4 Mobilisasi dan Demobilisasi ls 1,00 2.000.000,00 2.000.000,00 1,00 2.000.000,00 2.000.000,00 Arah Pondok 1,00 62,00
5 Uji Mutu Paving Block ls 1,00 1.000.000,00 1.000.000,00 1,00 1.000.000,00 1.000.000,00 Samping Sekolah 1,00 23,00
Sub Total I 8.378.400,00 8.378.400,00
II PEKERJAAN KONSTRUKSI PAVING BLOCK
1 Pek. Lapis Pondasi dengan Agregat A m3 14,51 403.100,00 5.848.981,00 14,51 403.100,00 5.848.981,00 Kanstin 444,40 m'
2 Pek. Kanstin Abu-abu 10x20x40 m' 400,01 74.500,00 29.800.745,00 444,40 74.500,00 33.107.800,00 Paving 464,94 m2
4 Pek. Paving Blok K-300 T = 8CM m2 477,20 269.600,00 128.653.120,00 464,94 269.600,00 125.346.476,00
Sub Total II 164.302.846,00 164.303.257,00
JUMLAH ( A + B ) 172.681.246,00 172.681.657,00
PPN 10 % 17.268.124,60 17.268.165,70
TOTAL 189.949.370,60 189.949.822,70
DIBULATKAN : 189.949.000,00 189.949.000,00