A. MITRA
B. Program
C. Total Anggaran Biaya KEHATI
D. Periode Kegiatan
E. Lingkup
F. Desk Bio Region
G. No. Piagam Kesepakatan Kerjasama
No. Kegiatan
Total
GRAND TOTAL
: Asosiasi Sawit Rakyat Mandiri Kabupaten Berau
: Mewujudkan tata kelola perkebunan sawit rakyat yang berkelanjutan dalam aspek legalitas, ekonomi, social, dan lin
: Rp. 299.150.000,-
: 3 Bulan
: Daerah
15 50,000 750,000
750,000
303,650,000
pek legalitas, ekonomi, social, dan lingkungan
Bulan 1
1,050,000 350,000
1,050,000 - 1,050,000
-
750,000 750,000
750,000 - 750,000
-
8,250,000 3,750,000
5,500,000 2,500,000
14,400,000 6,300,000
2,400,000 1,050,000
3,500,000 penginapan penanggung jawab dan PM 1,400,000
6,600,000 6,600,000
40,650,000 - 40,650,000
1,700,000
500,000
3,300,000
5,500,000 - 5,500,000
-
5,500,000
41,250,000
46,750,000 - 46,750,000
-
15,000,000 15,000,000
1,500,000 1,500,000
16,500,000 - 16,500,000
-
18,900,000 23,100,000 45% 6,300,000
36,000,000 12,000,000
12,000,000 4,000,000
40,500,000 13,500,000
11,250,000 3,750,000
118,650,000 23,100,000 141,750,000
-
3,000,000 1,000,000
15,300,000 5,100,000
900,000 300,000
3,000,000 1,000,000
9,000,000 3,000,000
9,000,000 3,000,000
6,000,000
4,500,000 1,500,000
44,700,000 6,000,000 50,700,000
- -
274,550,000 29,100,000 303,650,000 93,650,000
90.42% 9.58% 100.00%
Cash Flow Budget
750,000
4,500,000 8,250,000
3,000,000 5,500,000
8,100,000 14,400,000
1,350,000 2,400,000
2,100,000 3,500,000
6,600,000
1,700,000 1,700,000
500,000 500,000
3,300,000 3,300,000
5,500,000 5,500,000
41,250,000 41,250,000
15,000,000
1,500,000
d Infocus
e akomodasi tim
Sub Total
1.2.3 Pemetaan kebun anggota ASRM
a Pengadaan Drone multi-rotor
b Pengadaan GPS Garmin 64s
c Komputer pengolah data spasial
d Hardisk
e Honorarium tenaga ahli pemetaan - Ganecha
f Honorarium tenaga pendamping (Unit Layanan)
g Bahan dan alat pendukung
h Perdiem
i Akomodasi
j Transport pendamping
h sewa mobil + Bensin + Driver
Sub Total
a.2 Konsumsi
b Material supplies
c Sewa mobil + Bensin + Driver
d pengganti uang transport narasumber/pemateri
e Akomodasi narasumber dan tim ASRM
f HOK asistensi supervisi
g akomodasi asistensi supervisi
Sub Total
Output 1.3. Data dan informasi anggota baru asosiasi di wilayah kerja
ASRM Kab. Berau
1,3,1 Pelatihan pengisian form pendataan berbasis sistem data base sawit
rakyat
a Konsumsi
b ATK
c Transport Lokal
Sub Total
1,3,2 Pendataan anggota ASRM Kab. Berau di 11 desa
a material supplies
Total
GRAND TOTAL
Keterangan Unit Harga/Unit Total Harga KEHATI I
750,000 750,000
-
15 orang, (11 kali) 165 50,000 8,250,000 8,250,000
ATK dan banner, 11 desa, 1 pakaet 11 500,000 5,500,000 5,500,000
16 hari (5 desa memerlukan waktu 2 hari) 16 900,000 14,400,000 14,400,000
1 paket
825 kartu anggota ASRM,Spesifikasi: 0 6,000,000 - -
Bahan PVC(seperti SIM,KTP), ukuran 8,5 825 20,000 16,500,000 -
cm X 5,5 cm 16,500,000 -
57,000,000 -
289,900,000 288,800,000
SWADAYA Total REALOKASI KEHATI II REALOKASI
4,050,000 4,800,000
1,500,000 1,500,000
- - 5,550,000 6,300,000 -
-2,250,000 6,000,000
-5,358,000 142,000
-3,600,000 10,800,000
-2,400,000 -
0 3,500,000
- 6,600,000
- - (13,608,000) 27,042,000 -
- -
16,500,000 16,500,000
- - 16,500,000 16,500,000 -
- -
- -
- -
- -
21,000,000 21,000,000
6,150,000 6,150,000
5,400,000 5,400,000
9,000,000 9,000,000
9,000,000 9,000,000
1,000,000 1,000,000
- -
- - 51,550,000 51,550,000 -
12,000,000 12,000,000 (750,000.00)
45,000,000 45,000,000
- -
8,100,000 8,100,000 8,100,000.00
- -
5,500,000.00
17,100,000.00
11,000,000.00
6,300,000.00
23,100,000.00
8,250,000.00
- - - - 93,250,000.00
-
-1,150,000 550,000
-500,000 -
-1,650,000 1,650,000
- 5,500,000 (3,300,000) 2,200,000 -
5,500,000
41,250,000
- - - 46,750,000 -
-
- 15,000,000 (45,000.00)
- 1,500,000
- -
5,000,000 5,000,000
- -
- - 5,000,000 21,500,000 (45,000.00)
-
92,400,000 56,700,000 75,600,000 25,200,000.00
108,000,000 144,000,000 48,000,000.00
49,500,000 66,000,000 22,000,000.00
148,500,000 198,000,000
36,000,000 48,000,000 16,000,000.00
92,400,000 - 398,700,000 531,600,000 111,200,000.00
-
- -
116,400,000 74,200,000 843,342,000 1,132,142,000 318,106,500.00
156.87% 156.87% 1,132,142,000
0.58
210,000,000
Kehati 94,500,000
swadaya 115,500,000
Total swadaya 139,500,000
Kehati I 288,800,000
Add Kehati 843,342,000
Total Kehati II 1,132,142,000
Total swadaya 139,500,000
Total biaya keg 1,271,642,000
Add Kehati III 318,106,500
Total Biaya Keg 1,450,248,500
3,300,000.00
KEHATI III REALOKASI KEHATI IV
5,850,000
5,850,000
4,800,000
1,500,000
6,300,000
6,000,000
142,000
10,800,000
3,500,000
6,600,000
27,042,000
3,000,000
6,480,000
1,619,500
11,099,500
-
16,500,000
16,500,000
-
-
-
-
21,000,000
6,150,000
5,400,000
9,000,000
9,000,000
1,000,000
-
51,550,000
11,250,000
45,000,000
56,250,000
25,483,999
4,328,000
16,250,000
1,631,000
50,000,000
20,000,000
1,500,000
25,000,000
15,000,000
7,500,000
7,200,000
173,892,999
16,200,000
3,000,000
-
1,500,000
7,200,000
12,600,000
5,400,000
45,900,000.00
20,350,000
5,500,000
17,100,000
11,000,000
4,200,000
23,100,000
8,250,000
89,500,000
22,000,000
5,500,000
17,100,000
11,000,000
6,300,000
23,100,000
8,250,000
93,250,000.00
550,000
-
1,650,000
2,200,000
5,500,000
41,250,000
46,750,000
14,955,000
1,500,000
-
5,000,000
-
21,455,000
100,800,000
192,000,000
88,000,000
198,000,000
64,000,000
642,800,000
15,952,501
81,600,000
4,800,000
5,556,500
19,000,000
9,000,000
-
24,000,000
159,909,001
1,450,248,500
318,106,500
CASHFLOW
TAHUN 2021
-
2,651,000 1,599,000 400,000
2,651,000.00 1,599,000.00 400,000.00
-
1,650,000 1,650,000 750,000
250,000 250,000 500,000
1,900,000.00 1,900,000.00 1,250,000.00
-
6,000,000
142,000
10,800,000
3,500,000
6,600,000
27,042,000.00 - -
-
- 1,500,000 500,000
- 3,780,000 900,000
1,619,500
1,619,500.00 5,280,000.00 1,400,000.00
-
-
8,250,000 8,250,000
8,250,000.00 8,250,000.00 -
-
-
-
-
- 10,500,000 10,500,000
- 3,300,000 2,850,000
- 2,700,000 2,700,000
- 4,500,000 4,500,000
- 4,500,000 4,500,000
- 500,000 500,000
-
- 26,000,000 25,550,000
-
11,250,000
45,000,000
56,250,000.00 - -
-
25,483,999
4,328,000
16,250,000
1,631,000
20,000,000 15,000,000 15,000,000
8,000,000 6,000,000 6,000,000
- 750,000 750,000
10,000,000 7,500,000 7,500,000
6,150,000 4,500,000 4,350,000
3,150,000 2,250,000 2,100,000
sewa mobil PP untuk transpor 3,600,000 3,600,000
94,992,999.00 39,600,000.00 39,300,000.00
-
- 5,400,000
- 1,000,000
-
konsumsi pengajuan STDB di - 500,000
- 2,700,000
4,200,000
1,800,000
- - 15,600,000.00
3,000,000
9,000,000
6,000,000
3,300,000
pengurangan jumlah untuk list budget 1,2,5 f 12,600,000
pengurangan jumlah untuk list budget 1,2,5 g 4,500,000
- 49,400,000.00 -
-
-
550,000
-
1,650,000
2,200,000.00 - -
-
5,500,000
41,250,000
46,750,000.00 - -
-
14,955,000
1,500,000
-
5,000,000
-
21,455,000.00 - -
-
63,000,000 12,600,000 6,300,000
#REF! 24,000,000 12,000,000
55,000,000 11,000,000 5,500,000
165,000,000 33,000,000
40,000,000 8,000,000 4,000,000
#REF! 88,600,000.00 27,800,000.00
TAHUN 2022
-
400,000 400,000 400,000 -
400,000.00 400,000.00 400,000.00 -
750,000 -
500,000 -
- 1,250,000.00 - -
-
-
-
-
- - - -
500,000 500,000
900,000 900,000
1,400,000.00 1,400,000.00 - -
- - - -
- - - -
- - - -
- - - -
5,400,000 5,400,000
1,000,000 1,000,000
500,000 500,000
2,700,000 1,800,000
4,200,000 4,200,000
1,800,000 1,800,000
15,600,000.00 14,700,000.00 - -
9,250,000
2,500,000
8,100,000
5,000,000
2,100,000
10,500,000
3,750,000
41,200,000.00 - - -
11,000,000 -
2,500,000
8,100,000
5,000,000
3,000,000
10,500,000
3,750,000
43,850,000.00 - - -
- - - -
- - - -
- - - -
-
No. Kegiatan
d Infocus
e akomodasi tim
Sub Total
1.2.3 Pemetaan kebun anggota ASRM
a Pengadaan Drone multi-rotor
b Pengadaan GPS Garmin 64s
c Komputer pengolah data spasial
d Hardisk
e Honorarium tenaga ahli pemetaan - Ahmad fatah yasin
f Honorarium tenaga pendamping (Unit Layanan)
g Bahan dan alat pendukung
h Perdiem
i Akomodasi
j Transport pendamping
h sewa mobil + Bensin + Driver
Sub Total
a.2 Konsumsi
b Material supplies
c Sewa mobil + Bensin + Driver
d pengganti uang transport narasumber/pemateri
e Akomodasi narasumber dan tim ASRM
f HOK asistensi supervisi
g akomodasi asistensi supervisi
Sub Total
Penyerahan Usulan STD-B dan Diskusi Komitmen Dukungan Kesiapan
1,2,7 ISPO 2025
a penginapan peserta
b paket meeting
c Pengganti transport (PP)
d transport lokal peserta tidak menginap
e Perdiem
f Material Supplies
h Sewa mobil+bensin+driver
Sub Total
1,2,8 Training penggunaan aplikasi e-sawit kita
a honor narasumber
b pengganti konsumsi
c transport lokal
Sub Total
Output 1.3. Data dan informasi anggota baru asosiasi di wilayah kerja
ASRM Kab. Berau
1,3,1 Pelatihan pengisian form pendataan berbasis sistem data base sawit
rakyat
a Konsumsi
b ATK
c Transport Lokal
Sub Total
1,3,2 Pendataan anggota ASRM Kab. Berau di 11 desa
a material supplies
Total
GRAND TOTAL
Keterangan KEHATI III REALOKASI KEHATI IV
4,800,000 4,800,000
1,500,000 1,500,000
6,300,000 - 6,300,000
-
15 orang, (11 kali) 6,000,000 0.00 6,000,000
ATK dan banner, 11 desa, 1 pakaet 142,000 0.00 142,000
-
33 orang unit layanan @ 3 orang/desa, 330
petani anggota ASRM @ 30 orang/desa, 22
perwakilan pemdes @ 2 orang/desa. 3 22,000,000 22,000,000
orang tim ASRM kali 11 desa = 33 .dan 2
narasumber kali 11 desa = 22
TAHUN 2021-2022
-
5,351,000 499,000 450,000 450,000 450,000
5,351,000.00 499,000.00 450,000.00 450,000.00 450,000.00
-
3,365,000 1,435,000
250,000 1,250,000
3,615,000.00 - - 2,685,000.00 -
-
6,000,000
142,000
10,800,000
3,500,000
6,600,000
27,042,000.00 -
-
- 3,000,000
- 6,300,000
1,619,500
1,619,500.00 - 9,300,000.00 - -
-
-
16,500,000
16,500,000.00 - - - -
-
-
-
-
9,450,000
10,632,600
6,300,000
8,700,000
3,600,000
1,165,150
-
39,847,750 -
-
11,250,000
45,000,000
5,000,000 5,000,000 5,000,000
-
3,440,000 12,760,000
- -
1,500,000 1,500,000
- -
- -
- -
6,300,000 6,300,000
2,700,000 2,700,000
13,940,000.00 - 23,260,000.00 - -
-
1,500,000 20,500,000
500,000 5,000,000
900,000 16,200,000
- 11,000,000
- 6,300,000
2,100,000 21,000,000
750,000 7,500,000
5,750,000.00 87,500,000.00
8,400,000.00
11,700,000.00
10,500,000.00
3,150,000.00
750,000.00
3,600,000.00
- - 38,100,000.00 - -
1,000,000.00
1,650,000.00
4,950,000.00
- - - 7,600,000.00 -
-
-
550,000
-
1,650,000
2,200,000.00 -
-
5,500,000 1,000,000
18,900,000.00
28,800,000.00
4,800,000.00
11,000,000.00
21,600,000.00
750,000.00
2,700,000.00
20,000,000.00
108,550,000.00
-
14,955,000
1,500,000
-
5,000,000
-
21,455,000.00 -
-
88,200,000 12,600,000 6,300,000 6,300,000 6,300,000
168,000,000 24,000,000 12,000,000 12,000,000 12,000,000
77,000,000 11,000,000 5,500,000 5,500,000 5,500,000
198,000,000 - 16,500,000 16,500,000 16,500,000
56,000,000 8,000,000 4,000,000 4,000,000 4,000,000
587,200,000.00 55,600,000.00 44,300,000.00 44,300,000.00 44,300,000.00
-
450,000 450,000 -
450,000.00 450,000.00 -
-
-
-
- - -
-
-
-
-
-
-
-
-
-
- - -
-
-
-
- - -
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
5,000,000 5,000,000 -
5,000,000.00 5,000,000.00 -
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
- - -
-
-
-
-
-
-
-
- - -
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
- - -
-
-
-
-
- - -
-
-
-
-
-
-
-
-
- - -
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
6,300,000 6,300,000 -
12,000,000 12,000,000 -
5,500,000 5,500,000 -
16,500,000 16,500,000 -
4,000,000 4,000,000 -
44,300,000.00 44,300,000.00 -
-
1,000,000 1,000,000 -
5,100,000 5,100,000 -
300,000 300,000 -
-
-
-
-
1,500,000 1,500,000 -
7,900,000.00 7,900,000.00 -
-
-
-
-
-
57,650,000 57,650,000 -
No.
1
1.1.1
a
1.1.2
a
b
1.1.3
a
b
c
d
e
f
1.1.4
a
b
c
1.1.5
a
b
1.2.1
a
b
c
d
e
f
g
h
i
j
1.2.2
a
b
c
1.2.3
a
b
c
d
e
f
g
h
i
j
h
1.2.4
a
a.1
a.2
a.3
b
b.1
b.2
b.c
b.d
1.2.5
a
b
c
d
e
f
g
h
1,2,6
b
c
d
e
f
g
1,2,7
a
b
c
d
e
f
h
1,2,8
a
b
c
1,3,1
a
b
c
1,3,2
a
b
1,4,1
a
b
c
d
e
f
g
h
2
2.1
2.2
3
3.1
3.2
3.3
3.4
3.5
4
4.1
4.2
4.3
4.4
4.5
4.6
4.7
4.8
Kegiatan
Output 1.1. Terkonsolidasinya struktur kerja antar pengurus asosiasi sawit rakyat mandiri
kabupaten berau
Rapat persiapan pelaksanaan dan monitoring/evaluasi kegiatan.
konsumsi
Sub Total
Rapat Konsolidasi Pengurus dari perwakilan 11 desa
konsumsi
material supplies
Sub Total
Sosialisasi dan publikasi organisasi ASRM Kab. Berau dan Program Kerja ASRM Kab. Berau di 11
desa
konsumsi
material supplies
sewa mobil + Bensin + Driver
Infocus
akomodasi tim
papan nama unit layanan ASRM Kab. Berau
Sub Total
Koordinasi dan konsultasi dengan para pihak
Konsumsi kegiatan
sewa mobil + Bensin + Driver
suport covid
Sub Total
Pembuatan kartu anggota Asosiasi Sawit Rakyat Mandiri Kab. Berau
Pembuatan desain kartu dan input data anggota ASRM
Cetak kartu anggota ASRM
Sub Total
Output 1.2. Berfungsinya struktur kerja organisasi di lingkup wilayah kerja ASRM
Pelatihan teknis fasilitasi bagi pelaksana unit layanan ASRM Berau
Airfare Travel Jakarta - Berau Return
Transfering Cost
uang makan dan incidental cost selama di lapangan
Akomodasi expert
akomodasi peserta dan tim ASRM
Konsumsi
Sewa mobil + Bensin + Driver
Transport Lokal Peserta (Tidak Menginap)
Transport lokal peserta (Menginap)
Material supplies
Honorarium expert
Sub Total
Pembuatan website Asosiasi Sawit Rakyat Mandiri Kab. Berau
Biaya pembuatan website
Knowledge management specialist (konsultan)
honor admin website
Sub Total
Pemetaan kebun anggota ASRM
Pengadaan Drone multi-rotor
Pengadaan GPS Garmin 64s
Komputer pengolah data spasial
Hardisk
Honorarium tenaga ahli pemetaan - Ahmad fatah yasin
Honorarium tenaga pendamping (Unit Layanan)
Bahan dan alat pendukung
Perdiem
Akomodasi
Transport pendamping
sewa mobil + Bensin + Driver
Sub Total
Penyusunan kelengkapan administrasi dan fasilitasi pengajuan STD-B
Penyusunan kelengkapan administrasi
Honor penyesuaian data tabuler dan data spasial bidang
Konsumsi
Material supplies
Fasilitasi pengajuan STD-B
Konsumsi
Sewa mobil + Bensin + Driver
HOK asistensi supervisi
akomodasi
Sub Total
Fasilitasi penyuluhan anggota ASRM oleh unit layanan ASRM di 11 desa
Konsumsi
Material supplies
Sewa mobil + Bensin + Driver
pengganti uang transport narasumber/pemateri
Akomodasi narasumber dan tim ASRM
HOK asistensi supervisi
akomodasi asistensi supervisi
Perdiem
Sub Total
FGD Kemitraan Perkebunan Berdasarkan Permentan Nomor 01/Permentan/KB.120/1/2018
Tentang Pedoman Penetapan Harga Pembelian Tandan Buah Segar Kelapa Sawit Produksi
Pekebun.
Konsumsi
Material supplies
Sewa mobil + Bensin + Driver
pengganti uang transport narasumber/pemateri
Akomodasi narasumber dan tim ASRM
HOK asistensi supervisi
akomodasi asistensi supervisi
Sub Total
Penyerahan Usulan STD-B dan Diskusi Komitmen Dukungan Kesiapan ISPO 2025
penginapan peserta
paket meeting
Pengganti transport (PP)
transport lokal peserta tidak menginap
Perdiem
Material Supplies
Sewa mobil+bensin+driver
Sub Total
Training penggunaan aplikasi e-sawit kita
honor narasumber
pengganti konsumsi
transport lokal
Sub Total
Output 1.3. Data dan informasi anggota baru asosiasi di wilayah kerja ASRM Kab. Berau
Pelatihan pengisian form pendataan berbasis sistem data base sawit rakyat
Konsumsi
ATK
Transport Lokal
Sub Total
Pendataan anggota ASRM Kab. Berau di 11 desa
material supplies
Fee enumerator/ unit layanan (11 orang, 1 orang setiap desa)
Sub Total
output 1.4 Kesiapan ASRM menuju praktek pengelolaan sawit berkelanjutan
Lokakarya penulisan draff SOP tentang prinsip dan standar sawit berkelanjutan (ISPO/RSPO)
meeting paket
penginapan/hotel peserta (2 orang per kamar)
penginapan/hotel pemateri (1 orang per kamar)
Pengganti transport (PP)
perdiem
materia supply
Sewa mobil+bensin+driver
tiket pesawat berau jakarta PP
Sub Total
Pengadaan Barang
Furniture
Hardisk
Kamera Mirrorless
Infocus
Recoder
Sub Total
Biaya Manajemen
Honor Penanggungjawab (FTE = 45%) - Mupit Datusahlan, S.Si., M.Sc
Honor Manajer pelaksana proyek - Ahmad Faelani
Honor Manajer Keuangan - Nur Chamim
Honor Staff Lapangan - Abdul Halim, Misno, Husrianta
Honor Staff Administrasi - Ayu
Sub Total
Operasonal Kantor
Kesekretariatan
Sewa Motor + Bensin
Biaya Listrik
Sewa Printer
Sewa Laptop keuangan
Sewa Laptop pengolah data
Sewa kantor
Biaya Sanitary dan Tenaga kebersihan
Sub Total
Total
GRAND TOTAL
Keterangan
6 kali
5 pengurus ASRM, 6 kali
1 hari ,6 kali
1 paket
825 kartu anggota ASRM,Spesifikasi: Bahan PVC(seperti SIM,KTP), ukuran 8,5 cm X 5,5 cm
transport udara dari jakarta ke berau PP, kelas ekonomi, 1 trainer orang,
Lokal transport PP 1 orang expert
untuk 1 orang expert, selama 8 hari
penginapan expert 1 kamar, 8 malam,
20 orang peserta, 3 malam
33 unit layanan + 8 tim ASRM, Kali 3 hari
6 hari all in
transport lokal peserta 20 orang unit layanan, kali 3 hari
transport lokal peserta 20 orang unit layanan PP
biaya atk 1 paket, 2 kali pertemuan
6 hari
1 paket
(bisa di-hire sebulan 6 kerja selama 5 bulan)
(bisa di-hire sebulan 6 kerja perbulan, selama 5 bulan)
2 unit
2 unit
1 unit
1 unit
1 orang, kali 120 hari
1 orang, kali 120 hari
1 paket
1 orang, 100 hari (max)
1 orang, 100 hari (max)
0 orang, 50 hari (max)
8 kali
1 paket, 3 desa
33 orang unit layanan @ 3 orang/desa, 165 petani anggota ASRM @ 15 orang/desa, 22 perwakilan pemdes @ 2 orang/desa. 3 o
1 paket, 11 kali
15 hari (4 desa tambah @ 1 hari)
11 kali
2 kamar, 6 hari
1 kali asistensi, 11 kampung x 6 hari
1 kali asistensi, 11 kampung x 5 hari
1 kali asistensi, 11 kampung x 5 hari
33 orang unit layanan @ 3 orang/desa, 330 petani anggota ASRM @ 30 orang/desa, 22 perwakilan pemdes @ 2 orang/desa. 3 o
desa = 22
1 paket, 11 kali
15 hari (4 desa tambah @ 1 hari)
11 kali
3 kamar, 6 hari
1 kali asistensi, 11 kampung x 6 hari
1 kali asistensi, 11 kampung x 5 hari
pemerintah kampung 11, perwakilan petani 4, pengurus aosiasi 6, pelaksana program 7, kamar standar (28 orang, 14 kamar, 1
ATK, konsumsi meeting dan coffe break (peserta menginap 28, peserta undangan 11)
peserta menginap (pemerintah kampung 11, pengurus asosiasi 6, perwakilan petani 4)
peserta undangan
peserta menginap (pemerintah kampung 11, pengurus asosiasi 6, perwakilan petani 4)
banner kegiatan, ATK,
2 unit, 2 hari
17 orang, 2 hari
ATK pelatihan , 1 paket
transport lokal 11 orang, 2 hari
atk peserta, konsumsi, ulk 11, pemerintah kampung 11, pelaksana program 9, pembina 1, narasumber 2, spos 2 (36 orang, 18
ulk 11, pemerintah kampung 11, pelaksana program 9, (31 org, 16 kamar, 3 hari)
tim spos 2, narasumber 2
11 ulk, 11 pemerintah kampung (22 orang)
atk peserta, konsumsi, ulk 11, pemerintah kampung 11, pelaksana program 9, pembina 1, narasumber 2, spos 2 (36 orang, 3 h
banner kegiatan, ATK panitia
3 hari
tim spos 2, narasumber 2
0 6,000,000 - - -
825 20,000 16,500,000 - 16,500,000
16,500,000 - - - 16,500,000
0 2,800,000 - - -
0 500,000 - - -
0 250,000 - - -
0 550,000 - - -
60 350,000 21,000,000 - 21,000,000
123 50,000 6,150,000 - 6,150,000
6 900,000 5,400,000 - 5,400,000
60 150,000 9,000,000 - 9,000,000
20 450,000 9,000,000 - 9,000,000
2 500,000 1,000,000 - 1,000,000
0 2,500,000 - -
51,550,000 - - - 51,550,000
-
54 150,000 8,100,000 - 8,100,000
0 50,000 - - -
14 600,000 8,400,000
39 300,000 11,700,000
21 500,000 10,500,000
11 150,000 1,650,000
21 150,000 3,150,000
1 750,000 750,000
4 900,000 3,600,000
39,750,000
1 1,000,000 1,000,000
33 50,000 1,650,000
33 150,000 4,950,000
7,600,000 - - - -
-
34 50,000 1,700,000 1,700,000 -1,150,000
1 500,000 500,000 500,000 -500,000
22 150,000 3,300,000 3,300,000 -1,650,000
5,500,000 5,500,000 - 5,500,000 (3,300,000)
-
11 500,000 5,500,000 5,500,000
825 50,000 41,250,000 41,250,000
46,750,000 46,750,000 - - -
54 350,000 18,900,000
48 600,000 28,800,000
8 600,000 4,800,000
22 500,000 11,000,000
108 200,000 21,600,000
1 750,000 750,000
3 900,000 2,700,000
4 5,000,000 20,000,000
108,550,000
-
1 15,000,000 15,000,000 15,000,000 -
1 1,500,000 1,500,000 1,500,000 -
0 15,000,000 - - -
1 5,000,000 5,000,000 - 5,000,000
0 1,500,000 - - -
21,500,000 16,500,000 - - 5,000,000
-
3 14,000,000 42,000,000 18,900,000 92,400,000 56,700,000
3 12,000,000 36,000,000 36,000,000 108,000,000
3 5,500,000 16,500,000 16,500,000 49,500,000
3 5,500,000 16,500,000 49,500,000 148,500,000
3 4,000,000 12,000,000 12,000,000 36,000,000
123,000,000 132,900,000 92,400,000 - 398,700,000
-
3 1,000,000 3,000,000 3,000,000 9,000,000
9 1,700,000 15,300,000 15,300,000 45,900,000
3 300,000 900,000 900,000 2,700,000
3 1,000,000 3,000,000 3,000,000 3,000,000
3 3,000,000 9,000,000 9,000,000 10,000,000
3 3,000,000 9,000,000 9,000,000 -
3 2,000,000 6,000,000 24,000,000 -
3 1,500,000 4,500,000 4,500,000 13,500,000
50,700,000.00 44,700,000 24,000,000 68,700,000 84,100,000
- -
289,900,000 288,800,000 116,400,000 74,200,000 843,342,000
156.87% 156.87%
KEHATI II REALOKASI KEHATI III REALOKASI KEHATI IV
- - -
3,150,000 3,150,000
750,000 750,000
3,600,000 3,600,000
38,100,000.00 38,100,000.00
1,000,000.00 1,000,000
1,650,000.00 1,650,000
4,950,000.00 4,950,000
- - - 7,600,000 7,600,000.00
-
-
550,000 550,000 550,000
- - -
1,650,000 1,650,000 1,650,000
2,200,000 - 2,200,000 - 2,200,000
0.00 -
5,500,000 5,500,000 1,000,000.00 6,500,000
41,250,000 41,250,000 7,100,000.00 48,350,000
46,750,000 - 46,750,000 8,100,000 54,850,000
-
-
-
-
-
-
-
-
-
0.00 0.00
0.00 -
15,000,000 (45,000.00) 14,955,000 0.00 14,955,000
1,500,000 1,500,000 0.00 1,500,000
- - 0.00 -
5,000,000 5,000,000 0.00 5,000,000
- - 0.00 -
21,500,000 (45,000.00) 21,455,000 0.00 21,455,000
0.00 -
75,600,000 25,200,000.00 100,800,000 18,900,000.00 119,700,000
144,000,000 48,000,000.00 192,000,000 36,000,000.00 228,000,000
66,000,000 22,000,000.00 88,000,000 16,500,000.00 104,500,000
198,000,000 198,000,000 198,000,000
48,000,000 16,000,000.00 64,000,000 12,000,000.00 76,000,000
531,600,000 111,200,000.00 642,800,000 83,400,000.00 726,200,000
-
12,000,000 3,952,501.00 15,952,501 3,000,000.00 18,952,501
61,200,000 20,400,000.00 81,600,000 15,300,000.00 96,900,000
3,600,000 1,200,000.00 4,800,000 900,000.00 5,700,000
6,000,000 (443,500.00) 5,556,500 5,556,500
19,000,000 - 19,000,000 19,000,000
9,000,000 - 9,000,000 9,000,000
- - -
18,000,000 6,000,000.00 24,000,000 4,500,000.00 28,500,000
128,800,000 31,109,001.00 159,909,001 23,700,000.00 183,609,001
-
-
-
-
-
1,132,142,000 318,106,500.00 1,450,248,500 222,117,750 1,672,366,250
77,882,250.00
CASH FLOW
TAHUN 2021-2022
- -
5,351,000 499,000 450,000 450,000 450,000 -
5,351,000.00 499,000.00 450,000.00 450,000.00 450,000.00 -
- -
3,365,000 1,435,000 -
250,000 1,250,000 -
3,615,000.00 - - 2,685,000.00 - -
- -
6,000,000 -
142,000 -
10,800,000 -
- -
3,500,000 -
6,600,000 -
27,042,000.00 - -
- -
- 3,000,000 -
- 6,300,000 -
1,619,500 -
1,619,500.00 - 9,300,000.00 - - -
- -
- -
16,500,000 -
16,500,000.00 - - - - -
-
-
- -
- -
- -
- -
9,450,000 -
10,632,600 -
6,300,000 -
8,700,000 -
3,600,000 -
1,165,150 -
- -
39,847,750 - -
- -
11,250,000 -
45,000,000 -
5,000,000 5,000,000 5,000,000 -
56,250,000.00 - 5,000,000.00 5,000,000.00 5,000,000.00 -
- -
25,483,999 -
4,328,000 -
16,250,000 -
1,631,000 -
35,000,000 13,500,000.00 -
14,000,000 5,400,000.00 -
1,500,000 - -
17,500,000 6,750,000.00 -
6,150,000 8,400,000.00 -
3,150,000 4,350,000.00 -
2,400,000.00 -
124,992,999.00 40,800,000.00 -
- -
- -
3,440,000 12,760,000 -
- - -
1,500,000 1,500,000 -
- - -
- - -
- - -
6,300,000 6,300,000 -
2,700,000 2,700,000 -
13,940,000.00 - 23,260,000.00 - - -
- -
12,558,000 7,792,000 9,000,000 7,500,000 -
3,572,000 1,928,000 3,000,000 2,500,000 -
12,600,000 4,500,000 7,200,000 9,900,000 -
8,000,000 3,000,000 6,000,000 5,000,000 -
- 4,200,000 3,000,000 1,200,000 -
16,800,000 6,300,000 -
5,250,000 3,000,000 4,500,000 3,750,000 -
6,000,000 5,000,000
58,780,000.00 30,720,000.00 - 38,700,000.00 34,850,000.00 -
- -
1,500,000 20,500,000 -
500,000 5,000,000 -
900,000 16,200,000 -
- 11,000,000 -
- 6,300,000 -
2,100,000 21,000,000 -
750,000 7,500,000 -
5,750,000.00 87,500,000.00 -
-
8,400,000.00 -
11,700,000.00 -
10,500,000.00 -
3,150,000.00 -
750,000.00 -
3,600,000.00 -
- - 38,100,000.00 - - -
-
1,000,000.00 -
1,650,000.00 -
4,950,000.00 -
- - - 7,600,000.00 - -
- -
- -
550,000 -
- -
1,650,000 -
2,200,000.00 - -
- -
5,500,000 1,000,000 -
41,250,000 5,000,000 2,100,000 -
46,750,000.00 6,000,000.00 2,100,000.00 - - -
-
-
-
-
-
-
-
-
-
-
- -
- -
14,955,000 -
1,500,000 -
- -
5,000,000 -
- -
21,455,000.00 - -
- -
88,200,000 12,600,000 6,300,000 6,300,000 6,300,000 -
168,000,000 24,000,000 12,000,000 12,000,000 12,000,000 -
77,000,000 11,000,000 5,500,000 5,500,000 5,500,000 -
198,000,000 - 16,500,000 16,500,000 16,500,000 (49,500,000)
56,000,000 8,000,000 4,000,000 4,000,000 4,000,000 -
587,200,000.00 55,600,000.00 44,300,000.00 44,300,000.00 44,300,000.00 (49,500,000)
-
12,855,037 3,097,464 1,000,000 1,000,000 1,000,000 -
71,400,000 10,200,000 5,100,000 5,100,000 5,100,000 -
1,530,750 3,269,250 300,000 300,000 300,000 -
5,556,500 - -
19,000,000 - -
9,000,000 - -
- - -
20,698,900 3,301,100 1,500,000 1,500,000 1,500,000 -
140,041,187.00 19,867,814.00 7,900,000.00 7,900,000.00 7,900,000.00 -
-
-
-
-
-
1,151,334,436 240,986,814 130,410,000 106,635,000 92,500,000 (49,500,000)
No. Kegiatan
Output 1.1. Terkonsolidasinya struktur kerja antar pengurus asosiasi sawit rakyat
1 mandiri kabupaten berau
1.1.1 Rapat persiapan pelaksanaan dan monitoring/evaluasi kegiatan.
a konsumsi
Sub Total
1.1.2 Rapat Konsolidasi Pengurus dari perwakilan 11 desa
a konsumsi
b material supplies
Sub Total
Sosialisasi dan publikasi organisasi ASRM Kab. Berau dan Program Kerja ASRM Kab.
1.1.3
Berau di 11 desa
a konsumsi
b material supplies
d Infocus
e akomodasi tim
Sub Total
1.2.3 Pemetaan kebun anggota ASRM
a Pengadaan Drone multi-rotor
b Pengadaan GPS Garmin 64s
c Komputer pengolah data spasial
d Hardisk
e Honorarium tenaga ahli pemetaan - Ahmad fatah yasin
f Honorarium tenaga pendamping (Unit Layanan)
g Bahan dan alat pendukung
h Perdiem
i Akomodasi
j Transport pendamping
h sewa mobil + Bensin + Driver
Sub Total
c Konsumsi
d Material supplies
e Fasilitasi pengajuan STD-B
f Konsumsi
g Sewa mobil + Bensin + Driver
h HOK asistensi supervisi
i akomodasi
j Perdiem
Sub Total
1.2.5 Fasilitasi penyuluhan anggota ASRM oleh unit layanan ASRM di 11 desa
a Konsumsi
b Material supplies
c Sewa mobil + Bensin + Driver
d pengganti uang transport narasumber/pemateri
e Akomodasi narasumber dan tim ASRM
f HOK asistensi supervisi
g akomodasi asistensi supervisi
h Perdiem
Sub Total
1,2,6 FGD Kemitraan Perkebunan Berdasarkan Permentan Nomor
01/Permentan/KB.120/1/2018 Tentang Pedoman Penetapan Harga Pembelian
Tandan Buah Segar Kelapa Sawit Produksi Pekebun.
a Konsumsi
b Material supplies
c Sewa mobil + Bensin + Driver
d pengganti uang transport narasumber/pemateri
e Akomodasi narasumber dan tim ASRM
f HOK asistensi supervisi
g akomodasi asistensi supervisi
Sub Total
1,2,7 Penyerahan Usulan STD-B dan Diskusi Komitmen Dukungan Kesiapan ISPO 2025
a penginapan peserta
b paket meeting
c Pengganti transport (PP)
Honor pemateri
d Perdiem peserta
e Material Supplies
f Sewa mobil+bensin+driver
g HOK asistensi kegiatan
h akomodasi asistensi tim lapangan
i Perdiem asistensi tim lapangan
Sub Total
1,2,8 Training penggunaan aplikasi e-sawit kita
a honor narasumber
b pengganti konsumsi
c transport lokal
HOK asistensi kegiatan
akomodasi
Perdiem
Sub Total
Output 1.3. Data dan informasi anggota baru asosiasi di wilayah kerja ASRM Kab.
Berau
1,3,1
Pelatihan pengisian form pendataan berbasis sistem data base sawit rakyat
a Konsumsi
b ATK
c Transport Lokal
Sub Total
1,3,2 Pendataan anggota ASRM Kab. Berau di 11 desa
a material supplies
b Fee enumerator/ unit layanan (11 orang, 1 orang setiap desa)
Sub Total
output 1.4 Kesiapan ASRM menuju praktek pengelolaan sawit berkelanjutan
1,4,1 Lokalatih Penyusunan Program Kerja ASRM Menuju Pemenuhan Sertifikasi Sawit Berkelanjutan
a meeting paket
b penginapan/hotel peserta (2 orang per kamar)
c Pengganti transport (PP)
d materia supply
f honor pemateri
g sewa mobil+bensin+driver
h HOK asistensi kegiatan
i akomodasi
j Perdiem
Sub Total
2 Pengadaan Barang
2.1 Furniture
2.2 Hardisk
Kamera Mirrorless
Infocus
Recoder
Sub Total
3 Biaya Manajemen
3.1 Honor Penanggungjawab (FTE = 45%) - Mupit Datusahlan, S.Si., M.Sc
3.2 Honor Manajer pelaksana proyek - Ahmad Faelani
3.3 Honor Manajer Keuangan - Nur Chamim
3.4 Honor Staff Lapangan - Abdul Halim, Misno, Husrianta
3.5 Honor Staff Administrasi - Ayu
Sub Total
4 Operasonal Kantor
4.1 Kesekretariatan
Total
GRAND TOTAL
Keterangan Unit Harga/Unit Total Harga KEHATI I
750,000 750,000
-
15 orang, (11 kali) 165 50,000 8,250,000 8,250,000
ATK dan banner, 11 desa, 1 pakaet 11 500,000 5,500,000 5,500,000
16 hari (5 desa memerlukan waktu 2 hari) 16 900,000 14,400,000 14,400,000
1 paket
825 kartu anggota ASRM,Spesifikasi: 0 6,000,000 - -
Bahan PVC(seperti SIM,KTP), ukuran 8,5 825 20,000 16,500,000 -
cm X 5,5 cm 16,500,000 -
si Sawit Berkelanjutan
atk peserta, konsumsi, pelaksana program 7 54 350,000 18,900,000
atk peserta, konsumsi, pelaksana program 14 600,000 8,400,000
11 pemerintah kampung, 4 perwakilan koper 18 500,000 9,000,000
banner kegiatan, ATK panitia 1 750,000 750,000
Dinas perkebunan/ mitra pembangunan 2 1,000,000 2,000,000
1 mobil 3 hari 3 900,000 2,700,000
3 orang, 6 hari 18 350,000 6,300,000
3 orang, 3 hari 9 150,000 1,350,000
3 orang, 3 hari 9 150,000 1,350,000
50,750,000
289,900,000 288,800,000
SWADAYA Total REALOKASI KEHATI II REALOKASI KEHATI III
-2,400,000 - -
0 3,500,000 3,500,000
- 6,600,000 6,600,000
- - (13,608,000) 27,042,000 - 27,042,000
- - -
16,500,000 16,500,000 16,500,000
- - 16,500,000 16,500,000 - 16,500,000
- - -
- - -
- - -
- - -
21,000,000 21,000,000 21,000,000
6,150,000 6,150,000 6,150,000
5,400,000 5,400,000 5,400,000
9,000,000 9,000,000 9,000,000
9,000,000 9,000,000 9,000,000
1,000,000 1,000,000 1,000,000
- - -
- - 51,550,000 51,550,000 - 51,550,000
12,000,000 12,000,000 (750,000.00) 11,250,000
- -
8,100,000 8,100,000 8,100,000.00 16,200,000
- - -
5,500,000.00 5,500,000
17,100,000.00 17,100,000
11,000,000.00 11,000,000
6,300,000.00 6,300,000
23,100,000.00 23,100,000
8,250,000.00 8,250,000
- - - - 93,250,000.00 93,250,000.00
- - - - - -
-
-1,150,000 550,000 550,000
-500,000 - -
-1,650,000 1,650,000 1,650,000
- 5,500,000 (3,300,000) 2,200,000 - 2,200,000
5,500,000 5,500,000
41,250,000 41,250,000
- - - 46,750,000 - 46,750,000
-
- 15,000,000 (45,000.00) 14,955,000
- 1,500,000 1,500,000
- - -
5,000,000 5,000,000 5,000,000
- - -
- - 5,000,000 21,500,000 (45,000.00) 21,455,000
-
92,400,000 56,700,000 75,600,000 25,200,000.00 100,800,000
108,000,000 144,000,000 48,000,000.00 192,000,000
49,500,000 66,000,000 22,000,000.00 88,000,000
148,500,000 198,000,000 198,000,000
36,000,000 48,000,000 16,000,000.00 64,000,000
92,400,000 - 398,700,000 531,600,000 111,200,000.00 642,800,000
-
- -
116,400,000 74,200,000 843,342,000 1,132,142,000 318,106,500.00 1,450,248,500
156.87% 156.87%
Des'20 - FEB 22
-
1,350,000.00 7,200,000 5,351,000
1,350,000.00 7,200,000 5,351,000.00
-
4,800,000 3,365,000
1,500,000 250,000
- 6,300,000 3,615,000.00
- -
0.00 6,000,000 6,000,000
0.00 142,000 142,000
0.00 - -
15,000,000.00 15,000,000
- -
- -
16,200,000 3,440,000
- -
3,000,000 1,500,000
- -
(1,500,000.00) - -
(7,200,000.00) - -
2,100,000.00 14,700,000 6,300,000
900,000.00 6,300,000 2,700,000
900,000.00 900,000
(4,800,000.00) 41,100,000.00 13,940,000.00
- -
16,500,000 36,850,000 Ada penambahan jumlah peserta 15 orang d 12,558,000
5,500,000 11,000,000 3,572,000
16,200,000 33,300,000 12,600,000
11,000,000 22,000,000 8,000,000
4,200,000 8,400,000 -
23,100,000 46,200,000 perbaikan list budget dari 1,,2,6,g 16,800,000
8,250,000 16,500,000 eks labanan makmur 5,250,000
8,250,000 8,250,000
93,000,000 182,500,000 58,780,000.00
- -
22,000,000 1,500,000
5,500,000 500,000
17,100,000 900,000
11,000,000 -
6,300,000 -
23,100,000 pengurangan jumlah untuk list budget 1,2,5 f 2,100,000
8,250,000 pengurangan jumlah untuk list budget 1,2,5 g 750,000
- 93,250,000.00 5,750,000.00
- Acara dimana?
8,400,000 8,400,000
11,700,000 11,700,000
10,500,000 10,500,000
1,000,000 1,000,000
- bukankah meals sdh dicover dlm paket meeting?
500,000 500,000
1,800,000 1,800,000
3,150,000 3,150,000
1,350,000 1,350,000
- bukankah meals sdh dicover dlm paket meeting?
38,400,000.00 38,400,000.00 -
Dilakukan dmn?
- dilaksanakan dimana?
18,900,000 18,900,000 -
8,400,000 8,400,000 2hari 1 malam -
9,000,000 9,000,000 -
750,000 750,000 -
2,000,000 2,000,000 -
2,700,000 2,700,000 -
6,300,000 6,300,000 -
1,350,000 1,350,000 -
- sudah tercover dlm paket meeting -
49,400,000.00 49,400,000.00 0.00
0.00 - -
0.00 14,955,000 14,955,000
0.00 1,500,000 1,500,000
0.00 - -
0.00 5,000,000 5,000,000
0.00 - -
0.00 21,455,000 21,455,000.00
0.00 - -
18,900,000.00 119,700,000 19 88,200,000
36,000,000.00 228,000,000 168,000,000
16,500,000.00 104,500,000 77,000,000
198,000,000 198,000,000
12,000,000.00 76,000,000 56,000,000
83,400,000.00 726,200,000 587,200,000.00
-
TAHUN 2021-2022
-
499,000 450,000 450,000 450,000 -
499,000.00 450,000.00 450,000.00 450,000.00 -
-
1,435,000 -
1,250,000 -
- - 2,685,000.00 - -
-
-
-
-
- -
-
3,000,000 -
6,300,000 -
-
- 9,300,000.00 - - -
-
-
-
- - - - -
-
-
-
-
-
-
-
-
-
-
-
-
-
- -
-
-
-
12,760,000 -
- -
1,500,000 -
- -
- -
- -
6,300,000 2,100,000 -
2,700,000 900,000 -
900,000
- 23,260,000.00 - 3,900,000.00 -
-
7,792,000 9,000,000 7,500,000 -
1,928,000 3,000,000 2,500,000 -
4,500,000 7,200,000 9,000,000 -
3,000,000 6,000,000 5,000,000 -
4,200,000 3,000,000 1,200,000 -
6,300,000 12,600,000 10,500,000 -
3,000,000 4,500,000 3,750,000 -
4,500,000 3,750,000
30,720,000.00 - 49,800,000.00 43,200,000.00 -
-
20,500,000 -
5,000,000 -
16,200,000 -
11,000,000 -
6,300,000 -
21,000,000 -
7,500,000 -
87,500,000.00 -
8,400,000.00 -
11,700,000.00 -
10,500,000.00 -
1,000,000.00 -
-
500,000.00 -
1,800,000.00 -
3,150,000.00
1,350,000.00
- 33,900,000.00 4,500,000.00 - -
-
1,000,000.00 -
900,000.00 -
1,650,000.00 -
3,150,000
1,350,000
1,350,000
- 3,550,000 5,850,000 - -
-
-
-
-
-
- -
-
1,000,000 -
5,000,000 2,100,000 -
6,000,000.00 2,100,000.00 - - -
-
-
- - 18,900,000 -
- - 8,400,000 -
- - 9,000,000 -
- - 750,000 -
- - 2,000,000 -
- - 2,700,000 -
- - 6,300,000 -
- - 1,350,000 -
- - -
0.00 0.00 49,400,000.00 0.00 -
-
-
-
-
-
-
- -
-
12,600,000 6,300,000 6,300,000 6,300,000 -
24,000,000 12,000,000 12,000,000 12,000,000 -
11,000,000 5,500,000 5,500,000 5,500,000 -
- -
8,000,000 4,000,000 4,000,000 4,000,000 -
55,600,000.00 27,800,000.00 27,800,000.00 27,800,000.00 -
-
Sub Total
1.2.3 2.1.3 Pemetaan kebun anggota ASRM
a a Pengadaan Drone multi-rotor
b b Pengadaan GPS Garmin 64s
c c Komputer pengolah data spasial
d d Hardisk
e e Honorarium tenaga ahli pemetaan - Ahmad fatah yasin
f f Honorarium tenaga pendamping (Unit Layanan)
g g Bahan dan alat pendukung
h h Perdiem
i i Akomodasi
j j Transport pendamping
h k sewa mobil + Bensin + Driver
Sub Total
Penyusunan kelengkapan administrasi dan fasilitasi pengajuan
1.2.4 2.1.4
STD-B
a a Penyusunan kelengkapan administrasi
b b Honor penyesuaian data tabuler dan data spasial bidang
c c Konsumsi
d d Material supplies
e e Fasilitasi pengajuan STD-B
f f Konsumsi
g g Sewa mobil + Bensin + Driver
h h HOK asistensi supervisi
i i akomodasi
j j Perdiem
Sub Total
1.2.5 2.1.5 Fasilitasi penyuluhan anggota ASRM oleh unit layanan ASRM di
11 desa
a a Konsumsi
b b Material supplies
c c Sewa mobil + Bensin + Driver
d d pengganti uang transport narasumber/pemateri
e e Akomodasi narasumber dan tim ASRM
f f HOK asistensi supervisi
g g akomodasi asistensi supervisi
h h Perdiem
Sub Total
1,2,6 2.1.6
FGD Kemitraan Perkebunan Berdasarkan Permentan Nomor
01/Permentan/KB.120/1/2018 Tentang Pedoman Penetapan
Harga Pembelian Tandan Buah Segar Kelapa Sawit Produksi
Pekebun.
a a Konsumsi
b b Material supplies
c c Sewa mobil + Bensin + Driver
d d pengganti uang transport narasumber/pemateri
e e Akomodasi narasumber dan tim ASRM
f f HOK asistensi supervisi
g g akomodasi asistensi supervisi
Sub Total
Penyerahan Usulan STD-B dan Diskusi Komitmen Dukungan
1,2,7 2.1.7
Kesiapan ISPO 2025
a a penginapan peserta
b b paket meeting
c c Pengganti transport (PP)
e Honor pemateri
d f Perdiem peserta
e g Material Supplies
f h Sewa mobil+bensin+driver
g i HOK asistensi kegiatan
h j akomodasi asistensi tim lapangan
Sub Total
2.1.8 Publik hearing dengan DPRD dan Dinas Perkebunan Kabupaten Berau
a konsumsi
b material supply
c Sewa mobil+bensin+driver
d transport lokal peserta luar tanjung redeb
c HOK asistensi kegiatan
e akomodasi
Sub total
2.1.9 Publik hearing dengan DPRD dan Dinas Perkebunan provinsi Kalimantan Timur
a Tiket pesawat PP
b penginapan
c perdiem
e Sewa mobil+bensin+driver
sub total
1,2,8 2.2.1 Training penggunaan aplikasi e-sawit kita
a a honor narasumber
b b pengganti konsumsi
c c transport lokal
d HOK asistensi kegiatan
e akomodasi
f Perdiem
Sub Total
Output 3. Data dan informasi anggota baru asosiasi di wilayah
kerja ASRM Kab. Berau
1,3,1 3.1.1 Pelatihan pengisian form pendataan berbasis sistem data base
sawit rakyat
a a Konsumsi
b b ATK
c c Transport Lokal
Sub Total
1,3,2 3.1.2 Pendataan anggota ASRM Kab. Berau di 11 desa
a a material supplies
Total
GRAND TOTAL
Keterangan Unit Harga/Unit
Total HargaKEHATI IV
15 50,000
### 4,800,000
1,500,000
### 6,300,000
-
15 orang, (11 kali) 165 ###
50,000 6,000,000
ATK dan banner, 11 desa, 1 pakaet 11 ###
500,000 142,000
16 hari (5 desa memerlukan waktu 2 hari) 16 ###
900,000 10,800,000
3 kali sewa x 11 desa 16 ###
150,000 -
penginapan tim asosiasi 2 kamar, 5 hari 10 ###
350,000 3,500,000
papan nama unit layanan di 11 desa 11 ###
600,000 6,600,000
### 27,042,000
-
pengurus ASRM, pelaksana program, bupati, dprd, 70 ###
50,000 3,000,000
7 ###
900,000 6,300,000
banner, ATK 3 500,000
1 hari ,6 kali 6 ###
900,000 1,619,500
### 10,919,500
-
1 paket 0 ###
6,000,000 -
825 kartu anggota ASRM,Spesifikasi: Bahan 16,500,000
825 ###
20,000
PVC(seperti SIM,KTP), ukuran 8,5 cm X 5,5 cm
### 16,500,000
-
-
20 orang peserta, 3 malam 60 350,000
### 9,450,000
33 unit layanan + 8 tim ASRM, Kali 3 hari 123 50,000
### 10,632,600
6 hari all in 6 900,000
### 6,300,000
transport lokal peserta 20 orang unit layanan,
60 150,000
### 8,700,000
kali 3 hari
transport lokal peserta 20 orang unit layanan PP 20 450,000
### 3,600,000
biaya atk 1 paket, 2 kali pertemuan 2 500,000
### 1,165,150
6 hari 0 2,500,000
### -
### 39,847,750
-
1 paket 1 12,000,000
### 11,250,000
2 orang, PP 4 3,500,000
3 malam 3 650,000
2 orang, 4 hari 8 500,000
1 unit 2 hari 2 900,000
15 orang 15 50,000
1 500,000
1 unit, 2 hari 2 900,000
3 orang, 2 hari 6 350,000
3 orang, 2 hari 6 150,000
-
furniture perlengkapan kantor 1 paket 1 ###
15,000,000 14,955,000
1 ###
1,500,000 1,500,000
1 unit untuk dokumentasi kegiatan 0 15,000,000
### -
1 unit 1 5,000,000
### 5,000,000
1 unit 0 1,500,000
### -
### 21,455,000
-
1 orang, 12 bulan add 8 bulan 3 14,000,000
### 119,700,000
1 orang, 12 bulan 3 12,000,000
### 228,000,000
1 orang, 12 bulan 3 5,500,000
### 104,500,000
3 orang, 12 bulan 3 5,500,000
### 198,000,000
1 orang, 12 bulan 3 4,000,000
### 76,000,000
### 726,200,000
-
ATK, internet dan biaya kirim dokumen, ( 3 18,952,501
bulan) 3 1,000,000
###
operasional staff lapangan 3 motor 3 bulan 9 1,700,000
### 96,900,000
3 bulan 3 300,000
### 5,700,000
1 unit x 3 bulan sewa 3 1,000,000
### 5,556,500
1 unit x 3 bulan sewa 3 3,000,000
### 19,000,000
1 unit x 3 bulan sewa 3 3,000,000
### 9,000,000
3 bulan 3 2,000,000
### -
3 bulan 3 1,500,000
### 28,500,000
### 183,609,001
-
-
-
-
-
### 1,747,216,250
REALOKASI KEHATI V Notes TAHUN 2021-2021
DES'20-JUN'22
-
1,101,000 8,301,000 6,501,000
1,101,000 8,301,000 6,501,000
- - -
65,000 4,865,000 3,365,000
(750,000) 750,000 250,000
(685,000) 5,615,000 3,615,000
- - -
- 6,000,000 6,000,000
- 142,000 142,000
- 10,800,000 10,800,000
- - -
- 3,500,000 3,500,000
- 6,600,000 6,600,000
- 27,042,000 27,042,000
- - -
500,000 3,500,000 -
- 6,300,000 -
600,000 600,000
- 1,619,500 1,619,500
1,100,000 12,019,500 1,619,500
- - -
- - -
- 16,500,000 16,500,000
- 16,500,000 16,500,000
- - -
- - -
- 9,450,000 9,450,000
- 10,632,600 10,632,600
- 6,300,000 6,300,000
- 8,700,000 8,700,000
- 3,600,000 3,600,000
- 1,165,150 1,165,150
- - -
- 39,847,750 39,847,750
- - -
- 11,250,000 11,250,000
- 45,000,000 45,000,000
5,000,000 20,000,000 -
- - -
- - -
(7,280,000) 8,920,000 8,920,000
- - -
- - -
- - -
- - Acara dimana? -
(8,400,000) - -
(4,700,000) 7,000,000 7,000,000
1,500,000 12,000,000 12,000,000
6,750,000 7,750,000 7,750,000
- - bukankah meals -
- 500,000 500,000
- 1,800,000 1,800,000
- 3,150,000 3,150,000
(900,000) 450,000 450,000
(5,750,000) 32,650,000 32,650,000
- -
3,150,000 3,150,000
500,000 500,000
2,700,000 2,700,000
5,600,000 5,600,000
3,150,000 3,150,000
1,350,000 1,350,000
16,450,000 16,450,000 -
-
10,000,000 10,000,000
1,200,000 1,200,000
2,000,000 2,000,000
2,700,000 2,700,000
15,900,000 15,900,000 harus dicek -
- - kembali
Dilakukan apakah
dmn? -
narsum dr
instiper ini
1,000,000 berkontrak/tdk -
dlm program
SPOSI agar tdk
900,000 terjadi double -
1,650,000 claim -
3,150,000 -
1,350,000 -
1,350,000 -
- 9,400,000 -
- - -
- -
- 550,000 550,000
- -
- 1,650,000 1,650,000
- 2,200,000 2,200,000
- -
1,500,000 1,500,000
500,000 500,000
3,150,000 3,150,000
3,150,000 3,150,000
1,000,000 1,000,000
1,000,000 1,000,000
650,000 650,000
1,800,000 1,800,000
- -
500,000 500,000
7,500,000 7,500,000
9,800,000 9,800,000
30,550,000 30,550,000 -
- -
- -
1,500,000 1,500,000
25,000,000 25,000,000
4,000,000 4,000,000
1,500,000 1,500,000
1,800,000 1,800,000
10,500,000 10,500,000
2,100,000 2,100,000
46,400,000 46,400,000 -
10,000,000 10,000,000
32,000,000 32,000,000
50,000,000 50,000,000
- -
2,490,000 2,490,000
2,800,000 2,800,000
- -
7,500,000 7,500,000
6,000,000 6,000,000
1,485,000 1,485,000
9,000,000 9,000,000
- -
12,000,000 12,000,000
800,000 800,000
1,720,000 1,720,000
8,010,000 8,010,000
15,000,000 15,000,000
10,200,000 10,200,000
- -
6,000,000 6,000,000
1,500,000 1,500,000
3,600,000 3,600,000
- -
5,600,000 5,600,000
2,400,000 2,400,000
188,105,000 188,105,000 -
- -
- 14,955,000 14,955,000
- 1,500,000 1,500,000
- -
- 5,000,000 5,000,000
- - -
- 21,455,000 21,455,000
- - -
18,900,000 138,600,000 19 119,700,000
36,000,000 264,000,000 228,000,000
16,500,000 121,000,000 104,500,000
- 198,000,000 198,000,000
12,000,000 88,000,000 76,000,000
83,400,000 809,600,000 726,200,000
- - -
451,446,436 2,198,662,686 -
CASH FLOW
TAHUN 2022
- -
600,000 600,000 600,000 -
600,000 600,000 600,000 -
- -
1,500,000 -
500,000 -
- 2,000,000 - -
- -
-
-
-
-
-
-
- - - -
- -
1,000,000 1,500,000 1,000,000 -
1,800,000 2,700,000 1,800,000 -
200,000 200,000 200,000
-
3,000,000 4,400,000 3,000,000 -
- -
- -
-
- - - -
-
-
-
-
-
-
-
-
- -
- - -
- -
-
15,000,000 5,000,000 -
15,000,000 5,000,000 - -
-
-
-
-
-
-
-
-
-
-
-
-
- - -
- -
- -
-
-
-
-
-
-
-
-
- - - -
- -
- -
-
-
-
-
-
-
- - -
-
-
-
-
-
-
-
-
-
- - - -
-
3,150,000 -
500,000 -
2,700,000 -
5,600,000 -
3,150,000 -
1,350,000 -
16,450,000 - - -
-
10,000,000 -
1,200,000 -
2,000,000 -
2,700,000 -
- 15,900,000 - -
-
1,000,000 -
900,000 -
1,650,000 -
3,150,000 -
1,350,000 -
1,350,000 -
9,400,000 - - -
- -
- -
-
-
-
- - -
- -
-
- - - -
- -
- -
-
-
-
-
-
-
-
-
- - - -
14,000,000 -
1,950,000 -
4,000,000 -
1,800,000 -
- 21,750,000 - -
-
10,000,000 -
2,250,000 -
650,000 -
4,500,000 -
500,000 -
9,000,000 -
- 10,450,000 5,250,000 11,210,500
750,000 -
500,000 -
1,800,000 -
2,100,000 -
900,000 -
- 6,050,000 - -
-
1,500,000 -
500,000 -
3,150,000 -
3,150,000 -
1,000,000 -
1,000,000 -
650,000 -
1,800,000 -
- -
500,000 -
7,500,000 -
9,800,000 -
- 30,550,000 - -
-
-
1,500,000 -
25,000,000 -
4,000,000 -
1,500,000 -
1,800,000 -
10,500,000 -
2,100,000 -
29,000,000 17,400,000 - -
-
-
10,000,000 -
32,000,000 -
50,000,000 -
-
2,490,000 -
2,800,000 -
-
7,500,000 -
6,000,000 -
1,485,000 -
9,000,000 -
-
4,000,000 4,000,000 4,000,000 -
800,000 -
1,720,000 -
8,010,000 -
15,000,000 -
3,400,000 3,400,000 3,400,000 -
-
6,000,000 -
1,500,000 -
3,600,000 -
-
5,600,000 -
2,400,000 -
154,205,000 7,400,000 26,500,000 -
- -
-
-
-
-
-
- - - -
- -
6,300,000 6,300,000 6,300,000 -
12,000,000 12,000,000 12,000,000 -
5,500,000 5,500,000 5,500,000 -
-
4,000,000 4,000,000 4,000,000 -
27,800,000 27,800,000 27,800,000 -
-