BUDGET ESTIMATE
Project : Aselih Town House
Cluster Unit Type 60/80 Lokasi : Jl. Aselih
BUDGET ESTIMATE
NO ITEM DESCRIPTION
VOL UNIT UNIT PRICE AMOUNT
I PEKERJAAN PERSIAPAN
1 Pekerjaan pembersihan site 1.0 ls Rp 3,000,000 Rp 3,000,000
2 K3 1.0 ls Rp 1,000,000 Rp 1,000,000
3 Proteksi area kerja 1.0 ls Rp 1,000,000 Rp 1,000,000
4 Mobilisasi demobilisasi 1.0 ls Rp 2,000,000 Rp 2,000,000
5 Kebersihan proyek 1.0 ls Rp 1,200,000 Rp 1,200,000
6 Pembuangan puing eks.bongkaran 1.0 ls Rp 1,400,000 Rp 1,400,000
SUBTOTAL Rp 9,600,000
IV PEKERJAAN DINDING
1 Pek. Pemasangan Dinding 1/2 Bata Ringan / Hebel 215.0 m² Rp 210,000 Rp 45,150,000
2 Pek. Plester Aci dinding, campuran 1:4 385.0 m² Rp 60,000 Rp 23,100,000
3 Pek. Dinding Bata Exposed 10.0 m² Rp 300,000 Rp 3,000,000
4 Pek. Keramik Dinding Kamar Mandi 45.0 m² Rp 320,000 Rp 14,400,000
SUBTOTAL Rp 85,650,000
V PEKERJAAN LANTAI
1 Pek. Cor lantai beton 1 : 3 : 5, 12 cm 9.6 m3 Rp 1,950,000 Rp 18,720,000
2 Pek. Pemasangan Lantai Granit 60 x 60 75.0 m² Rp 400,000 Rp 30,000,000
3 Pek. Pemasangan Lantai Kamar Mandi 30 x 30 12.0 m² Rp 300,000 Rp 3,600,000
4 Pek. Paving Block Car Port 18.0 m² Rp 250,000 Rp 4,500,000
5 Pek. Pemasangan Lantai Granit 60 x 60 Tangga 7.0 m² Rp 400,000 Rp 2,800,000
SUBTOTAL Rp 59,620,000
VI PEKERJAAN PLAFON
1 Gypsum plafond 80.0 m² Rp 210,000 Rp 16,800,000
ex. Jayaboard, rangka hollow, U channel keliling
2 Cat plafond 80.0 m² Rp 35,000 Rp 2,800,000
ex. Vinilex White 300
SUBTOTAL Rp 19,600,000
BUDGET ESTIMATE
NO ITEM DESCRIPTION
VOL UNIT UNIT PRICE AMOUNT
IX PEKERJAAN SANITARY
1 Kloset Duduk + Jet Washer 3.0 un Rp 2,100,000 Rp 6,300,000
2 Wall Hung Wastafel + faucet 2.0 un Rp 1,200,000 Rp 2,400,000
3 Shower Set 2.0 un Rp 900,000 Rp 1,800,000
4 Floor Drain 4.0 un Rp 300,000 Rp 1,200,000
5 Pek. Instalasi Air Bersih 1.0 ls Rp 3,000,000 Rp 3,000,000
6 Pek. Instalasi Air Kotor 1.0 ls Rp 3,000,000 Rp 3,000,000
7 Pek. Sumur Bor + Pompa 25.0 m Rp 350,000 Rp 8,750,000
8 Septic Tank 1.0 un Rp 1,500,000 Rp 1,500,000
SUBTOTAL Rp 27,950,000
X PEKERJAAN LAIN-LAIN
1 Railing Tangga 18.0 m' Rp 500,000 Rp 9,000,000
2 Railing Balkon Kamar Utama 4.0 m' Rp 800,000 Rp 3,200,000
3 Pekerjaan Rangka Atap + Aluminium Foil 80.0 m² Rp 250,000 Rp 20,000,000
4 Pekerjaan Penutup Atap 80.0 m² Rp 300,000 Rp 24,000,000
SUBTOTAL Rp 56,200,000
TOTAL Rp 403,701,800