PEMERINTAH KABUPATEN KOLAKA MANAJEMEN KONSTRUKSI (MK) KONTRAKTOR PELAKSANA

DINAS KESEHATAN PT. SULAPAAPPA PT. ANGGAZA WIDYA RIDHAMULIA


INSTANSI / SKPD : DINAS KESEHATAN KABUPATEN KOLAKA
PEKERJAAN : PEMBANGUNAN RSU KOLAKA TOWER II (LANJUTAN)
LOKASI : KABUPATEN KOLAKA PROVINSI SULAWESI TENGGARA
TAHUN ANGGARAN : 2021
NILAI KONTRAK : RP. 27.666.666.666,00
NO. KONTRAK : 02/KONTRAK/RSU-TW2/II/2021
TGL. KONTRAK : 11 FEBRUARI 2021
JADWAL PEKERJAAN : 11 FEBRUARI 2021 S/D 09 AGUSTUS 2021 (180 HARI KALENDER)
SUMBER DANA : APBD
KONTRAKTOR : PT. ANGGAZA WIDYA RIDHAMULIA
BACK UP DATA
JENIS PEKERJAAN : PEKERJAAN PENUTUP LANTAI DAN DINDING
ITEM PEKERJAAN : PASANGAN PLINT GRANIT 10 x 60 CM, Ex. GRANITO
Panjang
No Uraian QTY Volume Satuan Ket.
(m)
PARSIAL A
1 AREA TANGGA 11.28 1.00 11.28 M1
2 RG. DEPAN TANGGA 14.12 1.00 14.12 M1
3 AHU DAN RESERVOIR 78.78 1.00 78.78 M1
4 RG. KOMERSIL 30.22 1.00 30.22 M1
5 RG. PENGEMASAN ALAT 13.35 1.00 13.35 M1
6 RG. PROSESSING PRODUKSI 18.79 1.00 18.79 M1
7 KORIDOR AHU 66.77 1.00 66.77 M1
8 KORIDOR 90.65 1.00 90.65 M1
9 RG. STERILISASI 17.89 1.00 17.89 M1
10 GUDANG STERIL + RG.DISTRIBUSI INSTRUMEN & BRG. STERIL 28.59 1.00 28.59 M1
11 GUDANG BARANG/LINEN BAHAN PERBEKALAN BARU 17.50 1.00 17.50 M1
12 RG. DEKONTAMINASI 24.38 1.00 24.38 M1
13 UNIT CSSD + RG. PENCUCIAN PERLENGKAPAN 86.80 1.00 86.80 M1
14 RG. DEKONTAMINASI TROLI/KERETA + RG. PENCATATAN 36.24 1.00 36.24 M1
15 RG. KEPALA CSSD 17.05 1.00 17.05 M1
16 RG. GANTI WANITA 19.15 1.00 19.15 M1
17 RG. GANTI PRIA 19.84 1.00 19.84 M1
18 RG. PANEL 10.00 1.00 10.00 M1
19 JANITOR 8.00 1.00 8.00 M1
20 PANTRY 10.34 1.00 10.34 M1
21 RG. AREA SERVICE SHAFT 33.92 1.00 33.92 M1
VOLUME A 653.66 M1

DI PERIKSA OLEH : DI PERIKSA OLEH : DI BUAT OLEH :


TIM TEKNIS MANAJEMEN KONSTRUKSI (MK) KONTRAKTOR PELAKSANA
PEMBANGUNAN RSU KOLAKA TOWER II PT. SULAPAAPPA PT. ANGGAZA WIDYA RIDHAMULIA
(LANJUTAN)
BAHAR, A.Md SAMSIR, S.ARS AGUS TRIYONO, ST
NIP. 198003122011011005 SITE ENGINEER SITE MANAGER
PEMERINTAH KABUPATEN KOLAKA MANAJEMEN KONSTRUKSI (MK) KONTRAKTOR PELAKSANA
DINAS KESEHATAN PT. SULAPAAPPA PT. ANGGAZA WIDYA RIDHAMULIA
INSTANSI / SKPD : DINAS KESEHATAN KABUPATEN KOLAKA
PEKERJAAN : PEMBANGUNAN RSU KOLAKA TOWER II (LANJUTAN)
LOKASI : KABUPATEN KOLAKA PROVINSI SULAWESI TENGGARA
TAHUN ANGGARAN : 2021
NILAI KONTRAK : RP. 27.666.666.666,00
NO. KONTRAK : 02/KONTRAK/RSU-TW2/II/2021
TGL. KONTRAK : 11 FEBRUARI 2021
JADWAL PEKERJAAN : 11 FEBRUARI 2021 S/D 09 AGUSTUS 2021 (180 HARI KALENDER)
SUMBER DANA : APBD
KONTRAKTOR : PT. ANGGAZA WIDYA RIDHAMULIA
BACK UP DATA
JENIS PEKERJAAN : PEKERJAAN PENUTUP LANTAI DAN DINDING
ITEM PEKERJAAN : PASANGAN PLINT GRANIT 10 x 60 CM, Ex. GRANITO
Panjang
No Uraian QTY Volume Satuan Ket.
(m)
PARSIAL B
1 RG. SEKERTARIS DIREKTUR 14.04 1.00 14.04 M1
2 RG. DIREKTUR 8.92 1.00 8.92 M1
3 RG. RAPAT DAN DISKUSI 23.94 1.00 23.94 M1
4 JANITOR 8.77 1.00 8.77 M1
5 PANTRY 15.32 1.00 15.32 M1
6 RG. GANTI WANITA 12.12 1.00 12.12 M1
7 RG. GANTI PRIA 12.57 1.00 12.57 M1
8 AREA TANGGA 7.62 1.00 7.62 M1
9 RG. DEPAN TANGGA 14.12 1.00 14.12 M1
10 KORIDOR ADMINISTRASI 180.09 1.00 180.09 M1
11 RG. KEPALA BIDANG 19.39 1.00 19.39 M1
12 RG. KOMITE KEPERAWATAN 15.35 1.00 15.35 M1
13 RG. KOMITE MEDIS 23.60 1.00 23.60 M1
14 RG. RAPAT DAN DISKUSI 28.60 1.00 28.60 M1
15 RG. KEPALA BAGIAN 19.48 1.00 19.48 M1
16 RG. STAFF 18.88 1.00 18.88 M1
17 RG. KEPALA SEKSI 1 12.54 1.00 12.54 M1
18 RG. KEPALA SEKSI 2 12.54 1.00 12.54 M1
19 RG. MEDICAL RECORD 18.87 1.00 18.87 M1
20 RG. PANEL 11.59 1.00 11.59 M1
21 RG. STAFF 24.94 1.00 24.94 M1
22 RG. KEPALA SEKSI 3 13.70 1.00 13.70 M1
23 RG. KEPALA SEKSI 4 13.70 1.00 13.70 M1
24 RG. KEPALA SEKSI 5 14.49 1.00 14.49 M1
25 RG. KEPALA SEKSI 6 13.60 1.00 13.60 M1
26 RG. STAFF 20.30 1.00 20.30 M1
27 RG. KEPALA BIDANG 20.70 1.00 20.70 M1
28 RG. KEPALA SEKSI 7 14.30 1.00 14.30 M1
29 RG. KEPALA SEKSI 8 13.70 1.00 13.70 M1
30 RG. STAFF 20.39 1.00 20.39 M1
31 RG. KEPALA BIDANG 20.60 1.00 20.60 M1
32 RG. BADAN PENGAWAS 20.39 1.00 20.39 M1
33 RG. SPI 20.75 1.00 20.75 M1
VOLUME B 709.91 M1

VOLUME TOTAL ( A + B ) 1,363.57 M1

DI PERIKSA OLEH : DI PERIKSA OLEH : DI BUAT OLEH :


TIM TEKNIS MANAJEMEN KONSTRUKSI (MK) KONTRAKTOR PELAKSANA
PEMBANGUNAN RSU KOLAKA TOWER II PT. SULAPAAPPA PT. ANGGAZA WIDYA RIDHAMULIA
(LANJUTAN)
BAHAR, A.Md SAMSIR, S.ARS AGUS TRIYONO, ST
NIP. 198003122011011005 SITE ENGINEER SITE MANAGER
PEMERINTAH KABUPATEN KOLAKA MANAJEMEN KONSTRUKSI (MK) KONTRAKTOR PELAKSANA
DINAS KESEHATAN PT. SULAPAAPPA PT. ANGGAZA WIDYA RIDHAMULIA
INSTANSI / SKPD : DINAS KESEHATAN KABUPATEN KOLAKA
PEKERJAAN : PEMBANGUNAN RSU KOLAKA TOWER II (LANJUTAN)
LOKASI : KABUPATEN KOLAKA PROVINSI SULAWESI TENGGARA
TAHUN ANGGARAN : 2021
NILAI KONTRAK : RP. 27.666.666.666,00
NO. KONTRAK : 02/KONTRAK/RSU-TW2/II/2021
TGL. KONTRAK : 11 FEBRUARI 2021
JADWAL PEKERJAAN : 11 FEBRUARI 2021 S/D 09 AGUSTUS 2021 (180 HARI KALENDER)
SUMBER DANA : APBD
KONTRAKTOR : PT. ANGGAZA WIDYA RIDHAMULIA
GAMBAR KERJA

PAS. PLINT GRANIT PARSIAL A

PAS. PLINT GRANIT PARSIAL B

DI PERIKSA OLEH : DI PERIKSA OLEH : DI BUAT OLEH :


TIM TEKNIS MANAJEMEN KONSTRUKSI (MK) KONTRAKTOR PELAKSANA
PEMBANGUNAN RSU KOLAKA TOWER II PT. SULAPAAPPA PT. ANGGAZA WIDYA RIDHAMULIA
(LANJUTAN)
BAHAR, A.Md SAMSIR, S.ARS AGUS TRIYONO, ST
NIP. 198003122011011005 SITE ENGINEER SITE MANAGER
PEMERINTAH KABUPATEN KOLAKA MANAJEMEN KONSTRUKSI (MK) KONTRAKTOR PELAKSANA
DINAS KESEHATAN PT. SULAPAAPPA PT. ANGGAZA WIDYA RIDHAMULIA
INSTANSI / SKPD : DINAS KESEHATAN KABUPATEN KOLAKA
PEKERJAAN : PEMBANGUNAN RSU KOLAKA TOWER II (LANJUTAN)
LOKASI : KABUPATEN KOLAKA PROVINSI SULAWESI TENGGARA
TAHUN ANGGARAN : 2021
NILAI KONTRAK : RP. 27.666.666.666,00
NO. KONTRAK : 02/KONTRAK/RSU-TW2/II/2021
TGL. KONTRAK : 11 FEBRUARI 2021
JADWAL PEKERJAAN : 11 FEBRUARI 2021 S/D 09 AGUSTUS 2021 (180 HARI KALENDER)
SUMBER DANA : APBD
KONTRAKTOR : PT. ANGGAZA WIDYA RIDHAMULIA
GAMBAR KERJA

PAS. PLINT GRANIT B


PEMERINTAH KABUPATEN KOLAKA MANAJEMEN KONSTRUKSI (MK) KONTRAKTOR PELAKSANA
DINAS KESEHATAN PT. SULAPAAPPA PT. ANGGAZA WIDYA RIDHAMULIA
INSTANSI / SKPD : DINAS KESEHATAN KABUPATEN KOLAKA
PEKERJAAN : PEMBANGUNAN RSU KOLAKA TOWER II (LANJUTAN)
LOKASI : KABUPATEN KOLAKA PROVINSI SULAWESI TENGGARA
TAHUN ANGGARAN : 2021
NILAI KONTRAK : RP. 27.666.666.666,00
NO. KONTRAK : 02/KONTRAK/RSU-TW2/II/2021
TGL. KONTRAK : 11 FEBRUARI 2021
JADWAL PEKERJAAN : 180 (SERATUS DELAPAN PULUH) HARI KALENDER
SUMBER DANA : APBD
KONTRAKTOR : PT. ANGGAZA WIDYA RIDHAMULIA
BACK UP DATA
JENIS PEKERJAAN : PEKERJAAN PENUTUP LANTAI DAN DINDING
ITEM PEKERJAAN : PASANGAN PLINT GRANIT 10 x 60 CM, Ex. GRANITO
Panjang
No Uraian QTY Volume Satuan Ket.
(m)
PARSIAL B
1 RG. SEKERTARIS DIREKTUR 14.04 1.00 14.04 M1
2 RG. DIREKTUR 8.92 1.00 8.92 M1
3 RG. RAPAT DAN DISKUSI 23.94 1.00 23.94 M1
4 JANITOR 8.77 1.00 8.77 M1
5 PANTRY 15.32 1.00 15.32 M1
6 RG. GANTI WANITA 12.12 1.00 12.12 M1
7 RG. GANTI PRIA 12.57 1.00 12.57 M1
8 AREA TANGGA 7.62 1.00 7.62 M1
9 RG. DEPAN TANGGA 14.12 1.00 14.12 M1
10 KORIDOR ADMINISTRASI 180.09 1.00 180.09 M1
11 RG. KEPALA BIDANG 19.39 1.00 19.39 M1
Panjang
No Uraian QTY Volume Satuan Ket.
(m)
12 RG. KOMITE KEPERAWATAN 15.35 1.00 15.35 M1
13 RG. KOMITE MEDIS 23.60 1.00 23.60 M1
14 RG. RAPAT DAN DISKUSI 28.60 1.00 28.60 M1
15 RG. KEPALA BAGIAN 19.48 1.00 19.48 M1
16 RG. STAFF 18.88 1.00 18.88 M1
17 RG. KEPALA SEKSI 1 12.54 1.00 12.54 M1
18 RG. KEPALA SEKSI 2 12.54 1.00 12.54 M1
19 RG. MEDICAL RECORD 18.87 1.00 18.87 M1
20 RG. PANEL 11.59 1.00 11.59 M1
21 RG. STAFF 24.94 1.00 24.94 M1
22 RG. KEPALA SEKSI 3 13.70 1.00 13.70 M1
23 RG. KEPALA SEKSI 4 13.70 1.00 13.70 M1
24 RG. KEPALA SEKSI 5 14.49 1.00 14.49 M1
25 RG. KEPALA SEKSI 6 13.60 1.00 13.60 M1
26 RG. STAFF 20.30 1.00 20.30 M1
27 RG. KEPALA BIDANG 20.70 1.00 20.70 M1
28 RG. KEPALA SEKSI 7 14.30 1.00 14.30 M1
29 RG. KEPALA SEKSI 8 13.70 1.00 13.70 M1
30 RG. STAFF 20.39 1.00 20.39 M1
31 RG. KEPALA BIDANG 20.60 1.00 20.60 M1
32 RG. BADAN PENGAWAS 20.39 1.00 20.39 M1
33 RG. SPI 20.75 1.00 20.75 M1
VOLUME B 709.91 M1