NOVEMBER 2019
LOKASI
rta
PROYEK
ka
Ja
Ke
PLT KABUPATEN TANGERANG DKI.JAKARTA
Ke
GS
ura Ke
laya
Jak Ke
art J
Ke a ak
Tenjo Ja KEC.LIMO art KEC.GN PUTRI
ka Gandul 75 a
rta Limo KEC.CIMANGGIS
193
Parungpanjang KEC.DEPOK
33 KEC.SEWANGAN 40 87
KEC.TENJO 100 Sawangan Depok Cimanggis Cileungsi 21 KAB. BOGOR
KEC.PARUNGPANJANG 84 03 38 16
Parung 13 197 88
Bojong Gede 36 KABUPATEN BEKASI
Rumpin 23 Klapanunggal
06 42 19
Ke G
85 49 Jonggol
ardu
Indu KEC.PARUNG Cibinong Gn. Putri
k Bun
ar 44 28 37
39 KEC.CIGUDEG Cariu
KEC.BOJONG GEDE 18 KEC.CILEUNGSI
Jasinga 50 111
86 Citeureup 90
12 27 41
71 KEC.RUMPIN
Kemang KEC.CIBINONG
KEC.JONGGOL
34 89
68 KABUPATEN
194 Semplak
35 KEC.SEMPLAK 91 PURWAKARTA
98
tung
Cigudeg 92 KEC.CIOMAS 15 63 41 60 10 KEC.CARIU
angk
asbi 97 69 Cibungbulang 55 Kd. Halang
Ke R KEC.JASINGA 72 04 Sukamakmur
31 22 43 20
24 Leuwiliang Ciomas KEC.CITEUREUP
67 BOGOR 83 01
96 93 58
KABUPATEN LEBAK 95 94 57 25 62 50
61 Ciampea 29 47 59
Nanggung 17 74
KEC.CIAMPEA 02 KEC.KD.HALANG
73 KEC.CIOMAS 48
56 12 61 KABUPATEN
51 KEC.CIAWI KARAWANG
14 Ciawi 05 Cisarua 09
66 Ke
81 ( S Gard
26 AG u
KEC.NANGGUNG 54 196 82 08 UL Ind
ING uk
195 ) Laga
Caringin da KABUPATEN CIANJUR
Puncak 07 r
Ke
Ke Cijeruk 30 70
la
pa
nu
U ng
ga
Ke PL
TP Sa
lak 68
l
Ke Sukabu
KABUPATEN SUKABUMI
mi
DIAGRAM SUPERELEVASI
UNTUK SEMUA JENIS TIKUNGAN
LxC
LxT LT
LxT
LT1 LT2 LT
LxT
LEGENDA EXISTING LEGENDA RENCANA PENJELASAN UMUM UNTUK PLAN & PROFILE
B. POTONGAN MELINTANG
PEKERJAAN REALIGNMENT GEOMETRIK GERBANG TOL CIMANGGIS UTAMA
JALAN TOL JAGORAWI - TAHUN 2019
KONSULTAN PERENCANA Direncanakan dan Diajukan : Disetujui : PROYEK :
KODE PROYEK / TH PROVINSI
PEKERJAAN REALIGNMENT GEOMETRIK
PT. CIPTA SENDI BANGUNAN GERBANG TOL CIMANGGIS UTAMA 2019 JAWA BARAT
JALAN TOL JAGORAWI - TAHUN 2019
VILA NUSA INDAH 3 BLOK KA.1 NO. 10
BOJONG KULUR, GUNUNG PUTRI, BOGOR LEMBAR NO. TOTAL LEMBAR
Achsan N Okky Irawan Hendri Prabowo Dyah Indra Arianti TIPIKAL POTONGAN MAIN ROAD
TELP. 021 – 8273 4950 E-mail : csb_konsultan@yahoo.com
Operator Cad Highway Engineer Team Leader PT. Jasamarga Tollroad Maintenance
PADA DAERAH NORMAL B.01 03
GM Maintenance Management Administration
JAKARTA BOGOR
KONSULTAN PERENCANA Direncanakan dan Diajukan : Disetujui : PROYEK :
KODE PROYEK / TH PROVINSI
PEKERJAAN REALIGNMENT GEOMETRIK
PT. CIPTA SENDI BANGUNAN GERBANG TOL CIMANGGIS UTAMA 2019 JAWA BARAT
JALAN TOL JAGORAWI - TAHUN 2019
VILA NUSA INDAH 3 BLOK KA.1 NO. 10
BOJONG KULUR, GUNUNG PUTRI, BOGOR LEMBAR NO. TOTAL LEMBAR
Achsan N Okky Irawan Hendri Prabowo Dyah Indra Arianti TIPIKAL POTONGAN MAIN ROAD
TELP. 021 – 8273 4950 E-mail : csb_konsultan@yahoo.com
Operator Cad Highway Engineer Team Leader PT. Jasamarga Tollroad Maintenance
PADA DAERAH PELEBARAN B.02 03
GM Maintenance Management Administration
JAKARTA
BOGOR
DETAIL A
JAKARTA BOGOR
KONSULTAN PERENCANA Direncanakan dan Diajukan : Disetujui : PROYEK :
KODE PROYEK / TH PROVINSI
PEKERJAAN REALIGNMENT GEOMETRIK
PT. CIPTA SENDI BANGUNAN GERBANG TOL CIMANGGIS UTAMA 2019 JAWA BARAT
JALAN TOL JAGORAWI - TAHUN 2019
VILA NUSA INDAH 3 BLOK KA.1 NO. 10
BOJONG KULUR, GUNUNG PUTRI, BOGOR LEMBAR NO. TOTAL LEMBAR
Achsan N Okky Irawan Hendri Prabowo Dyah Indra Arianti
TELP. 021 – 8273 4950 E-mail : csb_konsultan@yahoo.com
Operator Cad Highway Engineer PT. Jasamarga Tollroad Maintenance TIPIKAL POTONGAN RAMP OFF B.03 03
Team Leader GM Maintenance Management Administration
C. ALINYEMEN LAYOUT
PEKERJAAN REALIGNMENT GEOMETRIK GERBANG TOL CIMANGGIS UTAMA
JALAN TOL JAGORAWI - TAHUN 2019
C1. ALINYEMEN LAYOUT JALAN UTAMA
PEKERJAAN REALIGNMENT GEOMETRIK GERBANG TOL CIMANGGIS UTAMA
JALAN TOL JAGORAWI - TAHUN 2019
KONSULTAN PERENCANA Direncanakan dan Diajukan : Disetujui : PROYEK :
KODE PROYEK / TH PROVINSI
PEKERJAAN REALIGNMENT GEOMETRIK
PT. CIPTA SENDI BANGUNAN GERBANG TOL CIMANGGIS UTAMA 2019 JAWA BARAT
9291600 Y
JALAN TOL JAGORAWI - TAHUN 2019
VILA NUSA INDAH 3 BLOK KA.1 NO. 10
BOJONG KULUR, GUNUNG PUTRI, BOGOR LEMBAR NO. TOTAL LEMBAR
Achsan N Okky Irawan Hendri Prabowo Dyah Indra Arianti ALINYEMEN LAYOUT MAINROAD
TELP. 021 – 8273 4950 E-mail : csb_konsultan@yahoo.com
Operator Cad Highway Engineer Team Leader PT. Jasamarga Tollroad Maintenance C.01 05
GM Maintenance Management Administration STS. 18+000 ~ STA.19+400
KEY PLAN
K
DEPO G
GGUN
WINAN
U
PATOK
LEU
FO
JALAN
9291200 Y
PATOK
FO PATOK
FO
8+000
BP = STA.1
INAT
KOORD 710000 X
70 9978 .911
X= 8.672
Y = 929003
JAKARTA
PATOK BM.1B
K
PATOK BM.1A FO
PO
2 709920.200
FO X = 709947.93 9291305.791
DE
59
Y = 9291406.2 77.893
77.918
NG
Z=
GU
9290800 Y
NG
INA
UW
N LE
LA
JA
710000 X U
PATOK
PATOK FO
9290800 Y
FO
BM.39B
90.830
X = 7098
8
Y = 9290202.84
73.697
Z=
GARIS IMPIT STA.18+700
JAKARTA
PATOK
FO PATOK
PATOK FO
PATOK FO
FO
KONSULTAN PERENCANA Direncanakan dan Diajukan : Disetujui : PROYEK :
KODE PROYEK / TH PROVINSI
PEKERJAAN REALIGNMENT GEOMETRIK
PT. CIPTA SENDI BANGUNAN GERBANG TOL CIMANGGIS UTAMA 2019 JAWA BARAT
JALAN TOL JAGORAWI - TAHUN 2019
VILA NUSA INDAH 3 BLOK KA.1 NO. 10
BOJONG KULUR, GUNUNG PUTRI, BOGOR LEMBAR NO. TOTAL LEMBAR
Achsan N Okky Irawan Hendri Prabowo Dyah Indra Arianti ALINYEMEN LAYOUT MAINROAD
TELP. 021 – 8273 4950 E-mail : csb_konsultan@yahoo.com
Operator Cad Highway Engineer Team Leader PT. Jasamarga Tollroad Maintenance C.02 05
GM Maintenance Management Administration STS. 19+400 ~ STA.19+626.427
KEY PLAN
7
EP = 19+626.42
KOORDINAT
3
X = 709843.35
57
PATOK Y = 9289979.1
BM.40B
9
X = 709875.71
78
Y = 9290071.8 2
71.15
Z=
GARIS IMPIT STA.19+400
709800 X
9290800 Y
PATOK
FO
PATOK
709800 X
FO
9290800 Y
BM.2A
X= 709709.071
Y= 9290032.03
78.944
KONSULTAN PERENCANA Direncanakan dan Diajukan : Disetujui : PROYEK :
KODE PROYEK / TH PROVINSI
PEKERJAAN REALIGNMENT GEOMETRIK
PT. CIPTA SENDI BANGUNAN GERBANG TOL CIMANGGIS UTAMA 2019 JAWA BARAT
JALAN TOL JAGORAWI - TAHUN 2019
VILA NUSA INDAH 3 BLOK KA.1 NO. 10
BOJONG KULUR, GUNUNG PUTRI, BOGOR LEMBAR NO. TOTAL LEMBAR
Achsan N Okky Irawan Hendri Prabowo Dyah Indra Arianti
TELP. 021 – 8273 4950 E-mail : csb_konsultan@yahoo.com
PT. Jasamarga Tollroad Maintenance DATA KURVA MAINROAD C.03 05
Operator Cad Highway Engineer Team Leader GM Maintenance Management Administration
C2. ALINYEMEN LAYOUT JALAN AKSES MASUK
PEKERJAAN REALIGNMENT GEOMETRIK GERBANG TOL CIMANGGIS UTAMA
JALAN TOL JAGORAWI - TAHUN 2019
KONSULTAN PERENCANA Direncanakan dan Diajukan : Disetujui : PROYEK :
KODE PROYEK / TH PROVINSI
PEKERJAAN REALIGNMENT GEOMETRIK
PT. CIPTA SENDI BANGUNAN GERBANG TOL CIMANGGIS UTAMA 2019 JAWA BARAT
JALAN TOL JAGORAWI - TAHUN 2019
VILA NUSA INDAH 3 BLOK KA.1 NO. 10
BOJONG KULUR, GUNUNG PUTRI, BOGOR LEMBAR NO. TOTAL LEMBAR
Achsan N Okky Irawan Hendri Prabowo Dyah Indra Arianti
TELP. 021 – 8273 4950 E-mail : csb_konsultan@yahoo.com
Operator Cad Highway Engineer PT. Jasamarga Tollroad Maintenance ALINYEMEN LAYOUT C.04 05
Team Leader GM Maintenance Management Administration
KEY PLAN
709600 X
9290800 Y
BEGINNING POINT
STA= 0+000
X = 709658.079
Y = 9290038.672
BM.2B
.414
X = 709657 39
2.8
Y = 929003 550
Z= 80.
BM.2A
.071
X = 709709 3
2.0
Y = 929003 944
Z= 78.
ENDING POINT
STA=0+389.724
U
X = 709858.738
Y = 9290303.889
PATOK
PATOK FO
FO
PATOK
FO
JAKARTA
BOGOR
BM.40B
.719 BM.39B
X = 709875 78 .830
1.8
Y = 929007 152 X = 709890 48
71. 2.8
Z= Y = 929020 697
Z= 73.
PATOK
FO
KONSULTAN PERENCANA Direncanakan dan Diajukan : Disetujui : PROYEK :
KODE PROYEK / TH PROVINSI
PEKERJAAN REALIGNMENT GEOMETRIK
PT. CIPTA SENDI BANGUNAN GERBANG TOL CIMANGGIS UTAMA 2019 JAWA BARAT
JALAN TOL JAGORAWI - TAHUN 2019
VILA NUSA INDAH 3 BLOK KA.1 NO. 10
BOJONG KULUR, GUNUNG PUTRI, BOGOR LEMBAR NO. TOTAL LEMBAR
Achsan N Okky Irawan Hendri Prabowo Dyah Indra Arianti
TELP. 021 – 8273 4950 E-mail : csb_konsultan@yahoo.com
Operator Cad Highway Engineer PT. Jasamarga Tollroad Maintenance DATA KURVA JALAN AKSES MASUK C.05 05
Team Leader GM Maintenance Management Administration
D. PLAN DAN PROFIL
PEKERJAAN REALIGNMENT GEOMETRIK GERBANG TOL CIMANGGIS UTAMA
JALAN TOL JAGORAWI - TAHUN 2019
D1. PLAN DAN PROFIL JALAN UTAMA
PEKERJAAN REALIGNMENT GEOMETRIK GERBANG TOL CIMANGGIS UTAMA
JALAN TOL JAGORAWI - TAHUN 2019
KONSULTAN PERENCANA Direncanakan dan Diajukan : Disetujui : PROYEK :
KODE PROYEK / TH PROVINSI
PEKERJAAN REALIGNMENT GEOMETRIK
PT. CIPTA SENDI BANGUNAN GERBANG TOL CIMANGGIS UTAMA 2019 JAWA BARAT
JALAN TOL JAGORAWI - TAHUN 2019
VILA NUSA INDAH 3 BLOK KA.1 NO. 10
BOJONG KULUR, GUNUNG PUTRI, BOGOR LEMBAR NO. TOTAL LEMBAR
Achsan N Okky Irawan Hendri Prabowo Dyah Indra Arianti PLAN PROFILE MAINROAD
TELP. 021 – 8273 4950 E-mail : csb_konsultan@yahoo.com
Operator Cad Highway Engineer Team Leader PT. Jasamarga Tollroad Maintenance D.01 04
GM Maintenance Management Administration STS. 18+000 ~ STA.18+700
KEY PLAN
K
DEPO
: PELEBARAN
GUNG
INANG
U
LEUW
PATOK
FO
JALAN
9291200 Y
PATOK
FO PATOK
FO
710000 X
JAKARTA
PATOK BM.1B
K
PATOK BM.1A FO
PO
FO .932 709920.200
X = 709947
DE
59 9291305.791
Y = 9291406.2 77.893
77. 918
NG
Z=
GU
NG
INA
UW
N LE
LA
JA
ELEVASI
RENCANA
ELEVASI
EXISTING
SUPER
ELEVATION
DIAGRAM
LENGKUNG
STATION
KONSULTAN PERENCANA Direncanakan dan Diajukan : Disetujui : PROYEK :
KODE PROYEK / TH PROVINSI
PEKERJAAN REALIGNMENT GEOMETRIK
PT. CIPTA SENDI BANGUNAN GERBANG TOL CIMANGGIS UTAMA 2019 JAWA BARAT
JALAN TOL JAGORAWI - TAHUN 2019
VILA NUSA INDAH 3 BLOK KA.1 NO. 10
BOJONG KULUR, GUNUNG PUTRI, BOGOR LEMBAR NO. TOTAL LEMBAR
Achsan N Okky Irawan Hendri Prabowo Dyah Indra Arianti PLAN PROFILE MAINROAD
TELP. 021 – 8273 4950 E-mail : csb_konsultan@yahoo.com
Operator Cad Highway Engineer Team Leader PT. Jasamarga Tollroad Maintenance D.02 04
GM Maintenance Management Administration STS. 18+700 ~ STA.19+400
KEY PLAN
: PELEBARAN
9290800 Y
U
710000 X
PATOK
PATOK FO
9290800 Y
FO
BM.39B
90.830
X = 7098 48
Y = 9290202.8
73.697
Z=
BOGOR
JAKARTA
PATOK
FO PATOK
PATOK FO
PATOK FO
FO
ELEVASI
RENCANA
ELEVASI
EXISTING
SUPER
ELEVATION
DIAGRAM
LENGKUNG
STATION
KONSULTAN PERENCANA Direncanakan dan Diajukan : Disetujui : PROYEK :
KODE PROYEK / TH PROVINSI
PEKERJAAN REALIGNMENT GEOMETRIK
PT. CIPTA SENDI BANGUNAN GERBANG TOL CIMANGGIS UTAMA 2019 JAWA BARAT
JALAN TOL JAGORAWI - TAHUN 2019
VILA NUSA INDAH 3 BLOK KA.1 NO. 10
BOJONG KULUR, GUNUNG PUTRI, BOGOR LEMBAR NO. TOTAL LEMBAR
Achsan N Okky Irawan Hendri Prabowo Dyah Indra Arianti PLAN PROFILE MAINROAD
TELP. 021 – 8273 4950 E-mail : csb_konsultan@yahoo.com
Operator Cad Highway Engineer Team Leader PT. Jasamarga Tollroad Maintenance D.03 04
GM Maintenance Management Administration STS. 19+400 ~ STA.19+626.427
KEY PLAN
PATOK
BM.40B
9
X = 709875.71
78
Y = 9290071.8 2
71.15
Z=
GARIS IMPIT STA.19+400
BOGOR
JAKARTA
709800 X
9290800 Y
PATOK
FO
PATOK
709800 X
FO
9290800 Y
BM.2A
X= 709709.071
Y= 9290032.03
78.944
ELEVASI
RENCANA
ELEVASI
EXISTING
SUPER
ELEVATION
DIAGRAM
LENGKUNG
STATION
D2. PLAN DAN PROFIL JALAN AKSES MASUK
PEKERJAAN REALIGNMENT GEOMETRIK GERBANG TOL CIMANGGIS UTAMA
JALAN TOL JAGORAWI - TAHUN 2019
KONSULTAN PERENCANA Direncanakan dan Diajukan : Disetujui : PROYEK :
KODE PROYEK / TH PROVINSI
PEKERJAAN REALIGNMENT GEOMETRIK
PT. CIPTA SENDI BANGUNAN GERBANG TOL CIMANGGIS UTAMA 2019 JAWA BARAT
JALAN TOL JAGORAWI - TAHUN 2019
VILA NUSA INDAH 3 BLOK KA.1 NO. 10
BOJONG KULUR, GUNUNG PUTRI, BOGOR LEMBAR NO. TOTAL LEMBAR
Achsan N Okky Irawan Hendri Prabowo Dyah Indra Arianti
TELP. 021 – 8273 4950 E-mail : csb_konsultan@yahoo.com
Operator Cad Highway Engineer PT. Jasamarga Tollroad Maintenance PLAN DAN PROFILE D.04 04
Team Leader GM Maintenance Management Administration
KEY PLAN
INT
G PO
E GINNIN 00
B 0+0
STA= 8.079
= 7 0965 38.672
X 2 900
Y=9 ENDING POINT
DIVERGING CHEVRON
STA: 0+000 MERGING NOSE STA. 1+224.330
M.2
B
B
14
57.4 9 X = 709658.079 STA: 0+309.590 X = 709878.066
7096 2.83
X = 92900380.550
Y = 9290038.672 Y = 9290492.776
Y=
Z= X = 709847.038
Y = 9290224.541
OK
PAT
FO
.2A
BM 71
09.0
7097 032.03
X= 9290 78.944
Y=
Z=
OK OK
PAT PAT
FO FO
A
ART
JAK
OR
BOG
.39B
BM 30
90.8 8
7098 2.84
X = 92902073.697
Y=
Z=
OK
PAT
E. CROSS SECTION
PEKERJAAN REALIGNMENT GEOMETRIK GERBANG TOL CIMANGGIS UTAMA
JALAN TOL JAGORAWI - TAHUN 2019
E1. CROSS SECTION JALAN UTAMA
PEKERJAAN REALIGNMENT GEOMETRIK GERBANG TOL CIMANGGIS UTAMA
JALAN TOL JAGORAWI - TAHUN 2019
KONSULTAN PERENCANA Direncanakan dan Diajukan : Disetujui : PROYEK :
KODE PROYEK / TH PROVINSI
PEKERJAAN REALIGNMENT GEOMETRIK
PT. CIPTA SENDI BANGUNAN GERBANG TOL CIMANGGIS UTAMA 2019 JAWA BARAT
JALAN TOL JAGORAWI - TAHUN 2019
VILA NUSA INDAH 3 BLOK KA.1 NO. 10
BOJONG KULUR, GUNUNG PUTRI, BOGOR LEMBAR NO. TOTAL LEMBAR
Achsan N Okky Irawan Hendri Prabowo Dyah Indra Arianti POTONGAN MELINTANG
TELP. 021 – 8273 4950 E-mail : csb_konsultan@yahoo.com
Operator Cad Highway Engineer PT. Jasamarga Tollroad Maintenance E1.01 26
Team Leader GM Maintenance Management Administration STA:19+384.580 ~ STA:19+359.581
STA: 19+384.580
JAKARTA BOGOR
MP
MP
GD
GD
NOMOR TITIK
BR
BR
BR
BR
SP
SP
SP
SP
SP
SP
SP
SP
JA
JA
SH SH JA MP BRBR CR11 MP MP MP JA GD BR BR MP MP SH
0.94
0.03
0.53
0.06
0.75
0.60
0.34
0.59
0.41
0.50
0.62
0.41
0.13
0.50
0.13
JARAK 7.64 1.21 3.18 1.83 3.49 5.00 2.80 14.84 1.77 1.67 1.47 15.37 2.81 1.18 3.74 1.35 4.08 3.22 2.03 1.85
74.421
74.221
73.760
73.181
73.178
73.767
73.755
73.800
73.888
73.907
73.915
73.959
74.039
74.047
74.032
74.220
74.175
74.175
74.199
74.259
74.250
74.021
73.928
73.869
74.434
74.421
74.327
74.160
74.036
73.987
73.749
73.124
73.145
74.050
74.147
ELEV.TANAH ASLI
100.43
103.64
104.05
106.08
106.21
106.71
106.84
108.69
29.27
30.48
31.42
31.45
31.98
32.04
35.22
37.05
40.54
41.30
41.89
42.23
47.23
47.82
50.61
65.45
67.22
67.64
69.31
69.80
71.28
86.64
89.45
90.63
94.37
95.00
96.34
JARAK LANGSUNG
STA: 19+359.581
JAKARTA BOGOR
GD
GD
NOMOR TITIK
BR
BR
BR
SP
SP
SP
SP
SP
SP
SP
SP
JA
JA
SH JA MP BR MP BR BR MP CR12 MP MP MP JA JA MP MP SH SH
0.09
0.48
0.06
0.49
0.67
0.77
0.41
0.56
0.30
0.13
0.47
0.08
JARAK 1.16 2.07 1.82 3.55 0.98 4.27 1.48 1.00 14.93 1.79 1.58 1.47 15.36 3.01 1.32 3.69 4.05 3.07 1.15 1.55 7.18
74.272
74.066
73.448
73.451
74.041
74.156
74.190
74.285
74.301
74.313
74.331
74.435
74.434
74.504
74.519
74.736
74.677
74.677
74.764
74.784
74.789
74.561
74.499
74.748
74.614
74.460
74.319
74.327
74.173
73.328
73.464
74.493
74.564
79.951
ELEV.TANAH ASLI
104.82
23.82
24.98
25.07
25.55
25.61
27.68
29.51
33.06
33.55
34.22
35.20
39.47
40.24
41.72
42.72
57.66
59.44
59.85
61.44
61.99
63.46
78.82
81.82
83.14
86.84
90.89
93.96
94.26
95.41
95.54
96.01
96.09
97.64
JARAK LANGSUNG
KONSULTAN PERENCANA Direncanakan dan Diajukan : Disetujui : PROYEK :
KODE PROYEK / TH PROVINSI
PEKERJAAN REALIGNMENT GEOMETRIK
PT. CIPTA SENDI BANGUNAN GERBANG TOL CIMANGGIS UTAMA 2019 JAWA BARAT
JALAN TOL JAGORAWI - TAHUN 2019
VILA NUSA INDAH 3 BLOK KA.1 NO. 10
BOJONG KULUR, GUNUNG PUTRI, BOGOR LEMBAR NO. TOTAL LEMBAR
Achsan N Okky Irawan Hendri Prabowo Dyah Indra Arianti POTONGAN MELINTANG
TELP. 021 – 8273 4950 E-mail : csb_konsultan@yahoo.com
Operator Cad Highway Engineer Team Leader PT. Jasamarga Tollroad Maintenance E1.02 26
GM Maintenance Management Administration STA:19+334.581 ~ STA:19+309.581
STA: 19+334.581
JAKARTA BOGOR
MP
GD
GD
NOMOR TITIK
BR
BR
BR
BR
SH
SP
SP
SP
SP
SP
SP
SP
SP
JA
JA
PDS SH SH JA MP MP BRBR CR13 MP MP MP MP MP SH
0.76
0.10
0.45
0.07
0.41
0.63
0.62
0.41
0.44
0.35
0.95
0.15
0.41
0.23
1.03
JARAK 3.43 1.07 1.98 1.82 3.56 1.19 4.17 2.62 15.01 1.63 1.76 1.52 15.32 6.44 4.32 2.89 7.39
80.225
80.206
74.866
74.491
73.882
73.896
74.450
74.628
74.677
74.784
74.811
74.804
74.827
74.914
74.930
74.969
75.246
75.198
75.198
75.271
75.264
75.263
75.071
75.063
74.895
74.775
74.724
74.491
74.053
74.125
75.064
75.051
79.340
ELEV.TANAH ASLI
14.63
15.38
18.82
19.89
19.98
20.43
20.50
22.48
24.30
27.85
28.26
28.89
30.08
34.25
34.87
37.49
52.50
54.13
54.54
56.30
56.74
58.26
73.58
80.02
84.34
87.23
87.58
88.54
88.68
89.09
89.31
90.34
97.73
JARAK LANGSUNG
Pagar Tol
STA: 19+309.581
JAKARTA BOGOR
GD
GD
NOMOR TITIK
BR
BR
BR
BR
SP
SP
SP
SP
SP
SP
SP
SP
JA
JA
PGR SH JA MP MP MP BR BR CR14 MP MP MP MP MP SH
0.14
0.42
0.06
0.37
0.62
0.67
0.41
0.47
0.36
0.86
0.11
0.57
0.12
1.18
JARAK 6.23 1.06 1.97 1.78 3.57 1.28 2.58 1.47 2.70 15.03 1.62 1.77 1.54 15.24 4.52 4.88 2.92 6.59
80.119
75.486
75.076
74.493
74.461
75.046
75.145
75.189
75.299
75.302
75.315
75.323
75.385
75.398
75.427
75.483
75.739
75.704
75.704
75.726
75.792
75.809
75.527
75.516
75.356
75.227
75.153
75.066
74.498
74.528
75.529
75.600
ELEV.TANAH ASLI
17.13
23.36
24.41
24.55
24.97
25.03
27.00
28.78
32.35
32.72
33.34
34.62
37.20
38.67
39.34
42.05
57.08
58.69
59.10
60.87
61.34
62.88
78.12
82.63
87.51
90.43
90.79
91.65
91.75
92.32
92.44
93.62
JARAK LANGSUNG
KONSULTAN PERENCANA Direncanakan dan Diajukan : Disetujui : PROYEK :
KODE PROYEK / TH PROVINSI
PEKERJAAN REALIGNMENT GEOMETRIK
PT. CIPTA SENDI BANGUNAN GERBANG TOL CIMANGGIS UTAMA 2019 JAWA BARAT
JALAN TOL JAGORAWI - TAHUN 2019
VILA NUSA INDAH 3 BLOK KA.1 NO. 10
BOJONG KULUR, GUNUNG PUTRI, BOGOR LEMBAR NO. TOTAL LEMBAR
Achsan N Okky Irawan Hendri Prabowo Dyah Indra Arianti POTONGAN MELINTANG
TELP. 021 – 8273 4950 E-mail : csb_konsultan@yahoo.com
Operator Cad Highway Engineer Team Leader PT. Jasamarga Tollroad Maintenance E1.03 26
GM Maintenance Management Administration STA:19+284.556 ~ STA:19+259.556
Pagar Tol
STA: 19+284.556
JAKARTA BOGOR
MP
GD
NOMOR TITIK
BR
BR
BR
BR
SP
SP
SP
SP
SP
SP
SP
SP
JA
PT SH JA MP MPMP BR BR CR15 MP GD JA MK MP MP MP SH SH
0.14
0.40
0.12
0.35
0.65
0.66
0.67
0.41
0.59
0.46
0.86
0.09
0.62
0.06
1.27
JARAK 5.94 0.97 1.94 1.77 3.59 1.35 3.35 2.72 15.03 1.59 1.76 1.46 15.18 2.32 5.75 2.88 7.28
79.651
75.920
75.627
75.087
75.072
75.648
75.695
75.727
75.801
75.800
75.814
75.822
75.839
75.882
75.909
75.971
76.239
76.248
76.248
76.173
76.263
76.287
76.010
75.964
75.799
75.678
75.671
75.609
75.029
75.043
76.016
76.149
80.342
ELEV.TANAH ASLI
12.75
18.69
19.65
19.80
20.19
20.31
22.25
24.02
27.61
27.96
28.62
29.97
30.63
33.98
34.64
37.37
52.39
53.98
54.40
56.15
56.75
58.20
73.38
75.70
81.45
84.33
84.79
85.64
85.73
86.35
86.41
87.68
94.96
JARAK LANGSUNG
Pagar Tol
STA: 19+259.556
JAKARTA BOGOR
GD
NOMOR TITIK
BR
BR
BR
BR
SP
SP
SP
SP
SP
SP
SP
SP
JA
JC PB SH JA MP MP BRBR CR16 MP GDJA MK MP MP SH SH
0.90
0.08
0.45
0.10
0.31
0.65
0.60
0.41
0.58
0.43
0.84
0.06
0.62
0.04
1.32
JARAK 2.66 4.20 1.93 1.80 3.61 1.44 4.02 2.78 15.08 1.54 1.79 1.47 15.15 6.72 3.02 7.08
78.715
78.647
76.209
76.063
75.501
75.533
76.112
76.177
76.211
76.266
76.282
76.270
76.277
76.390
76.389
76.440
76.782
76.783
76.783
76.690
76.729
76.751
76.429
76.323
76.190
76.125
76.098
75.507
75.531
76.492
76.697
80.763
ELEV.TANAH ASLI
13.00
13.90
13.98
14.43
14.52
16.45
18.25
21.86
22.17
22.83
24.27
28.29
28.89
31.67
46.75
48.29
48.70
50.49
51.07
52.53
67.68
74.41
77.43
77.86
78.70
78.76
79.38
79.41
80.73
87.81
6.14
8.80
JARAK LANGSUNG
KONSULTAN PERENCANA Direncanakan dan Diajukan : Disetujui : PROYEK :
KODE PROYEK / TH PROVINSI
PEKERJAAN REALIGNMENT GEOMETRIK
PT. CIPTA SENDI BANGUNAN GERBANG TOL CIMANGGIS UTAMA 2019 JAWA BARAT
JALAN TOL JAGORAWI - TAHUN 2019
VILA NUSA INDAH 3 BLOK KA.1 NO. 10
BOJONG KULUR, GUNUNG PUTRI, BOGOR LEMBAR NO. TOTAL LEMBAR
Achsan N Okky Irawan Hendri Prabowo Dyah Indra Arianti POTONGAN MELINTANG
TELP. 021 – 8273 4950 E-mail : csb_konsultan@yahoo.com
Operator Cad Highway Engineer Team Leader PT. Jasamarga Tollroad Maintenance E1.04 26
GM Maintenance Management Administration STA:19+234.556 ~ STA:19+209.559
Pagar Tol
STA: 19+234.556
JAKARTA BOGOR
MP
GD
NOMOR TITIK
BR
BR
BR
BR
SP
SP
SP
SP
SP
SP
SP
SP
JA
JC PB SH JA MP MP BRBR CR17 MP MK MP MP JA GD SH SH
0.06
0.46
0.10
0.49
0.60
0.61
0.41
0.54
0.66
0.96
0.04
0.63
0.01
1.34
JARAK 1.44 2.33 1.35 1.55 2.09 3.60 1.40 3.67 3.05 15.07 1.61 1.83 1.44 15.14 5.33 2.81 6.60
77.628
77.479
77.153
76.516
75.926
75.949
76.530
76.527
76.620
76.691
76.714
76.711
76.713
76.793
76.796
76.870
77.217
77.220
77.220
77.126
77.201
77.194
76.857
76.738
76.680
76.598
76.568
75.967
75.994
76.948
77.204
80.679
ELEV.TANAH ASLI
10.13
11.47
11.54
12.00
12.09
13.64
15.73
19.33
19.82
20.43
21.82
25.49
26.11
29.15
44.22
45.83
46.24
48.07
48.60
50.05
65.19
70.51
73.32
73.98
74.94
74.98
75.62
75.63
76.97
83.57
6.36
7.80
JARAK LANGSUNG
STA: 19+209.559
Pagar Tol
JAKARTA BOGOR
GD
NOMOR TITIK
BR
BR
BR
BR
SP
SP
SP
SP
SP
SP
SP
SP
JA
JA
JC PB SH MP MP BR BR CR18 MP MK MP MP JA GD SH
0.45
0.35
0.23
0.51
0.56
0.72
0.41
0.38
0.65
0.09
0.68
0.04
1.19
JARAK 1.91 3.07 4.38 3.27 2.46 1.84 3.53 1.47 3.66 2.95 15.21 1.58 1.88 1.53 15.14 3.98 2.77 0.97 6.43
76.568
76.344
76.672
75.161
74.976
76.596
76.763
76.940
76.976
77.034
77.089
77.102
77.115
77.129
77.205
77.216
77.306
77.648
77.670
77.670
77.561
77.595
77.612
77.313
77.236
77.066
77.019
76.917
76.293
76.294
77.277
77.364
ELEV.TANAH ASLI
11.08
11.53
15.92
16.27
19.54
22.00
22.23
24.07
27.60
28.12
28.68
30.15
33.81
34.52
37.47
52.68
54.26
54.67
56.55
56.93
58.45
73.59
77.57
80.34
80.98
81.95
82.04
82.73
82.76
83.96
6.10
8.01
JARAK LANGSUNG
KONSULTAN PERENCANA Direncanakan dan Diajukan : Disetujui : PROYEK :
KODE PROYEK / TH PROVINSI
PEKERJAAN REALIGNMENT GEOMETRIK
PT. CIPTA SENDI BANGUNAN GERBANG TOL CIMANGGIS UTAMA 2019 JAWA BARAT
JALAN TOL JAGORAWI - TAHUN 2019
VILA NUSA INDAH 3 BLOK KA.1 NO. 10
BOJONG KULUR, GUNUNG PUTRI, BOGOR LEMBAR NO. TOTAL LEMBAR
Achsan N Okky Irawan Hendri Prabowo Dyah Indra Arianti POTONGAN MELINTANG
TELP. 021 – 8273 4950 E-mail : csb_konsultan@yahoo.com
Operator Cad Highway Engineer Team Leader PT. Jasamarga Tollroad Maintenance E1.05 26
GM Maintenance Management Administration STA:19+184.558 ~ STA:19+159.558
STA: 19+184.558
Pagar Tol
JAKARTA BOGOR
GD
GD
NOMOR TITIK
BR
BR
BR
BR
SH
SH
SH
SP
SP
SP
SP
SP
SP
SP
SP
SP
SP
SP
SP
JA
JA
JC PB MP MP MP CR19 MP JA MK MP MP SH
0.77
0.32
0.15
0.55
0.01
0.16
0.09
1.69
0.28
0.74
0.42
0.55
0.23
0.11
0.80
0.07
0.81
0.63
JARAK 7.95 3.75 1.85 3.48 1.66 3.64 3.03 15.33 4.37 1.55 15.03 2.48 3.13 1.33 1.07 2.57 2.77
75.685
75.595
76.151
74.667
74.774
76.599
77.022
76.852
76.888
77.083
77.385
77.401
77.455
77.508
77.520
77.516
77.519
77.618
77.620
77.699
78.076
78.019
78.030
77.749
77.705
77.470
77.438
77.456
76.693
76.654
77.696
77.945
78.500
79.185
80.309
ELEV.TANAH ASLI
14.66
14.98
18.73
18.87
19.42
19.44
19.59
19.68
21.38
21.65
23.51
26.99
27.73
28.14
29.81
33.45
34.00
37.02
52.35
56.73
58.28
73.31
75.79
78.92
79.14
80.47
80.58
81.38
81.45
82.27
83.33
83.96
86.53
5.94
6.71
JARAK LANGSUNG
STA: 19+159.558
Pagar Tol
JAKARTA BOGOR
GD
GD
NOMOR TITIK
BR
BR
BR
BR
SP
SP
SP
JA
JA
JA
JC PB SH SH MP MP CR20 MP MK MP SH SH SH SH
0.25
0.21
0.54
0.29
0.37
0.59
0.44
0.46
0.16
0.66
JARAK 1.56 2.71 2.60 5.94 1.89 3.48 1.45 8.13 15.41 1.48 1.98 1.47 16.11 3.16 2.16 2.46 4.60
75.175
75.496
75.714
76.748
77.562
77.386
77.623
77.697
77.729
77.805
77.874
77.880
77.897
77.913
78.103
78.449
78.426
78.434
78.374
78.381
78.403
78.103
77.921
77.937
77.054
77.015
78.587
80.304
ELEV.TANAH ASLI
10.19
12.79
18.73
18.98
19.19
19.73
20.02
21.91
25.38
25.76
26.34
27.79
35.93
51.34
52.81
53.25
55.23
55.69
57.16
73.27
76.43
76.59
78.75
79.42
81.88
86.47
5.91
7.48
JARAK LANGSUNG
KONSULTAN PERENCANA Direncanakan dan Diajukan : Disetujui : PROYEK :
KODE PROYEK / TH PROVINSI
PEKERJAAN REALIGNMENT GEOMETRIK
PT. CIPTA SENDI BANGUNAN GERBANG TOL CIMANGGIS UTAMA 2019 JAWA BARAT
JALAN TOL JAGORAWI - TAHUN 2019
VILA NUSA INDAH 3 BLOK KA.1 NO. 10
BOJONG KULUR, GUNUNG PUTRI, BOGOR LEMBAR NO. TOTAL LEMBAR
Achsan N Okky Irawan Hendri Prabowo Dyah Indra Arianti POTONGAN MELINTANG
TELP. 021 – 8273 4950 E-mail : csb_konsultan@yahoo.com
Operator Cad Highway Engineer Team Leader PT. Jasamarga Tollroad Maintenance E1.06 26
GM Maintenance Management Administration STA:19+134.558 ~ STA:19+109.557
STA: 19+134.558
BOGOR JAKARTA
Pagar Tol
MP
MP
MP
GD
GD
GD
NOMOR TITIK
BR
BR
BR
BR
SP
SP
SP
SP
SP
JA
JA
JA
JC PB SH SH MP MP CR21 MK MP SP SP SH SH
0.23
0.22
0.55
0.24
0.43
0.60
0.93
0.18
0.44
0.43
0.35
0.25
0.69
JARAK 1.46 1.84 2.78 4.32 2.01 3.41 9.15 15.35 1.56 1.90 1.55 15.02 3.08 3.21 4.13 3.57 4.63
74.991
74.969
75.841
77.220
77.946
77.719
77.955
78.010
78.068
78.150
78.195
78.218
78.224
78.245
78.440
78.790
78.791
78.792
78.792
78.678
78.711
78.729
78.424
78.250
78.204
76.199
74.601
74.474
75.717
76.862
77.516
ELEV.TANAH ASLI
12.11
16.42
16.66
16.87
17.43
17.66
19.67
23.07
23.50
24.10
25.03
34.18
49.53
49.70
51.26
51.70
53.60
54.03
55.58
70.60
73.68
74.03
77.24
77.49
81.62
82.31
85.88
90.51
6.03
7.49
9.33
JARAK LANGSUNG
STA: 19+109.557
JAKARTA BOGOR
Pagar Tol
MP
MP
MP
GD
GD
GD
NOMOR TITIK
BR
BR
BR
BR
JA
JA
JA
PT PT JC JC PDS MP CR22 MK MP SH SH SH
0.24
0.49
0.59
0.58
0.44
0.44
0.32
0.24
JARAK 3.46 2.31 7.59 1.07 1.46 2.45 3.39 9.87 15.19 1.56 2.01 1.55 15.01 3.04 1.16 2.50 5.47
74.047
74.828
75.007
74.945
77.570
77.836
78.472
78.417
78.562
78.563
78.580
78.581
78.742
79.094
79.100
79.094
79.094
78.972
79.008
79.052
78.739
78.509
78.491
78.380
77.446
76.354
ELEV.TANAH ASLI
13.36
14.43
15.90
16.14
18.58
21.97
22.46
23.05
23.63
33.50
48.70
49.13
50.69
51.14
53.15
53.47
55.01
70.03
73.07
73.31
74.47
76.97
82.43
0.00
3.46
5.77
JARAK LANGSUNG
KONSULTAN PERENCANA Direncanakan dan Diajukan : Disetujui : PROYEK :
KODE PROYEK / TH PROVINSI
PEKERJAAN REALIGNMENT GEOMETRIK
PT. CIPTA SENDI BANGUNAN GERBANG TOL CIMANGGIS UTAMA 2019 JAWA BARAT
JALAN TOL JAGORAWI - TAHUN 2019
VILA NUSA INDAH 3 BLOK KA.1 NO. 10
BOJONG KULUR, GUNUNG PUTRI, BOGOR LEMBAR NO. TOTAL LEMBAR
Achsan N Okky Irawan Hendri Prabowo Dyah Indra Arianti POTONGAN MELINTANG
TELP. 021 – 8273 4950 E-mail : csb_konsultan@yahoo.com
Operator Cad Highway Engineer Team Leader PT. Jasamarga Tollroad Maintenance E1.07 26
GM Maintenance Management Administration STA:19+084.098 ~ STA:19+059.090
STA: 19+084.098
JAKARTA BOGOR
MP
GD
GD
GD
NOMOR TITIK
BR
BR
BR
BR
SH
JA
JA
JA
SH MP CR23 MP MP MK MP SH SH SH SH SH SH
0.56
0.10
0.48
0.57
0.54
0.95
0.44
0.34
0.36
JARAK 7.52 2.11 2.06 3.55 9.92 15.10 1.62 1.93 1.63 14.87 2.93 1.65 2.81 1.59 2.03 1.89 3.60 8.61
77.394
78.521
78.637
78.639
78.649
78.753
78.757
78.783
78.789
78.992
79.321
79.342
79.362
79.362
79.284
79.283
79.316
78.971
78.874
78.810
78.550
77.502
76.854
75.920
75.805
75.622
ELEV.TANAH ASLI
20.32
22.43
22.99
23.09
25.14
28.70
29.18
29.75
30.28
40.20
55.30
56.25
57.87
58.32
60.25
60.59
62.22
77.09
80.02
80.38
82.03
84.83
86.43
88.46
90.35
93.95
JARAK LANGSUNG
STA: 19+059.090
JAKARTA BOGOR
MP
GD
GD
GD
NOMOR TITIK
BR
BR
BR
BR
SP
SP
SP
JA
JA
JA
SH MP CR24 MP MP MK MP SH SH SH SH SH
0.84
0.24
0.20
0.53
0.18
0.41
0.63
0.52
0.44
0.48
0.32
0.81
JARAK 10.32 1.97 3.62 9.39 15.24 1.64 1.55 1.87 1.54 14.88 3.09 1.55 2.10 3.39 1.06 9.59
78.124
78.579
78.395
78.705
78.703
78.751
78.847
78.946
78.957
78.978
78.999
79.189
79.557
79.581
79.599
79.600
79.532
79.507
79.542
79.219
79.063
79.032
78.956
78.314
76.898
76.274
75.057
ELEV.TANAH ASLI
106.55
109.64
109.96
110.76
112.32
114.42
117.81
118.87
50.38
51.22
51.46
51.66
52.18
52.36
54.34
57.96
58.37
59.00
59.52
68.91
84.15
85.79
87.34
87.78
89.65
90.13
91.67
JARAK LANGSUNG
KONSULTAN PERENCANA Direncanakan dan Diajukan : Disetujui : PROYEK :
KODE PROYEK / TH PROVINSI
PEKERJAAN REALIGNMENT GEOMETRIK
PT. CIPTA SENDI BANGUNAN GERBANG TOL CIMANGGIS UTAMA 2019 JAWA BARAT
JALAN TOL JAGORAWI - TAHUN 2019
VILA NUSA INDAH 3 BLOK KA.1 NO. 10
BOJONG KULUR, GUNUNG PUTRI, BOGOR LEMBAR NO. TOTAL LEMBAR
Achsan N Okky Irawan Hendri Prabowo Dyah Indra Arianti POTONGAN MELINTANG
TELP. 021 – 8273 4950 E-mail : csb_konsultan@yahoo.com
Operator Cad Highway Engineer Team Leader PT. Jasamarga Tollroad Maintenance E1.08 26
GM Maintenance Management Administration STA:19+033.669 ~ STA:19+008.642
STA: 19+033.669
JAKARTA BOGOR
MP
MP
GD
GD
GD
NOMOR TITIK
BR
BR
BR
BR
SH
SH
SP
SP
SP
JA
JA
JA
MP CR25 MP MP MP MP SH SH
0.52
0.23
0.23
0.51
0.08
0.38
0.63
0.57
0.44
0.57
0.37
0.75
JARAK 11.04 1.98 3.63 8.51 15.37 2.56 1.61 1.80 1.39 15.00 3.10 6.47 6.23
78.684
78.828
78.616
78.892
78.896
78.928
79.045
79.148
79.150
79.195
79.194
79.341
79.745
79.797
79.801
79.801
79.741
79.758
79.754
79.465
79.235
79.146
78.972
76.216
73.671
ELEV.TANAH ASLI
105.44
108.53
108.91
109.65
116.12
122.36
49.44
49.96
50.18
50.41
50.92
51.00
52.98
56.61
56.99
57.62
58.19
66.70
82.06
84.62
86.23
86.68
88.48
89.05
90.44
JARAK LANGSUNG
STA: 19+008.642
JAKARTA BOGOR
MP
GD
GD
GD
NOMOR TITIK
BR
BR
BR
BR
SP
SP
SP
JC
JA
JA
SH SH SH MP CR26 MP MP MP MP SH SH SH
0.91
0.89
0.22
0.19
0.55
0.09
0.43
0.62
0.55
0.44
0.40
0.38
0.77
JARAK 6.24 4.34 1.87 3.65 7.42 15.51 3.54 1.57 1.97 1.49 14.92 3.11 5.60 4.19
75.695
78.113
78.889
79.108
78.884
79.100
79.107
79.131
79.213
79.307
79.314
79.345
79.341
79.472
79.912
79.976
79.982
79.983
79.918
79.942
79.949
79.673
79.538
79.350
79.118
76.726
74.847
ELEV.TANAH ASLI
106.17
109.28
109.66
110.43
116.02
120.21
44.60
48.94
49.86
50.74
50.96
51.15
51.70
51.80
53.66
57.31
57.75
58.37
58.92
66.33
81.85
85.38
86.95
87.40
89.36
89.76
91.25
JARAK LANGSUNG
KONSULTAN PERENCANA Direncanakan dan Diajukan : Disetujui : PROYEK :
KODE PROYEK / TH PROVINSI
PEKERJAAN REALIGNMENT GEOMETRIK
PT. CIPTA SENDI BANGUNAN GERBANG TOL CIMANGGIS UTAMA 2019 JAWA BARAT
JALAN TOL JAGORAWI - TAHUN 2019
VILA NUSA INDAH 3 BLOK KA.1 NO. 10
BOJONG KULUR, GUNUNG PUTRI, BOGOR LEMBAR NO. TOTAL LEMBAR
Achsan N Okky Irawan Hendri Prabowo Dyah Indra Arianti POTONGAN MELINTANG
TELP. 021 – 8273 4950 E-mail : csb_konsultan@yahoo.com
Operator Cad Highway Engineer Team Leader PT. Jasamarga Tollroad Maintenance E1.09 26
GM Maintenance Management Administration STA:18+983.454 ~ STA:18+958.420
STA: 18+983.454
JAKARTA BOGOR
MP
MP
MP
GD
GD
NOMOR TITIK
BR
BR
BR
BR
SH
SP
SP
SP
JC
JC
JA
SH SH SH SH CR27 MP MP GD MP SH
0.88
0.23
0.19
0.48
0.19
0.47
0.65
0.49
0.44
0.34
0.37
0.74
JARAK 4.40 4.44 1.57 2.34 5.51 6.27 15.50 4.94 1.23 2.11 1.87 14.97 2.81 6.64 9.68
75.408
77.176
77.928
79.047
79.216
78.986
79.151
79.224
79.245
79.419
79.430
79.439
79.451
79.580
79.994
80.091
80.105
80.106
80.104
80.071
79.797
79.785
79.676
79.444
79.193
76.585
ELEV.TANAH ASLI
101.90
102.27
103.00
109.64
33.99
38.44
40.00
42.34
43.22
43.46
43.65
44.12
44.31
49.82
50.29
50.94
51.43
57.69
73.19
78.13
79.36
79.80
81.91
83.79
98.76
99.09
JARAK LANGSUNG
STA: 18+958.420
JAKARTA BOGOR
Pagar Tol
Bidang Pers. = 68.00M
MP
MP
MP
GD
GD
GD
NOMOR TITIK
BR
BR
BR
BR
SH
SP
SP
SP
SP
PT
JC
JC
JC
JA
JA
SH MP CR28 MP MP MP SH SH
0.85
0.06
0.18
0.13
0.62
0.14
1.69
0.34
0.63
0.62
0.44
0.48
0.35
0.37
0.54
0.37
JARAK 2.88 3.75 4.97 15.32 6.26 1.62 1.85 1.51 14.90 2.79 6.67 10.14 4.12
77.789
79.148
79.272
79.045
79.064
79.308
79.337
79.380
79.452
79.537
79.554
79.542
79.572
79.651
80.048
80.179
80.201
80.213
80.201
80.166
80.144
79.833
79.823
79.738
79.604
79.275
76.365
72.612
70.827
70.991
ELEV.TANAH ASLI
101.36
111.50
115.62
115.99
31.41
34.29
35.14
35.20
35.38
35.51
36.13
36.26
37.96
41.71
42.05
42.68
43.30
48.28
63.59
69.85
71.47
71.91
73.76
74.24
75.74
90.64
91.00
93.78
94.15
94.69
JARAK LANGSUNG
KONSULTAN PERENCANA Direncanakan dan Diajukan : Disetujui : PROYEK :
KODE PROYEK / TH PROVINSI
PEKERJAAN REALIGNMENT GEOMETRIK
PT. CIPTA SENDI BANGUNAN GERBANG TOL CIMANGGIS UTAMA 2019 JAWA BARAT
JALAN TOL JAGORAWI - TAHUN 2019
VILA NUSA INDAH 3 BLOK KA.1 NO. 10
BOJONG KULUR, GUNUNG PUTRI, BOGOR LEMBAR NO. TOTAL LEMBAR
Achsan N Okky Irawan Hendri Prabowo Dyah Indra Arianti POTONGAN MELINTANG
TELP. 021 – 8273 4950 E-mail : csb_konsultan@yahoo.com
Operator Cad Highway Engineer Team Leader PT. Jasamarga Tollroad Maintenance E1.10 26
GM Maintenance Management Administration STA:18+933.048 ~ STA:18+907.995
STA: 18+933.048
JAKARTA BOGOR
Pagar Tol
Bidang Pers. = 68.00M
MP
MP
GD
GD
GD
NOMOR TITIK
BR
BR
BR
BR
SH
SP
SP
SP
JA
JA
JA
SH SH MP CR29 MP MP MP MP MP SH SH SH PT JC
0.95
0.19
0.24
0.60
0.10
0.47
0.63
0.49
0.47
0.42
0.64
0.63
JARAK 2.03 1.72 3.73 3.63 15.14 4.26 3.64 1.58 1.87 1.55 14.95 2.81 5.33 4.39 5.09 5.67 1.06
78.373
79.195
79.460
79.243
79.466
79.464
79.509
79.568
79.654
79.669
79.688
79.687
79.761
80.102
80.222
80.288
80.295
80.281
80.226
80.215
80.219
79.912
79.763
79.611
79.446
76.829
75.201
73.248
70.762
71.025
ELEV.TANAH ASLI
102.25
107.92
108.98
24.71
26.74
27.69
27.87
28.11
28.71
28.81
30.53
34.26
34.72
35.36
35.84
39.47
54.62
58.88
62.52
64.10
64.57
66.44
66.86
68.41
83.36
86.17
86.81
87.44
92.77
97.16
JARAK LANGSUNG
STA: 18+907.995
JAKARTA BOGOR
Pagar Tol
Bidang Pers. = 68.00M
MP
MP
GD
GD
GD
NOMOR TITIK
BR
BR
BR
BR
JA
JA
JA
SH MP CR30 MP MP MP MP MP MP SH SH SH PT JC
0.25
0.42
0.63
0.55
0.47
0.52
0.54
0.87
JARAK 3.04 1.62 3.78 2.27 15.00 2.31 3.69 3.70 1.64 1.77 1.52 14.90 2.95 5.99 10.73 3.90 1.05
79.237
79.495
79.571
79.624
79.739
79.755
79.756
79.772
79.809
80.122
80.192
80.281
80.334
80.357
80.360
80.311
80.294
80.271
79.947
79.812
79.712
79.651
76.756
72.528
71.857
71.857
ELEV.TANAH ASLI
103.82
104.86
20.79
23.82
24.08
25.70
29.47
29.89
30.52
31.07
33.34
48.34
50.64
54.33
58.03
59.67
60.14
61.90
62.42
63.94
78.84
81.79
82.33
83.19
89.18
99.91
JARAK LANGSUNG
KONSULTAN PERENCANA Direncanakan dan Diajukan : Disetujui : PROYEK :
KODE PROYEK / TH PROVINSI
PEKERJAAN REALIGNMENT GEOMETRIK
PT. CIPTA SENDI BANGUNAN GERBANG TOL CIMANGGIS UTAMA 2019 JAWA BARAT
JALAN TOL JAGORAWI - TAHUN 2019
VILA NUSA INDAH 3 BLOK KA.1 NO. 10
BOJONG KULUR, GUNUNG PUTRI, BOGOR LEMBAR NO. TOTAL LEMBAR
Achsan N Okky Irawan Hendri Prabowo Dyah Indra Arianti POTONGAN MELINTANG
TELP. 021 – 8273 4950 E-mail : csb_konsultan@yahoo.com
Operator Cad Highway Engineer Team Leader PT. Jasamarga Tollroad Maintenance E1.11 26
GM Maintenance Management Administration STA:18+882.098 ~ STA:18+856.988
STA: 18+882.098
JAKARTA BOGOR
MP
MP
GD
GD
GD
NOMOR TITIK
BR
BR
BR
BR
SP
SP
SP
SP
JC
JC
JA
JA
SH SH MP CR31 MP MP MP MP MP SH SH
0.19
0.41
0.63
0.50
0.47
0.49
0.38
0.42
0.18
0.68
0.29
JARAK 3.63 2.75 1.58 3.82 1.80 15.06 4.28 3.61 3.78 1.59 1.83 1.56 14.94 2.69 3.88 7.79 2.52
79.621
79.566
79.583
79.561
79.629
79.729
79.734
79.753
79.768
79.791
80.119
80.231
80.318
80.380
80.384
80.395
80.340
80.354
80.309
80.018
79.992
79.877
79.765
77.787
75.072
74.308
74.034
73.983
74.247
ELEV.TANAH ASLI
11.62
15.25
18.01
18.19
19.77
23.60
24.01
24.63
25.14
26.93
41.99
46.27
49.88
53.66
55.25
55.72
57.54
58.03
59.59
74.53
74.90
77.59
78.01
81.89
89.68
92.20
92.37
93.05
93.34
JARAK LANGSUNG
STA: 18+856.988
JAKARTA BOGOR
Pagar Tol
Bidang Pers. = 72.00M
MP
MP
MP
GD
GD
GD
NOMOR TITIK
CR
CR
BR
BR
BR
BR
JA
JA
MP CR32 MP MP MP MP MP SH SH SH SH SH PT
0.26
0.36
0.63
0.50
0.47
0.48
0.33
0.54
0.95
JARAK 1.47 3.86 2.33 15.20 6.59 3.66 3.74 1.49 1.80 1.45 15.06 2.71 2.75 4.95 2.84 6.15 3.75
79.554
79.626
79.643
79.778
79.755
79.771
79.784
79.825
80.095
80.248
80.343
80.426
80.434
80.403
80.319
80.357
80.326
80.024
79.995
79.841
79.709
79.261
77.854
76.718
75.695
75.382
75.201
ELEV.TANAH ASLI
12.60
12.96
13.59
14.09
16.42
31.62
38.21
41.86
45.60
47.09
47.56
49.36
49.83
51.29
66.35
66.67
69.38
69.91
70.87
73.62
78.57
81.41
87.56
91.31
7.01
7.27
8.74
JARAK LANGSUNG
KONSULTAN PERENCANA Direncanakan dan Diajukan : Disetujui : PROYEK :
KODE PROYEK / TH PROVINSI
PEKERJAAN REALIGNMENT GEOMETRIK
PT. CIPTA SENDI BANGUNAN GERBANG TOL CIMANGGIS UTAMA 2019 JAWA BARAT
JALAN TOL JAGORAWI - TAHUN 2019
VILA NUSA INDAH 3 BLOK KA.1 NO. 10
BOJONG KULUR, GUNUNG PUTRI, BOGOR LEMBAR NO. TOTAL LEMBAR
Achsan N Okky Irawan Hendri Prabowo Dyah Indra Arianti POTONGAN MELINTANG
TELP. 021 – 8273 4950 E-mail : csb_konsultan@yahoo.com
Operator Cad Highway Engineer Team Leader PT. Jasamarga Tollroad Maintenance E1.12 26
GM Maintenance Management Administration STA:18+831.878 ~ STA:18+806.644
STA: 18+831.878
JAKARTA BOGOR
Pagar Tol
Bidang Pers. = 72.00M
MP
MP
MP
GD
GD
NOMOR TITIK
CR
CR
BR
BR
BR
BR
JA
CR33 MP MP MP MP MP MP SH SH SH SH SH PT
0.43
0.64
0.49
0.47
0.43
0.36
0.40
0.77
JARAK 3.71 3.35 15.39 5.06 4.19 3.62 3.64 1.24 1.78 1.59 14.92 2.73 3.22 6.30 3.31 4.28 3.85
79.702
79.708
79.709
79.741
79.806
80.070
80.137
80.272
80.395
80.480
80.486
80.438
80.258
80.297
80.312
80.030
80.018
79.884
79.757
79.645
78.139
77.160
76.413
75.956
75.770
ELEV.TANAH ASLI
10.67
26.06
31.12
35.30
38.92
42.56
43.80
44.27
46.05
46.48
48.08
62.99
63.35
66.08
66.48
67.25
70.47
76.77
80.08
84.36
88.21
5.76
6.19
6.83
7.32
JARAK LANGSUNG
STA: 18+806.644
JAKARTA BOGOR
MP
MP
GD
GD
NOMOR TITIK
BR
BR
BR
BR
JC
JC
JA
CR34 MP MP MP MP MP MP MP SH SH SH SH SH
0.26
0.70
0.61
0.92
0.47
0.53
0.26
0.43
0.73
JARAK 3.57 4.66 15.41 5.98 2.31 3.58 3.63 3.65 1.87 1.48 15.05 2.71 3.40 6.93 3.53 3.19
79.630
79.629
79.650
79.638
79.750
80.029
80.148
80.212
80.294
80.403
80.497
80.500
80.431
80.235
80.251
80.250
79.919
79.902
79.683
79.705
79.645
78.430
77.671
77.452
77.133
ELEV.TANAH ASLI
11.53
26.94
32.92
35.23
38.81
42.44
46.09
47.00
47.47
49.34
49.87
51.35
66.40
66.66
69.37
69.80
70.53
73.93
80.85
84.38
87.57
5.30
5.56
6.26
6.88
JARAK LANGSUNG
KONSULTAN PERENCANA Direncanakan dan Diajukan : Disetujui : PROYEK :
KODE PROYEK / TH PROVINSI
PEKERJAAN REALIGNMENT GEOMETRIK
PT. CIPTA SENDI BANGUNAN GERBANG TOL CIMANGGIS UTAMA 2019 JAWA BARAT
JALAN TOL JAGORAWI - TAHUN 2019
VILA NUSA INDAH 3 BLOK KA.1 NO. 10
BOJONG KULUR, GUNUNG PUTRI, BOGOR LEMBAR NO. TOTAL LEMBAR
Achsan N Okky Irawan Hendri Prabowo Dyah Indra Arianti POTONGAN MELINTANG
TELP. 021 – 8273 4950 E-mail : csb_konsultan@yahoo.com
Operator Cad Highway Engineer Team Leader PT. Jasamarga Tollroad Maintenance E1.13 26
GM Maintenance Management Administration STA:18+781.526 ~ STA:18+756.407
STA: 18+781.526
Pagar Tol
JAKARTA BOGOR
MP
MP
GD
GD
NOMOR TITIK
CR
CR
BR
BR
JA
CR35 MP MP MP MP MP MP SH SH SH SH PT
0.53
0.47
0.56
0.40
0.41
0.82
JARAK 15.46 8.76 2.19 3.74 3.60 3.54 1.98 1.46 14.92 2.58 4.38 7.63 5.44 3.32
79.796
79.989
80.228
80.321
80.383
80.496
80.603
80.582
80.505
80.177
80.204
80.183
79.873
79.835
79.768
79.601
79.611
78.370
78.309
78.012
78.375
ELEV.TANAH ASLI
12.58
28.04
36.80
38.99
42.74
46.34
49.87
50.41
50.88
52.85
53.41
54.87
69.79
70.19
72.77
73.17
73.99
78.37
86.00
91.44
94.76
JARAK LANGSUNG
STA: 18+756.407
Pagar Tol
JAKARTA BOGOR
MP
GD
GD
NOMOR TITIK
KN
KN
JC
JA
CR36 MP BR BR JC MPP MPP MP JC SH SH SH PT
0.89
0.56
0.05
0.15
0.35
0.41
0.30
0.87
JARAK 15.41 11.33 1.27 3.95 3.30 3.69 1.77 1.52 15.08 2.72 3.44 7.42 10.15
79.856
80.119
80.302
80.244
80.283
80.393
80.462
80.576
80.589
80.517
80.776
80.434
80.117
80.115
80.113
79.804
79.793
79.676
79.518
78.344
78.320
78.640
ELEV.TANAH ASLI
13.52
28.94
40.26
41.15
42.42
46.36
49.67
53.35
53.92
53.97
54.12
54.47
56.24
56.65
58.17
73.25
73.56
76.27
77.15
80.59
88.01
98.16
JARAK LANGSUNG
KONSULTAN PERENCANA Direncanakan dan Diajukan : Disetujui : PROYEK :
KODE PROYEK / TH PROVINSI
PEKERJAAN REALIGNMENT GEOMETRIK
PT. CIPTA SENDI BANGUNAN GERBANG TOL CIMANGGIS UTAMA 2019 JAWA BARAT
JALAN TOL JAGORAWI - TAHUN 2019
VILA NUSA INDAH 3 BLOK KA.1 NO. 10
BOJONG KULUR, GUNUNG PUTRI, BOGOR LEMBAR NO. TOTAL LEMBAR
Achsan N Okky Irawan Hendri Prabowo Dyah Indra Arianti POTONGAN MELINTANG
TELP. 021 – 8273 4950 E-mail : csb_konsultan@yahoo.com
Operator Cad Highway Engineer Team Leader PT. Jasamarga Tollroad Maintenance E1.14 26
GM Maintenance Management Administration STA:18+731.760 ~ STA:18+706.667
STA: 18+731.760
JAKARTA BOGOR
MD
MD
MD
MD
MP
MP
GD
GD
NOMOR TITIK
KN
KN
BR
JC
JC
JA
CR37 MP MP MP MP MP JC SH SH SH
0.06
0.08
0.94
0.56
0.05
0.08
0.45
0.43
0.28
0.85
JARAK 8.42 15.47 11.91 1.73 1.11 3.71 3.70 3.59 1.70 1.35 15.19 2.83 4.52 4.56
79.957
80.335
80.388
80.621
80.644
80.476
80.233
80.290
80.341
80.432
80.518
80.517
80.489
80.727
80.261
80.009
80.043
80.003
79.748
79.731
79.596
79.411
78.157
78.122
ELEV.TANAH ASLI
13.88
29.34
41.25
41.31
43.04
43.11
44.05
45.16
48.87
52.57
56.16
56.71
56.76
56.84
57.29
58.99
59.43
60.78
75.96
76.24
79.07
79.92
84.44
89.00
JARAK LANGSUNG
STA: 18+706.667
JAKARTA BOGOR
MP
MP
GD
GD
NOMOR TITIK
KN
KN
BR
CB
JC
JC
JA
CR38 MP CB BR MP MP MP MP JC SH SH SH
0.53
0.46
0.14
0.14
0.32
0.44
0.21
JARAK 15.64 14.01 1.38 1.00 1.21 3.65 3.63 3.64 1.72 1.43 15.16 2.79 0.96 4.10 6.97
80.012
80.224
80.355
80.421
80.415
80.147
80.238
80.315
80.386
80.443
80.444
80.353
80.598
80.234
79.931
79.956
79.951
79.663
79.650
79.482
79.297
77.937
78.022
ELEV.TANAH ASLI
12.57
28.21
42.22
42.75
44.13
45.13
46.34
49.98
53.61
57.25
57.71
57.85
57.99
58.31
60.04
60.47
61.90
77.06
77.28
80.07
81.03
85.13
92.09
JARAK LANGSUNG
KONSULTAN PERENCANA Direncanakan dan Diajukan : Disetujui : PROYEK :
KODE PROYEK / TH PROVINSI
PEKERJAAN REALIGNMENT GEOMETRIK
PT. CIPTA SENDI BANGUNAN GERBANG TOL CIMANGGIS UTAMA 2019 JAWA BARAT
JALAN TOL JAGORAWI - TAHUN 2019
VILA NUSA INDAH 3 BLOK KA.1 NO. 10
BOJONG KULUR, GUNUNG PUTRI, BOGOR LEMBAR NO. TOTAL LEMBAR
Achsan N Okky Irawan Hendri Prabowo Dyah Indra Arianti POTONGAN MELINTANG
TELP. 021 – 8273 4950 E-mail : csb_konsultan@yahoo.com
Operator Cad Highway Engineer Team Leader PT. Jasamarga Tollroad Maintenance E1.15 26
GM Maintenance Management Administration STA:18+681.573 ~ STA:18+657.403
STA: 18+681.573
JAKARTA BOGOR
MP
GD
NOMOR TITIK
BR
BR
KN
KN
CB
JC
CR39 MP CB BR MP MP MP GD JA MP MP JA SH SH SH
0.38
0.41
0.95
0.48
0.09
0.14
0.32
0.74
JARAK 15.52 16.18 1.14 1.31 3.65 3.69 3.58 1.65 1.28 15.05 2.94 1.16 4.40 5.92
79.755
79.948
80.285
80.374
80.434
80.439
80.202
80.224
80.259
80.320
80.362
80.367
80.278
80.523
80.149
79.868
79.901
79.917
79.619
79.476
79.309
77.770
77.555
ELEV.TANAH ASLI
10.68
26.20
42.37
42.76
43.17
44.31
45.26
46.57
50.22
53.90
57.49
57.96
58.05
58.18
58.50
60.15
60.89
62.18
77.22
80.16
81.32
85.72
91.64
JARAK LANGSUNG
STA: 18+657.403
JAKARTA
BOGOR
MP
GD
NOMOR TITIK
KN
KN
BR
BR
JC
CR40 MP CB CB BR MP MP MP GD MP MP JA SH SH SH
0.39
0.43
0.10
0.10
0.36
JARAK 15.43 13.47 5.11 1.11 1.03 1.32 3.62 3.62 3.61 1.64 1.96 15.07 3.05 1.00 4.02 6.00
79.539
79.865
80.182
80.195
80.354
80.387
80.187
80.202
80.242
80.298
80.313
80.316
80.226
80.459
80.162
79.792
79.818
79.563
79.450
79.282
77.784
77.622
ELEV.TANAH ASLI
24.44
37.91
38.30
43.41
44.52
45.55
46.87
50.49
54.11
57.72
58.14
58.24
58.34
58.70
60.33
62.29
77.36
80.41
81.41
85.43
91.43
9.02
JARAK LANGSUNG
KONSULTAN PERENCANA Direncanakan dan Diajukan : Disetujui : PROYEK :
KODE PROYEK / TH PROVINSI
PEKERJAAN REALIGNMENT GEOMETRIK
PT. CIPTA SENDI BANGUNAN GERBANG TOL CIMANGGIS UTAMA 2019 JAWA BARAT
JALAN TOL JAGORAWI - TAHUN 2019
VILA NUSA INDAH 3 BLOK KA.1 NO. 10
BOJONG KULUR, GUNUNG PUTRI, BOGOR LEMBAR NO. TOTAL LEMBAR
Achsan N Okky Irawan Hendri Prabowo Dyah Indra Arianti POTONGAN MELINTANG
TELP. 021 – 8273 4950 E-mail : csb_konsultan@yahoo.com
Operator Cad Highway Engineer Team Leader PT. Jasamarga Tollroad Maintenance E1.16 26
GM Maintenance Management Administration STA:18+632.345 ~ STA:18+607.286
STA: 18+632.345
JAKARTA
BOGOR
MP
GD
GD
NOMOR TITIK
KN
KN
JC
JA
MP MP JC CB BG BG CB CB BR MP MP MP GD JA MP MP SH SH SH
0.75
0.91
0.42
0.15
0.13
0.34
0.62
0.41
JARAK 15.19 7.92 2.08 2.77 6.20 1.16 1.23 1.30 3.60 3.63 3.64 1.57 1.21 15.35 2.94 0.97 3.70 6.66 9.57
79.875
80.053
80.093
80.151
80.367
80.328
80.274
80.289
80.147
80.130
80.159
80.211
80.253
80.246
80.128
80.381
79.985
79.722
79.757
79.775
79.452
79.307
79.244
79.138
77.853
77.735
ELEV.TANAH ASLI
22.86
30.78
32.86
35.63
36.38
42.57
43.73
44.96
45.86
47.16
50.76
54.38
58.03
58.44
58.60
58.73
59.07
60.64
61.26
62.47
77.82
80.76
81.17
82.14
85.84
92.50
JARAK LANGSUNG
STA: 18+607.286
JAKARTA BOGOR
MP
GD
GD
GD
NOMOR TITIK
BG
BG
KN
KN
PD
CB
CB
JC
JA
JA
MP JC CB BR MP MP MP MP MP SH SH SH
0.25
0.71
0.68
0.35
0.90
0.39
0.08
0.12
0.38
0.51
0.39
JARAK 15.17 6.75 3.39 10.43 1.24 1.32 3.60 3.68 3.58 1.96 1.16 15.15 3.06 1.00 3.21 7.01
79.888
80.033
80.064
80.383
80.314
80.457
80.454
80.261
80.240
79.989
80.004
80.055
80.106
80.154
80.140
80.073
80.335
79.929
79.703
79.678
79.674
79.430
79.308
79.201
79.031
77.851
77.777
ELEV.TANAH ASLI
26.16
32.91
36.30
36.55
37.26
47.69
48.36
48.71
49.95
50.85
52.18
55.77
59.45
63.04
63.42
63.51
63.63
64.01
65.97
66.48
67.63
82.78
85.84
86.24
87.24
90.45
97.46
JARAK LANGSUNG
KONSULTAN PERENCANA Direncanakan dan Diajukan : Disetujui : PROYEK :
KODE PROYEK / TH PROVINSI
PEKERJAAN REALIGNMENT GEOMETRIK
PT. CIPTA SENDI BANGUNAN GERBANG TOL CIMANGGIS UTAMA 2019 JAWA BARAT
JALAN TOL JAGORAWI - TAHUN 2019
VILA NUSA INDAH 3 BLOK KA.1 NO. 10
BOJONG KULUR, GUNUNG PUTRI, BOGOR LEMBAR NO. TOTAL LEMBAR
Achsan N Okky Irawan Hendri Prabowo Dyah Indra Arianti POTONGAN MELINTANG
TELP. 021 – 8273 4950 E-mail : csb_konsultan@yahoo.com
Operator Cad Highway Engineer Team Leader PT. Jasamarga Tollroad Maintenance E1.17 26
GM Maintenance Management Administration STA:18+582.228 ~ STA:18+560.970
STA: 18+582.228
JAKARTA
BOGOR
0.38 CR.JA
PDS
MP
MP
GD
GD
NOMOR TITIK
BG
KN
KN
JC
JC
JC
MP BGPD CB CB BR MP MP MP GD MP SH SH SH
0.52
0.67
0.61
0.85
0.45
0.15
0.16
0.37
0.28
0.99
JARAK 4.70 16.63 1.26 0.97 1.34 3.51 3.66 3.56 1.63 2.02 15.05 2.79 4.81 5.56 9.47
79.925
79.975
80.766
80.776
80.806
80.776
80.209
80.231
79.956
79.990
80.027
80.040
80.043
80.026
79.920
80.215
79.644
79.482
79.574
79.319
79.291
79.196
79.077
79.002
77.791
77.725
ELEV.TANAH ASLI
102.53
102.91
105.70
105.98
106.97
111.78
117.34
44.44
49.14
49.66
50.33
66.96
67.57
68.42
69.68
70.64
71.98
75.49
79.15
82.71
83.16
83.30
83.46
83.83
85.46
87.48
JARAK LANGSUNG
STA: 18+560.970
JAKARTA BOGOR
MP
MP
TM
GD
GD
NOMOR TITIK
CR
CR
BR
KN
KN
CB
JC
MP JC MP MP GD JA MP SH SH SH
0.09
0.53
0.47
0.09
0.14
0.36
0.70
0.26
0.26
1.06
JARAK 4.16 12.96 1.97 12.24 3.64 3.60 1.64 1.29 15.06 2.81 5.09 5.80 8.74
79.942
79.989
80.235
80.819
80.062
80.064
79.992
79.981
79.980
79.966
79.924
80.186
79.705
79.411
79.523
79.520
79.273
79.274
79.137
79.094
78.897
77.569
77.661
ELEV.TANAH ASLI
103.56
103.81
106.62
106.88
107.94
113.03
118.83
44.63
48.79
61.75
61.84
63.80
64.33
76.58
80.21
83.81
84.28
84.37
84.51
84.87
86.51
87.21
88.50
JARAK LANGSUNG
JARAK
JARAK
NOMOR TITIK
NOMOR TITIK
TELP. 021 – 8273 4950
ELEV.TANAH ASLI
ELEV.TANAH ASLI
JARAK LANGSUNG
JARAK LANGSUNG
15.31
KONSULTAN PERENCANA
E-mail : csb_konsultan@yahoo.com
44.61 79.944
MP
5.64
46.31 79.986
MP
Achsan N
Operator Cad
50.25 80.023 MP
0.67
50.92 80.011 0.10 MD
51.02 80.271 MD
1.19
52.22 80.271 0.20 MD
52.41 80.028 MD
7.65
52.65 80.046 0.24 MP
2.92
55.57 80.062 0.27 MP
55.84 80.053 0.11 MD
55.95 80.315 MD 53.97 80.087 MP
54.24 80.086 0.28 MD
54.30 80.328 0.06 MD
2.08
Okky Irawan
58.03 80.305 MD
Highway Engineer
0.15
2.18
3.81
3.90
62.28 80.047
1.15
63.43 80.042 60.84 80.100 MP
MP MP
61.20 80.122 0.36 MD
61.34 80.320 0.14 MD
61.67 80.320 0.34 MD
61.71 80.321 0.04 MD
Team Leader
0.16
Hendri Prabowo
17.24
Dyah Indra Arianti
16.19
PT. Jasamarga Tollroad Maintenance
GM Maintenance Management Administration
JAKARTA
80.67 79.890
MP
78.70 79.963
MP
JAKARTA
3.59
3.58
11.77
BOGOR
JC
15.08
100.85 79.232
BOGOR
3.18
109.84 78.870
3.99
POTONGAN MELINTANG
SH
GERBANG TOL CIMANGGIS UTAMA
115.74 77.162
STA:18+535.970 ~ STA:18+510.970
JALAN TOL JAGORAWI - TAHUN 2019
SH
113.83 77.547
PEKERJAAN REALIGNMENT GEOMETRIK
4.78
6.11
SH
120.52 77.328
2019
E1.18
LEMBAR NO.
KODE PROYEK / TH
SH
119.94 77.528
2.84
7.31
26
SH
122.78 77.471
PROVINSI
TOTAL LEMBAR
JAWA BARAT
JARAK
JARAK
NOMOR TITIK
NOMOR TITIK
TELP. 021 – 8273 4950
ELEV.TANAH ASLI
ELEV.TANAH ASLI
JARAK LANGSUNG
JARAK LANGSUNG
E-mail : csb_konsultan@yahoo.com
42.98 79.843
MP
44.14 79.857
MP
Achsan N
Operator Cad
8.02
11.08
52.15 79.921 0.21 MP
52.36 79.920 0.13 MD
52.49 80.163 MD
2.09
54.06 79.900 0.22 MP
54.28 79.891 0.11 MD 54.58 80.165 MD
54.39 80.138 MD 0.15
Okky Irawan
2.17
56.57 80.139 0.13 MD
3.02
Direncanakan dan Diajukan :
2.87
58.35 80.188 MD
59.79 79.898 MP
2.19
2.20
62.41 80.108 MD
Team Leader
0.11
Hendri Prabowo
64.91 79.952 MP
0.62
4.42
65.53 79.949 MP
67.13 79.846
MP
Disetujui :
14.65
15.55
JAKARTA
JAKARTA
80.18 79.836
MP
3.61
11.76
11.99
BOGOR
BOGOR
CR
99.20 79.104
CR
100.39 79.179
3.17
3.16
2.70
2.47
107.71 78.846
6.55
6.29
POTONGAN MELINTANG
GERBANG TOL CIMANGGIS UTAMA
SH
113.26 76.770
STA:18+485.970 ~ STA:18+461.093
JALAN TOL JAGORAWI - TAHUN 2019
PEKERJAAN REALIGNMENT GEOMETRIK
SH
114.00 77.071
4.19
4.16
SH
117.45 76.792
SH
118.16 76.982
2019
E1.19
LEMBAR NO.
KODE PROYEK / TH
8.89
26
PROVINSI
9.29
TOTAL LEMBAR
JAWA BARAT
JARAK
JARAK
NOMOR TITIK
NOMOR TITIK
TELP. 021 – 8273 4950
ELEV.TANAH ASLI
ELEV.TANAH ASLI
JARAK LANGSUNG
JARAK LANGSUNG
E-mail : csb_konsultan@yahoo.com
43.07 79.416
MP
43.29 79.712
MP
Achsan N
Operator Cad
10.90
13.79
53.97 79.561 0.34 MP
54.32 79.561 0.08 MD
54.40 79.834 MD
Okky Irawan
Highway Engineer
2.16
56.55 79.859 0.08 MD
Direncanakan dan Diajukan :
2.91
2.26
2.27
3.41
62.44 79.909 MD
Team Leader
0.10
Hendri Prabowo
4.32
65.02 79.821 0.40 MD
65.41 79.812 MP
67.09 79.704
MP
Disetujui :
11.49
17.56
JAKARTA
JAKARTA
78.58 79.609
MP
1.59
80.17 79.577 MP
0.58
80.74 79.817 0.39 BR
81.13 80.442 TM
0.78
81.91 80.430 0.09 TM
81.99 79.846 TM
82.98 79.667 MP
1.61
0.55
83.60 79.983 TM 83.52 79.633 0.09 JC
0.85 83.61 79.864 0.50 KN
84.45 78.980 SP 84.11 79.434 0.63 GD
84.49 78.698 0.04 SP 84.74 79.140 SP
0.29 84.83 78.893 0.09 SP
84.78 78.732 0.09 SP 0.24
84.87 79.002 SP 85.07 78.893 0.07 SP
85.39 79.106 0.52 GD 85.13 79.148 SP
85.69 79.285 0.55 GD
86.48 79.189 0.80 JA
1.99 1.11
87.38 79.127
MP
87.59 79.246
MP
STA: 18+411.094
STA: 18+436.093
11.77
11.88
BOGOR
BOGOR
CR
99.15 79.149
CR
99.47 79.090
3.21
3.16
2.69
106.99 78.755
8.33
7.96
POTONGAN MELINTANG
GERBANG TOL CIMANGGIS UTAMA
STA:18+436.093 ~ STA:18+411.094
JALAN TOL JAGORAWI - TAHUN 2019
PEKERJAAN REALIGNMENT GEOMETRIK
SH
114.89 76.072
SH
114.95 76.442
2.85
4.89
SH
117.73 75.768
2019
E1.20
LEMBAR NO.
2.67
KODE PROYEK / TH
SH
119.84 76.501
SH
120.40 76.461
2.90
26
PROVINSI
TOTAL LEMBAR
SH
123.30 76.523
6.68
JAWA BARAT
JARAK
JARAK
NOMOR TITIK
NOMOR TITIK
TELP. 021 – 8273 4950
ELEV.TANAH ASLI
ELEV.TANAH ASLI
JARAK LANGSUNG
JARAK LANGSUNG
39.05 78.985
MP
PT. CIPTA SENDI BANGUNAN
E-mail : csb_konsultan@yahoo.com
40.20 78.701
MP
Achsan N
Operator Cad
13.93
11.76
51.96 78.900
MP
52.97 79.263 MP
Okky Irawan
2.63
0.13
Highway Engineer
53.33 79.524 MD
54.60 78.870 0.04 KN
2.23
Direncanakan dan Diajukan :
7.08
59.75 79.544 0.10 MD
0.83
Team Leader
60.69 79.333 MD
0.90
61.60 79.325 BR
0.91
62.51 79.665 0.08 TM
62.59 80.191 TM
PP
62.97 79.414 0.97
63.57 80.198 0.08 TM
63.64 79.616 TM
3.91
4.45
SH
66.88 79.434
Disetujui :
SH
68.09 79.565
Dyah Indra Arianti
PT. Jasamarga Tollroad Maintenance
4.22
7.07
GM Maintenance Management Administration
JAKARTA
TM
72.30 79.667
JAKARTA
2.05
SH
73.96 79.489
TM
74.35 79.671
4.74
5.93
TM
79.09 79.777
0.98
79.88 79.733
TM
0.84 80.07 78.914 0.09 SP
80.72 78.755 SP 80.17 78.493 0.31 SP
80.75 78.350 0.03 SP 80.48 78.492 0.06 SP
81.08 78.338 0.33 SP 80.54 78.712 0.67 SP
81.21 78.501 0.13 SP 81.20 78.902 0.72 GD
81.82 78.748 0.61 GD 81.92 78.975 JA
82.50 78.838 0.67 JA
1.23
83.15 78.986
MP
1.27
83.77 78.923
MP
STA: 18+361.848
STA: 18+386.850
11.73
11.76
BOGOR
BOGOR
CR
94.88 79.142
CR
95.53 79.191
3.18
3.22
2.65
SH
102.49 78.914
1.00
SH
103.07 79.003
7.75
9.14
POTONGAN MELINTANG
SH
110.23 76.045
GERBANG TOL CIMANGGIS UTAMA
STA:18+386.850 ~ STA:18+361.848
JALAN TOL JAGORAWI - TAHUN 2019
2.87
PEKERJAAN REALIGNMENT GEOMETRIK
SH
112.21 75.692
SH
113.11 75.607
1.86
3.82
114.97 75.223
0.63
SH SH
115.60 75.337
SH
116.02 75.099
2019
1.37
E1.21
LEMBAR NO.
1.51
SH
116.97 75.592
117.54 74.587 SH
KODE PROYEK / TH
3.81
26
PROVINSI
TOTAL LEMBAR
JAWA BARAT
Pagar Tol
PT
121.87 75.472
KONSULTAN PERENCANA Direncanakan dan Diajukan : Disetujui : PROYEK :
KODE PROYEK / TH PROVINSI
PEKERJAAN REALIGNMENT GEOMETRIK
PT. CIPTA SENDI BANGUNAN GERBANG TOL CIMANGGIS UTAMA 2019 JAWA BARAT
JALAN TOL JAGORAWI - TAHUN 2019
VILA NUSA INDAH 3 BLOK KA.1 NO. 10
BOJONG KULUR, GUNUNG PUTRI, BOGOR LEMBAR NO. TOTAL LEMBAR
Achsan N Okky Irawan Hendri Prabowo Dyah Indra Arianti POTONGAN MELINTANG
TELP. 021 – 8273 4950 E-mail : csb_konsultan@yahoo.com
Operator Cad Highway Engineer Team Leader PT. Jasamarga Tollroad Maintenance E1.22 26
GM Maintenance Management Administration STA:18+339.159 ~ STA:18+316.206
STA: 18+339.159
JAKARTA
BOGOR
MP
TM
TM
TM
GD
GD
NOMOR TITIK
CR
CR
KN
KN
SH
SH
SH
SP
SP
SP
SP
JA
MP MP SH SH SH MP CR SH SH SH
0.09
0.36
0.51
0.17
0.12
0.26
0.59
0.05
0.25
0.12
0.64
0.53
1.39
0.29
0.43
JARAK 11.69 2.63 7.81 5.45 3.63 5.69 11.72 3.22 2.65 1.09 8.42 4.89 4.95
78.483
78.774
78.769
79.040
79.650
79.618
79.304
79.346
79.410
79.431
79.411
79.660
78.926
78.744
78.139
78.122
78.460
78.631
78.691
78.772
79.164
79.265
79.261
79.235
79.154
78.898
75.589
74.263
ELEV.TANAH ASLI
100.22
100.50
103.15
103.58
104.67
113.09
117.98
43.31
55.00
57.63
57.72
58.08
58.59
58.76
66.57
72.02
75.65
81.34
81.46
81.71
82.31
82.35
82.60
82.72
83.36
83.88
85.27
96.99
JARAK LANGSUNG
STA: 18+316.206
JAKARTA BOGOR
MP
TM
TM
TM
GD
GD
NOMOR TITIK
CR
CR
KN
KN
SH
SH
SH
SP
SP
SP
SP
MP MP SH SH MP CR SH SH SH SH
0.07
0.34
0.60
0.12
0.21
0.20
0.67
0.09
0.29
0.07
0.57
0.29
0.44
JARAK 11.52 1.99 8.04 6.49 6.10 1.91 11.64 3.24 2.72 1.22 4.51 3.16 8.91
78.354
78.613
78.618
78.885
79.566
79.556
79.221
79.299
79.312
79.377
79.621
78.945
78.678
77.972
77.959
78.385
78.595
78.754
79.111
79.212
79.213
79.257
79.134
78.784
76.383
75.950
72.965
ELEV.TANAH ASLI
101.47
101.91
103.13
107.64
110.80
119.71
44.31
55.84
57.83
57.90
58.24
58.83
58.96
66.99
73.48
79.58
79.79
79.99
80.66
80.75
81.04
81.11
81.68
83.59
95.23
98.47
98.76
JARAK LANGSUNG
KONSULTAN PERENCANA Direncanakan dan Diajukan : Disetujui : PROYEK :
KODE PROYEK / TH PROVINSI
PEKERJAAN REALIGNMENT GEOMETRIK
PT. CIPTA SENDI BANGUNAN GERBANG TOL CIMANGGIS UTAMA 2019 JAWA BARAT
JALAN TOL JAGORAWI - TAHUN 2019
VILA NUSA INDAH 3 BLOK KA.1 NO. 10
BOJONG KULUR, GUNUNG PUTRI, BOGOR LEMBAR NO. TOTAL LEMBAR
Achsan N Okky Irawan Hendri Prabowo Dyah Indra Arianti POTONGAN MELINTANG
TELP. 021 – 8273 4950 E-mail : csb_konsultan@yahoo.com
Operator Cad Highway Engineer Team Leader PT. Jasamarga Tollroad Maintenance E1.23 26
GM Maintenance Management Administration STA:18+292.035 ~ STA:18+267.713
STA: 18+292.035
JAKARTA BOGOR
MP
MP
TM
TM
TM
GD
GD
NOMOR TITIK
CR
CR
KN
KN
SH
SH
SH
SH
SP
SP
SP
SP
JA
MP MP SH SH CR SH SH SH SH SH
0.05
0.24
0.70
0.09
0.07
0.22
0.73
0.05
0.30
0.06
0.57
0.65
1.26
0.29
0.23
0.72
JARAK 15.72 11.38 1.51 7.03 4.79 6.12 11.74 3.25 2.95 5.55 2.12 2.86 4.64 1.62 8.46
78.167
78.431
78.478
78.670
79.473
79.459
79.130
79.150
79.214
79.138
79.574
79.044
78.694
78.204
78.208
78.400
78.681
78.649
78.714
79.071
79.168
79.154
79.059
79.042
78.911
76.244
75.893
74.505
73.434
72.395
ELEV.TANAH ASLI
100.62
106.17
108.29
111.15
115.79
117.40
45.62
57.00
58.51
58.56
58.80
59.50
59.59
66.62
71.41
77.53
77.60
77.82
78.55
78.60
78.91
78.96
79.53
80.18
81.43
93.18
96.42
96.72
99.67
99.90
JARAK LANGSUNG
STA: 18+267.713
JAKARTA BOGOR
MP
TM
TM
TM
GD
NOMOR TITIK
CR
KN
KN
SH
SH
SH
SP
SP
SP
SP
JA
MP MP SH SH MP CR CRGD SH SH SH SH SH
0.06
0.41
0.54
0.17
0.14
0.23
0.69
0.05
0.30
0.04
0.57
0.58
1.41
0.29
0.60
0.70
JARAK 10.79 1.53 4.64 4.31 5.33 11.74 3.27 2.66 4.58 2.19 6.50 6.40 12.91
78.036
78.332
78.393
78.593
79.207
79.199
78.985
79.006
79.172
79.101
79.511
78.827
78.594
78.189
78.189
78.328
78.452
78.541
78.633
79.015
79.120
79.110
79.011
78.984
78.890
76.310
75.893
73.448
71.283
ELEV.TANAH ASLI
103.71
33.02
43.81
45.34
45.40
45.80
46.34
46.51
51.15
55.46
60.78
60.92
61.15
61.84
61.89
62.19
62.23
62.80
63.38
64.79
76.53
79.79
80.09
82.75
83.35
84.05
88.63
90.81
97.31
JARAK LANGSUNG
KONSULTAN PERENCANA Direncanakan dan Diajukan : Disetujui : PROYEK :
KODE PROYEK / TH PROVINSI
PEKERJAAN REALIGNMENT GEOMETRIK
PT. CIPTA SENDI BANGUNAN GERBANG TOL CIMANGGIS UTAMA 2019 JAWA BARAT
JALAN TOL JAGORAWI - TAHUN 2019
VILA NUSA INDAH 3 BLOK KA.1 NO. 10
BOJONG KULUR, GUNUNG PUTRI, BOGOR LEMBAR NO. TOTAL LEMBAR
Achsan N Okky Irawan Hendri Prabowo Dyah Indra Arianti POTONGAN MELINTANG
TELP. 021 – 8273 4950 E-mail : csb_konsultan@yahoo.com
Operator Cad Highway Engineer Team Leader PT. Jasamarga Tollroad Maintenance E1.24 26
GM Maintenance Management Administration STA:18+242.270 ~ STA:18+216.922
STA: 18+242.270
JAKARTA BOGOR
MP
TM
TM
TM
GD
GD
GD
NOMOR TITIK
CR
CR
KN
KN
SH
SH
SH
SP
SP
SP
SP
JC
JA
SH SH CR57 MP MP SH TM TM MP CR SH SH SH SH
0.70
0.39
0.12
0.30
0.63
0.12
1.23
0.10
0.15
0.81
0.04
0.25
0.14
0.57
0.48
1.48
0.29
0.49
0.68
JARAK 2.40 4.18 3.13 16.39 9.50 1.56 3.41 1.95 3.67 11.82 3.27 2.67 4.84 4.38 3.13
74.588
77.387
77.363
77.595
77.671
78.060
78.428
78.491
78.721
79.329
79.344
78.959
78.961
79.134
79.115
78.971
79.413
78.777
78.411
77.956
77.975
78.206
78.302
78.451
78.538
78.925
79.021
79.000
78.916
78.903
78.810
76.229
74.724
73.484
ELEV.TANAH ASLI
100.08
17.23
21.42
22.12
22.50
25.63
42.02
51.52
53.08
53.20
53.50
54.13
54.24
55.48
58.88
60.84
64.51
64.60
64.75
65.56
65.60
65.85
65.99
66.56
67.04
68.52
80.33
83.60
83.89
86.56
87.05
87.72
92.56
96.94
JARAK LANGSUNG
STA: 18+216.922
JAKARTA BOGOR
MP
TM
TM
TM
GD
GD
GD
NOMOR TITIK
CR
CR
KN
SH
SH
SP
SP
SP
SP
JC
JC
JA
SH SH SH CR58 MP MP SH MP CR SH SH
0.43
0.06
0.20
1.09
0.12
0.14
0.76
0.05
0.29
0.07
0.59
0.48
1.43
0.29
0.46
0.86
JARAK 5.79 3.88 4.18 1.29 3.15 17.33 7.72 1.59 2.64 3.13 11.88 3.28 2.68 5.47 8.25
72.725
74.366
77.181
77.433
77.577
77.648
78.113
78.438
78.490
78.754
79.574
78.796
78.786
78.814
79.266
78.744
78.408
77.791
77.761
78.075
78.255
78.274
78.363
78.767
78.875
78.875
78.863
78.845
78.805
76.222
ELEV.TANAH ASLI
19.11
22.99
27.17
28.46
28.89
32.04
49.36
57.09
58.67
58.73
58.93
60.02
62.66
65.78
65.90
66.04
66.80
66.84
67.13
67.20
67.79
68.27
69.70
81.58
84.86
85.15
87.83
88.29
89.14
94.61
JARAK LANGSUNG
KONSULTAN PERENCANA Direncanakan dan Diajukan : Disetujui : PROYEK :
KODE PROYEK / TH PROVINSI
PEKERJAAN REALIGNMENT GEOMETRIK
PT. CIPTA SENDI BANGUNAN GERBANG TOL CIMANGGIS UTAMA 2019 JAWA BARAT
JALAN TOL JAGORAWI - TAHUN 2019
VILA NUSA INDAH 3 BLOK KA.1 NO. 10
BOJONG KULUR, GUNUNG PUTRI, BOGOR LEMBAR NO. TOTAL LEMBAR
Achsan N Okky Irawan Hendri Prabowo Dyah Indra Arianti POTONGAN MELINTANG
TELP. 021 – 8273 4950 E-mail : csb_konsultan@yahoo.com
Operator Cad Highway Engineer Team Leader PT. Jasamarga Tollroad Maintenance E1.25 26
GM Maintenance Management Administration STA:18+187.532 ~ STA:18+159.850
STA: 18+187.532
JAKARTA BOGOR
MP
TM
TM
GD
GD
GD
NOMOR TITIK
CR
CR
SH
KN
SH
SH
SH
SP
SP
SP
SP
JC
JC
JA
SH SH SH SH CR59 MP MP MP CR SH SH SH
0.36
0.35
0.11
0.19
1.05
0.92
0.33
0.17
0.52
0.11
0.28
0.03
0.75
0.38
1.37
0.29
0.49
0.87
JARAK 5.00 4.46 3.34 3.97 1.13 3.25 17.83 5.96 1.48 11.65 3.23 2.63 6.21 3.75
72.803
73.116
74.685
77.464
77.591
77.335
77.676
77.765
78.268
78.437
78.478
78.763
79.581
78.727
78.724
79.113
78.504
78.219
77.567
77.595
77.858
78.080
78.115
78.160
78.570
78.685
78.683
78.705
78.643
78.506
75.824
73.932
ELEV.TANAH ASLI
20.15
24.61
27.94
31.91
33.04
33.40
33.74
36.99
54.82
60.78
62.26
62.37
62.56
63.61
64.53
64.86
65.03
65.55
65.67
65.94
65.97
66.73
67.11
68.48
80.12
83.35
83.64
86.27
86.76
87.62
93.83
97.59
JARAK LANGSUNG
STA: 18+159.850
JAKARTA BOGOR
MP
GD
GD
GD
NOMOR TITIK
CR
CR
BR
BR
SP
SP
SP
SP
JC
JA
SH SH SH CR60 MP MP MP CR SH SH SH
0.19
0.46
0.64
0.06
0.31
0.05
0.83
0.11
1.51
0.29
0.49
JARAK 6.87 7.55 2.20 2.96 17.60 2.52 1.68 11.66 3.21 2.62 1.23 6.99 3.80 8.33
72.756
73.379
77.595
77.574
77.677
77.750
78.294
78.351
78.351
78.332
77.949
77.354
77.445
77.674
77.981
77.980
78.035
78.411
78.521
78.525
78.519
78.495
78.233
75.001
73.553
ELEV.TANAH ASLI
18.85
25.72
33.27
35.46
35.65
38.61
56.21
58.73
60.41
60.87
61.50
61.56
61.87
61.92
62.75
62.86
64.37
76.03
79.24
79.53
82.15
82.64
83.87
90.86
94.66
JARAK LANGSUNG
KONSULTAN PERENCANA Direncanakan dan Diajukan : Disetujui : PROYEK :
KODE PROYEK / TH PROVINSI
PEKERJAAN REALIGNMENT GEOMETRIK
PT. CIPTA SENDI BANGUNAN GERBANG TOL CIMANGGIS UTAMA 2019 JAWA BARAT
JALAN TOL JAGORAWI - TAHUN 2019
VILA NUSA INDAH 3 BLOK KA.1 NO. 10
BOJONG KULUR, GUNUNG PUTRI, BOGOR LEMBAR NO. TOTAL LEMBAR
Achsan N Okky Irawan Hendri Prabowo Dyah Indra Arianti POTONGAN MELINTANG
TELP. 021 – 8273 4950 E-mail : csb_konsultan@yahoo.com
Operator Cad Highway Engineer PT. Jasamarga Tollroad Maintenance E1.26 26
Team Leader GM Maintenance Management Administration STA:18+134.948 ~ STA:18+109.949
STA: 18+134.948
JBT
JBT
JBT
JBT
JBT
JBT
NOMOR TITIK
BR
BR
SH
SH
SH CR61 MP MP MP SH SH
0.01
0.54
0.29
0.23
0.28
0.05
JARAK 15.89 2.85 18.76 1.67 2.07 1.40 14.93 3.14 10.43 8.77
72.049
71.509
77.521
77.521
77.624
78.138
78.153
78.153
77.787
77.787
77.859
78.351
78.433
78.433
71.083
70.437
69.540
ELEV.TANAH ASLI
107.04
25.72
41.60
41.61
42.15
45.00
63.76
65.44
65.73
67.80
68.03
69.43
84.36
87.51
87.79
87.84
98.27
JARAK LANGSUNG
STA: 18+109.949
JBT
JBT
JBT
NOMOR TITIK
BR
BR
BR
SH
SH
PT SH SH CR62 MP MP MP SH SH SH SH
0.04
0.50
0.29
0.23
0.26
0.08
JARAK 3.76 5.60 7.79 2.82 18.76 1.84 1.75 1.57 14.93 3.11 3.83 3.18 6.87 4.84
72.549
72.653
72.807
72.903
77.293
77.293
77.359
77.886
77.911
77.690
77.568
77.562
77.641
78.115
78.192
78.192
74.222
74.403
73.533
71.586
70.848
ELEV.TANAH ASLI
102.37
107.20
25.17
28.93
34.52
42.31
42.35
42.86
45.68
64.44
66.28
66.57
68.32
68.55
70.12
85.05
88.16
88.42
88.49
92.32
95.50
JARAK LANGSUNG
E2. CROSS SECTION JALAN AKSES MASUK
PEKERJAAN REALIGNMENT GEOMETRIK GERBANG TOL CIMANGGIS UTAMA
JALAN TOL JAGORAWI - TAHUN 2019
KONSULTAN PERENCANA Direncanakan dan Diajukan : Disetujui : PROYEK :
KODE PROYEK / TH PROVINSI
PEKERJAAN REALIGNMENT GEOMETRIK
PT. CIPTA SENDI BANGUNAN GERBANG TOL CIMANGGIS UTAMA 2019 JAWA BARAT
JALAN TOL JAGORAWI - TAHUN 2019
VILA NUSA INDAH 3 BLOK KA.1 NO. 10
BOJONG KULUR, GUNUNG PUTRI, BOGOR LEMBAR NO. TOTAL LEMBAR
Achsan N Okky Irawan Hendri Prabowo Dyah Indra Arianti POTONGAN MELINTANG
TELP. 021 – 8273 4950 E-mail : csb_konsultan@yahoo.com
Operator Cad Highway Engineer Team Leader PT. Jasamarga Tollroad Maintenance
GM Maintenance Management Administration STA:0+005 ~ STA:0+025
KONSULTAN PERENCANA Direncanakan dan Diajukan : Disetujui : PROYEK :
KODE PROYEK / TH PROVINSI
PEKERJAAN REALIGNMENT GEOMETRIK
PT. CIPTA SENDI BANGUNAN GERBANG TOL CIMANGGIS UTAMA 2019 JAWA BARAT
JALAN TOL JAGORAWI - TAHUN 2019
VILA NUSA INDAH 3 BLOK KA.1 NO. 10
BOJONG KULUR, GUNUNG PUTRI, BOGOR LEMBAR NO. TOTAL LEMBAR
Achsan N Okky Irawan Hendri Prabowo Dyah Indra Arianti POTONGAN MELINTANG
TELP. 021 – 8273 4950 E-mail : csb_konsultan@yahoo.com
Operator Cad Highway Engineer Team Leader PT. Jasamarga Tollroad Maintenance
GM Maintenance Management Administration STA:0+050 ~ STA:0+075
KONSULTAN PERENCANA Direncanakan dan Diajukan : Disetujui : PROYEK :
KODE PROYEK / TH PROVINSI
PEKERJAAN REALIGNMENT GEOMETRIK
PT. CIPTA SENDI BANGUNAN GERBANG TOL CIMANGGIS UTAMA 2019 JAWA BARAT
JALAN TOL JAGORAWI - TAHUN 2019
VILA NUSA INDAH 3 BLOK KA.1 NO. 10
BOJONG KULUR, GUNUNG PUTRI, BOGOR LEMBAR NO. TOTAL LEMBAR
Achsan N Okky Irawan Hendri Prabowo Dyah Indra Arianti POTONGAN MELINTANG
TELP. 021 – 8273 4950 E-mail : csb_konsultan@yahoo.com
Operator Cad Highway Engineer Team Leader PT. Jasamarga Tollroad Maintenance
GM Maintenance Management Administration STA:0+100 ~ STA:0+125
KONSULTAN PERENCANA Direncanakan dan Diajukan : Disetujui : PROYEK :
KODE PROYEK / TH PROVINSI
PEKERJAAN REALIGNMENT GEOMETRIK
PT. CIPTA SENDI BANGUNAN GERBANG TOL CIMANGGIS UTAMA 2019 JAWA BARAT
JALAN TOL JAGORAWI - TAHUN 2019
VILA NUSA INDAH 3 BLOK KA.1 NO. 10
BOJONG KULUR, GUNUNG PUTRI, BOGOR LEMBAR NO. TOTAL LEMBAR
Achsan N Okky Irawan Hendri Prabowo Dyah Indra Arianti POTONGAN MELINTANG
TELP. 021 – 8273 4950 E-mail : csb_konsultan@yahoo.com
Operator Cad Highway Engineer Team Leader PT. Jasamarga Tollroad Maintenance
GM Maintenance Management Administration STA:0+150 ~ STA:0+175
KONSULTAN PERENCANA Direncanakan dan Diajukan : Disetujui : PROYEK :
KODE PROYEK / TH PROVINSI
PEKERJAAN REALIGNMENT GEOMETRIK
PT. CIPTA SENDI BANGUNAN GERBANG TOL CIMANGGIS UTAMA 2019 JAWA BARAT
JALAN TOL JAGORAWI - TAHUN 2019
VILA NUSA INDAH 3 BLOK KA.1 NO. 10
BOJONG KULUR, GUNUNG PUTRI, BOGOR LEMBAR NO. TOTAL LEMBAR
Achsan N Okky Irawan Hendri Prabowo Dyah Indra Arianti POTONGAN MELINTANG
TELP. 021 – 8273 4950 E-mail : csb_konsultan@yahoo.com
Operator Cad Highway Engineer Team Leader PT. Jasamarga Tollroad Maintenance
GM Maintenance Management Administration STA:0+200 ~ STA:0+225
F. STRUKTUR
PEKERJAAN REALIGNMENT GEOMETRIK GERBANG TOL CIMANGGIS UTAMA
JALAN TOL JAGORAWI - TAHUN 2019
F1. BARRIER
PEKERJAAN REALIGNMENT GEOMETRIK GERBANG TOL CIMANGGIS UTAMA
JALAN TOL JAGORAWI - TAHUN 2019
KONSULTAN PERENCANA Direncanakan dan Diajukan : Disetujui : PROYEK :
KODE PROYEK / TH PROVINSI
PEKERJAAN REALIGNMENT GEOMETRIK
PT. CIPTA SENDI BANGUNAN GERBANG TOL CIMANGGIS UTAMA 2019 JAWA BARAT
JALAN TOL JAGORAWI - TAHUN 2019
VILA NUSA INDAH 3 BLOK KA.1 NO. 10
BOJONG KULUR, GUNUNG PUTRI, BOGOR LEMBAR NO. TOTAL LEMBAR
Achsan N Okky Irawan Hendri Prabowo Dyah Indra Arianti
TELP. 021 – 8273 4950 E-mail : csb_konsultan@yahoo.com
PT. Jasamarga Tollroad Maintenance PENULANGAN BARRIER
Operator Cad Highway Engineer Team Leader F.02 04
GM Maintenance Management Administration
Ø13
Ø13-200
Ø13-200
Ø13
A B Ø13
PENULANGAN POTONGAN A
SKALA = 1 : 10
Ø13
Ø13-200
Ø13-200
POTONGAN A
SKALA = 1 : 10
A B
9291200 Y
VILA NUSA INDAH 3 BLOK KA.1 NO. 10
BOJONG KULUR, GUNUNG PUTRI, BOGOR LEMBAR NO. TOTAL LEMBAR
Achsan N Okky Irawan Hendri Prabowo Dyah Indra Arianti PLAN SAMBUNGAN PERKERASAN MAINROAD
TELP. 021 – 8273 4950 E-mail : csb_konsultan@yahoo.com
Operator Cad Highway Engineer Team Leader PT. Jasamarga Tollroad Maintenance STA. 18+100 ~ STA.18+800 F.03 04
GM Maintenance Management Administration
KEY PLAN
710000 X
9290800 Y
GARIS IMPIT STA.18+800
GARIS IMPIT STA.18+450
KONSULTAN PERENCANA Direncanakan dan Diajukan : Disetujui : PROYEK :
KODE PROYEK / TH PROVINSI
PEKERJAAN REALIGNMENT GEOMETRIK
PT. CIPTA SENDI BANGUNAN GERBANG TOL CIMANGGIS UTAMA 2019 JAWA BARAT
JALAN TOL JAGORAWI - TAHUN 2019
VILA NUSA INDAH 3 BLOK KA.1 NO. 10
BOJONG KULUR, GUNUNG PUTRI, BOGOR LEMBAR NO. TOTAL LEMBAR
Achsan N Okky Irawan Hendri Prabowo Dyah Indra Arianti
TELP. 021 – 8273 4950 E-mail : csb_konsultan@yahoo.com RIGID PAVEMENT JOINT DETAILS
Operator Cad Highway Engineer Team Leader PT. Jasamarga Tollroad Maintenance F.04 04
GM Maintenance Management Administration
KONSTRUKSI LAMA
KONSTRUKSI BARU (RIGID)
TIE BAR DUDUKAN Ø12
GRADE 40 D13 @ 600 DI CAT ANTI KARAT
TIE BAR
DI CAT ANTI KARAT TUL. MELINTANG Ø12 GRADE 40 D13 @ 600
CRACK INDUCER
CONTRACTION JOINT MELINTANG (TJ-I) EXPANSION JOINT MELINTANG (TJ-2) EXPANSION JOINT MELINTANG (TJ-3)
( DI ISI JOINT SEALER SETELAH PEMOTONGAN ) SKALA 1 : 10 SKALA 1 : 10
SKALA 1 : 50
CATATAN : ALUR UNTUK JOINT DIPOTONG DENGAN GERGAJI MESIN
DAN ALUR YANG TERJADI DENGAN SENDIRINYA TIDAH DIIJINKAN
CATATAN : PEMOTONGAN JOINT DENGAN GERGAJI MESIN SETIAP INTERVAL 5 M.
LAPISAN AUS
DI IKAT KAWAT
TULANG MELINTANG Ø12
LAPISAN BINDER TUL. MELINTANG Ø 12
DUDUKAN Ø 12
MESH REINFORCING BARS
DUDUKAN Ø12 Ø 12 C.T.C 200 MESHED
BATANG DOWEL
D13 L = 800 @ 300
TRANSISI STRUKTUR DENGAN PERKERASAN ASPAL METODE PERKUATAN DOWEL & TIE BAR
SKALA 1 : 10
G. DRAINASE
PEKERJAAN REALIGNMENT GEOMETRIK GERBANG TOL CIMANGGIS UTAMA
JALAN TOL JAGORAWI - TAHUN 2019
KONSULTAN PERENCANA Direncanakan dan Diajukan : Disetujui : PROYEK :
KODE PROYEK / TH PROVINSI
PEKERJAAN REALIGNMENT GEOMETRIK
PT. CIPTA SENDI BANGUNAN GERBANG TOL CIMANGGIS UTAMA 2019 JAWA BARAT
JALAN TOL JAGORAWI - TAHUN 2019
VILA NUSA INDAH 3 BLOK KA.1 NO. 10
BOJONG KULUR, GUNUNG PUTRI, BOGOR LEMBAR NO. TOTAL LEMBAR
Achsan N Okky Irawan Hendri Prabowo Dyah Indra Arianti STANDAR DRAINASE
TELP. 021 – 8273 4950 E-mail : csb_konsultan@yahoo.com
Operator Cad Highway Engineer Team Leader PT. Jasamarga Tollroad Maintenance SALURAN SAMPING MAIN ROAD G.01 04
GM Maintenance Management Administration
KONSULTAN PERENCANA Direncanakan dan Diajukan : Disetujui : PROYEK :
KODE PROYEK / TH PROVINSI
PEKERJAAN REALIGNMENT GEOMETRIK
PT. CIPTA SENDI BANGUNAN GERBANG TOL CIMANGGIS UTAMA 2019 JAWA BARAT
JALAN TOL JAGORAWI - TAHUN 2019
VILA NUSA INDAH 3 BLOK KA.1 NO. 10
K
LEMBAR NO. TOTAL LEMBAR
DEPO
BOJONG KULUR, GUNUNG PUTRI, BOGOR Achsan N Okky Irawan Hendri Prabowo Dyah Indra Arianti
TELP. 021 – 8273 4950 E-mail : csb_konsultan@yahoo.com PLAN DRAINASE MAINROAD
Operator Cad Highway Engineer Team Leader PT. Jasamarga Tollroad Maintenance G.02 04
GM Maintenance Management Administration STA. 18+100 ~ STA.18+800
KEY PLAN
UNG
ANGG
: PELEBARAN
U
WIN
PATOK
LEU FO
9291200 Y
9290800 Y
PATOK PATOK
PATOK
JALAN
FO FO
FO
710000 X
DV-1
+100
DS-3
K
PATOK BM.1B
PO
BM.1A
FO 709920.200
DE
47.932 9291305.791
X = 7099 77.893
6.259
NG
Y = 929140 .918
Z= 77
GU
NG
NA
WI
EU
NL
LA
JA
DS-4 DS-4
DV-1 DS-4
MANHOLE
ELEVASI
EXISTING
ELEVASI
DASAR
SALURAN
SUPER
ELEVATION
DIAGRAM
LENGKUNG
STATION
KONSULTAN PERENCANA Direncanakan dan Diajukan : Disetujui : PROYEK :
KODE PROYEK / TH PROVINSI
PEKERJAAN REALIGNMENT GEOMETRIK
PT. CIPTA SENDI BANGUNAN GERBANG TOL CIMANGGIS UTAMA 2019 JAWA BARAT
JALAN TOL JAGORAWI - TAHUN 2019
VILA NUSA INDAH 3 BLOK KA.1 NO. 10
BOJONG KULUR, GUNUNG PUTRI, BOGOR LEMBAR NO. TOTAL LEMBAR
Achsan N Okky Irawan Hendri Prabowo Dyah Indra Arianti POTONGAN MELINTANG DRAINASE
TELP. 021 – 8273 4950 E-mail : csb_konsultan@yahoo.com
Operator Cad Highway Engineer Team Leader PT. Jasamarga Tollroad Maintenance
MAIN ROAD G.03 04
GM Maintenance Management Administration
JAKARTA BOGOR
KONSULTAN PERENCANA Direncanakan dan Diajukan : Disetujui : PROYEK :
KODE PROYEK / TH PROVINSI
PEKERJAAN REALIGNMENT GEOMETRIK
PT. CIPTA SENDI BANGUNAN GERBANG TOL CIMANGGIS UTAMA 2019 JAWA BARAT
JALAN TOL JAGORAWI - TAHUN 2019
VILA NUSA INDAH 3 BLOK KA.1 NO. 10
BOJONG KULUR, GUNUNG PUTRI, BOGOR LEMBAR NO. TOTAL LEMBAR
Achsan N Okky Irawan Hendri Prabowo Dyah Indra Arianti DETAIL DRAINASE
TELP. 021 – 8273 4950 E-mail : csb_konsultan@yahoo.com
Operator Cad Highway Engineer Team Leader PT. Jasamarga Tollroad Maintenance SALURAN PELUNCUR MAIN ROAD G.04 04
GM Maintenance Management Administration
POTONGAN A-A
TAMPAK DEPAN
(DV - 1)
POTONGAN B - B