Anda di halaman 1dari 3

No.

Uraian Biaya (Rp)


Volume Satuan Jumlah
A. BIAYA PERMETER PEMBORAN
DAN BIAYA PENGADAAN ALAT:
1. Biaya permeter pemboran 450 Meter 900,000.00 405,000,000.00
2. Perlengkapan Alat Tulis 1 Paket 500,000.00 500,000.00

3. Obat – Obatan (P3K) 1 Paket 500,000.00 500,000.00


4. Biaya pembelian Camera Canon EOS 1 Buah 21,000,000.00 21,000,000.00
D5+ Lensa + Tripod + Memori 54 Gb

5. Biaya perlengkapan alat safety 11 Paket 1,000,000.00 11,000,000.00

6. Biaya pembelian Acer ultrabook intel 1 Buah 15,000,000.00 15,000,000.00


core i7 Extreme

7. Biaya penginapan 11 orang 1 Minggu 16,500,000.00 16,500,000.00


8. Biaya konsumsi makan 3x11 orang 1 Minggu 11,500,000.00 11,500,000.00
9. Biaya sewa mesin bor Jacro DR175 1 Minggu 2,800,000.00 2,800,000.00
10. Biaya penyediaan lumpur bor 5 Buah 300,000.00 1,500,000.00
11. Sewa box core lokal 1 Minggu 2,135,000.00 2,135,000.00
Jumlah Biaya 487,485,000.00
B. GAJI PERSONIL:
1. Team leader 1 Orang 2,000,000.00 14,000,000.00
2. Geologist 2 Orang 7,000,000.00 14,000,000.00
3. Master bor 1 Orang 1,500,000.00 12,250,000.00
4. Asisten Master Bor 1 Orang 750,000.00 10,500,000.00
5. Helper 6 Orang 3,500,000.00 21,000,000.00
Jumlah Biaya 71,750,000.00
TOTAL I 559,235,000.00
No. Uraian Volume Biaya (Rp)
Satuan Jumlah
A. BIAYA MOBILISASI DAN DEMOKRASI:
1. Tiket pesawat + Transport lokal 7 Buah 1,500,000.00 10,500,000.00
2. Biaya penginapan 1 Hari 500,000.00 500,000.00
3. Sewa Mobil + Supir 1 Minggu 10,000,000.00 10,000,000.00
4. Biaya Minyak Mobil 1 Minggu 10,400,000.00 10,400,000.00
5. Pergerakan antar lokasi 10 Kali 125,000.00 1,250,000.00
Jumlah Biaya 32,650,000.00
B. BIAYA SURVEY DAN PEMBERSIHAN LOKASI:
1. Survey lokasi 1 Kali 4,000,000.00 4,000,000.00
2. Pembersihan lokasi 10 Kali 400,000.00 4,000,000.00
Jumlah Biaya 8,000,000.00
C. BIAYA LAIN-LAIN:
1. Biaya tak terduga Ls 2,000,000.00 2,000,000.00
2. Uang saku selama survey Ls 7,000,000.00 7,000,000.00
Jumlah Biaya 9,000,000.00
TOTAL II 49,650,000.00

No URAIAN KEGIATAN JUMLAH BIAYA


. (Rp)
I. BIAYA LANGSUNG PERSONIL
A. BIAYA PERMETER PEMBORAN DAN BIAYA 487,485,000.00
PENGADAAN ALAT
B. GAJI PERSONIL 71,750,000.00
JUMLAH BIAYA LANGSUNG PERSONIL 559,235,000.00

II. BIAYA LANGSUNG NON PERSONIL


A. BIAYA MOBILISASI DAN DEMOKRASI 32,650,000.00
B. BIAYA SURVEY DAN PEMBERSIHAN LOKASI 8,000,000.00
C. BIAYA LAIN-LAIN 9,000,000.00
JUMLAH BIAYA LANGSUNG NON PERSONIL 49,650,000.00

JUMLAH ( I+II ) 608,885,000.00


Terbilang : Enam Ratus Delapan Juta Delapan Ratus Delapan Puluh Lima Ribu Rupiah

Waktu Kegiatan
Kegiatan
Hari Hari Hari Hari Hari Hari Hari
Ke 1 Ke 2 Ke 3 Ke 4 Ke 5 Ke 6 Ke 7
Mobilisasi Alat dan
personil
Survey dan persiapan
Kegiatan Pemboran

Pelepasan alat

Mobilisasi alat dan


karyawan

Anda mungkin juga menyukai