PERENCANAAN PENAMBANGAN BATUBARA PADA

CV. NAMAME MINE DI KECAMATAN LOA JANAN,


KABUPATEN KUTAI KARTANEGARA,
PROVINSI KALIMANTAN TIMUR

LAPORAN PERENCANAAN TAMBANG

OLEH :
KELOMPOK 7

PROGRAM STUDI S1 TEKNIK PERTAMBANGAN


JURUSAN TEKNIK PERTAMBANGAN
FAKULTAS TEKNIK PERTAMBANGAN DAN PERMINYAKAN
UNIVERSITAS PAPUA
2021
PERENCANAAN PENAMBANGAN BATUBARA PADA

i
CV. NAMAME MINE DI KECAMATAN LOA JANAN,
KABUPATEN KUTAI KARTANEGARA,
PROVINSI KALIMANTAN TIMUR

LAPORAN PERENCANAAN TAMBANG

Disusun Sebagai Salah Satu Syarat Kelulusan Pada Mata Kuliah Perencanaan
Tambang
Pada Program Studi S1 Teknik Pertambangan
Jurusan Teknik Pertambangan
Fakultas Teknik Pertambangan dan Perminyakan
Universitas Papua
Tahun Ajaran 2021/2022

OLEH :
KELOMPOK 7

1. RENTA LAMRIA DAMANIK (201763002)


2. MUHAMMAD ARMAN SALAM (201763011)
3. NALENSIUS SITUMORANG (201763022)

PROGRAM STUDI S1 TEKNIK PERTAMBANGAN


JURUSAN TEKNIK PERTAMBANGAN
FAKULTAS TEKNIK PERTAMBANGAN DAN PERMINYAKAN
UNIVERSITAS PAPUA
2021
PERENCANAAN PENAMBANGAN BATUBARA PADA

ii
CV. NAMAME MINE DI KECAMATAN LOA JANAN,
KABUPATEN KUTAI KARTANEGARA,
PROVINSI KALIMANTAN TIMUR

LAPORAN PERENCANAAN TAMBANG

Disetujui dan Disahkan Pada :


Hari :
Tanggal :

OLEH :
KELOMPOK 7

Tim Dosen

1. Arif Setiawan, S.T., M.T (…………………………….)


2. Ismiyati, S.T., M.T (…………………………….)
3. Jance M. Supit, S.T., M.Eng (…………………………….)
4. Yulius G. Pangkung, S.T., M.Eng (…………………………….)
5. Katerina T.A Tomata, S.T (…………………………….)
6. Citcy T. Manullang, S..T (…………………………….)
7. Karmila Laitupa, S.T., M.T (…………………………….)
8. Ricardo O. M. Hutapea, S.T., MT (…………………………….)
9. Juanita R. Horman, S.T., M.T (…………………………….)

Dosen Penanggung Jawab

Dr. Hendri P. Perangin-Angin, S.T., M.T


KATA PENGANTAR

iii
Puji syukur Penulis haturkan kehadirat Tuhan Yang Maha Esa atas berkat
dan karunia-Nya atas tersusunnya Laporan Perencanaan Tambang. Adapun
Maksud dari pembuatan Laporan Perencanaan Tambang ini adalah sebagai salah
satu syarat kelulusan pada mata kuliah Perencanaan Tambang. Tujuan dari
pembuatan laporan ini adalah Agar mahasiswa memahami dan mengerti tahapan
serta cara melakukan perencanaan tambang pada bahan galian batubara yang
berada Di Kecamatan Loa Janan, Kabupaten Kutai Kartanegara, Provinsi
Kalimantan Timur.
Dalam kesempatan ini penulis mengucapkan terimakasih kepada:
1. Bapak Dr. Hendri P. Perangin-Angin, S.T., M.T selaku Dosen Koordinator
Penanggung Jawab pada mata kuliah Perencanaan Tambang,
2. Bapak Arif Setiawan, S.T., M.T selaku Dosen pada mata kuliah
Perencanaan Tambang,
3. Ibu Ismiyati, S.T., M.T selaku Dosen pada mata kuliah Perencanaan
Tambang,
4. Bapak Jance M. Supit, S.T., M.Eng selaku Dosen pada mata kuliah
Perencanaan Tambang,
5. Bapak Yulius G. Pangkung, S.T., M.Eng selaku Dosen pada mata kuliah
Perencanaan Tambang,
6. Ibu Katerina T.A Tomata, S.T selaku Dosen pada mata kuliah Perencanaan
Tambang,
7. Ibu Citcy T. Manullang, S..T selaku Dosen pada mata kuliah Perencanaan
Tambang,
8. Ibu Karmila Laitupa, S.T., M.T selaku Dosen pada mata kuliah Perencanaan
Tambang,
9. Bapak Ricardo O. M. Hutapea, S.T., MT selaku Dosen pada mata kuliah
Perencanaan Tambang,
10. Ibu Juanita R. Horman, S.T., M.T selaku Dosen pada mata kuliah
Perencanaan Tambang,
Penulis berharap laporan ini dapat berguna untuk pembaca. Penulis juga
mengharapkan kritik dan saran dari pembaca agar laporan ini kedepannya menjadi

iv
lebih baik. Semoga laporan ini dapat bermanfaat bagi para pembaca maupun
penulis.

Manokwari, 01 Oktober 2021


Penulis

Kelompok 7

DAFTAR ISI
Halaman

v
HALAMAN JUDUL.......................................................................................i
HALAMAN TUJUAN....................................................................................ii
HALAMAN PENGESAHAN........................................................................iii
KATA PENGANTAR....................................................................................iv
DAFTAR ISI...................................................................................................v
DAFTAR GAMBAR......................................................................................ix
DAFTAR TABEL...........................................................................................xi
I PENDAHULUAN..................................................................................1
1.1 Latar Belakang...............................................................................1
1.2 Maksud dan Tujuan.......................................................................1
1.3 Ruang Lingkup dan Batasan Masalah...........................................2
1.4 Pelaksana Studi..............................................................................5
II PROSEDUR PENELITIAN.................................................................10
2.1 Ijin Usaha Pertambangan...............................................................10
2.2 Tata Cara Perijinan Pemakaian Lahan...........................................12
III KEADAAN UMUM..............................................................................14
3.1 Lokasi dan Luas Daerah................................................................14
3.2 Kesampaian Daerah dan Sarana Perhubungan..............................15
3.3 Keadaan Lingkungan Daerah.........................................................16
3.4 Iklim...............................................................................................19
3.5 Geologi Daerah..............................................................................20
3.6 Keadaan Endapan..........................................................................25
IV GEOTEKNIK........................................................................................28
4.1 Pengertian Geoteknik Secara Umum.............................................28
4.2 Peranan Geoteknik Dalam Tahapan..............................................29
4.3 Peranan Geoteknik Dalam Penambangan Batubara......................31
4.4 Pengklasifikasian Massa Batuan....................................................32
4.5 Analisis dan Kemantapan Lereng..................................................38
4.6 Review Desain Geometri Bench yang Direncanakan....................43
4.7 Kemampuan Batuan.......................................................................45
V PERANCANGAN TAMBANG............................................................47
5.1 Desain Tambang Terbuka..............................................................47

vi
5.2 Rencana Akhir Tambang...............................................................53
5.3 Cadangan Tertambang...................................................................53
5.4 Tahapan Kegiatan Pertambangan..................................................54
5.5 Rencana Produksi dan Umur Tambang.........................................55
5.6 Pananganan Overburden................................................................57
5.7 Rencana Penanganan Bahan Galian Yang Belum Terpasarkan....57
5.8 Rencana Penanganan Sisa Cadangan Pada Pasca Tambang..........57
5.9 Tata Letak Tambang dan Fasilitas Penunjang...............................57
VI HIDROLOGI.........................................................................................59
6.1 Kajian Hidrologi............................................................................59
6.2 Analisa Data Curah Hujan.............................................................61
6.3 Air Limpasan.................................................................................62
6.4 Debit Air Limpasan.......................................................................64
6.5 Morfologi.......................................................................................64
6.6 Kajian Hidrogeologi......................................................................65
6.7 Pengendalian Air Tambang...........................................................66
6.8 Kolam Pengendapan......................................................................69
VII PERALATAN PENAMBANGAN.......................................................72
7.1 Jenis Material yang Mempengaruhi Kerja Lapangan....................72
7.2 Penggunaan Alat............................................................................74
7.3 Produktivitas Alat..........................................................................78
VIII PERENCANAAN PENGOLAHAN....................................................94
8.1 Pengolahan.....................................................................................94
8.2 Jam Kerja dan Target Produksi......................................................95
8.3 Bagan Alir......................................................................................96
8.4 Cara Pengolahan Batubara.............................................................97
8.5 Peralatan pengolahan.....................................................................98
8.6 Hasil Pengolahan...........................................................................101
IX LINGKUNGAN, KESEHATAN DAN KESELAMATAN KERJA. 102
9.1 Lingkungan....................................................................................102
9.2 Rehabilitas Lahan..........................................................................106
9.3 Keselamatan dan Kesehatan Kerja................................................106

vii
9.4 Peralatan.........................................................................................107
9.5 Langkah-langkah K3......................................................................112
9.6 Job Safety Analysis........................................................................113
X ORGANISASI DAN TENAGA KERJA.............................................123
10.1 Bagan Organisasi...........................................................................123
10.2 Jumlah dan Kriteria Tenaga kerja Tetap dan Tidak Tetap.............125
10.3 Tingkat Gaji/Upah.........................................................................130
10.4 Sistem Kerja...................................................................................132
10.5 Kondisi Tenaga Kerja Pasca Penambangan...................................133
XI PEMASARAN.......................................................................................134
11.1 Prospek Pemasaran........................................................................134
11.2 Penentuan Harga............................................................................136
11.3 Kontrak Kerja................................................................................136
11.4 Pembayaran....................................................................................136
11.5 Quality Control..............................................................................136
XII REKLAMASI DAN PENUTUPAN TAMBANG...............................138
12.1 Pendahuluan...................................................................................138
12.2 Reklamasi.......................................................................................138
12.3 Penutupan Tambang......................................................................143
DAFTAR PUSTAKA......................................................................................150
LAMPIRAN

viii
DAFTAR GAMBAR

Halaman
3.1 Topografi WIUP CV. Namame Mine.....................................................15
3.2 Peta Kesampaian Daerah.........................................................................16
3.3 Peta Fisiografi Kutai Kartanegara...........................................................21
3.4 Stratigrafi Regional Cekungan Kutai......................................................24
3.5 Peta Geologi Regional Loa Janan...........................................................25
4.1 Longsoran Bidang...................................................................................40
4.2 Penampang Lereng dan bidang bebas longsoran bidang........................41
4.3 Longsoran Baji........................................................................................41
4.4 Longsoran Guling....................................................................................42
4.5 Longsoran Busur.....................................................................................42
4.6 Review Jenjang dan Penentuan FK Single Slope....................................44
4.7 Review Jenjang dan Penentuan FK Overall Slope..................................44
5.1 Pengolahan Data Single Slope, CV. Namame Mine...............................48
5.2 Pengolahan Data Overall Slope, CV. Namame Mine.............................48
6.1 Siklus Hidrologi......................................................................................59
6.2 Dimensi Saluran......................................................................................69
6.3 Dimensi Kolam Pengendapan.................................................................71
7.1 Bulldozer Komatsu D155A-2..................................................................76
7.2 Backhoe Komatsu PC300LC-7................................................................77
7.3 Dump Truck Hino FM 260 JD.................................................................77
8.1 Bagan Alir Proses Pengolahan Batubara.................................................96
8.2 Jaw Crushher..........................................................................................99
8.3 Vibrating Screen......................................................................................99
8.4 Humprey Spiral.......................................................................................100
9.1 Water Truck.............................................................................................103
9.2 Alat Pemantau Debu................................................................................104
9.3 Pemantauan Kebisingan..........................................................................105
9.4 Helmet.....................................................................................................108
9.5 Alat Pelindung Mata................................................................................108

ix
9.6 Ear Muff dan Ear Plugs..........................................................................109
9.7 Sarung Tangan.........................................................................................109
9.8 Pakaian Pelindung...................................................................................110
9.9 Respirator dan Filter................................................................................110
9.10 Sepatu Kerja............................................................................................111
9.11 P3K .......................................................................................................111
9.12 Alat Pemadam Api Ringan......................................................................112
9.13 Kerangka Konsep....................................................................................118
10.1 Struktur Organisasi CV.Namame Mine..................................................124

x
DAFTAR TABEL

Halaman
1.1 Tim Penyusun atau Pelaksana Kegiatan Studi........................................6
1.2 Jadwal Pelaksanaan Pekerjaan Kegiatan Studi.......................................7
3.1 Luas Wilayah, Jumlahh Rumah Tangga dan Jumlah Penduduk 2019....17
3.2 Komposisi Penduduk Berdasarkan Tiap Desa Kecamatan Loa Janan....17
3.3 Jumlah Sekolah Pada Kecamatan Loa Janan..........................................18
3.4 Sebaran Sarana Kesehatan Menurut Desa dan Jenis Sarana Loa Janan..18
3.5 Jumlah Petugas Kesehatan......................................................................19
4.1 Besaran Parameter UCS..........................................................................33
4.2 Klasifikasi Kemampuan Garuan.............................................................34
4.3 Klasifikasi RMR dan nilai pembobotnya................................................35
4.4 Pembobotan RMR Namame Mine..........................................................35
4.5 Deskripsi setiap kelas SMR.....................................................................37
4.6 Nilai Pembobotan untuk kekar................................................................37
4.7 Data Analisis SMR..................................................................................37
5.1 Grade Jalan Tambang.............................................................................51
5.2 Waktu Kerja CV.Namame Mine.............................................................55
5.3 Waktu Tersedua Per Bulan CV.Namame Mine......................................56
6.1 Klasifikasi Curah Hujan..........................................................................62
6.2 Harga Koefisien Limpasan......................................................................63
6.3 Harga Koefisien Kekerasan Manning.....................................................67
6.4 Tinggi Jagaan Untuk Saluran Pasangan..................................................69
7.1 Tumbuhan Yang Terdapat Pada Daerah CV.Namame Min....................72
7.2 Sifat Fisik dan Mekanis dari Material pada CV. Namame Mine............73
7.3 Efisiensi Waktu Berdasarkan Kondisi Kerja...........................................79
7.4 Nilai Efisiensi Kerja Alat........................................................................79
7.5 Nilai Efisiensi Operator...........................................................................80
7.6 Bucket Fill Factor untuk Excavator........................................................80
7.7 Angka Rata-rata Tahanan Gulir Untuk Berbagai Macam Jalan..............81
7.8 Pengaruh Kemiringan Jalan terhadap Tahanan Gulir.............................82

xi
7.9 Jumlah Penggunaan Backhoe untuk pengupasan overburden.................87
7.10 Jumlah Penggunaan Dumptruck untuk pengangkutan overburden.........88
7.11 Jumlah Penggunaan Backhoe untuk pengupasan Interburden................89
7.12 Jumlah Pengupasan Dumptruck untuk pengangkutan interburden.........90
7.13 Jumlah Penggunaan Backhoe untuk penggalian batubara.......................91
7.14 Jumlah Penggunaan Dumptruck untuk pengangkutan batubara.............91
7.15 Jumlah Penggunaan alat mekanis............................................................92
7.16 Match Factor atau keserasian alat gali muat dan angkut........................93
8.1 Data Kualitas Batubara............................................................................94
8.2 Jam Kerja CV. Namame Mine................................................................95
8.3 Target Produksi CV. Namame Mine.......................................................96
9.1 Langkah-langkah Pelaksanaan K3 Pertambangan..................................112
9.2 Nilai Probability......................................................................................115
9.3 Nilai Consequence...................................................................................116
9.4 Nilai Risk.................................................................................................116
10.1 Penentuan Tingkat Pendidikan Karyawan..............................................125
10.2 Penentuan Jumlah dan Klasifikasi Tenaga Kerja....................................125
10.3 Penentuan Jumlah dan Klasifikasi Tenaga Kerja Tidak tetap.................128
10.4 Daftar Gaji dan Tunjangan Bagi Pegawai...............................................131
11.1 Target Produksi CV.Namame Mine........................................................134
11.2 Target Pemasaran Produk........................................................................135
12.1 Rencana Biaya Reklamasi CV.Namame Mine.......................................145