DAFTAR MONITORING Doc.

No : SD-DWG/ENG/01

GAMBAR / SPESIFIKASI KONSULTAN FOR CONSTRUCTION Revision :P


Halaman :

Proyek : Tower 7 - LA VIZ


Gambar / Spesifikasi : ARSITEKTUR

Status Gambar / Spesifikasi


Ukuran Kertas / Format Diberikan Oleh Distribusi
0 1 2 3 4
No Judul Gambar For Construction No. Gambar
Soft Ukuran Kertas /
A1 A2 A3 Oleh Tanggal Tanggal Rev Tanggal Rev Tanggal Rev Tanggal Rev Tanggal Rev Penerima Tanggal
Copy Format

1 0. INFORMASI UMUM
2 COVER A-0000 Ÿ PAKUWON PERMAI
3 DAFTAR GAMBAR ARSITEKTUR #1 A-0001 PAKUWON PERMAI
4 DAFTAR GAMBAR ARSITEKTUR #2 A-0001A PAKUWON PERMAI
5 DAFTAR GAMBAR ARSITEKTUR #3 A-0001B PAKUWON PERMAI
6 DAFTAR GAMBAR ARSITEKTUR #4 A-0001C PAKUWON PERMAI
7 DAFTAR GAMBAR ARSITEKTUR #5 A-0001D PAKUWON PERMAI
8 DAFTAR GAMBAR ARSITEKTUR #6 A-0001E PAKUWON PERMAI
9 NOTASI GAMBAR (KODE, MATERIAL FINISHING, LEGENDA DAN SIMBOL) A-0002 PAKUWON PERMAI
10 SCHEDULE FINISHING MATERIAL #1 A-0003 PAKUWON PERMAI
11 SCHEDULE FINISHING MATERIAL #2 A-0003A PAKUWON PERMAI
12 SCHEDULE FINISHING MATERIAL #3 A-0003B PAKUWON PERMAI
13 SCHEDULE FINISHING MATERIAL #4 A-0003C PAKUWON PERMAI
14 SITE PLAN A-0006 PAKUWON PERMAI
15 BLOCK PLAN A-0007 PAKUWON PERMAI

16 1. GAMBAR UMUM
17 1. DENAH
18 DENAH LANTAI LOWER GROUND A-1101 PAKUWON PERMAI
19 DENAH LANTAI LLG A-1101A PAKUWON PERMAI
20 DENAH LANTAI GROUND FLOOR A-1102 PAKUWON PERMAI
21 DENAH LANTAI P1 A-1103 PAKUWON PERMAI
22 DENAH LANTAI P2 A-1104 PAKUWON PERMAI
23 DENAH LANTAI P3 A-1105 PAKUWON PERMAI
24 DENAH LANTAI P4 A-1106 PAKUWON PERMAI
25 DENAH LANTAI P5 A-1107 PAKUWON PERMAI
26 DENAH LANTAI P6 A-1108 PAKUWON PERMAI
27 DENAH LANTAI P7 A-1109 PAKUWON PERMAI
28 DENAH LANTAI POOL DECK & ROOF GARDEN A-1110 PAKUWON PERMAI
29 DENAH LANTAI L0 A-1111 PAKUWON PERMAI
30 DENAH LANTAI 1 A-1112 PAKUWON PERMAI
31 DENAH LANTAI 2 A-1113 PAKUWON PERMAI
32 DENAH LANTAI 3, 6 & 8 (TIPIKAL 1) A-1114 PAKUWON PERMAI
33 DENAH LANTAI 5 & 7 (TIPIKAL 2) A-1115 PAKUWON PERMAI
34 DENAH LANTAI 9 & 11 (TIPIKAL 2) A-1116 PAKUWON PERMAI
35 DENAH LANTAI 10 (TIPIKAL 1) A-1117 PAKUWON PERMAI
36 DENAH LANTAI 12 (TIPIKAL 1) A-1117A PAKUWON PERMAI
37 DENAH LANTAI 15 (TIPIKAL 2) A-1118 PAKUWON PERMAI
38 DENAH LANTAI 16 (TIPIKAL 1) A-1118A PAKUWON PERMAI
39 DENAH LANTAI 17 (REFUGEE 1) A-1119 PAKUWON PERMAI
40 DENAH LANTAI 18 (TIPIKAL 1) A-1120 PAKUWON PERMAI
41 DENAH PARTIAL 19 (TIPIKAL 2) A-1121 PAKUWON PERMAI
42 DENAH LANTAI 20 (TIPIKAL 1) A-1122 PAKUWON PERMAI
43 DENAH LANTAI 21 (TIPIKAL 2) A-1122A PAKUWON PERMAI
44 DENAH LANTAI 22 (TIPIKAL 1) A-1123 PAKUWON PERMAI
45 DENAH LANTAI 23 (TIPIKAL 2) A-1124 PAKUWON PERMAI
46 DENAH LANTAI 25 (TIPIKAL 1) A-1124A PAKUWON PERMAI
47 DENAH LANTAI 26, 28 (TIPIKAL 2) A-1125 PAKUWON PERMAI
DAFTAR MONITORING Doc. No : SD-DWG/ENG/01

GAMBAR / SPESIFIKASI KONSULTAN FOR CONSTRUCTION Revision :P


Halaman :

Proyek : Tower 7 - LA VIZ


Gambar / Spesifikasi : ARSITEKTUR

Status Gambar / Spesifikasi


Ukuran Kertas / Format Diberikan Oleh Distribusi
0 1 2 3 4
No Judul Gambar For Construction No. Gambar
Soft Ukuran Kertas /
A1 A2 A3 Oleh Tanggal Tanggal Rev Tanggal Rev Tanggal Rev Tanggal Rev Tanggal Rev Penerima Tanggal
Copy Format

48 DENAH LANTAI 27 (TIPIKAL 1) A-1126 PAKUWON PERMAI


49 DENAH LANTAI 29 (TIPIKAL 1) A-1126A PAKUWON PERMAI
50 DENAH LANTAI 30 (TIPIKAL 2) A-1126B PAKUWON PERMAI
51 DENAH LANTAI 31 (TIPIKAL 1) A-1127 PAKUWON PERMAI
52 DENAH LANTAI 32 (TIPIKAL 2) A-1128 PAKUWON PERMAI
53 DENAH LANTAI 33 (REFUGEE 2) A-1128A PAKUWON PERMAI
54 DENAH LANTAI 35 (TIPIKAL 2) A-1128B PAKUWON PERMAI
55 DENAH LANTAI 36 (TIPIKAL 1) A-1129 PAKUWON PERMAI
56 DENAH LANTAI 37 (TIPIKAL 2) A-1130 PAKUWON PERMAI
57 DENAH LANTAI 38 & 50 (PENTHOUSE 1) A-1131 PAKUWON PERMAI
58 DENAH LANTAI 39 & 51 (PENTHOUSE 2) A-1132 PAKUWON PERMAI
59 DENAH LANTAI ATAP (RUANG ME & LMR) A-1133 PAKUWON PERMAI
60 DENAH ATAP LMR A-1134 PAKUWON PERMAI

61 2. TAMPAK
62 TAMPAK UTARA A-1201 PAKUWON PERMAI
63 TAMPAK SELATAN A-1202 PAKUWON PERMAI
64 TAMPAK BARAT A-1203 PAKUWON PERMAI
65 TAMPAK TIMUR A-1204 PAKUWON PERMAI

66 3. POTONGAN
67 POTONGAN A A-1301 PAKUWON PERMAI
68 POTONGAN B A-1302 PAKUWON PERMAI
69 POTONGAN C A-1303 PAKUWON PERMAI
70 POTONGAN D & E A-1304 PAKUWON PERMAI

71 2. PARSIAL INTERIOR
72 1. DENAH POLA LANTAI
73 DENAH POLA LANTAI - LT. LOWER GROUND A-2101 PAKUWON PERMAI
74 DENAH POLA LANTAI - LT. LLG A-2101A PAKUWON PERMAI
75 DENAH POLA LANTAI - LT. GROUND FLOOR A-2102 PAKUWON PERMAI
76 DENAH POLA LANTAI - LT. P1 A-2103 PAKUWON PERMAI
77 DENAH POLA LANTAI - LT. P2 A-2104 PAKUWON PERMAI
78 DENAH POLA LANTAI - LT. P3 A-2105 PAKUWON PERMAI
79 DENAH POLA LANTAI - LT. P4 A-2106 PAKUWON PERMAI
80 DENAH POLA LANTAI - LT. P5 A-2107 PAKUWON PERMAI
81 DENAH POLA LANTAI - LT. P6 A-2108 PAKUWON PERMAI
82 DENAH POLA LANTAI - LT. P7 A-2109 PAKUWON PERMAI
83 DENAH POLA LANTAI - LT. L0 A-2110 PAKUWON PERMAI
84 DENAH POLA LANTAI - LT. 1 A-2111 PAKUWON PERMAI
85 DENAH POLA LANTAI - LT. 2 A-2112 PAKUWON PERMAI
86 DENAH POLA LANTAI - LT. 3, 6, 8, 10, 18, 27 & 31 (TIPIKAL 1) A-2113 PAKUWON PERMAI
87 DENAH POLA LANTAI - LT. 12 (TIPIKAL 1) A-2113A PAKUWON PERMAI
88 DENAH POLA LANTAI - LT. 16 (TIPIKAL 1) A-2113B PAKUWON PERMAI
89 DENAH POLA LANTAI - LT. 20 (TIPIKAL 1) A-2113C PAKUWON PERMAI
90 DENAH POLA LANTAI - LT. 22 (TIPIKAL 1) A-2113D PAKUWON PERMAI
91 DENAH POLA LANTAI - LT. 29 (TIPIKAL 1) A-2113E PAKUWON PERMAI
92 DENAH POLA LANTAI - LT. 36 (TIPIKAL 1) A-2113F PAKUWON PERMAI
DAFTAR MONITORING Doc. No : SD-DWG/ENG/01

GAMBAR / SPESIFIKASI KONSULTAN FOR CONSTRUCTION Revision :P


Halaman :

Proyek : Tower 7 - LA VIZ


Gambar / Spesifikasi : ARSITEKTUR

Status Gambar / Spesifikasi


Ukuran Kertas / Format Diberikan Oleh Distribusi
0 1 2 3 4
No Judul Gambar For Construction No. Gambar
Soft Ukuran Kertas /
A1 A2 A3 Oleh Tanggal Tanggal Rev Tanggal Rev Tanggal Rev Tanggal Rev Tanggal Rev Penerima Tanggal
Copy Format

93 DENAH POLA LANTAI - LT. 5, 7, 9, 11, 21, 26, 28 & 32 (TIPIKAL 2) A-2114 PAKUWON PERMAI
94 DENAH POLA LANTAI - LT. 15 (TIPIKAL 2) A-2114A PAKUWON PERMAI
95 DENAH POLA LANTAI - LT. 19 (TIPIKAL 2) A-2114B PAKUWON PERMAI
96 DENAH POLA LANTAI - LT. 30 (TIPIKAL 2) A-2114C PAKUWON PERMAI
97 DENAH POLA LANTAI - LT. 35 (TIPIKAL 2) A-2114D PAKUWON PERMAI
98 DENAH POLA LANTAI - LT. 37 (TIPIKAL 2) A-2114E PAKUWON PERMAI
99 DENAH POLA LANTAI - LT. 17 (REFUGEE 1) A-2115 PAKUWON PERMAI
100 DENAH POLA LANTAI - LT. 33 (REFUGEE 2) A-2116 PAKUWON PERMAI
101 DENAH POLA LANTAI - LT. 38 & 50 (PENTHOUSE 1) A-2117 PAKUWON PERMAI
102 DENAH POLA LANTAI - LT. 39 & 51 (PENTHOUSE 2) A-2118 PAKUWON PERMAI
103 DENAH POLA LANTAI - LT. ATAP (RUANG MR & LMR) A-2119 PAKUWON PERMAI

104 2. DENAH PLAFOND DAN TITIK LAMPU


105 DENAH PLAFOND & TITIK LAMPU - LT. LOWER GROUND A-2201 PAKUWON PERMAI
106 DENAH PLAFOND & TITIK LAMPU - LT. LLG A-2201A PAKUWON PERMAI
107 DENAH PLAFOND & TITIK LAMPU - LT. GROUND FLOOR A-2202 PAKUWON PERMAI
108 DENAH PLAFOND & TITIK LAMPU - LT. P1 A-2203 PAKUWON PERMAI
109 DENAH PLAFOND & TITIK LAMPU - LT. P2 A-2204 PAKUWON PERMAI
110 DENAH PLAFOND & TITIK LAMPU - LT. P3 A-2205 PAKUWON PERMAI
111 DENAH PLAFOND & TITIK LAMPU - LT. P4 A-2206 PAKUWON PERMAI
112 DENAH PLAFOND & TITIK LAMPU - LT. P5 A-2207 PAKUWON PERMAI
113 DENAH PLAFOND & TITIK LAMPU - LT. P6 A-2208 PAKUWON PERMAI
114 DENAH PLAFOND & TITIK LAMPU - LT. P7 A-2209 PAKUWON PERMAI
115 DENAH PLAFOND & TITIK LAMPU - LT. L0 A-2210 PAKUWON PERMAI
116 DENAH PLAFOND & TITIK LAMPU - LT. 1 A-2211 PAKUWON PERMAI
117 DENAH PLAFOND & TITIK LAMPU - LT. 2 A-2212 PAKUWON PERMAI
118 DENAH PLAFOND & TITIK LAMPU - LT. 3, 6, 8, 10, 18, 27 & 31 (TIPIKAL 1) A-2213 PAKUWON PERMAI
119 DENAH PLAFOND & TITIK LAMPU - LT. 12 (TIPIKAL 1) A-2213A PAKUWON PERMAI
120 DENAH PLAFOND & TITIK LAMPU - LT. 16 (TIPIKAL 1) A-2213B PAKUWON PERMAI
121 DENAH PLAFOND & TITIK LAMPU - LT. 20 (TIPIKAL 1) A-2213C PAKUWON PERMAI
122 DENAH PLAFOND & TITIK LAMPU - LT. 22 (TIPIKAL 1) A-2213D PAKUWON PERMAI
123 DENAH PLAFOND & TITIK LAMPU - LT. 29 (TIPIKAL 1) A-2213E PAKUWON PERMAI
124 DENAH PLAFOND & TITIK LAMPU - LT. 36 (TIPIKAL 1) A-2213F PAKUWON PERMAI
125 DENAH PLAFOND & TITIK LAMPU - LT. 5, 7, 9, 11, 21, 26, 28 & 32 (TIPIKAL 2) A-2214 PAKUWON PERMAI
DAFTAR MONITORING Doc. No : SD-DWG/ENG/01

GAMBAR / SPESIFIKASI KONSULTAN FOR CONSTRUCTION Revision :P


Halaman :

Proyek : Tower 7 - LA VIZ


Gambar / Spesifikasi : ARSITEKTUR

Status Gambar / Spesifikasi


Ukuran Kertas / Format Diberikan Oleh Distribusi
0 1 2 3 4
No Judul Gambar For Construction No. Gambar
Soft Ukuran Kertas /
A1 A2 A3 Oleh Tanggal Tanggal Rev Tanggal Rev Tanggal Rev Tanggal Rev Tanggal Rev Penerima Tanggal
Copy Format

126 DENAH PLAFOND & TITIK LAMPU - LT. 15 (TIPIKAL 2) A-2214A PAKUWON PERMAI
127 DENAH PLAFOND & TITIK LAMPU - LT. 19 (TIPIKAL 2) A-2214B PAKUWON PERMAI
128 DENAH PLAFOND & TITIK LAMPU - LT. 30 (TIPIKAL 2) A-2214C PAKUWON PERMAI
129 DENAH PLAFOND & TITIK LAMPU - LT. 35 (TIPIKAL 2) A-2214D PAKUWON PERMAI
130 DENAH PLAFOND & TITIK LAMPU - LT. 37 (TIPIKAL 2) A-2214E PAKUWON PERMAI
131 DENAH PLAFOND & TITIK LAMPU - LT. 17 (REFUGEE 1) A-2215 PAKUWON PERMAI
132 DENAH PLAFOND & TITIK LAMPU - LT. 33 (REFUGEE 2) A-2216 PAKUWON PERMAI
133 DENAH PLAFOND & TITIK LAMPU - LT. 38 & 50 (PENTHOUSE 1) A-2217 PAKUWON PERMAI
134 DENAH PLAFOND & TITIK LAMPU - LT. 39 & 51 (PENTHOUSE 2) A-2218 PAKUWON PERMAI
135 DENAH PLAFOND & TITIK LAMPU - LT. ATAP (RUANG MR & LMR) A-2219 PAKUWON PERMAI

136 3. TANGGA
137 DETAIL TANGGA KEBAKARAN #1 - DENAH A-2301 PAKUWON PERMAI
138 DETAIL TANGGA KEBAKARAN #1 - DENAH A-2301A PAKUWON PERMAI
139 DETAIL TANGGA KEBAKARAN #1 - DENAH A-2301B PAKUWON PERMAI
140 DETAIL TANGGA KEBAKARAN #1 - POTONGAN A - PART 1 & 2 A-2301C PAKUWON PERMAI
141 DETAIL TANGGA KEBAKARAN #1 - POTONGAN A - PART 3 A-2301D PAKUWON PERMAI
142 DETAIL TANGGA KEBAKARAN #2 - DENAH A-2302 PAKUWON PERMAI
143 DETAIL TANGGA KEBAKARAN #2 - DENAH A-2302A PAKUWON PERMAI
144 DETAIL TANGGA KEBAKARAN #2 - DENAH A-2302B PAKUWON PERMAI
145 DETAIL TANGGA KEBAKARAN #2 - POTONGAN A - PART 1 & 2 A-2302C PAKUWON PERMAI
146 DETAIL TANGGA KEBAKARAN #2 - POTONGAN A - PART 3 A-2302D PAKUWON PERMAI
147 DETAIL TANGGA KEBAKARAN #3 - DENAH A-2303 PAKUWON PERMAI
148 DETAIL TANGGA KEBAKARAN #3 - POTONGAN A A-2303A PAKUWON PERMAI
149 DETAIL TANGGA LMR #1 & #2 LT. ROOF A-2304 PAKUWON PERMAI
150 DETAIL TANGGA LMR #3 & #4 LT. ROOF A-2305 PAKUWON PERMAI
151 DETAIL TANGGA #6 LT. LG A-2306 PAKUWON PERMAI

152 4. CORE
153 DETAIL CORE #6 - DENAH LANTAI LG DAN LANTAI GF A-2401 PAKUWON PERMAI
154 DETAIL CORE #6 - DENAH LANTAI P1-P2 DAN P4 A-2401A PAKUWON PERMAI
155 DETAIL CORE #6 - DENAH LANTAI P3-P5 A-2401B PAKUWON PERMAI
156 DETAIL CORE #6 - DENAH LANTAI P6-P7 A-2401C PAKUWON PERMAI
157 DETAIL CORE #6 - DENAH LANTAI L0 DAN LANTAI 1-51 A-2401D PAKUWON PERMAI
158 DETAIL CORE #6 - DENAH LANTAI REFUGEE 1 & 2 A-2401E PAKUWON PERMAI
159 DETAIL CORE #6 - DENAH LANTAI LMR DAN ATAP LMR A-2401F PAKUWON PERMAI
160 DETAIL CORE #6 - DENAH LANTAI POTONGAN A - PARSIAL 1 A-2401G PAKUWON PERMAI
161 DETAIL CORE #6 - DENAH LANTAI POTONGAN A - PARSIAL 2 A-2401H PAKUWON PERMAI
162 DETAIL CORE #6 - DENAH LANTAI POTONGAN A - PARSIAL 3 A-2401I PAKUWON PERMAI

163 5. LIFT LOBBY


164 DETAIL LOBBY LIFT MALL LANTAI LG ~ GF A-2501 PAKUWON PERMAI
165 DETAIL LOBBY LIFT MALL LANTAI P1 ~ P2 A-2501A PAKUWON PERMAI
166 DETAIL LOBBY LIFT MALL LANTAI P3 ~ P4 A-2501B PAKUWON PERMAI
167 DETAIL LOBBY LIFT MALL LANTAI P5 ~ P6 A-2501C PAKUWON PERMAI
168 DETAIL LOBBY LIFT MALL TAMPAK A & B A-2501D PAKUWON PERMAI
169 DETAIL LOBBY LIFT 1 (GF, P5 ~ P7) A-2502 PAKUWON PERMAI
170 DETAIL LOBBY LIFT 1 (LT. L0 ~ LT. 2 & LT. TYP 1, LT. TYP 2) A-2502A PAKUWON PERMAI
DAFTAR MONITORING Doc. No : SD-DWG/ENG/01

GAMBAR / SPESIFIKASI KONSULTAN FOR CONSTRUCTION Revision :P


Halaman :

Proyek : Tower 7 - LA VIZ


Gambar / Spesifikasi : ARSITEKTUR

Status Gambar / Spesifikasi


Ukuran Kertas / Format Diberikan Oleh Distribusi
0 1 2 3 4
No Judul Gambar For Construction No. Gambar
Soft Ukuran Kertas /
A1 A2 A3 Oleh Tanggal Tanggal Rev Tanggal Rev Tanggal Rev Tanggal Rev Tanggal Rev Penerima Tanggal
Copy Format

171 DETAIL LOBBY LIFT 1 PRIVATE LOBBY (LT. REFUGEE 1, LT. REFUGEE 2 & LT. PENTHOUSE 1, LT. PENTHOUSE 2) A-2502B PAKUWON PERMAI
172 DETAIL LOBBY LIFT 2 (GF, P5 ~ P7), PRIVATE LOBBY (LT. L0 ~ LT. 2) A-2503 PAKUWON PERMAI
173 DETAIL LOBBY LIFT 2 PRIVATE LOBBY (LT. TYP 1, LT. TYP 2 & LT. PENTHOUSE 1, LT. PENTHOUSE 2) A-2503A PAKUWON PERMAI
174 DETAIL LOBBY LIFT 3 (GF, P5 ~P7) A-2504 PAKUWON PERMAI
175 DETAIL LOBBY LIFT 3 (LT. L0 ~ LT. 2 & LT. TYP 1, LT. TYP 2) A-2504A PAKUWON PERMAI
176 DETAIL LOBBY LIFT 3 (PENTHOUSE 1, LT. PENTHOUSE 2) A-2504B PAKUWON PERMAI
177 DETAIL LOBBY LIFT 4 A-2505 PAKUWON PERMAI
178 DETAIL LOBBY LIFT 4 A-2506 PAKUWON PERMAI

170 6. TOILET
171 TOILET MALL - DENAH & POTONGAN (@LG) A-2601 PAKUWON PERMAI
172 TOILET MALL - DENAH PLAFOND & POTONGAN B (@LG) A-2601A PAKUWON PERMAI
173 TOILET MALL - POTONGAN C & D (@LG) A-2601B PAKUWON PERMAI
174 TOILET MALL - POTONGAN E @ F (@LG) A-2601C PAKUWON PERMAI
175 TOILET SUPIR TIPE 1, DENAH, DENAH PLAFOND & POTONGAN (@P6) A-2602 PAKUWON PERMAI
176 TOILET SUPIR TIPE 2, DENAH, DENAH PLAFOND & POTONGAN A-2603 PAKUWON PERMAI
177 TOILET SUPIR TIPE 3, DENAH, DENAH PLAFOND A-2604 PAKUWON PERMAI
178 TOILET SUPIR TIPE 3, POTONGAN A-2604A PAKUWON PERMAI
179 TOILET CLUB HOUSE - DENAH (@P0) A-2605 PAKUWON PERMAI
180 TOILET CLUB HOUSE - DENAH PLAFOND (@P0) A-2605A PAKUWON PERMAI
181 TOILET CLUB HOUSE - POTONGAN A & B (@P0) A-2605B PAKUWON PERMAI
182 TOILET MALL - DENAH (@LG, GF) A-2607 PAKUWON PERMAI
183 TOILET MALL - DENAH PLAFOND (@LG, GF) A-2607A PAKUWON PERMAI
184 TOILET MALL - POTONGAN (@LG, GF) A-2607B PAKUWON PERMAI
185 TOILET MALL - POTONGAN (@LG, GF) A-2607C PAKUWON PERMAI
186 TOILET MALL - POTONGAN (@LG, GF) A-2607D PAKUWON PERMAI
187 DETAIL TEMPAT WUDHU (@P1) A-2608 PAKUWON PERMAI
188 TOILET MALL - DENAH (@LG) A-2609 PAKUWON PERMAI
189 TOILET MALL - DENAH PLAFOND (@LG) A-2609A PAKUWON PERMAI
190 TOILET MALL - POTONGAN (@LG) A-2609B PAKUWON PERMAI
191 TOILET MALL - POTONGAN (@LG) A-2609C PAKUWON PERMAI

192 7. RAMP
193 DETAIL RAMP 01 - DENAH LG A-2701 PAKUWON PERMAI
194 DETAIL RAMP 01 - DENAH GF A-2701A PAKUWON PERMAI
195 DETAIL RAMP 01 - DENAH P1 A-2701B PAKUWON PERMAI
196 DETAIL RAMP 01 - DENAH P2 A-2701C PAKUWON PERMAI
197 DETAIL RAMP 01 - DENAH P3 A-2701D PAKUWON PERMAI
198 DETAIL RAMP 01 - DENAH P4 A-2701E PAKUWON PERMAI
199 DETAIL RAMP 01 - DENAH P5 A-2701F PAKUWON PERMAI
200 DETAIL RAMP 01 - DENAH P6 A-2701G PAKUWON PERMAI
201 DETAIL RAMP 01 - POTONGAN A A-2701H PAKUWON PERMAI
202 DETAIL RAMP 02 - DENAH LG A-2702 PAKUWON PERMAI
203 DETAIL RAMP 02 - DENAH & POTONGAN A-2702A PAKUWON PERMAI
204 DETAIL RAMP 02 - POTONGAN & DETAIL A-2702B PAKUWON PERMAI
205 DETAIL RAMP 03 - DENAH LANTAI A-2703 PAKUWON PERMAI
206 DETAIL RAMP 03 - POTONGAN A-2703A PAKUWON PERMAI
DAFTAR MONITORING Doc. No : SD-DWG/ENG/01

GAMBAR / SPESIFIKASI KONSULTAN FOR CONSTRUCTION Revision :P


Halaman :

Proyek : Tower 7 - LA VIZ


Gambar / Spesifikasi : ARSITEKTUR

Status Gambar / Spesifikasi


Ukuran Kertas / Format Diberikan Oleh Distribusi
0 1 2 3 4
No Judul Gambar For Construction No. Gambar
Soft Ukuran Kertas /
A1 A2 A3 Oleh Tanggal Tanggal Rev Tanggal Rev Tanggal Rev Tanggal Rev Tanggal Rev Penerima Tanggal
Copy Format

207 8. UNIT TYPE APARTEMEN


208 DETAIL DENAH UNIT TIPE 2BA A-2801 PAKUWON PERMAI
209 POTONGAN UNIT TIPE 2BA A-2801A PAKUWON PERMAI
210 DETAIL TOILET #1 UNIT TIPE 2BA A-2801B PAKUWON PERMAI
211 DETAIL DENAH UNIT TIPE 2BB A-2802 PAKUWON PERMAI
212 POTONGAN UNIT TIPE 2BB A-2802A PAKUWON PERMAI
213 DETAIL TOILET #1 UNIT TIPE 2BB A-2802B PAKUWON PERMAI
214 DETAIL DENAH UNIT TIPE 2BC A-2803 PAKUWON PERMAI
215 POTONGAN UNIT TIPE 2BC A-2803A PAKUWON PERMAI
216 DETAIL TOILET #1 UNIT TIPE 2BC A-2803B PAKUWON PERMAI
217 DETAIL TOILET #2 UNIT TIPE 2BC A-2803C PAKUWON PERMAI
218 DETAIL DENAH UNIT TIPE 2BD A-2804 PAKUWON PERMAI
219 POTONGAN UNIT TIPE 2BD A-2804A PAKUWON PERMAI
220 DETAIL DENAH UNIT TIPE 2BE A-2805 PAKUWON PERMAI
221 POTONGAN UNIT TIPE 2BE A-2805A PAKUWON PERMAI
222 DETAIL TOILET #1 UNIT TIPE 2BE A-2805B PAKUWON PERMAI
223 DETAIL DENAH UNIT TIPE 3BA A-2806 PAKUWON PERMAI
224 POTONGAN UNIT TIPE 3BA A-2806A PAKUWON PERMAI
225 DETAIL TOILET #1 UNIT TIPE 3BA A-2806B PAKUWON PERMAI
226 DETAIL TOILET #2 UNIT TIPE 3BA A-2806C PAKUWON PERMAI
227 DETAIL TOILET #3 UNIT TIPE 3BA A-2806D PAKUWON PERMAI
228 DETAIL DENAH UNIT TIPE 3BB A-2807 PAKUWON PERMAI
229 POTONGAN UNIT TIPE 3BB A-2807A PAKUWON PERMAI
230 DETAIL TOILET #1 UNIT TIPE 3BB A-2807B PAKUWON PERMAI
231 DETAIL TOILET #2 UNIT TIPE 3BB A-2807C PAKUWON PERMAI
232 DETAIL TOILET #3 UNIT TIPE 3BB A-2807D PAKUWON PERMAI
233 DETAIL DENAH UNIT TIPE 3BC A-2808 PAKUWON PERMAI
234 POTONGAN UNIT TIPE 3BC A-2808A PAKUWON PERMAI
235 DETAIL TOILET #1 UNIT TIPE 3BC A-2808B PAKUWON PERMAI
236 DETAIL TOILET #2 UNIT TIPE 3BC A-2808C PAKUWON PERMAI
237 DETAIL DENAH UNIT TIPE 3BD A-2809 PAKUWON PERMAI
238 POTONGAN UNIT TIPE 3BD A-2809A PAKUWON PERMAI
239 DETAIL TOILET #1 UNIT TIPE 3BD A-2809B PAKUWON PERMAI
240 DETAIL TOILET #2 UNIT TIPE 3BD A-2809C PAKUWON PERMAI
241 DETAIL DENAH UNIT TIPE 2BA PENTHOUSE A-2810 PAKUWON PERMAI
242 POTONGAN UNIT TIPE 2BA PENTHOUSE A-2810A PAKUWON PERMAI
243 DETAIL DENAH UNIT TIPE 2BB PENTHOUSE A-2811 PAKUWON PERMAI
244 POTONGAN UNIT TIPE 2BB PENTHOUSE A-2811A PAKUWON PERMAI
245 DETAIL DENAH UNIT TIPE 2BC PENTHOUSE A-2812 PAKUWON PERMAI
246 POTONGAN UNIT TIPE 2BC PENTHOUSE A-2812A PAKUWON PERMAI
247 DETAIL TOILET #1 UNIT TIPE 2BC PENTHOUSE A-2812B PAKUWON PERMAI
248 DETAIL DENAH UNIT TIPE 2BD PENTHOUSE A-2813 PAKUWON PERMAI
249 POTONGAN UNIT TIPE 2BD PENTHOUSE A-2813A PAKUWON PERMAI
250 DETAIL DENAH UNIT TIPE 2BE PENTHOUSE A-2814 PAKUWON PERMAI
251 POTONGAN UNIT TIPE 2BE PENTHOUSE A-2814A PAKUWON PERMAI
252 DETAIL DENAH UNIT TIPE 2BE LT. L0 A-2815 PAKUWON PERMAI
253 POTONGAN UNIT TIPE 2BE LT. L0 A-2815A PAKUWON PERMAI
254 DETAIL TOILET #1 UNIT TIPE 2BE LT. L0 A-2815B PAKUWON PERMAI
DAFTAR MONITORING Doc. No : SD-DWG/ENG/01

GAMBAR / SPESIFIKASI KONSULTAN FOR CONSTRUCTION Revision :P


Halaman :

Proyek : Tower 7 - LA VIZ


Gambar / Spesifikasi : ARSITEKTUR

Status Gambar / Spesifikasi


Ukuran Kertas / Format Diberikan Oleh Distribusi
0 1 2 3 4
No Judul Gambar For Construction No. Gambar
Soft Ukuran Kertas /
A1 A2 A3 Oleh Tanggal Tanggal Rev Tanggal Rev Tanggal Rev Tanggal Rev Tanggal Rev Penerima Tanggal
Copy Format

255 DETAIL DENAH UNIT TIPE 2BF LT. 1 A-2816 PAKUWON PERMAI
256 POTONGAN UNIT TIPE 2BF LT. 1 A-2816A PAKUWON PERMAI
257 DETAIL TOILET #1 UNIT TIPE 2BF LT. 1 A-2816B PAKUWON PERMAI
258 DETAIL TOILET #2 UNIT TIPE 2BF LT. 1 A-2816C PAKUWON PERMAI
259 DETAIL DENAH UNIT TIPE 3BC LT. L0 A-2817 PAKUWON PERMAI
260 POTONGAN UNIT TIPE 3BC LT. L0 A-2817A PAKUWON PERMAI
261 DETAIL TOILET #1 UNIT TIPE 3BC LT. L0 A-2817B PAKUWON PERMAI
262 DETAIL DENAH UNIT TIPE 3BD LT. L0 A-2818 PAKUWON PERMAI
263 POTONGAN UNIT TIPE 3BD LT. L0 A-2818A PAKUWON PERMAI
264 DETAIL TOILET #1 UNIT TIPE 3BD LT. L0 A-2818B PAKUWON PERMAI
265 DETAIL DENAH UNIT TIPE 3BA LT. 1 A-2819 PAKUWON PERMAI
266 POTONGAN UNIT TIPE 3BA LT. 1 A-2819A PAKUWON PERMAI
267 POTONGAN UNIT TIPE 3BA LT. 1 A-2819B PAKUWON PERMAI
268 DETAIL DENAH UNIT TIPE 3BC LT. 1 A-2820 PAKUWON PERMAI
269 POTONGAN UNIT TIPE 3BC LT. 1 A-2820A PAKUWON PERMAI
270 DETAIL DENAH UNIT TIPE 3BD LT. 1 A-2821 PAKUWON PERMAI
271 POTONGAN UNIT TIPE 3BD LT. 1 A-2821A PAKUWON PERMAI
272 DETAIL DENAH UNIT TIPE 2BD LT. 1 A-2822 PAKUWON PERMAI
273 POTONGAN UNIT TIPE 2BD LT. 1 A-2822A PAKUWON PERMAI
274 DETAIL DENAH UNIT TIPE 2BE LT. 1 A-2823 PAKUWON PERMAI
275 POTONGAN UNIT TIPE 2BE LT. 1 A-2823A PAKUWON PERMAI
276 DETAIL DENAH UNIT TIPE 3BB LT. 2 A-2824 PAKUWON PERMAI
277 POTONGAN UNIT TIPE 3BB LT. 2 A-2824A PAKUWON PERMAI
278 DETAIL TOILET #1 UNIT TIPE 3BB LT. 2 A-2824B PAKUWON PERMAI
279 DETAIL TOILET #1 UNIT TIPE 3BB LT. 2 A-2824C PAKUWON PERMAI
280 DETAIL TOILET #1 UNIT TIPE 3BB LT. 2 A-2824D PAKUWON PERMAI
281 DETAIL DENAH UNIT TIPE 2BC LT. 2 A-2825 PAKUWON PERMAI
282 POTONGAN UNIT TIPE 2BC LT. 2 A-2825A PAKUWON PERMAI
283 DETAIL TOILET #1 UNIT TIPE 3BC LT. 3 A-2825B PAKUWON PERMAI
284 DETAIL TOILET #2 UNIT TIPE 3BC LT. 3 A-2825C PAKUWON PERMAI
285 DETAIL TOILET #3 UNIT TIPE 3BC LT. 3 A-2825D PAKUWON PERMAI
286 DETAIL DENAH UNIT TIPE 3BD LT. 2 A-2826 PAKUWON PERMAI
287 POTONGAN UNIT TIPE 3BD LT. 2 A-2826A PAKUWON PERMAI
288 DETAIL TOILET #1 UNIT TIPE 3BD LT. 2 A-2826B PAKUWON PERMAI
289 DETAIL TOILET #1 UNIT TIPE 3BD LT. 2 A-2826C PAKUWON PERMAI
290 DETAIL TOILET #1 UNIT TIPE 3BD LT. 2 A-2826D PAKUWON PERMAI
291 DETAIL DENAH UNIT TIPE 3BA+ (3BA PLUS) A-2827 PAKUWON PERMAI
292 POTONGAN UNIT TIPE 3BA+ (3BA PLUS) A-2827A PAKUWON PERMAI
293 DETAIL DENAH UNIT TIPE 3BB+ (3BB PLUS) A-2828 PAKUWON PERMAI
294 POTONGAN UNIT TIPE 3BB+ (3BB PLUS) A-2828A PAKUWON PERMAI
295 DETAIL DENAH UNIT TIPE 3BC+ (3BC PLUS) A-2829 PAKUWON PERMAI
296 POTONGAN UNIT TIPE 3BC+ (3BC PLUS) A-2829A PAKUWON PERMAI
297 DETAIL DENAH UNIT TIPE 3BD+ (3BD PLUS) A-2830 PAKUWON PERMAI
298 POTONGAN UNIT TIPE 3BD+ (3BD PLUS) A-2830A PAKUWON PERMAI

299 9. DETAIL R. ME & DETAIL PENDUKUNG


300 DETAIL PARTIAL LOADING DOCK & R. BIN (LT. LG) A-2901 PAKUWON PERMAI
301 DETAIL PARTIAL LOADING DOCK & R. BIN (LT. LG) A-2901A PAKUWON PERMAI
DAFTAR MONITORING Doc. No : SD-DWG/ENG/01

GAMBAR / SPESIFIKASI KONSULTAN FOR CONSTRUCTION Revision :P


Halaman :

Proyek : Tower 7 - LA VIZ


Gambar / Spesifikasi : ARSITEKTUR

Status Gambar / Spesifikasi


Ukuran Kertas / Format Diberikan Oleh Distribusi
0 1 2 3 4
No Judul Gambar For Construction No. Gambar
Soft Ukuran Kertas /
A1 A2 A3 Oleh Tanggal Tanggal Rev Tanggal Rev Tanggal Rev Tanggal Rev Tanggal Rev Penerima Tanggal
Copy Format

302 DETAIL PARTIAL #1 R. GENSET & R. PENDUKUNG ME (LT. P6 & P7) A-2902 PAKUWON PERMAI
303 DETAIL PARTIAL #2 R. GENSET & R. PENDUKUNG ME (LT. P6 & P7) A-2902A PAKUWON PERMAI
304 DETAIL PARTIAL #2 R. GENSET & R. PENDUKUNG ME (LT. P6 & P7) A-2902B PAKUWON PERMAI
305 DETAIL PARTIAL #2 R. GENSET & R. PENDUKUNG ME (LT. P6 & P7) A-2902C PAKUWON PERMAI
306 DETAIL PARTIAL #1 R. FWT A-2903 PAKUWON PERMAI
307 DETAIL PARTIAL #1 R. BALANCING TANK A-2904 PAKUWON PERMAI
308 DETAIL R. WEEKLY TANK & STORAGE A-2906 PAKUWON PERMAI
309 DETAIL R. WEEKLY TANK & STORAGE A-2906A PAKUWON PERMAI

299 3. PARSIAL EKSTERIOR


300 1. FAÇADE
301 PARSIAL TAMPAK UTARA (1) A-3101 PAKUWON PERMAI
302 PARSIAL TAMPAK UTARA (1) A-3101A PAKUWON PERMAI
303 PARSIAL TAMPAK UTARA (1) A-3101B PAKUWON PERMAI
304 PARSIAL TAMPAK UTARA (2) A-3102 PAKUWON PERMAI
305 PARSIAL TAMPAK UTARA (2) A-3102B PAKUWON PERMAI
306 PARSIAL TAMPAK UTARA (2) A-3103 PAKUWON PERMAI
307 PARSIAL TAMPAK UTARA (3) A-3103A PAKUWON PERMAI
308 PARSIAL TAMPAK UTARA (3) A-3104 PAKUWON PERMAI
309 PARSIAL TAMPAK SELATAN (1) A-3104A PAKUWON PERMAI
310 PARSIAL TAMPAK SELATAN (1) A-3104B PAKUWON PERMAI
311 PARSIAL TAMPAK SELATAN (1) A-3105 PAKUWON PERMAI
312 PARSIAL TAMPAK SELATAN (2) A-3105A PAKUWON PERMAI
313 PARSIAL TAMPAK SELATAN (2) A-3106 PAKUWON PERMAI
314 PARSIAL TAMPAK SELATAN (3) A-3106A PAKUWON PERMAI
315 PARSIAL TAMPAK SELATAN (3) A-3106B PAKUWON PERMAI
316 PARSIAL TAMPAK SELATAN (3) A-3104 PAKUWON PERMAI
317 PARSIAL TAMPAK BARAT (1) A-3108 PAKUWON PERMAI
318 PARSIAL TAMPAK BARAT (2) A-3109 PAKUWON PERMAI
319 PARSIAL TAMPAK TIMUR (1) A-3109A PAKUWON PERMAI
320 PARSIAL TAMPAK TIMUR (1) A-3110 PAKUWON PERMAI
321 PARSIAL TAMPAK TIMUR (2) A-3110A PAKUWON PERMAI
322 PARSIAL TAMPAK TIMUR (2) A-3111 PAKUWON PERMAI
323 PARSIAL TAMPAK TIMUR (3) A-3112 PAKUWON PERMAI
324 PARSIAL TAMPAK TIMUR (3) A-3113 PAKUWON PERMAI
325 PARSIAL TAMPAK BARAT (3) A-3113A PAKUWON PERMAI
326 PARSIAL TAMPAK UTARA (4)
327 PARSIAL TAMPAK UTARA (4)

328 2. CROWN & CANOPY


329 DETAIL CROWN - DENAH LT. LMR & ATAP LMR A-3201 PAKUWON PERMAI
330 DETAIL CROWN - POTONGAN A-3201A PAKUWON PERMAI
331 DETAIL CANOPY #1 - DENAH A-3202 PAKUWON PERMAI
332 DETAIL CANOPY #1 - POTONGAN A-3202A PAKUWON PERMAI
333 DETAIL CANOPY #1 - POTONGAN & TAMPAK IMAGE A-3202B PAKUWON PERMAI

334 4. DETAIL
335 1. DETAIL FAÇADE
DAFTAR MONITORING Doc. No : SD-DWG/ENG/01

GAMBAR / SPESIFIKASI KONSULTAN FOR CONSTRUCTION Revision :P


Halaman :

Proyek : Tower 7 - LA VIZ


Gambar / Spesifikasi : ARSITEKTUR

Status Gambar / Spesifikasi


Ukuran Kertas / Format Diberikan Oleh Distribusi
0 1 2 3 4
No Judul Gambar For Construction No. Gambar
Soft Ukuran Kertas /
A1 A2 A3 Oleh Tanggal Tanggal Rev Tanggal Rev Tanggal Rev Tanggal Rev Tanggal Rev Penerima Tanggal
Copy Format

336 DETAIL FACADE #1 A-4101 PAKUWON PERMAI


337 DETAIL FACADE #2 A-4102 PAKUWON PERMAI
337 DETAIL FACADE #3 A-4103 PAKUWON PERMAI

338 2. DETAIL STANDAR


339 DETAIL STANDAR #1 A-4201 PAKUWON PERMAI
339 DETAIL STANDAR #2 A-4202 PAKUWON PERMAI
340 DETAIL STANDAR #3 A-4203 PAKUWON PERMAI
341 DETAIL STANDAR #4 A-4204 PAKUWON PERMAI
342 DETAIL STANDAR #5 A-4205 PAKUWON PERMAI
343 DETAIL STANDAR #5A A-4205A PAKUWON PERMAI
344 DETAIL STANDAR #6 A-4206 PAKUWON PERMAI
345 DETAIL DINDING KORIDOR A-4207 PAKUWON PERMAI
346 DETAIL DINDING KORIDOR A-4207A PAKUWON PERMAI
347 DETAIL PLAT LANTAI DAK ATAP & AREA GONDOLA A-4208 PAKUWON PERMAI
348 DETAIL DINDING PRECAST A-4209 PAKUWON PERMAI
349 DETAIL STANDART #8 (PLANTER BOX) A-4210 PAKUWON PERMAI
350 DETAIL STANDART #9 (PLANTER BOX) A-4211 PAKUWON PERMAI
351 DETAIL STANDART #9 (PLANTER BOX) A-4211A PAKUWON PERMAI
352 DETAIL STANDART #9 (PLANTER BOX) A-4211B PAKUWON PERMAI
353 DETAIL STANDART #9 (PLANTER BOX) A-4212 PAKUWON PERMAI
354 DETAIL STANDART #9 (PLANTER BOX) A-4212A PAKUWON PERMAI

355 5. PENUNJANG
356 1. KOLAM RENANG
357 DENAH DAN POTONGAN KOLAM RENANG A-5101 PAKUWON PERMAI
358 POTONGAN KOLAM RENANG A-5101A PAKUWON PERMAI
359 DETAIL PARTIAL #01 - LT. POOLDECK (DENAH) A-5102 PAKUWON PERMAI
360 DETAIL PARTIAL #02 - LT. POOLDECK (DENAH) A-5102A PAKUWON PERMAI
361 DETAIL PARTIAL - LT. POOLDECK (POTONGAN) A-5102B PAKUWON PERMAI
362 DETAIL PARTIAL - LT. POOLDECK (POTONGAN) A-5102C PAKUWON PERMAI
363 DETAIL PARTIAL - LT. POOLDECK (DETAIL) A-5102D PAKUWON PERMAI
364 DETAIL PARTIAL - LT. POOLDECK (DETAIL) A-5102E PAKUWON PERMAI

358 6. SCHEDULE
359 1. KEYPLAN PINTU & JENDELA
360 KEYPLAN PINTU & JENDELA - DENAH LANTAI LG A-6101 PAKUWON PERMAI
361 KEYPLAN PINTU & JENDELA - DENAH LANTAI LLG A-6101A PAKUWON PERMAI
362 KEYPLAN PINTU & JENDELA - DENAH LANTAI GF A-6102 PAKUWON PERMAI
363 KEYPLAN PINTU & JENDELA - DENAH LANTAI P1 A-6103 PAKUWON PERMAI
364 KEYPLAN PINTU & JENDELA - DENAH LANTAI P2 A-6104 PAKUWON PERMAI
365 KEYPLAN PINTU & JENDELA - DENAH LANTAI P3 A-6105 PAKUWON PERMAI
366 KEYPLAN PINTU & JENDELA - DENAH LANTAI P4 A-6106 PAKUWON PERMAI
367 KEYPLAN PINTU & JENDELA - DENAH LANTAI P5 A-6107 PAKUWON PERMAI
368 KEYPLAN PINTU & JENDELA - DENAH LANTAI P6 A-6108 PAKUWON PERMAI
369 KEYPLAN PINTU & JENDELA - DENAH LANTAI P7 A-6109 PAKUWON PERMAI
370 KEYPLAN PINTU & JENDELA - DENAH LANTAI L0 A-6110 PAKUWON PERMAI
371 KEYPLAN PINTU & JENDELA - DENAH LANTAI 1 A-6111 PAKUWON PERMAI
DAFTAR MONITORING Doc. No : SD-DWG/ENG/01

GAMBAR / SPESIFIKASI KONSULTAN FOR CONSTRUCTION Revision :P


Halaman :

Proyek : Tower 7 - LA VIZ


Gambar / Spesifikasi : ARSITEKTUR

Status Gambar / Spesifikasi


Ukuran Kertas / Format Diberikan Oleh Distribusi
0 1 2 3 4
No Judul Gambar For Construction No. Gambar
Soft Ukuran Kertas /
A1 A2 A3 Oleh Tanggal Tanggal Rev Tanggal Rev Tanggal Rev Tanggal Rev Tanggal Rev Penerima Tanggal
Copy Format

372 KEYPLAN PINTU & JENDELA - DENAH LANTAI 2 A-6112 PAKUWON PERMAI
373 KEYPLAN PINTU & JENDELA - DENAH LANTAI 3, 6, 8, 10, 18, 27 & 31 (TIPIKAL 1) A-6113 PAKUWON PERMAI
374 KEYPLAN PINTU & JENDELA - DENAH LANTAI 12 (TIPIKAL 1) A-6113A PAKUWON PERMAI
375 KEYPLAN PINTU & JENDELA - DENAH LANTAI 16 (TIPIKAL 1) A-6113B PAKUWON PERMAI
376 KEYPLAN PINTU & JENDELA - DENAH LANTAI 20 (TIPIKAL 1) A-6113C PAKUWON PERMAI
377 KEYPLAN PINTU & JENDELA - DENAH LANTAI 22 (TIPIKAL 1) A-6113D PAKUWON PERMAI
378 KEYPLAN PINTU & JENDELA - DENAH LANTAI 29 (TIPIKAL 1) A-6113E PAKUWON PERMAI
379 KEYPLAN PINTU & JENDELA - DENAH LANTAI 36 (TIPIKAL 1) A-6113F PAKUWON PERMAI
380 KEYPLAN PINTU & JENDELA - DENAH LANTAI 5, 7, 9, 11, 21, 26, 28 & 32 (TIPIKAL 2) A-6114 PAKUWON PERMAI
381 KEYPLAN PINTU & JENDELA - DENAH LANTAI 15 (TIPIKAL 2) A-6114A PAKUWON PERMAI
382 KEYPLAN PINTU & JENDELA - DENAH LANTAI 19 (TIPIKAL 2) A-6114B PAKUWON PERMAI
383 KEYPLAN PINTU & JENDELA - DENAH LANTAI 30 (TIPIKAL 2) A-6114C PAKUWON PERMAI
384 KEYPLAN PINTU & JENDELA - DENAH LANTAI 35 (TIPIKAL 2) A-6114D PAKUWON PERMAI
385 KEYPLAN PINTU & JENDELA - DENAH LANTAI 37 (TIPIKAL 2) A-6114E PAKUWON PERMAI
386 KEYPLAN PINTU & JENDELA - DENAH LANTAI 17 (REFUGEE 1) A-6115 PAKUWON PERMAI
387 KEYPLAN PINTU & JENDELA - DENAH LANTAI 33 (REFUGEE 2) A-6116 PAKUWON PERMAI
388 KEYPLAN PINTU & JENDELA - DENAH LANTAI PENTHOUSE 1 A-6117 PAKUWON PERMAI
389 KEYPLAN PINTU & JENDELA - DENAH LANTAI PENTHOUSE 2 A-6118 PAKUWON PERMAI
390 KEYPLAN PINTU & JENDELA - DENAH LANTAI LMR A-6119 PAKUWON PERMAI

391 2. TYPE PINTU & JENDELA


392 TYPE PINTU & JENDELA #1 A-6201 PAKUWON PERMAI
393 TYPE PINTU & JENDELA #2 A-6202 PAKUWON PERMAI
394 TYPE PINTU & JENDELA #3 A-6203 PAKUWON PERMAI
395 TYPE PINTU & JENDELA #4 A-6204 PAKUWON PERMAI
396 TYPE PINTU & JENDELA #5 A-6205 PAKUWON PERMAI
397 TYPE PINTU & JENDELA #6 A-6206 PAKUWON PERMAI
398 TYPE PINTU & JENDELA #7 A-6207 PAKUWON PERMAI
399 TYPE PINTU & JENDELA #8 A-6208 PAKUWON PERMAI
400 TYPE PINTU & JENDELA #9 A-6209 PAKUWON PERMAI
401 TYPE PINTU & JENDELA #10 A-6210 PAKUWON PERMAI
402 TYPE PINTU & JENDELA #11 A-6211 PAKUWON PERMAI
403 TYPE PINTU & JENDELA #12 A-6212 PAKUWON PERMAI

398 3. DETAIL PINTU BESI


399 DETAIL PINTU BESI SD-01 A-6301 PAKUWON PERMAI
399 DETAIL PINTU BESI SD-02 A-6302 PAKUWON PERMAI
400 DETAIL PINTU BESI SD-03 A-6303 PAKUWON PERMAI
401 DETAIL PINTU BESI SD-04 A-6304 PAKUWON PERMAI

402 4. DETAIL PINTU ALUMINIUM


403 DETAIL PINTU ALUMINIUM A-6401 PAKUWON PERMAI

404 5. DETAIL PINTU KAYU


405 DETAIL PINTU KAYU A-6501 PAKUWON PERMAI
Doc. No : FR-DSG-004
DAFTAR MONITORING SHOP DRAWING Revision : 00

Halaman :

Proyek : Tower 7 - LA VIZ


Gambar / Spesifikasi : ARSITEKTUR
MONITORING SHOP DRAWING

I II
No Judul Gambar For Construction No. Gambar Rencana Nomor PSD
Pengajuan SD
Submitted Kembali Status Durasi Submitted Kembali Status Durasi
x
A STANDAR DRAWING, SCHEDULE MATERIAL
STANDAR DRAWING
1 SCHEDULE MATERIAL

1 TAPAK / SITEPLAN
1 SITE PLAN A-0006

2 LAYOUT PLAN A-0007

2 DENAH / LAYOUT PLAN


1 DENAH LANTAI LOWER GROUND A-1101 19-Nov-18 0002/SD-ARS/MITRA-LViz/IX/2018 28-Sep-18 7-Nov-18 B 40

2 DENAH PARSIAL LANTAI LOWER GROUND


3 DENAH LANTAI LLG (TUNNEL) A-1101A 0009/SD-ARS/MITRA-LViz/X/2018 29-Oct-18 21-Nov-18 B 23

4 DENAH PARSIAL LANTAI LLG (TUNNEL)

5 DENAH LANTAI DASAR / GROUND FLOOR A-1102 28-Nov-18 0003/SD-ARS/MITRA-LViz/IX/2018 28-Sep-18 21-Nov-18 B 54

6 DENAH PARSIAL LANTAI DASAR / GROUND FLOOR

7 DENAH LANTAI P1 A-1103 9-Dec-18 0004/SD-ARS/MITRA-Lviz/X/2018 5-Oct-18 13-Dec-18 B 69

8 DENAH PARSIAL LANTAI P1

9 DENAH LANTAI P2 A-1104 18-Dec-18 0005/SD-ARS/MITRA-Lviz/X/2018 5-Oct-18 13-Dec-18 B 69

10 DENAH PARSIAL LANTAI P2

11 DENAH LANTAI P3 A-1105 29-Dec-18 0006/SD-ARS/MITRA-Lviz/X/2018 5-Oct-18 13-Dec-18 B 69

12 DENAH PARSIAL LANTAI P3

13 DENAH LANTAI P4 A-1106 7-Jan-19 0010/SD-ARS/MITRA-LViz/X/2018 29-Oct-18 13-Dec-18 B 45

14 DENAH PARSIAL LANTAI P4

15 DENAH LANTAI P5 A-1107 16-Jan-19 0007/SD-ARS/MITRA-Lviz/X/2018 5-Oct-18 13-Dec-18 B 69

16 DENAH PARSIAL LANTAI P5


17 DENAH LANTAI P6 A-1108 27-Jan-19 0011/SD-ARS/MITRA-LViz/X/2018 29-Oct-18 13-Dec-18 B 45 9-Apr-19 23-Apr-19 B 14

18 DENAH PARSIAL LANTAI P6

19 DENAH LANTAI P7 A-1109 5-Feb-19 0012/SD-ARS/MITRA-LViz/X/2018 29-Oct-18 13-Dec-18 B 45 9-Apr-19 23-Apr-19 B 14

20 DENAH PARSIAL LANTAI P7

21 DENAH LANTAI POOLDECK A-1110

22 DENAH PARSIAL LANTAI POOLDECK

23 DENAH LANTAI 1 (MARKETING LT.0) A-1111 5-Feb-19 0067/SD-ARS/MITRA-LViz/III/2019 1-Apr-19 13-Apr-19 B 12


Doc. No : FR-DSG-004
DAFTAR MONITORING SHOP DRAWING Revision : 00

Halaman :

Proyek : Tower 7 - LA VIZ


Gambar / Spesifikasi : ARSITEKTUR
MONITORING SHOP DRAWING

I II
No Judul Gambar For Construction No. Gambar Rencana Nomor PSD
Pengajuan SD
Submitted Kembali Status Durasi Submitted Kembali Status Durasi

24 DENAH PARSIAL LANTAI 1 (MARKETING LT.0)


25 DENAH LANTAI 2 (MARKETING LT.1) A-1112 27-Nov-18 0016/SD-ARS/MITRA-LViz/I/2019 7-Jan-19 25-Feb-19 C 49 25-Feb-19 2-Mar-19 B 5

26 DENAH PARSIAL LANTAI 2 (MARKETING LT.1)

27 DENAH LANTAI 3 (MARKETING LT.2) A-1113 4-Dec-18 0028/SD-ARS/MITRA-LViz/I/2019 18-Jan-19 25-Feb-19 C 38 15-Mar-19 21-Mar-19 B 6

28 DENAH PARSIAL LANTAI 3 (MARKETING LT.2)

29 DENAH LANTAI 4,6,8 (MARKETING LT.3,6,8) - TYPIKAL 1 A-1114 11-Dec-18 0036/SD-ARS/MITRA-LViz/II/2019 6-Feb-19 25-Feb-19 C 19 19-Mar-19 28-Mar-19 B 9

30 DENAH PARSIAL LANTAI 4,6,8 (MARKETING LT.3,6,8)

31 DENAH LANTAI 5,7 (MARKETING LT.5,7) - TYIPIKAL 2 A-1115 18-Dec-18 0039/SD-ARS/MITRA-LViz/II/2019 7-Feb-19 25-Feb-19 C 18 19-Mar-19 28-Mar-19 B 9

32 DENAH PARSIAL LANTAI 5,7 (MARKETING LT.5,7)

33 DENAH LANTAI 9,11 (MARKETING LT.9,11) A-1116 15-Jan-19 0041/SD-ARS/MITRA-LViz/II/2019 11-Feb-19 25-Feb-19 C 14

34 DENAH PARSIAL LANTAI 9,11 (MARKETING LT.9,11)

35 DENAH LANTAI 10 (MARKETING LT.10) A-1117 22-Jan-19 0068/SD-ARS/MITRA-LViz/III/2019 2-Apr-19 13-Apr-19 B 11

36 DENAH PARSIAL LANTAI 10 (MARKETING LT.10)

37 DENAH LANTAI 12 (MARKETING LT.12) A-1117A 5-Feb-19 0073/SD-ARS/MITRA-LViz/IV/2019 8-Apr-19 26-Apr-19 B 18

38 DENAH PARSIAL LANTAI 12 (MARKETING LT.12)


39 DENAH LANTAI 13 (MARKETING LT.15) A-1118 12-Feb-19 0074/SD-ARS/MITRA-LViz/IV/2019 9-Apr-19 26-Apr-19 B 17

40 DENAH PARSIAL LANTAI 13 (MARKETING LT.15)

41 DENAH LANTAI 14 (MARKETING LT.16) A-1118A 19-Feb-19 0077/SD-ARS/MITRA-LViz/IV/2019 10-Apr-19 26-Apr-19 B 16

42 DENAH PARSIAL LANTAI 14 (MARKETING LT.16)

43 DENAH LANTAI 15 (MARKETING LT.17) A-1119 26-Feb-19 0085/SD-ARS/MITRA-LViz/IV/2019 26-Apr-19 10-May-19 B 14

44 DENAH PARSIAL LANTAI 15 (MARKETING LT.17)

45 DENAH LANTAI 16 (MARKETING LT.18) A-1120 5-Mar-19 0086/SD-ARS/MITRA-LViz/IV/2019 26-Apr-19 10-May-19 B 14

46 DENAH PARSIAL LANTAI 16 (MARKETING LT.18)

47 DENAH LANTAI 17 (MARKETING LT.19) A-1121 12-Mar-19 0087/SD-ARS/MITRA-LViz/IV/2019 26-Apr-19 10-May-19 B 14

48 DENAH PARSIAL LANTAI 17 (MARKETING LT.19)

49 DENAH LANTAI 18 (MARKETING LT.20) A-1122 19-Mar-19 0088/SD-ARS/MITRA-LViz/IV/2019 26-Apr-19 10-May-19 B 14

50 DENAH PARSIAL PARSIAL LANTAI 18 (MARKETING LT.20)

51 DENAH LANTAI 19 (MARKETING LT.21) A-1122A 26-Mar-19 0097/SD-ARS/MITRA-LViz/V/2019 17-May-19 21-Jun-19 B 35


52 DENAH PARSIAL LANTAI 19 (MARKETING LT.21)

53 DENAH LANTAI 20 (MARKETING LT.22) A-1123 2-Apr-19 0098/SD-ARS/MITRA-LViz/V/2019 17-May-19 21-Jun-19 B 35

54 DENAH PARSIAL LANTAI 20 (MARKETING LT.22)

55 DENAH LANTAI 21 (MARKETING LT.23) A-1124 9-Apr-19 0099/SD-ARS/MITRA-LViz/V/2019 17-May-19 21-Jun-19 B 35

56 DENAH PARSIAL LANTAI 21 (MARKETING LT.23)


Doc. No : FR-DSG-004
DAFTAR MONITORING SHOP DRAWING Revision : 00

Halaman :

Proyek : Tower 7 - LA VIZ


Gambar / Spesifikasi : ARSITEKTUR
MONITORING SHOP DRAWING

I II
No Judul Gambar For Construction No. Gambar Rencana Nomor PSD
Pengajuan SD
Submitted Kembali Status Durasi Submitted Kembali Status Durasi

57 DENAH LANTAI 22 (MARKETING LT.25) A-1124A 16-Apr-19 0100/SD-ARS/MITRA-LViz/V/2019 17-May-19 21-Jun-19 B 35


58 DENAH PARSIAL LANTAI 22 (MARKETING LT.25)

59 DENAH LANTAI 23 (MARKETING LT.26) A-1125 23-Apr-19 0101/SD-ARS/MITRA-LViz/V/2019 17-May-19 21-Jun-19 B 35

60 DENAH PARSIAL LANTAI 23 (MARKETING LT.26)

61 DENAH LANTAI 24 (MARKETING LT.27) A-1126 30-Apr-19 0102/SD-ARS/MITRA-LViz/V/2019 17-May-19 21-Jun-19 B 35

62 DENAH PARSIAL LANTAI 24 (MARKETING LT.27)

63 DENAH LANTAI 25 (MARKETING LT.28) A-1125 0103/SD-ARS/MITRA-LViz/V/2019 17-May-19 21-Jun-19 B 35

64 DENAH PARSIAL LANTAI 25 (MARKETING LT.28)

65 DENAH LANTAI 26 (MARKETING LT.29) A-1126A 14-May-19 0106/SD-ARS/MITRA-LViz/V/2019 20-May-19 21-Jun-19 B 32

66 DENAH PARSIAL LANTAI 26 (MARKETING LT.29)

67 DENAH LANTAI 27 (MARKETING LT.30) A-1126B 21-May-19 0107/SD-ARS/MITRA-LViz/V/2019 22-May-19 21-Jun-19 B 30

68 DENAH PARSIAL LANTAI 27 (MARKETING LT.30)

69 DENAH LANTAI 28 (MARKETING LT.31) A-1127 11-Jun-19 0108/SD-ARS/MITRA-LViz/V/2019 22-May-19 21-Jun-19 B 30

70 DENAH PARSIAL LANTAI 28 (MARKETING LT.31)

71 DENAH LANTAI 29 (MARKETING LT.32) A-1128 18-Jun-19 0109/SD-ARS/MITRA-LViz/V/2019 22-May-19 21-Jun-19 B 30


72 DENAH PARSIAL LANTAI 29 (MARKETING LT.32)

73 DENAH LANTAI 30 (MARKETING LT.33) A-1128A 25-Jun-19 0112/SD-ARS/MITRA-Lviz/VI/2019 14-Jun-19

74 DENAH PARSIAL LANTAI 30 (MARKETING LT.33)

75 DENAH LANTAI 31 (MARKETING LT.35) A-1128B 2-Jul-19 0113/SD-ARS/MITRA-Lviz/VI/2019 14-Jun-19

76 DENAH PARSIAL LANTAI 31 (MARKETING LT.35)

77 DENAH LANTAI 32 (MARKETING LT.36) A-1129 9-Jul-19

78 DENAH PARSIAL LANTAI 32 (MARKETING LT.36)

79 DENAH LANTAI 33 (MARKETING LT.37) A-1130 16-Jul-19

80 DENAH PARSIAL LANTAI 33 (MARKETING LT.37)

81 DENAH LANTAI 34,36 (MARKETING LT.38,50) PENTHOUSE A-1131 23-Jul-19

82 DENAH PARSIAL LANTAI 34,36 (MARKETING LT.38,50) PENTHOUSE

83 DENAH LANTAI 35,37 (MARKETING LT.39,51) PENTHOUSE A-1132 30-Jul-19

84 DENAH PARSIAL LANTAI 35,37 (MARKETING LT.39,51) PENTHOUSE


85 DENAH LANTAI LMR ROOF TOP & ATAP LMR A-1133; A-1134 20-Aug-19

86 DENAH PARSIAL LANTAI LMR ROOF TOP & ATAP LMR

3 TAMPAK
Doc. No : FR-DSG-004
DAFTAR MONITORING SHOP DRAWING Revision : 00

Halaman :

Proyek : Tower 7 - LA VIZ


Gambar / Spesifikasi : ARSITEKTUR
MONITORING SHOP DRAWING

I II
No Judul Gambar For Construction No. Gambar Rencana Nomor PSD
Pengajuan SD
Submitted Kembali Status Durasi Submitted Kembali Status Durasi

4 POTONGAN

5 TOILET
1 DETAIL TOILET MALL LANTAI LG A-2601 ~ A2601C 13-Jan-19 0029/SD-ARS/MITRA-LViz/I/2019 21-Jan-19 29-Apr-19 27-May-19 B 28

2 DETAIL TOILET MALL LANTAI GF 0032/SD-ARS/MITRA-LViz/V/2019 2-May-19 21-Jun-19 B 50

3 DETAIL TOILET PUBLIC LANTAI GF A-2609 ~ A-2609C 13-Jan-19 0032/SD-ARS/MITRA-LViz/I/2019 25-Jan-19

4 DETAIL TOILET DRIVER LANTAI P1,P3,P6 A-2602 ~ A-2604A 8-Jan-19 0027/SD-ARS/MITRA-LViz/I/2019 18-Jan-19 14-Feb-19 B 27

5 DETAIL TOILET CLUB HOUSE LT. P0 A-2605 ~ A-2605B 26-Feb-19

6 PINTU & JENDELA


1 KEYPLAN PINTU & JENDELA - DENAH LANTAI LG ~ P7 A-6101 ~ A-6109 24-Dec-18 0013/SD-ARS/MITRA-LViz/X/2018 29-Oct-18 7-Dec-18 B 39

2 KEYPLAN PINTU & JENDELA - DENAH LANTAI P0 A-6110 26-Feb-19

3 KEYPLAN PINTU & JENDELA - DENAH LANTAI 1, 2, 3-31 (TYP 1), 5-32 (TYP2) A-6111 ~ A-6114E 22-Jan-19 0040/SD-ARS/MITRA-LViz/II/2019 7-Feb-19 2-Mar-19 B 23
4 KEYPLAN PINTU & JENDELA - DENAH LANTAI 17, 33, 38-51 (PENTHOUSE) A-6115 ~ A6118 13-Aug-19

5 KEYPLAN PINTU & JENDELA - DENAH LANTAI LMR A-6119 10-Sep-19

6 DETAIL PINTU BESI A-6301 ~ A-6304 8-Feb-19

7 DETAIL PINTU ALUMUNIUM A-6401 ~ A-6402 8-Feb-19

8 DETAIL PINTU KAYU A-6501 8-Feb-19

7 PLAFOND & TITIK LAMPU


1 DENAH PLAFOND KORIDOR LANTAI LG A-2201 17-Dec-18 0034/SD-ARS/MITRA-LViz/II/2019 6-Feb-19 8-Mar-19 AB 30

2 RCP PLAFOND & TITIK LAMPU KORIDOR LANTAI LG

3 DENAH PLAFOND KORIDOR LANTAI LLG A-2201A 17-Dec-18 0035/SD-ARS/MITRA-LViz/II/2019 6-Feb-19 25-Feb-19 A 19

4 RCP PLAFOND & TITIK LAMPU KORIDOR LANTAI LLG

5 DENAH PLAFOND MALL LANTAI GF A-2202 26-Dec-18

6 RCP PLAFOND & TITIK LAMPU MALL LANTAI GF


7 DENAH PLAFOND KORIDOR LT. P1 A-2203 6-Jan-19 0019/SD-ARS/MITRA-Lviz/I/2019 8-Jan-19 20-Feb-19 B 43

8 RCP PLAFOND & TITIK LAMPU KORIDOR LT. P1

9 DENAH PLAFOND KORIDOR LT. P2 A-2204 15-Jan-19 0026/SD-ARS/MITRA-LViz/I/2019 18-Jan-19 20-Feb-19 B 33

10 RCP PLAFOND & TITIK LAMPU KORIDOR LT. P2

11 DENAH PLAFOND KORIDOR LT. P3 A-2205 26-Jan-19 0031/SD-ARS/MITRA-LViz/I/2019 24-Jan-19 20-Feb-19 A 27


Doc. No : FR-DSG-004
DAFTAR MONITORING SHOP DRAWING Revision : 00

Halaman :

Proyek : Tower 7 - LA VIZ


Gambar / Spesifikasi : ARSITEKTUR
MONITORING SHOP DRAWING

I II
No Judul Gambar For Construction No. Gambar Rencana Nomor PSD
Pengajuan SD
Submitted Kembali Status Durasi Submitted Kembali Status Durasi

12 RCP PLAFOND & TITIK LAMPU KORIDOR LT. P3


13 DENAH PLAFOND KORIDOR LT. P4 A-2206 4-Feb-19

14 RCP PLAFOND & TITIK LAMPU KORIDOR LT. P4

15 DENAH PLAFOND KORIDOR LT. P5 A-2207 13-Feb-19 0049/SD-ARS/MITRA-LViz/II/2019 19-Feb-19 2-Mar-19 B 11 11-Mar-19 28-Mar-19 B 17

16 RCP PLAFOND & TITIK LAMPU KORIDOR LT. P5

17 DENAH PLAFOND KORIDOR LT. P6 A-2208 24-Feb-19

18 RCP PLAFOND & TITIK LAMPU KORIDOR LT. P6

19 DENAH PLAFOND KORIDOR LT. P7 A-2209 5-Mar-19

20 RCP PLAFOND & TITIK LAMPU KORIDOR LT. P7

21 DENAH PLAFOND KORIDOR LT. P0 A-2210 5-Mar-19

22 RCP PLAFOND & TITIK LAMPU KORIDOR LT. P0

23 DENAH PLAFOND KORIDOR LT. 1 A-2211 25-Dec-18 0057/SD-ARS/MITRA-LViz/III/2019 13-Mar-19 21-Mar-19 C 8

24 RCP PLAFOND & TITIK LAMPU KORIDOR LT. 1

25 DENAH PLAFOND KORIDOR LT.2 A-2212 1-Jan-19

26 RCP PLAFOND & TITIK LAMPU KORIDOR LT. 2


27 DENAH PLAFOND KORIDOR LT. 3-31 (TYP 1) A-2213 ~ A-2213F 8-Jan-19

28 RCP PLAFOND & TITIK LAMPU KORIDOR LT. 3-31 (TYP 1)

29 DENAH PLAFOND KORIDOR LT. 5-32 (TYP 2) A-2214 ~ A-2214E 15-Jan-19

30 RCP PLAFOND & TITIK LAMPU KORIDOR LT. 5-32 (TYP 2)

31 DENAH PLAFOND KORIDOR LT. 17,33 (REFUGEE) A-2215 ~ A-2216 26-Mar-19

32 RCP PLAFOND & TITIK LAMPU KORIDOR LT. 17,33 (REFUGEE)

33 DENAH PLAFOND KORIDOR LT. 38, 50 (PENTHOUSE 1) A-2217 20-Aug-19

34 RCP PLAFOND & TITIK LAMPU KORIDOR LT. 38, 50 (PENTHOUSE 1)

35 DENAH PLAFOND KORIDOR LT. 39, 51 (PENTHOUSE 2) A-2218 27-Aug-19

36 RCP PLAFOND & TITIK LAMPU KORIDOR LT. 39, 51 (PENTHOUSE 2)

8 POLA LANTAI
1 DENAH POLA LANTAI MALL LANTAI LG A-2101 ~ A-2101A 9-Jan-19 0054/SD-ARS/MITRA-LViz/III/2019 4-Mar-19 13-Mar-19 B 9

2 DENAH POLA LANTAI KORIDOR LANTAI LG & LLG A-2101 ~ A-2101A 9-Jan-19 0025/SD-ARS/MITRA-LViz/I/2019 18-Jan-19 12-Feb-19 B 25

3 DENAH POLA LANTAI MALL LANTAI GF A-2102 18-Jan-19 0056/SD-ARS/MITRA-LViz/III/2019 13-Mar-19 21-Mar-19 A 8

4 DENAH POLA LANTAI KORIDOR LANTAI GF A-2102 18-Jan-19 0043/SD-ARS/MITRA-LViz/II/2019 14-Feb-19 25-Feb-19 A 11

5 DENAH POLA LANTAI PODIUM P1 A-2103 30-Dec-18 0004/SD-ARS/MITRA-LViz/I/2019 3-Jan-19 12-Feb-19 A 40

6 DENAH POLA LANTAI PODIUM P2 A-2104 8-Jan-19 0005/SD-ARS/MITRA-LViz/I/2019 3-Jan-19 12-Feb-19 A 40


Doc. No : FR-DSG-004
DAFTAR MONITORING SHOP DRAWING Revision : 00

Halaman :

Proyek : Tower 7 - LA VIZ


Gambar / Spesifikasi : ARSITEKTUR
MONITORING SHOP DRAWING

I II
No Judul Gambar For Construction No. Gambar Rencana Nomor PSD
Pengajuan SD
Submitted Kembali Status Durasi Submitted Kembali Status Durasi

7 DENAH POLA LANTAI PODIUM P3 A-2105 19-Jan-19 0006/SD-ARS/MITRA-LViz/I/2019 3-Jan-19 12-Feb-19 A 40

8 DENAH POLA LANTAI PODIUM P4 A-2106 28-Jan-19 0017/SD-ARS/MITRA-LViz/I/2019 7-Jan-19 12-Feb-19 A 36

9 DENAH POLA LANTAI PODIUM P5 A-2107 6-Feb-19 0018/SD-ARS/MITRA-LViz/I/2019 7-Jan-19 12-Feb-19 A 36

10 DENAH POLA LANTAI PODIUM P6 A-2108 17-Feb-19 0037/SD-ARS/MITRA-LViz/II/2019 6-Feb-19 12-Feb-19 A 6

11 DENAH POLA LANTAI PODIUM P7 A-2109 26-Feb-19 0038/SD-ARS/MITRA-LViz/II/2019 6-Feb-19 12-Feb-19 A 6

12 DENAH POLA LANTAI KORIDOR LT. P0 A-2110 26-Feb-19 0104/SD-ARS/MITRA-LViz/V/2019 17-May-19 27-Jun-19 C 41

13 DENAH POLA LANTAI KORIDOR LT. 1 A-2111 18-Dec-18 0058/SD-ARS/MITRA-LViz/V/2019 13-Mar-19 26-Apr-19 C 44 17-May-19 27-Jun-19 B 41

14 DENAH POLA LANTAI KORIDOR LT. 2-51 (TYPIKAL) A-2112 25-Dec-18 0105/SD-ARS/MITRA-LViz/V/2019 17-May-19 27-Jun-19 B 41

15 DENAH POLA LANTAI KORIDOR LT. LMR A-2119 20-Aug-19

9 TANGGA, RAMP & CORE


1 DETAIL TANGGA #1 - LT. LG - P7 A-2301 ~ A-2301D 17-Dec-18 0021/SD-ARS/MITRA-LViz/I/2019 14-Jan-19 5-Mar-19 A 50

2 DETAIL TANGGA #1 - LT. P7 - ATAP A-2301 ~ A-2301D 5-Mar-19 0062/SD-ARS/MITRA-LViz/III/2019 13-Mar-19 6-Apr-19 B 24

3 DETAIL TANGGA #2 - LT. LG - P7 A-2302 ~ A-2302D 24-Dec-18 0022/SD-ARS/MITRA-LViz/I/2019 14-Jan-19 12-Feb-19 B 29

4 DETAIL TANGGA #2 - LT. P7 - ATAP A-2302 ~ A-2302D 12-Mar-19 0063/SD-ARS/MITRA-LViz/III/2019 13-Mar-19 6-Apr-19 B 24
5 DETAIL TANGGA #3 - LT. LG - P0 A-2303 ~ A-2303A 5-Mar-19 0033/SD-ARS/MITRA-LViz/I/2019 29-Jan-19 2-Mar-19 AB 32

6 DETAIL TANGGA #4 - LT. LLG - LG 17-Dec-18 0065/SD-ARS/MITRA-LViz/III/2019 26-Mar-19 13-Apr-19 B 18

7 DETAIL CORE #6 - DENAH LANTAI LG - P7 A-2401 ~ A-2401i 2-Jan-19 0014/SD-ARS/MITRA-LViz/I/2019 3-Jan-19 12-Feb-19 B 40

8 DETAIL CORE #6 - DENAH LANTAI P0 - ATAP A-2401 ~ A-2401i 21-Mar-19 0069/SD-ARS/MITRA-LViz/III/2019 2-Apr-19 26-Apr-19 B 24

9 DETAIL LOBBY VPL LANTAI LG - P7 A-2501 ~ A-2501D 9-Jan-19

10 DETAIL LOBBY VPL 4,5,6 LANTAI P0 A-2502 ~ A-2502B 28-Mar-19

11 DETAIL LOBBY VPL 4,5 LANTAI 1 - 51 A-2503 ~ A-2503A 17-Jan-19

12 DETAIL LMR LANTAI P5 8-Mar-19

13 DETAIL LMR 1 & 2 LANTAI ATAP A-2304 ~ A-2305 3-Oct-19

14 Denah Ramp #1 Lt. LG - P1 0070/SD-ARS/MITRA-LViz/III/2019 2-Apr-19 13-Apr-19 A 11

15 Denah Ramp #1 Lt. G - P2 A-2701 ~ A-2701H 0093/SD-ARS/MITRA-LViz/V/2019 10-May-19 18-May-19 A 8

16 Denah Ramp #1 Lt. P2 - P3 0094/SD-ARS/MITRA-LViz/V/2019 10-May-19 18-May-19 A 8

17 Denah Ramp #1 Lt. P3 - P4 0095/SD-ARS/MITRA-LViz/V/2019 10-May-19 18-May-19 A 8


18 Denah Ramp #1 Lt. P4 - P5 0096/SD-ARS/MITRA-LViz/V/2019 10-May-19 18-May-19 A 8

19 DETAIL RAMP 2 A-2702 ~ A-2702B

20 DETAIL RAMP 3 A-2703 ~ A-2703A 0020/SD-ARS/MITRA-Lviz/I/2019 8-Jan-19

10 DETAIL UNIT & MALL


Doc. No : FR-DSG-004
DAFTAR MONITORING SHOP DRAWING Revision : 00

Halaman :

Proyek : Tower 7 - LA VIZ


Gambar / Spesifikasi : ARSITEKTUR
MONITORING SHOP DRAWING

I II
No Judul Gambar For Construction No. Gambar Rencana Nomor PSD
Pengajuan SD
Submitted Kembali Status Durasi Submitted Kembali Status Durasi

1 DENAH DROP OFF LANTAI LG A-1101; A-2101 1-Feb-19 0042/SD-ARS/MITRA-LViz/II/2019 11-Feb-19


2 DENAH MALL ENTRANCE LANTAI LG A-1101; A-2101 8-Feb-19

3 DENAH SHOPFRONT MALL LANTAI LG A-1101; A-2101 15-Feb-19

4 DENAH DROP OFF LANTAI GF A-1102; A-2102 10-Feb-19 0047/SD-ARS/MITRA-LViz/II/2019 18-Feb-19 28-Mar-19 B 38

5 DENAH CURB LANTAI GF A-1102; A-2102 17-Feb-19

6 DENAH APARTMENT LOBBY LANTAI GF A-1102; A-2102 24-Feb-19

7 DENAH SHOPFRONT MALL LANTAI GF A-1102; A-2102 3-Mar-19

8 DENAH PRE FUNCTION & FUNCTION ROOM LANTAI GF A-1102; A-2102 10-Mar-19

9 DENAH RUANG GYM LANTAI P0 A-1111; A-2110 21-Mar-19

10 DENAH GAMES ROOM LANTAI P0 A-1111; A-2110 28-Mar-19

11 DENAH POOLDECK & ROOF GARDEN LANTAI P0 A-1110 4-Apr-19

12 DENAH UNIT 3BC LANTAI L0 A-2817 26-Feb-19

13 DENAH UNIT 2BG LANTAI L0 A-2818 26-Feb-19

14 DENAH UNIT 2BF LANTAI L0 A-2803 5-Mar-19

15 DENAH UNIT 2BA LANTAI L0 A-2802 5-Mar-19


16 DENAH UNIT 2BB LANTAI L0 A-2801 12-Mar-19

17 DENAH UNIT 2BC LANTAI L0 A-2816 12-Mar-19

18 DENAH UNIT 3BD LANTAI L0 A-2815 19-Mar-19

19 DENAH UNIT 2BD LANTAI 1 A-2805 18-Dec-18

20 DENAH UNIT 2BE LANTAI 1 A-2804 18-Dec-18

21 DENAH UNIT 3BC LANTAI 1 A-2801 18-Dec-18

22 DENAH UNIT 3BD LANTAI 1 A-2802 25-Dec-18

23 DENAH UNIT 3BC LANTAI 2 A-2803 25-Dec-18

24 DENAH UNIT 3BD LANTAI 2 A-2820 25-Dec-18

25 DENAH UNIT 2BE TIPIKAL A-2819 1-Jan-19 0090/SD-ARS/MITRA-LViz/IV/2019 29-Apr-19 18-Jun-19 B 50

26 DENAH UNIT 2BD TIPIKAL A-2821 1-Jan-19 0089/SD-ARS/MITRA-LViz/IV/2019 26-Apr-19 18-Jun-19 B 53

27 DENAH UNIT 2BA LANTAI 1 A-2817 25-Dec-18 0075/SD-ARS/MITRA-LViz/IV/2019 9-Apr-19 6-May-19 B 27

28 DENAH UNIT 2BB TIPIKAL A-2824 25-Dec-18 0083/SD-ARS/MITRA-LViz/IV/2019 24-Apr-19 18-Jun-19 B 55


29 DENAH UNIT 2BC LANTAI 1 A-2826 1-Jan-19 0079/SD-ARS/MITRA-LViz/IV/2019 11-Apr-19 6-May-19 B 25

30 DENAH UNIT 3BC TIPIKAL A-2808 1-Jan-19 114/SD-ARS/MITRA-LViz/VI/2019 21-Jun-19

31 DENAH UNIT 3BD TIPIKAL A-2824 8-Jan-19

32 DENAH UNIT 3BA LANTAI 1 A-2809 8-Jan-19 0078/SD-ARS/MITRA-LViz/IV/2019 11-Apr-19 6-May-19 B 25

33 DENAH UNIT 3BB TIPIKAL 2 A-2817 5-Mar-19


Doc. No : FR-DSG-004
DAFTAR MONITORING SHOP DRAWING Revision : 00

Halaman :

Proyek : Tower 7 - LA VIZ


Gambar / Spesifikasi : ARSITEKTUR
MONITORING SHOP DRAWING

I II
No Judul Gambar For Construction No. Gambar Rencana Nomor PSD
Pengajuan SD
Submitted Kembali Status Durasi Submitted Kembali Status Durasi

34 DENAH UNIT 3BA+ LANTAI 12,29 A-2824 5-Mar-19


35 DENAH UNIT 3BC+ LANTAI 15,16,29,30 A-2824 2-Apr-19

36 DENAH UNIT 3BB+ LANTAI 19,35 A-2824 9-Apr-19

37 DENAH UNIT 3BD+ LANTAI 20,22,23,36,37 A-2830 30-Apr-19

38 DENAH REFUGEE 1 LANTAI 17 A-2829 4-Jun-19

39 DENAH REFUGEE 2 LANTAI 33 A-2827 4-Jun-19

40 DENAH UNIT 3BC PENTHOUSE A-2828 23-Jul-19

41 DENAH UNIT 2BE PENTHOUSE A-1119; A-2115 19-Mar-19 0001/SD-ARS/MITRA-LVIZ/VII/2018 20-Jul-18 27-Jul-18 B 7

42 DENAH UNIT 2BD PENTHOUSE A-1128A; A-2116 16-Jul-19 0008/SD-ARS/MITRA-Lviz/X/2018 11-Oct-18 26-Oct-18 B 15

43 DENAH UNIT 3BA PENTHOUSE A-2820 13-Aug-19

44 DENAH UNIT 3BB PENTHOUSE A-2809 13-Aug-19

45 DENAH UNIT 2BA PENTHOUSE A-2824 20-Aug-19

46 DENAH UNIT 2BB PENTHOUSE A-2814 20-Aug-19

47 DENAH UNIT 2BC PENTHOUSE A-2813 20-Aug-19

48 DENAH CORNER GUARD KOLOM LT. P1 A-1103 6-Jan-00 0001/SD-ARS/MITRA-LVIZ/VII/2018 20-Jul-18 27-Jul-18 B 7
49 DENAH TYPICAL CORNER GUARD KOLOM LT. P5 A-1107 6-Jan-00 0008/SD-ARS/MITRA-Lviz/X/2018 11-Oct-18 26-Oct-18 B 15

11 UTILITAS
1 DENAH SECURITY, CONTROL ROOM & FCC LANTAI LG A-1101 1-Feb-19

2 DENAH GARBAGE BIN APARTMENT & MALL LANTAI LG A-1101 1-Feb-19 0044/SD-ARS/MITRA-LViz/II/2019 14-Feb-19

3 DENAH LOADING DOCK APARTMENT & MALL LANTAI LG A-1101 1-Feb-19

4 DENAH AHU 1 & 2 LANTAI LG A-1101 Err:509

5 DENAH BTS 1 & 2 LANTAI LG A-1101 8-Feb-19

6 DENAH EL ROOM LANTAI LG - ATAP A-1101 8-Feb-19

7 DENAH LIFT SERVICE, JANITOR & BIN LANTAI LG - GF A-1101 8-Feb-19 0045/SD-ARS/MITRA-LViz/II/2019 14-Feb-19

8 DENAH STORAGE ROOM & WEEKLY TANK ROOM LANTAI LG A-1101; A-1102 15-Feb-19

9 DENAH RUANG ME & EXHAUST DOGHOUSE LANTAI LG A-2906 ~ A-2906A 15-Feb-19

10 DENAH AHU LANTAI LLG A-2906 ~ A-2906A 22-Feb-19

11 DENAH STORAGE & MAIL ROOM LANTAI GF A-1101 22-Feb-19

12 DENAH PANTRY LANTAI GF A-1101A 22-Feb-19


13 DENAH MANAGEMENT OFFICE & ENGINEER ROOM LANTAI GF A-1102 10-Feb-19 0071/SD-ARS/MITRA-LViz/IV/2019 4-Apr-19 23-Apr-19 B 19

14 DENAH AHU LANTAI GF A-1102 10-Feb-19 0076/SD-ARS/MITRA-LViz/IV/2019 9-Apr-19 2-May-19 B 23

15 DENAH DRIVER LOUNGE LANTAI P1 - P7 A-1102 10-Feb-19 0080/SD-ARS/MITRA-LViz/IV/2019 16-Apr-19 6-May-19 B 20


Doc. No : FR-DSG-004
DAFTAR MONITORING SHOP DRAWING Revision : 00

Halaman :

Proyek : Tower 7 - LA VIZ


Gambar / Spesifikasi : ARSITEKTUR
MONITORING SHOP DRAWING

I II
No Judul Gambar For Construction No. Gambar Rencana Nomor PSD
Pengajuan SD
Submitted Kembali Status Durasi Submitted Kembali Status Durasi

16 DENAH RUANG ME LANTAI P6 - P7 A-1103~A-1108 17-Feb-19 0081/SD-ARS/MITRA-Lviz/IV/2019 18-Apr-19 18-May-19 AC 30


17 RUMAH TUNNEL LANTAI LG 0066/SD-ARS/MITRA-LViz/III/2019 26-Mar-19 13-Apr-19 C 18 15-May-19 27-May-19 B 12

18 Denah & Pola Lantai R. Pompa & R. Balancing Tank Lt. Podium 7 0084/SD-ARS/MITRA-LViz/IV/2019 24-Apr-19 19-May-19 B 25

19 DENAH MUSHOLA LANTAI P1 A-2901 ~ A-2904 17-Feb-19 0023/SD-ARS/MITRA-LViz/VI/2019 (R1) 14-Jan-19 25-May-19 C 131 27-Juni-19 10-Juli-19 B 13

13 FAÇADE & PRECAST


1 Layout Precast Parapet Podium Lt. P1-P3 LBR-1 0024/SD-ARS/MITRA-LViz/I/2019 18-Jan-19

14 LAIN-LAIN
1 DETAIL STANDAR #1 A-4201~A-4202 0030/SD-ARS/MITRA-LViz/I/2019 21-Jan-19

2 DETAIL STANDAR #2 0091/SD-ARS/MITRA-LViz/IV/2019 29-Apr-19 18-May-19 B 19

3 DETAIL PRINSIP BALUSTRADE PLANTER BOX & RAILING BALKON

4 Denah & Potongan Typical Struktur Railing Lantai P1, P2 & P3 0092/SD-ARS/MITRA-LViz/V/2019 2-May-19 18-May-19 B 16

5 Mapping Planter Box & Railling Balkon Lt.P1 ~ Roof Top Tampak Utara 0116/SD-ARS/MITRA-LViz/VI/2019 27-Jun-19 11-Juli-19 B 14
LOGO OWNER LOGO MK SCHEDULE SHOP DRAWING
Proyek : Tower 7 - LA VIZ
Paket / Pekerjaan : Pekerjaan Struktur & Finishing
Bidang : ARSITEKTUR

Ref Gambar No. Shop Drawing Rencana Rencana Action Plan


No Judul Gambar Persetujuan SD (Master
Konsultan *) Pengajuan SD **) ***) Schedule)
x
A STANDAR DRAWING, SCHEDULE MATERIAL
STANDAR DRAWING
1 SCHEDULE MATERIAL A.00.

1 TAPAK / SITEPLAN
1 SITE PLAN A-0006 A.01.

2 LAYOUT PLAN A-0007 A.01.

2 DENAH / LAYOUT PLAN


1 DENAH LANTAI LOWER GROUND A-1101 A.02.01.01 19-Nov-18 3-Dec-18 19-Dec-18

2 DENAH PARSIAL LANTAI LOWER GROUND


3 DENAH LANTAI LLG (TUNNEL) A-1101A A.02.01.10

4 DENAH PARSIAL LANTAI LLG (TUNNEL)

5 DENAH LANTAI DASAR / GROUND FLOOR A-1102 A.02.02.01 28-Nov-18 12-Dec-18 28-Dec-18
6 DENAH PARSIAL LANTAI DASAR / GROUND FLOOR

7 DENAH LANTAI P1 A-1103 A.02.03.01 9-Dec-18 23-Dec-18 8-Jan-19


8 DENAH PARSIAL LANTAI P1

9 DENAH LANTAI P2 A-1104 A.02.04.01 18-Dec-18 1-Jan-19 17-Jan-19


10 DENAH PARSIAL LANTAI P2

11 DENAH LANTAI P3 A-1105 A.02.05.01 29-Dec-18 12-Jan-19 28-Jan-19

12 DENAH PARSIAL LANTAI P3


13 DENAH LANTAI P4 A-1106 A.02.06.01 7-Jan-19 21-Jan-19 6-Feb-19

14 DENAH PARSIAL LANTAI P4


15 DENAH LANTAI P5 A-1107 A.02.07.01 16-Jan-19 30-Jan-19 15-Feb-19

16 DENAH PARSIAL LANTAI P5


17 DENAH LANTAI P6 A-1108 A.02.08.01 27-Jan-19 10-Feb-19 26-Feb-19

18 DENAH PARSIAL LANTAI P6

19 DENAH LANTAI P7 A-1109 A.02.09.01 5-Feb-19 19-Feb-19 7-Mar-19


20 DENAH PARSIAL LANTAI P7

21 DENAH LANTAI POOLDECK A-1110 A.02.10.01


22 DENAH PARSIAL LANTAI POOLDECK

23 DENAH LANTAI 1 (MARKETING LT.0) A-1111 A.02.11.01 5-Feb-19 19-Feb-19 7-Mar-19


24 DENAH PARSIAL LANTAI 1 (MARKETING LT.0)

25 DENAH LANTAI 2 (MARKETING LT.1) A-1112 A.02.12.01 27-Nov-18 11-Dec-18 27-Dec-18


26 DENAH PARSIAL LANTAI 2 (MARKETING LT.1)

27 DENAH LANTAI 3 (MARKETING LT.2) A-1113 A.02.13.01 4-Dec-18 18-Dec-18 3-Jan-19

28 DENAH PARSIAL LANTAI 3 (MARKETING LT.2)


29 DENAH LANTAI 4,6,8 (MARKETING LT.3,6,8) - TYPIKAL 1 A-1114 A.02.14.01 11-Dec-18 25-Dec-18 10-Jan-19

30 DENAH PARSIAL LANTAI 4,6,8 (MARKETING LT.3,6,8)


31 DENAH LANTAI 5,7 (MARKETING LT.5,7) - TYIPIKAL 2 A-1115 A.02.15.01 18-Dec-18 1-Jan-19 17-Jan-19

32 DENAH PARSIAL LANTAI 5,7 (MARKETING LT.5,7)


33 DENAH LANTAI 9,11 (MARKETING LT.9,11) A-1116 A.02.16.01 15-Jan-19 29-Jan-19 14-Feb-19

34 DENAH PARSIAL LANTAI 9,11 (MARKETING LT.9,11)

35 DENAH LANTAI 10 (MARKETING LT.10) A-1117 A.02.17.01 22-Jan-19 5-Feb-19 21-Feb-19


36 DENAH PARSIAL LANTAI 10 (MARKETING LT.10)

37 DENAH LANTAI 12 (MARKETING LT.12) A-1117A A.02.18.01 5-Feb-19 19-Feb-19 7-Mar-19


38 DENAH PARSIAL LANTAI 12 (MARKETING LT.12)

39 DENAH LANTAI 13 (MARKETING LT.15) A-1118 A.02.19.01 12-Feb-19 26-Feb-19 14-Mar-19


40 DENAH PARSIAL LANTAI 13 (MARKETING LT.15)

41 DENAH LANTAI 14 (MARKETING LT.16) A-1118A A.02.20.01 19-Feb-19 5-Mar-19 21-Mar-19

42 DENAH PARSIAL LANTAI 14 (MARKETING LT.16)


43 DENAH LANTAI 15 (MARKETING LT.17) A-1119 A.02.21.01 26-Feb-19 12-Mar-19 28-Mar-19
LOGO OWNER LOGO MK SCHEDULE SHOP DRAWING
Proyek : Tower 7 - LA VIZ
Paket / Pekerjaan : Pekerjaan Struktur & Finishing
Bidang : ARSITEKTUR

Ref Gambar No. Shop Drawing Rencana Rencana Action Plan


No Judul Gambar Konsultan *) Pengajuan SD **) Persetujuan SD (Master
***) Schedule)

44 DENAH PARSIAL LANTAI 15 (MARKETING LT.17)


45 DENAH LANTAI 16 (MARKETING LT.18) A-1120 A.02.22.01 5-Mar-19 19-Mar-19 4-Apr-19

46 DENAH PARSIAL LANTAI 16 (MARKETING LT.18)


47 DENAH LANTAI 17 (MARKETING LT.19) A-1121 A.02.23.01 12-Mar-19 26-Mar-19 11-Apr-19

48 DENAH PARSIAL LANTAI 17 (MARKETING LT.19)


49 DENAH LANTAI 18 (MARKETING LT.20) A-1122 A.02.24.01 19-Mar-19 2-Apr-19 18-Apr-19

50 DENAH PARSIAL PARSIAL LANTAI 18 (MARKETING LT.20)

51 DENAH LANTAI 19 (MARKETING LT.21) A-1122A A.02.25.01 26-Mar-19 9-Apr-19 25-Apr-19


52 DENAH PARSIAL LANTAI 19 (MARKETING LT.21)

53 DENAH LANTAI 20 (MARKETING LT.22) A-1123 A.02.26.01 2-Apr-19 16-Apr-19 2-May-19


54 DENAH PARSIAL LANTAI 20 (MARKETING LT.22)

55 DENAH LANTAI 21 (MARKETING LT.23) A-1124 A.02.27.01 9-Apr-19 23-Apr-19 9-May-19


56 DENAH PARSIAL LANTAI 21 (MARKETING LT.23)

57 DENAH LANTAI 22 (MARKETING LT.25) A-1124A A.02.28.01 16-Apr-19 30-Apr-19 16-May-19

58 DENAH PARSIAL LANTAI 22 (MARKETING LT.25)


59 DENAH LANTAI 23,25 (MARKETING LT.26,28) A-1125 A.02.29.01 23-Apr-19 7-May-19 23-May-19

60 DENAH PARSIAL LANTAI 23,25 (MARKETING LT.26,28)


61 DENAH LANTAI 24 (MARKETING LT.27) A-1126 A.02.30.01 30-Apr-19 14-May-19 30-May-19

62 DENAH PARSIAL LANTAI 24 (MARKETING LT.27)


63 DENAH LANTAI 26 (MARKETING LT.29) A-1126A A.02.31.01 14-May-19 28-May-19 13-Jun-19

64 DENAH PARSIAL LANTAI 26 (MARKETING LT.29)

65 DENAH LANTAI 27 (MARKETING LT.30) A-1126B A.02.32.01 21-May-19 4-Jun-19 20-Jun-19


66 DENAH PARSIAL LANTAI 27 (MARKETING LT.30)

67 DENAH LANTAI 28 (MARKETING LT.31) A-1127 A.02.33.01 11-Jun-19 25-Jun-19 11-Jul-19


68 DENAH PARSIAL LANTAI 28 (MARKETING LT.31)

69 DENAH LANTAI 29 (MARKETING LT.32) A-1128 A.02.34.01 18-Jun-19 2-Jul-19 18-Jul-19


70 DENAH PARSIAL LANTAI 29 (MARKETING LT.32)

71 DENAH LANTAI 30 (MARKETING LT.33) A-1128A A.02.35.01 25-Jun-19 9-Jul-19 25-Jul-19

72 DENAH PARSIAL LANTAI 30 (MARKETING LT.33)


73 DENAH LANTAI 31 (MARKETING LT.35) A-1128B A.02.36.01 2-Jul-19 16-Jul-19 1-Aug-19

74 DENAH PARSIAL LANTAI 31 (MARKETING LT.35)


75 DENAH LANTAI 32 (MARKETING LT.36) A-1129 A.02.37.01 9-Jul-19 23-Jul-19 8-Aug-19

76 DENAH PARSIAL LANTAI 32 (MARKETING LT.36)


77 DENAH LANTAI 33 (MARKETING LT.37) A-1130 A.02.38.01 16-Jul-19 30-Jul-19 15-Aug-19

78 DENAH PARSIAL LANTAI 33 (MARKETING LT.37)


79 DENAH LANTAI 34,36 (MARKETING LT.38,50) PENTHOUSE A-1131 A.02.39.01 23-Jul-19 6-Aug-19 22-Aug-19

80 DENAH PARSIAL LANTAI 34,36 (MARKETING LT.38,50) PENTHOUSE

81 DENAH LANTAI 35,37 (MARKETING LT.39,51) PENTHOUSE A-1132 A.02.40.01 30-Jul-19 13-Aug-19 29-Aug-19
82 DENAH PARSIAL LANTAI 35,37 (MARKETING LT.39,51) PENTHOUSE

83 DENAH LANTAI LMR ROOF TOP & ATAP LMR A-1133; A-1134 A.02.41.01 20-Aug-19 3-Sep-19 19-Sep-19
84 DENAH PARSIAL LANTAI LMR ROOF TOP & ATAP LMR

3 TAMPAK

4 POTONGAN

5 TOILET
1 DETAIL TOILET MALL LANTAI LG & GF A-2601 ~ A2601C A.05.01.01- 13-Jan-19 20-Jan-19

2 DETAIL TOILET PUBLIC LANTAI GF A-2609 ~ A-2609C A.05.02.01-19 13-Jan-19 20-Jan-19

3 DETAIL TOILET DRIVER LANTAI P1,P3,P6 A-2602 ~ A-2604A A.05.03.01- 8-Jan-19 15-Jan-19
4 DETAIL TOILET CLUB HOUSE LT. P0 A-2605 ~ A-2605B A.05.04.01- 26-Feb-19 5-Mar-19
LOGO OWNER LOGO MK SCHEDULE SHOP DRAWING
Proyek : Tower 7 - LA VIZ
Paket / Pekerjaan : Pekerjaan Struktur & Finishing
Bidang : ARSITEKTUR

Ref Gambar No. Shop Drawing Rencana Rencana Action Plan


No Judul Gambar Konsultan *) Pengajuan SD **) Persetujuan SD (Master
***) Schedule)

6 PINTU & JENDELA


1 KEYPLAN PINTU & JENDELA - DENAH LANTAI LG ~ P7 A-6101 ~ A-6109 A.06.01.01-14 24-Dec-18 31-Dec-18
2 KEYPLAN PINTU & JENDELA - DENAH LANTAI P0 A-6110 A.06.01.15 26-Feb-19 5-Mar-19

3 KEYPLAN PINTU & JENDELA - DENAH LANTAI 1, 2, 3-31 (TYP 1), 5-32 (TYP2) A-6111 ~ A-6114E A.06.01.16-19 22-Jan-19 29-Jan-19
4 KEYPLAN PINTU & JENDELA - DENAH LANTAI 17, 33, 38-51 (PENTHOUSE) A-6115 ~ A6118 A.06.01.20-25 13-Aug-19 20-Aug-19

5 KEYPLAN PINTU & JENDELA - DENAH LANTAI LMR A-6119 A.06.01.26 10-Sep-19 17-Sep-19

6 DETAIL PINTU BESI A-6301 ~ A-6304 A.06.02.01 8-Feb-19 15-Feb-19


7 DETAIL PINTU ALUMUNIUM A-6401 ~ A-6402 A.06.03.01- 8-Feb-19 15-Feb-19

8 DETAIL PINTU KAYU A-6501 A.06.04.01- 8-Feb-19 15-Feb-19

7 PLAFOND & TITIK LAMPU


1 DENAH PLAFOND KORIDOR LANTAI LG & LLG A-2201 ~ A-2201A A.07.01.01- 17-Dec-18 24-Dec-18

2 RCP PLAFOND & TITIK LAMPU KORIDOR LANTAI LG & LLG

3 DENAH PLAFOND KORIDOR LANTAI GF A-2202 A.07.02.01- 26-Dec-18 2-Jan-19


4 RCP PLAFOND & TITIK LAMPU KORIDOR LANTAI GF

5 DENAH PLAFOND KORIDOR LT. P1 A-2203 A.07.03.01- 6-Jan-19 13-Jan-19


6 RCP PLAFOND & TITIK LAMPU KORIDOR LT. P1

7 DENAH PLAFOND KORIDOR LT. P2 A-2204 A.07.04.01- 15-Jan-19 22-Jan-19


8 RCP PLAFOND & TITIK LAMPU KORIDOR LT. P2

9 DENAH PLAFOND KORIDOR LT. P3 A-2205 A.07.05.01- 26-Jan-19 2-Feb-19

10 RCP PLAFOND & TITIK LAMPU KORIDOR LT. P3


11 DENAH PLAFOND KORIDOR LT. P4 A-2206 A.07.06.01- 4-Feb-19 11-Feb-19

12 RCP PLAFOND & TITIK LAMPU KORIDOR LT. P4


13 DENAH PLAFOND KORIDOR LT. P5 R A.07.07.01-04 13-Feb-19 20-Feb-19

14 RCP PLAFOND & TITIK LAMPU KORIDOR LT. P5


15 DENAH PLAFOND KORIDOR LT. P6 A-2208 A.07.08.01- 24-Feb-19 3-Mar-19

16 RCP PLAFOND & TITIK LAMPU KORIDOR LT. P6

17 DENAH PLAFOND KORIDOR LT. P7 A-2209 A.07.09.01- 5-Mar-19 12-Mar-19


18 RCP PLAFOND & TITIK LAMPU KORIDOR LT. P7

19 DENAH PLAFOND KORIDOR LT. P0 A-2210 A.07.10.01- 5-Mar-19 12-Mar-19


20 RCP PLAFOND & TITIK LAMPU KORIDOR LT. P0

21 DENAH PLAFOND KORIDOR LT. 1 A-2211 A.07.11.01-06 25-Dec-18 1-Jan-19


22 RCP PLAFOND & TITIK LAMPU KORIDOR LT. 1

23 DENAH PLAFOND KORIDOR LT.2 A-2212 A.07.12.01- 1-Jan-19 8-Jan-19


24 RCP PLAFOND & TITIK LAMPU KORIDOR LT. 2

25 DENAH PLAFOND KORIDOR LT. 3-31 (TYP 1) A-2213 ~ A-2213F A.07.13.01- 8-Jan-19 15-Jan-19

26 RCP PLAFOND & TITIK LAMPU KORIDOR LT. 3-31 (TYP 1)


27 DENAH PLAFOND KORIDOR LT. 5-32 (TYP 2) A-2214 ~ A-2214E A.07.14.01- 15-Jan-19 22-Jan-19

28 RCP PLAFOND & TITIK LAMPU KORIDOR LT. 5-32 (TYP 2)


29 DENAH PLAFOND KORIDOR LT. 17,33 (REFUGEE) A-2215 ~ A-2216 A.07.15.01- 26-Mar-19 2-Apr-19

30 RCP PLAFOND & TITIK LAMPU KORIDOR LT. 17,33 (REFUGEE)


31 DENAH PLAFOND KORIDOR LT. 38, 50 (PENTHOUSE 1) A-2217 A.07.16.01- 20-Aug-19 27-Aug-19

32 RCP PLAFOND & TITIK LAMPU KORIDOR LT. 38, 50 (PENTHOUSE 1)

33 DENAH PLAFOND KORIDOR LT. 39, 51 (PENTHOUSE 2) A-2218 A.07.17.01- 27-Aug-19 3-Sep-19
34 RCP PLAFOND & TITIK LAMPU KORIDOR LT. 39, 51 (PENTHOUSE 2)

8 POLA LANTAI
1 DENAH POLA LANTAI KORIDOR LANTAI LG & LLG A-2101 ~ A-2101A A.08.01.01-07 9-Jan-19 23-Jan-19

2 DENAH POLA LANTAI MALL LAVIZ LANTAI LG A.08.01.08-12

3 DENAH POLA LANTAI KORIDOR LANTAI GF A-2102 A.08.02.01- 18-Jan-19 1-Feb-19

4 DENAH POLA LANTAI PODIUM P1 A-2103 A.08.03.01- 30-Dec-18 6-Jan-19

5 DENAH POLA LANTAI PODIUM P2 A-2104 A.08.04.01- 8-Jan-19 15-Jan-19


LOGO OWNER LOGO MK SCHEDULE SHOP DRAWING
Proyek : Tower 7 - LA VIZ
Paket / Pekerjaan : Pekerjaan Struktur & Finishing
Bidang : ARSITEKTUR

Ref Gambar No. Shop Drawing Rencana Rencana Action Plan


No Judul Gambar Konsultan *) Pengajuan SD **) Persetujuan SD (Master
***) Schedule)

6 DENAH POLA LANTAI PODIUM P3 A-2105 A.08.05.01- 19-Jan-19 26-Jan-19

7 DENAH POLA LANTAI PODIUM P4 A-2106 A.08.06.01- 28-Jan-19 4-Feb-19

8 DENAH POLA LANTAI PODIUM P5 A-2107 A.08.07.01- 6-Feb-19 13-Feb-19

9 DENAH POLA LANTAI PODIUM P6 A-2108 A.08.08.01- 17-Feb-19 24-Feb-19

10 DENAH POLA LANTAI PODIUM P7 A-2109 A.08.09.01- 26-Feb-19 5-Mar-19

11 DENAH POLA LANTAI KORIDOR LT. P0 A-2110 A.08.10.01-05 26-Feb-19 5-Mar-19

12 DENAH POLA LANTAI KORIDOR LT. 1 A-2111 A.08.11.01-05 18-Dec-18 25-Dec-18

13 DENAH POLA LANTAI KORIDOR LT. 2 A-2112 A.08.12.01-05 25-Dec-18 1-Jan-19

14 DENAH POLA LANTAI KORIDOR LT. 3-31 (TYP 1) A-2113 ~ A-2213F A.08.13.01- 1-Jan-19 8-Jan-19

15 DENAH POLA LANTAI KORIDOR LT. 5-32 (TYP 2) A-2114 ~ A-2114E A.08.14.01- 8-Jan-19 15-Jan-19

16 DENAH POLA LANTAI KORIDOR LT. 17,33 (REFUGEE) A-2115 ~ A-2116 A.08.15.01- 19-Mar-19 26-Mar-19

17 DENAH POLA LANTAI KORIDOR LT. 38-51 (PENTHOUSE) A-2117 ~ A-2118 A.08.16.01- 13-Aug-19 20-Aug-19

18 DENAH POLA LANTAI KORIDOR LT. LMR A-2119 A.08.17.01- 20-Aug-19 27-Aug-19

9 TANGGA, RAMP & CORE


1 DETAIL TANGGA #1 - LT. LG - P7 A-2301 ~ A-2301D A.09.01.01-12 17-Dec-18 24-Dec-18

2 DETAIL TANGGA #1 - LT. P7 - ATAP A-2301 ~ A-2301D A.09.02.01-19 5-Mar-19 12-Mar-19


3 DETAIL TANGGA #2 - LT. LG - P7 A-2302 ~ A-2302D A.09.03.01-07 24-Dec-18 31-Dec-18

4 DETAIL TANGGA #2 - LT. P7 - ATAP A-2302 ~ A-2302D A.09.04.01-12 12-Mar-19 19-Mar-19


5 DETAIL TANGGA #3 - LT. LG - P0 A-2303 ~ A-2303A A.09.05.01-14 5-Mar-19 12-Mar-19

6 DETAIL TANGGA #4 - LT. LLG - LG A.09.06.01- 17-Dec-18 24-Dec-18

7 DETAIL TANGGA 1 & 2 (UJUNG TUNNEL) LT. LLG - LG A.09.07.01- 17-Dec-18 24-Dec-18
8 DETAIL CORE #6 - DENAH LANTAI LG - P7 A-2401 ~ A-2401i A.09.08.01-06 2-Jan-19 9-Jan-19

9 DETAIL CORE #6 - DENAH LANTAI P0 - ATAP A-2401 ~ A-2401i A.09.08.07-14 21-Mar-19 28-Mar-19
10 DETAIL LOBBY VPL LANTAI LG - P7 A-2501 ~ A-2501D A.09.09.01- 9-Jan-19 16-Jan-19

11 DETAIL LOBBY VPL 4,5,6 LANTAI P0 A-2502 ~ A-2502B A.09.09.01- 28-Mar-19 4-Apr-19
12 DETAIL LOBBY VPL 4,5 LANTAI 1 - 51 A-2503 ~ A-2503A A.09.09.01- 17-Jan-19 24-Jan-19

13 DETAIL LMR LANTAI P5 A.09.09.01- 8-Mar-19 15-Mar-19

14 DETAIL LMR 1 & 2 LANTAI ATAP A-2304 ~ A-2305 A.09.10.01- 3-Oct-19 10-Oct-19
15 DETAIL RAMP 1 A-2701 ~ A-2701H A.09.11.01-

16 DETAIL RAMP 2 A-2702 ~ A-2702B A.09.12.01-


17 DETAIL RAMP 3 A-2703 ~ A-2703A A.09.13.01-

10 DETAIL UNIT & MALL


1 DENAH DROP OFF LANTAI LG A-1101; A-2101 A.10.01.01-07 1-Feb-19 15-Feb-19 27-Nov-18
2 DENAH MALL ENTRANCE LANTAI LG A-1101; A-2101 A.10.02.01- 8-Feb-19 22-Feb-19

3 DENAH SHOPFRONT MALL LANTAI LG A-1101; A-2101 A.10.03.01- 15-Feb-19 1-Mar-19 4-Dec-18

4 DENAH DROP OFF LANTAI GF A-1102; A-2102 A.10.04.01-06 10-Feb-19 24-Feb-19


5 DENAH CURB LANTAI GF A-1102; A-2102 A.10.05.01- 17-Feb-19 3-Mar-19

6 DENAH APARTMENT LOBBY LANTAI GF A-1102; A-2102 A.10.06.01- 24-Feb-19 10-Mar-19


7 DENAH SHOPFRONT MALL LANTAI GF A-1102; A-2102 A.10.07.01- 3-Mar-19 17-Mar-19

8 DENAH PRE FUNCTION & FUNCTION ROOM LANTAI GF A-1102; A-2102 A.10.08.01- 10-Mar-19 24-Mar-19
9 DENAH RUANG GYM LANTAI P0 A-1111; A-2110 21-Mar-19 4-Apr-19

10 DENAH GAMES ROOM LANTAI P0 A-1111; A-2110 28-Mar-19 11-Apr-19

11 DENAH POOLDECK & ROOF GARDEN LANTAI P0 A-1110 4-Apr-19 18-Apr-19


12 DENAH UNIT 3BC LANTAI L0 A-2817 26-Feb-19 5-Mar-19

13 DENAH UNIT 2BG LANTAI L0 A-2818 26-Feb-19 5-Mar-19


14 DENAH UNIT 2BF LANTAI L0 A-2803 5-Mar-19 12-Mar-19

15 DENAH UNIT 2BA LANTAI L0 A-2802 5-Mar-19 12-Mar-19


16 DENAH UNIT 2BB LANTAI L0 A-2801 12-Mar-19 19-Mar-19

17 DENAH UNIT 2BC LANTAI L0 A-2816 12-Mar-19 19-Mar-19

18 DENAH UNIT 3BD LANTAI L0 A-2815 19-Mar-19 26-Mar-19


19 DENAH UNIT 2BD LANTAI 1 A-2805 A.10.09.01-11 18-Dec-18 25-Dec-18
LOGO OWNER LOGO MK SCHEDULE SHOP DRAWING
Proyek : Tower 7 - LA VIZ
Paket / Pekerjaan : Pekerjaan Struktur & Finishing
Bidang : ARSITEKTUR

Ref Gambar No. Shop Drawing Rencana Rencana Action Plan


No Judul Gambar Konsultan *) Pengajuan SD **) Persetujuan SD (Master
***) Schedule)

20 DENAH UNIT 2BE LANTAI 1 A-2804 A.10.10.01-11 18-Dec-18 25-Dec-18


21 DENAH UNIT 3BC LANTAI 1 A-2801 18-Dec-18 25-Dec-18

22 DENAH UNIT 3BD LANTAI 1 A-2802 25-Dec-18 1-Jan-19


23 DENAH UNIT 3BC LANTAI 2 A-2801 25-Dec-18 1-Jan-19

24 DENAH UNIT 3BD LANTAI 2 A-2802 25-Dec-18 1-Jan-19


25 DENAH UNIT 2BE TIPIKAL A-2801 A.10.15.01-11 1-Jan-19 8-Jan-19

26 DENAH UNIT 2BD TIPIKAL A-2802 1-Jan-19 8-Jan-19

27 DENAH UNIT 2BA TIPIKAL A-2803 A.10.13.01-15 25-Dec-18 1-Jan-19


28 DENAH UNIT 2BB TIPIKAL A-2820 A.10.11.01-14 25-Dec-18 1-Jan-19

29 DENAH UNIT 2BC TIPIKAL A-2819 A.10.14.01-15 1-Jan-19 8-Jan-19


30 DENAH UNIT 3BC TIPIKAL A-2821 1-Jan-19 8-Jan-19

31 DENAH UNIT 3BD TIPIKAL A-2817 8-Jan-19 15-Jan-19


32 DENAH UNIT 3BA TIPIKAL 1 A-2824 A.10.12.01-26 8-Jan-19 15-Jan-19

33 DENAH UNIT 3BB TIPIKAL 2 A-2826 5-Mar-19 12-Mar-19

34 DENAH UNIT 3BA+ LANTAI 12,29 A-2808 5-Mar-19 12-Mar-19


35 DENAH UNIT 3BC+ LANTAI 15,16,29,30 A-2824 2-Apr-19 9-Apr-19

36 DENAH UNIT 3BB+ LANTAI 19,35 A-2809 9-Apr-19 16-Apr-19


37 DENAH UNIT 3BD+ LANTAI 20,22,23,36,37 A-2817 30-Apr-19 7-May-19

38 DENAH REFUGEE 1 LANTAI 17 A-2824 4-Jun-19 11-Jun-19


39 DENAH REFUGEE 2 LANTAI 33 A-2824 4-Jun-19 11-Jun-19

40 DENAH UNIT 3BC PENTHOUSE A-2824 23-Jul-19 30-Jul-19

41 DENAH UNIT 2BE PENTHOUSE A-2830 19-Mar-19 26-Mar-19


42 DENAH UNIT 2BD PENTHOUSE A-2829 16-Jul-19 23-Jul-19

43 DENAH UNIT 3BA PENTHOUSE A-2827 13-Aug-19 20-Aug-19


44 DENAH UNIT 3BB PENTHOUSE A-2828 13-Aug-19 20-Aug-19

45 DENAH UNIT 2BA PENTHOUSE A-1119; A-2115 20-Aug-19 27-Aug-19


46 DENAH UNIT 2BB PENTHOUSE A-1128A; A-2116 20-Aug-19 27-Aug-19

47 DENAH UNIT 2BC PENTHOUSE A-2820 20-Aug-19 27-Aug-19

48 DENAH CORNER GUARD KOLOM LT. P1 A-1103 A.10.01.01-02 6-Jan-00 13-Jan-00


49 DENAH TYPICAL CORNER GUARD KOLOM LT. P5 A-1107 A.10.01.03-06 6-Jan-00 13-Jan-00

50 DENAH 2BD (03) LANTAI 05 (MEMO) A.10.09.12-18


51 DENAH 2BC (09) LANTAI 12 (MEMO) A.10.14.16-19

11 UTILITAS
1 DENAH SECURITY, CONTROL ROOM & FCC LANTAI LG A-1101 A.11.01.01-06 1-Feb-19 8-Feb-19
2 DENAH GARBAGE BIN APARTMENT & MALL LANTAI LG A-1101 A.11.02.01-09 1-Feb-19 8-Feb-19

3 DENAH AHU 1 & 2 LANTAI LG A-1101 A.11.03.01-10 28-Feb-00 7-Mar-00

4 DENAH LOADING DOCK APARTMENT & MALL LANTAI LG A-1101 A.11.04.01-03 1-Feb-19 8-Feb-19
5 DENAH BTS 1 & 2 LANTAI LG A-1101 A.11.05.01-04 8-Feb-19 15-Feb-19

6 DENAH EL ROOM LANTAI LG - ATAP A-1101 A.11.06.01-14 8-Feb-19 15-Feb-19


7 DENAH LIFT SERVICE, JANITOR & BIN LANTAI LG - GF A-1101 A.11.07.01-08 8-Feb-19 15-Feb-19

8 DENAH STORAGE & WEEKLY TANK ROOM LANTAI LG A-1101; A-1102 A.11.08.01-06 15-Feb-19 22-Feb-19
9 DENAH RUANG ME & EXHAUST DOGHOUSE LANTAI LG A-2906 ~ A-2906A A.11.09.01- 15-Feb-19 22-Feb-19

10 DENAH AHU LANTAI LLG A-2906 ~ A-2906A A.11.10.01- 22-Feb-19 1-Mar-19

11 DENAH STORAGE & MAIL ROOM LANTAI GF A-1101 A.11.11.01-05 22-Feb-19 1-Mar-19
12 DENAH PANTRY LANTAI GF A-1101A A.11.12.01-05 22-Feb-19 1-Mar-19

13 DENAH MANAGEMENT OFFICE & ENGINEER ROOM LANTAI GF A-1102 A.11.13.01-05 10-Feb-19 17-Feb-19
14 DENAH AHU LANTAI GF A-1102 A.11.14.01-05 10-Feb-19 17-Feb-19

15 DENAH DRIVER LOUNGE LANTAI P1 - P7 A-1102 A.11.15.01-04 10-Feb-19 17-Feb-19


16 DENAH RUANG ME LANTAI P6 - P7 A-1103~A-1108 A.11.16.01-08 17-Feb-19 24-Feb-19

17 RUMAH TUNNEL LANTAI LG A.11.17.01-04

18 DENAH MUSHOLA LANTAI P1 A-2901 ~ A-2904 A.11.18.01-11 17-Feb-19 24-Feb-19


19 DENAH R. POMPA & BALANCING TANK LT. P7 A.11.19.01-04
LOGO OWNER LOGO MK SCHEDULE SHOP DRAWING
Proyek : Tower 7 - LA VIZ
Paket / Pekerjaan : Pekerjaan Struktur & Finishing
Bidang : ARSITEKTUR

Ref Gambar No. Shop Drawing Rencana Rencana Action Plan


No Judul Gambar Konsultan *) Pengajuan SD **) Persetujuan SD (Master
***) Schedule)

14 LAIN-LAIN
1 DETAIL STANDAR 1 - 1B A-4201 ~ A-4202 A.14.01-03
2 DETAIL PRINSIP BALUSTRADE PLANTER BOX A.14.04-05

3 Mapping Planter Box & Railling Balkon Lt.P1 ~ Roof Top Tampak Utara A.14.09-12

Note : *) Nomer shop drawing sesuai Standart Drawing MITRA KONSTRUKSI


**) RENCANA PENGAJUAN SHOP DWG adalah selambatnya 1 bulan sebelum pekerjaan rencana dilaksanakan menurut master schedule yang disetujui
***) RENCANA PERSETUJUAN SHOP DWG adalah selambatnya maksimal 7 hari setelah pengajuan gambar

Surabaya, 28 Desember 2018


Diketahui Oleh, Dibuat Oleh,

Himawan Pranoto Retno Palupi


Project Manager Chief Engineer
TOWER 7 - LA VIZ
LANTAI ELEVASI TIPIKAL TIPIKAL 1 TIPIKAL 2
ATAP FFL. +153.700 1 2BA 1 3BA 1 3BB
51 FFL. +149.900 2 2BB
50 FFL. +146.600 3 2BC
39 FFL. +143.300 PENTHOUSE 2 4 2BD
38 FFL. +140.000 PENTHOUSE 1 5 2BE
37 FFL. +136.800 6 3BC
36 FFL. +133.600 7 3BD
35 FFL. +130.400
33 FFL. +127.200 REFUGEE LANTAI 12, 29
32 FFL. +123.850 3BA+
31 FFL. +120.650
30 FFL. 117.450 LANTAI 15, 16, 29, 30
29 FFL. 114.250 3BC+
28 FFL. +111.050
27 FFL. +107.850 LANTAI 19, 35
26 FFL. +104.650 3BB+
25 FFL.+ 101.450
23 FFL. +98.250 LANTAI 20, 22, 23, 36, 37
22 FFL. +95.050 3BD+
21 FFL. +91.850
20 FFL. +88.650
19 FFL. +85.450
18 FFL. +82.250
17 FFL. +79.050 REFUGEE
16 FFL. +75.700
15 FFL. +72.500
12 FFL. +69.300
11 FFL. +66.100
10 FFL. +62.900
9 FFL. +59.700
8 FFL. +56.500
7 FFL. +53.300
6 FFL. +50.100
5 FFL. +46.900 TIPIKAL 2
3 FFL. +43.700 TIPIKAL 1
2 FFL. +40.400
1 FFL. +37.100
L0 FFL. +33.400
P7 FFL. +28.800
P6 FFL. +25.900
P5 FFL. +22.900
P4 FFL. +19.900
P3 FFL. +16.900
P2 FFL. +13.900
P1 FFL. +10.900
GF FFL. +5.000
LG FFL. +0.000
LLG FFL. -3.200
MONITORING APPROVAL OF MATERIAL
Doc. No : FR-PYK-03-02
Revision : 00
Halaman :

Proyek : Tower 7 - LA VIZ


Spesifikasi : ARSITEKTUR

R0 R1 R2
No Doc. No. MA No. Manufacturer Specification Submitted By Remarks
Submit Reply Status Submit Reply Status Submit Reply Status

1 001/AMS/MPK-LVZ/XI/2018 Mortar Utama Perekat Bata Ringan MPK 12-Nov-18 12-Dec-18 A

2 002/AMS/MPK-LVZ/XI/2018 Mortar Utama Acian Bata Ringan MPK 12-Nov-18 12-Dec-18 A

10

11

12

13

14

15

16

17

18

19

20

21

22

23

24

25

26

27

28

29
MONITORING APPROVAL OF MATERIAL
Doc. No : FR-PYK-03-02
Revision : 00
Halaman :

Proyek : Tower 7 - LA VIZ


Spesifikasi : ARSITEKTUR

R0 R1 R2
No Doc. No. MA No. Manufacturer Specification Submitted By Remarks
Submit Reply Status Submit Reply Status Submit Reply Status

30

31

32

33

34 29-Dec-17 1-Mar-18 B

35

36

37

38

39

40

41

42

43

44

45

46

47

48

49

50

51

52

53

54

55

56

57

58
MONITORING APPROVAL OF MATERIAL
Doc. No : FR-PYK-03-02
Revision : 00
Halaman :

Proyek : Tower 7 - LA VIZ


Spesifikasi : ARSITEKTUR

R0 R1 R2
No Doc. No. MA No. Manufacturer Specification Submitted By Remarks
Submit Reply Status Submit Reply Status Submit Reply Status

59

60

61

62

63

64

65

66
SCHEDULE SHOP DRAWING LA VIZ TOWER SCHEDULE SHOP DRAWING LA VIZ TOWER
JANUARI 2019 MARET 2019

NOMOR Rencana Aktual JANUARI 2019 NOMOR Rencana Aktual FEB '19 MARET 2019
No JUDUL GAMBAR Keterangan No JUDUL GAMBAR Keterangan
GAMBAR Pengajuan Pengajuan GAMBAR Pengajuan Pengajuan
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 25 26 27 28 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31

1 DENAH LANTAI P4 A.02.06.01~ 7-Jan-19 29-Oct-18 : YOSIDA 1 DENAH LANTAI 16 (MARKETING LT.18) A.02.22.01- 5-Mar-19 : YOSIDA

2 DENAH LANTAI P5 A.02.07.01~ 16-Jan-19 29-Oct-18 : M. DWI 2 DENAH LANTAI 17 (MARKETING LT.19) A.02.23.01- 12-Mar-19 : M. DWI

3 DENAH LANTAI P6 A.02.08.01~ 27-Jan-19 29-Oct-18 : ERTA 3 DENAH LANTAI 18 (MARKETING LT.20) A.02.24.01- 19-Mar-19 : ERTA

4 DENAH LANTAI 2 (MARKETING LT.1) A.02.12.01~ 27-Nov-18 7-Jan-19 : HARI MINGGU 4 DENAH LANTAI 19 (MARKETING LT.21) A.02.25.01- 26-Mar-19 : HARI MINGGU

5 DENAH LANTAI 3 (MARKETING LT.2) A.02.13.01~ 4-Dec-18 18-Jan-19 : RENCANA PENGAJUAN 5 DENAH PLAFOND KORIDOR LT. P7 A.07.09.01- 5-Mar-19 : RENCANA PENGAJUAN

6 DENAH LANTAI 4,6,8 (MARKETING LT.3,6,8) - TYPIKAL 1 A.02.14.01~ 11-Dec-18 : TERLAMBAT 6 DENAH PLAFOND KORIDOR LT. P0 A.07.10.01- 5-Mar-19 : TERLAMBAT

7 DENAH LANTAI 5,7 (MARKETING LT.5,7) - TYIPIKAL 2 A.02.15.01~ 18-Dec-18 7 DENAH PLAFOND KORIDOR LT. 17,33 (REFUGEE) A.07.15.01- 26-Mar-19 : AS BUILD

8 DENAH LANTAI 9,11 (MARKETING LT.9,11) A.02.16.01~ 15-Jan-19 8 DENAH POLA LANTAI KORIDOR LT. 17,33 (REFUGEE) A.08.15.01- 19-Mar-19

9 DENAH LANTAI 10 (MARKETING LT.10) A.02.17.01~ 22-Jan-19 9 DETAIL TANGGA #1 - LT. P7 - ATAP A.09.02.13- 5-Mar-19

10 DETAIL TOILET MALL LANTAI LG & GF A.05.01.01~ 13-Jan-19 21-Jan-19 10 DETAIL TANGGA #2 - LT. P7 - ATAP A.09.02.08- 12-Mar-19

11 DETAIL TOILET PUBLIC LANTAI GF A.05.02.01~ 13-Jan-19 25-Jan-19 11 DETAIL TANGGA #3 - LT. LG - P0 A.09.03.01-14 5-Mar-19 29-Jan-19

12 DETAIL TOILET DRIVER LANTAI P1,P3,P6 A.05.03.01~ 8-Jan-19 18-Jan-19 12 DETAIL CORE #6 - DENAH LANTAI P0 - ATAP A.09.05.07- 21-Mar-19

13 KEYPLAN PINTU & JENDELA - DENAH LANTAI 1, 2, 3-31 (TYP 1), 5-32 (TYP2) A.06.01.16-19 22-Jan-19 13 DETAIL LOBBY VPL 4,5,6 LANTAI P0 A.09.07.01- 28-Mar-19

14 DENAH PLAFOND MALL LANTAI LG & LLG A.07.01.01~ 17-Dec-18 14 DETAIL LMR LANTAI P5 A.09.09.01- 8-Mar-19

15 DENAH PLAFOND MALL LANTAI GF A.07.02.01~ 26-Dec-18 15 DENAH SHOPFRONT MALL LANTAI GF A.10.07.01- 3-Mar-19

14 DENAH PLAFOND KORIDOR LT. P1 A.07.03.01~ 6-Jan-19 8-Jan-19 14 DENAH PRE FUNCTION & FUNCTION ROOM LANTAI GF A.10.08.01- 10-Mar-19

15 DENAH PLAFOND KORIDOR LT. P2 A.07.04.01~ 15-Jan-19 18-Jan-19 15 DENAH RUANG GYM LANTAI P0 A.10.09.01- 21-Mar-19

16 DENAH PLAFOND KORIDOR LT. P3 A.07.05.01~ 26-Jan-19 24-Jan-19 16 DENAH GAMES ROOM LANTAI P0 A.10.10.01- 28-Mar-19

17 DENAH PLAFOND KORIDOR LT.2 A.07.12.01~ 1-Jan-19 17 DENAH UNIT 2BC LANTAI P0 A.10.14.01- 5-Mar-19

18 DENAH PLAFOND KORIDOR LT. 3-31 (TYP 1) A.07.13.01~ 8-Jan-19 * Menunggu wall setting aprrove 18 DENAH UNIT 2BB LANTAI P0 A.10.15.01- 5-Mar-19

19 DENAH PLAFOND KORIDOR LT. 5-32 (TYP 2) A.07.14.01~ 15-Jan-19 19 DENAH UNIT 2BA LANTAI P0 A.10.16.01- 12-Mar-19

20 DENAH POLA LANTAI KORIDOR LANTAI LG & LLG A.08.01.01~ 9-Jan-19 18-Jan-19 20 DENAH UNIT 2BF LANTAI P0 0 12-Mar-19

21 DENAH POLA LANTAI MALL LANTAI GF A.08.02.01~ 18-Jan-19 21 DENAH UNIT 2BE LANTAI P0 0 19-Mar-19

22 DENAH POLA LANTAI PODIUM P2 A.08.04.01~ 8-Jan-19 3-Jan-19 22 DENAH UNIT 3BC LANTAI 15, 16 & 30 0 5-Mar-19

23 DENAH POLA LANTAI PODIUM P3 A.08.05.01~ 19-Jan-19 3-Jan-19 23 DENAH UNIT 3BA+ LANTAI 12,29 0 5-Mar-19

#REF! DENAH POLA LANTAI KORIDOR LT. 3-31 (TYP 1) A.08.13.01~ 1-Jan-19 24 DENAH UNIT 2BE PENTHOUSE 0 19-Mar-19
* Menunggu wall setting approve
#REF! DENAH POLA LANTAI KORIDOR LT. 5-32 (TYP 2) A.08.14.01~ 8-Jan-19

#REF! DETAIL CORE #6 - DENAH LANTAI LG - P7 A.09.08.01~ 2-Jan-19 3-Jan-19

#REF! DETAIL LOBBY VPL LANTAI LG - P7 A.09.10.01~ 9-Jan-19

#REF! DETAIL LOBBY VPL 4,5 LANTAI 1 - 51 A.09.12.01~ 17-Jan-19

#REF! DENAH UNIT 3BA LANTAI 1 A.10.25.01~ 1-Jan-19

#REF! DENAH UNIT 3BD LANTAI 2 A.10.29.01~ 1-Jan-19

#REF! DENAH UNIT 3BC TYIPIKAL A.10.30.01~ 1-Jan-19 * Menunggu wall setting approve

#REF! DENAH UNIT 3BA TYPIKAL A.10.31.01~ 8-Jan-19

#REF! DENAH UNIT 3BD TYPIKAL A.10.32.01~ 8-Jan-19

#REF! DENAH MUSHOLA LANTAI P1 A.11.18.01~ 6-Jan-19 14-Jan-19

#REF! DENAH DRIVER LOUNGE LANTAI P1 - P7 A.11.19.01~ 13-Jan-19


MEMO PERUBAHAN UNIT LAVIZ
NO MEMO FLOOR UNIT NOTE STATUS
1 083/ME/SPI4/IV/2019 05 2BD (03) a. Dinding kamar mandi diperlebar 600mm ke area pantry APPROVED
b. Posisi kran air utk mesin cuci terpasang 400mm dari dinding kamar mandi, tambah 2 titik stop kontak, tambah instalasi pembuangan air mesin cuci 8/21/2019
c. Posisi air wastafel kamar mandi 1000mm dari dinding kamar mandi, ketinggian titik air bersih 600mm dan pembuangan 400mm dari lantai
Meja vanity, wastafel dan mirror tdk terpasang
d. Closet tdk dipasang, hanya disediakan corringan. Type akan diganti menjadi TOTO CW934J
e. Pembuatan opening pintu 880mm di master BR
f. - Tambah stop kontak 2 titik (hanya power) tanam di lantai area dining room, keramik 1 lantai dicutter seukuran 2 stop kontak
- Tambah stop kontak 2 titik (hanya power) di atas ceiling
- Posisi exhaust kitchen pindah di area dining room
g. Pintu kamar mandi swing tdk dipasang
h. Titik air kitchen sink dibuat 700mm dari opening WD-01, elevasi 600mm. Pembuangan elevasi 400mm.
i. Tambah 2 titik stop kontak di area livingroom
j. Tambah 1 titik stop kontak di depan BR1
k. Pelebaran dinding samping master BR selebar 650mm dan tambah 1 titik stop kontak di depan dinding livingroom
l. Tambah 4 titik stop kontak di master BR. Tambah 1 titik line di master BR.
m. Tambah 1 set hand shower (TOTO TX470SEN) EGO both spout with diverter for hand shower utk mixer shower
n. Tambah 1 titik line dan 3 titik stop kontak di BR1
o. Tambah 4 titik stop kontak area pantry utk kulkas 1 dan 2 blender
p. Instalasi jet spray kamar mandi tetap dibuat
06 3BA (06) a. Semua HT up-size lebih besar, material by tenant, install by MPK SUBMIT
b. All ceiling gypsum tdk dipasang, rangka ceiling tetap dibuat 8/9/2019
c. All kabel listrik tdk perlu di-wire (material serahkan tenant)
12 2BC (09) a. Perubahan posisi dinding kamar anak dan pintunya APPROVED
7/1/2019
15 2BE (05) a. Dinding master BR dan BR 1 tdk dibuat APPROVED
3BA (06) b. Geser posisi pintu sliding kamar mandi jarak 600mm dari dinding 12/17/2019
c. Perubahan posisi wastafel unit 05 menjadi as dinding, luas meja vanity berubah, ukuran mirror berubah
d. Pintu swing kamar mandi unit 05 tdk dipasang
e. Instalasi pantry unit 05 tdk dibuat
f. Pembuatan dinding baru master BR unit 05
g. Relokasi pintu master BR unit 05
h. Perubahan maid room unit 06, kamar mandi tdk dibuat, instalasi air kotor 1 titik, instalasi kran dan air bersih 1 titik, 2 stop kontak
i. Dinding BR2 unit 06 tdk dibuat
j. Bathtube kamar mandi unit 06 tdk dipasang, dinding geser
k. Penambahan 2 titik TV di livingroom dan BR1 unit 06
l. All lantai livingroom, pantry, BR tdk dipasang
m. All kamar mandi dan area service finish
18 2BE (05) a. Pembuatan dinding dan opening pintu BR unit 06 APPROVED
20 3BA (06) b. Pintu master BR unit 06 tdk dibuat (rong koridor 1800mm) 1/29/2020
22 c. Pembuatan opening connecting door antar unit
d. Bathtube tdk dipasang, diganti instalasi mesin cuci, tambah 2 titik stop kontak, tambah 1 titik air bersih dan kran, tambah 1 titik pipa air kotor
e. Wastafel tdk dipasang, tapi instalasinya dan 1 titik stop kontak tetap ada
f. Area shower ukuran 800x800mm, hanya perbedaan level lantai, tdk ada border dan shower partisi
g. Finishing lantai dan dinding kamar mandi yg ada mesin cucinya tetap dikerjakan, menggunakan HT sama dg area shower (doff)
h. Pintu kamar mandi yg ada mesin cucinya menggunakan pintu sliding kamar mandi unit 05
i. Dinding kamar mandi mundur 100mm dari dinding foyer lift
j. Dinding foyer lift mundur, rong koridor menjadi 1700mm
MEMO PERUBAHAN UNIT LAVIZ
NO MEMO FLOOR UNIT NOTE STATUS
k. Maid room dan maid toilet tdk dibuat
l. Pembuatan dinding BR unit 06
m. Penambahan 1 titik fitting lampu di unit 06
n. Dinding BR1 unit 05 tdk dibuat
o. Perubahan posisi opening master BR unit 05 (hanya opening)
p. Pembuatan lubang opening kamar mandi unit 05 820mm, tanpa pintu
q. Opening pintu swing kamar mandi unit 05 tdk dibuat
r. Posisi wastafel dan shower kamar mandi unit 05 ditukar
- Perubahan ukuran partisi shower dan threshold (tdk dipasang, material serahkan ke tenant)
- Meja vanity dan mirror tdk berubah ukuran (tdk dipasang, material serahkan ke tenant)
s. Type closet kamar mandi unit 05 menggunakan closet kamar mandi master BR unit 06 (eco washer), ditukar dg unit 05
t. Lebar dan panjang kamar mandi unit 05 menjadi 3400x2890mm
u. Penambahan bathtube (material by tenant), instalasi air bersih dan air kotor by PKW
v. Kamar mandi unit 05 dan 06 kecuali yg ada mesin cucinya tdk difinish
- Hanya screed dan waterproofing
- All instalasi tetap dipasang
- Ceiling tetap difinish
- All sanitary yg tdk dipasang diserahkan ke tenant
w. Posisi pintu kamar mandi sliding unit 06 jarak 100 dari dinding shaft
x. Dinding master BR unit 05 rata dg dinding kamar mandi
y. Finishing lantai dan skirting BR all dan livingroom unit 05 dan 06 tdk dipasang
z. Instalasi pantry unit 05 tetap dibuat
37 3BD+ (10) a. Dinding master BR area TV mundur 600mm (rong) SUBMIT
b. Pembuatan back panel dinding ke mullion master BR 3/18/2020
c. Dinding maid room mundur 900mm (rong)
d. Kamar mandi maid room tdk dibuat, instalasi mesin cuci tetap dibuat
e. Perubahan posisi pintu master BR
f. Pembuatan opening kamar mandi menuju BR2 menggunakan sliding door, maka ada penambahan 1 unti sliding door dan threshold-nya
g. All lantai BR tdk dipasang
2 085/ME/SPI4/IV/2019 2BA (07) - Perubahan lay out pantry, penambahan instalasi mesin cuci
2BB (08) - Penambahan instalasi air bersih dan air kotor utk mesin cuci
TYIPIKAL

2BC (09) - Penyesuaian posisi stop kontak


2BD (03)
2BE (02)
2BF (07) - Perubahan desain baru
P0
2BG (08)
3 099/ME/SPI4/V/2019 20 3BD (10) a. Dinding dan pintu master bedroom tidak dibuat APPROVED
b. Master bathroom tidak dibuat (pola lantai diteruskan, shaft tetap) 12/21/2019
c. Finishing lantai dan dinding maid bathroom menggunakan material master bathroom
d. Mixer shower maid menggunakan mixer master bathroom
e. Closet jongkok maid bathroom diganti dg closet duduk master bathroom
f. Penambahan dinding bata dan plester aci pada shaft
g. Wastafel master bathroom dipasang di dekat shaft, meja vanity mengikuti ukuran
4 130/ME/SPI4/VII/2019 P0 2BC (03) Include Memo No.145/ME/SPI4/VIII/2019 APPROVED
2BB (05) 11/20/2019
2BA (06)
MEMO PERUBAHAN UNIT LAVIZ
NO MEMO FLOOR UNIT NOTE STATUS
01 2BA (07) Dibatalkan
2BB (08)
2BC (09)
5 128/ME/SPI4/VII/2019 23 3BC(01) a. dinding master bedroom unit 23-01 tidak di buat
3BD(10) b. Master bathroom unit 23-01 tidak di buat
c. Opening bedroom 2 unit 23-01 tidak dibuat
d. Pembuatan dinding dan opening serta pintu area pantry (menggunakan pintu bedroom 2 unit 23-01)
e. Dinding bedroom 1 unit 23-01 tidak dibuat
f. Dinding bedroom 1 unit 23-10 tidak dibuat
g. Pembuatan dinding opening serta pintu untuk bedroom (menggunakan pintu bedroom 1 unit 23-10)
h. Bathroom u
i. Pembuatan dinding opening serta pintu bedroom (menggunakan pintu bedroom 1 unit 23-10)
j. Dinding antar master bedroom & bedroom 2 unit 23-10 tidak di buat
k. maid room, maid bathroom, dan pantry unit 23-10 tidak dibuat
l. pembuatan bathroom sesuai layout
m. Opening master bedroom unit 23-10 tidak di buat (ditutup)
n. Instalasi zink dibuat di dinding shaft
o. Perubahan posisi pantry
p. Pembuatan dinding opening serta pintu untuk gudang (pintu menggunakan pintu master bedroom unit 23-10)
q. Perubahan posisi pintu master bathroom unit 23-10
6 135/ME/SPI4/VII/2019 23 3BB (06) a. Dinding foyer lift mundur 50 cm APPROVED
b. Bathube master bathroom tidak dibuat 10/12/2019
c. Meja vanity area master bathroom membesar dikecilkan 20 cm
d. Area shower master bathroom membesar menjadi 1050 x 1450
e. Dinding dan pintu area service tetap dibuat
f. Penambahan dua titik jet spray dan jet spray untuk maid bathroom dan master bedroom
g. Tambah 1 closet duduk ( CW 635PJ/SW ) lengkap 1 set untuk maid bathroom
32 3BC (01) a. Maid bedroom dan main bathroom unit 32-01 tidak dibuat, alokasi menjadi kamar mandi standart sesuai layout
3BD (10) ( all material dan ukuran menggunakan kamar mandi unit 32-10 yang tidak dibuat, hanya shower partisi menyesuaikan layout / membesar )
b. Pantry unit 32-01 tidak dibuat
c. Pembuatan dinding, opening dan pintu baru menjadi bedroom 1
d. Dinding master bedroom dan bedroom 1 unit 32-01 tidak dibuat
e. Master bathroom unit 32-01 luas di perlebar, area shower melebar ( shower partisi menyesuaikan / membesar )
dan alokasi wastafel closet dan opening sesuai layout
f. Bedroom 2 unit 32-01 dan 32-10 tidak dibuat
g. Dinding pemisah foyer lift unit 32-01 dan 32-10 tidak dibuat
h. Pembuatan dinding, opening dan pintu baru menjadi bedroom 3
i. Pembuatan bathroom baru sesuai layout ( raylayout dari master bathroom unit 32-10 ( kaca shower partisi melebar sesuai layout )
j. Master bathroom unit 32-10 tidak dibuat
k. Master bedroom dan bedroom 1 unit 32-10 tidak dibuat
28 3BB (06) a. Bathube di master bedroom tidak dibuat SUBMIT
b. Posisi wastafel di pindah, ukuran meja vanity dan mirror membesar 10/1/2019
c. Ukuran area shower membesar ( kaca shower partisi dan treshold membesar )
7 145/ME/SPI4/VIII/2019 P0 2BC (03) a. Combine unit, re-layout toilet club house APPROVED
2BB (05) 11/20/2019
2BA (06)
MEMO PERUBAHAN UNIT LAVIZ
NO MEMO FLOOR UNIT NOTE STATUS
1 2BA (07) a. Combine unit APPROVED
19 2BB (08) 11/20/2019
28 2BC (09)
35 2BB (08) a. Combine unit Loft Menunggu
36 2BC (09) Type Sanitair
37
38
39 2BA (07) a. Combine unit
50 2BB (08)
2BC (09)
51 ALL - Perubahan desain baru Menunggu
Desain Layout
8 155/ME/SPI4/IX/2019 7 2BC (03) a. Bedroom 1 unit 07-03 tidak dibuat APPROVED
2BE (05) b. Sebagian dinding dan pintu master bedroom unit 07-03 tidak dibuat 3/26/2020
c. Pembuatan dinding baru dan opening baru bedroom unit 07-03
d. Dinding antar unit tidak dibuat
e. Pembuatan dinding baru dan opening baru bedroom unit 07-05
f. Dinding antar bedroom unit 07-05 tidak dibuat
g. Perubahan posisi opening pintu master bedroom unit 07-05
h. Pintu sliding bathroom unit 07-03 dan 07-05 tidak dipasang / ditutup
i. Tambah dua line internet di bedroom
2BB (08) a. All finishing lantai unit tidak dipasang
2BC (09) Include Memo No. 170/ME/SPI4/X/2019
9 162/ME/SPI4/IX/2019 32 3BC (01) a. HT master bedroom dan bathroom 1 tidak dipasang
3BD (10) Include Memo No. 135/ME/SPI4/VII/2019
2BB (08) a. Area shower master bedroom unit 8 di perlebar
2BC (09) b. Posisi closet dan FD master bathroom berubah
c. Luas master bathroom diperlebar
d. Pembuatan bathroom baru unit 8 (pemasangan closet, shower dan FD) tidak ada pintu hanya opening
e. Bathroom tidak dibuat dan bedroom melebar
f. Perubahan luas foyer lift unit 8 dan 9
g. Dinding antar unit 8 dan 9 tidak dibuat
h. Bathroom unit 9 tidak dibuat
i. Bedroom 1 unit 9 tidak dibuat
j. All HT dan skirting 800x800 tidak dipasang
k. All bathroom HT tidak dipasang (sanitair, mirror, meja vanity, shower partisi tidak dipasang, material serahkan tenant)
l. All ceiling tidak dipasang (gypsum dan rangka serahkan tenant)
10 170/ME/SPI4/X/2019 7 2BB (08) a.Pintu foyer lift unit 9 tidak dipasang dan dinding serta pintu foyer unit 8 berubah
2BC (09) b. Dinding foyer dan pantry dibuat selebar 70cm AS
c. Dinding antar unit sebagian tidak dibuat dan geser rata kolom
d. Pembuatan dinding untuk bedroom
e. Bedroom 1 unit 8 tidak dibuat
f. Dinding pantry unit 9 tidak dibuat
g. Dinding bedroom 1 unit 9 tidak dibuat
h. Pembuatan dinding bedroom
MEMO PERUBAHAN UNIT LAVIZ
NO MEMO FLOOR UNIT NOTE STATUS
i. Kamar mandi luar unit 9 tidak dibuat
j. Perubahan posisi pintu bedroom
k. Re-layout kamar mandi unit 9 untuk shower, closet, wastafel, FD, dan pintu
21 2BA (07) a. Pintu bedroom 1 tidak dibuat SUBMIT
b. Dinding antar master bedroom dan bedroom tidak dibuat 3/20/2020
c. Dinding antar bathroom tidak dibuat
d. Penambahan dinding untuk mixer bathube
e. Tambah 1 set bathube (FB 1700-70)
f. Pembuatan dinding antar bathroom
g. Perubahan posisi closet dan FD
h. Penambahan 1 titik TV dan 1 titik Stop Kontak di area bathube (tinggi 2 meter dari FFL)
32 2BA (07) a. Dinding antar bedroom 1 dan master bedroom tidak dibuat
b. Pembuatan opening bedroom di bedroom 1
c. Bathroom luar tidak dibuat
d. Dinding dan opening master bedroom ditutup sejajar dinding bathroom luar
e. Master bathroom wastafel tidak dibuat
f. Perubahan luasan area shower master bathroom
g. Penambahan dinding untuk tempat sabun di master bathroom
h. Pembuatan ruang untuk closet master bathroom
i. All area closet dan shower lantai hanya slooping ke area FD (tidak ada beda lv)
j. Pintu master bathroom tidak dibuat
k. Penambahan stop kontak sesuai layout
l. Re layout posisi indoor AC sesuai layout
11 192/ME/SPI4/XI/2019 P0 2BF (07) Include Memo No. 085/ME/SPI4/IV/2019
2BG (08)
12 193/ME/SPI4/XI/2019 18 2BA (07) a. Lantai HT all bedroom tidak dipasang
b. Lantai all bedroom finish plester aci -12mm dari FFL (By Mitra)
13 021/ME/SPI4/I/2020 15 3BD (10) a. Maid Bedroom tidak dibuat
b. Maid Bathroom tidak dibuat
c. Tambah dua titik stop kontak di lantai (hanya power)
d. Saluran pembuangan maid bathroom tetap dibuat (dijadikan saluran pembuangan wastafel oleh tenant)
38 3BA (06) a. Unit Hold (email marketing Tgl 17 Januari 2020)
Include Memo No. 062/ME/SPI4/III/2020
14 062/ME/SPI4/III/2020 37 3BB (06) a. Maid bedroom dan maid bathroom tidak dibuat
b. Instalasi maid bathroom tetap dibuat (untuk instalasi wastafel)
c. Bathube master bathroom tidak dibuat
d. Relokasi wastafel dibuat di area bathube master bathroom
e. Perubahan ukuran area shower master bathroom
f. Pembuatan dinding baru untuk bedroom di area maid
g. Bedroom 1 dan bedroom 2 tidak dibuat
h. Relokasi kitchen menuju dinding samping bedroom 2, termasuk zink, gas detector exhouse
i. Kitchen dan pantry tidak dibuat
38 3BA (06) a. Bathroom luar tidak dibuat hanya instalasi wastafel tetap ada
b. Perubahan lokasi pintu master bedroom
c. Pembuatan bathroom baru disamping foyer lift
MEMO PERUBAHAN UNIT LAVIZ
NO MEMO FLOOR UNIT NOTE STATUS
d. Maid badroom tidak dibuat
e. Perubahan posisi pintu maid bathroom
f. Relokasi pantry sesuai layout
g. Pintu foyer lift tidak dipasang (hanya opening)
MEMO PERUBAHAN UNIT LAVIZ
NO MEMO FLOOR UNIT NOTE STATUS

MEMO PERUBAHAN UNITANDERSON

NO MEMO FLOOR UNIT NOTE


1 124/ME/SPI4/VII/2019 21 2BD (03) a. Pembuatan opening connecting antar unit 21-03 dan 21-05
Eng - ADR - ARS 2BE(05)
2 154/ME/SPI4/IX/2019 9 31 a. Penutupan lubang connecting lama
Eng - ADR - ARS 32 b. Pembuatan lubang connecting baru
c. Pemasangan 1 titik stop kontak di penutupan lubang connecting lama

1 156/ME/SPI4/IX/2019 1 3 a. Pembuatan Opening Connecting antar unit 01-03 dan 01-05


Eng - BSN - ARS 5
18 26 a. Pembuatan Opening Connecting antar unit 18-26 dan 18-27
27
TOWER 7 - LA VIZ
UNIT / NO.
3BC (01) 3BC+ (01) 2BE (02) 2BD (03) 2BE (05) 3BA (06) 3BA+ (06) 3BB (06) 3BB+ (06) 2BF (07) 2BG (08) 2BA (07) 2BB (08) 2BC (09) 3BD (10)
Submit Return Submit Return Submit Return Submit Return Submit Return Submit Return Submit Return Submit Return Submit Return Submit Return Submit Return Submit Return Submit Return Submit Return Submit
Lt.P0 9/17/2019 10/8/2019 11/20/2019 10/8/2019 11/20/2019 10/8/2019 11/20/2019 9/20/2019
Lt.1 8/12/2019 9/11/2019 4/24/2019 6/18/2019 4/26/2019 6/18/2019 4/24/2019 6/18/2019 4/11/2019 5/6/2019 CANCEL CANCEL CANCEL 8/7/2019
Lt.2 9/5/2019 10/29/2019 9/20/2019 10/29/2019 9/10/2019
8/8/2019 9/11/2019
TYP 1Lt.3 9/10/2019 10/29/2019
4/29/2019 6/18/2019
TYP 2Lt.5 7/30/2019 8/21/2019 8/9/2019 9/11/2019
TYP 1Lt.6 8/8/2019 9/11/2019 8/9/2019
TYP 2Lt.7 3/6/2020 3/26/2020 3/6/2020 3/26/2020 8/9/2019 4/11/2019 6/18/2019
TYP 1Lt.8 6/21/2019 9/11/2019 9/10/2019 10/29/2019
4/29/2019 6/18/2019 4/9/2019 5/6/2019 4/24/2019 6/18/2019
TYP 2Lt.9 8/9/2019 9/11/2019
TYP L1t.10 4/29/2019 6/18/2019 9/10/2019 10/29/2019
9/10/2019
TYP L2t.11 8/8/2019 9/11/2019 8/9/2019 9/11/2019
TYP L1t.12 1/14/2020 3/16/2020 5/23/2019 7/1/2019
TYP L2t.15 1/7/2020 3/16/2020 7/11/2019 12/17/2019 7/11/2019 ###
4/11/2019 6/18/2019
TYP L1t.16 1/7/2020 3/16/2020 4/29/2019 6/18/2019 9/10/2019 10/29/2019
RFG L1t.17 8/9/2019 9/11/2019
TYP L1t.18 6/21/2019 1/29/2020 6/21/2019 1/29/2020 4/9/2019 5/6/2019 4/24/2019 6/18/2019 4/11/2019 6/18/2019
TYP L2t.19 4/29/2019 6/18/2019 1/14/2020 3/16/2020 10/18/2019 11/20/2019 10/18/2019 11/20/2019 10/18/2019 11/20/2019
TYP L1t.20 6/21/2019 1/29/2020 6/21/2019 1/29/2020 4/9/2019 5/6/2019 8/8/2019
TYP L2t.21 4/29/2019 6/18/2019 8/9/2019 9/11/2019 3/20/2020 9/10/2019
TYP L1t.22 6/21/2019 9/11/2019 6/21/2019 1/29/2020 6/21/2019 1/29/2020
TYP L2t.23 9/23/2019 10/12/2019 4/24/2019 6/18/2019 4/11/2019 6/18/2019
TYP L1t.25 9/10/2019 10/29/2019 4/9/2019 5/6/2019
4/29/2019 6/18/2019 8/8/2019 9/11/2019
TYP L2t.26 8/9/2019 9/11/2019
TYP L1t.27 9/10/2019 10/29/2019
TYP L2t.28 4/29/2019 6/18/2019 10/1/2019 10/18/2019 11/20/2019 10/18/2019 11/20/2019 10/18/2019 11/20/2019
TYP L1t.29 1/7/2020 3/16/2020 1/14/2020 3/16/2020
9/10/2019
TYP L2t.30 1/7/2020 3/16/2020 8/9/2019 9/11/2019
4/9/2019 5/6/2019 4/24/2019 6/18/2019 4/11/2019 6/18/2019
TYP L1t.31 9/10/2019 10/29/2019
TYP L2t.32 8/9/2019 9/11/2019
RFG L2t.33 9/10/2019 10/29/2019
TYP L2t.35 6/21/2019 9/11/2019 1/14/2020 3/16/2020
TYP L1t.36 4/29/2019 6/18/2019 8/8/2019 9/11/2019 4/29/2019 6/18/2019 1/14/2020 3/16/2020 4/9/2019 5/6/2019 4/24/2019 6/18/2019 4/11/2019 6/18/2019
TYP L2t.37 8/9/2019 9/11/2019
PH 1Lt.38 1/14/2020 3/16/2020 9/10/2019 10/29/2019 9/10/2019
PH 2Lt.39
PH 1Lt.50
PH 2Lt.51

KIRIM
APPROVE
PERUBAHAN UNIT KIRIM
PERUBAHAN UNIT APPROVE
3BD (10) 3BD+ (10)
Return Submit Return

9/11/2019
10/29/2019

10/29/2019

12/21/2019
10/29/2019
1/20/2020 3/16/2020

10/29/2019

1/20/2020 3/16/2020
3/18/2020
10/29/2019
TOWER 7 - LA VIZ

Dimensi
No. Tipe Pintu Luasan (m2)
Lebar Tinggi
1 WD-01 1.18 x 2.375 = 2.80
2 WD-02 0.99 x 2.375 = 2.35
3 WD-02A/03A 0.92 x 2.375 = 2.19
4 WD-03 0.92 x 2.375 = 2.19

Lt.P0 6 15 4 12
Lt.1 14 20 4 16
Lt.2 14 20 5 15
Lt.3 14 19 5 16
Lt.5 14 19 5 15
Lt.6 14 19 5 16
Lt.7 13 17 5 14
Lt.8 14 19 5 16
Lt.9 14 19 5 15
Lt.10 14 19 5 16
Lt.11 14 19 5 15
Lt.12
Lt.15
Lt.16
Lt.17
Lt.18
Lt.19
Lt.20
Lt.21
Lt.22
Lt.23
Lt.25
Lt.26
Lt.27
Lt.28
Lt.29
Lt.30
Lt.31
Lt.32
Lt.33
Lt.35
Lt.36
Lt.37
Lt.38
Lt.39
Lt.50
Lt.51
SCHEDULE SHOP DRAWING LA VIZ TOWER
23-28 MARET 2020
DIVISI ENG. ARSITEKTUR

NOMOR Rencana MARET 2020


No JUDUL GAMBAR GAMBAR Pengajuan Keterangan
23 24 25 26 27 28
1 R. BALANCING TANK LT.P7 A.11. 24-Mar-20 : ERTA
2 UNIT 2BF (07) LT.P0 A.02. l : ARI
3 UNIT 2BG (08) LT.P0 A.10. 1-Apr-20
4 UNIT 3BC (01) & 3BD+ (10) LT.23 A.02. 23-Mar-20
5 DETAIL GYM DAN GAMES ROOM LT.P0 A.10. 26-Apr-20
6 DROP OFF LOBBY LT.G A.05. 31-Mar-20

SCHEDULE SHOP DRAWING LA VIZ TOWER


30 MARET - 04 APRIL 2020
DIVISI ENG. ARSITEKTUR

NOMOR Rencana MARET-APRIL 2020


No JUDUL GAMBAR Keterangan
GAMBAR Pengajuan
30 31 1 2 3 4
1 UNIT 2BG (08) LT.P0 A.10. 1-Apr-20 : ERTA
2 GARBAGE BIN MALL & APART. LT.LG A.02. 2-Apr-20 : ARI
3 UNIT 2BA (07) LT.32 A.10. 4-Apr-20
4 DROP OFF LOBBY LT.G A.02. 31-Mar-20
5 UNIT 3BC & 3BD (01 & 10) LT.23 A.10. 1-Apr-20
6 TOILET CLUB HOUSE A.05. 4-Apr-20
SCHEDULE SHOP DRAWING LA VIZ TOWER
30 MARET - 04 APRIL 2020
DIVISI ENG. ARSITEKTUR

NOMOR Rencana Apr-20


No JUDUL GAMBAR GAMBAR Pengajuan Keterangan
30 31 1 2 3 4
1 UNIT 2BG (08) LT.P0 A.10. 1-Apr-20 : ERTA
2 GARBAGE BIN MALL & APART. LT.LG A.02. 2-Apr-20 : ARI
3 UNIT 2BA (07) LT.32 A.10. 4-Apr-20
4 DROP OFF LOBBY LT.G A.02. 31-Mar-20
5 UNIT 3BC & 3BD (01 & 10) LT.23 A.10. 1-Apr-20
6 TOILET CLUB HOUSE A.05. 4-Apr-20

LAPORAN MINGGUAN SHOP DRAWING LA VIZ TOWER


30 MARET - 04 APRIL 2020
DIVISI ENG. ARSITEKTUR

NOMOR Rencana Apr-20


No JUDUL GAMBAR Keterangan Target
GAMBAR Pengajuan
30 31 1 2 3 4
1 UNIT 2BG (08) LT.P0 A.10. 1-Apr-20 : ERTA
2 GARBAGE BIN MALL & APART. LT.LG A.02. 2-Apr-20 : ARI
3 UNIT 2BA (07) LT.32 A.10. 4-Apr-20 :TERLAMBAT
4 DROP OFF LOBBY LT.G A.02. 31-Mar-20
5 UNIT 3BC & 3BD (01 & 10) LT.23 A.10. 1-Apr-20
6 TOILET CLUB HOUSE A.05. 4-Apr-20

SCHEDULE SHOP DRAWING LA VIZ TOWER


06 - 11 APRIL 2020
DIVISI ENG. ARSITEKTUR

NOMOR Rencana Apr-20


No JUDUL GAMBAR GAMBAR Pengajuan Keterangan
6 7 8 9 10 11
1 UNIT 2BG (08) LT.P0 A.10. 1-Apr-20 : ERTA
2 GARBAGE BIN MALL & APART. LT.LG A.02. 2-Apr-20 : ARI
3 UNIT 2BA (07) LT.32 A.10. 4-Apr-20
4 DROP OFF LOBBY LT.G A.02. 31-Mar-20
5 UNIT 3BC & 3BD (01 & 10) LT.23 A.10. 1-Apr-20
6 TOILET CLUB HOUSE A.05. 4-Apr-20
TUGAS HARIAN

NAMA : Yosida S. HARI / TANGGAL :

JABATAN : Drafter / Eng. 30 Maret - 04 April


DIVISI : Engineering STR / ARS / ME 2020
PROYEK : LaViz

STATUS PEK.
HARI/TANGGAL PEKERJAAN KETERANGAN
SELESAI PROSES
Senin, 30/03/2020 1. Cek gambar fasade posisi planter box :
Tampak Utara dan Selatan
2. Pembetulan Layout desain Forcon LT.51 3/30/2020 3/30/2020 DONE
3. Monitoring perubahan unit
(memo dan shop dwg)

Selasa, 31/03/2020 1. Perubahan HT (memo PDC) :


Denah, Pola Lantai
2. Monitoring dan input data 3/31/2020 3/31/2020 DONE
progress shop drawing for meeting
3. Gambar penempatan gondola LT.P0 & LT.P6
4. Shop drawing (memo PDC) :
Anderson : LT.P1, LT.P2 & LT.P3 3/31/2020 KEEP
LaViz : LT.P1, LT.P2-P4 3/31/2020 3/31/2020 DONE

Rabu, 01/03/2020 1. Shop drawing (memo) :


Anderson : LT.P1, LT.P2 & LT.P3 4/1/2020 3/31/2020 DONE
LaViz : LT.P1, LT.P2-P4 3/31/2020 3/31/2020
2. Input progress blockwall dari FE for meeting
3. Asbuilt drawing Benson : 4/1/2020 4/1/2020 DONE
LT.LG & G

Kamis, 02/04/2020 1. Revisi penempatan gondola LT.P0 & LT.P6 4/2/2020 4/2/2020 DONE
2. Cek lapangan batas LT.LG & G (PTC - PM) 4/2/2020 DONE

Jum'at, 03/04/2020 1. Cek shop drawing Garbage Bin LT.LG 4/3/2020 DONE
2. Asbuilt drawing Benson LT.P1 & P2 4/3/2020 4/3/2020 DONE

Sabtu, 04/04/2020 1. Cek shop drawing Unit LT.23 (01) & (10) 4/4/2020 DONE
2. Schedule dan laporan shop drawing 4/4/2020 4/4/2020 DONE
3. Asbuilt drawing Benson LT. P3 & P4 4/4/2020 KEEP

Mengetahui, Mengetahui,

M. Abduh Putu Johni


Deputy Project Manager Engineering