Anda di halaman 1dari 4

10

12

14
2

6
A

LOGO

LOKASI

B
PROJECT
C

Project Name

KONSULTAN PERENCANA

D
DAFTAR GAMBAR
E

KODE
NAMA PEKERJAAN GAMBAR KODE PROYEK JENIS PEKERJAAN

F
DAFTAR GAMBAR AR-01-01 JLN-PVG-MSO PAVING BLOCK
DENAH AR-01-02 JLN-PVG-MSO PAVING BLOCK
POTONGAN AR-01-03 JLN-PVG-MSO PAVING BLOCK
VOLUME PEKERJAAN PAVING AR-01-04 JLN-PVG-MSO PAVING BLOCK
DISETUJUI
BLOCK
Owner

H
I

REV. DESKRIPSI TANGGAL STATUS

J
DIGAMBAR Author
DIPERIKSA Checker
DISETUJUI Owner
PERHATIAN
K

L
KETERANGAN GAMBAR SKALA

A3
DAFTAR GAMBAR

25/11/2020 00:26:00
A4
PAVING BLOCK
M

NO. GAMBAR NO. KODE PROYEK GAMBAR

AR-01-01 JLN-PVG-MSO
11

13

15
1

5
10

12

14
2

6
A

LOGO

5000
LOKASI

B
130

PROJECT

2
C

1 DENAH AR-01-02 Project Name

AR-01-02
1 : 200 KONSULTAN PERENCANA

D
E

PAVING BLOCK

F
KANSTEEN COR BETON

DRAINASE

DISETUJUI
29

1529
Owner

H
130

100
I

15
REV. DESKRIPSI TANGGAL STATUS

3
1
AR-01-02

J
AR-01-03 DIGAMBAR Author
DIPERIKSA Checker
DISETUJUI Owner

3 POLA PAVING PERHATIAN

2 DENAH DETAIL
AR-01-02
1 : 20
K

AR-01-02
1 : 50

L
KETERANGAN GAMBAR SKALA

A3
DENAH As

25/11/2020 00:26:00
indicated
A4
PAVING BLOCK
M

NO. GAMBAR NO. KODE PROYEK GAMBAR

AR-01-02 JLN-PVG-MSO
11

13

15
1

5
10

12

14
2

6
A

LOGO

2 PLASTERAN + ACIAN KANSTIN


PAS.BATU PAVING TBL = 8 cm
AR-01-03
KANSTEEN COR BETON
PASIR PASANG TEBAL = 5 cm TANPA TULANGAN 225 Mpa LOKASI

B
PASIR BATU/SIRTU TBL =5 cm DRAINASE

5 5 8
PROJECT

18
C

Level 1 Project Name


34

33

35
0
KONSULTAN PERENCANA
URUGAN TANAH

D
3
AR-01-03
15 100 15 29
E

1 POTONGAN 1

F
AR-01-03
1 : 10

15 DISETUJUI

PLASTERAN + ACIAN BATU PAVING TBL 8cm


1

Owner

H
PASIR PASANG TBL 5cm 11
8

COR BETON TANPA


TULANGAN T=33cm
18

PASIR BATU/SIRTU
5

TBL 5cm
I

REV. DESKRIPSI TANGGAL STATUS

21
34

Level 1 Level 1
33

0 0

J
DIGAMBAR Author
DIPERIKSA Checker

8
DISETUJUI Owner
PERHATIAN
11 • SEMUA UKURAN DALAM MILIMETER KECUALI, DITENTUKAN LAIN
• SEBELUM PELAKSANAAN PEKERJAAN DIMULAI, PELAKSANA DIW AJIBKAN
K

MEMERIKSA, MEMBANDINGKAN, SEMUA GAMBAR DANMELAPORKAN


KEPADA DIREKSI LAPANGAN/PERENCANA BILA TERDAPAT HAL-HAL YANG
TIDAK COCOK TERMASUK DIMENSI ATAU UKURAN
• SEBELUM PELAKSANAAN DIMULAI, KONTRAKTORDIWAJIBKAN MENGADAKAN
PENGECEKAN BANGUNAN EKSISTING DAN DITUANGKAN DALAM GAMBAR
SHOP DRAWING YANG DISETUJUI OLEH DIREKSI LAPANGAN ATAU
PERENCANA

2 DETAIL KANSTIN 3 DETAIL PAVING BLOCK 4 DETAIL BATU PAVING • DILARANG MENGGANDAKAN ATAUMENG-COPY SELURUH ATAU SEBAGIAN
GAMBAR TANPA SEIJIN TERTULIS DARI KONSULTAN PERENCANA

L
KETERANGAN GAMBAR SKALA
AR-01-03 AR-01-03 AR-01-03
1:5 1:5 1 : 10 A3
POTONGAN As

25/11/2020 00:26:00
indicated
A4
PAVING BLOCK
M

NO. GAMBAR NO. KODE PROYEK GAMBAR

AR-01-03 JLN-PVG-MSO
11

13

15
1

5
10

12

14
2

6
A

LOGO

LOKASI

B
PROJECT
C

Project Name

KONSULTAN PERENCANA

D
VOLUME PEKERJAAN PAVING BLOCK
E

JENIS PEKERJAAN NAMA MATERIAL VOLUME m3 LUAS m2

PEKERJAAN PAVING PASIR BATU/SIRTU 2.50 m³ 50 m²

F
BLOCK
PEKERJAAN PAVING PASIR PASANG 2.50 m³ 50 m²
BLOCK
PEKERJAAN PAVING BATU PAVING 4.00 m³ 50 m²
BLOCK DISETUJUI

PEKERJAAN PAVING Default Roof 0.15 m³ 15 m²


BLOCK Owner

PEKERJAAN PAVING PLASTERAN-KANSTIN 4.95 m³ 15 m²

H
BLOCK
I

REV. DESKRIPSI TANGGAL STATUS

J
DIGAMBAR Author
DIPERIKSA Checker
DISETUJUI Owner
PERHATIAN

• SEMUA UKURAN DALAM MILIMETER KECUALI, DITENTUKAN LAIN


• SEBELUM PELAKSANAAN PEKERJAAN DIMULAI, PELAKSANA DIW AJIBKAN
K

MEMERIKSA, MEMBANDINGKAN, SEMUA GAMBAR DANMELAPORKAN


KEPADA DIREKSI LAPANGAN/PERENCANA BILA TERDAPAT HAL-HAL YANG
TIDAK COCOK TERMASUK DIMENSI ATAU UKURAN
• SEBELUM PELAKSANAAN DIMULAI, KONTRAKTORDIWAJIBKAN MENGADAKAN
PENGECEKAN BANGUNAN EKSISTING DAN DITUANGKAN DALAM GAMBAR
SHOP DRAWING YANG DISETUJUI OLEH DIREKSI LAPANGAN ATAU
PERENCANA
• DILARANG MENGGANDAKAN ATAUMENG-COPY SELURUH ATAU SEBAGIAN
GAMBAR TANPA SEIJIN TERTULIS DARI KONSULTAN PERENCANA

L
KETERANGAN GAMBAR SKALA

A3
VOLUME PEKERJAAN

25/11/2020 00:26:01
PAVING BLOCK
A4
PAVING BLOCK
M

NO. GAMBAR NO. KODE PROYEK GAMBAR

AR-01-04 JLN-PVG-MSO
11

13

15
1

Anda mungkin juga menyukai