P.DATA-2 (LT.

2)

BEBAN (Watt)
Group
R S T

PP.TAMAN / PARKIR

KEGIATAN
BEBAN (Watt)
UPS DATA R S T DUKUNGAN MANAJEMEN DAN
30KVA/3P PELAKSANAAN TUGAS LAINNYA
DITJEN PENDIDIKAN VOKASI

PEKERJAAN

PERENCANAAN LANJUTAN
GEDUNG DIREKTORAT
POLITEKNIK PERTANIAN NEGERI
KUPANG
LOKASI

KAMPUS POLITEKNIK PERTANIAN


667 267 251 NEGERI KUPANG

TOTAL 1.185 W = 1.481 VA

6.500 7.000 6.750


PP.PH (POWER HOUSE)
TOTAL 20.250 W = 25.312 VA

BEBAN (Watt)
Group
R S T

P.DATA-4 (LT.4)

BEBAN (Watt)
Group
R S T

UPS DATA
40KVA/3P
855 1.250 950

JUMLAH 3.055 W = 3.818 VA

PERENCANA

TOTAL : 4.240 W
P.AL (ARUS LEMAH) GRIYA AGRA SAGUNA
MULTIDISCIPLINARY CONSULTANT

PENANGGUNG JAWAB

UPS 6KVA/3P

IR. RIKSA ASWATA, MKM, IAI


IAI : 1.1.101.2.076.01.1065736

TEAM LEADER

8.000 8.000 8.750


T. AHLI ARSITEK
TOTAL 24.750 W = 30.937 VA
T. AHLI STRUKTUR

T. AHLI MEKANIKAL

T. AHLI ELEKTRIKAL

DI GAMBAR

5.000 W JUDUL GAMBAR SKALA

WIRING DIAGRAM PANEL


P.DATA,PP.PH,PP.TAMAN
& P.AL NTS

TANGGAL NOMOR LEMBAR KODE

2021 EL-405