A. U M U M
PEKERJAAN REALIGNMENT GEOMETRIK GERBANG TOL CIMANGGIS UTAMA
JALAN TOL JAGORAWI - TAHUN 2019
KONSULTAN PERENCANA Direncanakan dan Diajukan : Disetujui : PROYEK :
KODE PROYEK / TH PROVINSI
PEKERJAAN REALIGNMENT GEOMETRIK
PT. CIPTA SENDI BANGUNAN GERBANG TOL CIMANGGIS UTAMA 2019 JAWA BARAT
JALAN TOL JAGORAWI - TAHUN 2019
VILA NUSA INDAH 3 BLOK KA.1 NO. 10
BOJONG KULUR, GUNUNG PUTRI, BOGOR LEMBAR NO. TOTAL LEMBAR
Achsan N Okky Irawan Hendri Prabowo Dyah Indra Arianti
TELP. 021 – 8273 4950 E-mail : csb_konsultan@yahoo.com
Operator Cad Highway Engineer PT. Jasamarga Tollroad Maintenance DAFTAR ISI A.01 4
Team Leader GM Maintenance Management Administration

PEKERJAAN REALIGNMENT GEOMETRIK 8 POTONGAN MELINTANG STA:19+033.669 ~ STA:19+008.642 E1.08


9 POTONGAN MELINTANG STA:18+983.454 ~ STA:18+958.420 E1.09
GERBANG TOL CIMANGGIS UTAMA 10 POTONGAN MELINTANG STA:18+933.048 ~ STA:18+907.995 E1.10
JALAN TOL JAGORAWI - TAHUN 2019 11 POTONGAN MELINTANG STA:18+882.098 ~ STA:18+856.988 E1.11
JUDUL GAMBAR NOMOR GAMBAR 12 POTONGAN MELINTANG STA:18+831.878 ~ STA:18+806.644 E1.12
A. UMUM 13 POTONGAN MELINTANG STA:18+781.526 ~ STA:18+756.407 E1.13
1 DAFTAR ISI A.01 14 POTONGAN MELINTANG STA:18+731.760 ~ STA:18+706.667 E1.14
2 PETA LOKASI A.02 15 POTONGAN MELINTANG STA:18+681.573 ~ STA:18+657.403 E1.15
3 DIAGRAM SUPERELEVASI A.03 16 POTONGAN MELINTANG STA:18+632.345 ~ STA:18+607.286 E1.16
4 LEGENDA A.04 17 POTONGAN MELINTANG STA:18+582.228 ~ STA:18+560.970 E1.17
18 POTONGAN MELINTANG STA:18+535.970 ~ STA:18+510.970 E1.18
B. POTONGAN MELINTANG 19 POTONGAN MELINTANG STA:18+485.970 ~ STA:18+461.093 E1.19
1 TIPIKAL POTONGAN MAIN ROAD PADA DAERAH PELEBARAN B.01 20 POTONGAN MELINTANG STA:18+436.093 ~ STA:18+411.094 E1.20
2 TIPIKAL POTONGAN MAIN ROAD PADA DAERAH NORMAL B.02 21 POTONGAN MELINTANG STA:18+386.850 ~ STA:18+361.848 E1.21
3 TIPIKAL POTONGAN RAMP OFF B.03 22 POTONGAN MELINTANG STA:18+339.159 ~ STA:18+316.206 E1.22
23 POTONGAN MELINTANG STA:18+292.035 ~ STA:18+267.713 E1.23
C. ALINYEMEN LAYOUT 24 POTONGAN MELINTANG STA:18+242.270 ~ STA:18+216.922 E1.24
25 POTONGAN MELINTANG STA:18+187.532 ~ STA:18+159.850 E1.25
C1. ALINYEMEN LAYOUT JALAN UTAMA
26 POTONGAN MELINTANG STA:18+134.948 ~ STA:18+109.949 E1.26
1 ALINYEMEN LAYOUT MAIN ROAD STA. 18+000 ~ STA.19+400 C.01
27 POTONGAN MELINTANG STA:18+084.103 ~ STA:18+058.946 E1.27
2 ALINYEMEN LAYOUT MAINROAD STA. 19+400 ~ STA.19+626.427 C.02
28 POTONGAN MELINTANG STA:18+033.945 ~ STA:18+020.994 E1.28
3 DATA KURVA C.03
E2. CROSS SECTION JALAN AKSES MASUK
C2. ALINYEMEN LAYOUT JALAN AKSES MASUK
1 POTONGAN MELINTANG STA:0+005 ~ STA:0+025 E2.01
1 ALINYEMEN LAYOUT C.04
2 POTONGAN MELINTANG STA:0+050 ~ STA:0+075 E2.02
2 DATA KURVA C.05
3 POTONGAN MELINTANG STA:0+100 ~ STA:0+125 E2.03
4 POTONGAN MELINTANG STA:0+150 ~ STA:0+175 E2.04
D. PLAN DAN PROFIL
5 POTONGAN MELINTANG STA:0+200 ~ STA:0+225 E2.05
D1. PLAN DAN PROFIL JALAN UTAMA
1 PLAN PROFILE MAINROAD STA. 18+000 ~ STA.18+700 D.01 F STRUKTUR
2 PLAN PROFILE MAINROAD STA. 18+700 ~ STA.19+400 D.02
F1. BARRIER
3 PLAN PROFILE MAINROAD STA. 19+400 ~ STA.19+626.427 D.03
1 DIMENSI BARRIER F.01
D2. PLAN DAN PROFIL JALAN AKSES MASUK 2 PENULANGAN BARRIER F.02
1 PLAN DAN PROFILE D.04
F2. STRUKTUR PERKERASAN
1 PLAN SAMBUNGAN PERKERASAN MAINROAD STA. 18+100 ~ STA.18+800 F.03
E. CROSS SECTION
2 RIGID PAVEMENT JOINT DETAILS F.04
E1. CROSS SECTION JALAN UTAMA
1 POTONGAN MELINTANG STA:19+384.580 ~ STA:19+359.581 E1.01 G DRAINASE
2 POTONGAN MELINTANG STA:19+384.580 ~ STA:19+359.581 E1.02 1 STANDAR DRAINASE SALURAN SAMPING MAIN ROAD G.01
3 POTONGAN MELINTANG STA:19+334.581 ~ STA:19+309.581 E1.03 2 PLAN DRAINASE MAIN ROAD STA. 18+100 ~ STA. 18+800 G.02
4 POTONGAN MELINTANG STA:19+284.556 ~ STA:19+259.556 E1.04 3 POTONGAN MELINTANG DRAINASE MAIN ROAD G.03
5 POTONGAN MELINTANG STA:19+184.558 ~ STA:19+159.558 E1.05 4 DETAIL DRAINASE SALURAN PELUNCUR MAIN ROAD G.04
6 POTONGAN MELINTANG STA:19+134.558 ~ STA:19+109.557 E1.06
7 POTONGAN MELINTANG STA:19+084.098 ~ STA:19+059.090 E1.07
KONSULTAN PERENCANA Direncanakan dan Diajukan : Disetujui : PROYEK :
KODE PROYEK / TH PROVINSI
PEKERJAAN REALIGNMENT GEOMETRIK
PT. CIPTA SENDI BANGUNAN GERBANG TOL CIMANGGIS UTAMA 2019 JAWA BARAT
JALAN TOL JAGORAWI - TAHUN 2019
VILA NUSA INDAH 3 BLOK KA.1 NO. 10
BOJONG KULUR, GUNUNG PUTRI, BOGOR LEMBAR NO. TOTAL LEMBAR
Achsan N Okky Irawan Hendri Prabowo Dyah Indra Arianti
TELP. 021 – 8273 4950 E-mail : csb_konsultan@yahoo.com
Operator Cad Highway Engineer Team Leader PT. Jasamarga Tollroad Maintenance PETA LOKASI A.02 4
GM Maintenance Management Administration

PROVINSI JAWA BARAT

LOKASI
rta

PROYEK
ka
Ja

Ke
PLT KABUPATEN TANGERANG DKI.JAKARTA
Ke

GS
ura Ke
laya
Jak Ke
art J
Ke a ak
Tenjo Ja KEC.LIMO art KEC.GN PUTRI
ka Gandul 75 a
rta Limo KEC.CIMANGGIS
193
Parungpanjang KEC.DEPOK
33 KEC.SEWANGAN 40 87
KEC.TENJO 100 Sawangan Depok Cimanggis Cileungsi 21 KAB. BOGOR

KEC.PARUNGPANJANG 84 03 38 16
Parung 13 197 88
Bojong Gede 36 KABUPATEN BEKASI
Rumpin 23 Klapanunggal
06 42 19
Ke G
85 49 Jonggol
ardu
Indu KEC.PARUNG Cibinong Gn. Putri
k Bun
ar 44 28 37
39 KEC.CIGUDEG Cariu
KEC.BOJONG GEDE 18 KEC.CILEUNGSI
Jasinga 50 111
86 Citeureup 90
12 27 41
71 KEC.RUMPIN
Kemang KEC.CIBINONG
KEC.JONGGOL
34 89
68 KABUPATEN
194 Semplak
35 KEC.SEMPLAK 91 PURWAKARTA
98
tung
Cigudeg 92 KEC.CIOMAS 15 63 41 60 10 KEC.CARIU
angk
asbi 97 69 Cibungbulang 55 Kd. Halang
Ke R KEC.JASINGA 72 04 Sukamakmur
31 22 43 20
24 Leuwiliang Ciomas KEC.CITEUREUP
67 BOGOR 83 01
96 93 58
KABUPATEN LEBAK 95 94 57 25 62 50
61 Ciampea 29 47 59
Nanggung 17 74
KEC.CIAMPEA 02 KEC.KD.HALANG
73 KEC.CIOMAS 48
56 12 61 KABUPATEN
51 KEC.CIAWI KARAWANG
14 Ciawi 05 Cisarua 09
66 Ke
81 ( S Gard
26 AG u
KEC.NANGGUNG 54 196 82 08 UL Ind
ING uk
195 ) Laga
Caringin da KABUPATEN CIANJUR
Puncak 07 r

KEC.CIJERUK KEC.PUNCAK Ke Cia


KEC.LEUWILIANG KEC.CARINGIN nju
r

Ke
Ke Cijeruk 30 70
la
pa
nu
U ng
ga
Ke PL
TP Sa
lak 68
l
Ke Sukabu

KABUPATEN SUKABUMI
mi

LOKASI RENCANA PENAMBAHAN LAJUR


KONSULTAN PERENCANA Direncanakan dan Diajukan : Disetujui : PROYEK :
KODE PROYEK / TH PROVINSI
PEKERJAAN REALIGNMENT GEOMETRIK
PT. CIPTA SENDI BANGUNAN GERBANG TOL CIMANGGIS UTAMA 2019 JAWA BARAT
JALAN TOL JAGORAWI - TAHUN 2019
VILA NUSA INDAH 3 BLOK KA.1 NO. 10
BOJONG KULUR, GUNUNG PUTRI, BOGOR LEMBAR NO. TOTAL LEMBAR
Achsan N Okky Irawan Hendri Prabowo Dyah Indra Arianti
TELP. 021 – 8273 4950 E-mail : csb_konsultan@yahoo.com
Operator Cad Highway Engineer Team Leader PT. Jasamarga Tollroad Maintenance DIAGRAM SUPERELEVASI A.03 4
GM Maintenance Management Administration

DIAGRAM SUPERELEVASI
UNTUK SEMUA JENIS TIKUNGAN

LxC

LxT LT

LxT

1. TANGEN - LINGKARAN TANPA LENGKUNG TRANSISI 2. TANGEN - KLOTOID - LINGKARAN

LT1 LT2 LT

LxT

3. LINGKARAN - KLOTOID BOLAK BALIK - LINGKARAN

4. LINGKARAN - KLOTOID - LINGKARAN


KONSULTAN PERENCANA Direncanakan dan Diajukan : Disetujui : PROYEK :
KODE PROYEK / TH PROVINSI
PEKERJAAN REALIGNMENT GEOMETRIK
PT. CIPTA SENDI BANGUNAN GERBANG TOL CIMANGGIS UTAMA 2019 JAWA BARAT
JALAN TOL JAGORAWI - TAHUN 2019
VILA NUSA INDAH 3 BLOK KA.1 NO. 10
BOJONG KULUR, GUNUNG PUTRI, BOGOR LEMBAR NO. TOTAL LEMBAR
Achsan N Okky Irawan Hendri Prabowo Dyah Indra Arianti
TELP. 021 – 8273 4950 E-mail : csb_konsultan@yahoo.com
Operator Cad PT. Jasamarga Tollroad Maintenance LEGENDA
Highway Engineer Team Leader A.04 4
GM Maintenance Management Administration

LEGENDA EXISTING LEGENDA RENCANA PENJELASAN UMUM UNTUK PLAN & PROFILE
B. POTONGAN MELINTANG
PEKERJAAN REALIGNMENT GEOMETRIK GERBANG TOL CIMANGGIS UTAMA
JALAN TOL JAGORAWI - TAHUN 2019
KONSULTAN PERENCANA Direncanakan dan Diajukan : Disetujui : PROYEK :
KODE PROYEK / TH PROVINSI
PEKERJAAN REALIGNMENT GEOMETRIK
PT. CIPTA SENDI BANGUNAN GERBANG TOL CIMANGGIS UTAMA 2019 JAWA BARAT
JALAN TOL JAGORAWI - TAHUN 2019
VILA NUSA INDAH 3 BLOK KA.1 NO. 10
BOJONG KULUR, GUNUNG PUTRI, BOGOR LEMBAR NO. TOTAL LEMBAR
Achsan N Okky Irawan Hendri Prabowo Dyah Indra Arianti TIPIKAL POTONGAN MAIN ROAD
TELP. 021 – 8273 4950 E-mail : csb_konsultan@yahoo.com
Operator Cad Highway Engineer Team Leader PT. Jasamarga Tollroad Maintenance
PADA DAERAH NORMAL B.01 03
GM Maintenance Management Administration

JAKARTA BOGOR
KONSULTAN PERENCANA Direncanakan dan Diajukan : Disetujui : PROYEK :
KODE PROYEK / TH PROVINSI
PEKERJAAN REALIGNMENT GEOMETRIK
PT. CIPTA SENDI BANGUNAN GERBANG TOL CIMANGGIS UTAMA 2019 JAWA BARAT
JALAN TOL JAGORAWI - TAHUN 2019
VILA NUSA INDAH 3 BLOK KA.1 NO. 10
BOJONG KULUR, GUNUNG PUTRI, BOGOR LEMBAR NO. TOTAL LEMBAR
Achsan N Okky Irawan Hendri Prabowo Dyah Indra Arianti TIPIKAL POTONGAN MAIN ROAD
TELP. 021 – 8273 4950 E-mail : csb_konsultan@yahoo.com
Operator Cad Highway Engineer Team Leader PT. Jasamarga Tollroad Maintenance
PADA DAERAH PELEBARAN B.02 03
GM Maintenance Management Administration

JAKARTA
BOGOR
DETAIL A

JAKARTA BOGOR
KONSULTAN PERENCANA Direncanakan dan Diajukan : Disetujui : PROYEK :
KODE PROYEK / TH PROVINSI
PEKERJAAN REALIGNMENT GEOMETRIK
PT. CIPTA SENDI BANGUNAN GERBANG TOL CIMANGGIS UTAMA 2019 JAWA BARAT
JALAN TOL JAGORAWI - TAHUN 2019
VILA NUSA INDAH 3 BLOK KA.1 NO. 10
BOJONG KULUR, GUNUNG PUTRI, BOGOR LEMBAR NO. TOTAL LEMBAR
Achsan N Okky Irawan Hendri Prabowo Dyah Indra Arianti
TELP. 021 – 8273 4950 E-mail : csb_konsultan@yahoo.com
Operator Cad Highway Engineer PT. Jasamarga Tollroad Maintenance TIPIKAL POTONGAN RAMP OFF B.03 03
Team Leader GM Maintenance Management Administration
C. ALINYEMEN LAYOUT
PEKERJAAN REALIGNMENT GEOMETRIK GERBANG TOL CIMANGGIS UTAMA
JALAN TOL JAGORAWI - TAHUN 2019
C1. ALINYEMEN LAYOUT JALAN UTAMA
PEKERJAAN REALIGNMENT GEOMETRIK GERBANG TOL CIMANGGIS UTAMA
JALAN TOL JAGORAWI - TAHUN 2019
KONSULTAN PERENCANA Direncanakan dan Diajukan : Disetujui : PROYEK :
KODE PROYEK / TH PROVINSI
PEKERJAAN REALIGNMENT GEOMETRIK
PT. CIPTA SENDI BANGUNAN GERBANG TOL CIMANGGIS UTAMA 2019 JAWA BARAT

9291600 Y
JALAN TOL JAGORAWI - TAHUN 2019
VILA NUSA INDAH 3 BLOK KA.1 NO. 10
BOJONG KULUR, GUNUNG PUTRI, BOGOR LEMBAR NO. TOTAL LEMBAR
Achsan N Okky Irawan Hendri Prabowo Dyah Indra Arianti ALINYEMEN LAYOUT MAINROAD
TELP. 021 – 8273 4950 E-mail : csb_konsultan@yahoo.com
Operator Cad Highway Engineer Team Leader PT. Jasamarga Tollroad Maintenance C.01 05
GM Maintenance Management Administration STS. 18+000 ~ STA.19+400
KEY PLAN

K
DEPO G
GGUN
WINAN

U
PATOK

LEU
FO

JALAN

9291200 Y
PATOK
FO PATOK
FO

8+000
BP = STA.1
INAT
KOORD 710000 X
70 9978 .911
X= 8.672
Y = 929003

GARIS IMPIT STA.18+700


BOGOR

JAKARTA

PATOK BM.1B
K

PATOK BM.1A FO
PO

2 709920.200
FO X = 709947.93 9291305.791
DE

59
Y = 9291406.2 77.893
77.918
NG

Z=
GU

9290800 Y
NG
INA
UW
N LE
LA
JA

710000 X U
PATOK
PATOK FO
9290800 Y

FO
BM.39B
90.830
X = 7098
8
Y = 9290202.84
73.697
Z=
GARIS IMPIT STA.18+700

GARIS IMPIT STA.19+400


BOGOR

JAKARTA

PATOK
FO PATOK
PATOK FO
PATOK FO
FO
KONSULTAN PERENCANA Direncanakan dan Diajukan : Disetujui : PROYEK :
KODE PROYEK / TH PROVINSI
PEKERJAAN REALIGNMENT GEOMETRIK
PT. CIPTA SENDI BANGUNAN GERBANG TOL CIMANGGIS UTAMA 2019 JAWA BARAT
JALAN TOL JAGORAWI - TAHUN 2019
VILA NUSA INDAH 3 BLOK KA.1 NO. 10
BOJONG KULUR, GUNUNG PUTRI, BOGOR LEMBAR NO. TOTAL LEMBAR
Achsan N Okky Irawan Hendri Prabowo Dyah Indra Arianti ALINYEMEN LAYOUT MAINROAD
TELP. 021 – 8273 4950 E-mail : csb_konsultan@yahoo.com
Operator Cad Highway Engineer Team Leader PT. Jasamarga Tollroad Maintenance C.02 05
GM Maintenance Management Administration STS. 19+400 ~ STA.19+626.427
KEY PLAN

7
EP = 19+626.42
KOORDINAT
3
X = 709843.35
57
PATOK Y = 9289979.1

BM.40B
9
X = 709875.71
78
Y = 9290071.8 2
71.15
Z=
GARIS IMPIT STA.19+400

709800 X

9290800 Y
PATOK
FO
PATOK

709800 X
FO
9290800 Y

BM.2A
X= 709709.071
Y= 9290032.03
78.944
KONSULTAN PERENCANA Direncanakan dan Diajukan : Disetujui : PROYEK :
KODE PROYEK / TH PROVINSI
PEKERJAAN REALIGNMENT GEOMETRIK
PT. CIPTA SENDI BANGUNAN GERBANG TOL CIMANGGIS UTAMA 2019 JAWA BARAT
JALAN TOL JAGORAWI - TAHUN 2019
VILA NUSA INDAH 3 BLOK KA.1 NO. 10
BOJONG KULUR, GUNUNG PUTRI, BOGOR LEMBAR NO. TOTAL LEMBAR
Achsan N Okky Irawan Hendri Prabowo Dyah Indra Arianti
TELP. 021 – 8273 4950 E-mail : csb_konsultan@yahoo.com
PT. Jasamarga Tollroad Maintenance DATA KURVA MAINROAD C.03 05
Operator Cad Highway Engineer Team Leader GM Maintenance Management Administration
C2. ALINYEMEN LAYOUT JALAN AKSES MASUK
PEKERJAAN REALIGNMENT GEOMETRIK GERBANG TOL CIMANGGIS UTAMA
JALAN TOL JAGORAWI - TAHUN 2019
KONSULTAN PERENCANA Direncanakan dan Diajukan : Disetujui : PROYEK :
KODE PROYEK / TH PROVINSI
PEKERJAAN REALIGNMENT GEOMETRIK
PT. CIPTA SENDI BANGUNAN GERBANG TOL CIMANGGIS UTAMA 2019 JAWA BARAT
JALAN TOL JAGORAWI - TAHUN 2019
VILA NUSA INDAH 3 BLOK KA.1 NO. 10
BOJONG KULUR, GUNUNG PUTRI, BOGOR LEMBAR NO. TOTAL LEMBAR
Achsan N Okky Irawan Hendri Prabowo Dyah Indra Arianti
TELP. 021 – 8273 4950 E-mail : csb_konsultan@yahoo.com
Operator Cad Highway Engineer PT. Jasamarga Tollroad Maintenance ALINYEMEN LAYOUT C.04 05
Team Leader GM Maintenance Management Administration
KEY PLAN
709600 X

9290800 Y
BEGINNING POINT
STA= 0+000
X = 709658.079
Y = 9290038.672

BM.2B
.414
X = 709657 39
2.8
Y = 929003 550
Z= 80.

BM.2A
.071
X = 709709 3
2.0
Y = 929003 944
Z= 78.

ENDING POINT
STA=0+389.724

U
X = 709858.738
Y = 9290303.889

PATOK
PATOK FO
FO
PATOK
FO

JAKARTA

BOGOR

BM.40B
.719 BM.39B
X = 709875 78 .830
1.8
Y = 929007 152 X = 709890 48
71. 2.8
Z= Y = 929020 697
Z= 73.

PATOK
FO
KONSULTAN PERENCANA Direncanakan dan Diajukan : Disetujui : PROYEK :
KODE PROYEK / TH PROVINSI
PEKERJAAN REALIGNMENT GEOMETRIK
PT. CIPTA SENDI BANGUNAN GERBANG TOL CIMANGGIS UTAMA 2019 JAWA BARAT
JALAN TOL JAGORAWI - TAHUN 2019
VILA NUSA INDAH 3 BLOK KA.1 NO. 10
BOJONG KULUR, GUNUNG PUTRI, BOGOR LEMBAR NO. TOTAL LEMBAR
Achsan N Okky Irawan Hendri Prabowo Dyah Indra Arianti
TELP. 021 – 8273 4950 E-mail : csb_konsultan@yahoo.com
Operator Cad Highway Engineer PT. Jasamarga Tollroad Maintenance DATA KURVA JALAN AKSES MASUK C.05 05
Team Leader GM Maintenance Management Administration
D. PLAN DAN PROFIL
PEKERJAAN REALIGNMENT GEOMETRIK GERBANG TOL CIMANGGIS UTAMA
JALAN TOL JAGORAWI - TAHUN 2019
D1. PLAN DAN PROFIL JALAN UTAMA
PEKERJAAN REALIGNMENT GEOMETRIK GERBANG TOL CIMANGGIS UTAMA
JALAN TOL JAGORAWI - TAHUN 2019
KONSULTAN PERENCANA Direncanakan dan Diajukan : Disetujui : PROYEK :
KODE PROYEK / TH PROVINSI
PEKERJAAN REALIGNMENT GEOMETRIK
PT. CIPTA SENDI BANGUNAN GERBANG TOL CIMANGGIS UTAMA 2019 JAWA BARAT
JALAN TOL JAGORAWI - TAHUN 2019
VILA NUSA INDAH 3 BLOK KA.1 NO. 10
BOJONG KULUR, GUNUNG PUTRI, BOGOR LEMBAR NO. TOTAL LEMBAR
Achsan N Okky Irawan Hendri Prabowo Dyah Indra Arianti PLAN PROFILE MAINROAD
TELP. 021 – 8273 4950 E-mail : csb_konsultan@yahoo.com
Operator Cad Highway Engineer Team Leader PT. Jasamarga Tollroad Maintenance D.01 04
GM Maintenance Management Administration STS. 18+000 ~ STA.18+700
KEY PLAN

K
DEPO
: PELEBARAN

GUNG
INANG

U
LEUW
PATOK
FO

JALAN

9291200 Y
PATOK
FO PATOK
FO

710000 X

GARIS IMPIT STA.18+700


BOGOR

JAKARTA

PATOK BM.1B
K

PATOK BM.1A FO
PO

FO .932 709920.200
X = 709947
DE

59 9291305.791
Y = 9291406.2 77.893
77. 918
NG

Z=
GU
NG
INA
UW
N LE
LA
JA

ELEVASI
RENCANA

ELEVASI
EXISTING

SUPER
ELEVATION

DIAGRAM
LENGKUNG

STATION
KONSULTAN PERENCANA Direncanakan dan Diajukan : Disetujui : PROYEK :
KODE PROYEK / TH PROVINSI
PEKERJAAN REALIGNMENT GEOMETRIK
PT. CIPTA SENDI BANGUNAN GERBANG TOL CIMANGGIS UTAMA 2019 JAWA BARAT
JALAN TOL JAGORAWI - TAHUN 2019
VILA NUSA INDAH 3 BLOK KA.1 NO. 10
BOJONG KULUR, GUNUNG PUTRI, BOGOR LEMBAR NO. TOTAL LEMBAR
Achsan N Okky Irawan Hendri Prabowo Dyah Indra Arianti PLAN PROFILE MAINROAD
TELP. 021 – 8273 4950 E-mail : csb_konsultan@yahoo.com
Operator Cad Highway Engineer Team Leader PT. Jasamarga Tollroad Maintenance D.02 04
GM Maintenance Management Administration STS. 18+700 ~ STA.19+400
KEY PLAN

: PELEBARAN

9290800 Y
U
710000 X
PATOK
PATOK FO

9290800 Y
FO
BM.39B
90.830
X = 7098 48
Y = 9290202.8
73.697
Z=

GARIS IMPIT STA.19+400


GARIS IMPIT STA.18+700

BOGOR

JAKARTA

PATOK
FO PATOK
PATOK FO
PATOK FO
FO

ELEVASI
RENCANA

ELEVASI
EXISTING

SUPER
ELEVATION

DIAGRAM
LENGKUNG

STATION
KONSULTAN PERENCANA Direncanakan dan Diajukan : Disetujui : PROYEK :
KODE PROYEK / TH PROVINSI
PEKERJAAN REALIGNMENT GEOMETRIK
PT. CIPTA SENDI BANGUNAN GERBANG TOL CIMANGGIS UTAMA 2019 JAWA BARAT
JALAN TOL JAGORAWI - TAHUN 2019
VILA NUSA INDAH 3 BLOK KA.1 NO. 10
BOJONG KULUR, GUNUNG PUTRI, BOGOR LEMBAR NO. TOTAL LEMBAR
Achsan N Okky Irawan Hendri Prabowo Dyah Indra Arianti PLAN PROFILE MAINROAD
TELP. 021 – 8273 4950 E-mail : csb_konsultan@yahoo.com
Operator Cad Highway Engineer Team Leader PT. Jasamarga Tollroad Maintenance D.03 04
GM Maintenance Management Administration STS. 19+400 ~ STA.19+626.427
KEY PLAN

PATOK

BM.40B
9
X = 709875.71
78
Y = 9290071.8 2
71.15
Z=
GARIS IMPIT STA.19+400

BOGOR

JAKARTA

709800 X

9290800 Y
PATOK
FO
PATOK

709800 X
FO
9290800 Y

BM.2A
X= 709709.071
Y= 9290032.03
78.944

ELEVASI
RENCANA

ELEVASI
EXISTING

SUPER
ELEVATION

DIAGRAM
LENGKUNG

STATION
D2. PLAN DAN PROFIL JALAN AKSES MASUK
PEKERJAAN REALIGNMENT GEOMETRIK GERBANG TOL CIMANGGIS UTAMA
JALAN TOL JAGORAWI - TAHUN 2019
KONSULTAN PERENCANA Direncanakan dan Diajukan : Disetujui : PROYEK :
KODE PROYEK / TH PROVINSI
PEKERJAAN REALIGNMENT GEOMETRIK
PT. CIPTA SENDI BANGUNAN GERBANG TOL CIMANGGIS UTAMA 2019 JAWA BARAT
JALAN TOL JAGORAWI - TAHUN 2019
VILA NUSA INDAH 3 BLOK KA.1 NO. 10
BOJONG KULUR, GUNUNG PUTRI, BOGOR LEMBAR NO. TOTAL LEMBAR
Achsan N Okky Irawan Hendri Prabowo Dyah Indra Arianti
TELP. 021 – 8273 4950 E-mail : csb_konsultan@yahoo.com
Operator Cad Highway Engineer PT. Jasamarga Tollroad Maintenance PLAN DAN PROFILE D.04 04
Team Leader GM Maintenance Management Administration
KEY PLAN
INT
G PO
E GINNIN 00
B 0+0
STA= 8.079
= 7 0965 38.672
X 2 900
Y=9 ENDING POINT
DIVERGING CHEVRON
STA: 0+000 MERGING NOSE STA. 1+224.330
M.2
B
B
14
57.4 9 X = 709658.079 STA: 0+309.590 X = 709878.066
7096 2.83
X = 92900380.550
Y = 9290038.672 Y = 9290492.776
Y=
Z= X = 709847.038
Y = 9290224.541

OK
PAT
FO

.2A
BM 71
09.0
7097 032.03
X= 9290 78.944
Y=
Z=

OK OK
PAT PAT
FO FO
A
ART
JAK

OR
BOG

.39B
BM 30
90.8 8
7098 2.84
X = 92902073.697
Y=
Z=

OK
PAT
E. CROSS SECTION
PEKERJAAN REALIGNMENT GEOMETRIK GERBANG TOL CIMANGGIS UTAMA
JALAN TOL JAGORAWI - TAHUN 2019
E1. CROSS SECTION JALAN UTAMA
PEKERJAAN REALIGNMENT GEOMETRIK GERBANG TOL CIMANGGIS UTAMA
JALAN TOL JAGORAWI - TAHUN 2019
KONSULTAN PERENCANA Direncanakan dan Diajukan : Disetujui : PROYEK :
KODE PROYEK / TH PROVINSI
PEKERJAAN REALIGNMENT GEOMETRIK
PT. CIPTA SENDI BANGUNAN GERBANG TOL CIMANGGIS UTAMA 2019 JAWA BARAT
JALAN TOL JAGORAWI - TAHUN 2019
VILA NUSA INDAH 3 BLOK KA.1 NO. 10
BOJONG KULUR, GUNUNG PUTRI, BOGOR LEMBAR NO. TOTAL LEMBAR
Achsan N Okky Irawan Hendri Prabowo Dyah Indra Arianti POTONGAN MELINTANG
TELP. 021 – 8273 4950 E-mail : csb_konsultan@yahoo.com
Operator Cad Highway Engineer PT. Jasamarga Tollroad Maintenance E1.01 26
Team Leader GM Maintenance Management Administration STA:19+384.580 ~ STA:19+359.581

STA: 19+384.580

JAKARTA BOGOR

Bidang Pers. = 70.00M

MP

MP

GD

GD
NOMOR TITIK

BR
BR

BR
BR
SP
SP
SP
SP

SP
SP
SP
SP
JA

JA
SH SH JA MP BRBR CR11 MP MP MP JA GD BR BR MP MP SH
0.94
0.03
0.53
0.06

0.75
0.60
0.34

0.59

0.41

0.50

0.62

0.41

0.13
0.50
0.13
JARAK 7.64 1.21 3.18 1.83 3.49 5.00 2.80 14.84 1.77 1.67 1.47 15.37 2.81 1.18 3.74 1.35 4.08 3.22 2.03 1.85
74.421

74.221
73.760
73.181
73.178
73.767

73.755

73.800

73.888
73.907
73.915
73.959

74.039
74.047

74.032

74.220

74.175
74.175

74.199
74.259

74.250

74.021

73.928

73.869

74.434
74.421

74.327

74.160

74.036
73.987

73.749
73.124
73.145
74.050

74.147
ELEV.TANAH ASLI

100.43

103.64
104.05

106.08
106.21
106.71
106.84

108.69
29.27

30.48
31.42
31.45
31.98
32.04

35.22

37.05

40.54
41.30
41.89
42.23

47.23
47.82

50.61

65.45

67.22
67.64

69.31
69.80

71.28

86.64

89.45

90.63

94.37
95.00

96.34
JARAK LANGSUNG

STA: 19+359.581

JAKARTA BOGOR

Bidang Pers. = 70.00M


MP

GD

GD
NOMOR TITIK
BR

BR
BR
SP
SP
SP
SP

SP
SP
SP
SP
JA

JA
SH JA MP BR MP BR BR MP CR12 MP MP MP JA JA MP MP SH SH
0.09
0.48
0.06

0.49
0.67

0.77

0.41

0.56

0.30

0.13
0.47
0.08
JARAK 1.16 2.07 1.82 3.55 0.98 4.27 1.48 1.00 14.93 1.79 1.58 1.47 15.36 3.01 1.32 3.69 4.05 3.07 1.15 1.55 7.18
74.272

74.066
73.448
73.451
74.041

74.156

74.190

74.285
74.301
74.313
74.331

74.435
74.434

74.504
74.519

74.736

74.677
74.677

74.764
74.784

74.789

74.561

74.499

74.748

74.614

74.460

74.319
74.327
74.173
73.328
73.464
74.493
74.564

79.951
ELEV.TANAH ASLI

104.82
23.82

24.98
25.07
25.55
25.61

27.68

29.51

33.06
33.55
34.22
35.20

39.47
40.24

41.72
42.72

57.66

59.44
59.85

61.44
61.99

63.46

78.82

81.82

83.14

86.84

90.89

93.96
94.26
95.41
95.54
96.01
96.09
97.64
JARAK LANGSUNG
KONSULTAN PERENCANA Direncanakan dan Diajukan : Disetujui : PROYEK :
KODE PROYEK / TH PROVINSI
PEKERJAAN REALIGNMENT GEOMETRIK
PT. CIPTA SENDI BANGUNAN GERBANG TOL CIMANGGIS UTAMA 2019 JAWA BARAT
JALAN TOL JAGORAWI - TAHUN 2019
VILA NUSA INDAH 3 BLOK KA.1 NO. 10
BOJONG KULUR, GUNUNG PUTRI, BOGOR LEMBAR NO. TOTAL LEMBAR
Achsan N Okky Irawan Hendri Prabowo Dyah Indra Arianti POTONGAN MELINTANG
TELP. 021 – 8273 4950 E-mail : csb_konsultan@yahoo.com
Operator Cad Highway Engineer Team Leader PT. Jasamarga Tollroad Maintenance E1.02 26
GM Maintenance Management Administration STA:19+334.581 ~ STA:19+309.581

STA: 19+334.581

JAKARTA BOGOR

Bidang Pers. = 70.00M

MP

GD

GD
NOMOR TITIK

BR
BR

BR
BR

SH
SP
SP
SP
SP

SP
SP
SP
SP
JA

JA
PDS SH SH JA MP MP BRBR CR13 MP MP MP MP MP SH
0.76

0.10
0.45
0.07

0.41
0.63

0.62

0.41

0.44

0.35
0.95
0.15
0.41
0.23
1.03
JARAK 3.43 1.07 1.98 1.82 3.56 1.19 4.17 2.62 15.01 1.63 1.76 1.52 15.32 6.44 4.32 2.89 7.39
80.225
80.206

74.866

74.491
73.882
73.896
74.450

74.628

74.677

74.784
74.811
74.804

74.827

74.914
74.930

74.969

75.246

75.198
75.198

75.271
75.264

75.263

75.071

75.063

74.895

74.775
74.724
74.491
74.053
74.125
75.064
75.051

79.340
ELEV.TANAH ASLI
14.63
15.38

18.82

19.89
19.98
20.43
20.50

22.48

24.30

27.85
28.26
28.89

30.08

34.25
34.87

37.49

52.50

54.13
54.54

56.30
56.74

58.26

73.58

80.02

84.34

87.23
87.58
88.54
88.68
89.09
89.31
90.34

97.73
JARAK LANGSUNG
Pagar Tol

STA: 19+309.581

JAKARTA BOGOR

Bidang Pers. = 71.00M


MP

GD

GD
NOMOR TITIK
BR
BR

BR
BR
SP
SP
SP
SP

SP
SP
SP
SP
JA

JA
PGR SH JA MP MP MP BR BR CR14 MP MP MP MP MP SH
0.14
0.42
0.06

0.37
0.62

0.67

0.41

0.47

0.36
0.86
0.11
0.57
0.12
1.18
JARAK 6.23 1.06 1.97 1.78 3.57 1.28 2.58 1.47 2.70 15.03 1.62 1.77 1.54 15.24 4.52 4.88 2.92 6.59
80.119

75.486
75.076
74.493
74.461
75.046

75.145

75.189

75.299
75.302
75.315

75.323

75.385

75.398
75.427

75.483

75.739

75.704
75.704

75.726
75.792

75.809

75.527

75.516

75.356

75.227
75.153
75.066
74.498
74.528
75.529
75.600
ELEV.TANAH ASLI
17.13

23.36
24.41
24.55
24.97
25.03

27.00

28.78

32.35
32.72
33.34

34.62

37.20

38.67
39.34

42.05

57.08

58.69
59.10

60.87
61.34

62.88

78.12

82.63

87.51

90.43
90.79
91.65
91.75
92.32
92.44
93.62
JARAK LANGSUNG
KONSULTAN PERENCANA Direncanakan dan Diajukan : Disetujui : PROYEK :
KODE PROYEK / TH PROVINSI
PEKERJAAN REALIGNMENT GEOMETRIK
PT. CIPTA SENDI BANGUNAN GERBANG TOL CIMANGGIS UTAMA 2019 JAWA BARAT
JALAN TOL JAGORAWI - TAHUN 2019
VILA NUSA INDAH 3 BLOK KA.1 NO. 10
BOJONG KULUR, GUNUNG PUTRI, BOGOR LEMBAR NO. TOTAL LEMBAR
Achsan N Okky Irawan Hendri Prabowo Dyah Indra Arianti POTONGAN MELINTANG
TELP. 021 – 8273 4950 E-mail : csb_konsultan@yahoo.com
Operator Cad Highway Engineer Team Leader PT. Jasamarga Tollroad Maintenance E1.03 26
GM Maintenance Management Administration STA:19+284.556 ~ STA:19+259.556

Pagar Tol
STA: 19+284.556

JAKARTA BOGOR

Bidang Pers. = 72.00M

MP

GD
NOMOR TITIK

BR
BR

BR
BR
SP
SP
SP
SP

SP
SP
SP
SP
JA
PT SH JA MP MPMP BR BR CR15 MP GD JA MK MP MP MP SH SH
0.14
0.40
0.12

0.35
0.65

0.66

0.67

0.41

0.59

0.46
0.86
0.09
0.62
0.06
1.27
JARAK 5.94 0.97 1.94 1.77 3.59 1.35 3.35 2.72 15.03 1.59 1.76 1.46 15.18 2.32 5.75 2.88 7.28
79.651

75.920
75.627
75.087
75.072
75.648

75.695

75.727

75.801
75.800
75.814

75.822
75.839

75.882
75.909

75.971

76.239

76.248
76.248

76.173
76.263

76.287

76.010

75.964

75.799

75.678
75.671
75.609
75.029
75.043
76.016
76.149

80.342
ELEV.TANAH ASLI
12.75

18.69
19.65
19.80
20.19
20.31

22.25

24.02

27.61
27.96
28.62

29.97
30.63

33.98
34.64

37.37

52.39

53.98
54.40

56.15
56.75

58.20

73.38

75.70

81.45

84.33
84.79
85.64
85.73
86.35
86.41
87.68

94.96
JARAK LANGSUNG
Pagar Tol

STA: 19+259.556

JAKARTA BOGOR

Bidang Pers. = 72.00M


MP

GD
NOMOR TITIK
BR
BR

BR
BR
SP
SP
SP
SP

SP
SP
SP
SP
JA
JC PB SH JA MP MP BRBR CR16 MP GDJA MK MP MP SH SH
0.90
0.08
0.45
0.10

0.31
0.65

0.60

0.41

0.58

0.43
0.84
0.06
0.62
0.04
1.32
JARAK 2.66 4.20 1.93 1.80 3.61 1.44 4.02 2.78 15.08 1.54 1.79 1.47 15.15 6.72 3.02 7.08
78.715

78.647

76.209
76.063
75.501
75.533
76.112

76.177

76.211

76.266
76.282
76.270

76.277

76.390
76.389

76.440

76.782

76.783
76.783

76.690
76.729

76.751

76.429

76.323

76.190
76.125
76.098
75.507
75.531
76.492
76.697

80.763
ELEV.TANAH ASLI
13.00
13.90
13.98
14.43
14.52

16.45

18.25

21.86
22.17
22.83

24.27

28.29
28.89

31.67

46.75

48.29
48.70

50.49
51.07

52.53

67.68

74.41

77.43
77.86
78.70
78.76
79.38
79.41
80.73

87.81
6.14

8.80

JARAK LANGSUNG
KONSULTAN PERENCANA Direncanakan dan Diajukan : Disetujui : PROYEK :
KODE PROYEK / TH PROVINSI
PEKERJAAN REALIGNMENT GEOMETRIK
PT. CIPTA SENDI BANGUNAN GERBANG TOL CIMANGGIS UTAMA 2019 JAWA BARAT
JALAN TOL JAGORAWI - TAHUN 2019
VILA NUSA INDAH 3 BLOK KA.1 NO. 10
BOJONG KULUR, GUNUNG PUTRI, BOGOR LEMBAR NO. TOTAL LEMBAR
Achsan N Okky Irawan Hendri Prabowo Dyah Indra Arianti POTONGAN MELINTANG
TELP. 021 – 8273 4950 E-mail : csb_konsultan@yahoo.com
Operator Cad Highway Engineer Team Leader PT. Jasamarga Tollroad Maintenance E1.04 26
GM Maintenance Management Administration STA:19+234.556 ~ STA:19+209.559

Pagar Tol
STA: 19+234.556

JAKARTA BOGOR

Bidang Pers. = 72.00M

MP

GD
NOMOR TITIK

BR
BR

BR
BR
SP
SP
SP
SP

SP
SP
SP
SP
JA
JC PB SH JA MP MP BRBR CR17 MP MK MP MP JA GD SH SH
0.06
0.46
0.10

0.49
0.60

0.61

0.41

0.54

0.66
0.96
0.04
0.63
0.01
1.34
JARAK 1.44 2.33 1.35 1.55 2.09 3.60 1.40 3.67 3.05 15.07 1.61 1.83 1.44 15.14 5.33 2.81 6.60
77.628

77.479

77.153

76.516
75.926
75.949
76.530
76.527

76.620

76.691
76.714
76.711

76.713

76.793
76.796

76.870

77.217

77.220
77.220

77.126
77.201

77.194

76.857

76.738

76.680
76.598
76.568
75.967
75.994
76.948
77.204

80.679
ELEV.TANAH ASLI
10.13

11.47
11.54
12.00
12.09
13.64

15.73

19.33
19.82
20.43

21.82

25.49
26.11

29.15

44.22

45.83
46.24

48.07
48.60

50.05

65.19

70.51

73.32
73.98
74.94
74.98
75.62
75.63
76.97

83.57
6.36

7.80

JARAK LANGSUNG

STA: 19+209.559
Pagar Tol

JAKARTA BOGOR

Bidang Pers. = 72.00M


MP
GD

GD
NOMOR TITIK
BR
BR

BR
BR
SP
SP

SP
SP

SP
SP
SP
SP
JA

JA
JC PB SH MP MP BR BR CR18 MP MK MP MP JA GD SH
0.45

0.35

0.23

0.51
0.56

0.72

0.41

0.38

0.65

0.09
0.68
0.04
1.19
JARAK 1.91 3.07 4.38 3.27 2.46 1.84 3.53 1.47 3.66 2.95 15.21 1.58 1.88 1.53 15.14 3.98 2.77 0.97 6.43
76.568

76.344

76.672
75.161

74.976
76.596

76.763

76.940
76.976

77.034

77.089
77.102
77.115

77.129

77.205
77.216

77.306

77.648

77.670
77.670

77.561
77.595

77.612

77.313

77.236

77.066
77.019
76.917
76.293
76.294
77.277
77.364
ELEV.TANAH ASLI
11.08
11.53

15.92
16.27

19.54

22.00
22.23

24.07

27.60
28.12
28.68

30.15

33.81
34.52

37.47

52.68

54.26
54.67

56.55
56.93

58.45

73.59

77.57

80.34
80.98
81.95
82.04
82.73
82.76
83.96
6.10

8.01

JARAK LANGSUNG
KONSULTAN PERENCANA Direncanakan dan Diajukan : Disetujui : PROYEK :
KODE PROYEK / TH PROVINSI
PEKERJAAN REALIGNMENT GEOMETRIK
PT. CIPTA SENDI BANGUNAN GERBANG TOL CIMANGGIS UTAMA 2019 JAWA BARAT
JALAN TOL JAGORAWI - TAHUN 2019
VILA NUSA INDAH 3 BLOK KA.1 NO. 10
BOJONG KULUR, GUNUNG PUTRI, BOGOR LEMBAR NO. TOTAL LEMBAR
Achsan N Okky Irawan Hendri Prabowo Dyah Indra Arianti POTONGAN MELINTANG
TELP. 021 – 8273 4950 E-mail : csb_konsultan@yahoo.com
Operator Cad Highway Engineer Team Leader PT. Jasamarga Tollroad Maintenance E1.05 26
GM Maintenance Management Administration STA:19+184.558 ~ STA:19+159.558

STA: 19+184.558

Pagar Tol
JAKARTA BOGOR

Bidang Pers. = 72.00M

GD

GD
NOMOR TITIK

BR
BR

BR
BR

SH
SH
SH
SP
SP

SP
SP
SP
SP
SP
SP

SP
SP
SP
SP
JA

JA
JC PB MP MP MP CR19 MP JA MK MP MP SH
0.77

0.32

0.15
0.55
0.01
0.16
0.09
1.69
0.28

0.74
0.42

0.55

0.23

0.11
0.80
0.07
0.81

0.63
JARAK 7.95 3.75 1.85 3.48 1.66 3.64 3.03 15.33 4.37 1.55 15.03 2.48 3.13 1.33 1.07 2.57 2.77
75.685
75.595

76.151
74.667

74.774
76.599
77.022
76.852
76.888
77.083
77.385
77.401

77.455

77.508
77.520
77.516

77.519

77.618
77.620

77.699

78.076

78.019

78.030

77.749

77.705

77.470
77.438

77.456
76.693
76.654
77.696
77.945
78.500
79.185

80.309
ELEV.TANAH ASLI
14.66
14.98

18.73
18.87
19.42
19.44
19.59
19.68
21.38
21.65

23.51

26.99
27.73
28.14

29.81

33.45
34.00

37.02

52.35

56.73

58.28

73.31

75.79

78.92
79.14

80.47
80.58
81.38
81.45
82.27
83.33
83.96

86.53
5.94
6.71

JARAK LANGSUNG

STA: 19+159.558
Pagar Tol

JAKARTA BOGOR

Bidang Pers. = 72.00M


MP
GD

GD

GD
NOMOR TITIK
BR
BR

BR
BR
SP
SP
SP
JA

JA

JA
JC PB SH SH MP MP CR20 MP MK MP SH SH SH SH
0.25
0.21
0.54
0.29

0.37
0.59

0.44

0.46

0.16

0.66
JARAK 1.56 2.71 2.60 5.94 1.89 3.48 1.45 8.13 15.41 1.48 1.98 1.47 16.11 3.16 2.16 2.46 4.60
75.175

75.496

75.714

76.748

77.562
77.386
77.623
77.697
77.729

77.805

77.874
77.880
77.897

77.913

78.103

78.449

78.426
78.434

78.374
78.381

78.403

78.103

77.921
77.937

77.054
77.015

78.587

80.304
ELEV.TANAH ASLI
10.19

12.79

18.73
18.98
19.19
19.73
20.02

21.91

25.38
25.76
26.34

27.79

35.93

51.34

52.81
53.25

55.23
55.69

57.16

73.27

76.43
76.59

78.75
79.42

81.88

86.47
5.91

7.48

JARAK LANGSUNG
KONSULTAN PERENCANA Direncanakan dan Diajukan : Disetujui : PROYEK :
KODE PROYEK / TH PROVINSI
PEKERJAAN REALIGNMENT GEOMETRIK
PT. CIPTA SENDI BANGUNAN GERBANG TOL CIMANGGIS UTAMA 2019 JAWA BARAT
JALAN TOL JAGORAWI - TAHUN 2019
VILA NUSA INDAH 3 BLOK KA.1 NO. 10
BOJONG KULUR, GUNUNG PUTRI, BOGOR LEMBAR NO. TOTAL LEMBAR
Achsan N Okky Irawan Hendri Prabowo Dyah Indra Arianti POTONGAN MELINTANG
TELP. 021 – 8273 4950 E-mail : csb_konsultan@yahoo.com
Operator Cad Highway Engineer Team Leader PT. Jasamarga Tollroad Maintenance E1.06 26
GM Maintenance Management Administration STA:19+134.558 ~ STA:19+109.557

STA: 19+134.558

BOGOR JAKARTA

Pagar Tol

Bidang Pers. = 71.00M

MP

MP
MP
GD

GD

GD
NOMOR TITIK

BR
BR

BR
BR
SP
SP
SP

SP
SP
JA

JA

JA
JC PB SH SH MP MP CR21 MK MP SP SP SH SH
0.23
0.22
0.55
0.24

0.43
0.60
0.93

0.18

0.44

0.43

0.35

0.25

0.69
JARAK 1.46 1.84 2.78 4.32 2.01 3.41 9.15 15.35 1.56 1.90 1.55 15.02 3.08 3.21 4.13 3.57 4.63
74.991

74.969

75.841

77.220

77.946
77.719
77.955
78.010
78.068

78.150

78.195
78.218
78.224
78.245

78.440

78.790
78.791

78.792
78.792

78.678
78.711

78.729

78.424

78.250
78.204

76.199
74.601

74.474
75.717

76.862

77.516
ELEV.TANAH ASLI
12.11

16.42
16.66
16.87
17.43
17.66

19.67

23.07
23.50
24.10
25.03

34.18

49.53
49.70

51.26
51.70

53.60
54.03

55.58

70.60

73.68
74.03

77.24
77.49

81.62
82.31

85.88

90.51
6.03

7.49

9.33

JARAK LANGSUNG

STA: 19+109.557

JAKARTA BOGOR
Pagar Tol

Bidang Pers. = 71.00M


MP

MP

MP
MP
GD

GD

GD
NOMOR TITIK
BR
BR

BR
BR
JA

JA

JA
PT PT JC JC PDS MP CR22 MK MP SH SH SH
0.24

0.49
0.59
0.58

0.44

0.44

0.32

0.24
JARAK 3.46 2.31 7.59 1.07 1.46 2.45 3.39 9.87 15.19 1.56 2.01 1.55 15.01 3.04 1.16 2.50 5.47
74.047

74.828

75.007

74.945

77.570

77.836
78.472

78.417

78.562
78.563
78.580
78.581

78.742

79.094
79.100

79.094
79.094

78.972
79.008

79.052

78.739

78.509
78.491
78.380

77.446

76.354
ELEV.TANAH ASLI
13.36

14.43

15.90
16.14

18.58

21.97
22.46
23.05
23.63

33.50

48.70
49.13

50.69
51.14

53.15
53.47

55.01

70.03

73.07
73.31
74.47

76.97

82.43
0.00

3.46

5.77

JARAK LANGSUNG
KONSULTAN PERENCANA Direncanakan dan Diajukan : Disetujui : PROYEK :
KODE PROYEK / TH PROVINSI
PEKERJAAN REALIGNMENT GEOMETRIK
PT. CIPTA SENDI BANGUNAN GERBANG TOL CIMANGGIS UTAMA 2019 JAWA BARAT
JALAN TOL JAGORAWI - TAHUN 2019
VILA NUSA INDAH 3 BLOK KA.1 NO. 10
BOJONG KULUR, GUNUNG PUTRI, BOGOR LEMBAR NO. TOTAL LEMBAR
Achsan N Okky Irawan Hendri Prabowo Dyah Indra Arianti POTONGAN MELINTANG
TELP. 021 – 8273 4950 E-mail : csb_konsultan@yahoo.com
Operator Cad Highway Engineer Team Leader PT. Jasamarga Tollroad Maintenance E1.07 26
GM Maintenance Management Administration STA:19+084.098 ~ STA:19+059.090

STA: 19+084.098

JAKARTA BOGOR

Bidang Pers. = 67.00M


MP

MP
GD

GD

GD
NOMOR TITIK
BR
BR

BR
BR
SH
JA

JA

JA
SH MP CR23 MP MP MK MP SH SH SH SH SH SH
0.56
0.10

0.48
0.57
0.54

0.95

0.44

0.34

0.36
JARAK 7.52 2.11 2.06 3.55 9.92 15.10 1.62 1.93 1.63 14.87 2.93 1.65 2.81 1.59 2.03 1.89 3.60 8.61
77.394

78.521
78.637
78.639

78.649

78.753
78.757
78.783
78.789

78.992

79.321
79.342

79.362
79.362

79.284
79.283

79.316

78.971

78.874
78.810

78.550

77.502

76.854

75.920

75.805

75.622
ELEV.TANAH ASLI
20.32

22.43
22.99
23.09

25.14

28.70
29.18
29.75
30.28

40.20

55.30
56.25

57.87
58.32

60.25
60.59

62.22

77.09

80.02
80.38

82.03

84.83

86.43

88.46

90.35

93.95
JARAK LANGSUNG

STA: 19+059.090

JAKARTA BOGOR

Bidang Pers. = 66.00M


MP

MP
GD

GD

GD
NOMOR TITIK
BR
BR

BR
BR
SP
SP
SP
JA

JA

JA
SH MP CR24 MP MP MK MP SH SH SH SH SH
0.84
0.24
0.20
0.53
0.18

0.41
0.63
0.52

0.44

0.48

0.32
0.81
JARAK 10.32 1.97 3.62 9.39 15.24 1.64 1.55 1.87 1.54 14.88 3.09 1.55 2.10 3.39 1.06 9.59
78.124
78.579
78.395
78.705
78.703
78.751

78.847

78.946
78.957
78.978
78.999

79.189

79.557

79.581

79.599
79.600

79.532
79.507

79.542

79.219

79.063
79.032
78.956

78.314

76.898

76.274
75.057
ELEV.TANAH ASLI

106.55

109.64
109.96
110.76

112.32

114.42

117.81
118.87
50.38
51.22
51.46
51.66
52.18
52.36

54.34

57.96
58.37
59.00
59.52

68.91

84.15

85.79

87.34
87.78

89.65
90.13

91.67

JARAK LANGSUNG
KONSULTAN PERENCANA Direncanakan dan Diajukan : Disetujui : PROYEK :
KODE PROYEK / TH PROVINSI
PEKERJAAN REALIGNMENT GEOMETRIK
PT. CIPTA SENDI BANGUNAN GERBANG TOL CIMANGGIS UTAMA 2019 JAWA BARAT
JALAN TOL JAGORAWI - TAHUN 2019
VILA NUSA INDAH 3 BLOK KA.1 NO. 10
BOJONG KULUR, GUNUNG PUTRI, BOGOR LEMBAR NO. TOTAL LEMBAR
Achsan N Okky Irawan Hendri Prabowo Dyah Indra Arianti POTONGAN MELINTANG
TELP. 021 – 8273 4950 E-mail : csb_konsultan@yahoo.com
Operator Cad Highway Engineer Team Leader PT. Jasamarga Tollroad Maintenance E1.08 26
GM Maintenance Management Administration STA:19+033.669 ~ STA:19+008.642

STA: 19+033.669

JAKARTA BOGOR

Bidang Pers. = 66.00M

MP

MP
GD

GD

GD
NOMOR TITIK

BR
BR

BR
BR
SH

SH
SP
SP
SP
JA

JA

JA
MP CR25 MP MP MP MP SH SH
0.52
0.23
0.23
0.51
0.08

0.38
0.63
0.57

0.44

0.57

0.37
0.75
JARAK 11.04 1.98 3.63 8.51 15.37 2.56 1.61 1.80 1.39 15.00 3.10 6.47 6.23
78.684
78.828
78.616
78.892
78.896
78.928

79.045

79.148
79.150
79.195
79.194

79.341

79.745

79.797

79.801
79.801

79.741
79.758

79.754

79.465

79.235
79.146
78.972

76.216

73.671
ELEV.TANAH ASLI

105.44

108.53
108.91
109.65

116.12

122.36
49.44
49.96
50.18
50.41
50.92
51.00

52.98

56.61
56.99
57.62
58.19

66.70

82.06

84.62

86.23
86.68

88.48
89.05

90.44
JARAK LANGSUNG

STA: 19+008.642

JAKARTA BOGOR

Bidang Pers. = 66.00M


MP

MP
GD

GD

GD
NOMOR TITIK
BR
BR

BR
BR
SP
SP
SP

JC
JA

JA
SH SH SH MP CR26 MP MP MP MP SH SH SH
0.91
0.89
0.22
0.19
0.55
0.09

0.43
0.62
0.55

0.44

0.40

0.38
0.77
JARAK 6.24 4.34 1.87 3.65 7.42 15.51 3.54 1.57 1.97 1.49 14.92 3.11 5.60 4.19
75.695

78.113
78.889
79.108
78.884
79.100
79.107
79.131

79.213

79.307
79.314
79.345
79.341

79.472

79.912

79.976

79.982
79.983

79.918
79.942

79.949

79.673

79.538
79.350
79.118

76.726

74.847
ELEV.TANAH ASLI

106.17

109.28
109.66
110.43

116.02

120.21
44.60

48.94
49.86
50.74
50.96
51.15
51.70
51.80

53.66

57.31
57.75
58.37
58.92

66.33

81.85

85.38

86.95
87.40

89.36
89.76

91.25

JARAK LANGSUNG
KONSULTAN PERENCANA Direncanakan dan Diajukan : Disetujui : PROYEK :
KODE PROYEK / TH PROVINSI
PEKERJAAN REALIGNMENT GEOMETRIK
PT. CIPTA SENDI BANGUNAN GERBANG TOL CIMANGGIS UTAMA 2019 JAWA BARAT
JALAN TOL JAGORAWI - TAHUN 2019
VILA NUSA INDAH 3 BLOK KA.1 NO. 10
BOJONG KULUR, GUNUNG PUTRI, BOGOR LEMBAR NO. TOTAL LEMBAR
Achsan N Okky Irawan Hendri Prabowo Dyah Indra Arianti POTONGAN MELINTANG
TELP. 021 – 8273 4950 E-mail : csb_konsultan@yahoo.com
Operator Cad Highway Engineer Team Leader PT. Jasamarga Tollroad Maintenance E1.09 26
GM Maintenance Management Administration STA:18+983.454 ~ STA:18+958.420

STA: 18+983.454

JAKARTA BOGOR

Bidang Pers. = 68.00M

MP

MP

MP
GD

GD
NOMOR TITIK

BR
BR

BR
BR

SH
SP
SP
SP

JC

JC
JA
SH SH SH SH CR27 MP MP GD MP SH
0.88
0.23
0.19
0.48
0.19

0.47
0.65
0.49

0.44

0.34

0.37
0.74
JARAK 4.40 4.44 1.57 2.34 5.51 6.27 15.50 4.94 1.23 2.11 1.87 14.97 2.81 6.64 9.68
75.408

77.176

77.928

79.047
79.216
78.986
79.151
79.224
79.245

79.419
79.430
79.439
79.451

79.580

79.994

80.091

80.105
80.106

80.104

80.071

79.797
79.785

79.676
79.444
79.193

76.585
ELEV.TANAH ASLI

101.90
102.27
103.00

109.64
33.99

38.44

40.00

42.34
43.22
43.46
43.65
44.12
44.31

49.82
50.29
50.94
51.43

57.69

73.19

78.13

79.36
79.80

81.91

83.79

98.76
99.09
JARAK LANGSUNG

STA: 18+958.420

JAKARTA BOGOR

Pagar Tol
Bidang Pers. = 68.00M
MP

MP

MP
GD

GD

GD
NOMOR TITIK
BR
BR

BR
BR

SH
SP
SP
SP
SP

PT
JC

JC

JC
JA

JA

SH MP CR28 MP MP MP SH SH
0.85
0.06
0.18
0.13
0.62
0.14
1.69

0.34
0.63
0.62

0.44

0.48

0.35

0.37
0.54

0.37
JARAK 2.88 3.75 4.97 15.32 6.26 1.62 1.85 1.51 14.90 2.79 6.67 10.14 4.12
77.789

79.148
79.272
79.045
79.064
79.308
79.337
79.380
79.452

79.537
79.554
79.542
79.572

79.651

80.048

80.179

80.201
80.213

80.201
80.166

80.144

79.833
79.823

79.738
79.604
79.275

76.365

72.612

70.827
70.991
ELEV.TANAH ASLI

101.36

111.50

115.62
115.99
31.41

34.29
35.14
35.20
35.38
35.51
36.13
36.26
37.96

41.71
42.05
42.68
43.30

48.28

63.59

69.85

71.47
71.91

73.76
74.24

75.74

90.64
91.00

93.78
94.15
94.69
JARAK LANGSUNG
KONSULTAN PERENCANA Direncanakan dan Diajukan : Disetujui : PROYEK :
KODE PROYEK / TH PROVINSI
PEKERJAAN REALIGNMENT GEOMETRIK
PT. CIPTA SENDI BANGUNAN GERBANG TOL CIMANGGIS UTAMA 2019 JAWA BARAT
JALAN TOL JAGORAWI - TAHUN 2019
VILA NUSA INDAH 3 BLOK KA.1 NO. 10
BOJONG KULUR, GUNUNG PUTRI, BOGOR LEMBAR NO. TOTAL LEMBAR
Achsan N Okky Irawan Hendri Prabowo Dyah Indra Arianti POTONGAN MELINTANG
TELP. 021 – 8273 4950 E-mail : csb_konsultan@yahoo.com
Operator Cad Highway Engineer Team Leader PT. Jasamarga Tollroad Maintenance E1.10 26
GM Maintenance Management Administration STA:18+933.048 ~ STA:18+907.995

STA: 18+933.048

JAKARTA BOGOR

Pagar Tol
Bidang Pers. = 68.00M
MP

MP
GD

GD

GD
NOMOR TITIK
BR
BR

BR
BR

SH
SP
SP
SP
JA

JA

JA
SH SH MP CR29 MP MP MP MP MP SH SH SH PT JC
0.95
0.19
0.24
0.60
0.10

0.47
0.63
0.49

0.47

0.42

0.64
0.63
JARAK 2.03 1.72 3.73 3.63 15.14 4.26 3.64 1.58 1.87 1.55 14.95 2.81 5.33 4.39 5.09 5.67 1.06
78.373

79.195
79.460
79.243
79.466
79.464
79.509

79.568

79.654
79.669
79.688
79.687

79.761

80.102

80.222

80.288

80.295
80.281

80.226
80.215

80.219

79.912

79.763
79.611
79.446

76.829

75.201

73.248

70.762
71.025
ELEV.TANAH ASLI

102.25

107.92
108.98
24.71

26.74
27.69
27.87
28.11
28.71
28.81

30.53

34.26
34.72
35.36
35.84

39.47

54.62

58.88

62.52

64.10
64.57

66.44
66.86

68.41

83.36

86.17
86.81
87.44

92.77

97.16
JARAK LANGSUNG

STA: 18+907.995

JAKARTA BOGOR

Pagar Tol
Bidang Pers. = 68.00M
MP

MP
GD

GD

GD
NOMOR TITIK
BR
BR

BR
BR
JA

JA

JA
SH MP CR30 MP MP MP MP MP MP SH SH SH PT JC
0.25

0.42
0.63
0.55

0.47

0.52

0.54
0.87
JARAK 3.04 1.62 3.78 2.27 15.00 2.31 3.69 3.70 1.64 1.77 1.52 14.90 2.95 5.99 10.73 3.90 1.05
79.237

79.495
79.571

79.624

79.739
79.755
79.756
79.772

79.809

80.122

80.192

80.281

80.334

80.357
80.360

80.311
80.294

80.271

79.947

79.812
79.712
79.651

76.756

72.528

71.857
71.857
ELEV.TANAH ASLI

103.82
104.86
20.79

23.82
24.08

25.70

29.47
29.89
30.52
31.07

33.34

48.34

50.64

54.33

58.03

59.67
60.14

61.90
62.42

63.94

78.84

81.79
82.33
83.19

89.18

99.91
JARAK LANGSUNG
KONSULTAN PERENCANA Direncanakan dan Diajukan : Disetujui : PROYEK :
KODE PROYEK / TH PROVINSI
PEKERJAAN REALIGNMENT GEOMETRIK
PT. CIPTA SENDI BANGUNAN GERBANG TOL CIMANGGIS UTAMA 2019 JAWA BARAT
JALAN TOL JAGORAWI - TAHUN 2019
VILA NUSA INDAH 3 BLOK KA.1 NO. 10
BOJONG KULUR, GUNUNG PUTRI, BOGOR LEMBAR NO. TOTAL LEMBAR
Achsan N Okky Irawan Hendri Prabowo Dyah Indra Arianti POTONGAN MELINTANG
TELP. 021 – 8273 4950 E-mail : csb_konsultan@yahoo.com
Operator Cad Highway Engineer Team Leader PT. Jasamarga Tollroad Maintenance E1.11 26
GM Maintenance Management Administration STA:18+882.098 ~ STA:18+856.988

STA: 18+882.098

JAKARTA BOGOR

Bidang Pers. = 70.00M


MP

MP

MP
GD

GD

GD
NOMOR TITIK
BR
BR

BR
BR

SP
SP
SP
SP
JC

JC
JA

JA
SH SH MP CR31 MP MP MP MP MP SH SH
0.19

0.41
0.63
0.50

0.47

0.49

0.38

0.42

0.18
0.68
0.29
JARAK 3.63 2.75 1.58 3.82 1.80 15.06 4.28 3.61 3.78 1.59 1.83 1.56 14.94 2.69 3.88 7.79 2.52
79.621

79.566

79.583
79.561

79.629

79.729
79.734
79.753
79.768

79.791

80.119

80.231

80.318

80.380

80.384
80.395

80.340
80.354

80.309

80.018
79.992

79.877
79.765

77.787

75.072

74.308
74.034
73.983
74.247
ELEV.TANAH ASLI
11.62

15.25

18.01
18.19

19.77

23.60
24.01
24.63
25.14

26.93

41.99

46.27

49.88

53.66

55.25
55.72

57.54
58.03

59.59

74.53
74.90

77.59
78.01

81.89

89.68

92.20
92.37
93.05
93.34
JARAK LANGSUNG

STA: 18+856.988

JAKARTA BOGOR

Pagar Tol
Bidang Pers. = 72.00M
MP

MP

MP
GD

GD

GD
NOMOR TITIK

CR

CR
BR
BR

BR
BR
JA

JA

MP CR32 MP MP MP MP MP SH SH SH SH SH PT
0.26

0.36
0.63
0.50

0.47

0.48

0.33

0.54
0.95
JARAK 1.47 3.86 2.33 15.20 6.59 3.66 3.74 1.49 1.80 1.45 15.06 2.71 2.75 4.95 2.84 6.15 3.75
79.554
79.626

79.643

79.778
79.755
79.771
79.784

79.825

80.095

80.248

80.343

80.426

80.434
80.403

80.319
80.357

80.326

80.024
79.995

79.841
79.709
79.261

77.854

76.718

75.695

75.382

75.201
ELEV.TANAH ASLI
12.60
12.96
13.59
14.09

16.42

31.62

38.21

41.86

45.60

47.09
47.56

49.36
49.83

51.29

66.35
66.67

69.38
69.91
70.87

73.62

78.57

81.41

87.56

91.31
7.01
7.27

8.74

JARAK LANGSUNG
KONSULTAN PERENCANA Direncanakan dan Diajukan : Disetujui : PROYEK :
KODE PROYEK / TH PROVINSI
PEKERJAAN REALIGNMENT GEOMETRIK
PT. CIPTA SENDI BANGUNAN GERBANG TOL CIMANGGIS UTAMA 2019 JAWA BARAT
JALAN TOL JAGORAWI - TAHUN 2019
VILA NUSA INDAH 3 BLOK KA.1 NO. 10
BOJONG KULUR, GUNUNG PUTRI, BOGOR LEMBAR NO. TOTAL LEMBAR
Achsan N Okky Irawan Hendri Prabowo Dyah Indra Arianti POTONGAN MELINTANG
TELP. 021 – 8273 4950 E-mail : csb_konsultan@yahoo.com
Operator Cad Highway Engineer Team Leader PT. Jasamarga Tollroad Maintenance E1.12 26
GM Maintenance Management Administration STA:18+831.878 ~ STA:18+806.644

STA: 18+831.878

JAKARTA BOGOR

Pagar Tol
Bidang Pers. = 72.00M
MP

MP

MP
GD

GD
NOMOR TITIK

CR

CR
BR
BR

BR
BR

JA
CR33 MP MP MP MP MP MP SH SH SH SH SH PT
0.43
0.64
0.49

0.47

0.43

0.36

0.40
0.77
JARAK 3.71 3.35 15.39 5.06 4.19 3.62 3.64 1.24 1.78 1.59 14.92 2.73 3.22 6.30 3.31 4.28 3.85
79.702
79.708
79.709
79.741

79.806

80.070

80.137

80.272

80.395

80.480

80.486
80.438

80.258
80.297

80.312

80.030
80.018

79.884
79.757
79.645

78.139

77.160

76.413

75.956

75.770
ELEV.TANAH ASLI
10.67

26.06

31.12

35.30

38.92

42.56

43.80
44.27

46.05
46.48

48.08

62.99
63.35

66.08
66.48
67.25

70.47

76.77

80.08

84.36

88.21
5.76
6.19
6.83
7.32

JARAK LANGSUNG

STA: 18+806.644

JAKARTA BOGOR

Bidang Pers. = 74.00M


MP

MP

MP
GD

GD
NOMOR TITIK
BR
BR

BR
BR

JC

JC
JA
CR34 MP MP MP MP MP MP MP SH SH SH SH SH
0.26
0.70
0.61

0.92
0.47

0.53

0.26

0.43
0.73
JARAK 3.57 4.66 15.41 5.98 2.31 3.58 3.63 3.65 1.87 1.48 15.05 2.71 3.40 6.93 3.53 3.19
79.630
79.629
79.650
79.638

79.750

80.029

80.148

80.212

80.294

80.403

80.497
80.500
80.431

80.235
80.251

80.250

79.919
79.902

79.683
79.705
79.645

78.430

77.671

77.452

77.133
ELEV.TANAH ASLI
11.53

26.94

32.92

35.23

38.81

42.44

46.09
47.00
47.47

49.34
49.87

51.35

66.40
66.66

69.37
69.80
70.53

73.93

80.85

84.38

87.57
5.30
5.56
6.26
6.88

JARAK LANGSUNG
KONSULTAN PERENCANA Direncanakan dan Diajukan : Disetujui : PROYEK :
KODE PROYEK / TH PROVINSI
PEKERJAAN REALIGNMENT GEOMETRIK
PT. CIPTA SENDI BANGUNAN GERBANG TOL CIMANGGIS UTAMA 2019 JAWA BARAT
JALAN TOL JAGORAWI - TAHUN 2019
VILA NUSA INDAH 3 BLOK KA.1 NO. 10
BOJONG KULUR, GUNUNG PUTRI, BOGOR LEMBAR NO. TOTAL LEMBAR
Achsan N Okky Irawan Hendri Prabowo Dyah Indra Arianti POTONGAN MELINTANG
TELP. 021 – 8273 4950 E-mail : csb_konsultan@yahoo.com
Operator Cad Highway Engineer Team Leader PT. Jasamarga Tollroad Maintenance E1.13 26
GM Maintenance Management Administration STA:18+781.526 ~ STA:18+756.407

STA: 18+781.526

Pagar Tol
JAKARTA BOGOR

Bidang Pers. = 75.00M

MP

MP
GD

GD
NOMOR TITIK

CR

CR
BR
BR

JA
CR35 MP MP MP MP MP MP SH SH SH SH PT

0.53
0.47

0.56

0.40

0.41
0.82
JARAK 15.46 8.76 2.19 3.74 3.60 3.54 1.98 1.46 14.92 2.58 4.38 7.63 5.44 3.32
79.796

79.989

80.228

80.321

80.383

80.496

80.603
80.582
80.505

80.177
80.204

80.183

79.873
79.835

79.768
79.601
79.611

78.370

78.309

78.012

78.375
ELEV.TANAH ASLI
12.58

28.04

36.80

38.99

42.74

46.34

49.87
50.41
50.88

52.85
53.41

54.87

69.79
70.19

72.77
73.17
73.99

78.37

86.00

91.44

94.76
JARAK LANGSUNG

STA: 18+756.407

Pagar Tol
JAKARTA BOGOR

Bidang Pers. = 75.00M


MPP
JCC

MP
GD

GD

NOMOR TITIK
KN
KN

JC
JA
CR36 MP BR BR JC MPP MPP MP JC SH SH SH PT
0.89

0.56
0.05
0.15
0.35

0.41

0.30

0.87
JARAK 15.41 11.33 1.27 3.95 3.30 3.69 1.77 1.52 15.08 2.72 3.44 7.42 10.15
79.856

80.119

80.302
80.244

80.283

80.393

80.462

80.576
80.589
80.517
80.776
80.434

80.117
80.115

80.113

79.804
79.793

79.676
79.518

78.344

78.320

78.640
ELEV.TANAH ASLI
13.52

28.94

40.26
41.15

42.42

46.36

49.67

53.35
53.92
53.97
54.12
54.47

56.24
56.65

58.17

73.25
73.56

76.27
77.15

80.59

88.01

98.16
JARAK LANGSUNG
KONSULTAN PERENCANA Direncanakan dan Diajukan : Disetujui : PROYEK :
KODE PROYEK / TH PROVINSI
PEKERJAAN REALIGNMENT GEOMETRIK
PT. CIPTA SENDI BANGUNAN GERBANG TOL CIMANGGIS UTAMA 2019 JAWA BARAT
JALAN TOL JAGORAWI - TAHUN 2019
VILA NUSA INDAH 3 BLOK KA.1 NO. 10
BOJONG KULUR, GUNUNG PUTRI, BOGOR LEMBAR NO. TOTAL LEMBAR
Achsan N Okky Irawan Hendri Prabowo Dyah Indra Arianti POTONGAN MELINTANG
TELP. 021 – 8273 4950 E-mail : csb_konsultan@yahoo.com
Operator Cad Highway Engineer Team Leader PT. Jasamarga Tollroad Maintenance E1.14 26
GM Maintenance Management Administration STA:18+731.760 ~ STA:18+706.667

STA: 18+731.760

JAKARTA BOGOR

Bidang Pers. = 75.00M

MD
MD

MD
MD

MP

MP
GD

GD
NOMOR TITIK

KN
KN
BR

JC

JC
JA
CR37 MP MP MP MP MP JC SH SH SH

0.06

0.08
0.94

0.56
0.05
0.08
0.45

0.43

0.28

0.85
JARAK 8.42 15.47 11.91 1.73 1.11 3.71 3.70 3.59 1.70 1.35 15.19 2.83 4.52 4.56
79.957

80.335

80.388
80.621

80.644
80.476
80.233

80.290

80.341

80.432

80.518
80.517
80.489
80.727
80.261

80.009
80.043

80.003

79.748
79.731

79.596
79.411

78.157

78.122
ELEV.TANAH ASLI
13.88

29.34

41.25
41.31

43.04
43.11
44.05

45.16

48.87

52.57

56.16
56.71
56.76
56.84
57.29

58.99
59.43

60.78

75.96
76.24

79.07
79.92

84.44

89.00
JARAK LANGSUNG

STA: 18+706.667

JAKARTA BOGOR

Bidang Pers. = 74.00M

MP

MP
GD

GD
NOMOR TITIK

KN
KN
BR
CB

JC

JC
JA
CR38 MP CB BR MP MP MP MP JC SH SH SH
0.53

0.46
0.14
0.14
0.32

0.44

0.21
JARAK 15.64 14.01 1.38 1.00 1.21 3.65 3.63 3.64 1.72 1.43 15.16 2.79 0.96 4.10 6.97
80.012

80.224

80.355
80.421

80.415
80.147

80.238

80.315

80.386

80.443
80.444
80.353
80.598
80.234

79.931
79.956

79.951

79.663
79.650

79.482
79.297

77.937

78.022
ELEV.TANAH ASLI
12.57

28.21

42.22
42.75

44.13
45.13

46.34

49.98

53.61

57.25
57.71
57.85
57.99
58.31

60.04
60.47

61.90

77.06
77.28

80.07
81.03

85.13

92.09
JARAK LANGSUNG
KONSULTAN PERENCANA Direncanakan dan Diajukan : Disetujui : PROYEK :
KODE PROYEK / TH PROVINSI
PEKERJAAN REALIGNMENT GEOMETRIK
PT. CIPTA SENDI BANGUNAN GERBANG TOL CIMANGGIS UTAMA 2019 JAWA BARAT
JALAN TOL JAGORAWI - TAHUN 2019
VILA NUSA INDAH 3 BLOK KA.1 NO. 10
BOJONG KULUR, GUNUNG PUTRI, BOGOR LEMBAR NO. TOTAL LEMBAR
Achsan N Okky Irawan Hendri Prabowo Dyah Indra Arianti POTONGAN MELINTANG
TELP. 021 – 8273 4950 E-mail : csb_konsultan@yahoo.com
Operator Cad Highway Engineer Team Leader PT. Jasamarga Tollroad Maintenance E1.15 26
GM Maintenance Management Administration STA:18+681.573 ~ STA:18+657.403

STA: 18+681.573

JAKARTA BOGOR

Bidang Pers. = 74.00M

MP

GD
NOMOR TITIK

BR
BR

KN
KN
CB

JC
CR39 MP CB BR MP MP MP GD JA MP MP JA SH SH SH

0.38
0.41

0.95

0.48
0.09
0.14
0.32

0.74
JARAK 15.52 16.18 1.14 1.31 3.65 3.69 3.58 1.65 1.28 15.05 2.94 1.16 4.40 5.92
79.755

79.948

80.285
80.374
80.434

80.439
80.202

80.224

80.259

80.320

80.362
80.367
80.278
80.523
80.149
79.868
79.901

79.917

79.619

79.476

79.309

77.770

77.555
ELEV.TANAH ASLI
10.68

26.20

42.37
42.76
43.17

44.31
45.26

46.57

50.22

53.90

57.49
57.96
58.05
58.18
58.50
60.15
60.89

62.18

77.22

80.16

81.32

85.72

91.64
JARAK LANGSUNG

STA: 18+657.403

JAKARTA
BOGOR

Bidang Pers. = 74.00M

MP

GD
NOMOR TITIK

KN
KN
BR
BR

JC
CR40 MP CB CB BR MP MP MP GD MP MP JA SH SH SH
0.39

0.43
0.10
0.10
0.36
JARAK 15.43 13.47 5.11 1.11 1.03 1.32 3.62 3.62 3.61 1.64 1.96 15.07 3.05 1.00 4.02 6.00
79.539

79.865

80.182
80.195

80.354

80.387
80.187

80.202

80.242

80.298

80.313
80.316
80.226
80.459
80.162
79.792

79.818

79.563

79.450
79.282

77.784

77.622
ELEV.TANAH ASLI
24.44

37.91
38.30

43.41

44.52
45.55

46.87

50.49

54.11

57.72
58.14
58.24
58.34
58.70
60.33

62.29

77.36

80.41
81.41

85.43

91.43
9.02

JARAK LANGSUNG
KONSULTAN PERENCANA Direncanakan dan Diajukan : Disetujui : PROYEK :
KODE PROYEK / TH PROVINSI
PEKERJAAN REALIGNMENT GEOMETRIK
PT. CIPTA SENDI BANGUNAN GERBANG TOL CIMANGGIS UTAMA 2019 JAWA BARAT
JALAN TOL JAGORAWI - TAHUN 2019
VILA NUSA INDAH 3 BLOK KA.1 NO. 10
BOJONG KULUR, GUNUNG PUTRI, BOGOR LEMBAR NO. TOTAL LEMBAR
Achsan N Okky Irawan Hendri Prabowo Dyah Indra Arianti POTONGAN MELINTANG
TELP. 021 – 8273 4950 E-mail : csb_konsultan@yahoo.com
Operator Cad Highway Engineer Team Leader PT. Jasamarga Tollroad Maintenance E1.16 26
GM Maintenance Management Administration STA:18+632.345 ~ STA:18+607.286

STA: 18+632.345

JAKARTA
BOGOR

Bidang Pers. = 74.00M

MP

GD

GD
NOMOR TITIK

KN
KN
JC

JA
MP MP JC CB BG BG CB CB BR MP MP MP GD JA MP MP SH SH SH

0.75

0.91

0.42
0.15
0.13
0.34

0.62

0.41
JARAK 15.19 7.92 2.08 2.77 6.20 1.16 1.23 1.30 3.60 3.63 3.64 1.57 1.21 15.35 2.94 0.97 3.70 6.66 9.57
79.875

80.053

80.093

80.151
80.367

80.328

80.274

80.289
80.147

80.130

80.159

80.211

80.253
80.246
80.128
80.381
79.985
79.722
79.757

79.775

79.452

79.307
79.244
79.138

77.853

77.735
ELEV.TANAH ASLI
22.86

30.78

32.86

35.63
36.38

42.57

43.73

44.96
45.86

47.16

50.76

54.38

58.03
58.44
58.60
58.73
59.07
60.64
61.26

62.47

77.82

80.76
81.17
82.14

85.84

92.50
JARAK LANGSUNG

STA: 18+607.286

JAKARTA BOGOR

Bidang Pers. = 72.00M


PDS

MP

GD

GD

GD
NOMOR TITIK
BG

BG

KN
KN
PD
CB

CB

JC

JA

JA
MP JC CB BR MP MP MP MP MP SH SH SH
0.25
0.71

0.68
0.35

0.90

0.39
0.08
0.12
0.38

0.51

0.39
JARAK 15.17 6.75 3.39 10.43 1.24 1.32 3.60 3.68 3.58 1.96 1.16 15.15 3.06 1.00 3.21 7.01
79.888

80.033

80.064
80.383
80.314

80.457
80.454
80.261

80.240
79.989

80.004

80.055

80.106

80.154
80.140
80.073
80.335
79.929

79.703
79.678

79.674

79.430

79.308
79.201
79.031

77.851

77.777
ELEV.TANAH ASLI
26.16

32.91

36.30
36.55
37.26

47.69
48.36
48.71

49.95
50.85

52.18

55.77

59.45

63.04
63.42
63.51
63.63
64.01

65.97
66.48

67.63

82.78

85.84
86.24
87.24

90.45

97.46
JARAK LANGSUNG
KONSULTAN PERENCANA Direncanakan dan Diajukan : Disetujui : PROYEK :
KODE PROYEK / TH PROVINSI
PEKERJAAN REALIGNMENT GEOMETRIK
PT. CIPTA SENDI BANGUNAN GERBANG TOL CIMANGGIS UTAMA 2019 JAWA BARAT
JALAN TOL JAGORAWI - TAHUN 2019
VILA NUSA INDAH 3 BLOK KA.1 NO. 10
BOJONG KULUR, GUNUNG PUTRI, BOGOR LEMBAR NO. TOTAL LEMBAR
Achsan N Okky Irawan Hendri Prabowo Dyah Indra Arianti POTONGAN MELINTANG
TELP. 021 – 8273 4950 E-mail : csb_konsultan@yahoo.com
Operator Cad Highway Engineer Team Leader PT. Jasamarga Tollroad Maintenance E1.17 26
GM Maintenance Management Administration STA:18+582.228 ~ STA:18+560.970

STA: 18+582.228

JAKARTA
BOGOR

Bidang Pers. = 70.00M

0.38 CR.JA
PDS

MP

MP
GD

GD
NOMOR TITIK
BG

KN
KN
JC

JC

JC
MP BGPD CB CB BR MP MP MP GD MP SH SH SH
0.52
0.67

0.61
0.85

0.45
0.15
0.16
0.37

0.28
0.99
JARAK 4.70 16.63 1.26 0.97 1.34 3.51 3.66 3.56 1.63 2.02 15.05 2.79 4.81 5.56 9.47
79.925

79.975
80.766
80.776

80.806
80.776
80.209

80.231
79.956

79.990

80.027

80.040

80.043
80.026
79.920
80.215
79.644

79.482

79.574

79.319
79.291

79.196
79.077
79.002

77.791

77.725
ELEV.TANAH ASLI

102.53
102.91

105.70
105.98
106.97

111.78

117.34
44.44

49.14
49.66
50.33

66.96
67.57
68.42

69.68
70.64

71.98

75.49

79.15

82.71
83.16
83.30
83.46
83.83

85.46

87.48
JARAK LANGSUNG

STA: 18+560.970

JAKARTA BOGOR

Bidang Pers. = 70.00M


MP

MP

MP
TM

GD

GD
NOMOR TITIK

CR

CR
BR

KN
KN
CB

JC
MP JC MP MP GD JA MP SH SH SH
0.09

0.53

0.47
0.09
0.14
0.36

0.70

0.26

0.26
1.06
JARAK 4.16 12.96 1.97 12.24 3.64 3.60 1.64 1.29 15.06 2.81 5.09 5.80 8.74
79.942

79.989

80.235
80.819

80.062
80.064

79.992

79.981

79.980
79.966
79.924
80.186
79.705
79.411
79.523

79.520

79.273
79.274

79.137
79.094
78.897

77.569

77.661
ELEV.TANAH ASLI

103.56
103.81

106.62
106.88
107.94

113.03

118.83
44.63

48.79

61.75
61.84

63.80
64.33

76.58

80.21

83.81
84.28
84.37
84.51
84.87
86.51
87.21

88.50

JARAK LANGSUNG
JARAK
JARAK

NOMOR TITIK
NOMOR TITIK
TELP. 021 – 8273 4950

ELEV.TANAH ASLI
ELEV.TANAH ASLI

JARAK LANGSUNG
JARAK LANGSUNG

Bidang Pers. = 70.00M


Bidang Pers. = 70.00M

15.31
KONSULTAN PERENCANA

VILA NUSA INDAH 3 BLOK KA.1 NO. 10


BOJONG KULUR, GUNUNG PUTRI, BOGOR
PT. CIPTA SENDI BANGUNAN

E-mail : csb_konsultan@yahoo.com

44.61 79.944

MP

5.64
46.31 79.986

MP
Achsan N
Operator Cad

50.25 80.023 MP
0.67
50.92 80.011 0.10 MD
51.02 80.271 MD
1.19
52.22 80.271 0.20 MD
52.41 80.028 MD

7.65
52.65 80.046 0.24 MP

2.92
55.57 80.062 0.27 MP
55.84 80.053 0.11 MD
55.95 80.315 MD 53.97 80.087 MP
54.24 80.086 0.28 MD
54.30 80.328 0.06 MD

2.08
Okky Irawan

58.03 80.305 MD
Highway Engineer

0.15
2.18

58.18 80.049 0.29 MD


58.46 80.056 MP 56.48 80.343 MD
0.16
Direncanakan dan Diajukan :

56.64 80.090 0.29 MD


56.93 80.090 MP

3.81
3.90

62.28 80.047

1.15
63.43 80.042 60.84 80.100 MP

MP MP
61.20 80.122 0.36 MD
61.34 80.320 0.14 MD
61.67 80.320 0.34 MD
61.71 80.321 0.04 MD
Team Leader

0.16
Hendri Prabowo

61.87 80.318 0.08 MD


61.95 80.102 0.57 MD
62.51 80.081 MP
Disetujui :

17.24
Dyah Indra Arianti

16.19
PT. Jasamarga Tollroad Maintenance
GM Maintenance Management Administration

JAKARTA

80.67 79.890

MP
78.70 79.963
MP
JAKARTA

3.59
3.58

84.26 79.879 0.51 MP


84.77 79.885 JC 82.28 79.950
MP

84.85 79.864 0.08 KN


84.94 80.089 0.09 KN
85.30 79.726 0.37 GD
85.89 79.375 0.59 SP
0.12
3.58

86.01 79.128 0.27 SP


86.28 79.140 0.18 SP
86.45 79.380 0.56 SP
87.02 79.494 0.60 GD
87.62 79.430 JA 85.86 79.951 0.47 MP
1.47 86.34 79.933 JC
89.09 79.441 MP 86.45 79.918 0.11 KN
86.56 80.131 0.11 KN
STA: 18+510.970

86.92 79.754 0.37 GD


87.55 79.432 0.62 SP
87.69 79.209 0.14 SP
87.94 79.194 0.25 SP
88.15 79.362 0.21 SP
88.55 79.420 0.41 GD
1.93
90.49 79.526
MP
STA: 18+535.970

11.77
BOGOR

JC
15.08

100.85 79.232
BOGOR

3.18

104.03 79.178 0.32 MP


104.35 79.143 CR
2.66
PROYEK :

107.01 79.043 0.42 CR


107.43 78.960 GD
0.80 105.57 79.277 MP
SH

108.23 78.848 105.91 79.217 0.34 CR


2.72

108.62 79.117 0.33 CR


108.95 79.005 GD
0.89
7.51
SH

109.84 78.870
3.99
POTONGAN MELINTANG

SH
GERBANG TOL CIMANGGIS UTAMA

115.74 77.162
STA:18+535.970 ~ STA:18+510.970
JALAN TOL JAGORAWI - TAHUN 2019

SH

113.83 77.547
PEKERJAAN REALIGNMENT GEOMETRIK

4.78
6.11

SH

120.52 77.328
2019

E1.18
LEMBAR NO.
KODE PROYEK / TH

SH

119.94 77.528
2.84

7.31
26

SH

122.78 77.471
PROVINSI

TOTAL LEMBAR
JAWA BARAT
JARAK
JARAK

NOMOR TITIK
NOMOR TITIK
TELP. 021 – 8273 4950

ELEV.TANAH ASLI
ELEV.TANAH ASLI

JARAK LANGSUNG
JARAK LANGSUNG

Bidang Pers. = 70.00M


Bidang Pers. = 70.00M
KONSULTAN PERENCANA

VILA NUSA INDAH 3 BLOK KA.1 NO. 10


BOJONG KULUR, GUNUNG PUTRI, BOGOR
PT. CIPTA SENDI BANGUNAN

E-mail : csb_konsultan@yahoo.com

42.98 79.843

MP
44.14 79.857

MP
Achsan N
Operator Cad

8.02

11.08
52.15 79.921 0.21 MP
52.36 79.920 0.13 MD
52.49 80.163 MD

2.09
54.06 79.900 0.22 MP
54.28 79.891 0.11 MD 54.58 80.165 MD
54.39 80.138 MD 0.15
Okky Irawan

54.74 79.924 0.19 MD


54.93 79.933 MP
Highway Engineer

2.17
56.57 80.139 0.13 MD
3.02
Direncanakan dan Diajukan :

56.70 79.898 0.23 MD


56.92 79.901 MP
57.95 79.964 0.32 MP
58.27 79.948 0.08 MD

2.87
58.35 80.188 MD
59.79 79.898 MP
2.19

60.14 79.897 0.35 MD


60.21 80.120 0.07 MD 60.55 80.199 MD
60.65 79.923 0.10 MD
60.84 79.925 0.19 MP

2.20
62.41 80.108 MD
Team Leader

0.11
Hendri Prabowo

62.52 79.885 0.19 MD


62.71 79.890 MP
4.07

64.91 79.952 MP
0.62

4.42
65.53 79.949 MP

67.13 79.846

MP
Disetujui :

Dyah Indra Arianti


PT. Jasamarga Tollroad Maintenance
GM Maintenance Management Administration

14.65

15.55
JAKARTA
JAKARTA

80.18 79.836
MP

3.61

82.69 79.751 0.46 MP


83.14 79.743 0.11 JC
83.25 79.730 0.07 KN 83.79 79.818 MP
83.32 79.962 0.37 KN 0.51
83.69 79.642 0.67 GD 84.30 79.796 0.07 JC
84.36 79.224 0.11 SP 84.37 79.784 0.07 KN
84.47 78.991 0.24 SP 84.44 80.002 0.41 KN
84.71 78.974 0.04 SP 84.85 79.675 0.66 MD
84.76 79.232 0.65 SP 85.51 79.312 0.05 SP
85.40 79.342 0.68 GD 85.56 79.096 0.31 SP
86.09 79.300 JA 85.87 79.046 0.11 SP
1.35 85.97 79.280 0.56 SP
87.43 79.301 MP 86.54 79.373 0.69 GD
87.22 79.367 JA
STA: 18+461.093

88.40 79.391 1.18 MP


STA: 18+485.970

11.76
11.99

BOGOR
BOGOR

CR

99.20 79.104
CR

100.39 79.179
3.17
3.16

102.36 79.051 0.33 MP


102.70 79.034 CR
103.55 79.127 0.34 MP
103.89 79.072 CR
PROYEK :

2.70
2.47

105.39 79.054 0.40 CR


105.79 78.880 GD
0.92 106.36 79.048 CR
0.59
SH

106.71 78.644 106.95 78.907 GD


0.77
SH

107.71 78.846
6.55
6.29
POTONGAN MELINTANG
GERBANG TOL CIMANGGIS UTAMA

SH

113.26 76.770
STA:18+485.970 ~ STA:18+461.093
JALAN TOL JAGORAWI - TAHUN 2019
PEKERJAAN REALIGNMENT GEOMETRIK

SH

114.00 77.071
4.19
4.16

SH

117.45 76.792
SH

118.16 76.982
2019

E1.19
LEMBAR NO.
KODE PROYEK / TH

8.89
26
PROVINSI

9.29
TOTAL LEMBAR
JAWA BARAT
JARAK
JARAK

NOMOR TITIK
NOMOR TITIK
TELP. 021 – 8273 4950

ELEV.TANAH ASLI
ELEV.TANAH ASLI

JARAK LANGSUNG
JARAK LANGSUNG

Bidang Pers. = 70.00M


Bidang Pers. = 70.00M
KONSULTAN PERENCANA

VILA NUSA INDAH 3 BLOK KA.1 NO. 10


BOJONG KULUR, GUNUNG PUTRI, BOGOR
PT. CIPTA SENDI BANGUNAN

E-mail : csb_konsultan@yahoo.com

43.07 79.416

MP
43.29 79.712

MP
Achsan N
Operator Cad

10.90
13.79
53.97 79.561 0.34 MP
54.32 79.561 0.08 MD
54.40 79.834 MD
Okky Irawan
Highway Engineer

2.16
56.55 79.859 0.08 MD
Direncanakan dan Diajukan :

56.63 79.593 0.23 MD 57.08 79.784 MP


56.86 79.609 MP 57.32 79.796 0.24 MD
57.42 80.035 0.10 MD

2.91
2.26

59.76 79.669 MP 59.68 80.040 0.12 MD


60.06 79.665 0.29 MD 59.80 79.796 MD
0.11 59.97 79.795 0.17 MP
60.16 79.911 MD

2.27
3.41

62.44 79.909 MD
Team Leader

0.10
Hendri Prabowo

62.54 79.679 0.24 MD


62.77 79.680 MP 63.39 79.810 MP
63.76 79.817 0.38 MD
63.93 80.053 0.17 MD
1.00
64.93 80.051 0.09 MD

4.32
65.02 79.821 0.40 MD
65.41 79.812 MP

67.09 79.704

MP
Disetujui :

Dyah Indra Arianti


PT. Jasamarga Tollroad Maintenance
GM Maintenance Management Administration

11.49
17.56

JAKARTA
JAKARTA

78.58 79.609

MP

1.59
80.17 79.577 MP
0.58
80.74 79.817 0.39 BR
81.13 80.442 TM
0.78
81.91 80.430 0.09 TM
81.99 79.846 TM
82.98 79.667 MP

1.61
0.55
83.60 79.983 TM 83.52 79.633 0.09 JC
0.85 83.61 79.864 0.50 KN
84.45 78.980 SP 84.11 79.434 0.63 GD
84.49 78.698 0.04 SP 84.74 79.140 SP
0.29 84.83 78.893 0.09 SP
84.78 78.732 0.09 SP 0.24
84.87 79.002 SP 85.07 78.893 0.07 SP
85.39 79.106 0.52 GD 85.13 79.148 SP
85.69 79.285 0.55 GD
86.48 79.189 0.80 JA
1.99 1.11
87.38 79.127
MP

87.59 79.246
MP

STA: 18+411.094
STA: 18+436.093

11.77
11.88

BOGOR
BOGOR

CR

99.15 79.149
CR

99.47 79.090
3.21
3.16

102.35 79.147 0.29 MP


102.65 79.076 CR 102.63 79.056 0.34 MP
102.97 79.038 CR
2.62
PROYEK :

2.69

105.27 79.085 0.39 CR


105.66 78.967 GD 105.66 79.048 0.39 JC
0.90 106.04 78.961 GD
SH

106.55 78.817 0.95


SH

106.99 78.755
8.33
7.96
POTONGAN MELINTANG
GERBANG TOL CIMANGGIS UTAMA

STA:18+436.093 ~ STA:18+411.094
JALAN TOL JAGORAWI - TAHUN 2019
PEKERJAAN REALIGNMENT GEOMETRIK

SH

114.89 76.072
SH

114.95 76.442
2.85
4.89

SH

117.73 75.768
2019

E1.20
LEMBAR NO.

2.67
KODE PROYEK / TH

SH

119.84 76.501
SH

120.40 76.461
2.90
26
PROVINSI

TOTAL LEMBAR

SH

123.30 76.523
6.68
JAWA BARAT
JARAK
JARAK

NOMOR TITIK
NOMOR TITIK
TELP. 021 – 8273 4950

ELEV.TANAH ASLI
ELEV.TANAH ASLI

JARAK LANGSUNG
JARAK LANGSUNG

Bidang Pers. = 70.00M


Bidang Pers. = 70.00M
KONSULTAN PERENCANA

VILA NUSA INDAH 3 BLOK KA.1 NO. 10


BOJONG KULUR, GUNUNG PUTRI, BOGOR

39.05 78.985

MP
PT. CIPTA SENDI BANGUNAN

E-mail : csb_konsultan@yahoo.com

40.20 78.701

MP
Achsan N
Operator Cad

13.93

11.76
51.96 78.900

MP
52.97 79.263 MP
Okky Irawan

53.20 79.266 0.22 MD

2.63
0.13
Highway Engineer

53.33 79.524 MD
54.60 78.870 0.04 KN
2.23
Direncanakan dan Diajukan :

54.64 79.139 0.45 KN


55.08 79.755 0.51 TM 55.55 79.549 MD
55.59 79.762 0.31 TM 55.67 79.304 0.11 MD
55.90 79.411 SH 55.87 79.307 0.20 MP
3.36

59.23 79.332 0.42 MP


59.65 79.338 MD

7.08
59.75 79.544 0.10 MD
0.83
Team Leader

60.58 79.539 0.12 MD


Hendri Prabowo

60.69 79.333 MD
0.90
61.60 79.325 BR
0.91
62.51 79.665 0.08 TM
62.59 80.191 TM

PP
62.97 79.414 0.97
63.57 80.198 0.08 TM
63.64 79.616 TM

3.91
4.45

SH
66.88 79.434
Disetujui :

SH

68.09 79.565
Dyah Indra Arianti
PT. Jasamarga Tollroad Maintenance

4.22

7.07
GM Maintenance Management Administration

JAKARTA

TM

72.30 79.667
JAKARTA
2.05

SH
73.96 79.489
TM

74.35 79.671
4.74

5.93
TM

79.09 79.777
0.98

79.88 79.733

TM
0.84 80.07 78.914 0.09 SP
80.72 78.755 SP 80.17 78.493 0.31 SP
80.75 78.350 0.03 SP 80.48 78.492 0.06 SP
81.08 78.338 0.33 SP 80.54 78.712 0.67 SP
81.21 78.501 0.13 SP 81.20 78.902 0.72 GD
81.82 78.748 0.61 GD 81.92 78.975 JA
82.50 78.838 0.67 JA
1.23

83.15 78.986
MP

1.27
83.77 78.923
MP
STA: 18+361.848
STA: 18+386.850

11.73

11.76
BOGOR

BOGOR
CR

94.88 79.142
CR

95.53 79.191
3.18

3.22

98.06 79.172 0.32 MP


98.38 79.173 CR
98.75 79.265 0.29 MP
99.03 79.264 CR
2.72

2.65

101.10 79.209 0.40 CR


101.68 79.249 CR 101.49 79.126 GD
102.07 79.176 0.39 GD
0.99
PROYEK :

SH

102.49 78.914
1.00
SH

103.07 79.003
7.75

9.14
POTONGAN MELINTANG

SH

110.23 76.045
GERBANG TOL CIMANGGIS UTAMA

STA:18+386.850 ~ STA:18+361.848
JALAN TOL JAGORAWI - TAHUN 2019

2.87
PEKERJAAN REALIGNMENT GEOMETRIK

SH

112.21 75.692
SH

113.11 75.607
1.86

3.82

114.97 75.223
0.63
SH SH

115.60 75.337
SH

116.02 75.099
2019

1.37
E1.21
LEMBAR NO.

1.51
SH

116.97 75.592
117.54 74.587 SH
KODE PROYEK / TH

118.07 74.771 0.53 SH


4.82

3.81
26
PROVINSI

TOTAL LEMBAR
JAWA BARAT

Pagar Tol
PT

Pagar Tol 121.79 76.196


PT

121.87 75.472
KONSULTAN PERENCANA Direncanakan dan Diajukan : Disetujui : PROYEK :
KODE PROYEK / TH PROVINSI
PEKERJAAN REALIGNMENT GEOMETRIK
PT. CIPTA SENDI BANGUNAN GERBANG TOL CIMANGGIS UTAMA 2019 JAWA BARAT
JALAN TOL JAGORAWI - TAHUN 2019
VILA NUSA INDAH 3 BLOK KA.1 NO. 10
BOJONG KULUR, GUNUNG PUTRI, BOGOR LEMBAR NO. TOTAL LEMBAR
Achsan N Okky Irawan Hendri Prabowo Dyah Indra Arianti POTONGAN MELINTANG
TELP. 021 – 8273 4950 E-mail : csb_konsultan@yahoo.com
Operator Cad Highway Engineer Team Leader PT. Jasamarga Tollroad Maintenance E1.22 26
GM Maintenance Management Administration STA:18+339.159 ~ STA:18+316.206

STA: 18+339.159

JAKARTA
BOGOR

Bidang Pers. = 70.00M

MP
TM
TM

TM

GD

GD
NOMOR TITIK

CR

CR
KN
KN

SH

SH
SH
SP
SP
SP
SP
JA
MP MP SH SH SH MP CR SH SH SH

0.09
0.36
0.51
0.17

0.12
0.26
0.59
0.05
0.25
0.12
0.64
0.53
1.39

0.29

0.43
JARAK 11.69 2.63 7.81 5.45 3.63 5.69 11.72 3.22 2.65 1.09 8.42 4.89 4.95
78.483

78.774

78.769
79.040
79.650
79.618
79.304

79.346

79.410

79.431

79.411
79.660
78.926
78.744
78.139
78.122
78.460
78.631
78.691
78.772

79.164

79.265
79.261

79.235
79.154

78.898

75.589

74.263
ELEV.TANAH ASLI

100.22
100.50

103.15
103.58

104.67

113.09

117.98
43.31

55.00

57.63
57.72
58.08
58.59
58.76

66.57

72.02

75.65

81.34
81.46
81.71
82.31
82.35
82.60
82.72
83.36
83.88
85.27

96.99
JARAK LANGSUNG

STA: 18+316.206

JAKARTA BOGOR

Bidang Pers. = 69.00M

MP
TM
TM

TM

GD

GD
NOMOR TITIK

CR

CR
KN
KN

SH

SH
SH
SP
SP
SP
SP

MP MP SH SH MP CR SH SH SH SH
0.07
0.34
0.60
0.12

0.21
0.20
0.67
0.09
0.29
0.07
0.57

0.29

0.44
JARAK 11.52 1.99 8.04 6.49 6.10 1.91 11.64 3.24 2.72 1.22 4.51 3.16 8.91
78.354

78.613

78.618
78.885
79.566
79.556
79.221

79.299

79.312

79.377
79.621
78.945
78.678
77.972
77.959
78.385
78.595

78.754

79.111

79.212
79.213

79.257
79.134

78.784

76.383

75.950

72.965
ELEV.TANAH ASLI

101.47
101.91

103.13

107.64

110.80

119.71
44.31

55.84

57.83
57.90
58.24
58.83
58.96

66.99

73.48

79.58
79.79
79.99
80.66
80.75
81.04
81.11
81.68

83.59

95.23

98.47
98.76
JARAK LANGSUNG
KONSULTAN PERENCANA Direncanakan dan Diajukan : Disetujui : PROYEK :
KODE PROYEK / TH PROVINSI
PEKERJAAN REALIGNMENT GEOMETRIK
PT. CIPTA SENDI BANGUNAN GERBANG TOL CIMANGGIS UTAMA 2019 JAWA BARAT
JALAN TOL JAGORAWI - TAHUN 2019
VILA NUSA INDAH 3 BLOK KA.1 NO. 10
BOJONG KULUR, GUNUNG PUTRI, BOGOR LEMBAR NO. TOTAL LEMBAR
Achsan N Okky Irawan Hendri Prabowo Dyah Indra Arianti POTONGAN MELINTANG
TELP. 021 – 8273 4950 E-mail : csb_konsultan@yahoo.com
Operator Cad Highway Engineer Team Leader PT. Jasamarga Tollroad Maintenance E1.23 26
GM Maintenance Management Administration STA:18+292.035 ~ STA:18+267.713

STA: 18+292.035

JAKARTA BOGOR

Bidang Pers. = 67.00M

MP

MP
TM
TM

TM

GD

GD
NOMOR TITIK

CR

CR
KN
KN

SH

SH
SH

SH
SP
SP
SP
SP
JA
MP MP SH SH CR SH SH SH SH SH

0.05
0.24
0.70
0.09

0.07
0.22
0.73
0.05
0.30
0.06
0.57
0.65
1.26

0.29

0.23
0.72
JARAK 15.72 11.38 1.51 7.03 4.79 6.12 11.74 3.25 2.95 5.55 2.12 2.86 4.64 1.62 8.46
78.167

78.431

78.478
78.670
79.473
79.459
79.130

79.150

79.214

79.138
79.574
79.044
78.694
78.204
78.208
78.400
78.681
78.649
78.714

79.071

79.168
79.154

79.059
79.042
78.911

76.244

75.893

74.505

73.434

72.395
ELEV.TANAH ASLI

100.62

106.17

108.29

111.15

115.79

117.40
45.62

57.00

58.51
58.56
58.80
59.50
59.59

66.62

71.41

77.53
77.60
77.82
78.55
78.60
78.91
78.96
79.53
80.18
81.43

93.18

96.42
96.72

99.67
99.90
JARAK LANGSUNG

STA: 18+267.713

JAKARTA BOGOR

Bidang Pers. = 65.00M

MP
TM
TM

TM

GD

NOMOR TITIK

CR
KN
KN

SH

SH
SH
SP
SP
SP
SP
JA

MP MP SH SH MP CR CRGD SH SH SH SH SH
0.06
0.41
0.54
0.17

0.14
0.23
0.69
0.05
0.30
0.04
0.57
0.58
1.41

0.29

0.60
0.70
JARAK 10.79 1.53 4.64 4.31 5.33 11.74 3.27 2.66 4.58 2.19 6.50 6.40 12.91
78.036

78.332

78.393
78.593
79.207
79.199
78.985

79.006

79.172

79.101
79.511
78.827
78.594
78.189
78.189
78.328
78.452
78.541
78.633

79.015

79.120
79.110

79.011
78.984
78.890

76.310

75.893

73.448

71.283
ELEV.TANAH ASLI

103.71
33.02

43.81

45.34
45.40
45.80
46.34
46.51

51.15

55.46

60.78
60.92
61.15
61.84
61.89
62.19
62.23
62.80
63.38
64.79

76.53

79.79
80.09

82.75
83.35
84.05

88.63

90.81

97.31
JARAK LANGSUNG
KONSULTAN PERENCANA Direncanakan dan Diajukan : Disetujui : PROYEK :
KODE PROYEK / TH PROVINSI
PEKERJAAN REALIGNMENT GEOMETRIK
PT. CIPTA SENDI BANGUNAN GERBANG TOL CIMANGGIS UTAMA 2019 JAWA BARAT
JALAN TOL JAGORAWI - TAHUN 2019
VILA NUSA INDAH 3 BLOK KA.1 NO. 10
BOJONG KULUR, GUNUNG PUTRI, BOGOR LEMBAR NO. TOTAL LEMBAR
Achsan N Okky Irawan Hendri Prabowo Dyah Indra Arianti POTONGAN MELINTANG
TELP. 021 – 8273 4950 E-mail : csb_konsultan@yahoo.com
Operator Cad Highway Engineer Team Leader PT. Jasamarga Tollroad Maintenance E1.24 26
GM Maintenance Management Administration STA:18+242.270 ~ STA:18+216.922

STA: 18+242.270

JAKARTA BOGOR

Bidang Pers. = 65.00M

MP
TM
TM

TM
GD

GD

GD
NOMOR TITIK

CR

CR
KN
KN

SH

SH
SH
SP
SP
SP
SP
JC

JA
SH SH CR57 MP MP SH TM TM MP CR SH SH SH SH
0.70
0.39

0.12
0.30
0.63
0.12
1.23

0.10
0.15
0.81
0.04
0.25
0.14
0.57
0.48
1.48

0.29

0.49
0.68
JARAK 2.40 4.18 3.13 16.39 9.50 1.56 3.41 1.95 3.67 11.82 3.27 2.67 4.84 4.38 3.13
74.588

77.387
77.363
77.595

77.671

78.060

78.428

78.491
78.721
79.329
79.344
78.959
78.961

79.134

79.115

78.971
79.413
78.777
78.411
77.956
77.975
78.206
78.302
78.451
78.538

78.925

79.021
79.000

78.916
78.903
78.810

76.229

74.724

73.484
ELEV.TANAH ASLI

100.08
17.23

21.42
22.12
22.50

25.63

42.02

51.52

53.08
53.20
53.50
54.13
54.24
55.48

58.88

60.84

64.51
64.60
64.75
65.56
65.60
65.85
65.99
66.56
67.04
68.52

80.33

83.60
83.89

86.56
87.05
87.72

92.56

96.94
JARAK LANGSUNG

STA: 18+216.922

JAKARTA BOGOR

Bidang Pers. = 65.00M

MP
TM
TM

TM
GD

GD

GD
NOMOR TITIK

CR

CR
KN

SH
SH
SP
SP
SP
SP
JC

JC

JA
SH SH SH CR58 MP MP SH MP CR SH SH
0.43

0.06
0.20
1.09

0.12
0.14
0.76
0.05
0.29
0.07
0.59
0.48
1.43

0.29

0.46
0.86
JARAK 5.79 3.88 4.18 1.29 3.15 17.33 7.72 1.59 2.64 3.13 11.88 3.28 2.68 5.47 8.25
72.725

74.366

77.181

77.433
77.577

77.648

78.113

78.438

78.490
78.754
79.574
78.796

78.786

78.814
79.266
78.744
78.408
77.791
77.761
78.075
78.255
78.274
78.363

78.767

78.875
78.875

78.863
78.845
78.805

76.222
ELEV.TANAH ASLI
19.11

22.99

27.17

28.46
28.89

32.04

49.36

57.09

58.67
58.73
58.93
60.02

62.66

65.78
65.90
66.04
66.80
66.84
67.13
67.20
67.79
68.27
69.70

81.58

84.86
85.15

87.83
88.29
89.14

94.61
JARAK LANGSUNG
KONSULTAN PERENCANA Direncanakan dan Diajukan : Disetujui : PROYEK :
KODE PROYEK / TH PROVINSI
PEKERJAAN REALIGNMENT GEOMETRIK
PT. CIPTA SENDI BANGUNAN GERBANG TOL CIMANGGIS UTAMA 2019 JAWA BARAT
JALAN TOL JAGORAWI - TAHUN 2019
VILA NUSA INDAH 3 BLOK KA.1 NO. 10
BOJONG KULUR, GUNUNG PUTRI, BOGOR LEMBAR NO. TOTAL LEMBAR
Achsan N Okky Irawan Hendri Prabowo Dyah Indra Arianti POTONGAN MELINTANG
TELP. 021 – 8273 4950 E-mail : csb_konsultan@yahoo.com
Operator Cad Highway Engineer Team Leader PT. Jasamarga Tollroad Maintenance E1.25 26
GM Maintenance Management Administration STA:18+187.532 ~ STA:18+159.850

STA: 18+187.532

JAKARTA BOGOR

Bidang Pers. = 65.00M

MP
TM

TM
GD

GD

GD
NOMOR TITIK

CR

CR
SH

KN
SH
SH
SH
SP
SP
SP
SP
JC

JC

JA
SH SH SH SH CR59 MP MP MP CR SH SH SH
0.36
0.35

0.11
0.19
1.05
0.92
0.33
0.17
0.52
0.11
0.28
0.03
0.75
0.38
1.37

0.29

0.49
0.87
JARAK 5.00 4.46 3.34 3.97 1.13 3.25 17.83 5.96 1.48 11.65 3.23 2.63 6.21 3.75
72.803

73.116

74.685

77.464

77.591
77.335
77.676

77.765

78.268

78.437

78.478
78.763
79.581
78.727
78.724
79.113
78.504
78.219
77.567
77.595
77.858
78.080
78.115
78.160

78.570

78.685
78.683

78.705
78.643
78.506

75.824

73.932
ELEV.TANAH ASLI
20.15

24.61

27.94

31.91

33.04
33.40
33.74

36.99

54.82

60.78

62.26
62.37
62.56
63.61
64.53
64.86
65.03
65.55
65.67
65.94
65.97
66.73
67.11
68.48

80.12

83.35
83.64

86.27
86.76
87.62

93.83

97.59
JARAK LANGSUNG

STA: 18+159.850

JAKARTA BOGOR

Bidang Pers. = 66.00M

MP
GD

GD

GD
NOMOR TITIK

CR

CR
BR
BR
SP
SP
SP
SP
JC

JA
SH SH SH CR60 MP MP MP CR SH SH SH
0.19

0.46
0.64
0.06
0.31
0.05
0.83
0.11
1.51

0.29

0.49
JARAK 6.87 7.55 2.20 2.96 17.60 2.52 1.68 11.66 3.21 2.62 1.23 6.99 3.80 8.33
72.756

73.379

77.595

77.574
77.677

77.750

78.294

78.351

78.351
78.332
77.949
77.354
77.445
77.674
77.981
77.980
78.035

78.411

78.521
78.525

78.519
78.495

78.233

75.001

73.553
ELEV.TANAH ASLI
18.85

25.72

33.27

35.46
35.65

38.61

56.21

58.73

60.41
60.87
61.50
61.56
61.87
61.92
62.75
62.86
64.37

76.03

79.24
79.53

82.15
82.64

83.87

90.86

94.66
JARAK LANGSUNG
KONSULTAN PERENCANA Direncanakan dan Diajukan : Disetujui : PROYEK :
KODE PROYEK / TH PROVINSI
PEKERJAAN REALIGNMENT GEOMETRIK
PT. CIPTA SENDI BANGUNAN GERBANG TOL CIMANGGIS UTAMA 2019 JAWA BARAT
JALAN TOL JAGORAWI - TAHUN 2019
VILA NUSA INDAH 3 BLOK KA.1 NO. 10
BOJONG KULUR, GUNUNG PUTRI, BOGOR LEMBAR NO. TOTAL LEMBAR
Achsan N Okky Irawan Hendri Prabowo Dyah Indra Arianti POTONGAN MELINTANG
TELP. 021 – 8273 4950 E-mail : csb_konsultan@yahoo.com
Operator Cad Highway Engineer PT. Jasamarga Tollroad Maintenance E1.26 26
Team Leader GM Maintenance Management Administration STA:18+134.948 ~ STA:18+109.949

STA: 18+134.948

JAKARTA BOGOR JEMBATAN


JEMBATAN

Bidang Pers. = 66.00M

JBT
JBT

JBT

JBT

JBT
JBT
NOMOR TITIK

BR

BR
SH

SH
SH CR61 MP MP MP SH SH

0.01
0.54

0.29

0.23

0.28
0.05
JARAK 15.89 2.85 18.76 1.67 2.07 1.40 14.93 3.14 10.43 8.77
72.049

71.509
77.521
77.521

77.624

78.138

78.153
78.153

77.787
77.787

77.859

78.351

78.433
78.433
71.083

70.437

69.540
ELEV.TANAH ASLI

107.04
25.72

41.60
41.61
42.15

45.00

63.76

65.44
65.73

67.80
68.03

69.43

84.36

87.51
87.79
87.84

98.27
JARAK LANGSUNG

STA: 18+109.949

JAKARTA BOGOR JEMBATAN


JEMBATAN

Bidang Pers. = 65.00M


JBT
JBT

JBT

JBT

JBT
NOMOR TITIK
BR

BR

BR
SH

SH
PT SH SH CR62 MP MP MP SH SH SH SH
0.04
0.50

0.29

0.23

0.26
0.08
JARAK 3.76 5.60 7.79 2.82 18.76 1.84 1.75 1.57 14.93 3.11 3.83 3.18 6.87 4.84
72.549

72.653

72.807

72.903
77.293
77.293

77.359

77.886

77.911
77.690

77.568
77.562

77.641

78.115

78.192
78.192
74.222

74.403

73.533

71.586

70.848
ELEV.TANAH ASLI

102.37

107.20
25.17

28.93

34.52

42.31
42.35
42.86

45.68

64.44

66.28
66.57

68.32
68.55

70.12

85.05

88.16
88.42
88.49

92.32

95.50
JARAK LANGSUNG
E2. CROSS SECTION JALAN AKSES MASUK
PEKERJAAN REALIGNMENT GEOMETRIK GERBANG TOL CIMANGGIS UTAMA
JALAN TOL JAGORAWI - TAHUN 2019
KONSULTAN PERENCANA Direncanakan dan Diajukan : Disetujui : PROYEK :
KODE PROYEK / TH PROVINSI
PEKERJAAN REALIGNMENT GEOMETRIK
PT. CIPTA SENDI BANGUNAN GERBANG TOL CIMANGGIS UTAMA 2019 JAWA BARAT
JALAN TOL JAGORAWI - TAHUN 2019
VILA NUSA INDAH 3 BLOK KA.1 NO. 10
BOJONG KULUR, GUNUNG PUTRI, BOGOR LEMBAR NO. TOTAL LEMBAR
Achsan N Okky Irawan Hendri Prabowo Dyah Indra Arianti POTONGAN MELINTANG
TELP. 021 – 8273 4950 E-mail : csb_konsultan@yahoo.com
Operator Cad Highway Engineer Team Leader PT. Jasamarga Tollroad Maintenance
GM Maintenance Management Administration STA:0+005 ~ STA:0+025
KONSULTAN PERENCANA Direncanakan dan Diajukan : Disetujui : PROYEK :
KODE PROYEK / TH PROVINSI
PEKERJAAN REALIGNMENT GEOMETRIK
PT. CIPTA SENDI BANGUNAN GERBANG TOL CIMANGGIS UTAMA 2019 JAWA BARAT
JALAN TOL JAGORAWI - TAHUN 2019
VILA NUSA INDAH 3 BLOK KA.1 NO. 10
BOJONG KULUR, GUNUNG PUTRI, BOGOR LEMBAR NO. TOTAL LEMBAR
Achsan N Okky Irawan Hendri Prabowo Dyah Indra Arianti POTONGAN MELINTANG
TELP. 021 – 8273 4950 E-mail : csb_konsultan@yahoo.com
Operator Cad Highway Engineer Team Leader PT. Jasamarga Tollroad Maintenance
GM Maintenance Management Administration STA:0+050 ~ STA:0+075
KONSULTAN PERENCANA Direncanakan dan Diajukan : Disetujui : PROYEK :
KODE PROYEK / TH PROVINSI
PEKERJAAN REALIGNMENT GEOMETRIK
PT. CIPTA SENDI BANGUNAN GERBANG TOL CIMANGGIS UTAMA 2019 JAWA BARAT
JALAN TOL JAGORAWI - TAHUN 2019
VILA NUSA INDAH 3 BLOK KA.1 NO. 10
BOJONG KULUR, GUNUNG PUTRI, BOGOR LEMBAR NO. TOTAL LEMBAR
Achsan N Okky Irawan Hendri Prabowo Dyah Indra Arianti POTONGAN MELINTANG
TELP. 021 – 8273 4950 E-mail : csb_konsultan@yahoo.com
Operator Cad Highway Engineer Team Leader PT. Jasamarga Tollroad Maintenance
GM Maintenance Management Administration STA:0+100 ~ STA:0+125
KONSULTAN PERENCANA Direncanakan dan Diajukan : Disetujui : PROYEK :
KODE PROYEK / TH PROVINSI
PEKERJAAN REALIGNMENT GEOMETRIK
PT. CIPTA SENDI BANGUNAN GERBANG TOL CIMANGGIS UTAMA 2019 JAWA BARAT
JALAN TOL JAGORAWI - TAHUN 2019
VILA NUSA INDAH 3 BLOK KA.1 NO. 10
BOJONG KULUR, GUNUNG PUTRI, BOGOR LEMBAR NO. TOTAL LEMBAR
Achsan N Okky Irawan Hendri Prabowo Dyah Indra Arianti POTONGAN MELINTANG
TELP. 021 – 8273 4950 E-mail : csb_konsultan@yahoo.com
Operator Cad Highway Engineer Team Leader PT. Jasamarga Tollroad Maintenance
GM Maintenance Management Administration STA:0+150 ~ STA:0+175
KONSULTAN PERENCANA Direncanakan dan Diajukan : Disetujui : PROYEK :
KODE PROYEK / TH PROVINSI
PEKERJAAN REALIGNMENT GEOMETRIK
PT. CIPTA SENDI BANGUNAN GERBANG TOL CIMANGGIS UTAMA 2019 JAWA BARAT
JALAN TOL JAGORAWI - TAHUN 2019
VILA NUSA INDAH 3 BLOK KA.1 NO. 10
BOJONG KULUR, GUNUNG PUTRI, BOGOR LEMBAR NO. TOTAL LEMBAR
Achsan N Okky Irawan Hendri Prabowo Dyah Indra Arianti POTONGAN MELINTANG
TELP. 021 – 8273 4950 E-mail : csb_konsultan@yahoo.com
Operator Cad Highway Engineer Team Leader PT. Jasamarga Tollroad Maintenance
GM Maintenance Management Administration STA:0+200 ~ STA:0+225
F. STRUKTUR
PEKERJAAN REALIGNMENT GEOMETRIK GERBANG TOL CIMANGGIS UTAMA
JALAN TOL JAGORAWI - TAHUN 2019
F1. BARRIER
PEKERJAAN REALIGNMENT GEOMETRIK GERBANG TOL CIMANGGIS UTAMA
JALAN TOL JAGORAWI - TAHUN 2019
KONSULTAN PERENCANA Direncanakan dan Diajukan : Disetujui : PROYEK :
KODE PROYEK / TH PROVINSI
PEKERJAAN REALIGNMENT GEOMETRIK
PT. CIPTA SENDI BANGUNAN GERBANG TOL CIMANGGIS UTAMA 2019 JAWA BARAT
JALAN TOL JAGORAWI - TAHUN 2019
VILA NUSA INDAH 3 BLOK KA.1 NO. 10
BOJONG KULUR, GUNUNG PUTRI, BOGOR LEMBAR NO. TOTAL LEMBAR
Achsan N Okky Irawan Hendri Prabowo Dyah Indra Arianti
TELP. 021 – 8273 4950 E-mail : csb_konsultan@yahoo.com
PT. Jasamarga Tollroad Maintenance PENULANGAN BARRIER
Operator Cad Highway Engineer Team Leader F.02 04
GM Maintenance Management Administration

Ø13
Ø13-200

Ø13-200
Ø13

DRAIN INLET SKEMATIK TULANGAN DRAIN INLET


SKALA = 1 : 10

A B Ø13
PENULANGAN POTONGAN A
SKALA = 1 : 10

Ø13
Ø13-200

Ø13-200

DRAIN INLET DRAIN INLET


DRAIN INLET
PENULANGAN TAMPAK DEPAN PENULANGAN POTONGAN B
SKALA = 1 : 10
SKALA = 1 : 10
KONSULTAN PERENCANA Direncanakan dan Diajukan : Disetujui : PROYEK :
KODE PROYEK / TH PROVINSI
PEKERJAAN REALIGNMENT GEOMETRIK
PT. CIPTA SENDI BANGUNAN GERBANG TOL CIMANGGIS UTAMA 2019 JAWA BARAT
JALAN TOL JAGORAWI - TAHUN 2019
VILA NUSA INDAH 3 BLOK KA.1 NO. 10
BOJONG KULUR, GUNUNG PUTRI, BOGOR LEMBAR NO. TOTAL LEMBAR
Achsan N Okky Irawan Hendri Prabowo Dyah Indra Arianti
TELP. 021 – 8273 4950 E-mail : csb_konsultan@yahoo.com
PT. Jasamarga Tollroad Maintenance DIMENSI BARRIER
Operator Cad Highway Engineer Team Leader F.01 04
GM Maintenance Management Administration

DRAIN INLET TAMPAK ATAS DRAIN INLET


SKALA = 1 : 10

POTONGAN A
SKALA = 1 : 10

A B

DRAIN INLET DRAIN INLET DRAIN INLET


POTONGAN B
TAMPAK DEPAN SKALA = 1 : 10
SKALA = 1 : 10
F2. PERKERASAN
PEKERJAAN REALIGNMENT GEOMETRIK GERBANG TOL CIMANGGIS UTAMA
JALAN TOL JAGORAWI - TAHUN 2019
KONSULTAN PERENCANA Direncanakan dan Diajukan : Disetujui : PROYEK :
KODE PROYEK / TH PROVINSI
PEKERJAAN REALIGNMENT GEOMETRIK
PT. CIPTA SENDI BANGUNAN GERBANG TOL CIMANGGIS UTAMA 2019 JAWA BARAT
JALAN TOL JAGORAWI - TAHUN 2019

9291200 Y
VILA NUSA INDAH 3 BLOK KA.1 NO. 10
BOJONG KULUR, GUNUNG PUTRI, BOGOR LEMBAR NO. TOTAL LEMBAR
Achsan N Okky Irawan Hendri Prabowo Dyah Indra Arianti PLAN SAMBUNGAN PERKERASAN MAINROAD
TELP. 021 – 8273 4950 E-mail : csb_konsultan@yahoo.com
Operator Cad Highway Engineer Team Leader PT. Jasamarga Tollroad Maintenance STA. 18+100 ~ STA.18+800 F.03 04
GM Maintenance Management Administration
KEY PLAN

710000 X

GARIS IMPIT STA.18+450


GARIS IMPIT STA.18+100

9290800 Y
GARIS IMPIT STA.18+800
GARIS IMPIT STA.18+450
KONSULTAN PERENCANA Direncanakan dan Diajukan : Disetujui : PROYEK :
KODE PROYEK / TH PROVINSI
PEKERJAAN REALIGNMENT GEOMETRIK
PT. CIPTA SENDI BANGUNAN GERBANG TOL CIMANGGIS UTAMA 2019 JAWA BARAT
JALAN TOL JAGORAWI - TAHUN 2019
VILA NUSA INDAH 3 BLOK KA.1 NO. 10
BOJONG KULUR, GUNUNG PUTRI, BOGOR LEMBAR NO. TOTAL LEMBAR
Achsan N Okky Irawan Hendri Prabowo Dyah Indra Arianti
TELP. 021 – 8273 4950 E-mail : csb_konsultan@yahoo.com RIGID PAVEMENT JOINT DETAILS
Operator Cad Highway Engineer Team Leader PT. Jasamarga Tollroad Maintenance F.04 04
GM Maintenance Management Administration

SEE SHAPE OF SEALER JOINT SEALER


(3~6mm BELLOW SURFACE)
TIE BAR
GRADE 40 D13 @ 600 MESH REINFORCING BARS CEMENT GROUT
Ø 12 C.T.C 200 MESHED
KONSTRUKSI PERTAMA KONSTRUKSI KEDUA

KONSTRUKSI LAMA
KONSTRUKSI BARU (RIGID)
TIE BAR DUDUKAN Ø12
GRADE 40 D13 @ 600 DI CAT ANTI KARAT
TIE BAR
DI CAT ANTI KARAT TUL. MELINTANG Ø12 GRADE 40 D13 @ 600
CRACK INDUCER

LONGITUDINAL KEYED ABUTTING JOINT ( LJ-I ) LONGITUDINAL DUMMY JOINT ( LJ-2 )


SKALA 1 : 10 SKALA 1 : 10
LONGITUDINAL JOINT ( LJ-3 )
SKALA 1 : 10

JOINT SEALER JOINT SEALER


(3~6mm BELLOW SURFACE) (3~6mm BELLOW SURFACE)
JOINT SEALER
SETENGAH PANJANG DOWEL (3~6mm BELLOW SURFACE) SETENGAH PANJANG DOWEL SETENGAH PANJANG DOWEL
DI BERI PELUMAS DIBERI PELUMAS DIBERI PELUMAS
EXPANSION CAP (PIPA PVC) DI CAT ANTI KARAT DI CAT ANTI KARAT EXPANSION CAP (PIPA PVC)
DI CAT ANTI KARAT

BATANG DOWEL Ø 32 - 300 DUDUKAN Ø12 DUDUKAN Ø12 DUDUKAN Ø12


TUL. MELINTANG Ø12 BATANG DOWEL Ø 32 - 300 TUL. MELINTANG Ø12 BATANG DOWEL Ø 32 - 300 TUL. MELINTANG Ø12
SLIDING FIXED
FIXED SLIDING NON EXTRUDED PREMOLDED
SLIDING FIXED
JOINT FILLERS

CONTRACTION JOINT MELINTANG (TJ-I) EXPANSION JOINT MELINTANG (TJ-2) EXPANSION JOINT MELINTANG (TJ-3)
( DI ISI JOINT SEALER SETELAH PEMOTONGAN ) SKALA 1 : 10 SKALA 1 : 10

SKALA 1 : 50
CATATAN : ALUR UNTUK JOINT DIPOTONG DENGAN GERGAJI MESIN
DAN ALUR YANG TERJADI DENGAN SENDIRINYA TIDAH DIIJINKAN
CATATAN : PEMOTONGAN JOINT DENGAN GERGAJI MESIN SETIAP INTERVAL 5 M.

PERKERASAN BETON TRANSISI L= 5.00 CM

LAPISAN AUS
DI IKAT KAWAT
TULANG MELINTANG Ø12
LAPISAN BINDER TUL. MELINTANG Ø 12

BATANG DOWEL/TIE BAR


WET LEAN CONCRETE

DUDUKAN Ø 12
MESH REINFORCING BARS
DUDUKAN Ø12 Ø 12 C.T.C 200 MESHED
BATANG DOWEL
D13 L = 800 @ 300

TRANSISI STRUKTUR DENGAN PERKERASAN ASPAL METODE PERKUATAN DOWEL & TIE BAR
SKALA 1 : 10
G. DRAINASE
PEKERJAAN REALIGNMENT GEOMETRIK GERBANG TOL CIMANGGIS UTAMA
JALAN TOL JAGORAWI - TAHUN 2019
KONSULTAN PERENCANA Direncanakan dan Diajukan : Disetujui : PROYEK :
KODE PROYEK / TH PROVINSI
PEKERJAAN REALIGNMENT GEOMETRIK
PT. CIPTA SENDI BANGUNAN GERBANG TOL CIMANGGIS UTAMA 2019 JAWA BARAT
JALAN TOL JAGORAWI - TAHUN 2019
VILA NUSA INDAH 3 BLOK KA.1 NO. 10
BOJONG KULUR, GUNUNG PUTRI, BOGOR LEMBAR NO. TOTAL LEMBAR
Achsan N Okky Irawan Hendri Prabowo Dyah Indra Arianti STANDAR DRAINASE
TELP. 021 – 8273 4950 E-mail : csb_konsultan@yahoo.com
Operator Cad Highway Engineer Team Leader PT. Jasamarga Tollroad Maintenance SALURAN SAMPING MAIN ROAD G.01 04
GM Maintenance Management Administration
KONSULTAN PERENCANA Direncanakan dan Diajukan : Disetujui : PROYEK :
KODE PROYEK / TH PROVINSI
PEKERJAAN REALIGNMENT GEOMETRIK
PT. CIPTA SENDI BANGUNAN GERBANG TOL CIMANGGIS UTAMA 2019 JAWA BARAT
JALAN TOL JAGORAWI - TAHUN 2019
VILA NUSA INDAH 3 BLOK KA.1 NO. 10

K
LEMBAR NO. TOTAL LEMBAR

DEPO
BOJONG KULUR, GUNUNG PUTRI, BOGOR Achsan N Okky Irawan Hendri Prabowo Dyah Indra Arianti
TELP. 021 – 8273 4950 E-mail : csb_konsultan@yahoo.com PLAN DRAINASE MAINROAD
Operator Cad Highway Engineer Team Leader PT. Jasamarga Tollroad Maintenance G.02 04
GM Maintenance Management Administration STA. 18+100 ~ STA.18+800
KEY PLAN

UNG
ANGG
: PELEBARAN

U
WIN
PATOK
LEU FO

9291200 Y

9290800 Y
PATOK PATOK
PATOK
JALAN
FO FO
FO

710000 X

GARIS IMPIT STA.18+800


GARIS IM

DS-4 DS-4 DS-4 DS-4 DS-4 DS-4 DS-4 DS-4 DS-4


DS-4 DS-4
DS-4
PIT STA.18

DV-1
+100

DS-3
K

PATOK BM.1B
PO

BM.1A
FO 709920.200
DE

47.932 9291305.791
X = 7099 77.893
6.259
NG

Y = 929140 .918
Z= 77
GU
NG
NA
WI
EU
NL
LA
JA

DS-4 DS-4

DV-1 DS-4

MANHOLE

ELEVASI
EXISTING

ELEVASI
DASAR
SALURAN

SUPER
ELEVATION

DIAGRAM
LENGKUNG

STATION
KONSULTAN PERENCANA Direncanakan dan Diajukan : Disetujui : PROYEK :
KODE PROYEK / TH PROVINSI
PEKERJAAN REALIGNMENT GEOMETRIK
PT. CIPTA SENDI BANGUNAN GERBANG TOL CIMANGGIS UTAMA 2019 JAWA BARAT
JALAN TOL JAGORAWI - TAHUN 2019
VILA NUSA INDAH 3 BLOK KA.1 NO. 10
BOJONG KULUR, GUNUNG PUTRI, BOGOR LEMBAR NO. TOTAL LEMBAR
Achsan N Okky Irawan Hendri Prabowo Dyah Indra Arianti POTONGAN MELINTANG DRAINASE
TELP. 021 – 8273 4950 E-mail : csb_konsultan@yahoo.com
Operator Cad Highway Engineer Team Leader PT. Jasamarga Tollroad Maintenance
MAIN ROAD G.03 04
GM Maintenance Management Administration

JAKARTA BOGOR
KONSULTAN PERENCANA Direncanakan dan Diajukan : Disetujui : PROYEK :
KODE PROYEK / TH PROVINSI
PEKERJAAN REALIGNMENT GEOMETRIK
PT. CIPTA SENDI BANGUNAN GERBANG TOL CIMANGGIS UTAMA 2019 JAWA BARAT
JALAN TOL JAGORAWI - TAHUN 2019
VILA NUSA INDAH 3 BLOK KA.1 NO. 10
BOJONG KULUR, GUNUNG PUTRI, BOGOR LEMBAR NO. TOTAL LEMBAR
Achsan N Okky Irawan Hendri Prabowo Dyah Indra Arianti DETAIL DRAINASE
TELP. 021 – 8273 4950 E-mail : csb_konsultan@yahoo.com
Operator Cad Highway Engineer Team Leader PT. Jasamarga Tollroad Maintenance SALURAN PELUNCUR MAIN ROAD G.04 04
GM Maintenance Management Administration

POTONGAN A-A

TAMPAK DEPAN

(DV - 1)
POTONGAN B - B

A B Panjang (L) TINGGI POSISI


No Station
X Y Z X Y Z (m) (M)

Anda mungkin juga menyukai