 Unit
67 Floor Drain @ Rp. 60,000.00 Unit
68 Fiting Lampu Donwligh @ Rp. 68,750.00 Unit
69 Furing Baja Ringan @ Rp. 18,000.00 Kg
70 Gipsum board (120 Cm x 240 cm x 9 mm) @ Rp. 123,250.00 Lbr
71 Gipsum Profil @ Rp. 33,600.00 M'
72 Grendel Jendela @ Rp. 22,800.00 Unit
73 Grendel Pintu @ Rp. 22,800.00 Unit
74 Granitto Lantai 60 x 60 cm Setara King Stone @ Rp. 120,000.00 Unit
75 Glass Block @ Rp. 30,000.00 Unit
76 Hak Angin @ Rp. 8,400.00 Unit
77 Hollow 4/4 zincromate @ Rp. 67,500.00 Btg
78 Hollow 2/4 zincromate @ Rp. 52,500.00 Btg
79 Ijuk @ Rp. 60,000.00 Kg
80 Kaca Bening Uk 2 mm @ Rp. 130,000.00 m2
81 Kaca Bening Uk 3 mm @ Rp. 140,000.00 m2
82 Kaca Bening Uk 5 mm @ Rp. 160,000.00 m2
83 Kaca Rayband uk. 3 mm @ Rp. 190,000.00 m2
84 Kaca Rayband uk. 5 mm @ Rp. 200,000.00 m2
85 Kapur Padam @ Rp. 169,000.00 m3
86 Karpus Asbes Gelombang Besar @ Rp. 196,800.00 m2
87 Karpus Asbes Gelombang Kecil @ Rp. 180,000.00 m2
1 2 3 4 5
88 Karpet Kualitas Rendah @ Rp. 50,000.00 m2
89 Kawat Ikat Beton @ Rp. 22,000.00 Kg
90 Kawat Duri @ Rp. 199,200.00 Rol
91 Kawat Las @ Rp. 35,000.00 Kg
92 Kawat Harmonika @ Rp. 300,000.00 Rol
93 Kawat Nyamuk/Kasa Logam lebar 120 cm @ Rp. 72,000.00 m'
94 Kawat Nyamuk/Kasa Plastik @ Rp. 36,000.00 m'
95 Kayu Bahan Pintu @ Rp. 3,612,000.00 m3
96 Kayu Bekisting Kelas III @ Rp. 2,520,000.00 m3
97 Kayu Dolken Tiang Perancah @ Rp. 24,000.00 Btg
98 Kayu Gelagar Uk. 8/15 - 4 m @ Rp. 23,280.00 Btg
99 Kayu Klas I (seumantok/ Ulin/ dll) @ Rp. 4,000,000.00 m3
100 Kayu Klas II ( Kamper/ Kruing/ dll) @ Rp. 3,500,000.00 m3
101 Kayu Klas III ( Borneo/dll) @ Rp. 3,000,000.00 m3
102 Kayu Klas IV (sengon/dll) @ Rp. 2,500,000.00 m3
103 Kayu Rangka/Bouw Plank @ Rp. 3,500,000.00 m3
104 Kayu Rangka Plafond @ Rp. 3,000,000.00 m3
105 Kayu Reng Uk. 2/3 -4 m @ Rp. 34,800.00 Btg
106 Kabel NYM 1 x 1.5 mm (50 m) @ Rp. 336,000.00 Rol
107 Kabel NYA 2 x 1.5 mm (50 m) @ Rp. 381,600.00 Rol
108 Kabel NYA 2 x 2.5 mm (50 m) @ Rp. 540,000.00 Rol
109 Kerikil Beton (1 m3 = 1350 kg) @ Rp. 90,000.00 m3
110 Kerikil Beton @ Rp. 66.67 Kg
111 Keramik Uk. 40 x 40 cm Kualitas I @ Rp. 97,600.00 Kotak
112 Keramik Uk. 40 x 40 cm Kualitas I (Unit) @ Rp. 16,266.67 Unit
113 Keramik Uk. 30 x 30 cm Kualitas I @ Rp. 73,800.00 Kotak
114 Keramik Uk. 30 x 30 cm Kualitas I (Unit) @ Rp. 6,709.09 Unit
115 Keramik Uk. 25 x 25 cm @ Rp. 66,800.00 Kotak
116 Keramik Uk. 25 x 25 cm I (Unit) @ Rp. 4,175.00 Unit
117 Keramik Dinding Uk. 20 x 40 cm @ Rp. 65,000.00 Kotak
118 Kertas Amplas @ Rp. 9,600.00 Lbr
119 Kloset Duduk Keramik (Setara KIA) @ Rp. 1,480,000.00 Unit
120 Kloset Jongkok Keramik (setara Toto) @ Rp. 478,800.00 Unit
121 Kunci Pintu Biasa @ Rp. 180,000.00 Unit
122 Kunci Pintu Kamar Mandi @ Rp. 70,000.00 Unit
123 Kunci Pintu 2 slag @ Rp. 240,000.00 Unit
124 Kunci Slot @ Rp. 150,000.00 Unit
125 Kuas @ Rp. 25,000.00 Unit
126 Kerikil halus @ Rp. 120,000.00 m3
127 Kran Air Setara Toto 3/4 @ Rp. 37,500.00 Unit
128 Lem Kayu @ Rp. 13,000.00 Kg
129 Lem Walpaper @ Rp. 18,000.00 Kg
130 Lem Pipa @ Rp. 9,000.00 Unit
131 Lempengan rumput @ Rp. 62,400.00 m2
132 List Eternit Kayu @ Rp. 37,200.00 Btg
133 List Pofil Gypsum 10 cm @ Rp. 33,600.00 m'
134 List Pofil Sunda Plafond @ Rp. 56,250.00 m'
135 Lat Plafond Profil @ Rp. 15,000.00 m'
136 Lampu Philips SL * HE 15 Watt @ Rp. 36,000.00 Unit
137 Lampu Philips SL * HE 20 Watt @ Rp. 45,700.00 Unit
138 Lampu Philips SL * HE 25 Watt @ Rp. 50,700.00 Unit
139 Lampu Philips SL * HE 18 Watt @ Rp. 40,000.00 Unit
140 Lampu Philips SL * HE 45 Watt @ Rp. 58,000.00 Unit
141 Lampu TL 20 Watt @ Rp. 32,400.00 Unit
142 Lampu TL 40 Watt @ Rp. 33,600.00 Unit
143 Minyak Cat @ Rp. 24,000.00 Ltr
1 2 3 4 5
144 Minyak Kilat @ Rp. 42,000.00 Ltr
145 Minyak Bekisting @ Rp. 6,000.00 Ltr
146 Mulitipleks 3 mm 120 x 240 mm @ Rp. 78,000.00 Lbr
147 Mulitipleks 4 mm 120 x 240 mm @ Rp. 120,000.00 Lbr
148 Mulitipleks 6 mm 120 x 240 mm @ Rp. 144,000.00 Lbr
149 Mulitipleks 9 mm 120 x 240 mm @ Rp. 228,000.00 Lbr
150 Nok/ Rabung seng 0,35 Cat Pabrik @ Rp. 69,600.00 Lbr
151 Nok/ Rabung seng 0,35 Tidak di Cat @ Rp. 52,000.00 Lbr
152 Paku Asbes @ Rp. 42,000.00 Kg
153 Paku Beton 8 cm @ Rp. 72,000.00 Kotak
154 Paku Skrup @ Rp. 25,500.00 Kotak
155 Paku Kayu @ Rp. 26,640.00 Kg
156 Paku Reng @ Rp. 31,200.00 Kg
157 Paku Seng @ Rp. 33,600.00 Kg
158 Paku Tripleks @ Rp. 33,600.00 Kg
159 Paku Gypsum @ Rp. 82,500.00 Kg
160 Papan Beskisting @ Rp. 2,500,000.00 m3
161 Papan Kayu Bouwplank @ Rp. 3,500,000.00 m3
162 Papan Kayu Klas I (Seumantok/ Ulin/dll) @ Rp. 4,000,000.00 m3
163 Papan Kayu Klas II (Meranti/ Kruing/dll) @ Rp. 3,500,000.00 m3
164 Papan Kayu Klas III (Borneo/dll) @ Rp. 3,000,000.00 m3
165 Papan Lisplank Klas II @ Rp. 3,000,000.00 m3
166 Parquet @ Rp. 175,000.00 /M2
167 Pasir Beton (1 m3=1400 kg) @ Rp. 90,000.00 m3
168 Pasir Beton @ Rp. 64.29 Kg
169 Pasir Pasang @ Rp. 90,000.00 m3
170 Pasir Urug @ Rp. 70,000.00 m3
171 Paving Block @ Rp. 156,000.00 m2
172 Penjaga jarak bekisting/spacer @ Rp. 7,000.00 Bh
173 Pipa HDPE SDR 13.6 (PN 12.5) dia.160mm @ Rp. 476,750 m'
174 Pipa HDPE SDR 13.6 (PN 12.5) dia.110mm @ Rp. 323,000 m'
175 Pipa HDPE SDR 13.6 (PN 12.5) dia.90mm @ Rp. 233,000 m'
176 Pipa HDPE SDR 13.6 (PN 12.5) dia.75mm @ Rp. 151,000 m'
177 Pipa Leiding D 1/2 Galvanis @ Rp. 122,400.00 m'
178 Pipa Leiding D 1 Galvanis @ Rp. 180,000.00 m'
179 Pipa Leiding D 1 1/2 Galvanis @ Rp. 288,000.00 m'
180 Pipa Leiding D 2 Galvanis @ Rp. 360,000.00 m'
181 Pipa Leiding D 3 Galvanis @ Rp. 590,400.00 m'
182 Pipa Leiding D 4 Galvanis @ Rp. 648,000.00 m'
183 Pipa PVC D 1/2 Kualitas AWE (United) @ Rp. 40,800.00 m'
184 Pipa PVC D 3/4 AV @ Rp. 42,700.00 m'
185 Pipa PVC D 1 AV @ Rp. 45,700.00 m'
186 Pipa PVC D 1 1/2 AV @ Rp. 79,200.00 m'
187 Pipa PVC D 2 AV @ Rp. 100,800.00 m'
188 Pipa PVC D 3 AV @ Rp. 182,400.00 m'
189 Pipa PVC D 3/4 AV @ Rp. 31,200.00 m'
190 Pipa PVC D 4 AV @ Rp. 228,000.00 m'
191 Plamur Tembok @ Rp. 14,000.00 Kg
192 Playwood 3 mm @ Rp. 67,500.00 Lbr
193 Playwood 9 mm @ Rp. 187,500.00 Lbr
194 Plafond Asbes @ Rp. 52,500.00 Lbr
195 Politur setara Cap kupu-kupu @ Rp. 72,000.00 Kg
196 Plint ubin Pc abu-abu ukuran 15cm x 20cm @ Rp. 10,000.00 Bh
197 Plint ubin Pc abu-abu ukuran 10cm x 25cm @ Rp. 10,000.00 Bh
198 Profil Aluminium @ Rp. 74,000.00 Btg
1 2 3 4 5
199 Profil Aluminium/m @ Rp. 14,800.00 m'
200 Profil C. 95 Galvalum @ Rp. 27,000.00 m'
201 Profil C. 75 Galvalum @ Rp. 21,250.00 m'
202 Rabung Genteng Metal Multiroof 0.30 mm @ Rp. 40,000.00 Unit
203 Rabung Onduline @ Rp. 131,250.00 m'
204 Ramset /dina bolt @ Rp. 4,125.00 Unit
205 Reng U 0.5 @ Rp. 15,000.00 Unit
206 Residu @ Rp. 24,000.00 Unit
207 Saklar Tunggal Setara Panasonic @ Rp. 30,000.00 Unit
208 Saklar Double Setara Panasonic @ Rp. 37,500.00 Unit
209 Saklar Triple Setara Panasonic @ Rp. 51,000.00 Unit
210 Stop Kontak Setara Panasonic @ Rp. 30,000.00 Unit
211 Semen Andalas @ 40 Kg @ Rp. 57,000.00 Sak
212 Semen Pc @ Rp. 1,425.00 Kg
213 Semen Padang/Cibinong @ 50 Kg @ Rp. 75,000.00 Sak
214 Semen Putih @ Rp. 200,000.00 Sak
215 Semen Putih@ 50 Kg @ Rp. 4,000.00 Kg
216 Seng gelombang 0,20- 9 Parit 6 Kaki @ Rp. 73,860.00 Lbr
217 Seng gelombang 3 x 6 11 parit 6 Kaki Cat @ Rp. 87,600.00 Lbr
218 Seng gelombang 3 x 7 11 parit 8 Kaki @ Rp. 93,000.00 Lbr
219 Seng Gelombang BJLS 0,20 6 x 9 cm 8 Kaki Cat @ Rp. 126,000.00 Lbr
220 Seng Plat BJLS 20 8 Kaki @ Rp. 67,200.00 Lbr
221 Seng Plat BJLS 30 @ Rp. 102,000.00 Lbr
222 Seng Genteng Metal @ Rp. 80,000.00 Lbr
223 Sealtape @ Rp. 3,000.00 Unit
224 Sealant @ Rp. 30,000.00 Tube
225 Socket GIP d = 1" @ Rp. 10,500.00 Unit
226 Socket GIP d = 3" @ Rp. 75,000.00 Unit
227 Socket GIP d = 4" @ Rp. 120,000.00 Unit
228 Soda Api @ Rp. 13,750.00 Liter
229 Solar @ Rp. 7,000.00 Liter
230 Spirtus @ Rp. 22,500.00 Liter
231 Storox - 100 @ Rp. 28,000.00 Kg
232 Sunda Plafond (0.08 x 20 ) @ Rp. 68,750.00 Lbr
233 Tanah Timbun pilihan - material Jalan @ Rp. 130,000.00 m3
234 Tanah Timbun @ Rp. 60,000.00 m3
235 Tali @ Rp. 1,000.00 m'
236 Tripleks 3 mm @ Rp. 78,000.00 Lbr
237 Tripleks 4 mm @ Rp. 120,000.00 Lbr
238 Tripleks 6 mm @ Rp. 144,000.00 Lbr
239 Tripleks 9 mm @ Rp. 228,000.00 Lbr
240 Tiner @ Rp. 31,500.00 Ltr
241 Tee GiP dia 1" @ Rp. 18,000.00 Unit
242 Tee GiP dia 3" @ Rp. 142,500.00 Unit
243 Tee GiP dia 4" @ Rp. 255,000.00 Unit
244 Urinoir @ Rp. 755,000.00 Unit
245 Vynil @ Rp. 169,200.00 m2
246 Vynil (1 Unit) @ Rp. 15,243.24 Unit
247 Wallpeper @ Rp. 90,000.00 M'
248 Waterstop lebar 150 mm @ Rp. 100,000.00 M'
249 Waterstop lebar 200 mm @ Rp. 150,000.00 M'
250 Waterstop lebar 230 - 320 mm @ Rp. 180,000.00 M'
251 Wastafel Standar @ Rp. 362,500.00 Unit
252 Waterdrain @ Rp. 15,000.00 Unit
253 Zakering Kast Lokal 1 Group @ Rp. 120,000.00 Unit
254 Zakering Kast Lokal 2 Group @ Rp. 150,000.00 Unit
1 2 3 4 5
255 Zakering Kast Lokal 3 Group @ Rp. 266,600.00 Unit
F PEKERJAAN LANTAI
1. Lantai
Luas =
Lantai Keramik Toilet / Kamar Mandi 20x20 cm V = 1.00
Lantai Keramik Selasar 30/30 cm V = 8.08
G PEKERJAAN PENGECATAN
1. PEKERJAAN PENGECATAN
m2 0.486559
m2
m1
m
m
m
m3
m
m
m2
m
m
m
m3
m
m
m2
m
m
m
m3
m2
m2
m2
m2
m2
m2
m2
KUSEN
PJ1 P1
m2 2.878 2.00 1.6217
5.76
KUSEN
PJ1 P1
m2 4.4186 2.00 3.843
8.84
P2 P3 J1
2.00 1.5744 4.00 1.1385 2.00 2.1917
3.24 6.30 2.28
P2 P3 J1
2.00 3.423 4.00 3.0745 2.00 0.6216
7.69 13.69 6.15
J2 J3 V1
5.00 1.8812 1.00 3.6997 1.00 0.391
10.96 1.88 3.70
J2 J3 V1
5.00 1.00 0.9812 1.00 0
3.11 - 0.98
V2 Jalusi
1.00 0.667 1.00 0.539267 4.00
0.39 0.67 2.16
V2 Jalusi
1.00 1.00 0 4.00
- - -