Anda di halaman 1dari 2

AREA WILAYAH PKS DAN KEBUN SSDP

Toni Asoka 110 Ha (96/97) Kebun Hakim Bako 45.78 Ha (2015/97)

Limbong 30 Ha (96/97)
Kebun Martin 60 Ha (96/97)

Asiong 110 Ha (2018)

SSDP 48, Ha (2000) Kbn Simarmata 10.36 ha


HaHa (96/97)
Rencana Jalur Pipa Baru
HDPE 6” = 1300m.

GSA 96/97

Jalur PipaLama HDPE Ø4”

Asiong 2012
Jalur Pipa LAMAHDPEØ6”
IPAL PKS

Kbn Masy
Gading

GD 2015

Total luasan LA = 162 Ha (total kajian = 20% x 162 Ha = 33 Ha)

Kajian tahap 1 = 15 Ha (lokasi di SKGR)

Kajian tahap 2 = 18 Ha (lokasi tanah Hakim Bako)

Lahan aplikasi = 129 Ha:

 SKGR = 32 Ha
 Hakim Bako = 27 Ha
 Martin = 60 Ha
 Simarmata = 10 Ha

Anda mungkin juga menyukai