RENCANA ANGGARAN BIAYA PROYEK RUMAH TINGGAL

TIPE : 36 M2
LUAS TANAH : 72 M2
LOKASI : Dsn. Candi, Desa Tunggulwulung, Kec. Pandaan

NO URAIAN PEKERJAAN VOL SAT. HARGA SAT.

II PEKERJAAN PERSIAPAN
1
1 Pembersihan Lokasi 0.96 ls Rp 500,000.00
2 Uizet dan Bowplank 18.83 m1 Rp 25,000.00

II PEKERJAAN TANAH
1 Galian tanah pondasi batu kali
1 Galian tanah pondasi batu kali 11.58 m3 Rp 55,000.00
2 Galian rollag 0.48 m3 Rp 55,000.00
3 Galian perpipaan 4.20 m3 Rp 55,000.00
4 Urug tanah kembali 2.89 m3 Rp 55,000.00
5 Urug pasir pondasi 2.75 m3 Rp 150,000.00
6 Urug pasir lantai 2.14 m3 Rp 150,000.00

III PEKERJAAN PASANGAN


1 Pasangan anstamping
1 Pasangan Astamping 2.93 m3 Rp 400,000.00
2 Pasangan pondasi batu 10.60 m3 Rp 550,000.00
3 Pasangan pondasi rollag 10.89 m1 Rp 25,000.00
4 Pasangan bata ringan 12.41 m2 Rp 850,000.00
5 Patlah lantai 42.76 m2 Rp 25,000.00

IV PEKERJAAN BETON
1 Sloof 15/20
1 Sloof 15/20 37.32 m1 Rp 90,000.00
2 Kolom praktis 15/15 42.76 m1 Rp 90,000.00
3 kolom gewel 15/15 3.88 m1 Rp 90,000.00
4 Ring balok 15/20 27.99 m1 Rp 90,000.00
5 Ring balok gewel 15/20 16.33 m1 Rp 90,000.00
6 Kolom teras 15/20 4.66 m1 Rp 90,000.00
7 Dag teras 0.19 m3 Rp 3,220,000.00

V PEKERJAAN PLESTER
1 Plesteran tasram + Acian 1:4
1 Plesteran tasram + Acian 1:4 9.32 m2 Rp 36,000.00
2 Plesteran dinding + gewel + Acian 1: 8 93.30 m2 Rp 65,000.00
3 Plesteran dak beton + Acian 7.78 m2 Rp 35,000.00
4 Benangan sudut 46.65 m1 Rp 35,000.00

VI PEKERJAAN KERAMIK / GRANIT


1 Keramik 40X40 Utama
1 Keramik 40x40 Utama 29.16 m2 Rp 140,000.00
2 Keramik 20X40 Teras 1.95 m2 Rp 270,000.00
3 Keramik 20X40 dinding KM 3.06 m2 Rp 95,000.00
4 Keramik 20X20 lantai KM 1.75 m2 Rp 95,000.00

VII PEKERJAAN PINTU DAN JENDELA


1 Daun Pintu panil kayu Keras
1 Daun Pintu Panil kayu keras 1.00 bh Rp 850,000.00
2 Daun Pintu P1 double tripleks 2.00 bh Rp 600,000.00
3 Daun Pintu KM PVC fabrikasi 1.00 bh Rp 230,000.00
4 Daun Jendela Almunium + Kaca 5.00 bh Rp 550,000.00
5 Kaca bening 5 mm 4.51 m2 Rp 212,500.00
6 Lubang Angin 4.00 bh Rp 15,000.00
7 Kusen 56.00 bh Rp 75,000.00

VIII PEKERJAAN ATAP DAN PLAFOND


1 Rangka kuda-kuda, Usuk Galvalum
1 Rangka kuda-kuda, Usuk galvalum 37.58 m2 Rp 138,000.00
2 Genteng Beton 37.58 m2 Rp 75,000.00
3 Lisplang 12.63 m1 Rp 70,000.00
4 Bubungan 5.96 m1 Rp 75,000.00
5 Rangka Plafon hollow gavalum + gypsum board 31.10 m2 Rp 60,000.00

IX PEKERJAAN INSTALASI LISTRIK


1 Instalasi Titik Lampu
1 Instalasi titi lampu 6.00 ttk Rp 110,000.00
2 Instalasi titik stop kontak 6.00 ttk Rp 110,000.00
3 Pasang ground 1.00 ttk Rp 110,000.00
4 MCB 1.00 ttk Rp 172,500.00
5 Pasang Daya 1300 Watt 1.00 ttk

X PEKERJAAN CAT
1 Plamir dinding dan plafon
1 Plamir dinding dan plafon 104.33 m2 Rp 20,000.00
2 Can dinding exterior propan 13.61 m2 Rp 35,000.00
3 Cat dinding interior ecomulsion 79.70 m2 Rp 25,000.00
4 Cat lispang ex Emco 3.38 m2 Rp 50,000.00
5 Cat plafon ex ecomulsion 27.99 m2 Rp 30,000.00
6 Pelitur daun pintu dan jendela Mowilex 27.99 m2 Rp 45,000.00

XI PEKERJAAN INSTALASI AIR


1 Saluran 4" air kotor
1 Saluran 4" air kotor 7.78 m1 Rp 110,000.00
2 Saluran 3" air kotor 6.22 m1 Rp 110,000.00
3 Saluran 3/4 PDAM 5.05 m1 Rp 90,000.00
4 Closed Jongkok 1.00 bh Rp 110,000.00
5 Kran tembok 233-117 2.00 bh Rp 55,000.00
6 Avour kamar mandi Sargot alinco 1985 1.00 bh Rp 27,500.00
7 Septictank dan resapan 1.00 bh Rp 1,035,000.00
8 Bak kontrol 1.00 bh Rp 172,500.00
9 Pasang Meter PDAM/Sumur 1.00 bh Rp 2,500,000.00

XII PEKERJAAN PENGAMAN


1 Engsel pintu
1 Engsel pintu 5.00 bh Rp 125,000.00
2 Engsel jendela 5.00 bh Rp 75,000.00
3 Grendel tanam pintu 2.00 bh Rp 75,000.00
4 Grendel jendela 5.00 bh Rp 55,000.00
5 Hak angin 5.00 bh Rp 25,000.00
6 Kunci pintu single swing 4.00 set Rp 175,000.00

XIII PEKERJAAN TAMAN 5.75 m2 Rp 250,000.00

XIV PEKERJAAN CARPORT 8.46 m2 Rp 70,000.00

XV PAGAR BELAKANG 9.07 m2 Rp 260,000.00

XVI FINISHING 0.63 ls Rp 1,750,000.00

TOTAL
Harga /M2
JUMLAH

Rp 480,000.00
Rp 470,750.00
Rp 950,750.00

Rp 636,900.00
Rp 26,400.00
Rp 231,000.00
Rp 158,950.00
Rp 412,500.00
Rp 321,000.00
Rp 1,786,750.00

Rp 1,172,000.00
Rp 5,830,000.00
Rp 272,250.00
Rp 10,548,500.00
Rp 1,069,000.00
Rp 18,891,750.00

Rp 3,358,800.00
Rp 3,848,400.00
Rp 349,200.00
Rp 2,519,100.00
Rp 1,469,700.00
Rp 419,400.00
Rp 611,800.00
Rp 12,576,400.00

Rp 335,520.00
Rp 6,064,500.00
Rp 272,300.00
Rp 1,632,750.00
Rp 8,305,070.00

Rp 4,082,400.00
Rp 526,500.00
Rp 290,700.00
Rp 166,250.00
Rp 5,065,850.00

Rp 850,000.00
Rp 1,200,000.00
Rp 230,000.00
Rp 2,750,000.00
Rp 958,375.00
Rp 60,000.00
Rp 4,200,000.00
Rp 10,248,375.00

Rp 5,186,040.00
Rp 2,818,500.00
Rp 884,100.00
Rp 447,000.00
Rp 1,866,000.00

Rp 11,201,640.00

Rp 660,000.00
Rp 660,000.00
Rp 110,000.00
Rp 172,500.00

Rp 1,602,500.00

Rp 2,086,600.00
Rp 476,350.00
Rp 1,992,500.00
Rp 169,000.00
Rp 839,700.00
Rp 1,259,550.00
Rp 6,823,700.00

Rp 855,800.00
Rp 684,200.00
Rp 454,500.00
Rp 110,000.00
Rp 110,000.00
Rp 27,500.00
Rp 1,035,000.00
Rp 172,500.00
Rp 2,500,000.00
Rp 5,949,500.00

Rp 625,000.00
Rp 375,000.00
Rp 150,000.00
Rp 275,000.00
Rp 125,000.00
Rp 700,000.00
Rp 2,250,000.00

Rp 1,437,500.00

Rp 592,200.00

Rp 2,358,200.00

Rp 1,102,500.00

Rp 91,142,685.00
Rp 2,531,741.25
RENCANA ANGGARAN BIAYA PROYEK RUMAH TINGGAL
TIPE : 36 M2
LUAS TANAH : 72 M2
LOKASI : Dsn. Candi, Desa Tunggulwulung, Kec. Pandaan
Tanggal 1 Durasi Rencana Actual Start % Complete Actual (beyond plan) % Complete (beyond plan)

RENCANA DURASI REALISASI DURASI PROGRESS DURASI


NO URAIAN PEKERJAAN NOMINAL BOBOT MULAI RENCANA MULAI REALISASI REALISASI
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 48 49 50 51 52 53 54 55 56 57 58 59 60
I PEKERJAAN PERSIAPAN
1 Pembersihan Lokasi Rp 480,000.00 0.527% 1 6 1 6 100%
2 Uizet dan Bowplank Rp 470,750.00 0.516% 2 4 2 5 35%
II PEKERJAAN TANAH
1 Galian tanah pondasi batu kali Rp 636,900.00 0.699% 4 2 4 8 85%
2 Galian rollag Rp 26,400.00 0.029% 4 3 4 6 85%
3 Galian perpipaan Rp 231,000.00 0.253% 5 4 5 3 50%
4 Urug tanah kembali Rp 158,950.00 0.174% 5 2 5 5 60%
5 Urug pasir pondasi Rp 412,500.00 0.453% 5 2 5 6 75%
6 Urug pasir lantai Rp 321,000.00 0.352% 6 5 6 7 100%
III PEKERJAAN PASANGAN
1 Pasangan Astamping Rp 1,172,000.00 1.286% 9 3 9 3 0%
2 Pasangan pondasi batu Rp 5,830,000.00 6.397% 9 6 9 7 50%
3 Pasangan pondasi rollag Rp 272,250.00 0.299% 9 3 9 1 0%
4 Pasangan bata ringan Rp 10,548,500.00 11.574% 9 4 8 5 1%
5 Patlah lantai Rp 1,069,000.00 1.173% 10 5 10 3 80%
IV PEKERJAAN BETON
1 Sloof 15/20 Rp 3,358,800.00 3.685% 12 6 12 7 0%
2 Kolom praktis 15/15 Rp 3,848,400.00 4.222% 12 1 12 5 0%
3 kolom gewel 15/15 Rp 349,200.00 0.383% 14 5 14 6 0%
4 Ring balok 15/20 Rp 2,519,100.00 2.764% 14 8 14 2 44%
5 Ring balok gewel 15/20 Rp 1,469,700.00 1.613% 14 7 14 3 0%
6 Kolom teras 15/20 Rp 419,400.00 0.460% 15 4 15 8 12%
7 Dag teras Rp 611,800.00 0.671% 15 5 15 3 5%
V PEKERJAAN PLESTER
1 Plesteran tasram + Acian 1:4 Rp 335,520.00 0.368% 16 28 16 30 50%
2 Plesteran dinding + gewel + Acian 1: 8 Rp 6,064,500.00 6.654% 16 28 16 30 50%
3 Plesteran dak beton + Acian Rp 272,300.00 0.299% 16 28 16 30 50%
4 Benangan sudut Rp 1,632,750.00 1.791% 16 28 16 30 50%
VI PEKERJAAN KERAMIK / GRANIT
1 Keramik 40x40 Utama Rp 4,082,400.00 4.479% 16 28 16 30 50%
2 Keramik 20X40 Teras Rp 526,500.00 0.578% 16 28 16 30 50%
3 Keramik 20X40 dinding KM Rp 290,700.00 0.319% 16 28 16 30 50%
4 Keramik 20X20 lantai KM Rp 166,250.00 0.182% 16 28 16 30 50%
VII PEKERJAAN PINTU DAN JENDELA
1 Daun Pintu Panil kayu keras Rp 850,000.00 0.933% 16 28 16 30 50%
2 Daun Pintu P1 double tripleks Rp 1,200,000.00 1.317% 16 28 16 30 50%
3 Daun Pintu KM PVC fabrikasi Rp 230,000.00 0.252% 16 28 16 30 50%
4 Daun Jendela Almunium + Kaca Rp 2,750,000.00 3.017% 16 28 16 30 50%
5 Kaca bening 5 mm Rp 958,375.00 1.052% 16 28 16 30 50%
6 Lubang Angin Rp 60,000.00 0.066% 16 28 16 30 50%
7 Kusen Rp 4,200,000.00 4.608% 16 28 16 30 50%
VIII PEKERJAAN ATAP DAN PLAFOND
1 Rangka kuda-kuda, Usuk galvalum Rp 5,186,040.00 5.690% 16 28 16 30 50%
2 Genteng Beton Rp 2,818,500.00 3.092% 16 28 16 30 50%
3 Lisplang Rp 884,100.00 0.970% 16 28 16 30 50%
4 Bubungan Rp 447,000.00 0.490% 16 28 16 30 50%
5 Rangka Plafon hollow gavalum + gypsum board
Rp 1,866,000.00 2.047% 50%
16 28 16 30
IX PEKERJAAN INSTALASI LISTRIK
1 Instalasi titi lampu Rp 660,000.00 0.724% 16 28 16 30 50%
2 Instalasi titik stop kontak Rp 660,000.00 0.724% 16 28 16 30 50%
3 Pasang ground Rp 110,000.00 0.121% 16 28 16 30 50%
4 MCB Rp 172,500.00 0.189% 16 28 16 30 50%
X PEKERJAAN CAT
1 Plamir dinding dan plafon Rp 2,086,600.00 2.289% 16 28 16 30 50%
2 Can dinding exterior propan Rp 476,350.00 0.523% 16 28 16 30 50%
3 Cat dinding interior ecomulsion Rp 1,992,500.00 2.186% 16 28 16 30 50%
4 Cat lispang ex Emco Rp 169,000.00 0.185% 16 28 16 30 50%
5 Cat plafon ex ecomulsion Rp 839,700.00 0.921% 16 28 16 30 50%
6 Pelitur daun pintu dan jendela Mowilex Rp 1,259,550.00 1.382% 16 28 16 30 50%
XI PEKERJAAN INSTALASI AIR
1 Saluran 4" air kotor Rp 855,800.00 0.939% 16 28 16 30 50%
2 Saluran 3" air kotor Rp 684,200.00 0.751% 16 28 16 30 50%
3 Saluran 3/4 PDAM Rp 454,500.00 0.499% 16 28 16 30 50%
4 Closed Jongkok Rp 110,000.00 0.121% 16 28 16 30 50%
5 Kran tembok 233-117 Rp 110,000.00 0.121% 16 28 16 30 50%
6 Avour kamar mandi Sargot alinco 1985 Rp 27,500.00 0.030% 16 28 16 30 50%
7 Septictank dan resapan Rp 1,035,000.00 1.136% 16 28 16 30 50%
8 Bak kontrol Rp 172,500.00 0.189% 16 28 16 30 50%
Page 7 of 15
RENCANA DURASI REALISASI DURASI PROGRESS DURASI
NO URAIAN PEKERJAAN NOMINAL BOBOT MULAI RENCANA MULAI REALISASI REALISASI
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 48 49 50 51 52 53 54 55 56 57 58 59 60
9 Pasang Meter PDAM/Sumur Rp 2,500,000.00 2.743% 16 28 16 30 50%
XII PEKERJAAN PENGAMAN
1 Engsel pintu Rp 625,000.00 0.686% 16 28 16 30 50%
2 Engsel jendela Rp 375,000.00 0.411% 16 28 16 30 50%
3 Grendel tanam pintu Rp 150,000.00 0.165% 16 28 16 30 50%
4 Grendel jendela Rp 275,000.00 0.302% 16 28 16 30 50%
5 Hak angin Rp 125,000.00 0.137% 16 28 16 30 50%
6 Kunci pintu single swing Rp 700,000.00 0.768% 16 28 16 30 50%
XIII PEKERJAAN TAMAN Rp 1,437,500.00 1.577% 16 28 16 30 50%
XIV PEKERJAAN CARPORT Rp 592,200.00 0.650% 16 28 16 30 50%
XV PAGAR BELAKANG Rp 2,358,200.00 2.587% 16 28 16 30 50%
XVI FINISHING Rp 1,102,500.00 1.210% 16 28 16 30 50%
TOTAL Rp 91,142,685.00 100.000%
PROGRESS RENCANA 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
KUMULATIVE PROGRESS RENCANA 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
PROGRESS AKTUAL
KUMULATIVE PROGRESS AKTUAL

Page 8 of 15
LAPORAN MINGGUAN KEMAJUAN PEKERJAAN

Proyek : RUMAH CANDI


Customer/ No : s/d lalu saat ini s/d saat ini
Minggu ke : Master Schedule *)
Periode : Realisasi
Hari ke : Deviasi

BOBOT Prosentase Kemajuan Pekerjaan Bobot Kemajuan Pekerjaan


NO URAIAN PEKERJAAN NOMINAL
(%) s/d lalu saat ini s/d saat ini s/d lalu saat ini s/d saat ini

I PEKERJAAN PERSIAPAN
1 Pembersihan Lokasi Rp 480,000 0.527%
2 Uizet dan Bowplank Rp 470,750 0.516%
II PEKERJAAN TANAH
1 Galian tanah pondasi batu kali Rp 636,900 0.699%
2 Galian rollag Rp 26,400 0.029%
3 Galian perpipaan Rp 231,000 0.253%
4 Urug tanah kembali Rp 158,950 0.174%
5 Urug pasir pondasi Rp 412,500 0.453%
6 Urug pasir lantai Rp 321,000 0.352%
III PEKERJAAN PASANGAN
1 Pasangan Astamping Rp 1,172,000 1.286%
2 Pasangan pondasi batu Rp 5,830,000 6.397%
3 Pasangan pondasi rollag Rp 272,250 0.299%
4 Pasangan bata ringan Rp 10,548,500 11.574%
5 Patlah lantai Rp 1,069,000 1.173%
IV PEKERJAAN BETON
1 Sloof 15/20 Rp 3,358,800 3.685%
2 Kolom praktis 15/15 Rp 3,848,400 4.222%
3 kolom gewel 15/15 Rp 349,200 0.383%
4 Ring balok 15/20 Rp 2,519,100 2.764%
5 Ring balok gewel 15/20 Rp 1,469,700 1.613%
6 Kolom teras 15/20 Rp 419,400 0.460%
7 Dag teras Rp 611,800 0.671%
V PEKERJAAN PLESTER
1 Plesteran tasram + Acian 1:4 Rp 335,520 0.368%
2 Plesteran dinding + gewel + Acian 1: 8 Rp 6,064,500 6.654%
3 Plesteran dak beton + Acian Rp 272,300 0.299%
4 Benangan sudut Rp 1,632,750 1.791%
VI PEKERJAAN KERAMIK / GRANIT
1 Keramik 40x40 Utama Rp 4,082,400 4.479%
2 Keramik 20X40 Teras Rp 526,500 0.578%
3 Keramik 20X40 dinding KM Rp 290,700 0.319%
4 Keramik 20X20 lantai KM Rp 166,250 0.182%
VII PEKERJAAN PINTU DAN JENDELA
1 Daun Pintu Panil kayu keras Rp 850,000 0.933%
2 Daun Pintu P1 double tripleks Rp 1,200,000 1.317%
3 Daun Pintu KM PVC fabrikasi Rp 230,000 0.252%
4 Daun Jendela Almunium + Kaca Rp 2,750,000 3.017%
5 Kaca bening 5 mm Rp 958,375 1.052%
6 Lubang Angin Rp 60,000 0.066%
7 Kusen Rp 4,200,000 4.608%
VIII PEKERJAAN ATAP DAN PLAFOND
1 Rangka kuda-kuda, Usuk galvalum Rp 5,186,040 5.690%
2 Genteng Beton Rp 2,818,500 3.092%
3 Lisplang Rp 884,100 0.970%
4 Bubungan Rp 447,000 0.490%
5 Rangka Plafon hollow gavalum + gypsum board Rp 1,866,000 2.047%
IX PEKERJAAN INSTALASI LISTRIK
1 Instalasi titi lampu Rp 660,000 0.724%
2 Instalasi titik stop kontak Rp 660,000 0.724%
3 Pasang ground Rp 110,000 0.121%
4 MCB Rp 172,500 0.189%
X PEKERJAAN CAT
1 Plamir dinding dan plafon Rp 2,086,600 2.289%
2 Can dinding exterior propan Rp 476,350 0.523%
3 Cat dinding interior ecomulsion Rp 1,992,500 2.186%
4 Cat lispang ex Emco Rp 169,000 0.185%
5 Cat plafon ex ecomulsion Rp 839,700 0.921%
6 Pelitur daun pintu dan jendela Mowilex Rp 1,259,550 1.382%
XI PEKERJAAN INSTALASI AIR
1 Saluran 4" air kotor Rp 855,800 0.939%
2 Saluran 3" air kotor Rp 684,200 0.751%
3 Saluran 3/4 PDAM Rp 454,500 0.499%
4 Closed Jongkok Rp 110,000 0.121%
5 Kran tembok 233-117 Rp 110,000 0.121%
6 Avour kamar mandi Sargot alinco 1985 Rp 27,500 0.030%
7 Septictank dan resapan Rp 1,035,000 1.136%
8 Bak kontrol Rp 172,500 0.189%
9 Pasang Meter PDAM/Sumur Rp 2,500,000 2.743%
XII PEKERJAAN PENGAMAN
1 Engsel pintu Rp 625,000 0.686%
2 Engsel jendela Rp 375,000 0.411%
3 Grendel tanam pintu Rp 150,000 0.165%
4 Grendel jendela Rp 275,000 0.302%
5 Hak angin Rp 125,000 0.137%
6 Kunci pintu single swing Rp 700,000 0.768%
XIII PEKERJAAN TAMAN Rp 1,437,500 1.577%
XIV PEKERJAAN CARPORT Rp 592,200 0.650%
XV PAGAR BELAKANG Rp 2,358,200 2.587%
XVI FINISHING Rp 1,102,500 1.210%
T O T A L Rp 91,142,685 100.000% - - -
RENCANA ANGGARAN BIAYA PROYEK RUMAH TINGGAL
TIPE : 36 M2
LUAS TANAH : 72 M2
LOKASI : Dsn. Candi, Desa Tunggulwulung, Kec. Pandaan

NO URAIAN PEKERJAAN VOL SAT. HARGA SAT.

II PEKERJAAN PERSIAPAN
1
1 Pembersihan Lokasi 0.96 ls Rp 500,000.00
2 Uizet dan Bowplank m1 Rp 25,000.00

II PEKERJAAN TANAH
1 Galian tanah pondasi batu kali
1 Galian tanah pondasi batu kali m3 Rp 55,000.00
2 Galian rollag m3 Rp 55,000.00
3 Galian perpipaan m3 Rp 55,000.00
4 Urug tanah kembali m3 Rp 55,000.00
5 Urug pasir pondasi m3 Rp 150,000.00
6 Urug pasir lantai m3 Rp 150,000.00

III PEKERJAAN PASANGAN


1 Pasangan anstamping
1 Pasangan Astamping m3 Rp 400,000.00
2 Pasangan pondasi batu m3 Rp 550,000.00
3 Pasangan pondasi rollag m1 Rp 25,000.00
4 Pasangan bata ringan m2 Rp 850,000.00
5 Patlah lantai m2 Rp 25,000.00

IV PEKERJAAN BETON
1 Sloof 15/20
1 Sloof 15/20 m1 Rp 90,000.00
2 Kolom praktis 15/15 m1 Rp 90,000.00
3 kolom gewel 15/15 m1 Rp 90,000.00
4 Ring balok 15/20 m1 Rp 90,000.00
5 Ring balok gewel 15/20 m1 Rp 90,000.00
6 Kolom teras 15/20 m1 Rp 90,000.00
7 Dag teras m3 Rp 3,220,000.00

V PEKERJAAN PLESTER
1 Plesteran tasram + Acian 1:4
1 Plesteran tasram + Acian 1:4 m2 Rp 36,000.00
2 Plesteran dinding + gewel + Acian 1: 8 m2 Rp 65,000.00
3 Plesteran dak beton + Acian m2 Rp 35,000.00
4 Benangan sudut m1 Rp 35,000.00

VI PEKERJAAN KERAMIK / GRANIT


1 Keramik 40X40 Utama
1 Keramik 40x40 Utama m2 Rp 140,000.00
2 Keramik 20X40 Teras m2 Rp 270,000.00
3 Keramik 20X40 dinding KM m2 Rp 95,000.00
4 Keramik 20X20 lantai KM m2 Rp 95,000.00

VII PEKERJAAN PINTU DAN JENDELA


1 Daun Pintu panil kayu Keras
1 Daun Pintu Panil kayu keras bh Rp 850,000.00
2 Daun Pintu P1 double tripleks bh Rp 600,000.00
3 Daun Pintu KM PVC fabrikasi bh Rp 230,000.00
4 Daun Jendela Almunium + Kaca bh Rp 550,000.00
5 Kaca bening 5 mm m2 Rp 212,500.00
6 Lubang Angin bh Rp 15,000.00
7 Kusen bh Rp 75,000.00

VIII PEKERJAAN ATAP DAN PLAFOND


1 Rangka kuda-kuda, Usuk Galvalum
1 Rangka kuda-kuda, Usuk galvalum m2 Rp 138,000.00
2 Genteng Beton m2 Rp 75,000.00
3 Lisplang m1 Rp 70,000.00
4 Bubungan m1 Rp 75,000.00
5 Rangka Plafon hollow gavalum + gypsum board m2 Rp 60,000.00

IX PEKERJAAN INSTALASI LISTRIK


1 Instalasi Titik Lampu
1 Instalasi titi lampu ttk Rp 110,000.00
2 Instalasi titik stop kontak ttk Rp 110,000.00
3 Pasang ground ttk Rp 110,000.00
4 MCB ttk Rp 172,500.00
5 Pasang Daya 1300 Watt ttk

X PEKERJAAN CAT
1 Plamir dinding dan plafon
1 Plamir dinding dan plafon m2 Rp 20,000.00
2 Can dinding exterior propan m2 Rp 35,000.00
3 Cat dinding interior ecomulsion m2 Rp 25,000.00
4 Cat lispang ex Emco m2 Rp 50,000.00
5 Cat plafon ex ecomulsion m2 Rp 30,000.00
6 Pelitur daun pintu dan jendela Mowilex m2 Rp 45,000.00

XI PEKERJAAN INSTALASI AIR


1 Saluran 4" air kotor
1 Saluran 4" air kotor m1 Rp 110,000.00
2 Saluran 3" air kotor m1 Rp 110,000.00
3 Saluran 3/4 PDAM m1 Rp 90,000.00
4 Closed Jongkok bh Rp 110,000.00
5 Kran tembok 233-117 bh Rp 55,000.00
6 Avour kamar mandi Sargot alinco 1985 bh Rp 27,500.00
7 Septictank dan resapan bh Rp 1,035,000.00
8 Bak kontrol bh Rp 172,500.00
9 Pasang Meter PDAM/Sumur bh Rp 2,500,000.00

XII PEKERJAAN PENGAMAN


1 Engsel pintu
1 Engsel pintu bh Rp 125,000.00
2 Engsel jendela bh Rp 75,000.00
3 Grendel tanam pintu bh Rp 75,000.00
4 Grendel jendela bh Rp 55,000.00
5 Hak angin bh Rp 25,000.00
6 Kunci pintu single swing set Rp 175,000.00

XIII PEKERJAAN TAMAN m2 Rp 250,000.00

XIV PEKERJAAN CARPORT m2 Rp 70,000.00

XV PAGAR BELAKANG m2 Rp 260,000.00

XVI FINISHING ls Rp 1,750,000.00

TOTAL
Harga /M2
JUMLAH

Rp 480,000.00
Rp -
Rp 480,000.00

Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -

Rp -
Rp -
Rp -
Rp -
Rp -
Rp -

Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -

Rp -
Rp -
Rp -
Rp -
Rp -

Rp -
Rp -
Rp -
Rp -
Rp -

Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -

Rp -
Rp -
Rp -
Rp -
Rp -

Rp -

Rp -
Rp -
Rp -
Rp -

Rp -

Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -

Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -

Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -

Rp -

Rp -

Rp -

Rp -

Rp 480,000.00
Rp 13,333.33

Anda mungkin juga menyukai