Tabel 1. Harga Farm Gate (Rupiah) tahun 2000 dan Prakiraan harga
Gabah
HYV Kg 2,600.00 2,393.78 2,698.79 2,300.80 2,507.84 2,158.59
Lokal Kg - - - - - -
Kedelai Kg 5,000.00 3,616.00 4,761.26 3,530.50 4,675.21 3,331.00
Jagung Kg 2,000.00 1,312.85 2,122.10 1,445.85 2,595.36 1,431.60
Pupuk :
Urea Kg 1,600.00 2,367.00 1,697.68 1,806.50 2,076.28 2,129.50
TSP Kg 2,000.00 3,098.50 2,122.10 3,231.50 2,595.36 3,326.50
KCL Kg 2,300.00 2,975.00 2,440.42 2,661.50 2,984.66 2,452.50
Insektisida Lt 25,000.00 18,750.00 26,526.27 19,894.70 32,441.95 24,331.46
Rodentisida Kg 20,000.00 15,000.00 21,221.01 15,915.76 25,953.56 19,465.17
Herbisida Lt 40,000.00 30,000.00 42,442.03 31,831.52 51,907.12 38,930.34
Buruh :
Keluarga m/d 20,000.00 12,000.00 20,000.00 12,000.00 20,000.00 12,000.00
Sewa m/d 40,000.00 24,000.00 40,000.00 24,000.00 40,000.00 24,000.00
Benih
Padi :
HYV Kg 3,500.00 4,787.56 5,397.59 4,601.59 5,015.69 4,317.18
Lokal Kg - - - - - -
Kedelai Kg 5,000.00 4,520.00 5,000.00 4,413.13 5,000.00 4,163.75
Jagung Kg 3,000.00 1,641.06 3,000.00 1,807.31 3,000.00 1,789.49
Tabel Struktur Harga untuk Tanaman Pangan Beras - Eksport
1 US $ = Rp.
No. URAIAN units 2010 2015
378.00
37.80
-
340.20
3,231.90
35.17
35.17
3,302.24
35.87
3,266.37
2,123.14
32.66
23.08
2,067.39
Tabel Struktur Harga Jagung
1 US $ = Rp. 9,500.00
Harga Import Harga Ekspor
No Uraian Unit 2010 2015 2020 2010 2015 2020
Urea
1 Harga Pasar Dunia (FOB Eropa) 2000 $/ton 231.00 172.00 206.00
2 Pengapalan dan Asuransi $/ton + 15.00 15.00 15.00
3 Eks-pabrik palembang Indonesia $/ton = 246.00 187.00 221.00
Rp/kg = 2,337.00 1,776.50 2,099.50
4 Pengangkutan ke agen penjual Rp/kg + 10.00 10.00 10.00
5 Penyimpanan dan keuntungan agen
penjual Rp/kg + 15.00 15.00 15.00
6 Pengangkutan ke proyek/petani Rp/kg + 5.00 5.00 5.00
7 Harga ekonomik di Farm gate Rp/kg = 2,367.00 1,806.50 2,129.50
TSP
1 Harga Pasar Dunia (FOB Eropa) 2000 $/ton 278.00 292.00 302.00
2 Pengapalan dan Asuransi $/ton + 45.00 45.00 45.00
3 CIF Indonesia $/ton = 323.00 337.00 347.00
Rp/kg = 3,068.50 3,201.50 3,296.50
4 Pengangkutan ke agen penjual Rp/kg + 10.00 10.00 10.00
5 Penyimpanan dan keuntungan agen
penjual Rp/kg + 15.00 15.00 15.00
6 Pengangkutan ke proyek/petani Rp/kg + 5.00 5.00 5.00
7 Harga ekonomik di Farm gate Rp/kg = 3,098.50 3,231.50 3,326.50
KCL
1 Harga Pasar Dunia (FOB Eropa) 2000 $/ton 265.00 232.00 210.00
2 Pengapalan dan Asuransi $/ton + 45.00 45.00 45.00
3 Eks-pabrik Palembang Indonesia $/ton = 310.00 277.00 255.00
CIF Indonesia Rp/kg = 2,945.00 2,631.50 2,422.50
4 Pengangkutan ke agen penjual Rp/kg + 10.00 10.00 10.00
5 Penyimpanan dan keuntungan agen
penjual Rp/kg + 15.00 15.00 15.00
6 Pengangkutan ke proyek/petani Rp/kg + 5.00 5.00 5.00
7 Harga ekonomik di Farm gate Rp/kg = 2,975.00 2,661.50 2,452.50
Luas Lahan
Penggunaan Lahan dan
Saat Saat Mendatang Perbedaan
Pola Tanam
Sekarang Tanpa Proyek Dengan Proyek
(ha) (ha) (ha)
I Persawahan
Musim Tanam 1
- Padi 366 366 1,000 634.00
- Palawija - - -
-
Musim Tanam 2 -
- Padi 150 150 1,000 850.00
- Palawija 166 166 - (166.00)
-
Musim Tanam 3 -
- Palawija 166 166 1,000 834.00
-
II Ladang 160 160 160 -
-
III Belukar - -
-
IV Alang-alang 168 168 168
Musim Tanam 1
- Padi 366.00 3.61 1,320.89 366.00 3.61 1,320.89 1,000.00 4.50 4,500.00
- Palawija 362.00 1.00 362.00 362.00 1.20 434.40 - 1.20 -
Musim Tanam 2
- Padi 150.00 150.00 2.89 433.08 1,000.00 4.50 4,500.00
- Palawija 528.00 1.00 528.00 166.00 1.20 199.20 - 1.20 -
Musim Tanam 3 -
- Palawija 166.00 166.00 1.20 199.20 1,000.00 1.20 1,200.00
Input
Benih
HYV kg 30 105,000.00 143,626.73 30 105,000.00 129,515.41 25 125,392.21 107,929.51
Pupuk
Urea kg 109 174,400.00 258,003.00 109 185,047.25 232,115.50 300 622,885.44 638,850.00
TSP kg 54 108,000.00 167,319.00 54 114,593.48 179,631.00 300 778,606.80 997,950.00
KCL kg 30 69,000.00 89,250.00 30 73,212.50 73,575.00 150 447,698.91 367,875.00
Buruh
Keluarga m/d - 40 800,000.00 480,000.00 40 800,000.00 480,000.00
Sewa m/d 48 1,920,000.00 1,152,000.00 50 2,000,000.00 1,200,000.00 50 2,000,000.00 1,200,000.00
Pompa Air p/ha 1 395,652.00 395,652.00 1 419,806.84 314,855.13
Traktor p/ha 1 300,000.00 300,000.00 1 318,315.22 238,736.41 1 389,303.40 291,977.55
Total biaya input Rp. 3,372,052.00 2,655,850.73 4,334,290.50 3,087,164.86 5,384,492.01 4,250,036.00
Total Output kg 3609 9,383,400.00 8,639,147.97 3609 9,739,946.56 8,303,577.37 4500 11,285,299.24 9,713,655.54
A. Biaya Langsung
I Pekerjaan Persiapan Ls 400,000,000 Ls 400,000,000 Ls 400,000,000 LS 100,000,000
IV Pekerjaan Saluran
a. Saluran Induk m' 975,000 3,500 3,412,500,000 450 438,750,000
b. Saluran Sekunder m' 975,000 14,500 14,137,500,000 14,500 14,137,500,000 14,500 14,137,500,000
VI. Pompanisasi
a, Pengadaan Pompa bh 200,000,000 0 0 5 1,000,000,000
b. Rumah Pompa bh 500,000,000 0 0 5 2,500,000,000
Jumlah Pekerjaan Sipil 22,810,760,000 21,691,500,000 17,737,500,000
II PEKERJAAN SIPIL
2.1. Bangunan Utama 4,860,760,000.00 0.80 3,888,608,000
2.2. Main System 3,412,500,000.00 0.80 2,730,000,000
2.3. Saluran Sekunder 14,137,500,000.00 0.80 11,310,000,000
J u m l a h ( I + II ) 22,810,760,000.00 18,248,608,000
ALTERNATIF II
No Item Finansial Cost Conversion Ekonomi Cost
(Rp. x 1.000) Factor (Rp. x 1.000)
II PEKERJAAN SIPIL
2.1. Bangunan Utama 6,715,250,000.00 0.80 5,372,200,000
2.2. Main System 438,750,000.00 0.80 351,000,000
2.3. Saluran Sekunder 14,137,500,000.00 0.80 11,310,000,000
J u m l a h ( I + II ) 21,691,500,000.00 17,353,200,000
ALTERNATIF III
No Item Finansial Cost Conversion Ekonomi Cost
(Rp. x 1.000) Factor (Rp. x 1.000)
II PEKERJAAN SIPIL
2.1. Pompanisasi 3,500,000,000.00 0.80 2,800,000,000
2.2. Main System 0.80 0
2.3. Saluran Sekunder 14,137,500,000.00 0.80 11,310,000,000
J u m l a h ( I + II ) 17,737,500,000.00 14,190,000,000
Keuntungan turun 20 %
Ekonomi Internal Rate of Return (EIRR) 18.05
B/C R (discount rate 20%) 0.90
Net Present Value (NPV) (1,274,841,515.96)
Tertunda 2 tahun
Ekonomi Internal Rate of Return (EIRR) 16.39
B/C R (discount rate 20%) 0.76
Net Present Value (NPV) (2,906,446,544.06)
Analisis sensitifitasAlternatif II
Biaya naik 20 %
Ekonomi Internal Rate of Return (EIRR) 17.84
B/C R (discount rate 20%) 0.87
Net Present Value (NPV) (1,788,803,388.25)
Keuntungan turun 20 %
Ekonomi Internal Rate of Return (EIRR) 18.54
B/C R (discount rate 20%) 0.92
Net Present Value (NPV) (951,271,144.59)
Tertunda 2 tahun
Ekonomi Internal Rate of Return (EIRR) 16.78
B/C R (discount rate 20%) 0.78
Net Present Value (NPV) (2,582,876,172.70)
Tabel 5.20. Perhitungan EIRR untuk pekerjaan FS DI. Kaubun (Alternatif III)
DF (%) = 20.00
No Tahun Biaya Biaya Jumlah Keuntungan Cashflow
Konstruksi O&P Biaya Ekonomi
Keuntungan turun 20 %
Ekonomi Internal Rate of Return (EIRR) 18.40
B/C R (discount rate 20%) 0.92
Net Present Value (NPV) (1093966794.39)
Tertunda 2 tahun
Ekonomi Internal Rate of Return (EIRR) 20.11
B/C R (discount rate 20%) 1.01
Net Present Value (NPV) 68211464.10