203,065,000
250,425,000
WC Volume Harga Satuan Jumlah
1. Pondasi
Batu Kali 1 600,000 600,000
Pasir 1 600,000 600,000
Timbunan 4 450,000 1,800,000
Semen 5 65,000 325,000
2. Slop, Tiang dan Dinding
Papan Mal 1/2 Kubik 1,700,000 850,000
Besi Tiang 15 80,000 1,200,000
Besi Behel 50 Batang 25,000 1,250,000
Kerikil Cor 1 ret 550,000 550,000
Semen 100 Sak 65,000 6,500,000
Batu Merah 5000 biji 700 3,500,000
A Plus 2 sak 65,000 130,000
Besi Plat 50 Batang 48,000 2,400,000
Besi Slop 6 Batang 55,000 330,000
Kawat 5 Kg 15,000 75,000
6. Lantai
Tehel Lantai 18 dos 75,000 1,350,000
Tehel Dinding 32 dos 75,000 2,400,000
5. Kusen dan
Pintu Aluminium 4 Set 700,000 2,800,000
kloset toto 4 Buah 250,000 1,000,000
Kerang air 8 buah 25,000 200,000
Pipa 5 batang 20,000 100,000
paralon 4 batang 70,000 280,000
sambungan pipa 10 buah 5,000 50,000
Ember 4 buah 100,000 400,000
Gayung 4 buah 25,000 100,000
Pentilasi angin 12 buah 15,000 180,000
5.Bak Spiting
Semen 5 sak 65,000 325,000
Batako 200 buah 3,000 600,000
Besi 5 batang 48,000 240,000
6. Gentong Air 2 2,500,000 5,000,000
7. Mesin Air 1 1,300,000 1,300,000
8. Instalasi
Boklam + pitting 5 buah 105,000 525,000
9. cat 1 Ember 400,000 400,000
Ongkos Tukang 10,000,000 10,000,000
47,360,000
A Plus 65,000
Balok 5 x 10 3,000,000
Batu Kali 600,000
Batu Merah
baut 15 61,000
Besi Behel 21,000
Besi Pengaman/Rantai Besi 250,000
Besi 10x12 54,000
Besi 12x12 70,000
Boklam Philips 8 watt 28,500
Pitting 4,500
cat
Daun Jendela 250,000
Daun Pintu 250,000
Ember cor 9,500
Jendela
Kabel 350,000
Kawat 13,000
Kerikil Cor
kuas biasa
kuas roll
les plan 30 cm x 4 m 103,000
Paku 10 15,000
paku 5 12,000
paku 7 12,000
Paku seng 5 cm Dos sedang 35,000
Papan Mal
Pasir
Pentilasi Angin
Pintu
Semen 50 kg 60,500
Seng 8 47,000
Seng 9 53,000
Seng Plat 11,000
Tehel
Timbunan
Saklar 15,000
Gentong Air
Mesin Air
Gayung
Ember
A. Pekerjaan Pendahuluan
F. Pekerjaan Pengecetan
G. Pekerjaan Instalasi Listrik
H. Pekerjaan Sanitair