PENYUSUNAN DOKUMEN ADENDUM AMDAL TAMBANG BATUBARA PT. HAMPARAN ANUGERAH ABADI
KABUPATEN BERAU PROVINSI KALIMANTAN TIMUR
A Survey Lapangan
No. Uraian Volume Satuan Volume Satuan Biaya Satuan Total (Rp)
1 Transportasi ke lokasi 2 tiket 6 orang 947,000 11,364,000
2 Transportasi lokal 1 mobil 5 hari 850,000 4,250,000
3 Akomudasi dan Konsumsi 6 orang 5 hari 450,000 13,500,000
4 Honor Lapangan 6 orang 5 hari 500,000 15,000,000
Total 44,114,000
D Biaya Laboratorium
No. Uraian Volume Satuan Volume Satuan Biaya Satuan Total (Rp)
1 Sampel Tanah 8 Sampel 850,000 6,800,000
2 Sampel Air 6 Sampel 2,100,000 12,600,000
3 Sampel Udara 6 Sampel 1,250,000 7,500,000
4 Sampel Benthos 6 Sampel 650,000 3,900,000
5 Sampel Plankton 6 Sampel 650,000 3,900,000
Total 34,700,000