Jbt. Perawang
KE PERAWANG
KE SIAK
Sp. Tualang
Sp. Pemda 1 2 3 4
Sp. Minas
KE DURI KE PEKANBARU
Keterangan :
: Rencana Berkala
EXISTING
7,00 M’
Aspal lama
CL
SEBELUM DIKERJAKAN
RENCANA PENANGANAN
A SETELAH DIKERJAKAN
Keterangan :
Potongan A – A :
AC - WC ( T = 4 cm )
CAP (T = 6 cm)
Agg. Kelas A Minor ( T = 20 – 25 Cm )
EXISTING
7,00 M’
Aspal lama
CL
SEBELUM DIKERJAKAN
RENCANA PENANGANAN
1 - 1.5 M’
7,00 M’ 1 - 1.5 M’
CL
A Timbunan Pilihan
2%
4%
A
SETELAH DIKERJAKAN
Keterangan :
Potongan A – A :
AC - WC ( T = 4 cm )
AC – BC ( T = 6 cm )
Agg. Klas A ( T = 15 cm )
Agg. Klas B ( T = 20 - 25 cm)
EXISTING :
7,00 M’
CL Aspal lama
SEBELUM DIKERJAKAN
RENCANA PENANGANAN
7,00 M’
CL
A
A
SETELAH DIKERJAKAN
Keterangan :
Potongan A – A :
C A P (T = 6 cm)
Agg Kelas A Minor ( T = 20 – 25 Cm)
EXISTING
7,00 M’
Aspal lama
CL
SEBELUM DIKERJAKAN
RENCANA PENANGANAN
1 - 1.5 M’
7,00 M’ 1 - 1.5 M’
CL
A Timbunan Pilihan
2%
4%
A
SETELAH DIKERJAKAN
Keterangan :
Potongan A – A :
AC - WC ( T = 4 cm )
AC – BC ( T = 6 cm )
Agg. Klas A ( T = 15 – 20 cm )